EP2578705B1 - Process for producing steel pipe for air bag - Google Patents

Process for producing steel pipe for air bag Download PDF

Info

Publication number
EP2578705B1
EP2578705B1 EP11789849.4A EP11789849A EP2578705B1 EP 2578705 B1 EP2578705 B1 EP 2578705B1 EP 11789849 A EP11789849 A EP 11789849A EP 2578705 B1 EP2578705 B1 EP 2578705B1
Authority
EP
European Patent Office
Prior art keywords
steel tube
steel
manufacturing
air bags
content
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP11789849.4A
Other languages
German (de)
English (en)
French (fr)
Other versions
EP2578705A1 (en
EP2578705A4 (en
Inventor
Takuma Kawamoto
Yuji Arai
Takashi Takano
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel and Sumitomo Metal Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel and Sumitomo Metal Corp filed Critical Nippon Steel and Sumitomo Metal Corp
Priority to PL11789849T priority Critical patent/PL2578705T3/pl
Publication of EP2578705A1 publication Critical patent/EP2578705A1/en
Publication of EP2578705A4 publication Critical patent/EP2578705A4/en
Application granted granted Critical
Publication of EP2578705B1 publication Critical patent/EP2578705B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/10Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of tubular bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C29/00Cooling or heating work or parts of the extrusion press; Gas treatment of work
    • B21C29/003Cooling or heating of work
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • C21D1/25Hardening, combined with annealing between 300 degrees Celsius and 600 degrees Celsius, i.e. heat refining ("Vergüten")
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/10Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of tubular bodies
    • C21D8/105Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of tubular bodies of ferrous alloys
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/08Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for tubular bodies or pipes
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/002Ferrous alloys, e.g. steel alloys containing In, Mg, or other elements not provided for in one single group C22C38/001 - C22C38/60
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/06Ferrous alloys, e.g. steel alloys containing aluminium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/42Ferrous alloys, e.g. steel alloys containing chromium with nickel with copper
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/48Ferrous alloys, e.g. steel alloys containing chromium with nickel with niobium or tantalum
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/50Ferrous alloys, e.g. steel alloys containing chromium with nickel with titanium or zirconium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/54Ferrous alloys, e.g. steel alloys containing chromium with nickel with boron

Definitions

  • This invention relates to a process for inexpensively manufacturing a seamless steel tube which is suitable as a steel tube for air bags (air bag systems) and of which are required a high strength as expressed by a tensile strength of at least 900 MPa and a high level of toughness as expressed by a value of vTrs100 (the lowest Charpy fracture appearance transition temperature at which the percent ductile fracture is 100%) of -60° C or below.
  • vTrs100 the lowest Charpy fracture appearance transition temperature at which the percent ductile fracture is 100%
  • Air bag system which has been installed in many automobiles. At the time of a collision, an air bag system inflates an air bag with a gas or the like between a passenger and the steering wheel, the instrument panel, or the like before the passenger impacts these objects and reduces injuries of the passenger by absorbing the kinetic energy thereof.
  • Air bag systems were initially of a type which used explosive chemicals, but in recent years, a type which uses a high-pressure filling gas has been developed and is being increasingly widely used.
  • an inflating gas such as an inert gas (such as argon) which is blown into an air bag at the time of a collision is always maintained at a high pressure inside an accumulator connected to the air bag, and at the time of a collision, the gas is blown all at once from the accumulator into the air bag in order to inflate the air bag.
  • An accumulator is typically manufactured by welding a lid to both ends of a steel tube which has been cut to a suitable length and if necessary subjected to diameter reduction.
  • an air bag accumulator used for an accumulator of an air bag system (referred to below as an air bag accumulator or simply as an accumulator) in an extremely short length of time. Therefore, unlike structures such as conventional pressure cylinders or line pipes, this type of steel tube requires high dimensional accuracy, workability, and weldability as well as a high strength and excellent bursting resistance.
  • accumulators are now manufactured from high-strength seamless steel tubes having a tensile strength of at least 900 MPa or even at least 1000 MPa.
  • a tensile strength of at least 900 MPa or even at least 1000 MPa.
  • a seamless steel tube having an outer diameter of 60 mm and a wall thickness of 3.55 mm as an example, if its tensile strength is 800 MPa, its bursting pressure is at most around 100 MPa, but if its tensile strength is 1000 MPa, its bursting pressure increases to 130 MPa.
  • the outer diameter of an air bag accumulator and the required bursting pressure are constant, it is possible to decrease the wall thickness by around 20%.
  • An accumulator also needs to have excellent low-temperature toughness so that even in cold regions, the accumulator does not undergo brittle fracture at the time of a collision which can lead to secondary accidents.
  • an accumulator has been imparted a high strength and a high toughness by carrying out quench hardening and tempering thereon.
  • an accumulator have low-temperature toughness such that fracture in a Charpy impact test at -60° C is ductile (namely, vTrs100 is -60° C or below) and preferably such that fracture in a Charpy impact test at -80° C is ductile (vTrs100 is -80° C or below).
  • Patent Document 1 proposes a process for manufacturing a seamless steel tube for air bags comprising forming a seamless steel tube by hot working using a steel material having a chemical composition in a prescribed range, cold drawing the seamless steel tube so as to give predetermined dimensions, heating the steel tube to a temperature in the range of at least the Ac 3 point to at most 1050° C followed by quenching, and then tempering it at a temperature in the range of at least of 450° C to at most the Ac 1 point.
  • this process provides a seamless steel tube which has excellent workability and weldability at the time of manufacture of an air bag inflator, which has a tensile strength of at least 900 MPa when used as an inflator, and which has high toughness such that it exhibits ductility in a dropping test performed at -60° C on a steel tube cut in half.
  • the fact that it exhibits ductility in a dropping test at -60° C does not necessarily mean that it is ductile in a bursting test at -60° C.
  • Patent Document 2 proposes a process for manufacturing a steel tube for air bag systems having a tensile strength exceeding 1000 MPa by carrying out quench hardening by high-frequency induction heating to achieve grain refinement by rapid heating.
  • the seamless steel tube is prepared by hot tube forming using a steel material having a chemical composition in a prescribed range, and the seamless steel tube is subjected to cold drawing to obtain a steel tube having predetermined dimensions. After the steel tube is heated, it is quenched and then tempered at a temperature of at most the Ac 1 transformation point. By carrying out tempering after quench hardening, the steel tube is given a desirable high toughness so as to exhibit ductility in a bursting test even at -80° C or below.
  • Patent Document 1 in order to obtain a steel tube having a tensile strength of at least 1000 MPa and a high toughness, it was necessary to contain a large amount of expensive alloying metals such as Cr and Mo.
  • the (Cr + Mo) content is from 1.0 to 2.5 mass %
  • Patent Document 2 a steel material is employed for which in many cases the (Cr + Mo) content is 0.92 mass %. If large amounts of Cr and Mo are contained, in addition to a high material cost particularly due to expensive Mo, after forming a seamless steel tube in a hot state, the resulting steel tube tends to have a high strength which makes the subsequent cold drawing difficult. Therefore, softening treatment becomes necessary before cold drawing, thereby making the manufacturing process complicated and manufacturing costs high.
  • Patent Document 3 which utilizes a steel in which the (Cr + Mo) content is 1.0 - 1.18 mass %, has the same problems as Patent Documents 1 and 2.
  • Patent Document 4 discloses a steel composition for a seamless steel tube having excellent bursting resistance and which contains Cr, Mo, Cu, and Ni. However, its properties are evaluated with respect to a seamless steel tube in which the (Cr + Mo) content is at least 0.76 mass %, and the tensile strength of that tube is at most 947 MPa.
  • Patent Document 5 ( US 2006/169368 A1 ) relates to low carbon alloy steel tubes having ultra high strength and excellent toughness at low temperature and also to a method of manufacturing such a steel tube.
  • An object of the present invention is to provide a process for manufacturing a steel tube for air bags having a high strength and high toughness by less expensive means than the prior art techniques and which is less expensive than conventional products by simplifying a drawing step or decreasing the alloy cost.
  • an object of the present invention is to provide a process for manufacturing a steel tube for air bags having a wall thickness and diameter which are the same as or smaller than those of conventional products using a starting material and a manufacturing process with lower costs than in the past.
  • the present inventors noted that as a result of relying on strengthening by Cr and Mo in a conventional high-strength steel tube for air bags, the strength after the completion of hot tube forming becomes high, thereby leading to a decrease in productivity during cold drawing, and the alloy cost increases. Therefore, they investigated an alloy composition and a manufacturing process which suppress the use of these alloy elements as much as possible and which can guarantee a high strength as expressed by a tensile strength of at least 900 MPa and excellent low-temperature toughness as expressed by vTrs100 of -60° C or below.
  • the present invention is a process for manufacturing a steel tube having a tensile strength of at least 900 MPa and a low-temperature toughness expressed by a value of vTrs 100 of -60°C or below for air bags characterized by including a tube forming step in which a seamless steel tube is produced by hot tube forming from a steel consisting of, in mass %, C: 0.04 - 0.20%, Si: 0.10 - 0.50%, Mn: 0.10 - 1.00%, P: at most 0.025%, S: at most 0.005%, Al: at most 0.10%, Cr: 0.01 - 0.50%, Cu: 0.01 - 0.50%, Ni: 0.01 - 0.50%, Mo: less than 0.10%, Nb: at most 0.050%, Ti: at most 0.050%, V: at most 0.20%, Ca: at most 0.005%, B: at most 0.0030%, and a remainder of Fe and unavoidable impurities, a cold drawing step in which the
  • Preferred embodiments of a process for manufacturing a steel tube for air bags according to the present invention are as follows.
  • the steel may optionally further contain one or more of the following elements:
  • the contents of Cu, Ni, Cr, and Mo in the steel preferably satisfy the following Equation (1).
  • the wall thickness of the steel tube after completion of the cold drawing step is preferably at most 2.0 mm.
  • the cold drawing step is preferably carried out by performing cold drawing a single time.
  • the heating for quench hardening in the heat treatment step is preferably carried out by high-frequency induction heating.
  • the steel tube obtained in the cold drawing step preferably undergoes straightening.
  • the present invention it is possible to manufacture a steel tube for air bags having a high strength as expressed by a tensile strength of at least 900 MPa and excellent low-temperature toughness as expressed by vTrs100 of -60° C or below, while the content of expensive Mo is restricted to 0 or a low level.
  • the strength of the seamless steel tube obtained by hot tube forming is not too high, so the working ratio in the subsequent cold drawing step can be increased compared to a conventional process, and the number of times that cold drawing operation must be carried out with intervening softening between cold rolling operations can be decreased. Therefore, according to the present invention, it is possible to decrease both the alloy cost and the manufacturing cost of a steel tube for air bags compared to the prior art.
  • percent with respect to the chemical composition of a steel means mass percent.
  • the remainder of the chemical composition of a steel other than the elements described below is Fe and unavoidable impurities.
  • C is an element which is effective at inexpensively increasing the strength of steel. If its content is less than 0.04%, it is difficult to obtain a high strength (tensile strength), and if it exceeds 0.20%, workability and weldability decrease. Accordingly, the C content is made at least 0.04% and at most 0.20%. A preferred range for the C content is at least 0.07% to at most 0.20%, and a more preferred range is at least 0.12% to at most 0.17%. When it is desired to obtain a tensile strength of at least 1000 MPa, it is preferable to contain at least 0.06% of C.
  • Si is an element which has a deoxidizing action and which also increases the strength of steel by increasing its hardenability.
  • the Si content is made at least 0.10%. However, if its content exceeds 0.50%, toughness decreases, so the Si content is made at most 0.50%.
  • a preferred range for the Si content is at least 0.20% to at most 0.45%.
  • Mn is an element which has a deoxidizing action and which is also effective at increasing the strength and toughness of steel by increasing its hardenability. If its content is less than 0.10%, a sufficient strength and toughness are not obtained. If its content exceeds 1.00%, coarsening of MnS takes place, the coarse MnS being elongated at the time of hot rolling, leading to a decrease in toughness. Therefore, the Mn content is made at least 0.10% and at most 1.00%. A preferred Mn content is at least 0.30% and at most 0.80%.
  • P which is contained in steel as an impurity, produces a decrease in toughness due to grain boundary segregation.
  • the P content exceeds 0.025%, toughness is markedly decreased. Accordingly, the P content is made at most 0.025%.
  • the P content is preferably at most 0.020% and more preferably at most 0.015%.
  • S which is contained in steel as an impurity, also decreases toughness particularly in the T direction of a steel tube (the direction perpendicular to the rolling direction (the lengthwise direction) of a steel tube). If the S content exceeds 0.005%, there is a marked decrease in the toughness in the T direction of a steel tube, so the S content is made at most 0.005%. A preferred S content is at most 0.003%.
  • Al is an element which has a deoxidizing action and which is effective at increasing the toughness and workability of steel. However, if Al is contained in an amount exceeding 0.10%, there is marked occurrence of sand marks. Accordingly, the Al content is made at most 0.10%.
  • the Al content may be on the level of an impurity, so there is no particular lower limit, but it is preferably at least 0.005%.
  • the Al content in the present invention is expressed as the content of acid-soluble Al (so-called sol. Al).
  • Cr has the effect of increasing the strength and toughness of steel by increasing the hardenability and resistance to temper softening. This effect appears when the Cr content is at least 0.01%.
  • Cr is an element which improves hardenability, it causes hardening of steel in the cooling stage after hot tube forming, thereby limiting the working ratio in a single time of cold drawing operation, so there is an increased necessity to perform cold drawing a plurality of times in a cold drawing step with intervening softening treatment.
  • an increase in the Cr content leads to an increase in the alloy cost.
  • the Cr content is made at least 0.01% and at most 0.50%.
  • a preferred Cr content is at least 0.15% to at most 0.45%, and a more preferred content is at least 0.18% to at most 0.35%.
  • Mo has the effect of increasing the strength and toughness of steel by increasing the hardenability and resistance to temper softening. This effect appears when its content is at least 0.01%.
  • the necessary strength and toughness are achieved by Ni and Cu, and it is not essential to add Mo. Namely, Mo may be 0%.
  • an Mo content of 0.10% or higher is an impediment to achieving the objects of the present invention. Accordingly, when Mo is contained, its content is made less than 0.10%, and a preferred content of Mo is at least 0.01% and at most 0.05%.
  • Cu has the effect of increasing the strength and toughness of steel by increasing its hardenability. This effect is exhibited if the Cu content is at least 0.01% and preferably at least 0.03%. However, a Cu content in excess of 0.50% leads to an increase in the alloy cost. Accordingly, the Cu content is made at least 0.01% and at most 0.50%. A preferred Cu content is at least 0.03% and particularly at least 0.05%, and more preferably at least 0.15%. The upper limit on the Cu content is preferably 0.40% and more preferably 0.35%.
  • Ni has the effect of increasing the strength and toughness of steel by increasing its hardenability. This effect appears if the Ni content is at least 0.01% and preferably at least 0.03%. However, an Ni content exceeding 0.50% leads to an increase in the alloy cost. Accordingly, the Ni content is made at least 0.01% and at most 0.50%.
  • the Ni content is preferably at least 0.03%, more preferably at least 0.05%, and most preferably at least 0.15%.
  • the upper limit on the Ni content is preferably 0.40% and more preferably 0.35%.
  • the sum of the contents of Cu and Ni (Cu + Ni) is preferably at least 0.20% and at most 0.65%, and more preferably at least 0.28% and at most 0.60%.
  • the contents of Cu, Ni, Cr, and Mo in steel are adjusted so as to satisfy the following Equation (1).
  • Equation (1) The symbols for elements in Equation (1) indicate the value of the content of each element in mass percent. When the steel does not contain Mo, Mo is 0.
  • Cr and Mo interfere with spheroidization of cementite which precipitates during tempering. Particularly in a steel containing B, they easily form compounds with B (borides) at grain boundaries, so they easily cause a decrease in toughness particularly in a high-strength steel.
  • B borides
  • At least one element selected from one or both of the following groups (i) and (ii) can be further contained.
  • Nb which is finely dispersed in steel as carbides, has an effect of strongly pinning grain boundaries. As a result, it refines crystal grains and increases the toughness of steel. However, if Nb is contained in an amount exceeding 0.050%, carbides coarsen and toughness ends up decreasing. Accordingly, when Nb is added, its content is made at most 0.050%. The above-described effect of Nb appears even with an extremely small content, but in order to adequately obtain this effect, the Nb content is preferably at least 0.005%.
  • Ti has the effect of fixing N in steel and thereby increasing toughness. Finely-dispersed Ti nitrides strongly pin grain boundaries and refine crystal grains, thereby increasing the toughness of steel. However, if Ti is contained in an amount larger than 0.050%, nitrides coarsen and toughness ends up decreasing. Accordingly, the content of Ti when it is added is made at most 0.050%. The effect of Ti appears even when it is added in a minute amount, but in order to adequately obtain its effect, its content is preferably at least 0.005%. A preferred Ti content is 0.008 - 0.035%.
  • V at most 0.20%
  • V has the effect of ensuring toughness and increasing strength by precipitation strengthening.
  • a V content exceeding 0.20% leads to a decrease in toughness.
  • the content of V when it is added is made at most 0.20%.
  • the effect of V appears even when it is added in a minute amount, but in order to obtain an adequate effect, its content is preferably at least 0.02%.
  • a preferred range for the V content is 0.03 - 0.10%.
  • Ca has the effect of fixing S, which is present in steel as an unavoidable impurity, as sulfides and improving the anisotropy of toughness, thereby increasing the toughness in the T direction of a steel tube and hence increasing the resistance to bursting thereof.
  • the content of Ca when it is added is made at most 0.005%.
  • the above-described effect of Ca is observed even when it is added in an extremely small amount, but in order to obtain an adequate effect, its content is preferably at least 0.0005%.
  • B When B is added in a minute amount, it segregates at grain boundaries in steel and markedly increases the hardenability of steel. However, if the B content is 0.0030% or higher, coarse borides precipitate at grain boundaries and a tendency for toughness to decrease is observed. Accordingly, when B is added, its content is made at most 0.0030%. The effect of B is observed even when it is added in a minute amount, but in order to guarantee an adequate effect, its content is preferably made at least 0.0005%.
  • N which easily forms a compound with B, is preferably fixed by Ti, and B is preferably contained in at least an amount which is fixed by N.
  • the B content preferably satisfies the relationship given by the following Equation (2) based on the stoichiometric ratios of B, Ti, and N.
  • Equation (2) B, N, and Ti represent the values of the contents of those elements in mass percent.
  • a steel ingot of a steel having its chemical composition adjusted as set forth above in (A) is used as a starting material to obtain a seamless steel tube by hot tube forming.
  • a steel ingot which is used as a starting material for hot tube forming may be a cast member (a round CC billet) obtained by casting using a continuous casting machine having a cylindrical mold, or it may be an ingot which is cast into a rectangular mold and then hot forged to obtain a cylindrical shape.
  • ferrite-stabilizing elements such as Cr and Mo
  • austenite-stabilizing elements such as Cu and Ni
  • a hot tube forming method for obtaining a seamless steel tube there are no particular limitations on a hot tube forming method for obtaining a seamless steel tube.
  • the mandrel-Mannesmann method can be used. Cooling after hot tube forming is preferably cooling with a low cooling rate such as air cooling in order to facilitate cold drawing.
  • a low cooling rate such as air cooling
  • the shape of the resulting seamless steel tube but a diameter of 32 - 50 mm and a wall thickness of around 2.5 - 3.0 mm, for example, are suitable.
  • a seamless steel tube which is obtained by hot tube forming generally has a large wall thickness and a large diameter with an inadequate dimensional accuracy.
  • the seamless steel tube which is used as a mother tube is subjected to cold drawing.
  • the working ratio (reduction in area) in at least one time of cold drawing operation which is performed in the cold drawing step is made greater than 40%. If the working ratio in one time of cold drawing operation exceeds 50%, inner surface wrinkles and cracks easily develop, so the working ratio is preferably 42 - 48% and more preferably 43 - 46%.
  • the working ratio in at least one of the times should be at least 40%, and it is possible to combine cold drawing having a working ratio of at least 40% with cold drawing having a working ratio of less than 40%.
  • the working ratio in cold drawing is synonymous with the reduction in area (decrease in cross section) defined by the following formula.
  • % reduction in area S 0 ⁇ S f ⁇ 100 / S 0
  • S 0 is the cross-sectional area of the steel tube before cold drawing
  • S f is the cross-sectional area of the steel tube after the completion of cold drawing.
  • the cross-sectional area of a steel tube is the cross-sectional area of just the tube wall and excludes the hollow portion of the tube cross section.
  • the working ratio (or reduction in area) in one time of cold drawing operation can be the total working ratio when cold drawing is performed a plurality of times with no softening intervening between occurrences of cold drawing.
  • the working ratio in one time of cold drawing can exceed 40%, so if the finished dimensions of a seamless steel tube obtained by hot tube forming are suitably selected, it is possible to manufacture a thin-walled steel tube of predetermined dimensions in a single occurrence (one time) of cold drawing. Manufacture can thus be greatly simplified compared to the conventional process for manufacturing a thin-walled steel tube, which requires two occurrences of cold drawing and requires intervening softening between them.
  • cold drawing can be carried out in a conventional manner.
  • a seamless steel tube prepared by the mandrel-Mannesmann method as described above is used as a mother tube
  • the resulting tube may be allowed to cool to room temperature and then subjected to drawing with a die and a plug to reduce the diameter and wall thickness of the tube.
  • a steel tube for air bags preferably has a diameter of at most 30 mm and a wall thickness of at most 2 mm, for example.
  • the above-described drawing method is preferable.
  • a steel composition used in the present invention it is possible to perform working with a reduction in area of 46%, for example, by single occurrence of cold drawing. Therefore, when the final dimensions of a steel tube for air bags are a wall thickness of 1.7 mm and an outer diameter of 25 mm, if the dimensions of a mother tube to undergo cold drawing are, for example, an outer diameter of 31.8 mm and a wall thickness of 2.5 mm, it is possible to obtain a product having predetermined dimensions by performing cold drawing a single time.
  • a steel tube for air bags manufactured in the present invention has a tensile strength of at least 900 MPa and has undergone cold drawing with a reduction in area of at least 40%, there is a tendency for the strength of the steel tube after cold drawing to be higher than for a conventional steel, and in some cases, there is the possibility of the steel tube developing bending such as springback after cold drawing.
  • a steel tube which is given predetermined dimensions by cold drawing is heated to at least the Ac 3 transformation point by rapid heating for the purpose of quench hardening.
  • This rapid heating is typically carried out by high-frequency induction heating. If there are bends in a steel tube which is to undergo quench hardening, the problem may occur that the steel tube is unable to pass straight through the high-frequency coils used for high-frequency induction heating. Accordingly, in a preferred embodiment, straightening is carried out after cold drawing to remove bends in the steel tube.
  • straightening can be carried out in a conventional manner.
  • a preferred method is one in which four 2-roll stands having an adjusted roll gap are provided with the center of the roll gap in each stand being slightly deviated or offset with respect to each other and a steel tube is passed through the rolls to apply working in the form of bending forth and back.
  • the amount of offset (the amount of deviation of the roll axis between adjacent roll pairs) is made at least 1% of the outer diameter of the steel tube, and the roll gap is preferably made at most 1% smaller than the outer diameter of the steel tube.
  • the amount of offset is preferably made at most 50% of the outer diameter of the steel tube, and the roll gap is preferably made at least 5% smaller than the outer diameter of the steel tube.
  • the steel tube After carrying out the straightening described above in (D) as required, the steel tube is subjected to heat treatment in order to impart the required tensile strength to the steel tube and increase the toughness in the T direction, thereby guaranteeing bursting resistance.
  • heat treatment is carried out by quench hardening after heating to a temperature of at least the Ac 3 (transformation) point and subsequent tempering at a temperature of at most the Ac 1 (transformation) point.
  • the heating temperature before quenching is lower than the Ac 3 point at which an austenite single phase forms, it is not possible to guarantee good toughness in the T direction (and accordingly good bursting resistance).
  • the heating temperature is preferably made at most 1050° C. More preferably it is at most 1000° C.
  • Heating to at least the Ac 3 point for quench hardening is carried out by rapid heating at a heating rate of at least 50° C per second.
  • This heating rate can be the average heating rate in a temperature range from at least 200° C to the heating temperature. If the heating rate is lower than 50° C per second, it is not possible to achieve refinement of austenite grain diameters, and the tensile strength and low-temperature toughness or bursting resistance decrease.
  • the heating rate is preferably at least 80° C per second and more preferably at least 100° C per second.
  • This rapid heating can be achieved by high-frequency induction heating. In this case, the heating rate can be adjusted by the feed speed of a steel tube passing through high-frequency coils.
  • a steel tube which has been heated to a temperature of at least the Ac 3 point by rapid heating is held for a short period at a temperature of at least the Ac 3 point, and then it is rapidly cooled to carry out quench hardening.
  • the holding time is preferably in the range of 0.5 - 8 seconds. More preferably it is 1 - 4 seconds. If the holding time is too short, the uniformity of mechanical properties is sometimes inferior. If the holding time is too long, particularly if the holding temperature is on the high side, it easily leads to coarsening of the austenite grain diameter. Refinement of grain diameter is necessary to guarantee extremely high toughness.
  • the cooling rate for quench hardening is controlled so as to be at least 50° C per second at least in a temperature range of 850 - 500° C. This cooling rate is preferably at least 100° C per second. In order to make the tensile strength at least 1000 MPa and make vTrs100 a value of -80° C or below, the cooling rate is preferably made at least 150° C per second. If the cooling rate is too low, quench hardening becomes incomplete, and the proportion of martensite decreases, so a sufficient tensile strength is not obtained.
  • a steel tube which has undergone the above-described rapid cooling and cooled to the vicinity of room temperature is then subjected to tempering at a temperature of at most the Ac 1 point in order to impart a tensile strength of at least 900 MPa and sufficient bursting resistance. If the tempering temperature exceeds the Ac 1 point, it becomes difficult to stably obtain the desired tensile strength and low-temperature toughness with certainty.
  • a method for tempering there are no particular limitations on a method for tempering, and it can be carried out by, for example, soaking in a heat treatment furnace such as a hearth roller type continuous furnace or by using high-frequency induction heating or the like followed by cooling.
  • Preferred soaking conditions in a heat treatment furnace are a temperature of 350 - 500° C and a holding time of 20 - 30 minutes.
  • bends can be straightened using a suitable straightener or the like in the manner described in (D).
  • the steel tube is cut to a predetermined length to obtain a short tube, and if necessary at least one end of the cut tube is subjected to diameter reduction by press working or spinning (this is referred to as bottling) for final working to a shape necessary for mounting of an initiator or the like.
  • the predetermined dimensions and dimensional accuracy for a steel tube for air bags referred to in this description mean the dimensions and dimensional accuracy with respect to the tube thickness and diameter.
  • a lid is mounted on each end of the steel tube by welding.
  • the two types of mother tubes which were obtained in this manner underwent cold drawing one or two times by a usual method which carries out drawing using a die and a plug and were finished to form steel tubes with an outer diameter of 25.0 mm and a wall thickness of 1.7 mm.
  • Comparative Examples 9 and 10 the second mother tubes were used.
  • Each steel tube which underwent cold drawing was straightened using a straightener, and then it was subjected to water quenching by heating to 920° C at an average heating rate of 300° C per second (the average value in the temperature range of 200 - 900° C) using a high-frequency induction heating apparatus, holding at 920° C for 2 seconds, and water cooling (at an average cooling rate of 150° C per second in the temperature range of 850 - 500° C). Subsequently, in order to temper the steel tube, it was soaked for 30 minutes at 350 - 500° C in a bright annealing furnace and then cooled to room temperature by natural cooling initially in the furnace and then outside the furnace to obtain a steel tube for air bags.
  • a tube of a fixed length was cut from each resulting steel tube, and it was cut in the lengthwise direction of the tube at room temperature and unrolled.
  • a rectangular member having a length of 55 mm, a height of 10 mm, and a width of 1.7 mm which was taken in the T direction from the unrolled tube and which had a 2-mm V-notch was used as a test piece for a Charpy impact test which was carried out at various temperatures of -40° C and below. By means of this test, the lowest temperature at which the percent ductile fracture was 100% (vTrs100) was obtained.
  • Steels G and H which were comparative examples, contained a large amount of Mo, so the alloy cost was high. Furthermore, cracks developed when cold drawing was carried out with a reduction in area of at least 40%. Therefore, it is necessary to carry out cold drawing at least 2 times with a reduction in area of less than 40%, and softening between cold drawing is necessary, so the manufacturing costs of a steel tube for air bags also increase.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Manufacturing & Machinery (AREA)
  • Heat Treatment Of Articles (AREA)
  • Heat Treatment Of Steel (AREA)
  • Metal Extraction Processes (AREA)
EP11789849.4A 2010-06-03 2011-06-01 Process for producing steel pipe for air bag Active EP2578705B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL11789849T PL2578705T3 (pl) 2010-06-03 2011-06-01 Sposób wytwarzania rury stalowej do poduszki powietrznej

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2010127713 2010-06-03
PCT/JP2011/062583 WO2011152447A1 (ja) 2010-06-03 2011-06-01 エアバッグ用鋼管の製造方法

Publications (3)

Publication Number Publication Date
EP2578705A1 EP2578705A1 (en) 2013-04-10
EP2578705A4 EP2578705A4 (en) 2017-06-14
EP2578705B1 true EP2578705B1 (en) 2018-08-08

Family

ID=45066805

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11789849.4A Active EP2578705B1 (en) 2010-06-03 2011-06-01 Process for producing steel pipe for air bag

Country Status (12)

Country Link
US (1) US20130086965A1 (es)
EP (1) EP2578705B1 (es)
JP (1) JP5234226B2 (es)
KR (1) KR20130020811A (es)
CN (1) CN103261451B (es)
CA (1) CA2800991C (es)
ES (1) ES2691209T3 (es)
MX (1) MX2012013939A (es)
PL (1) PL2578705T3 (es)
TR (1) TR201815837T4 (es)
TW (1) TWI436912B (es)
WO (1) WO2011152447A1 (es)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5316635B2 (ja) * 2011-12-21 2013-10-16 新日鐵住金株式会社 エアバック用鋼管の製造方法
JP5304915B2 (ja) 2012-03-09 2013-10-02 新日鐵住金株式会社 金属管の製造方法及び製造設備
CN103639233B (zh) * 2013-11-28 2016-02-17 攀钢集团江油长城特殊钢有限公司 制造40MPa级超高压气瓶用锻制无缝钢管的方法
CN103725859B (zh) * 2013-11-30 2015-09-16 常熟市东鑫钢管有限公司 无缝钢管的制造方法
CN104046924B (zh) 2014-06-25 2017-01-04 宝山钢铁股份有限公司 一种汽车安全气囊用高强韧无缝钢管及其制造方法
PL3719148T3 (pl) * 2019-04-05 2023-05-08 Ssab Technology Ab Wyrób stalowy o wysokiej twardości i sposób jego wytwarzania
CN113770196A (zh) * 2021-09-15 2021-12-10 江苏宏亿钢管有限公司 安全气囊用精密无缝钢管加工工艺

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050000601A1 (en) * 2003-05-21 2005-01-06 Yuji Arai Steel pipe for an airbag system and a method for its manufacture
US20050076975A1 (en) * 2003-10-10 2005-04-14 Tenaris Connections A.G. Low carbon alloy steel tube having ultra high strength and excellent toughness at low temperature and method of manufacturing the same
US20060169368A1 (en) * 2004-10-05 2006-08-03 Tenaris Conncections A.G. (A Liechtenstein Corporation) Low carbon alloy steel tube having ultra high strength and excellent toughness at low temperature and method of manufacturing the same
PL1816227T3 (pl) * 2004-10-29 2016-07-29 Nippon Steel & Sumitomo Metal Corp Rura stalowa do napełniacza poduszki powietrznej oraz sposób jej wytwarzania
KR101008807B1 (ko) * 2006-02-09 2011-01-14 수미도모 메탈 인더스트리즈, 리미티드 에어백 인플레이터용 보틀 부재의 제조 방법
KR101081223B1 (ko) * 2006-10-27 2011-11-07 수미도모 메탈 인더스트리즈, 리미티드 에어백 어큐뮬레이터용 심리스 강관과 그 제조 방법
JP4770922B2 (ja) * 2008-12-08 2011-09-14 住友金属工業株式会社 エアバッグ用鋼管とその製造方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
CA2800991A1 (en) 2011-12-08
TR201815837T4 (tr) 2018-11-21
CN103261451A (zh) 2013-08-21
TWI436912B (zh) 2014-05-11
EP2578705A1 (en) 2013-04-10
CA2800991C (en) 2016-08-02
WO2011152447A1 (ja) 2011-12-08
JP5234226B2 (ja) 2013-07-10
US20130086965A1 (en) 2013-04-11
ES2691209T3 (es) 2018-11-26
PL2578705T3 (pl) 2019-03-29
TW201217199A (en) 2012-05-01
KR20130020811A (ko) 2013-02-28
MX2012013939A (es) 2013-05-06
CN103261451B (zh) 2015-06-24
EP2578705A4 (en) 2017-06-14
JPWO2011152447A1 (ja) 2013-08-01

Similar Documents

Publication Publication Date Title
EP2484793B1 (en) Steel pipe for air bag and process for producing same
US7727463B2 (en) Steel pipe for an airbag system
EP2578705B1 (en) Process for producing steel pipe for air bag
US7749339B2 (en) Process for manufacturing an airbag inflator bottle member
EP2551366B1 (en) High-strength electrical-resistance-welded steel pipe and manufacturing method therefor
JPH10140250A (ja) 高強度高靭性エアーバッグ用鋼管の製造方法
JP4770922B2 (ja) エアバッグ用鋼管とその製造方法
US20060070687A1 (en) Method for producing seamless steel pipe for inflator of air bag
JP2002194501A (ja) 高強度高靱性エアバッグ用鋼管とその製造方法
JP2004076034A (ja) エアバッグ用高強度高靭性高加工性継目無鋼管の製造方法
JPH10140249A (ja) 高強度高靭性エアーバッグ用鋼管の製造方法
JPH10140238A (ja) 高強度高靭性エアーバッグ用鋼管の製造方法
JP4079054B2 (ja) エアバッグボトル用高強度高靭性溶接鋼管およびその製造方法
JP3960145B2 (ja) エアバッグ用高強度高靱性高加工性継目無鋼管の製造方法
JP2003201541A (ja) エアバッグ用高強度高加工性継目無鋼管およびその製造方法
US20080265553A1 (en) Process for manufacturing an airbag inflator bottle member

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20121228

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
RA4 Supplementary search report drawn up and despatched (corrected)

Effective date: 20170515

RIC1 Information provided on ipc code assigned before grant

Ipc: C21D 8/10 20060101AFI20170509BHEP

Ipc: C22C 38/48 20060101ALI20170509BHEP

Ipc: C22C 38/06 20060101ALI20170509BHEP

Ipc: C21D 1/25 20060101ALI20170509BHEP

Ipc: C22C 38/04 20060101ALI20170509BHEP

Ipc: C21D 9/08 20060101ALI20170509BHEP

Ipc: C22C 38/50 20060101ALI20170509BHEP

Ipc: C22C 38/00 20060101ALI20170509BHEP

Ipc: C22C 38/42 20060101ALI20170509BHEP

Ipc: B21C 29/00 20060101ALI20170509BHEP

Ipc: C22C 38/54 20060101ALI20170509BHEP

Ipc: C22C 38/02 20060101ALI20170509BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: C22C 38/02 20060101ALI20180126BHEP

Ipc: C22C 38/04 20060101ALI20180126BHEP

Ipc: C21D 9/08 20060101ALI20180126BHEP

Ipc: C22C 38/48 20060101ALI20180126BHEP

Ipc: C22C 38/50 20060101ALI20180126BHEP

Ipc: C21D 1/25 20060101ALI20180126BHEP

Ipc: C22C 38/42 20060101ALI20180126BHEP

Ipc: B21C 29/00 20060101ALI20180126BHEP

Ipc: C22C 38/00 20060101ALI20180126BHEP

Ipc: C22C 38/54 20060101ALI20180126BHEP

Ipc: C22C 38/06 20060101ALI20180126BHEP

Ipc: C21D 8/10 20060101AFI20180126BHEP

INTG Intention to grant announced

Effective date: 20180213

RIN1 Information on inventor provided before grant (corrected)

Inventor name: ARAI YUJI

Inventor name: TAKANO TAKASHI

Inventor name: KAWAMOTO TAKUMA

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1027083

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180815

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602011050874

Country of ref document: DE

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2691209

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20181126

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20180808

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181208

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181108

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181109

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181108

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602011050874

Country of ref document: DE

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602011050874

Country of ref document: DE

Representative=s name: ZIMMERMANN & PARTNER PATENTANWAELTE MBB, DE

Ref country code: DE

Ref legal event code: R081

Ref document number: 602011050874

Country of ref document: DE

Owner name: NIPPON STEEL CORPORATION, JP

Free format text: FORMER OWNER: NIPPON STEEL & SUMITOMO METAL CORPORATION, TOKYO, JP

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: AT

Ref legal event code: UEP

Ref document number: 1027083

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180808

26N No opposition filed

Effective date: 20190509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20190630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190601

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190630

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190630

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190630

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190601

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181208

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20200601

Year of fee payment: 10

Ref country code: DE

Payment date: 20200519

Year of fee payment: 10

Ref country code: FR

Payment date: 20200512

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20200520

Year of fee payment: 10

Ref country code: IT

Payment date: 20200512

Year of fee payment: 10

Ref country code: PL

Payment date: 20200428

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20200526

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20200701

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20110601

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602011050874

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 1027083

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210601

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20210601

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210601

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220101

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210601

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180808

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210601

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20220829

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210602

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210601