Portable facility for the manufacture of prefabricated concrete elements for concrete towers Download PDFInfo
- Publication number
- EP2939809B1 EP2939809B1 EP15165971.1A EP15165971A EP2939809B1 EP 2939809 B1 EP2939809 B1 EP 2939809B1 EP 15165971 A EP15165971 A EP 15165971A EP 2939809 B1 EP2939809 B1 EP 2939809B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- concrete
- area
- prefabricated
- elements
- manufacture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004519 manufacturing process Methods 0.000 title claims description 44
- 239000002184 metal Substances 0.000 claims description 27
- 239000000463 material Substances 0.000 claims description 12
- 238000006073 displacement reaction Methods 0.000 claims description 8
- 239000002994 raw material Substances 0.000 claims description 4
- 238000000926 separation method Methods 0.000 claims description 4
- 238000005086 pumping Methods 0.000 claims description 2
- 230000000284 resting effect Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000003344 environmental pollutant Substances 0.000 description 2
- 231100000719 pollutant Toxicity 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/02—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
- E04G13/021—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor for circular columns
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B15/00—General arrangement or layout of plant ; Industrial outlines or plant installations
- B28B15/002—Mobile plants, e.g. on vehicles or on boats
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/02—Moulds with adjustable parts specially for modifying at will the dimensions or form of the moulded article
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/12—Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2230/00—Manufacture
- F05B2230/20—Manufacture essentially without removing material
- F05B2230/21—Manufacture essentially without removing material by casting
Definitions
- the present invention relates to a portable facility for the manufacture of prefabricated concrete elements for concrete towers, which enables a reduction in the time and material employed in the start-up of said facility which enables the execution of the manufacture of the prefabricated concrete elements for concrete towers.
- the object of the invention is a portable facility for prefabricated concrete elements for concrete towers, which enables, at each area of the same, the optimisation of the use of the concrete necessary to withstand the stresses associated with the weight of the elements leaning on said areas, reducing the total surface area of the facility covered by the concrete and the time and resources necessary both for its start-up and its dismantling.
- the towers In order to withstand the associated loads, it is expedient to employ a tower whose base diameter exceeds the maximum dimensions for transport by road; the towers are therefore usually manufactured from concrete voussoirs of transportable dimensions.
- Each voussoir is the result of dividing a tubular segment into several longitudinal segments. Placing several voussoirs adjacent to each other, a tubular segment or section of the tower is formed, where the tower consists of several tower segments thus assembled.
- the voussoirs basically feature a metal structure or framework which confers to the voussoir the properties suited for traction, and another part being concrete, which provides the required structural properties against compression.
- the metal framework in a first stage the metal framework is configured in accordance with the geometric specifications, and said framework is disposed within a mould featuring a base and a countermould for its closure, for the subsequent pouring of the concrete which will be cured, usually by steam, within said mould.
- the forming of the framework is performed on a number of structures which act as patterns for the configuration of the framework of the prefabricated concrete elements, where the structure of a voussoir weighs approximately 10 times less than the total of the voussoir; therefore, the structure on which it is assembled likewise weighs approximately 10 times less than the mould where the formed structure is subsequently disposed.
- Prefabricated modules are usually formed by using steam-curing moulds at a facility specifically prepared to this end, and are then transported by vehicle to site, the location where the tower is assembled and the vertical and horizontal joints between modules are executed.
- the vertical and horizontal joints of a modular tower are critical from the structural point of view, and furthermore determine the time employed in the erection of a tower. For this reason, the number of joints tends to be minimised, making the modules as large as possible, in such a way that road transport once again determines the size of said modules, which are constructed up to 20 m in length and 4 m in width. However, the resulting weight of each module may attain 50 tons, which increases considerably the cost of transporting the prefabricated elements from the location of their manufacture to the site where the tower is erected.
- the Spanish patent ES2371960B1 reveals a portable facility where a concrete slab is disposed on the terrain, and on which the different equipment and materials used rest; this slab is formed directly on the compacted terrain, without anchorage or foundations. However, this slab is formed directly on the terrain and features the same characteristics at all areas of the facility.
- the present invention reveals a portable facility for the manufacture of prefabricated concrete elements for concrete towers which resolves all the aforementioned drawbacks.
- Document JP2000210923A discloses a portable facility for the manufacture of prefabricated concrete elements comprising an apparatus for manufacturing a concrete unit which in turn comprises a form disposed in a form arraying place for arraying a plurality of the forms.
- the present invention relates to a portable facility for the manufacture of prefabricated concrete elements for concrete towers according to claim 1, which comprises a floor where at least one concreting area and at least one area for the configuration of the internal framework for the prefabricated concrete elements are disposed, and where the concreting area comprises at least one mould for the forming of the prefabricated concrete elements.
- the floor further comprises a modular concrete slab disposed on the compacted terrain prior to the installation of the portable facility.
- This modular concrete slab in turn comprises, at the concreting area, at least one concrete module configured to withstand the stresses associated with at least the weight of the mould for the forming of the prefabricated concrete elements and of the respective prefabricated element.
- each concrete module features a sufficient surface area and thickness so that the terrain on which it rests will not give way due to the effect of the weight of the elements resting on the same.
- the facility thus constituted enables the optimisation of the use of concrete at each area, reducing the total surface area of the facility covered by said material, and the time and resources necessary for both its start-up and its dismantling, as the modular concrete slab is disposed only where required by the weight of the components.
- the portable facility may comprise separation areas between the concrete modules of the concreting area comprised of a covering material covering the floor and isolating the internal atmosphere of the facility from pollutants which might be contained in the terrain, e.g. dust, in such a way that there may be concrete-free spaces between the concrete modules.
- pollutants which might be contained in the terrain, e.g. dust, in such a way that there may be concrete-free spaces between the concrete modules.
- the area for the forming of the internal framework of the prefabricated concrete element comprises at least one metal structure acting as a pattern for the forming of the framework of the prefabricated concrete elements.
- the modular concrete slab comprises, at the area for the forming of the framework, at least one concrete module configured to withstand the stresses associated with at least the weight of the metal structure and of the framework of the prefabricated concrete elements.
- an area for the traffic of persons and material-transporting vehicles may be disposed in an area annexed to the concreting area.
- This area for the traffic of persons and material-transporting vehicles comprises either a layer of paving or metal sheets of transportable dimensions, in accordance with the load capability required at said area, or alternatively a layer of low load-bearing capability covering material, to prevent the pollution of the atmosphere of the facility in order not to affect the quality of the prefabricated concrete elements.
- the metal sheets can be re-used at other facilities after the dismantling of the same.
- the portable facility for the manufacture of voussoirs for concrete towers thus constituted enables, at each area of the same, the optimisation of the use of the concrete necessary to withstand the stresses associated with the weight of the elements resting on said areas, reducing the total surface area of the facility covered by the concrete and the time and resources necessary for both its start-up and its dismantling.
- the portable facility for the manufacture of prefabricated concrete elements for concrete towers comprises a floor on which the following are disposed: at least one concreting area (1), a configuration area (2) for the internal framework (12) of the prefabricated concrete elements, and a pedestrian and material-transporting vehicle traffic area (4) disposed in an area annexed to the concreting area (1), preferably between the concreting area (1) and the configuration area (2) for the internal framework (12), where the concreting area (1) comprises at least one mould (5) for the forming of the prefabricated concrete elements.
- the portable facility further comprises a modular concrete slab disposed on the floor, which in turn comprises, at the concreting area (1), several concrete modules (10) configured to withstand the stresses associated at least with the weight of the mould (5) for the forming of the prefabricated concrete elements and of the respective prefabricated concrete element.
- Each mould (5) for the forming of the prefabricated concrete elements may rest on a single concrete module (10), where the concrete module is manufactured in situ, or may rest on several concrete modules (10).
- the portable facility further comprises a structure (7) with a set of pillars (8) and at least one area (3) for the passage of hoists (13) and a support for the structure (7) disposed on the floor, which comprises foundations anchored to the terrain in the region of the pillars (8).
- the configuration area (2) for the internal framework (12) of the prefabricated concrete elements comprises a number of metal structures (not portrayed) which serve as patterns for the forming of the framework of the prefabricated concrete elements.
- the modular concrete slab comprises, at the framework configuration area (2), at least one concrete module (20) configured to withstand the stresses associated at least with the metal structure and the framework of the prefabricated concrete elements.
- each concrete module features a sufficient surface area and thickness so that the terrain on which it rests will not give way due to the effect of the weight of the elements resting on the same.
- the concrete modules (10) of the concreting area (1) are of a greater thickness than the concrete modules (20) of the framework configuration area (2), due to the fact that the weight of the metal structures which serve as patterns for the configuration of the framework, plus that of the framework (2) assembled upon them, is of a lesser order of magnitude than the weight of the moulds (5) and the prefabricated concrete elements; preferably, the concrete modules (10) of the concreting area (1) feature at least double the thickness than the concrete modules (20) of the framework configuration area (2); more preferably, the concrete modules (10) of the concreting area (1) feature a thickness of at least five times the thickness of the concrete modules (20) of the framework configuration area (2).
- the floor comprises a number of supporting modules configured to withstand the stresses associated at least with the metal structure and the framework of the prefabricated concrete elements, and comprising at least one metal element.
- the portable facility comprises a number of separations (9) between concrete modules (10) in the concreting area (1), where said separations (9) are comprised of a covering material (6) covering the floor and isolating the internal atmosphere of the facility from pollutants which might be contained in the terrain, such as dust.
- the area (4) for the traffic of persons and material-transporting vehicles comprises either a layer of paving (40) or metal sheets (not portrayed), or a layer of low load-bearing capability covering material.
- the concrete modules (10) of the concreting area (1) feature a greater thickness than the supporting modules of the metal structures in the framework configuration area (2) due to the fact that the weight of said structures plus that of the framework (2) assembled upon them is of a lesser order of magnitude than the weight of the moulds (5) and the prefabricated concrete elements; preferably, the concrete modules (10) of the concreting area (1) feature at least double the thickness than the supporting modules for the metal structures in the framework configuration area (2); more preferably, the concrete modules (10) of the concreting area (1) feature a thickness of at least five times the thickness of the supporting modules for the metal structures in the framework configuration area (2).
- the portable facility further comprises, external to its structure (7), an area for the stockpiling of completed prefabricated elements and an additional area for the stockpiling of raw materials, with areas for traffic between the two.
- the floor is comprised of a discontinuous slab of concrete, of a thickness suited to its necessary load-bearing capacity, this being greater in the stockpiling area for completed prefabricated concrete elements than in the stockpiling area for raw materials, and comprises platforms for traffic in the transit areas.
- a portable facility with two overhead hoists (13) such as that mentioned above in the case of a facility with 6 concreting stations with their respective moulds (5) and 6 internal framework (12) configuring stations.
- the portable facility further comprises a means for the pouring of concrete into the moulds (5), comprised of concrete mixer trucks (11) from which the concrete is poured directly into the moulds (5). It is for this reason, so that said pouring means may surpass the height of the moulds (5), that the area (4) for the traffic of persons and material-transporting vehicles is elevated with regard to the concreting area (1), either because the moulds (5) are partially sunk, as may be seen in Figure 6 , or because the area (4) for the traffic of persons and material-transporting vehicles is disposed at a higher level above the floor than the concrete modules (10) configured to withstand the stresses associated with at least the weight of the mould (5) for the forming of the prefabricated concrete elements and of the respective prefabricated element, as may be seen in Figure 5 .
- the means for the pouring of the concrete into the moulds (5) further comprises a continuous concrete pumping means comprised of a hopper, a pump and a network of ducts to supply the moulds (5) directly, with no need to transport the concrete to each station by means of the concrete mixer trucks.
- the span of the travelling overhead hoists (13) which rest on the continuous concrete slabs (30) of the portable facility is greater than the length of the moulds (5), preferably of a magnitude such that, the moulds being located between the continuous concrete slabs (30), the space available enables the execution of the necessary works around the mould (5).
- Each overhead hoist (13) is used for the displacement of loads from at least two stations of the concreting area (1) and two stations of the internal framework (12) configuring area (2), understanding "station” to be the space occupied by one mould (5) and one metal structure.
- each overhead hoist (13) is used not only to move the countermoulds and the framework of the prefabricated concrete elements, but also to move the completed prefabricated concrete elements to the stockpiling area (14) for completed prefabricated elements.
- each overhead hoist (13) is used for the displacement of the completed prefabricated elements from at least two stations of the concreting area (1) to two stockpiling areas (14) for completed prefabricated elements, which preferably are disposed adjacent to the concreting area (1) and the internal framework (12) configuring area (2).
- the stations of the concreting area (1) and of the internal framework (12) configuring area (2) are preferably covered by an awning (15), while the stockpiling areas (14) for completed prefabricated elements are in the open.
- the overhead hoists (13) enable the stockpiling of completed prefabricated elements not only horizontally but also vertically, by means of the vertical displacement of the same, in order to reduce the space required for the facility.
- chocks which may be made of concrete, are used between completed prefabricated elements.
- the facility thus configured is modular, and achieves an optimised flow of materials.
- the continuous arrow indicates the direction of displacement of the overhead hoist (13) for the flow of completed prefabricated elements and of the framework.
- the dotted arrow indicates the direction of flow of the supply of concrete to the moulds (5) by the concrete pouring means.
- said portable facility comprises one overhead hoist (13) for every two prefabricated elements.
- a parallel facility is disposed, such as that described in this example of an embodiment portrayed in Figure 7 .
- each module comprising at least one overhead hoist for the displacement of prefabricated elements and of frameworks between two concreting areas (1) and two internal framework (12) configuring areas (2), likewise two stockpiling areas (14) for completed prefabricated elements.
- Manufacturing modules thus configured enable an optimised sizing of the manufacturing facility.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Panels For Use In Building Construction (AREA)
Description
- The present invention relates to a portable facility for the manufacture of prefabricated concrete elements for concrete towers, which enables a reduction in the time and material employed in the start-up of said facility which enables the execution of the manufacture of the prefabricated concrete elements for concrete towers.
- The object of the invention is a portable facility for prefabricated concrete elements for concrete towers, which enables, at each area of the same, the optimisation of the use of the concrete necessary to withstand the stresses associated with the weight of the elements leaning on said areas, reducing the total surface area of the facility covered by the concrete and the time and resources necessary both for its start-up and its dismantling.
- In the field of wind turbine generators, the greater the height and power of the same, and consequently the thrust withstood by the tower, the greater the moment at the base of the same. In order to withstand the associated loads, it is expedient to employ a tower whose base diameter exceeds the maximum dimensions for transport by road; the towers are therefore usually manufactured from concrete voussoirs of transportable dimensions. Each voussoir is the result of dividing a tubular segment into several longitudinal segments. Placing several voussoirs adjacent to each other, a tubular segment or section of the tower is formed, where the tower consists of several tower segments thus assembled.
- Internally, the voussoirs basically feature a metal structure or framework which confers to the voussoir the properties suited for traction, and another part being concrete, which provides the required structural properties against compression. In the manufacture of the same, in a first stage the metal framework is configured in accordance with the geometric specifications, and said framework is disposed within a mould featuring a base and a countermould for its closure, for the subsequent pouring of the concrete which will be cured, usually by steam, within said mould.
- The forming of the framework is performed on a number of structures which act as patterns for the configuration of the framework of the prefabricated concrete elements, where the structure of a voussoir weighs approximately 10 times less than the total of the voussoir; therefore, the structure on which it is assembled likewise weighs approximately 10 times less than the mould where the formed structure is subsequently disposed.
- Prefabricated modules are usually formed by using steam-curing moulds at a facility specifically prepared to this end, and are then transported by vehicle to site, the location where the tower is assembled and the vertical and horizontal joints between modules are executed.
- The vertical and horizontal joints of a modular tower are critical from the structural point of view, and furthermore determine the time employed in the erection of a tower. For this reason, the number of joints tends to be minimised, making the modules as large as possible, in such a way that road transport once again determines the size of said modules, which are constructed up to 20 m in length and 4 m in width. However, the resulting weight of each module may attain 50 tons, which increases considerably the cost of transporting the prefabricated elements from the location of their manufacture to the site where the tower is erected.
- Furthermore, there are locations where wind resources are optimal, but the infrastructure to reach the same is not.
- In order to avoid the transport of components of such considerable size and weight, portable facilities have been developed, especially conceived for the manufacture of prefabricated elements for wind turbine towers, which are installed in the proximity of the wind farm.
- The Spanish patent
ES2371960B1 - The present invention reveals a portable facility for the manufacture of prefabricated concrete elements for concrete towers which resolves all the aforementioned drawbacks.
- Document
JP2000210923A - The present invention relates to a portable facility for the manufacture of prefabricated concrete elements for concrete towers according to
claim 1, which comprises a floor where at least one concreting area and at least one area for the configuration of the internal framework for the prefabricated concrete elements are disposed, and where the concreting area comprises at least one mould for the forming of the prefabricated concrete elements. - The floor further comprises a modular concrete slab disposed on the compacted terrain prior to the installation of the portable facility.
- This modular concrete slab in turn comprises, at the concreting area, at least one concrete module configured to withstand the stresses associated with at least the weight of the mould for the forming of the prefabricated concrete elements and of the respective prefabricated element.
- To this end, each concrete module features a sufficient surface area and thickness so that the terrain on which it rests will not give way due to the effect of the weight of the elements resting on the same.
- In this way, the facility thus constituted enables the optimisation of the use of concrete at each area, reducing the total surface area of the facility covered by said material, and the time and resources necessary for both its start-up and its dismantling, as the modular concrete slab is disposed only where required by the weight of the components.
- Thus, optionally, the portable facility may comprise separation areas between the concrete modules of the concreting area comprised of a covering material covering the floor and isolating the internal atmosphere of the facility from pollutants which might be contained in the terrain, e.g. dust, in such a way that there may be concrete-free spaces between the concrete modules.
- According to the invention, the area for the forming of the internal framework of the prefabricated concrete element comprises at least one metal structure acting as a pattern for the forming of the framework of the prefabricated concrete elements.
- The modular concrete slab comprises, at the area for the forming of the framework, at least one concrete module configured to withstand the stresses associated with at least the weight of the metal structure and of the framework of the prefabricated concrete elements.
- Also optionally, on the floor of the portable facility, an area for the traffic of persons and material-transporting vehicles may be disposed in an area annexed to the concreting area.
- This area for the traffic of persons and material-transporting vehicles comprises either a layer of paving or metal sheets of transportable dimensions, in accordance with the load capability required at said area, or alternatively a layer of low load-bearing capability covering material, to prevent the pollution of the atmosphere of the facility in order not to affect the quality of the prefabricated concrete elements. Thus, the metal sheets can be re-used at other facilities after the dismantling of the same.
- The portable facility for the manufacture of voussoirs for concrete towers thus constituted enables, at each area of the same, the optimisation of the use of the concrete necessary to withstand the stresses associated with the weight of the elements resting on said areas, reducing the total surface area of the facility covered by the concrete and the time and resources necessary for both its start-up and its dismantling.
- As a supplement to the description made herein, and for the purpose of aiding the better understanding of the characteristics of the invention, in accordance with a preferred example of an embodiment of the same, a set of drawings is attached as an integral part of said description wherein, by way of illustration and not limitation, the following is portrayed:
-
Figure 1 depicts a schematic plan view of the portable facility for the manufacture of prefabricated concrete elements for concrete towers of the present invention. -
Figure 2 depicts a sectional view at AA ofFigure 1 . -
Figure 3 depicts a perspective view of a concrete module of the modular concrete slab of the present invention, said concrete module withstanding the stresses associated with the weight of the mould for the forming of the prefabricated concrete elements and of the respective prefabricated element. -
Figure 4 depicts a perspective view of several concrete modules of the modular concrete slab of the present invention, said concrete modules withstanding the stresses associated with the weight of the mould for the forming of the prefabricated concrete elements and of the respective prefabricated element. -
Figure 5 depicts a sectional view, similar to that inFigure 2 , where the area of the portable facility for the traffic of persons and of material-transporting vehicles is elevated. -
Figure 6 depicts a sectional view, similar to that inFigure 2 , where the area of the portable facility where at least one concrete module configured to withstand the stresses associated with at least the weight of the mould for the forming of the prefabricated concrete elements and of the respective prefabricated element is disposed, is seen to be partially sunk. -
Figure 7 depicts a schematic plan view of the portable facility for the manufacture of prefabricated concrete elements for concrete towers of the present invention, in accordance with another example of an embodiment. - The present invention will be described in detail below, where the portable facility for the manufacture of prefabricated concrete elements for concrete towers comprises a floor on which the following are disposed: at least one concreting area (1), a configuration area (2) for the internal framework (12) of the prefabricated concrete elements, and a pedestrian and material-transporting vehicle traffic area (4) disposed in an area annexed to the concreting area (1), preferably between the concreting area (1) and the configuration area (2) for the internal framework (12), where the concreting area (1) comprises at least one mould (5) for the forming of the prefabricated concrete elements.
- The portable facility further comprises a modular concrete slab disposed on the floor, which in turn comprises, at the concreting area (1), several concrete modules (10) configured to withstand the stresses associated at least with the weight of the mould (5) for the forming of the prefabricated concrete elements and of the respective prefabricated concrete element.
- Each mould (5) for the forming of the prefabricated concrete elements may rest on a single concrete module (10), where the concrete module is manufactured in situ, or may rest on several concrete modules (10).
- This reduces the material employed for the adaptation of the floor of the facility and minimises the start-up time of the same, likewise enabling a reduction in the size of the concrete modules (10) to the extent where the modules forming the modular concrete slab may be elements of transportable dimensions. Thus, the dismantling of the facility can be total, and the majority of the materials used in the construction of the same can be re-used in the construction of another facility annexed to another wind farm.
- The portable facility further comprises a structure (7) with a set of pillars (8) and at least one area (3) for the passage of hoists (13) and a support for the structure (7) disposed on the floor, which comprises foundations anchored to the terrain in the region of the pillars (8).
- The configuration area (2) for the internal framework (12) of the prefabricated concrete elements comprises a number of metal structures (not portrayed) which serve as patterns for the forming of the framework of the prefabricated concrete elements.
- The modular concrete slab comprises, at the framework configuration area (2), at least one concrete module (20) configured to withstand the stresses associated at least with the metal structure and the framework of the prefabricated concrete elements.
- To this end, each concrete module features a sufficient surface area and thickness so that the terrain on which it rests will not give way due to the effect of the weight of the elements resting on the same.
- The concrete modules (10) of the concreting area (1) are of a greater thickness than the concrete modules (20) of the framework configuration area (2), due to the fact that the weight of the metal structures which serve as patterns for the configuration of the framework, plus that of the framework (2) assembled upon them, is of a lesser order of magnitude than the weight of the moulds (5) and the prefabricated concrete elements; preferably, the concrete modules (10) of the concreting area (1) feature at least double the thickness than the concrete modules (20) of the framework configuration area (2); more preferably, the concrete modules (10) of the concreting area (1) feature a thickness of at least five times the thickness of the concrete modules (20) of the framework configuration area (2).
- In the framework configuration area (2), the floor comprises a number of supporting modules configured to withstand the stresses associated at least with the metal structure and the framework of the prefabricated concrete elements, and comprising at least one metal element.
- The portable facility comprises a number of separations (9) between concrete modules (10) in the concreting area (1), where said separations (9) are comprised of a covering material (6) covering the floor and isolating the internal atmosphere of the facility from pollutants which might be contained in the terrain, such as dust.
- The area (4) for the traffic of persons and material-transporting vehicles comprises either a layer of paving (40) or metal sheets (not portrayed), or a layer of low load-bearing capability covering material.
- The concrete modules (10) of the concreting area (1) feature a greater thickness than the supporting modules of the metal structures in the framework configuration area (2) due to the fact that the weight of said structures plus that of the framework (2) assembled upon them is of a lesser order of magnitude than the weight of the moulds (5) and the prefabricated concrete elements; preferably, the concrete modules (10) of the concreting area (1) feature at least double the thickness than the supporting modules for the metal structures in the framework configuration area (2); more preferably, the concrete modules (10) of the concreting area (1) feature a thickness of at least five times the thickness of the supporting modules for the metal structures in the framework configuration area (2).
- The portable facility further comprises, external to its structure (7), an area for the stockpiling of completed prefabricated elements and an additional area for the stockpiling of raw materials, with areas for traffic between the two. In said stockpiling areas, the floor is comprised of a discontinuous slab of concrete, of a thickness suited to its necessary load-bearing capacity, this being greater in the stockpiling area for completed prefabricated concrete elements than in the stockpiling area for raw materials, and comprises platforms for traffic in the transit areas.
- Of particular advantage is a disposition of a portable facility where the concreting area (1) is longitudinally disposed along the facility, and parallel with the same, the internal framework (12) configuring area (2), as portrayed in
Figure 1 , as it enables the use of travelling overhead hoists (13) which rest on continuous concrete slabs (30) disposed in two areas of passage for hoists and supports for the structure (7) of the portable facility (3), or conventional overhead hoists (13) which rest on the structure (7) of the portable facility and whose span covers one station of the concreting area (1) and one station of the internal framework (12) configuring area (2), understanding "station" to be the space occupied by one mould (5) and one metal structure. Thus, a reduction is produced in the number of overhead hoists (13) required, due to the fact that it is possible to combine longitudinal displacement by means of the wheels of the overhead hoist (13) with the transversal displacement of the carriage of the hoist, the concreting area (1) and the internal framework (12) configuring area (2) remaining between the areas of passage for hoists and supports for the structure (7) of the portable facility (3). - Specifically, of particular advantage is the disposition of a portable facility with two overhead hoists (13) such as that mentioned above in the case of a facility with 6 concreting stations with their respective moulds (5) and 6 internal framework (12) configuring stations.
- The portable facility further comprises a means for the pouring of concrete into the moulds (5), comprised of concrete mixer trucks (11) from which the concrete is poured directly into the moulds (5). It is for this reason, so that said pouring means may surpass the height of the moulds (5), that the area (4) for the traffic of persons and material-transporting vehicles is elevated with regard to the concreting area (1), either because the moulds (5) are partially sunk, as may be seen in
Figure 6 , or because the area (4) for the traffic of persons and material-transporting vehicles is disposed at a higher level above the floor than the concrete modules (10) configured to withstand the stresses associated with at least the weight of the mould (5) for the forming of the prefabricated concrete elements and of the respective prefabricated element, as may be seen inFigure 5 . - The means for the pouring of the concrete into the moulds (5) further comprises a continuous concrete pumping means comprised of a hopper, a pump and a network of ducts to supply the moulds (5) directly, with no need to transport the concrete to each station by means of the concrete mixer trucks.
- In another example of an embodiment, depicted in
Figure 7 , the span of the travelling overhead hoists (13) which rest on the continuous concrete slabs (30) of the portable facility is greater than the length of the moulds (5), preferably of a magnitude such that, the moulds being located between the continuous concrete slabs (30), the space available enables the execution of the necessary works around the mould (5). Each overhead hoist (13) is used for the displacement of loads from at least two stations of the concreting area (1) and two stations of the internal framework (12) configuring area (2), understanding "station" to be the space occupied by one mould (5) and one metal structure. - Furthermore, the overhead hoists (13) are used not only to move the countermoulds and the framework of the prefabricated concrete elements, but also to move the completed prefabricated concrete elements to the stockpiling area (14) for completed prefabricated elements. Preferably, each overhead hoist (13) is used for the displacement of the completed prefabricated elements from at least two stations of the concreting area (1) to two stockpiling areas (14) for completed prefabricated elements, which preferably are disposed adjacent to the concreting area (1) and the internal framework (12) configuring area (2).
- As may be seen in
Figure 7 , the stations of the concreting area (1) and of the internal framework (12) configuring area (2) are preferably covered by an awning (15), while the stockpiling areas (14) for completed prefabricated elements are in the open. The overhead hoists (13) enable the stockpiling of completed prefabricated elements not only horizontally but also vertically, by means of the vertical displacement of the same, in order to reduce the space required for the facility. For vertical stockpiling, chocks, which may be made of concrete, are used between completed prefabricated elements. - In this way, the facility thus configured is modular, and achieves an optimised flow of materials. The continuous arrow indicates the direction of displacement of the overhead hoist (13) for the flow of completed prefabricated elements and of the framework. The dotted arrow indicates the direction of flow of the supply of concrete to the moulds (5) by the concrete pouring means.
- Furthermore, and preferably, said portable facility comprises one overhead hoist (13) for every two prefabricated elements. If it is required to manufacture more prefabricated elements, a parallel facility is disposed, such as that described in this example of an embodiment portrayed in
Figure 7 . In saidFigure 7 a facility with three modules may be seen, each module comprising at least one overhead hoist for the displacement of prefabricated elements and of frameworks between two concreting areas (1) and two internal framework (12) configuring areas (2), likewise two stockpiling areas (14) for completed prefabricated elements. Manufacturing modules thus configured enable an optimised sizing of the manufacturing facility.
Claims (26)
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, comprising a floor on which the following are disposed:at least one concreting area (1) and at least one configuration area (2) for the forming of the internal framework (12) of the prefabricated concrete elements, where the concreting area comprises at least one mould (5) for the forming of the prefabricated concrete elements, wherein the floor comprises a modular concrete slab which in turn comprises, at the concreting area (1), at least one concrete module (10) configured to withstand the stresses associated at least with the weight of the mould (5) for the forming of the prefabricated concrete elements and of the respective prefabricated concrete element, wherein the configuring area (2) for the internal framework (12) of the prefabricated concrete element comprises at least one metal structure which acts as a pattern for the configuration of the framework of the prefabricated concrete elements, and in the framework configuring area (2):• the modular concrete slab comprises at least one concrete module (20) configured to withstand the stresses associated with at least the weight of the metal structure and of the framework of the prefabricated concrete elements, or• the floor comprises a number of supporting modules, configured to withstand the stresses associated with at least the weight of the metal structure and of the framework of the prefabricated concrete elements, comprising at least one metal element; andwherein the concrete modules (10) of the concreting area (1) are of a greater thickness than the concrete modules (20) of the framework configuration area (2), or the supporting modules for the metal structures in the framework configuration area (2), respectively.
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 1, characterised in that each mould (5) for the forming of the prefabricated concrete elements rests on a single concrete module (10).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 1, characterised in that each mould (5) for the forming of the prefabricated concrete elements rests on several concrete modules (10).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in any of the preceding claims, characterised in that on the floor of the portable facility, an area (4) for the traffic of persons and material-transporting vehicles is disposed in an area annexed to the concreting area (1).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 4, characterised in that the area (4) for the traffic of persons and material-transporting vehicles is disposed between the concreting area (1) and the internal framework (12) configuring area (2).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in any of the preceding claims, characterised in that it comprises a structure (7) with a set of pillars and in that at least one area for the passage of hoists and a support for the structure (7) is disposed on the floor; said structure comprises foundations anchored to the terrain in the region of the pillars (8).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in any of the preceding claims, characterised in that the floor comprises a covering material (6) at the separations (9) between the concrete modules (10) of the concreting area (1).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in either of claims 4 or 5, characterised in that the area for the traffic of persons and material-transporting vehicles comprises either a layer of paving (40) or metal sheets, or a layer of low load-bearing capability covering material.
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 1, characterised in that the concrete modules (10) of the concreting area (1) feature a thickness at least double that of the supporting modules for the metal structures in the framework configuration area (2).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 1, characterised in that the concrete modules (10) of the concreting area (1) feature a thickness at least five times that of the supporting modules for the metal structures in the framework configuration area (2).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 1, characterised in that the concrete modules (10) of the concreting area (1) feature a thickness at least double that of the concrete modules (20) of the framework configuration area (2).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 1, characterised in that the concrete modules (10) of the concreting area (1) feature a thickness at least five times that of the concrete modules (20) of the framework configuration area (2).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 6, characterised in that it further comprises, external to its structure (7), an area for the stockpiling of completed prefabricated elements and an additional area for the stockpiling of raw materials, with areas for traffic between the two, where the floor, in said stockpiling areas, is comprised of a discontinuous slab of concrete.
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 13, characterised in that the thickness of the discontinuous slab of concrete in the area for the stockpiling of completed prefabricated elements is greater than that of the slab in the area for the stockpiling of raw materials.
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claims 5 and 6, characterised in that the concreting area (1) is disposed longitudinally along the facility, and parallel with the same is the internal framework (12) configuring area (2), and in that the facility further comprises travelling overhead hoists (13) which rest on continuous concrete slabs (30) disposed in two areas of passage for hoists and supports for the structure (7) of the portable facility (3), or conventional overhead hoists (13) which rest on the structure (7) of the portable facility and whose span covers one station of the concreting area (1) and one station of the internal framework (12) configuring area (2), understanding "station" to be the space occupied by one mould (5) and one metal structure.
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 15, characterised in that it comprises two overhead hoists, 6 concreting stations with their respective moulds (5) and 6 internal framework (12) configuring stations.
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 16, characterised in that it further comprises a means for the pouring of concrete into the moulds (5).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claims 4 and 17, characterised in that the means for the pouring of concrete into the moulds (5) is comprised of concrete mixer trucks from which the concrete is poured directly into the moulds (5).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 18, characterised in that the area (4) for the traffic of persons and material-transporting vehicles is elevated with regard to the concreting area (1), either because the moulds (5) are partially sunk, or because the area (4) for the traffic of persons and material-transporting vehicles is disposed at a higher level above the floor than the concrete modules (10).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 17, characterised in that the means for the pouring of concrete into the moulds (5) further comprises a continuous concrete pumping means comprised of a hopper, a pump and a network of ducts to supply the moulds (5) directly.
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claims 5 and 6, characterised in that the concreting area (1) is disposed longitudinally along the facility, and parallel with the same is the internal framework (12) configuring area (2), and in that the facility further comprises travelling overhead hoists (13) which rest on continuous concrete slabs (30) disposed in two areas of passage for hoists and supports for the structure (7) of the portable facility (3), or conventional overhead hoists (13) which rest on the structure (7) of the portable facility and whose span is greater than the length of the moulds (5), and each overhead hoist (13) is displaceable in order to execute the displacement of loads from at least two stations of the concreting area (1) and two stations of the internal framework (12) configuring area (2), understanding "station" to be the space occupied by one mould (5) and one metal structure.
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 21, characterised in that the overhead hoists are displaceable from the stations of the concreting area (1) and the stations of the internal framework (12) configuring area (2) to a stockpiling area (14) for completed prefabricated elements.
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in claim 22, characterised in that each overhead hoist is displaceable from at least two stations of the concreting area (1) to two stockpiling areas (14) for completed prefabricated elements, disposed adjacent to the concreting area (1) and the internal framework (12) configuring area (2).
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in either of claims 22 to 23, characterised in that the stations of the concreting area (1) and the stations of the internal framework (12) configuring area (2) are covered, while the stockpiling areas (14) for completed prefabricated elements are in the open.
- A portable facility for the manufacture of prefabricated concrete elements for concrete towers, as claimed in any of claims 21 to 24, characterised in that the overhead hoists are configured to execute the stockpiling of completed prefabricated elements not only horizontally but also vertically.
- A plant for the manufacture of prefabricated concrete elements for concrete towers, characterised in that it comprises at least two portable facilities for the manufacture of prefabricated concrete elements for concrete towers, as claimed in any of claims 21 to 25.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL15165971T PL2939809T3 (en) | 2014-04-30 | 2015-04-30 | Portable facility for the manufacture of prefabricated concrete elements for concrete towers |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES201430587U ES1109530Y (en) | 2014-04-30 | 2014-04-30 | PORTABLE PLANT FOR THE MANUFACTURE OF PREFABRICATED CONCRETE ELEMENTS FOR CONCRETE TOWER |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2939809A1 EP2939809A1 (en) | 2015-11-04 |
EP2939809B1 true EP2939809B1 (en) | 2019-06-19 |
Family
ID=50686535
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP15165971.1A Active EP2939809B1 (en) | 2014-04-30 | 2015-04-30 | Portable facility for the manufacture of prefabricated concrete elements for concrete towers |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP2939809B1 (en) |
BR (1) | BR202015009894Y1 (en) |
ES (2) | ES1109530Y (en) |
MX (1) | MX367781B (en) |
PL (1) | PL2939809T3 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102018110224A1 (en) | 2018-04-27 | 2019-10-31 | Max Bögl Wind AG | Floor element for a modular base plate for a mobile production plant and mobile production plant |
CN110469115A (en) * | 2019-08-28 | 2019-11-19 | 盐城工学院 | A kind of wind-driven generator concrete towers forming table shaping apparatus |
CN114986666B (en) * | 2022-06-01 | 2024-07-23 | 中交第四公路工程局有限公司 | Box girder manufacturing system based on mortise and tenon structure combined prefabricated pedestal |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3603957B2 (en) * | 2001-09-06 | 2004-12-22 | 株式会社沖創建設 | On-site manufacturing method for PC members |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB476340A (en) * | 1936-02-08 | 1937-12-07 | William Porter Witherow | Improvements in or relating to method and apparatus for making concrete articles |
FR858786A (en) * | 1938-08-05 | 1940-12-03 | Improvements in the manufacture of concrete objects | |
JP3120980B2 (en) * | 1999-10-29 | 2000-12-25 | 普 山田 | Concrete unit manufacturing equipment |
DE202004021402U1 (en) * | 2003-01-20 | 2012-07-16 | RWP Gesellschaft für Baustellenautomatisierung mbH | Mobile, compact and flexible field factory |
ES2371960B1 (en) | 2009-11-30 | 2012-11-19 | Inneo Torres, S.L. | FACTORY FOR THE PRODUCTION BY MOLDING OF PREFABRICATED CONCRETE DOVELAS FOR THE CONSTRUCTION OF AIRLINER SUPPORT TOWERS. |
-
2014
- 2014-04-30 ES ES201430587U patent/ES1109530Y/en not_active Expired - Fee Related
-
2015
- 2015-04-30 PL PL15165971T patent/PL2939809T3/en unknown
- 2015-04-30 BR BR202015009894-0U patent/BR202015009894Y1/en active IP Right Grant
- 2015-04-30 MX MX2015005569A patent/MX367781B/en active IP Right Grant
- 2015-04-30 ES ES15165971T patent/ES2746423T3/en active Active
- 2015-04-30 EP EP15165971.1A patent/EP2939809B1/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3603957B2 (en) * | 2001-09-06 | 2004-12-22 | 株式会社沖創建設 | On-site manufacturing method for PC members |
Also Published As
Publication number | Publication date |
---|---|
ES1109530Y (en) | 2014-08-06 |
MX2015005569A (en) | 2016-03-10 |
BR202015009894U2 (en) | 2015-12-01 |
BR202015009894Y1 (en) | 2021-01-12 |
EP2939809A1 (en) | 2015-11-04 |
PL2939809T3 (en) | 2020-01-31 |
ES2746423T3 (en) | 2020-03-06 |
ES1109530U (en) | 2014-05-16 |
MX367781B (en) | 2019-09-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109056536B (en) | Cast-in-place box girder construction method based on combined hoop support | |
US8256173B2 (en) | Environmentally sustainable form-inclusion system | |
CN110820561A (en) | Large cantilever prestress bent cap support device and construction method | |
CA2594158A1 (en) | Bridge construction system and method | |
CN104594204B (en) | Urban light rail viaduct mountain type U beam Construction Supporting System and construction method | |
CN109736206B (en) | Cast-in-situ bracket structure for bridge side span closure of corrugated steel web continuous beam and construction method | |
CN103243934B (en) | The Housing system of single single footing institute construction and building method thereof | |
CN110886227B (en) | Main tower cast-in-place lower cross beam support system and construction method | |
EP2939809B1 (en) | Portable facility for the manufacture of prefabricated concrete elements for concrete towers | |
KR101673069B1 (en) | Construction method of partition wall of tunnel using pretension type precast concrete partition wall | |
JP2013512132A (en) | Factory for forming precast concrete panels for construction of wind generator support towers | |
KR101527782B1 (en) | Management and reverse displacement of composite bridge composite inclined support installation method | |
CN110656570A (en) | Telescopic pedestrian bridge, construction device and construction method | |
CN102943482B (en) | Prefabricate abutment pre-tightening type sealing up cofferdam | |
KR20140009925A (en) | Harbor structures construction equipment and it's construction method | |
KR101230049B1 (en) | Incremental launching apparatus for launching concrete slab for bridge using form and rail, and constructing method for the same | |
CN203188366U (en) | House system built through single independent foundation | |
CN115787504B (en) | Hanger platform and construction method of hollow tower pier top solid section | |
CN209907208U (en) | Wave form steel web continuous beam bridge side span folds cast-in-place supporting structure | |
CN111139745A (en) | Construction method for cast-in-place concrete top plate of combined box girder | |
CN109235482B (en) | Tower crane foundation based on bonded prestressed concrete and construction method thereof | |
KR20150020078A (en) | Anchoring device for foundations of a ski lift structure, and method of manufacturing such a device | |
CN214737289U (en) | Mounting structure for assembled elevated road and bridge | |
KR20180054526A (en) | Round lamp structure for vehicle entry and exit with stress distribution type precast frame | |
CN107558727A (en) | Vertical stretched operation frame and its installation and removal method for low level jacking formwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
17P | Request for examination filed |
Effective date: 20160315 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
TPAC | Observations filed by third parties |
Free format text: ORIGINAL CODE: EPIDOSNTIPA |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20161124 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04H 5/02 20060101ALI20190201BHEP Ipc: B28B 15/00 20060101AFI20190201BHEP |
|
INTG | Intention to grant announced |
Effective date: 20190222 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: NORDEX ENERGY SPAIN, S.A.U. |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602015032108 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1144896 Country of ref document: AT Kind code of ref document: T Effective date: 20190715 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20190619 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190919 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190919 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190920 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1144896 Country of ref document: AT Kind code of ref document: T Effective date: 20190619 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191021 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20191019 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2746423 Country of ref document: ES Kind code of ref document: T3 Effective date: 20200306 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R026 Ref document number: 602015032108 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200224 |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
26 | Opposition filed |
Opponent name: INNEO TORRES, S.L. Effective date: 20200520 |
|
PG2D | Information on lapse in contracting state deleted |
Ref country code: IS |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 |
|
PLBB | Reply of patent proprietor to notice(s) of opposition received |
Free format text: ORIGINAL CODE: EPIDOSNOBS3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200430 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200430 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200430 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200430 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20200430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200430 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20200430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200430 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200430 |
|
PLCK | Communication despatched that opposition was rejected |
Free format text: ORIGINAL CODE: EPIDOSNREJ1 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R100 Ref document number: 602015032108 Country of ref document: DE |
|
PLBN | Opposition rejected |
Free format text: ORIGINAL CODE: 0009273 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: OPPOSITION REJECTED |
|
27O | Opposition rejected |
Effective date: 20210701 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190619 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230601 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240418 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20240517 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20240429 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20240423 Year of fee payment: 10 |