EP2547590A1 - Shrink tunnel for applying shrink films, method for operating or controlling a shrink tunnel, and production system having a shrink tunnel - Google Patents

Shrink tunnel for applying shrink films, method for operating or controlling a shrink tunnel, and production system having a shrink tunnel

Info

Publication number
EP2547590A1
EP2547590A1 EP11702142A EP11702142A EP2547590A1 EP 2547590 A1 EP2547590 A1 EP 2547590A1 EP 11702142 A EP11702142 A EP 11702142A EP 11702142 A EP11702142 A EP 11702142A EP 2547590 A1 EP2547590 A1 EP 2547590A1
Authority
EP
European Patent Office
Prior art keywords
tunnel
temperature
shrink
shrink tunnel
operating temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP11702142A
Other languages
German (de)
French (fr)
Other versions
EP2547590B1 (en
Inventor
Christian Schilling
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KHS GmbH
Original Assignee
KHS GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=43911618&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP2547590(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by KHS GmbH filed Critical KHS GmbH
Publication of EP2547590A1 publication Critical patent/EP2547590A1/en
Application granted granted Critical
Publication of EP2547590B1 publication Critical patent/EP2547590B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B53/00Shrinking wrappers, containers, or container covers during or after packaging
    • B65B53/02Shrinking wrappers, containers, or container covers during or after packaging by heat
    • B65B53/06Shrinking wrappers, containers, or container covers during or after packaging by heat supplied by gases, e.g. hot-air jets
    • B65B53/063Tunnels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B9/00Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity
    • F27B9/06Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity heated without contact between combustion gases and charge; electrically heated
    • F27B9/10Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity heated without contact between combustion gases and charge; electrically heated heated by hot air or gas
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B9/00Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity
    • F27B9/30Details, accessories, or equipment peculiar to furnaces of these types
    • F27B9/40Arrangements of controlling or monitoring devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B2220/00Specific aspects of the packaging operation
    • B65B2220/24Cooling filled packages
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D19/00Arrangements of controlling devices
    • F27D2019/0003Monitoring the temperature or a characteristic of the charge and using it as a controlling value
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D19/00Arrangements of controlling devices
    • F27D2019/0028Regulation
    • F27D2019/0059Regulation involving the control of the conveyor movement, e.g. speed or sequences
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D19/00Arrangements of controlling devices
    • F27D2019/0087Automatisation of the whole plant or activity
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D21/00Arrangements of monitoring devices; Arrangements of safety devices

Definitions

  • Shrink tunnel for applying shrink films, method for operating or controlling a shrink tunnel and production plant with a shrinking tunnel
  • the invention relates to a shrink tunnel for applying
  • the packaging such as bottles, cans or other packaging, which were filled in previous investment components or machines with a product, sealed and labeled, a downstream
  • packaging means in which the packaging means are assembled, for example on packaging elements in each case to packaging groups with a predetermined number of packaging and the packaging groups thus produced are each covered with a shrink film.
  • Packaging group formed by shrinking the shrink film under the action of heat, in particular by blowing hot air in each case a fixed or fixed packaging unit.
  • the shrink tunnel which generally has a plurality of heating or tunnel zones, each having its own heating means, in successive heating or tunneling zones of the packaging units or packages all tunnel zones by appropriate control or regulation of the heating power of the heating means constantly required for the shrinkage of the shrink films target operating temperature, for example, a temperature in the range between 195 ° C and 210 ° C, preferably at a temperature of about 200 ° C, even during malfunctions in which no packaging or packaging groups for shrinking the shrink film by the
  • Shrink tunnels are moved and, for example, due to disturbances in the shrink tunnel preceding or subsequent investment components or machines are required.
  • the heating means are usually electric or
  • gas-powered heating elements especially those of hot air blowers.
  • the invention has for its object to provide a shrink tunnel, which avoids these disadvantages.
  • a shrink tunnel according to the patent claim 1 is formed.
  • a method for operating or controlling a shrink tunnel is the subject of patent claim 10.
  • a production plant for manufacturing packaging units or containers with these enclosing and / or fixing shrink films is the subject of patent claim 19.
  • the shrink tunnel and / or the method for its control are advantageously designed such that
  • Heating means is controlled or controlled in such a way that during the normal operating mode, the tunnel temperature of the desired operating temperature, for example, a target operating temperature in the range between 190 and 210 ° C, preferably a desired operating temperature of 200 ° C and in standby mode, the tunnel temperature in the at least one tunnel zone to a temperature amount, for example by a temperature amount of 50 ° C to 80 ° C compared to the target operating temperature to a reduced
  • Tunnel zones each associated with their own heating means, these are controlled or controlled independently for switching the operating modes, preferably depending on set or stored in the control unit or control parameters,
  • the setpoint operating temperature and / or the reduced tunneling temperature are adjustable and / or stored in the control device as control or regulating parameters
  • the heating means of the at least one tunnel zone (14) are controlled or regulated between a base load corresponding heating power and a maximum heating power, for example between a heating power (base load) of 10 KW to 14 KW and a heating power of 46 KW - 50 KW, and / or
  • Control device of the production plant and / or initiated with a time delay, for example with a time delay in the range of 1 to 2 minutes,
  • Transport speed of a shrink tunnel side carrier for example, a reduction of the transport speed to 20% to 40% of the transport speed of the normal operating mode and / or a shutdown of cooling of the shrink tunnel side transport element and / or cooling, which serves to cool the packaging units after shrinking of the shrink film,
  • the tunnel temperature is set to
  • blower of the heating means when omitted fault message or when resetting the shrink tunnel in the normal operating mode, the blower of the heating means are turned on, and / or
  • shrink tunnel side conveyor (13) is again increased, for example, at a first temperature threshold, which is about 5% below the temperature threshold,
  • Set operating temperature cooling of this transport system are switched on, for example, at a first temperature threshold, which is about 5% below the temperature threshold,
  • Target operating temperature further approximated threshold, which is, for example, 2% below the desired operating temperature, generates a production release causing signal and / or the cooling for the
  • Packaging units or containers (4) is switched on
  • Production plant is used specifically to assemble the filled with the product packaging 2 to packaging groups 3 and for packaging each
  • Packaging group 3 u.a. using a shrink wrap, so that the
  • Packaging units or container 4 each with a predetermined number of packaging 2 form.
  • the packaging means 2 are, for example, bottles, cans or similar containers which are filled, sealed and labeled with the product.
  • the plant section 1 has for this purpose in a transport direction A, in which the packaging 2 and
  • Packaging groups 3 and finally the packaging units or containers 4 are moved, following one another, inter alia, the following system components with the following functions:
  • a buffer or storage unit 5 which is formed for example by a buffer or storage table and which serves for the intermediate storage of this device via an outer conveyor 6 in the transport direction A supplied packaging 2.
  • Packaging agent groups 3 are formed, in the illustrated
  • each packaging material group 3 including its packaging element 8 is wrapped with the shrink film, preferably such that the overlapping ends of this envelope at the bottom of the packaging element
  • Packing group 3 and the packaging element 8 are located.
  • the packaging elements 8 or these forming blanks are fed in the packaging machine 7 via a feed dog 9 (arrow B).
  • a shrink tunnel 10 in which the shrinking of the shrink film on the respective packaging groups 3 to form the packaging units or container 4, by the action of heat, in particular by the action of hot air on the through the shrink tunnel 10 in
  • Transport direction A moved, wrapped with the shrink film
  • the buffer or storage unit 5 the packaging machine 7 and the shrink tunnel 10 are interconnected by a transport system 12 formed by at least one conveyor or conveyor belt, but the shrink tunnel 10 is an independent and independently controllable transport system for the packaging material groups 3 and the packaging units or container 4 formed from these in the form of at least one endless circulating drivable conveyor belt 13 (eg Drahtgliedergurtkette or also hinge band) has.
  • a transport system 12 formed by at least one conveyor or conveyor belt
  • the shrink tunnel 10 is an independent and independently controllable transport system for the packaging material groups 3 and the packaging units or container 4 formed from these in the form of at least one endless circulating drivable conveyor belt 13 (eg Drahtgliedergurtkette or also hinge band) has.
  • the shrink tunnel 10 for example, the usual for this system components construction.
  • the shrink tunnel is, for example, with several heating or tunnel zones 14 following one another in the direction of transport A.
  • Each tunnel zones 14 is provided in the illustrated embodiment with its own, in the figure only very schematically 15 heating means which effect shrinkage of the shrink film on the packaging groups 3 by heat and at least one hot air generator consisting of at least one fan and at least one Associated fan
  • Heater and optionally include at least one additional heater for a basic heating power.
  • slat curtains 16 are provided at the inlet and at the outlet of the shrink tunnel.
  • the shrink tunnel 10 also comprises a cooling device, not shown (for example cooling air blower), with which the at least one conveyor belt 13 on a
  • the shrink tunnel 10 In the trouble-free operating condition of the system, the shrink tunnel 10 is operated in its normal operating state or operating mode, the u.a. characterized by the following operating parameters:
  • Shrink tunnel 10 or its tunnel zones 14 are located on
  • Target operating temperature which is sufficient for the shrinking of the shrink film with the desired quality.
  • This target operating temperature which is the tunnel temperature in the interior of the shrink tunnel 10 or in the interior of the tunnel zones 14 and in particular also at least the temperature of the hot air introduced into the tunnel zones 14, is for example 200 ° C.
  • the at least one conveyor 13 is driven at production speed, i. at a speed that matches the performance of the plant and thus the performance of packaging machine 7 and the
  • Transport speed of the transport system 12 corresponds and is usually much larger than
  • the heating means 15 are to maintain the desired operating temperature between a basic heating power, which is for example 10-15 KW for each tunnel zone 14, and a maximum heating power or
  • Controlled or regulated total heat output for example, 45-50 KW for each tunnel zone 4.
  • the cooling device 17 or the local, cooling air generating blower is turned on.
  • a special feature of the system or the shrink tunnel 10 is that when occurring in the system disturbances of the shrink tunnel 10 and its
  • Tunnel zones 14 occupy a standby mode or standby mode with a respect to the normal, trouble-free operating state significantly reduced power and automatically return to the normal operating state after correcting the fault.
  • Such the standby mode is a standby mode or standby mode with a respect to the normal, trouble-free operating state significantly reduced power and automatically return to the normal operating state after correcting the fault.
  • causing disturbances are, for example, a given one
  • control of the shrink tunnel 10 between the two operating conditions is automatic, i. in the illustrated embodiment by an electronic
  • Control device 18 which is, for example, a shrinking tunnel 10 associated control device with its own intelligence and also regulates or controls the heating means 15 to comply with the respectively required tunnel temperature.
  • the control device 18, for example, via a not shown bus system with other control devices or with a central or higher
  • Control panel is connected, controls the switching between the
  • control device 18 for detecting present disturbances at least partially processed signals that are used to control other system components, for example, to control the
  • Packaging machine 7 Such signals are for example “shortage in the buffer or storage unit 5" and / or “shortage of packaging in the packaging machine 7", and / or “minimum product” as examples of error conditions in
  • Standby mode initiates the following actions, which can be taken individually or in any combination:
  • Control device 18 for adaptation to the concrete
  • Production conditions is adjustable, for example, for each tunnel zone 1 individually.
  • Shrink tunnels 10 applies with electrical energy, while in an operation of the shrink tunnel 10 with gas already for safety reasons the
  • Heating the tunnel zones 10 takes place exclusively with hot air.
  • a gas-driven shrink tunnel 10 inevitably causes a corresponding reduction in the basic heating power, i.
  • the heating elements or gas burners regulate themselves automatically to the required power and switch ggs. also for a short time.
  • Shrink tunnels 10 corresponds.
  • the standby mode which can preferably be triggered on site, ie on the shrink tunnel 10 or on the control device 18, is provided with a
  • the duration of this time delay At1 is preferably selected to be sufficiently long so that such packaging means groups 3 which are already in the shrink tunnel 10 as well as at the time of the input of at least one error message indicating the transition to the stand mode
  • Transport direction A preceding section of the system, for example, in the packaging machine 7 and / or on the transport system 12 between the packaging machine 7 and the shrink tunnel 10 are high
  • the time delay At1, at which the standby mode is initiated is for example 1 to 2 minutes.
  • the return of the shrink tunnel 10 from the standby mode to the normal operating mode or mode is also delayed after the error message (s) and due to the time required for re-heating to the target operating temperature, i. with a time delay ⁇ ⁇ 2, for example, from 2 to 3 minutes. Only after the expiration of this time delay is the
  • Packaging machine 7 again turned off, of course, during the standby mode of the shrink tunnel 10 was switched off or in a stand-by mode.
  • a re-switching of the packaging machine 7 and of the packaging material groups 3 to the shrink tunnel 10 preferably takes place
  • Packaging machine 7 and preferably also of the transport system 12 is then caused, for example, by a corresponding signal supplied by the control device 18.
  • the standby mode results in disturbances in the system a very significant energy savings, in particular, a very significant savings in heating energy and thus a significant reduction in the
  • Shrink tunnels at the normal target operating temperature for example, maintained at the operating temperature of 200 ° C. This requires a heating power, which is reduced because of the lack of moving through the shrink tunnel product groups 3 compared to the heating power in normal, trouble-free operation, but still means a heating power, which is about 40% to 50% of
  • Total performance of the shrink tunnel in normal trouble-free operation and corresponds, for example, in conventional shrink tunnels in the range between 40 KW and 45 KW.
  • Target operating temperature in normal trouble-free operation is 200 ° C, was at a temperature drop ⁇ ⁇ 50 ° C, i. on a reduced
  • Tunnel temperature of 150 ° C in standby mode a reduction of the heating power to 5.4 KW and a temperature drop ⁇ of 80 ° C, i. to a reduced tunnel temperature of 120 ° C, a reduction in heating power to 4.6 kW, the heating times to the nominal operating temperature 2.5 minutes at the temperature reduction ⁇ of 50 ° C and 4 minutes at the
  • Standby mode for the temperature drop from the target operating temperature to the reduced tunnel temperature of the standby mode is needed and is for example 8 to 10 minutes, resulting in a significant energy savings potential switching to standby mode. So is the example
  • a significant energy saving results further by switching off the cooling or cooling fan for the at least one conveyor belt 13 and the cooling zone 17 as well as by switching off at least one fan for the hot air in each tunnel zone 14, these fans, for example, a
  • Shrink tunnels 10 in the normal operating state after clearing the error messages takes place, for example, in the following steps:
  • the normal operating mode and the standby mode characterizing operating parameters, in particular the target operating temperature, the
  • Time delays At1 and At2 the reduction of the transport speed of the shrink tunnel side transport system or the at least one
  • Conveyor belt 13, etc. are as control or regulation parameters on the
  • Control device 18 adjustable and / or stored there in a data memory.
  • At least one further standby mode or standby mode is provided for the shrink tunnel 10, which is initiated according to other criteria or parameters and / or has other measures than the standby mode described above, at
  • This further standby mode can be provided, for example, for planned production interruptions, in particular of known frequency, preferably with a longer duration and / or with planned start and end times, for example for planned or predefined ones
  • Shrink tunnel 10 are driven into a lower standby mode, i.
  • the tunnel temperature in the tunnel zones 14 can be further reduced in comparison to the disruption-related standby mode, since the re-start, in particular the re-heating of the tunnel zones can be planned and timed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Auxiliary Devices For And Details Of Packaging Control (AREA)
  • Containers And Plastic Fillers For Packaging (AREA)
  • Basic Packing Technique (AREA)
  • Shaping By String And By Release Of Stress In Plastics And The Like (AREA)

Abstract

The invention relates to a shrink tunnel for use in a production system for producing packaging units or containers from packaging elements filled with a product and with shrink film shrunk on, comprising at least one tunnel zone having heating means for shrinking the shrink film onto the packaging units moved through the tunnel zone under the influence of heat at a tunnel temperature, which is a target operating temperature in the normal undisturbed operating state or operating mode of the shrink tunnel.

Description

Schrumpftunnel zum Aufbringen von Schrumpffolien, Verfahren zum Betrieb oder Steuern eines Schrumpftunnels sowie Produktionsanlage mit einem  Shrink tunnel for applying shrink films, method for operating or controlling a shrink tunnel and production plant with a shrinking tunnel
Schrumpftunnel  shrink tunnel
Die Erfindung bezieht sich auf einen Schrumpftunnel zum Aufbringen von The invention relates to a shrink tunnel for applying
Schrumpffolien auf Verpackungseinheiten oder Gebinde gemäß Oberbegriff Patentanspruch 1 , auf ein Verfahren zum Betrieb oder zum Steuern eines Shrink foils on packaging units or containers according to the preamble of claim 1, to a method for operating or controlling a
Schrumpftunnels gemäß Oberbegriff Patentanspruch 10 sowie auf eine Shrink tunnels according to the preamble of claim 10 and to a
Produktionsanlage mit einem Schrumpftunnel gemäß Oberbegriff 19. Production plant with a shrink tunnel according to preamble 19.
In Produktionsanlagen, insbesondere auch in solchen der Getränkeindustrie, ist es bekannt, die Packmittel, beispielsweise Flaschen, Dosen oder andere Packmittel, die in vorausgehenden Anlagekomponenten oder -maschinen mit einem Produkt gefüllt, verschlossen und etikettiert wurden, einer nachgeordneten In production plants, especially in those of the beverage industry, it is known, the packaging, such as bottles, cans or other packaging, which were filled in previous investment components or machines with a product, sealed and labeled, a downstream
Verpackungsmaschine zuzuführen, in der die Packmittel beispielsweise auf Verpackungselementen jeweils zu Packmittelgruppen mit einer vorgegebenen Anzahl von Packmittel zusammengestellt und die so erzeugten Packmittelgruppen jeweils mit einer Schrumpffolie umhüllt werden. In einem der Supply packaging machine, in which the packaging means are assembled, for example on packaging elements in each case to packaging groups with a predetermined number of packaging and the packaging groups thus produced are each covered with a shrink film. In one of the
Verpackungsmaschinen nachfolgenden Schrumpftunnel wird aus jeder Packaging machines downstream shrink tunnel will be out of everyone
Packmittelgruppe durch Aufschrumpfen der Schrumpffolie unter Hitzeeinwirkung, insbesondere auch durch Anblasen mit Heißluft jeweils eine feste oder fixierte Verpackungseinheit gebildet. Packaging group formed by shrinking the shrink film under the action of heat, in particular by blowing hot air in each case a fixed or fixed packaging unit.
Um das Aufschrumpfen mit der erforderlichen Qualität sicher zu stellen, ist es bei bekannten Anlagen üblich, den Schrumpftunnel, der in der Regel mehrere in einer Transportrichtung der Verpackungseinheiten oder Gebinde aufeinander folgende Heiz- oder Tunnelzonen mit jeweils eigenen Heizmitteln aufweist, so zu betreiben, dass sämtliche Tunnelzonen durch entsprechende Regelung oder Steuerung der Heizleistung der Heizmittel ständig die für das Schrumpfen der Schrumpffolien erforderliche Sollbetriebstemperatur, beispielsweise eine Temperatur im Bereich zwischen 195°C und 210°C, vorzugsweise eine Temperatur von etwa 200°C aufweisen, und zwar auch während Betriebsstörungen, in denen keine Packmittel oder Packmittelgruppen zum Aufschrumpfen der Schrumpffolie durch den In order to ensure shrinkage with the required quality, it is common practice in known systems to operate the shrink tunnel, which generally has a plurality of heating or tunnel zones, each having its own heating means, in successive heating or tunneling zones of the packaging units or packages all tunnel zones by appropriate control or regulation of the heating power of the heating means constantly required for the shrinkage of the shrink films target operating temperature, for example, a temperature in the range between 195 ° C and 210 ° C, preferably at a temperature of about 200 ° C, even during malfunctions in which no packaging or packaging groups for shrinking the shrink film by the
Schrumpftunnel bewegt werden und die beispielsweise durch Störungen in dem Schrumpftunnel vorausgehenden oder nachfolgenden Anlagekomponenten oder - maschinen bedingt sind. Die Heizmittel sind in der Regel elektrische oder Shrink tunnels are moved and, for example, due to disturbances in the shrink tunnel preceding or subsequent investment components or machines are required. The heating means are usually electric or
gasbetriebene Heizelemente, insbesondere auch solche von Heißluftgebläsen. gas-powered heating elements, especially those of hot air blowers.
Obwohl sich bei derartigen Betriebsstörungen durch das Fehlen von durch den Schrumpftunnel bewegten Packmitteln oder Packmittelgruppen die für die Although in such malfunctions due to the absence of moving through the shrink tunnel packaging or packaging groups that for the
Aufrechterhaltung der Tunneltemperatur bzw. Sollbetriebstemperatur benötigte Heizleistung reduziert, beispielsweise auf etwa 40% bis 45% der im störungsfreien normalen Betrieb der Anlage benötigten Heizleistung, bedingt diese Betriebsweise bekannter Schrumpftunnel einen erheblichen Energieaufwand mit erheblichen Energie- oder Heizkosten und damit verbunden mit unnötig hohen Abgas- und CO2- Emissionen. Maintaining the tunnel temperature or setpoint operating temperature required heating power reduced, for example, to about 40% to 45% of normal heating system required in the normal operation of the plant, this operation requires known shrink tunnel considerable energy consumption with significant energy or heating costs and associated with unnecessarily high exhaust gas and CO2 emissions.
Der Erfindung liegt die Aufgabe zugrunde, einen Schrumpftunnel aufzuzeigen, der diese Nachteile vermeidet. Zur Lösung dieser Aufgabe ist ein Schrumpftunnel entsprechend dem Patentanspruch 1 ausgebildet. Ein Verfahren zum Betrieb oder Steuern eines Schrumpftunnels ist Gegenstand des Patentanspruchs 10. Eine Produktionsanlage zum Fertigen von Verpackungseinheiten oder Gebinden mit diesen umschließenden und/oder fixierenden Schrumpffolien ist Gegenstand des Patentanspruchs 19. The invention has for its object to provide a shrink tunnel, which avoids these disadvantages. To solve this problem, a shrink tunnel according to the patent claim 1 is formed. A method for operating or controlling a shrink tunnel is the subject of patent claim 10. A production plant for manufacturing packaging units or containers with these enclosing and / or fixing shrink films is the subject of patent claim 19.
In Weiterbildung der Erfindung sind der Schrumpftunnel und/oder das Verfahren zu dessen Steuerung in vorteilhafter Weise so ausgebildet, In a development of the invention, the shrink tunnel and / or the method for its control are advantageously designed such that
dass die Tunneltemperatur im Schrumpftunnel und/oder in der wenigstens einen Tunnelzone über die Leistung von die Tunneltemperatur erzeugenden  in that the tunneling temperature in the shrinking tunnel and / or in the at least one tunneling zone exceeds the power of the tunneling temperature
Heizmittel in der Weise geregelt oder gesteuert wird, dass während des normalen Betriebsmodus die Tunneltemperatur der Sollbetriebstemperatur, beispielsweise einer Sollbetriebstemperatur im Bereich zwischen 190 und 210°C, vorzugsweise einer Betriebssolltemperatur von 200°C entspricht und im Standbymodus die Tunneltemperatur in der wenigstens einen Tunnelzone um einen Temperaturbetrag, beispielsweise um einen Temperaturbetrag von 50°C bis 80°C gegenüber der Sollbetriebstemperatur auf eine reduzierte Heating means is controlled or controlled in such a way that during the normal operating mode, the tunnel temperature of the desired operating temperature, for example, a target operating temperature in the range between 190 and 210 ° C, preferably a desired operating temperature of 200 ° C and in standby mode, the tunnel temperature in the at least one tunnel zone to a temperature amount, for example by a temperature amount of 50 ° C to 80 ° C compared to the target operating temperature to a reduced
Tunneltemperatur abgesenkt ist Tunnel temperature is lowered
und/oder and or
dass bei mehreren in der Transportrichtung aufeinander folgenden that at several consecutive in the transport direction
Tunnelzonen, denen jeweils eigene Heizmittel zugeordnet sind, diese für das Umschalten der Betriebsmodi eigenständig gesteuert oder geregelt werden, und zwar bevorzugt in Abhängigkeit von in der Steuereinheit eingestellten oder abgelegten Steuer- oder Regelparametern, Tunnel zones, each associated with their own heating means, these are controlled or controlled independently for switching the operating modes, preferably depending on set or stored in the control unit or control parameters,
und/oder and or
dass die Sollbetriebstemperatur und/oder die reduzierte Tunneltemperatur einstellbar und/oder in der Steuereinrichtung als Steuer- oder Regelparameter abgelegt sind, the setpoint operating temperature and / or the reduced tunneling temperature are adjustable and / or stored in the control device as control or regulating parameters,
und/oder and or
dass die Heizmittel der wenigstens einen Tunnelzone (14) zwischen einer einer Grundlast entsprechenden Heizleistung und einer maximalen Heizleistung, beispielsweise zwischen einer Heizleistung (Grundlast) von 10 KW bis 14 KW und einer Heizleistung von 46 KW - 50 KW gesteuert oder geregelt werden, und/oder the heating means of the at least one tunnel zone (14) are controlled or regulated between a base load corresponding heating power and a maximum heating power, for example between a heating power (base load) of 10 KW to 14 KW and a heating power of 46 KW - 50 KW, and / or
dass der Standbymodus bei Vorliegen wenigstens eines eine Betriebsstörung anzeigenden Signals, beispielsweise eines von einer übergeordneten that the standby mode in the presence of at least one malfunction indicating signal, for example one of a parent
Steuereinrichtung der Produktionsanlage gelieferten Signals (Liniensignal) und/oder mit einer Zeitverzögerung eingeleitet wird, beispielsweise mit einer Zeitverzögerung im Bereich von 1 bis 2 Minuten, Control device of the production plant (line signal) and / or initiated with a time delay, for example with a time delay in the range of 1 to 2 minutes,
und/oder and or
dass ein Rücksetzen des Schrumpftunnels in den normalen Betriebsmodus nach dem Wegfall der Störungsmeldung erfolgt, und zwar insbesondere durch Erhöhung der Heizleistung bzw. Hochfahren der Tunneltemperatur auf die Sollbetriebstemperatur, that a reset of the shrinking tunnel in the normal operating mode after the elimination of the fault message, in particular by increasing the heating power or raising the tunnel temperature to the target operating temperature,
und/oder and or
dass nach dem Auslösen des Standbymodus eine Reduzierung der that after the release of the standby mode, a reduction of the
Transportgeschwindigkeit eines schrumpftunnelseitigen Transporteurs, beispielsweise eine Reduzierung der Transportgeschwindigkeit auf 20% bis 40% der Transportgeschwindigkeit des normalen Betriebsmodus und/oder eine Abschaltung einer Kühlung des schrumpftunnelseitigen Transportelementes und/oder einer Kühlung, die zum Kühlen der Verpackungseinheiten nach dem Aufschrumpfen der Schrumpffolie dient, Transport speed of a shrink tunnel side carrier, for example, a reduction of the transport speed to 20% to 40% of the transport speed of the normal operating mode and / or a shutdown of cooling of the shrink tunnel side transport element and / or cooling, which serves to cool the packaging units after shrinking of the shrink film,
und/oder and or
ein Abschalten von Gebläsen der Heizmittel erfolgt, shutdown of blowers of the heating means,
und/oder and or
dass bei entfallener Störmeldung oder beim Rücksetzen des Schrumpftunnels in den normalen Betriebsmodus die Tunneltemperatur auf die if the fault message is omitted or the shrink tunnel is reset to the normal operating mode, the tunnel temperature is set to
Sollbetriebstemperatur zurücksetzt wird, Setpoint operating temperature is reset,
und/oder and or
dass bei entfallener Störmeldung oder beim Rücksetzen des Schrumpftunnels in den normalen Betriebsmodus die Gebläse der Heizmittel einschaltet werden, und/oder that when omitted fault message or when resetting the shrink tunnel in the normal operating mode, the blower of the heating means are turned on, and / or
dass bei entfallener Störmeldung oder beim Rücksetzen des Schrumpftunnels in den normalen Betriebsmodus und beim Erreichen eines ersten that in case of omitted fault message or when resetting the shrink tunnel in the normal operating mode and when reaching a first
Temperaturschwellwertes der Tunneltemperatur unterhalb der Temperature threshold of the tunnel temperature below the
Sollbetriebstemperatur die Transportgeschwindigkeit des Target operating temperature, the transport speed of
schrumpftunnelseitigen Transporteurs (13) wieder erhöht wird, und zwar beispielsweise bei einem ersten Temperaturschwellwert, der etwa 5% unterhalb des Temperaturschwellwertes liegt, shrink tunnel side conveyor (13) is again increased, for example, at a first temperature threshold, which is about 5% below the temperature threshold,
und/oder and or
dass bei entfallener Störmeldung oder beim Rücksetzen des Schrumpftunnels in den normalen Betriebsmodus und beim Erreichen eines ersten that in case of omitted fault message or when resetting the shrink tunnel in the normal operating mode and when reaching a first
Temperaturschwellwertes der Tunneltemperatur unterhalb der Temperature threshold of the tunnel temperature below the
Sollbetriebstemperatur eine Kühlung dieses Transportsystems eingeschaltet werden, und zwar beispielsweise bei einem ersten Temperaturschwellwert, der etwa 5% unterhalb des Temperaturschwellwertes liegt, Set operating temperature cooling of this transport system are switched on, for example, at a first temperature threshold, which is about 5% below the temperature threshold,
und/oder and or
dass bei entfallener Störmeldung oder beim Rücksetzen des Schrumpftunnels in den normalen Betriebsmodus und bei Erreichen eines zweiten, der Sollbetriebstemperatur weiter angenäherten Schwellwertes, der beispielsweise 2% unterhalb der Sollbetriebstemperatur liegt, ein die Produktionsfreigabe veranlassendes Signal erzeugt und/oder die Kühlung für die that in case of omitted fault message or when resetting the shrink tunnel in the normal operating mode and when reaching a second, the Target operating temperature further approximated threshold, which is, for example, 2% below the desired operating temperature, generates a production release causing signal and / or the cooling for the
Verpackungseinheiten oder Gebinde (4) einschaltet wird,  Packaging units or containers (4) is switched on,
wobei die vorgenannten Merkmale jeweils einzeln oder in beliebiger Kombination verwendet sein können. wherein the aforementioned features can be used individually or in any combination.
Weiterbildungen, Vorteile und Anwendungsmöglichkeiten der Erfindung ergeben sich auch aus der nachfolgenden Beschreibung von Ausführungsbeispielen und aus den Figuren. Dabei sind alle beschriebenen und/oder bildlich dargestellten Further developments, advantages and applications of the invention will become apparent from the following description of exemplary embodiments and from the figures. All are described and / or illustrated
Merkmale für sich oder in beliebiger Kombination grundsätzlich Gegenstand der Erfindung, unabhängig von ihrer Zusammenfassung in den Ansprüchen oder deren Rückbeziehung. Auch wird der Inhalt der Ansprüche zu einem Bestandteil der Beschreibung gemacht. Features alone or in any combination in principle subject of the invention, regardless of their summary in the claims or their dependency. Also, the content of the claims is made an integral part of the description.
Die Erfindung wird im Folgenden anhand der Figur, die in vereinfachter The invention is described below with reference to the figure, which is simplified in
Funktionsdarstellung einen Anlagenabschnitt 1 einer Produktionsanlage für mit einem Produkt gefüllte Packmittel 2, beispielsweise für mit einem flüssigen Füllgut, z.B. mit einem Getränk gefüllte Packmittel 2 zeigt, näher erläutert. Der in der Figur dargestellte und allgemein mit 1 bezeichnete Anlagenabschnitt der Functional representation of a plant section 1 of a production plant for filled with a product packaging 2, for example, with a liquid product, e.g. filled with a beverage packaging 2 shows, explained in more detail. The illustrated in the figure and generally designated 1 plant section of
Produktionsanlage dient speziell zum Zusammenstellen der mit dem Produkt gefüllten Packmittel 2 zu Packmittelgruppen 3 und zum Verpacken jeder Production plant is used specifically to assemble the filled with the product packaging 2 to packaging groups 3 and for packaging each
Packmittelgruppe 3 u.a. unter Verwendung einer Schrumpffolie, sodass die Packaging group 3 u.a. using a shrink wrap, so that the
Packmittelgruppen 3 jeweils nach dem Aufschrumpfen der Schrumpffolie Packages 3 each after shrinking the shrink film
Verpackungseinheiten oder Gebinde 4 mit jeweils einer vorgegebenen Anzahl von Packmitteln 2 bilden. Packaging units or container 4, each with a predetermined number of packaging 2 form.
Die Packmittel 2 sind beispielsweise Flaschen, Dosen oder dergleichen Behälter, die mit dem Produkt gefüllt, verschlossen und etikettiert sind. Der Anlagenabschnitt 1 weist hierfür in einer Transportrichtung A, in der die Packmittel 2 bzw. The packaging means 2 are, for example, bottles, cans or similar containers which are filled, sealed and labeled with the product. The plant section 1 has for this purpose in a transport direction A, in which the packaging 2 and
Packmittelgruppen 3 und schließlich auch die Verpackungseinheiten oder Gebinde 4 bewegt werden, auf einander folgend u.a. folgende Anlagenkomponenten mit folgenden Funktionen auf: Packaging groups 3 and finally the packaging units or containers 4 are moved, following one another, inter alia, the following system components with the following functions:
- Eine Puffer- oder Speichereinheit 5, die beispielsweise von einem Pufferoder Speichertisch gebildet ist und die zur Zwischenspeicherung der dieser Einrichtung über einen äußeren Transporteur 6 in Transportrichtung A zugeführten Packmittel 2 dient.  - A buffer or storage unit 5, which is formed for example by a buffer or storage table and which serves for the intermediate storage of this device via an outer conveyor 6 in the transport direction A supplied packaging 2.
- Eine Verpackungsmaschine 7 an, in der aus den Packmitteln 2 die  - A packaging machine 7, in from the packaging 2, the
Packmittelgruppen 3 gebildet werden, und zwar bei der dargestellten  Packaging agent groups 3 are formed, in the illustrated
Ausführungsform jeweils auf oder in einem Verpackungselement 8, beispielsweise in Form eines kartonartigen Verpackungselementes oder eines Tableaus oder Trays in der Weise, dass jede Packmittelgruppe 3 die Packmittel 2 in einer vorgegebenen Anzahl und Zuordnung zueinander aufweist, beispielsweise bei der dargestellten Ausführungsform in zwei Reihen mit jeweils drei Packmitteln 2. In der Verpackungsmaschine 7 wird jede Packmittelgruppe 3 einschließlich seines Verpackungselementes 8 mit der Schrumpffolie umhüllt, und zwar bevorzugt derart, dass die einander überlappenden Enden dieser Umhüllung sich an der Unterseite der  Embodiment respectively on or in a packaging element 8, for example in the form of a cardboard-like packaging element or a tray or tray in such a way that each packaging material group 3, the packaging means 2 in a predetermined number and assignment to each other, for example, in the illustrated embodiment in two rows, respectively three packaging means 2. In the packaging machine 7, each packaging material group 3 including its packaging element 8 is wrapped with the shrink film, preferably such that the overlapping ends of this envelope at the bottom of the
Packmittelgruppe 3 bzw. des Verpackungselementes 8 befinden.  Packing group 3 and the packaging element 8 are located.
- Die Verpackungselemente 8 oder diese bildenden Zuschnitte werden in der Verpackungsmaschine 7 über einen Transporteur 9 zugeführt (Pfeil B).  - The packaging elements 8 or these forming blanks are fed in the packaging machine 7 via a feed dog 9 (arrow B).
- Ein Schrumpftunnel 10, in dem das Aufschrumpfen der Schrumpffolie auf die jeweiligen Packmittelgruppen 3 zur Bildung der Verpackungseinheiten oder Gebinde 4 erfolgt, und zwar durch Hitzeeinwirkung, insbesondere auch durch Einwirkung von Heißluft auf die sich durch den Schrumpftunnel 10 in  - A shrink tunnel 10, in which the shrinking of the shrink film on the respective packaging groups 3 to form the packaging units or container 4, by the action of heat, in particular by the action of hot air on the through the shrink tunnel 10 in
Transportrichtung A bewegten, mit der Schrumpffolie umhüllten  Transport direction A moved, wrapped with the shrink film
Produktgruppen 3.  Product groups 3.
Die Verpackungseinheiten oder Gebinde 4 werden nach dem Verlassen des Schrumpftunnels 10 über einen äußeren Transporteur 11 einer weiteren The packaging units or containers 4 after leaving the shrink tunnel 10 via an outer conveyor 11 another
Verwendung oder Behandlung zugeführt, beispielsweise einer als Palettierer ausgebildeten Vorrichtung. Innerhalb des Anlagenabschnittes 1 sind die Puffer- oder Speichereinheit 5, die Verpackungsmaschine 7 und der Schrumpftunnel 10 durch ein von wenigstens einem Transporteur oder Transportband gebildetes Transportsystem 12 miteinander verbunden, wobei der Schrumpftunnel 10 allerdings ein eigenständiges und eigenständig steuerbares Transportsystem für die Packmittelgruppen 3 bzw. die aus diesen gebildeten Verpackungseinheiten oder Gebinde 4 in Form wenigstens eines endlos umlaufend antreibbaren Transportbandes 13 (z.B. Drahtgliedergurtkette oder aber auch Scharnierbandkette) aufweist. Use or treatment supplied, for example, designed as a palletizer device. Within the plant section 1, the buffer or storage unit 5, the packaging machine 7 and the shrink tunnel 10 are interconnected by a transport system 12 formed by at least one conveyor or conveyor belt, but the shrink tunnel 10 is an independent and independently controllable transport system for the packaging material groups 3 and the packaging units or container 4 formed from these in the form of at least one endless circulating drivable conveyor belt 13 (eg Drahtgliedergurtkette or also hinge band) has.
Ebenso wie die Verpackungsmaschine 7 weist auch der Schrumpftunnel 10 beispielsweise die für diese Anlagenkomponenten übliche Bauweise auf. So ist der Schrumpftunnel bei der dargestellten Ausführungsform beispielsweise mit mehreren in Transportrichtung A aufeinander folgenden Heiz- oder Tunnelzonen 14 As well as the packaging machine 7, the shrink tunnel 10, for example, the usual for this system components construction. Thus, in the illustrated embodiment, the shrink tunnel is, for example, with several heating or tunnel zones 14 following one another in the direction of transport A.
ausgebildet, beispielsweise mit insgesamt drei Tunnelzonen 14, wodurch u.a. formed, for example, with a total of three tunnel zones 14, whereby u.a.
sichergestellt ist, dass im normalen störungsfreien Betrieb der Anlage bzw. des Schrumpftunnels 10 auch bei einer dichten Folge der in Transportrichtung A durch den Schrumpftunnel 10 bewegten Packmittelgruppen 3 das Aufschrumpfen der Schrumpffolie auf jede Packmittelgruppe 3 mit der erforderlichen Qualität erfolgt. Jede Tunnelzonen 14 ist bei der dargestellten Ausführungsform mit eigenen, in der Figur nur sehr schematisch mit 15 angegebenen Heizmitteln ausgestattet, die durch Hitzeinwirkung das Aufschrumpfen der Schrumpffolie auf die Packmittelgruppen 3 bewirken und zumindest jeweils einen Heißlufterzeuger bestehend aus wenigstens einem Gebläse und aus wenigstens einer dem Gebläse zugeordneten It is ensured that in normal trouble-free operation of the system or the shrink tunnel 10 even with a dense sequence of moving in the transport direction A through the shrink tunnel 10 Packmittelgruppen 3 shrinking of the shrink film on each packaging material group 3 takes place with the required quality. Each tunnel zones 14 is provided in the illustrated embodiment with its own, in the figure only very schematically 15 heating means which effect shrinkage of the shrink film on the packaging groups 3 by heat and at least one hot air generator consisting of at least one fan and at least one Associated fan
Heizeinrichtung sowie gegebenenfalls wenigstens eine zusätzliche Heizeinrichtung für eine Grundheizleistung umfassen. Zur Vermeidung von Energieverlusten sind an dem Einlass und an dem Auslass des Schrumpftunnels 10 Lamellenvorhänge 16 vorgesehen. Heater and optionally include at least one additional heater for a basic heating power. To avoid energy losses 10 slat curtains 16 are provided at the inlet and at the outlet of the shrink tunnel.
Der Schrumpftunnel 10 umfasst auch eine nicht dargestellte Kühleinrichtung (z.B. Kühlluftgebläse), mit der das wenigstens eine Transportband 13 auf einer The shrink tunnel 10 also comprises a cooling device, not shown (for example cooling air blower), with which the at least one conveyor belt 13 on a
Transportbandlänge außerhalb des Schrumpftunnels 10 und in Umlaufrichtung vor dem Einlass des Schrumpftunnels 10 abgekühlt wird, sodass jede dem Schrumpftunnel 10 zugeführte und mit der Schrumpffolie umhüllte Packmittelgruppe 3 zunächst auf das abgekühlte Transportband 13 übergeben wird. Weiterhin weist der Schrumpftunnel 10 in Transportrichtung A auf die Tunnelzonen 14 folgend eine in der Figur mit unterbrochenen Linien angedeutete Kühlzone 17 auf, die u.a. zum Abkühlen der Verpackungseinheiten oder Gebinde 4 dient und hierfür Conveyor belt length outside the shrink tunnel 10 and is cooled in the direction of rotation in front of the inlet of the shrink tunnel 10, so that each the Shrink tunnel 10 supplied and wrapped with the shrink wrap packaging material group 3 is first transferred to the cooled conveyor belt 13. Furthermore, the shrink tunnel 10 in the direction of transport A to the tunnel zones 14 following a direction indicated in the figure by broken lines cooling zone 17, which is used inter alia for cooling the packaging units or container 4 and this
beispielsweise mit einem Kühlluftgebläse ausgestattet ist. For example, equipped with a cooling fan.
Im störungsfreien Betriebszustand der Anlage wird der Schrumpftunnel 10 in seinem normalen Betriebszustand oder Betriebsmodus betrieben, der u.a. durch folgende Betriebsparameter charakterisiert ist: In the trouble-free operating condition of the system, the shrink tunnel 10 is operated in its normal operating state or operating mode, the u.a. characterized by the following operating parameters:
Schrumpftunnel 10 bzw. dessen Tunnelzonen 14 befinden sich auf Shrink tunnel 10 or its tunnel zones 14 are located on
Sollbetriebstemperatur, die für das Aufschrumpfen der Schrumpffolie mit der angestrebten Qualität ausreicht. Diese Sollbetriebstemperatur, die die Tunneltemperatur im Inneren des Schrumpftunnels 10 bzw. im Inneren der Tunnelzonen 14 und dabei insbesondere auch wenigstens die Temperatur der in die Tunnelzonen 14 ausgebrachten Heißluft ist, beträgt beispielsweise 200°C.  Target operating temperature, which is sufficient for the shrinking of the shrink film with the desired quality. This target operating temperature, which is the tunnel temperature in the interior of the shrink tunnel 10 or in the interior of the tunnel zones 14 and in particular also at least the temperature of the hot air introduced into the tunnel zones 14, is for example 200 ° C.
Das wenigstens eine Transportband 13 wird mit Produktionsgeschwindigkeit angetrieben, d.h. mit einer Geschwindigkeit, die der Leistung der Anlage und damit der Leistung Verpackungsmaschine 7 und der  The at least one conveyor 13 is driven at production speed, i. at a speed that matches the performance of the plant and thus the performance of packaging machine 7 and the
Transportgeschwindigkeit des Transportsystems 12 entspricht und in der Regel deutlich größer ist als  Transport speed of the transport system 12 corresponds and is usually much larger than
8 m/min.  8 m / min.
- Die Heizmittel 15 werden zur Aufrechterhaltung der Sollbetriebstemperatur zwischen einer Grundheizleistung, die beispielsweise 10-15 KW für jede Tunnelzone 14 beträgt, und einer maximalen Heizleistung oder  - The heating means 15 are to maintain the desired operating temperature between a basic heating power, which is for example 10-15 KW for each tunnel zone 14, and a maximum heating power or
Gesamtheizleistung gesteuert oder geregelt, die beispielsweise 45-50 KW für jede Tunnelzone 4 beträgt.  Controlled or regulated total heat output, for example, 45-50 KW for each tunnel zone 4.
Die Kühleinrichtung 17 bzw. das dortige, Kühlluft erzeugende Gebläse ist eingeschaltet. Eine Besonderheit der Anlage bzw. des Schrumpftunnels 10 besteht darin, dass bei in der Anlage auftretenden Störungen der Schrumpftunnel 10 bzw. dessen The cooling device 17 or the local, cooling air generating blower is turned on. A special feature of the system or the shrink tunnel 10 is that when occurring in the system disturbances of the shrink tunnel 10 and its
Tunnelzonen 14 einen Standbybetriebszustand oder Standbymodus mit einer gegenüber dem normalen, störungsfreien Betriebszustand deutlich reduzierten Leistung einnehmen und nach dem Beheben der Störung wieder automatisch in den normalen Betriebszustand zurückkehren. Derartige den Standbymodus Tunnel zones 14 occupy a standby mode or standby mode with a respect to the normal, trouble-free operating state significantly reduced power and automatically return to the normal operating state after correcting the fault. Such the standby mode
veranlassende Störungen sind beispielsweise eine eine vorgegebene causing disturbances are, for example, a given one
Packmittelmindestmenge unterschreitende Anzahl an Packmitteln 2 in der Pufferund Speichereinheit 5 und/oder ein Packmittelstau innerhalb der Anlage, z.B. in einem bezogen auf die Transportrichtung A dern Schrumpftunnel 10 Minimum quantity of packaging material 2 in the buffer and storage unit 5 and / or a packaging jam within the plant, e.g. in relation to the transport direction A of the shrink tunnel 10
vorausgehenden und/oder nachfolgenden Anlagenabschnitt. Die Steuerung des Schrumpftunnels 10 zwischen den beiden Betriebszuständen erfolgt automatisch, d.h. bei der dargestellten Ausführungsform durch eine elektronische preceding and / or subsequent section of the system. The control of the shrink tunnel 10 between the two operating conditions is automatic, i. in the illustrated embodiment by an electronic
Steuereinrichtung 18, die beispielsweise eine dem Schrumpftunnel 10 zugeordnete Steuereinrichtung mit eigener Intelligenz ist und die auch die Heizmittel 15 zur Einhaltung der jeweils erforderlichen Tunneltemperatur regelt oder steuert. Die Steuereinrichtung 18, die beispielsweise über ein nicht dargestelltes Bussystem mit weiteren Steuereinrichtungen oder mit einer zentralen oder übergeordneten Control device 18, which is, for example, a shrinking tunnel 10 associated control device with its own intelligence and also regulates or controls the heating means 15 to comply with the respectively required tunnel temperature. The control device 18, for example, via a not shown bus system with other control devices or with a central or higher
Anlagensteuerung verbunden ist, steuert das Umschalten zwischen den Control panel is connected, controls the switching between the
Betriebszuständen des Schrumpftunnels 10 (normaler Betriebsmodus/ Operating conditions of the shrink tunnel 10 (normal operating mode /
Standbymodus) in Abhängigkeit von Fehlermeldungen beispielsweise der Standby mode) depending on error messages such as the
übergeordneten Anlagensteuerung und/oder in Abhängigkeit von anderen Signalen. Vorzugsweise werden in der Steuereinrichtung 18 zur Erkennung von vorliegenden Störungen zumindest teilweise auch Signale verarbeitet, die zur Steuerung anderer Anlagenkomponenten dienen, beispielsweise zur Steuerung der higher-level system control and / or depending on other signals. Preferably, in the control device 18 for detecting present disturbances at least partially processed signals that are used to control other system components, for example, to control the
Verpackungsmaschine 7. Solche Signale sind z.B.„Minderbelegung in der Pufferoder Speichereinheit 5" und/oder„Packmittelmangel in der Verpackungsmaschine 7", und/oder„Minimum Produkt" als Beispiele für Fehlerzustände in Packaging machine 7. Such signals are for example "shortage in the buffer or storage unit 5" and / or "shortage of packaging in the packaging machine 7", and / or "minimum product" as examples of error conditions in
Transportrichtung A vor dem Schrumpftunnel 10, und/oder„Rückstau extern" und/oder„Palettenmangel" für Fehlerzustände in Transportrichtung A nach dem Schrumpftunnel 10 usw. Mit dem Standbymodus werden u.a. die folgenden Maßnahmen eingeleitet, die jeweils einzeln oder in beliebiger Kombination vorgenommen werden können: Transport direction A in front of the shrink tunnel 10, and / or "back pressure external" and / or "lack of pallets" for fault conditions in the transport direction A after the shrink tunnel 10, etc. Standby mode initiates the following actions, which can be taken individually or in any combination:
Absenken der Tunneltemperatur um einen vorgegebenen Betrag ΔΤ, beispielsweise um 50°C bis 80°C, vorzugsweise um etwa 50°C unter die Sollbetriebstemperatur, wobei diese Temperaturabsenkung bzw. der Betrag ΔΤ vor Ort am Schrumpftunnel 10 bzw. an einer Eingabe der  Lowering the tunnel temperature by a predetermined amount ΔΤ, for example by 50 ° C to 80 ° C, preferably by about 50 ° C below the target operating temperature, said temperature decrease or the amount ΔΤ locally on the shrink tunnel 10 or at an input of
Steuereinrichtung 18 zur Anpassung an die konkreten  Control device 18 for adaptation to the concrete
Produktionsbedingungen einstellbar ist, und zwar beispielsweise auch für jede Tunnelzone 1 individuell.  Production conditions is adjustable, for example, for each tunnel zone 1 individually.
Abschalten der Grundlast, d.h. der die Grundheizleistung erbringenden Heizelemente, was zumindest in erster Linie für ein Beheizen des  Switching off the base load, i. the basic heating power providing heating elements, which is at least primarily for a heating of the
Schrumpftunnels 10 mit elektrischer Energie gilt, während bei einem Betrieb des Schrumpftunnels 10 mit Gas schon aus Sicherheitsgründen das  Shrink tunnels 10 applies with electrical energy, while in an operation of the shrink tunnel 10 with gas already for safety reasons the
Beheizen der Tunnelzonen 10 ausschließlich mit Heißluft erfolgt. Bei einem Absenken der Tunneltemperatur um den Betrag ΔΤ erfolgt bei einem gasbetriebenen Schrumpftunnel 10 zwangsläufig eine entsprechende Reduzierung der Grundheizleistung, d.h. die Heizelemente bzw. Gasbrenner regeln sich selbsttätig auf die jeweils benötigte Leistung und schalten ggs. auch kurzzeitig ab.  Heating the tunnel zones 10 takes place exclusively with hot air. When the tunnel temperature is lowered by the amount ΔΤ, a gas-driven shrink tunnel 10 inevitably causes a corresponding reduction in the basic heating power, i. The heating elements or gas burners regulate themselves automatically to the required power and switch ggs. also for a short time.
Reduzierung der Transportgeschwindigkeit des schrumpftunnelseitigen Transportsystems bzw. des wenigstens einen Transportbandes 13 auf eine Transportgeschwindigkeit, die nur noch 20% bis 40% der  Reduction of the transport speed of the shrinking tunnel side transport system or the at least one conveyor belt 13 to a transport speed which is only 20% to 40% of
Transportgeschwindigkeit des normalen Betriebszustandes des  Transport speed of the normal operating state of
Schrumpftunnels 10 entspricht.  Shrink tunnels 10 corresponds.
Abschaltung der Kühlung der Kühlzone 17 für das Kühlen der  Switching off the cooling of the cooling zone 17 for cooling the
Verpackungseinheiten oder Gebinde 4 und des wenigstens einen  Packaging units or containers 4 and at least one
Transportbandes 13.  Conveyor belt 13.
Abschalten eines Gebläses je Tunnelzone 14, sofern jeder Tunnelzone 14 wenigstens zwei elektrisch betriebene Gebläse zugeordnet sind, wie dies in der Regel der Fall ist. Der Standbymodus, der vorzugsweise auch vor Ort, d.h. an dem Schrumpftunnel 10 oder an der Steuereinrichtung 18 ausgelöst werden kann, wird mit einer Switching off a fan per tunnel zone 14, if each tunnel zone 14 at least two electrically operated blowers are assigned, as is usually the case. The standby mode, which can preferably be triggered on site, ie on the shrink tunnel 10 or on the control device 18, is provided with a
Zeitverzögerung At1 verzögert eingeleitet. Die Dauer dieser Zeitverzögerung At1 ist bevorzugt ausreichend lang gewählt, so dass solche Packmittelgruppen 3, die sich zum Zeitpunkt des Eingangs wenigstens einer den Übergang in den Standmodus veranlassenden Fehlermeldung bereits in dem Schrumpftunnel 10 sowie Time delay At1 delayed initiated. The duration of this time delay At1 is preferably selected to be sufficiently long so that such packaging means groups 3 which are already in the shrink tunnel 10 as well as at the time of the input of at least one error message indicating the transition to the stand mode
gegebenenfalls auch in einem diesen Schrumpftunnel bezogen auf die optionally also in a shrink tunnel with respect to
Transportrichtung A vorausgehenden Abschnitt der Anlage, beispielsweise in der Verpackungsmaschine 7 und/oder auf dem Transportsystem 12 zwischen der Verpackungsmaschine 7 und dem Schrumpftunnel 10 befinden, mit hoher Transport direction A preceding section of the system, for example, in the packaging machine 7 and / or on the transport system 12 between the packaging machine 7 and the shrink tunnel 10 are high
Betriebssicherheit zuverlässig im Schrumpftunnel 10 behandelt werden, d.h. die Schrumpffolie auch auf diese Packmittelgruppen 2 noch ordnungsgemäß Reliable reliability in the shrink tunnel 10 are treated, i. the shrink film on these groups of packaging 2 still properly
aufgeschrumpft wird. Die zeitliche Verzögerung At1 , mit der der Standbymodus eingeleitet wird, beträgt beispielsweise 1 bis 2 Minuten. is shrunk. The time delay At1, at which the standby mode is initiated, is for example 1 to 2 minutes.
Die Rückkehr des Schrumpftunnels 10 aus dem Standbymodus in den normalen Betriebszustand oder -modus erfolgt nach dem Wegfall der Fehlermeldung(en) und bedingt durch die für das Wieder-Aufheizen auf die Sollbetriebstemperatur benötigte Zeit ebenfalls zeitverzögert, d.h. mit einer Zeitverzögerung Δ\2 beispielsweise von 2 bis 3 Minuten. Erst nach Ablauf dieser Zeitverzögerung wird auch die The return of the shrink tunnel 10 from the standby mode to the normal operating mode or mode is also delayed after the error message (s) and due to the time required for re-heating to the target operating temperature, i. with a time delay Δ \ 2, for example, from 2 to 3 minutes. Only after the expiration of this time delay is the
Verpackungsmaschine 7 wieder eingeschaltet, die selbstverständlich während des Standbymodus des Schrumpftunnels 10 abgeschaltet bzw. in einem Stand-by- Betrieb war. Bevorzugt erfolgt ein Wieder-Einschalten der Verpackungsmaschine 7 und des die Packmittelgruppen 3 an den Schrumpftunnel 10 fördernden Packaging machine 7 again turned off, of course, during the standby mode of the shrink tunnel 10 was switched off or in a stand-by mode. A re-switching of the packaging machine 7 and of the packaging material groups 3 to the shrink tunnel 10 preferably takes place
Transportsystems 12 erst dann, wenn die Tunneltemperatur die Transport system 12 only when the tunnel temperature the
Sollbetriebstemperatur oder zumindest einen der Sollbetriebstemperatur stark angenäherten Temperaturwert erreicht hat. Das Einschalten der Setpoint operating temperature or at least one of the setpoint operating temperature has reached a highly approximate temperature value. Turning on the
Verpackungsmaschine 7 und vorzugsweise auch des Transportsystems 12 wird dann beispielsweise durch ein entsprechendes, von der Steuereinrichtung 18 geliefertes Signal veranlasst. Durch den Standbymodus ergibt sich bei Störungen in der Anlage eine ganz erhebliche Energieeinsparung, insbesondere auch eine ganz erhebliche Einsparung an Heizenergie und damit verbunden eine erhebliche Reduzierung der Packaging machine 7 and preferably also of the transport system 12 is then caused, for example, by a corresponding signal supplied by the control device 18. The standby mode results in disturbances in the system a very significant energy savings, in particular, a very significant savings in heating energy and thus a significant reduction in the
Abgasemission und insbesondere der C02-Emission bei gasbetriebenem Exhaust emission and, in particular, C02 emission from gas-fueled vehicles
Schrumpftunnel 10. Shrink tunnel 10.
Wie ausgeführt, wird bei herkömmlichen Anlagen auch bei Betriebsstörungen, d.h. dann, wenn keine Packmittelgruppen 3 zum Aufschrumpfen ihrer Schrumpffolie durch den Schrumpftunnel bewegt werden, die Betriebstemperatur des As stated, in conventional systems, even in case of malfunction, i. when no packaging agent groups 3 are moved through the shrink tunnel to shrink their shrink film, the operating temperature of the
Schrumpftunnels auf der normalen Sollbetriebstemperatur, beispielsweise auf der Betriebstemperatur von 200°C gehalten. Dies erfordert eine Heizleistung, die zwar wegen des Fehlens von durch den Schrumpftunnel bewegten Produktgruppen 3 gegenüber der Heizleistung im normalen, störungsfreien Betrieb reduziert ist, bedeutet aber dennoch eine Heizleistung, die etwa 40% bis 50% der Shrink tunnels at the normal target operating temperature, for example, maintained at the operating temperature of 200 ° C. This requires a heating power, which is reduced because of the lack of moving through the shrink tunnel product groups 3 compared to the heating power in normal, trouble-free operation, but still means a heating power, which is about 40% to 50% of
Gesamtheitsleistung des Schrumpftunnels im normalen störungsfreien Betrieb entspricht und beispielsweise bei herkömmlichen Schrumpftunneln im Bereich zwischen 40 KW und 45 KW liegt. Total performance of the shrink tunnel in normal trouble-free operation and corresponds, for example, in conventional shrink tunnels in the range between 40 KW and 45 KW.
Bei einer konkreten Ausführungsform des Schrumpftunnels 10, dessen In a concrete embodiment of the shrink tunnel 10, whose
Sollbetriebstemperatur im normalen störungsfreien Betrieb 200°C beträgt, wurde bei einer Temperaturabsenkung ΔΤ νοη 50°C, d.h. auf eine reduzierte Target operating temperature in normal trouble-free operation is 200 ° C, was at a temperature drop ΔΤ νοη 50 ° C, i. on a reduced
Tunneltemperatur von 150°C im Standbymodus eine Reduzierung der Heizleistung auf 5,4 KW und bei einer Temperaturabsenkung ΔΤ von 80°C, d.h. auf eine reduzierte Tunneltemperatur von 120°C eine Reduzierung der Heizleistung auf 4,6 KW festgestellt, wobei die Aufheizzeiten auf die Sollbetriebstemperatur 2,5 Minuten bei der Temperaturreduzierung ΔΤ von 50°C und 4 Minuten bei der Tunnel temperature of 150 ° C in standby mode, a reduction of the heating power to 5.4 KW and a temperature drop ΔΤ of 80 ° C, i. to a reduced tunnel temperature of 120 ° C, a reduction in heating power to 4.6 kW, the heating times to the nominal operating temperature 2.5 minutes at the temperature reduction ΔΤ of 50 ° C and 4 minutes at the
Temperaturabsenkung ΔΤ von 80°C betragen. Temperature drop ΔΤ of 80 ° C amount.
Auch unter Berücksichtigung der Zeitdauer, die nach dem Einleiten des Also taking into account the length of time after the initiation of the
Standbymodus für den Temperaturabfall von der Sollbetriebstemperatur auf die reduzierte Tunneltemperatur des Standbymodus benötigt wird und beispielsweise 8 bis 10 Minuten beträgt, ergibt sich ein erhebliches Energieeinsparpotenzial durch das Umschalten in den Standbymodus. So liegt beispielsweise die Standby mode for the temperature drop from the target operating temperature to the reduced tunnel temperature of the standby mode is needed and is for example 8 to 10 minutes, resulting in a significant energy savings potential switching to standby mode. So is the example
Energieeinsparung bei einer 10-minütigen Störung oder Unterbrechung des Energy savings in a 10-minute fault or interruption of the
Betriebes zwischen 1 ,44 KWh und 5,76 KWh und bei einer 30-minütigen Störung oder Unterbrechung bei etwa 18 KWh, und zwar einschließlich der für das Operation between 1, 44 KWh and 5.76 KWh and with a 30-minute disturbance or interruption at about 18 KWh, including that for the
Wiederaufheizen nach Beendigung der Betriebszerstörung notwendigen Reheat necessary after completion of the operation destruction
Heizenergie. Heating energy.
Eine wesentliche Energieeinsparung ergibt sich weiterhin durch das Abschalten der Kühlung oder Kühlgebläse für das wenigstens eine Transportband 13 und der Kühlzone 17 sowie auch durch das Abschalten wenigstens eines Gebläses für die Heißluft in jeder Tunnelzone 14, wobei diese Gebläse beispielsweise ein A significant energy saving results further by switching off the cooling or cooling fan for the at least one conveyor belt 13 and the cooling zone 17 as well as by switching off at least one fan for the hot air in each tunnel zone 14, these fans, for example, a
Leistungsbedarf von etwa 3 KW haben. Have power requirements of about 3 KW.
Das Zurücksetzen der Anlage und des Schrumpftunnels in den normalen Resetting the plant and the shrink tunnel to normal
Betriebszustand, d.h. die Produktionsfreigabe sowie das Hochfahren des Operating condition, i. the production release as well as the start-up of the
Schrumpftunnels 10 in dem normalen Betriebszustand nach dem Löschen der Fehlermeldungen erfolgt beispielsweise in folgenden Schritten: Shrink tunnels 10 in the normal operating state after clearing the error messages takes place, for example, in the following steps:
Rücksetzen der Tunneltemperatur der einzelnen Tunnelzonen 14 auf die erforderliche und an der Steuereinrichtung 18 eingestellte und/oder dort abgelegte Sollbetriebstemperatur und Einschalten sämtlicher Heizmittel 15 bzw. sämtliche Heizeinrichtungen und Heizluftgebläse;  Resetting the tunnel temperature of the individual tunnel zones 14 to the required set operating temperature set and / or stored at the control device 18 and switching on all the heating means 15 or all the heating devices and heating air blower;
- Rücksetzen der Transportgeschwindigkeit des wenigstens einen  - Reset the transport speed of at least one
Transportbandes 13 auf Produktgeschwindigkeit und Einschalten der Transportbandkühlung für das wenigstens eine Transportband 13 dann, wenn die Tunneltemperatur in sämtlichen Tunnelzonen 14 beim Wieder- Aufheizen einen Temperaturschwellwert erreicht hat, der etwa 5% bis 7%, beispielsweise etwa 5% oder 10°C unter der Sollbetriebstemperatur liegt; Freigabe bzw. Einschalten der Verpackungsmaschine 7 sowie Einschalten der Kühlung für die Verpackungseinheiten oder Gebinde 4, d.h. Freigabe der Produktion dann, wenn die Betriebstemperatur in sämtlichen Tunnelzonen 14 beim Aufheizen einen Temperaturschwellwert erreicht hat, der geringfügig, d.h. beispielsweise 2 bis 3%, z.B. 5°C unterhalb der Sollbetriebstemperatur liegt. Conveyor belt 13 on product speed and switching on the conveyor belt cooling for the at least one conveyor belt 13 when the tunnel temperature has reached a temperature threshold in all tunnel zones 14 during reheating a temperature threshold of about 5% to 7%, for example about 5% or 10 ° C below the Target operating temperature is; Enabling or switching on the packaging machine 7 and switching on the cooling for the packaging units or containers 4, ie release of production, when the operating temperature has reached a temperature threshold in all tunnel zones 14 during heating, the slightly ie, for example, 2 to 3%, for example, 5 ° C below the desired operating temperature.
Die den normalen Betriebsmodus und die den Standbymodus kennzeichnenden Betriebsparameter, insbesondere die Sollbetriebstemperatur, die The normal operating mode and the standby mode characterizing operating parameters, in particular the target operating temperature, the
Temperaturabsenkung ΔΤ und/oder die reduzierte Tunneltemperatur, die Temperature reduction ΔΤ and / or the reduced tunnel temperature, the
Zeitverzögerungen At1 und At2, die Reduzierung der Transportgeschwindigkeit des schrumpftunnelseitigen Transportsystems bzw. des wenigstens einen Time delays At1 and At2, the reduction of the transport speed of the shrink tunnel side transport system or the at least one
Transportbandes 13 usw. sind als Steuer- oder Regelungsparameter an der Conveyor belt 13, etc. are as control or regulation parameters on the
Steuereinrichtung 18 einstellbar und/oder dort in einem Datenspeicher abgelegt. Control device 18 adjustable and / or stored there in a data memory.
Bei einer bevorzugten Ausführungsform der Erfindung ist für den Schrumpftunnel 10 wenigstens ein weiterer Standbymodus oder Standbybetrieb vorgesehen, der nach anderen Kriterien oder Parametern eingeleitet wird und/oder andere Maßnahmen aufweist, als der vorstehend beschriebene Standbymodus, der bei In a preferred embodiment of the invention, at least one further standby mode or standby mode is provided for the shrink tunnel 10, which is initiated according to other criteria or parameters and / or has other measures than the standby mode described above, at
Betriebsstörungen in der Anlage eingeleitet wird. Dieser weitere Standbymodus kann beispielsweise für geplante Produktionsunterbrechungen insbesondere bekannter Häufigkeit mit vorzugsweise längerer Dauer und/oder mit geplanter Start- und Endzeit vorgesehen sein, beispielsweise für geplante oder vorgegebene Malfunctions in the system is initiated. This further standby mode can be provided, for example, for planned production interruptions, in particular of known frequency, preferably with a longer duration and / or with planned start and end times, for example for planned or predefined ones
Produktionspausen. Da das Ende derartiger geplanter Produktionsunterbrechungen, beispielweise das Ende einer täglich wiederkehrenden Pause, und damit auch der Zeitpunkt bekannt sind, an dem die Produktion wieder aufgenommen wird, kann während einer solchen geplanten oder fixen Produktionsunterbrechung der Production breaks. Since the end of such planned production interruptions, for example the end of a daily recurring break, and thus also the time at which production is resumed, can be known during such a planned or fixed production interruption
Schrumpftunnel 10 in einen tieferen Standbymodus gefahren werden, d.h. die Tunneltemperatur in den Tunnelzonen 14 kann im Vergleich zum störungsbedingten Standbymodus noch weiter abgesenkt werden, da auch das Wiederhochfahren, insbesondere das Wieder-Aufheizen der Tunnelzonen geplant und zeitgesteuert erfolgen können. Shrink tunnel 10 are driven into a lower standby mode, i. The tunnel temperature in the tunnel zones 14 can be further reduced in comparison to the disruption-related standby mode, since the re-start, in particular the re-heating of the tunnel zones can be planned and timed.
Die Erfindung wurde voranstehend an einem Ausführungsbeispiel beschrieben. Es versteht sich, dass zahlreiche Änderungen sowie Abwandlungen möglich sind, ohne dass dadurch der der Erfindung zugrundeliegende Erfindungsgedanke verlassen wird. The invention has been described above by means of an embodiment. It is understood that numerous changes and modifications are possible without that thereby the inventive concept underlying the invention is abandoned.
Bezugszeichenliste LIST OF REFERENCE NUMBERS
1 Anlagenabschnitt 1 section of the installation
2 Packmittel  2 packaging
3 Packmittelgruppe  3 packaging group
4 Verpackungseinheit oder Gebinde  4 packing unit or container
5 Puffer- oder Speichereinheit  5 buffer or storage unit
6 äußerer Transporteur  6 outer conveyor
7 Verpackungsmaschine  7 packaging machine
8 Verpackungselement  8 packing element
9 Transportsystem zum Zuführen der Verpackungselemente 8 9 transport system for feeding the packaging elements 8
10 Schrumpftunnel 10 shrink tunnel
11 äußerer Transporteur  11 outer conveyor
12 Transportsystem  12 transport system
13 Transportband  13 conveyor belt
14 Tunnelzone  14 tunnel zone
15 Heizmittel  15 heating means
16 Lamellenvorhang  16 slat curtain
17 Kühlzone  17 cooling zone
18 elektronische Steuereinheit  18 electronic control unit
A, B Transportrichtung  A, B transport direction
ΔΤ Temperaturreduzierung im Standby-Modus  ΔΤ Temperature reduction in standby mode
Δί1 Zeitverzögerung beim Einleiten des Standby-Modus  Δί1 Time delay when initiating standby mode
Δί2 Zeitverzögerung beim Wiederaufheizen des Schrumpftunnels Δί2 Time delay for reheating the shrink tunnel
10 10

Claims

Patentansprüche claims
1. Schrumpftunnel zur Verwendung in einer Produktionsanlage zum Herstellen von Verpackungseinheiten oder Gebinden (4) aus mit einem Produkt gefüllten Packmitteln (2) und mit aufgeschrumpfter Schrumpffolie, mit wenigstens einer Tunnelzone (14) mit Heizmitteln (15) zum Aufschrumpfen der Schrumpffolie unter Hitzeeinwirkung auf die durch die Tunnelzone bewegten Shrink tunnel for use in a production plant for producing packaging units or packages (4) of product-filled packaging (2) and shrunk-on shrink film, with at least one tunnel zone (14) with heating means (15) for shrinking the shrink film under heat which moved through the tunnel zone
Verpackungseinheiten (4) bei einer Tunneltemperatur, die eine  Packaging units (4) at a tunnel temperature, the one
Sollbetriebstemperatur im normalen störungsfreien Betriebszustand oder Betriebsmodus des Schrumpftunnels (10) ist, dadurch gekennzeichnet, dass der Schrumpftunnel (10) als weiteren Betriebszustand wenigstens einen  Target operating temperature in the normal trouble-free operating state or operating mode of the shrink tunnel (10), characterized in that the shrink tunnel (10) as a further operating state at least one
Standbymodus mit einer gegenüber dem normalen Betriebsmodus reduzierter Leistung, insbesondere mit einer reduzierter Heizleistung aufweist, und dass der Standbymodus zeit- und/oder signalgesteuert ausgelöst wird.  Standby mode with a reduced performance compared to the normal operating mode, in particular with a reduced heating power, and that the standby mode is triggered time and / or signal-controlled.
2. Schrumpftunnel nach Anspruch 1 , gekennzeichnet durch Steuermittel oder eine Steuereinrichtung (18) zur Steuerung oder Regelung der Tunneltemperatur im Schrumpftunnel und/oder in wenigstens einer Tunnelzone (14) über die Leistung von die Tunneltemperatur erzeugenden Heizmittel (15) in der Weise, dass während des normalen Betriebsmodus die Tunneltemperatur der 2. Shrink tunnel according to claim 1, characterized by control means or a control device (18) for controlling or regulating the tunnel temperature in the shrink tunnel and / or in at least one tunnel zone (14) on the performance of the tunnel temperature generating heating means (15) in such a way that during normal operating mode, the tunnel temperature of the
Sollbetriebstemperatur, beispielsweise einer Sollbetriebstemperatur im Bereich zwischen 190 und 210°C, vorzugsweise einer Betriebssolltemperatur von 200°C entspricht und im Standbymodus die Tunneltemperatur in der wenigstens einen Tunnelzone (14) um einen Temperaturbetrag (ΔΤ), beispielsweise um einen Temperaturbetrag von 50°C bis 80°C gegenüber der Sollbetriebstemperatur auf eine reduzierte Tunneltemperatur abgesenkt ist.  Target operating temperature, for example, a target operating temperature in the range between 190 and 210 ° C, preferably a desired operating temperature of 200 ° C and in standby mode, the tunnel temperature in the at least one tunnel zone (14) by a temperature amount (ΔΤ), for example by a temperature amount of 50 ° C. is lowered to 80 ° C compared to the desired operating temperature to a reduced tunnel temperature.
3. Schrumpftunnel nach Anspruch 1 oder 2, gekennzeichnet durch mehrere in der Transportrichtung (A) aufeinander folgende Tunnelzonen (14), wobei jeder Tunnelzone (14) Heizmittel (15) zugeordnet sind, die für das Umschalten der Betriebsmodi eigenständig Steuer- oder regelbar sind, und zwar bevorzugt in Abhängigkeit von in der Steuereinheit (18) eingestellten oder abgelegten Steueroder Regelparametern. 3. Shrink tunnel according to claim 1 or 2, characterized by a plurality in the transport direction (A) successive tunnel zones (14), each tunnel zone (14) heating means (15) are assigned, which are independently controllable or controllable for switching the operating modes , preferably in Dependence on the control or regulating parameters set or stored in the control unit (18).
4. Schrumpftunnel nach einem der vorhergehenden Ansprüche, dadurch 4. Shrink tunnel according to one of the preceding claims, characterized
gekennzeichnet, dass an der Steuereinrichtung (18) die Sollbetriebstemperatur und/oder die reduzierte Tunneltemperatur einstellbar und/oder in der  in that the setpoint operating temperature and / or the reduced tunneling temperature can be set and / or adjusted in the control device (18)
Steuereinrichtung (18) als Steuer- oder Regelparameter abgelegt sind.  Control device (18) are stored as control or control parameters.
5. Schrumpftunnel nach einem der vorhergehenden Ansprüche, dadurch 5. Shrink tunnel according to one of the preceding claims, characterized
gekennzeichnet, dass die Heizmittel (15) der wenigstens einen Tunnelzone zwischen einer einer Grundlast entsprechenden Heizleistung und einer maximalen Heizleistung, beispielsweise zwischen einer Heizleistung von 10 KW bis 14 KW und einer Heizleistung von 46 KW - 50 KW Steuer- oder regelbar sind.  in that the heating means (15) of the at least one tunnel zone can be controlled or regulated between a heating power corresponding to a base load and a maximum heating power, for example between a heating power of 10 KW to 14 KW and a heating power of 46 KW - 50 KW.
6. Schrumpftunnel nach einem der vorhergehenden Ansprüche, dadurch 6. Shrink tunnel according to one of the preceding claims, characterized
gekennzeichnet, dass die Steuereinrichtung (18) für die Einleitung des  characterized in that the control device (18) for the initiation of
Standbymodus bei Vorliegen wenigstens eines eine Betriebsstörung  Standby in the presence of at least one malfunction
anzeigenden Signals, beispielsweise eines von einer übergeordneten  indicating signal, for example one from a parent
Steuereinrichtung der Produktionsanlage gelieferten Signals und/oder für ein Auslösen des Standby-Modus mit einer Zeitverzögerung (At1) ausgebildet ist, beispielsweise mit einer Zeitverzögerung im Bereich von 1 bis 2 Minuten.  Control device of the production facility supplied signal and / or for triggering the standby mode with a time delay (At1) is formed, for example, with a time delay in the range of 1 to 2 minutes.
7. Schrumpftunnel nach einem der vorhergehenden Ansprüche, dadurch 7. Shrink tunnel according to one of the preceding claims, characterized
gekennzeichnet, dass die Steuereinrichtung (18) für ein Rücksetzen des  characterized in that the control device (18) for resetting the
Schrumpftunnels (10) in den normalen Betriebsmodus nach dem Wegfall der Störungsmeldung ausgebildet ist, und zwar insbesondere durch Erhöhung der Heizleistung bzw. Hochfahren der Tunneltemperatur auf die  Shrink tunnels (10) is formed in the normal operating mode after the elimination of the fault message, in particular by increasing the heating power or raising the tunnel temperature on the
Sollbetriebstemperatur.  Desired operating temperature.
8. Schrumpftunnel nach einem der vorhergehenden Ansprüche, dadurch 8. Shrink tunnel according to one of the preceding claims, characterized
gekennzeichnet, dass die Steuereinrichtung (18) für eine Reduzierung der Transportgeschwindigkeit eines schrumpftunnelseitigen Transporteurs (13), beispielsweise für eine Reduzierung der Transportgeschwindigkeit auf 20% bis 40% der Transportgeschwindigkeit des normalen Betriebsmodus und/oder zur Abschaltung einer Kühlung des schrumpftunnelseitigen Transportelementes (13) und/oder einer Kühlung, die zum Kühlen der Verpackungseinheiten (4) nach dem Aufschrumpfen der Schrumpffolie dient, und/oder zum Abschalten von Gebläsen der Heizmittel (15) jeweils nach dem Einleiten des Standby-Modus ausgebildet ist. characterized in that the control device (18) for reducing the Transport speed of a shrink tunnel side conveyor (13), for example, for a reduction of the transport speed to 20% to 40% of the transport speed of the normal operating mode and / or shutdown of cooling of the shrink tunnel side transport element (13) and / or cooling, for cooling the packaging units ( 4) after shrinking the shrink film is used, and / or for switching off blowers of the heating means (15) is formed in each case after the initiation of the standby mode.
9. Schrumpftunnel nach einem der vorhergehenden Ansprüche, dadurch 9. Shrink tunnel according to one of the preceding claims, characterized
gekennzeichnet, dass die Steuereinrichtung (18) so ausgebildet ist, dass sie bei entfallener Störmeldung oder beim Rücksetzen des Schrumpftunnels (10) in den normalen Betriebsmodus die Tunneltemperatur auf die Sollbetriebstemperatur zurücksetzt und die Gebläse der Heizmittel (15) einschaltet und/oder beim Erreichen eines ersten Temperaturschwellwertes der Tunneltemperatur unterhalb der Sollbetriebstemperatur die Transportgeschwindigkeit des schrumpftunnelseitigen Transporteurs (13) wieder erhöht und/oder eine Kühlung dieses Transportsystems einschaltet, und zwar beispielsweise bei einem ersten Temperaturschwellwert, der etwa 5% unterhalb des Temperaturschwellwertes liegt, und/oder bei Erreichen eines zweiten, der Sollbetriebstemperatur weiter angenäherten Schwellwertes, der beispielsweise 2% bis 5% unterhalb der Sollbetriebstemperatur liegt, ein die Produktionsfreigabe veranlassendes Signal erzeugt und/oder die Kühlung für die Verpackungseinheiten oder Gebinde (4) einschaltet.  characterized in that the control device (18) is designed so that it resets the tunneling temperature to the desired operating temperature and eliminates fault message or when resetting the shrinking tunnel (10) in the normal operating mode and the fans of the heating means (15) and / or upon reaching a first temperature threshold value of the tunnel temperature below the target operating temperature, the transport speed of the shrink tunnel side conveyor (13) again increased and / or a cooling system of this transport system turns on, for example at a first temperature threshold, which is about 5% below the temperature threshold, and / or upon reaching a second , the target operating temperature further approximated threshold, which is for example 2% to 5% below the desired operating temperature, generates a production release causing signal and / or the cooling for the packaging units or container (4) turns on.
10. Verfahren zum Betrieb oder Steuern eines Schrumpftunnels zur Verwendung in einer Produktionsanlage zum Herstellen von Verpackungseinheiten oder 10. A method of operating or controlling a shrink tunnel for use in a manufacturing facility to manufacture packaging units or
Gebinden (4) aus mit einem Produkt gefüllten Packmitteln (2) und mit  Containers (4) of packaging material (2) filled with a product and with
aufgeschrumpfter Schrumpffolie, wobei der Schrumpftunnel wenigstens eine Tunnelzone (14) mit Heizmitteln (15) zum Aufschrumpfen der Schrumpffolie unter Hitzeeinwirkung auf die durch den Schrumpftunnel (10) bewegten  shrunk shrink film, wherein the shrink tunnel at least one tunnel zone (14) with heating means (15) for shrinking the shrink film under heat on the through the shrink tunnel (10) moved
Verpackungseinheiten (4) bei einer Tunneltemperatur bildet, die eine Sollbetriebstemperatur im normalen störungsfreien Betriebszustand oder Betriebsmodus des Schrumpftunnels (10) ist, dadurch gekennzeichnet, dass bei Störungen für den Schrumpftunnel (10) ein Standbymodus mit einer gegenüber dem normalen Betriebsmodus reduzierter Leistung, insbesondere mit einer reduzierter Heizleistung zeit- und/oder signalgesteuert ausgelöst wird. Packing units (4) forms at a tunnel temperature, the one Setpoint operating temperature in the normal trouble-free operating state or operating mode of the shrink tunnel (10), characterized in that in case of faults for the shrink tunnel (10) a standby mode with a relation to the normal operating mode reduced power, in particular with a reduced heating power time and / or signal triggered ,
11. Verfahren nach Anspruch 10, dadurch gekennzeichnet, dass die 11. The method according to claim 10, characterized in that the
Tunneltemperatur im Schrumpftunnel (10) und/oder in der wenigstens einen Tunnelzone (14) über die Leistung von die Tunneltemperatur erzeugenden Heizmittel (15) in der Weise geregelt oder gesteuert wird, dass während des normalen Betriebsmodus die Tunneltemperatur der Sollbetriebstemperatur, beispielsweise einer Sollbetriebstemperatur im Bereich zwischen 190 und 210°C, vorzugsweise einer Betriebssolltemperatur von 200°C entspricht und im Standbymodus die Tunneltemperatur in der wenigstens einen Tunnelzone (14) um einen Temperaturbetrag (ΔΤ), beispielsweise um einen Temperaturbetrag von 50°C bis 80°C gegenüber der Sollbetriebstemperatur auf eine reduzierte Tunneltemperatur abgesenkt ist.  Tunnel temperature in the shrink tunnel (10) and / or in the at least one tunnel zone (14) via the power of the tunnel temperature generating heating means (15) is controlled or controlled so that during the normal operating mode, the tunnel temperature of the desired operating temperature, for example, a target operating temperature in Range between 190 and 210 ° C, preferably a desired operating temperature of 200 ° C and in standby mode, the tunnel temperature in the at least one tunnel zone (14) by a temperature amount (ΔΤ), for example by a temperature amount of 50 ° C to 80 ° C compared to Target operating temperature is lowered to a reduced tunnel temperature.
12. Verfahren nach Anspruch 10 oder 11 , dadurch gekennzeichnet, dass bei mehreren in der Transportrichtung (A) aufeinander folgenden Tunnelzonen (14), denen jeweils eigene Heizmittel (15) zugeordnet sind, diese für das Umschalten der Betriebsmodi eigenständig gesteuert oder geregelt werden, und zwar bevorzugt in Abhängigkeit von den in der Steuereinheit (18) eingestellten oder abgelegten Steuer- oder Regelparameter. 12. The method according to claim 10 or 11, characterized in that in the transport direction (A) successive tunnel zones (14), each associated with their own heating means (15), these are controlled or regulated independently for switching the operating modes, and preferably as a function of the control or regulating parameters set or stored in the control unit (18).
13. Verfahren nach einem der vorhergehenden Ansprüche, dadurch 13. The method according to any one of the preceding claims, characterized
gekennzeichnet, dass die Sollbetriebstemperatur und/oder die reduzierte  characterized in that the desired operating temperature and / or the reduced
Tunneltemperatur einstellbar und/oder in der Steuereinrichtung (18) als Steueroder Regelparameter abgelegt sind.  Tunneltemperatur adjustable and / or stored in the control device (18) as control or control parameters.
14. Verfahren nach einem der vorhergehenden Ansprüche, dadurch 14. The method according to any one of the preceding claims, characterized
gekennzeichnet, dass die Heizmittel (15) der wenigstens einen Tunnelzone (14) zwischen einer einer Grundlast entsprechenden Heizleistung und einer maximalen Heizleistung, beispielsweise zwischen einer Heizleistung von 10 KW bis 14 KW und einer Heizleistung von 46 KW - 50 KW gesteuert oder geregelt werden. characterized in that the heating means (15) of the at least one tunnel zone (14) between a heating power corresponding to a base load and a maximum heating power, for example, between a heating power of 10 KW to 14 KW and a heating power of 46 KW - 50 KW controlled or regulated.
15. Verfahren nach einem der vorhergehenden Ansprüche, dadurch 15. The method according to any one of the preceding claims, characterized
gekennzeichnet, dass der Standbymodus bei Vorliegen wenigstens eines eine Betriebsstörung anzeigenden Signals, beispielsweise eines von einer übergeordneten Steuereinrichtung der Produktionsanlage gelieferten Signals und/oder für mit einer Zeitverzögerung (At1) eingeleitet wird, beispielsweise mit einer Zeitverzögerung im Bereich von 1 bis 2 Minuten.  characterized in that the standby mode is initiated in the presence of at least one malfunction indicating signal, for example a signal supplied from a higher-level control device of the production plant and / or for a time delay (At1), for example with a time delay in the range of 1 to 2 minutes.
16. Verfahren nach einem der vorhergehenden Ansprüche, dadurch 16. The method according to any one of the preceding claims, characterized
gekennzeichnet, dass ein Rücksetzen des Schrumpftunnels (10) in den normalen Betriebsmodus nach dem Wegfall der Störungsmeldung erfolgt, und zwar insbesondere durch Erhöhung der Heizleistung bzw. Hochfahren der Tunneltemperatur auf die Sollbetriebstemperatur.  characterized in that a reset of the shrinking tunnel (10) in the normal operating mode after the elimination of the fault message, in particular by increasing the heating power or raising the tunnel temperature to the desired operating temperature.
17. Verfahren nach einem der vorhergehenden Ansprüche, dadurch 17. The method according to any one of the preceding claims, characterized
gekennzeichnet, dass eine Reduzierung der Transportgeschwindigkeit eines schrumpftunnelseitigen Transporteurs (13), beispielsweise für eine Reduzierung der Transportgeschwindigkeit auf 20% bis 40% der Transportgeschwindigkeit des normalen Betriebsmodus und/oder eine Abschaltung einer Kühlung des schrumpftunnelseitigen Transportelementes (13) und/oder einer Kühlung, die zum Kühlen der Verpackungseinheiten (4) nach dem Aufschrumpfen der Schrumpffolie dient, und/oder ein Abschalten von Gebläsen der Heizmittel (15) nach dem Auslösen des Standbymodus erfolgt.  characterized in that a reduction of the transport speed of a shrink tunnel side conveyor (13), for example for a reduction of the transport speed to 20% to 40% of the transport speed of the normal operating mode and / or a shutdown of cooling of the shrink tunnel side transport element (13) and / or cooling, which is used to cool the packaging units (4) after shrinking the shrink film, and / or switching off blowers of the heating means (15) after the triggering of the standby mode.
18. Verfahren nach einem der vorhergehenden Ansprüche, dadurch 18. The method according to any one of the preceding claims, characterized
gekennzeichnet, dass bei entfallener Störmeldung oder beim Rücksetzen des Schrumpftunnels (10) in den normalen Betriebsmodus die Tunneltemperatur auf die Sollbetriebstemperatur zurücksetzt und die Gebläse der Heizmittel (15) einschaltet und/oder beim Erreichen eines ersten Temperaturschwellwertes der Tunneltemperatur unterhalb der Sollbetriebstemperatur die in that, if the fault message is omitted or the shrinking tunnel (10) is reset to the normal operating mode, the tunnel temperature is reset to the setpoint operating temperature and the fans of the heating means (15) turns on and / or upon reaching a first temperature threshold of the tunnel temperature below the desired operating temperature the
Transportgeschwindigkeit des schrumpftunnelseitigen Transporteurs (13) wieder erhöht und/oder eine Kühlung dieses Transportsystems eingeschaltet werden, und zwar beispielsweise bei einem ersten Temperaturschwellwert, der etwa 5% unterhalb des Temperaturschwellwertes liegt, und/oder bei Erreichen eines zweiten, der Sollbetriebstemperatur weiter angenäherten Schwellwertes, der beispielsweise 2% unterhalb der Sollbetriebstemperatur liegt, ein die  Transport speed of shrinking tunnel side conveyor (13) again increased and / or cooling of this transport system are turned on, for example at a first temperature threshold, which is about 5% below the temperature threshold, and / or upon reaching a second, the target operating temperature further approximated threshold, for example, is 2% below the target operating temperature, a the
Produktionsfreigabe veranlassendes Signal erzeugt und/oder die Kühlung für die Verpackungseinheiten oder Gebinde (4) einschaltet werden.  Production release inducing signal generated and / or the cooling for the packaging units or containers (4) are turned on.
19. Produktionsanlage mit einem einer Verpackungsmaschine (7) nachgeschalteten Schrumpftunnel (10), dadurch gekennzeichnet, dass der Schrumpftunnel nach einem der vorhergehenden Ansprüche 1 - 8 ausgebildet ist. 19. Production plant with a packaging machine (7) downstream shrink tunnel (10), characterized in that the shrink tunnel according to one of the preceding claims 1-8 is formed.
EP11702142.8A 2010-03-16 2011-01-25 Control system and apparatus for controlling power consumption of a shrink tunnel. Active EP2547590B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102010011640.8A DE102010011640B4 (en) 2010-03-16 2010-03-16 Shrink tunnel for applying shrink films, method for operating or controlling a shrink tunnel and production plant with a shrink tunnel
PCT/EP2011/000284 WO2011113506A1 (en) 2010-03-16 2011-01-25 Shrink tunnel for applying shrink films, method for operating or controlling a shrink tunnel, and production system having a shrink tunnel

Publications (2)

Publication Number Publication Date
EP2547590A1 true EP2547590A1 (en) 2013-01-23
EP2547590B1 EP2547590B1 (en) 2016-03-30

Family

ID=43911618

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11702142.8A Active EP2547590B1 (en) 2010-03-16 2011-01-25 Control system and apparatus for controlling power consumption of a shrink tunnel.

Country Status (7)

Country Link
US (1) US9926091B2 (en)
EP (1) EP2547590B1 (en)
BR (1) BR112012021983A2 (en)
DE (1) DE102010011640B4 (en)
ES (1) ES2568526T3 (en)
PL (1) PL2547590T3 (en)
WO (1) WO2011113506A1 (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102011119584A1 (en) * 2011-10-05 2013-04-11 Focke & Co. (Gmbh & Co. Kg) System for operating a packaging system
DE102012106600A1 (en) * 2012-07-20 2014-06-12 Krones Ag Shrinking device with optimized energy management
DE102013104417A1 (en) * 2013-04-30 2014-10-30 Krones Aktiengesellschaft A method of transferring a shrink tunnel to a production mode and method of transferring a shrink tunnel from a production mode to a standstill mode
TWI655136B (en) * 2014-06-27 2019-04-01 日商養樂多本社股份有限公司 Shrinking label heat shrinking device
DE102015215379A1 (en) * 2015-08-12 2017-02-16 Krones Aktiengesellschaft Plant and method for producing and moving containers consisting of several articles
DE102016203435A1 (en) * 2016-03-02 2017-09-07 Krones Aktiengesellschaft Section of a packaging line for beverage containers and procedures for handling beverage containers during their transport along a packaging line
DE102016211619A1 (en) * 2016-06-28 2017-12-28 Krones Ag Plant for treating containers, and method for packing filled containers
FR3070376B1 (en) * 2017-08-30 2021-04-16 C E R M E X Constructions Etudes Et Rech De Materiels Pour Lemballage Dexpedition OPERATION OF A RETRACTION DEVICE OF AN AUTOMATIC SHRINDER
CN108860819A (en) * 2018-06-26 2018-11-23 芜湖优能自动化设备有限公司 A kind of machinery valve body assembly line packing device
DE102021103837A1 (en) 2021-02-18 2022-08-18 Krones Aktiengesellschaft Shrinkage device and method for optimizing the energy output of a shrinkage device
DE102021108138A1 (en) * 2021-03-31 2022-10-06 Krones Aktiengesellschaft Method for switching a shrinking device into a stand-by mode and shrinking device
IT202100009092A1 (en) * 2021-04-12 2022-10-12 Koerber Tissue S P A METHOD AND MACHINE FOR PACKAGING TISSUE PAPER PRODUCTS

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4664923A (en) 1984-05-17 1987-05-12 Pet Incorporated Method of infrared tunnel oven cooking of food products
US20040083687A1 (en) 2002-11-01 2004-05-06 Christman Russell T. Shrink tunnel control apparatus and method
US7363728B1 (en) 2004-07-20 2008-04-29 Belco Packaging Systems, Inc. Shrink wrap tunnel with variable set points

Family Cites Families (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3399506A (en) * 1965-04-01 1968-09-03 Grace W R & Co Process and apparatus for simultaneously heat sealing and heat shrinking film
US3591767A (en) * 1969-06-23 1971-07-06 David Jeffrey Mudie Radiant shrink tunnel
IT1156135B (en) * 1982-12-13 1987-01-28 Francesco Torre PACKAGING MACHINE FOR THERMAL Shrinkable FILM PRODUCTS
FR2646894B3 (en) * 1989-05-11 1991-07-12 Sleever Int PROCESS FOR CONTROLLING THE TEMPERATURE IN AN OVEN-TUNNEL OPEN AT ITS TWO ENDS, AND DEVICE FOR IMPLEMENTING THE PROCESS
US5606534A (en) * 1989-09-01 1997-02-25 Quantronix, Inc. Laser-based dimensioning system
US5197375A (en) * 1991-08-30 1993-03-30 The Middleby Corporation Conveyor oven control
US5371999A (en) * 1991-11-12 1994-12-13 Inter Pak Equipment Corporation Shrink film wrapping machine
DE4322249A1 (en) * 1992-10-23 1994-04-28 Marquardt Gmbh Bus switch
IT246650Y1 (en) * 1999-04-15 2002-04-09 Minipack Torre Spa TUNNEL PACKAGING MACHINE FOR PACKAGING WITH HEAT-SHRINK FILM
DE19920057A1 (en) * 1999-05-03 2000-11-09 Kallfass Gmbh Method and device for packaging objects in shrink film
AU7737500A (en) * 1999-09-29 2001-04-30 Quadlux, Inc. Lightwave conveyor oven and method of operating the same
TWI264042B (en) * 2002-09-20 2006-10-11 Tokyo Electron Ltd Dry-air supplying apparatus and processing apparatus
US20040216425A1 (en) * 2003-01-16 2004-11-04 Morton David L. Automatic cover applicator
US8087407B2 (en) * 2004-03-23 2012-01-03 Middleby Corporation Conveyor oven apparatus and method
CA2783217C (en) * 2005-10-27 2015-05-12 John H. Wiker Conveyor oven apparatus and method
DE102006013800C5 (en) * 2006-03-24 2010-04-15 Khs Ag Transport system for bottles or similar containers and equipment for treating bottles or similar containers
JP5087268B2 (en) * 2006-12-15 2012-12-05 株式会社フジシールインターナショナル Shrink film heat shrink device
DE102006060109A1 (en) * 2006-12-20 2008-06-26 Krones Ag Machine for shrinking shrink film onto packaged goods and shrink-wrapping process
US8056255B2 (en) * 2007-01-16 2011-11-15 Ctb, Inc. Manure removal and drying system
DE102007011526A1 (en) * 2007-03-09 2008-09-11 Khs Ag shrink tunnel
DE102007014802A1 (en) * 2007-03-28 2008-10-09 Khs Ag Method for monitoring, controlling and optimizing filling systems for foodstuffs, in particular for beverage bottles
DE102007019378A1 (en) * 2007-04-23 2008-11-27 Khs Ag Manufacturing process for machines
DE102007039425A1 (en) * 2007-08-21 2009-02-26 Beckhoff Automation Gmbh Control node and control
DE102007041251A1 (en) * 2007-08-30 2009-03-05 Khs Ag Manufacturing process for machines
DE102008021527B4 (en) * 2008-04-30 2023-06-29 Krones Aktiengesellschaft Plant and method for manufacturing containers
EP2149831B1 (en) * 2008-07-31 2012-02-01 Siemens Aktiengesellschaft Control method for a composite of several multi-axle handling devices arranged behind or beside each other and data storage medium, control system and composite
DE102009040977B4 (en) * 2009-09-11 2022-12-15 Krones Aktiengesellschaft Container treatment system and a container treatment method for treating containers that can be filled with a product
DE102011017448A1 (en) * 2011-04-18 2012-10-18 Krones Aktiengesellschaft Method for operating a container treatment plant with fault diagnosis
DE102012106600A1 (en) * 2012-07-20 2014-06-12 Krones Ag Shrinking device with optimized energy management
US10063814B2 (en) * 2014-03-12 2018-08-28 R.J. Reynolds Tobacco Company Smoking article package inspection system and associated method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4664923A (en) 1984-05-17 1987-05-12 Pet Incorporated Method of infrared tunnel oven cooking of food products
US20040083687A1 (en) 2002-11-01 2004-05-06 Christman Russell T. Shrink tunnel control apparatus and method
US7363728B1 (en) 2004-07-20 2008-04-29 Belco Packaging Systems, Inc. Shrink wrap tunnel with variable set points

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of WO2011113506A1

Also Published As

Publication number Publication date
BR112012021983A2 (en) 2018-01-16
PL2547590T3 (en) 2016-10-31
DE102010011640B4 (en) 2020-03-12
WO2011113506A1 (en) 2011-09-22
ES2568526T3 (en) 2016-04-29
DE102010011640A1 (en) 2011-11-17
US20130000256A1 (en) 2013-01-03
EP2547590B1 (en) 2016-03-30
US9926091B2 (en) 2018-03-27

Similar Documents

Publication Publication Date Title
EP2547590A1 (en) Shrink tunnel for applying shrink films, method for operating or controlling a shrink tunnel, and production system having a shrink tunnel
EP2571768A1 (en) Shrink tunnel for applying shrink films, method for operating or controlling a shrink tunnel and production plant with a shrink tunnel
EP3066531B1 (en) Method for addressing/sequencing linearly interlinked control components of a conveying system
EP3313737B1 (en) Packaging machine and method for operation of the packaging machine
EP2835317B1 (en) Method and device for shrinking of materials onto articles and/or onto an assembly of articles
EP2441563B1 (en) Device for producing plastic containers with variable station switch-off
EP0236666B1 (en) Process for reheating semiproducts from continuous-casting installations or from shaping installations for their introduction into shaping and/or finishing installations
EP2799352B1 (en) Method for transferring a shrinking tunnel to a production mode and method for transferring a shrinking tunnel from a production mode to a standstill mode
WO2012048435A1 (en) Method for operating a processing system, in which product units having different product characteristics are processed
DE102021103837A1 (en) Shrinkage device and method for optimizing the energy output of a shrinkage device
EP2833742B1 (en) Pasteurizing apparatus
DE102017107766A1 (en) Method and device for forming containers
EP2748104B1 (en) Vacuum device for plants for the processing of containers, and method for controlling a vacuum device
EP3254042B1 (en) Method for the automated operation of a drying plant with a drying chamber filled with at least one air volume
DE102015202163B4 (en) Method for automated operation of a drying plant
EP4067247A1 (en) Shrinking device and method for transferring a shrinking device to a standby mode
WO2017025222A1 (en) Installation and method for producing and moving packages that consist of several articles
EP3118127B1 (en) Method for reliably operating a cigarette packing machine
DE102022105519A1 (en) Operating method for a heating device for the temperature conditioning of preforms in a startup phase, heating device and machine
WO2023088989A2 (en) Buffer device
EP2187516B1 (en) Circuit arrangement of parallel power regulation devices for equal allocation of the input power supplied by the AC network
DD273240A1 (en) METHOD FOR CONTROLLING A PNEUMATIC PRESSURE CONTACT MACHINERY

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20121016

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

TPAC Observations filed by third parties

Free format text: ORIGINAL CODE: EPIDOSNTIPA

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20150422

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20151022

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 785091

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160415

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2568526

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20160429

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502011009263

Country of ref document: DE

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160630

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160701

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20160330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160730

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160801

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502011009263

Country of ref document: DE

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20170103

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170131

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170131

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170131

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170125

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20170131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170125

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20171220

Year of fee payment: 8

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 785091

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170125

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20180119

Year of fee payment: 8

Ref country code: ES

Payment date: 20180227

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170125

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20110125

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20190125

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190125

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20200310

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160330

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190126

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190125

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230124

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20230120

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20240119

Year of fee payment: 14