EP2933004B1 - Kletterstruktur zum gebrauch auf einem spielplatz - Google Patents

Kletterstruktur zum gebrauch auf einem spielplatz Download PDF

Info

Publication number
EP2933004B1
EP2933004B1 EP15447007.4A EP15447007A EP2933004B1 EP 2933004 B1 EP2933004 B1 EP 2933004B1 EP 15447007 A EP15447007 A EP 15447007A EP 2933004 B1 EP2933004 B1 EP 2933004B1
Authority
EP
European Patent Office
Prior art keywords
climbing
ropes
subunit
series
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP15447007.4A
Other languages
English (en)
French (fr)
Other versions
EP2933004A1 (de
Inventor
Joost Bert
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kinepolis Group Nv
Original Assignee
Kinepolis Group Nv
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kinepolis Group Nv filed Critical Kinepolis Group Nv
Publication of EP2933004A1 publication Critical patent/EP2933004A1/de
Application granted granted Critical
Publication of EP2933004B1 publication Critical patent/EP2933004B1/de
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B9/00Climbing poles, frames, or stages
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63GMERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
    • A63G31/00Amusement arrangements
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63GMERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
    • A63G31/00Amusement arrangements
    • A63G31/02Amusement arrangements with moving substructures
    • A63G31/14Amusement arrangements with moving substructures with planes mounted on springs; with movable planes
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B9/00Climbing poles, frames, or stages
    • A63B2009/004Three-dimensional rope or cable networks
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B9/00Climbing poles, frames, or stages
    • A63B2009/006Playground structures
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B2208/00Characteristics or parameters related to the user or player
    • A63B2208/12Characteristics or parameters related to the user or player specially adapted for children
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B71/00Games or sports accessories not covered in groups A63B1/00 - A63B69/00
    • A63B71/02Games or sports accessories not covered in groups A63B1/00 - A63B69/00 for large-room or outdoor sporting games
    • A63B71/023Supports, e.g. poles
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63GMERRY-GO-ROUNDS; SWINGS; ROCKING-HORSES; CHUTES; SWITCHBACKS; SIMILAR DEVICES FOR PUBLIC AMUSEMENT
    • A63G21/00Chutes; Helter-skelters
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/022Stairways; Layouts thereof characterised by the supporting structure
    • E04F11/0226Stairways having treads supported by balusters
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/022Stairways; Layouts thereof characterised by the supporting structure
    • E04F11/032Spiral stairways supported by a central column
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/104Treads
    • E04F11/108Treads of wood or with an upper layer of wood
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F2011/0203Miscellaneous features of stairways not otherwise provided for
    • E04F2011/0205Stairways characterised by the use of specific materials for the supporting structure of the treads
    • E04F2011/0209Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of metal

Definitions

  • the present invention relates to a climbing structure and more particularly, to a climbing structure that can be used in indoor and outdoor playgrounds
  • Climbing structures are used as leisure facilities in both indoor and outdoor playgrounds for children. Children are stimulated to use their own force in order to climb from one position to another. Their force is needed if they want to move in the gravitational field of the Earth. Climbing promotes human's strength, agility, concentration, self-control, as well as its balance and coordination capacities.
  • Different climbing structures are known in accordance with the prior art, e.g. climbing walls as described in US 7,056,266 , and climbing nets as described in DE19914192 . Nets guarantee the safety of children when they fall.
  • Other types of climbing structures known in the state of the art, e.g. DE10i61966, disclosing the combination of platforms attached to a supporting grid or mesh like structure. The platforms have several access points.
  • the later means offer children the opportunity to move from one surface to another.
  • the use of grid structures at the outer edge of the aforementioned background art guarantees the safety of the children, i.e. the grid can prevent that children fall from the climbing structure.
  • the large variety of shapes of the individual platforms, the orientation of the individual platforms, and the shape of the gridded surfaces are responsible for a large variety of climbing structures.
  • a disadvantage of these climbing structures is the rather complex integration of each unit within the climbing structure whereby the manufacturing and installation processes of these climbing structures are complicated and time-consuming. Therefore, the objective of the present invention is to provide a climbing structure, consisting of individual platforms, pillars and ropes, attached to each other in a relatively simple configuration, which streamlines the process of manufacturing and installation.
  • a climbing structure to be used in a playground for children comprising at least three subunits whereof at least one subunit being a climbing subunit, the climbing subunit comprises a pillar with an upper part and a lower part, and several platforms with holes, and a series of ropes characterized in that the upper part comprises a first set of fastening means to fasten the series of ropes, the lower part comprises a second set of fastening means to fasten the series of ropes, the platforms comprising holes along at least a part of the platform edge, the series of ropes of the climbing subunit is attached to the first set of fastening means and to the second set of fastening means of the same climbing subunit and run through the holes of the platforms of the same climbing subunit to connect the first set of fastening means with the second set of fastening means, and the subunits are connected with at least one other subunit.
  • the climbing subunits can be manufactured independently of each other.
  • a preferred embodiment of the present invention comprises at least two subunits being climbing subunits.
  • the first set of fastening means comprises a frame, in particular a round-shaped object, connected to the upper part of the pillar by means of a series of connectors, in particular rods.
  • the climbing structure is characterized in that the series of ropes comprising a first set of ropes and a second set of ropes, whereby the first set of ropes comprises structural ropes and the second set of ropes are interconnected to form a net.
  • the first set of ropes offers added stability to the platforms.
  • the first set of ropes supports the weight of the platforms in addition to the weight of the children.
  • the second set of ropes prevents that children could fall from the platforms and guarantees the safety of the children when using the climbing structure.
  • a preferred embodiment of the climbing structure is characterized in that the climbing structure comprises an anchoring unit which comprises at least three sub-anchoring units of which at least one sub-anchoring unit being a climbing sub-anchoring unit, whereby aforesaid climbing sub-anchoring comprises a tube and supporting means.
  • the subunits are connected with at least one other subunit.
  • Another aspect of the present invention comprises at least two sub-anchoring units being climbing sub-anchoring units.
  • a preferred embodiment of the present invention discloses that only a portion of less than 25% of the platforms side surface is connected to the pillar of the same climbing subunit by means of platform fixation means.
  • this configuration reduces the pulling force of a platform on the pillar in comparison with platforms for which the side surface is entirely in contact with the pillar since a portion of the weight caused by the mass of the platform and the mass of children on that platform is supported by the series of ropes.
  • a climbing structure 10 in accordance with a preferred embodiment of the present invention comprises three subunits 11, 12 and 13. If (imaginary) straight horizontal connection lines could be drawn in between the pillars of these subunits, the connection lines would form a triangle. This configuration is not the only possible configuration of the subunits, e.g. the (imaginary) straight connection lines between the pillars of the subunits could also form a line segment. Moreover, the climbing structure may comprise more than one subunit. In that case, the (imaginary) straight connection lines between the pillars of the subunits could form a segment, a triangle or a polygon.
  • the preferred embodiment of the climbing structure comprises two subunits being climbing subunits.
  • Fig. 1 depicts a climbing subunit 11 in accordance with a preferred embodiment of the present invention.
  • the climbing subunit comprises a pillar 20.
  • This pillar is a cylinder of height h.
  • the pillar is preferably made of steel.
  • the shape and construction material of the pillar are not restricted to aforementioned shape and construction material.
  • the pillar can be made of synthetic or natural organic fibres.
  • the pillar comprises a lower part 21 and an upper part 22.
  • the lower part of the pillar is considered as the part of the pillar starting at height 0, i.e. the base of the pillar, up to a height h/n.
  • the upper part of the pillar is considered as the part starting at height h(1-1/n) up to height h, i.e. the top of the pillar.
  • n a reel number larger or equal to 2.
  • n equals 4.
  • the climbing subunit comprises several platforms 23. The several platforms are preferable attached on different heights to the pillar.
  • Fig. 3 illustrates a plan side-view of a platform 23 in accordance with a preferred embodiment of the present invention.
  • the platform is attached to the pillar 20 of a climbing subunit using (third) fastening or fixation means 30.
  • fixation means are, by example without restrictions to the objective, platforms fixation means welded to the pillar.
  • the fixation means can be U-shaped fixation means.
  • these platform fixation means have holes allowing the platform to be attached to the pillar by means of bolts.
  • the lower surface 31 and the upper surface 32 of the platform are wavy.
  • Fig. 4 depicts a top view of a platform 23 in accordance with a preferred embodiment of the present invention.
  • the top view of platform 23 demonstrates the elliptical-shaped contour 40 of the platform, like the contour of the lower surface (not illustrated).
  • the platform is preferably manufactured from laminated wood.
  • the shape and material of the platform are not restricted to aforementioned shape and material.
  • the platform can also be made of synthetic fibres.
  • the platform comprises several holes 41 for at least along a part of its edge, as illustrated in Fig. 4 . These holes are circular and have diameters which are larger than the diameters of the ropes (these ropes can also be wire ropes) of the climbing structure.
  • the shape of the holes is not restricted to aforementioned shape.
  • the entire edge of the platform comprises preferably several holes whereby the distance between consecutive holes is fixed. Other embodiments of the platform can have a variable distances between consecutive holes. It is not required that the several platforms of the climbing structure are equally shaped.
  • the platforms can be different in terms of shape, dimensions, material and configuration of the holes.
  • the climbing subunit comprises a series of ropes 24, as illustrated in Fig. 2 .
  • the upper part of the pillar comprises a first set of fastening means 25 to fasten the series of ropes.
  • These fastening means comprises a frame, in particular a round-shaped object, preferably a steel ring, to which the series of ropes are attached.
  • the lower part of the pillar comprises second set of fastening means 26 to attach the series of ropes.
  • These fastening means comprises a frame, in particular a round-shaped object, preferably a second steel ring, to which the series of ropes is attached.
  • the series of ropes is attached to the first set of fastening means of the climbing subunit and to the second set of fastening means of the same climbing subunit, and the series of ropes runs through the holes in the platforms of the same climbing subunit from the first set of fastening means towards to the second set of fastening means. It is not required that the series of ropes runs through the holes of every climbing subunit.
  • a preferred embodiment of the present invention discloses a first series of ropes 50 and a second series of ropes 51, as shown in Fig. 5 .
  • the ropes of the first series of ropes are structural ropes. However, it is possible that platforms having the same position (i.e. platforms positioned on top of each other) are sharing the same structural ropes.
  • Supporting means are attached to the structural ropes to support the platforms.
  • These supporting means can be any means located preferably below and near each hole of the platform through which structural ropes run. Therefore, part of the platform can slightly move with respect to its initial position.
  • the structural ropes provide stabilization of the platforms, together with the fixation of the platforms to the pillars.
  • the structural ropes are preferably made of stainless steel.
  • the structural ropes can also be manufactured of other material like synthetic or natural organic fibres, or metal wires, provided that the structural ropes are strong enough to support the weight of the platforms and the weight of the children.
  • the ropes of the second series of ropes are net ropes, i.e.
  • the second series of ropes comprises typically a number of net ropes that is sufficient according the EN 1176 Standard conform fall protection.
  • the net ropes are preferably made of stainless steel. However, the net ropes can also be manufactured of other materials, like synthetic or natural organic fibres, provided that they are strong enough to guarantee the fall protection.
  • the climbing structure in accordance to present invention comprises more than one climbing subunit, the invention is in no way limited to a climbing structure with identical climbing subunits.
  • the climbing subunits can differ in terms of shape, dimensions and the material of the pillars, the platforms and the ropes.
  • the subunit 13 which is not a climbing subunit comprises a pillar 14.
  • This pillar is a cylinder of height h' that is by preference equal to the height h of the pillars of the climbing subunit.
  • the pillar of subunit 13 is preferably made of steel.
  • the shape and the material of the pillar are not restricted to aforementioned shape and material.
  • the climbing structure in accordance to a preferred embodiment of the present invention comprises more than one subunit which is not a climbing subunit, the invention is in no way limited to a climbing structure with identical subunits that are not climbing subunits.
  • these subunits can differ in terms of shape, dimensions and the material of the pillars, the platforms and the ropes.
  • the subunits can comprise decorative elements. As illustrated in Fig.1 , decorative elements 15 are added to the top portion of the pillars of the subunits.
  • recreational means like a slide 16 can be added to the climbing structure.
  • the subunits are connected with at least one other subunit. The connections are needed to guarantee the stability of the climbing structure.
  • the subunits in accordance with a preferred embodiment of the present invention are connected by means of two tubes 17 and 18. These tubes are attached to the pillars of the subunits.
  • the tubes are cylinders with a length that equals the distance between the pillars of the subunits.
  • the tubes are preferably made of steel.
  • the shape, the dimensions and the material of the tubes are not restricted to the aforementioned shape, dimensions and material.
  • other types of connections can be used in other embodiments to connect the subunits with at least one other subunit.
  • Fig. 6 depicts an anchoring unit 60 of the climbing structure in accordance with a preferred embodiment of the present invention.
  • the anchoring unit comprises three sub-anchoring units 61, 62 and 63.
  • the configuration of the sub-anchoring units is preferably equal to the configuration of the subunits.
  • the number of sub-anchoring units preferably equals the number of subunits.
  • two sub-anchoring units being climbing sub-anchoring units.
  • the number of climbing sub-anchoring units preferably equals the number of climbing subunits.
  • the climbing sub-anchoring unit comprises a tube 64.
  • This tube is a cylinder preferably made of steel.
  • the shape and material of the tube are not restricted to aforementioned shape and material.
  • the properties of the tube are strongly dependent on the properties of the climbing subunit.
  • the diameter of the tube of the climbing sub-anchoring units has to be larger, in accordance with the preferred embodiment, than the diameter of the pillar of the climbing subunit. I.e., the pillar is shifted into the tube.
  • the tube itself is attached to the ground.
  • the climbing sub-anchoring unit comprises supporting means 65.
  • These supporting means are preferably three round rods 66, 67, 68, slanting mounded to the tube attached to the ground. These rods are preferably made of steel. Aforementioned rods are not required to be identical. E.g., the rods can differ in length.
  • the type and number of supporting means, as well as the shape and the material are not limited to aforementioned type, number, shape and material. The characteristics of the supporting means do largely depend on the characteristics of the climbing subunits, as well as on the characteristics of the ground. In case that an anchoring unit in accordance with the present invention comprises more than one climbing sub-anchoring unit, is the invention not limited to anchoring units with identical climbing sub-anchoring units.
  • the climbing sub-anchoring units can for example differ in terms of shape, dimensions and material of the tubes and supporting means.
  • the sub-anchoring unit 63 which is not a climbing sub-anchoring unit, comprises a tube 69.
  • This tube is a cylinder which is preferably made of steel.
  • the shape and material of the tube are not restricted to the aforementioned shape and aforementioned material.
  • the tube can also be made of synthetic or natural fibres.
  • the characteristics of the tube depend largely on the characteristics of the subunits which are not climbing subunits. This said, the diameter of the tube of the sub-anchoring unit 63 has to be larger, in accordance with the preferred embodiment, than the diameter of the pillar of the subunit which is not a climbing subunit.
  • an anchoring unit in accordance with the present invention comprises more than one sub-anchoring unit which is not a climbing sub-anchoring unit
  • the invention is not limited to anchoring units with identical sub-anchoring units being none climbing sub-anchoring units.
  • the sub-anchoring units can for example differ in terms of shape, dimensions and material of the tubes and supporting means.
  • Each platform comprises a platform side surface 70. A portion of less than 25% of this platform side surface is connected to the pillar of the same climbing subunit by means of platform fixation means 30 . Additionally, a platform is also connected to a pillar of a climbing unit by means of series of ropes, i.e.
  • series of ropes run through the holes in the platform from the first set of fastening means to the second set of fastening means.
  • the first and second set of fastening means are attached to the pillar of the same climbing subunit. Hence, part of the platform is attached to the pillar by means of series of ropes.
  • the climbing structure in accordance to the present invention is relatively simple to construct, simplifying the installation and manufacturing process.
  • the subunits of the climbing structure can be manufactured and installed independently of each other. Therefore, the climbing structure in accordance with present invention is suitable to be installed on uneven grounds, e.g. grounds with steps.
  • the sub-anchoring units can namely be anchored independently of each other to the steps in a relatively simple way.
  • the pillars of the subunits which are manufactured independently of each other can be slide into the tubes of the sub-anchoring units.
  • the subunits are connected with at least one other subunit.

Landscapes

  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Physical Education & Sports Medicine (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Claims (7)

  1. Kletterstruktur (10) zum Gebrauch auf einem Kinderspielplatz mit mindestens drei Untereinheiten (11,12,13), wovon mindestens eine der Untereinheit eine Kletteruntereinheit (11) ist, wobei die Kletteruntereinheit eine Säule (20) mit einem oberen Teil (22) und einem unteren Teil (24) und verschiedene Podeste (23) mit Löchern (41) und einer Serie von Seilen (24) umfasst, dadurch gekennzeichnet, dass der obere Teil einen ersten Satz von Befestigungsmitteln (25) zum Befestigen der Serie von Seilen umfasst, wobei der untere Teil einen zweiten Satz von Befestigungsmitteln (26) zum Befestigen der Serie von Seilen umfasst, wobei die Podeste die Löcher entlang mindestens eines Teils der Podestkante aufweisen, die Serie von Seilen der Kletteruntereinheit an dem ersten Satz von Befestigungsmitteln und an dem zweiten Satz von Befestigungsmitteln von der gleichen Kletteruntereinheit angebracht ist und durch die Löcher der Podeste der gleichen Kletteruntereinheit zum Verbinden des ersten Satzes von Befestigungsmitteln mit dem zweiten Satz von Befestigungsmitteln verlaufen, und die Untereinheiten mit mindestens einer anderen der Untereinheit verbunden sind.
  2. Kletterstruktur nach Anspruch 1, wobei mindestens zwei der Untereinheiten Kletteruntereinheiten (11,12) sind.
  3. Kletterstruktur nach Anspruch 1, wobei der erste Satz von Befestigungsmitteln einen Rahmen, insbesondere einen rund-geformten Gegenstand, verbunden mit dem oberen Teil der Säule mit Hilfe von einer Serie von Verbindern, insbesondere Stäben, umfasst.
  4. Kletterstruktur nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Serie von Seilen eine erste Serie von Seilen (50) und eine zweite Serie von Seilen (51) umfasst, wobei die erste Serie von Seilen Strukturseile umfasst und die zweite Serie von Seilen zu einem Netz miteinander verbunden sind.
  5. Kletterstruktur nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Klettereinheit eine Verankerungseinheit (60) umfasst, wobei die Verankerungseinheit mindestens drei Unterverankerungseinheiten (61, 62, 63) umfasst, von welchen mindestens eine der Unterverankerungseinheit eine Kletterunterverankerung (61) ist, wobei die Kletterunterverankerung eine Röhre und Stützmittel (65) umfasst.
  6. Kletterstruktur nach Anspruch 5, wobei mindestens zwei der Unterverankerungseinheiten Kletterunterverankerungseinheiten (61, 62) sind.
  7. Kletterstruktur nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass nur ein Abschnitt von weniger als 25% der Podestseitenfläche (70) der Kletteruntereinheit mit der Säule der Kletteruntereinheit mit Hilfe von Podestbefestigungsmitteln (30) verbunden ist.
EP15447007.4A 2014-04-17 2015-04-10 Kletterstruktur zum gebrauch auf einem spielplatz Active EP2933004B1 (de)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BE2014/0269A BE1024165B1 (nl) 2014-04-17 2014-04-17 Klimeenheid voor gebruik in een speelruimte voor kinderen

Publications (2)

Publication Number Publication Date
EP2933004A1 EP2933004A1 (de) 2015-10-21
EP2933004B1 true EP2933004B1 (de) 2017-10-25

Family

ID=51014136

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15447007.4A Active EP2933004B1 (de) 2014-04-17 2015-04-10 Kletterstruktur zum gebrauch auf einem spielplatz

Country Status (3)

Country Link
EP (1) EP2933004B1 (de)
BE (1) BE1024165B1 (de)
ES (1) ES2655054T3 (de)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2883192A (en) * 1957-09-05 1959-04-21 Henry Gifford Hardy Playground equipment
DE9212556U1 (de) * 1992-09-17 1992-11-26 Gerg, Peter R., 8221 Neukirchen, De
AU662082B2 (en) * 1992-12-03 1995-08-17 Rubbermaid Australia Pty Ltd Play structure with multiple play spaces
DE19614819A1 (de) * 1996-04-15 1997-10-16 Guenter Beltzig Spielturm für Spielplätze
DE19914192A1 (de) 1999-03-24 2000-10-05 Berliner Seilfabrik Gmbh & Co Kletternetz mit Mittelmastunterstützung
DE10161966A1 (de) * 2001-03-13 2003-01-16 Georg Lauterbach Klettergerät und -anlage
US7056266B2 (en) 2001-09-06 2006-06-06 Everlast Climbing Industries, Inc. Climbing wall assembly
CN2617444Y (zh) * 2003-04-18 2004-05-26 付广宇 一种空中飞道
DE102008024861B4 (de) * 2008-05-23 2014-12-11 Markus Schulz Kletter-Befestigungssystem

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
BE1024165B1 (nl) 2017-11-23
EP2933004A1 (de) 2015-10-21
ES2655054T3 (es) 2018-02-16

Similar Documents

Publication Publication Date Title
US10006220B2 (en) Support system and structure supported thereby
US20090266267A1 (en) System for tower- and cable-based transportation structure
US8012066B1 (en) Wire trampoline enclosure
US8366562B2 (en) Arch-based play system
KR101232775B1 (ko) 복합 놀이기구
GB2549936B (en) Suspendable structure
EP0882473B1 (de) Spielplatzgerät mit aufrechten Pfosten
US8955808B2 (en) Support systems for holding items
KR101526279B1 (ko) 모험 시설용 발판
CA2354292A1 (en) Method and apparatus for providing lateral support to a post
EP2933004B1 (de) Kletterstruktur zum gebrauch auf einem spielplatz
GB2461335A (en) Multipurpose trampoline
AU2020100642A4 (en) A playground apparatus
JP5236104B1 (ja) 防護柵
US3013640A (en) Fire tower
KR101148084B1 (ko) 공중 부양의 즐거움을 제공하는 어린이 놀이용 네트
CN101109240B (zh) 一种二层帐篷房
KR200371027Y1 (ko) 조합놀이대
CN207506908U (zh) 一种带有凹形爬网的攀爬桥
CN207462657U (zh) 一种攀爬桥
RU75414U1 (ru) Ограда
RU2655231C1 (ru) Спортивно-игровой комплекс
EP1508350B1 (de) Modulares dreidimensionales Netz für Kinderspielplatz
KR200412678Y1 (ko) 지그재그 승탑 사다리
JP5950241B1 (ja) 防球用ネット、及び該防球用ネットの形成方法

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

17P Request for examination filed

Effective date: 20160414

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RIC1 Information provided on ipc code assigned before grant

Ipc: A63G 31/14 20060101ALI20170324BHEP

Ipc: A63G 31/00 20060101ALI20170324BHEP

Ipc: E04F 11/02 20060101ALI20170324BHEP

Ipc: A63H 33/00 20060101ALI20170324BHEP

Ipc: A63B 9/00 20060101AFI20170324BHEP

Ipc: A63B 71/02 20060101ALI20170324BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20170518

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 939393

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171115

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602015005601

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2655054

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20180216

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 939393

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171025

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 4

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180125

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180225

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180125

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180126

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602015005601

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20180726

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602015005601

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181101

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180410

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180430

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180410

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20190410

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190410

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180410

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171025

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20150410

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171025

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20230428

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230428

Year of fee payment: 9

Ref country code: ES

Payment date: 20230515

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20230428

Year of fee payment: 9