EP2530211A1 - Constrution de surfaces en beton a charpente metallique legere et son procede de construction - Google Patents

Constrution de surfaces en beton a charpente metallique legere et son procede de construction Download PDF

Info

Publication number
EP2530211A1
EP2530211A1 EP11736649A EP11736649A EP2530211A1 EP 2530211 A1 EP2530211 A1 EP 2530211A1 EP 11736649 A EP11736649 A EP 11736649A EP 11736649 A EP11736649 A EP 11736649A EP 2530211 A1 EP2530211 A1 EP 2530211A1
Authority
EP
European Patent Office
Prior art keywords
spatial light
steel frame
light steel
wall
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP11736649A
Other languages
German (de)
English (en)
Other versions
EP2530211B1 (fr
EP2530211A4 (fr
Inventor
Jianqun Hou
Weimin Zhuang
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architectural Design and Research Institute of Tsinghua University
Original Assignee
Architectural Design and Research Institute of Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architectural Design and Research Institute of Tsinghua University filed Critical Architectural Design and Research Institute of Tsinghua University
Publication of EP2530211A1 publication Critical patent/EP2530211A1/fr
Publication of EP2530211A4 publication Critical patent/EP2530211A4/fr
Application granted granted Critical
Publication of EP2530211B1 publication Critical patent/EP2530211B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/16Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
    • E04B1/161Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with vertical and horizontal slabs, both being partially cast in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/08Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with apertured web, e.g. with a web consisting of bar-like components; Honeycomb girders

Definitions

  • Embodiments of the present disclosure generally relate to a building and a method for constructing the same, more particularly, to a spatial light steel frame concrete building and a method for constructing the same.
  • a concrete structure may apply to not only a low-rise and multistorey building, but also a high-rise building, and consequently has been widely used.
  • reinforcing steel bars may need to be assembled in situ, and formworks may need to be mounted or removed in situ, which may cause heavy in-situ labor and long construction period.
  • a pre-cast reinforced concrete shear wall structure is that components are produced in a factory and assembled in situ.
  • the construction cost may be high.
  • a Chinese Patent application (Publishing No. CN1958984A ) discloses a steel mesh frame concrete composite building and a method for constructing the same, in which a cold-formed thin-walled steel is used to make a steel skeleton, and a conventional wood or steel formwork is replaced by a steel mesh.
  • a steel mesh skeleton is made in a factory and assembled into a steel mesh frame in situ, and then concrete is cast in situ to form a concrete seismic wall structure.
  • this structure still has the following defects.
  • a trellis profile steel used in the steel mesh frame is a cold-formed trellis profile steel component with a thickness of 1.0mm to 4.0mm and a C-shaped, U-shaped or Z-shaped cross section, holes are formed and arranged uniformly in a web member between two wing edges parallel to each other, a reinforcing hemming is formed on a periphery of each hole, and the reinforcing hemming between two adjacent holes forms a U-shaped web member.
  • the production process of this trellis profile steel is relatively complicated, holes need to be formed in a thin steel sheet by a punch, and then bending is performed on a cold-formed device.
  • the amount of crap steel sheets may be about 10wt% to about 15wt%, which may cause waste.
  • a special trellis profile steel production line may need to be constructed, which may result in high investment and high production cost.
  • the steel mesh used in the steel mesh frame is a fish scale mesh formed by cold forming a galvanized steel sheet with a thickness of 0.3mm to 0.6mm, convex strip-like ribs arranged parallel to each other and spaced apart from each other by a predetermined distance are formed on the fish scale mesh, and the steel mesh is fixed on the surface of the steel skeleton by the convex portions of the strip-like ribs.
  • the steel mesh does not play a part in structure stress, but is merely used as a formwork, which may cause high construction cost and increase the steel amount of a building. After the concrete is cast, wet plastering may also need to be performed on the surface of the steel mesh to flatten the surface of the steel mesh, thus increasing working procedures and wasting labor.
  • Another Chinese Patent application (Publishing No. CN101654925A ) discloses a spatial solid mold truss concrete building and a method for constructing the same.
  • non-removal formworks are used, and consequently may not be reused, which may increase the construction cost.
  • the formworks may not be removed, the density of the concrete after cast may not be detected conveniently.
  • Embodiments of the present disclosure seek to solve at least one of the problems existing in the prior art to at least some extent. Accordingly, a spatial light steel frame concrete building is provided.
  • the frame of the spatial light steel frame concrete building may be simple to process, the labor cost and investments on apparatuses may be reduced, and steels may be saved. Furthermore, a method for constructing the spatial light steel frame concrete building is also provided.
  • a spatial light steel frame concrete building comprises: a wall spatial light steel frame; a floor slab spatial light steel frame connected to the wall spatial light steel frame to form a building unit spatial light steel frame; and concrete poured in the building unit spatial light steel frame, in which each of the wall spatial light steel frame and the floor slab spatial light steel frame comprises a welded mesh reinforcement and a plurality of trellis profile steels, the plurality of trellis profile steels are spaced apart from each other and each has a plurality of stretching holes, the welded mesh reinforcement is welded to the trellis profile steels so as to connect the plurality of trellis profile steels together, each trellis profile steel comprises two wing edges parallel to each other and a plurality of web members connected between the two wing edges, the two wing edges and the plurality of web members are integrally formed, the plurality of stretching holes are defined by the plurality of web members between the two wing
  • a method for constructing a spatial light steel frame concrete building comprises steps of:
  • the wall spatial light steel frame and the floor slab spatial light steel frame are formed by welding the welded mesh reinforcement and the plurality of trellis profile steels each having a plurality of stretching holes respectively, such that the trellis profile steels may be simple to process, materials may be saved, and the cost, investments on production apparatuses, the time and the effort may be reduced. Moreover, the formworks may be removed to be reused, thus further reducing the cost.
  • relative terms such as “central”, “longitudinal”, “lateral”, “front”, “rear”, “right”, “left”, “inner”, “outer”, “lower”, “upper”, “horizontal”, “vertical”, “above”, “below”, “up”, “top”, “bottom” as well as derivative thereof (e.g., “horizontally”, “downwardly”, “upwardly”, etc.) should be construed to refer to the orientation as then described or as shown in the drawings under discussion. These relative terms are for convenience of description and do not require that the present disclosure be constructed or operated in a particular orientation.
  • the spatial light steel frame concrete building comprises a wall spatial light steel frame 1, a floor slab spatial light steel frame 2 and concrete.
  • the floor slab spatial light steel frame 2 is connected to the wall spatial light steel frame 1 to form a building unit spatial light steel frame.
  • the concrete is poured in the building unit spatial light steel frame.
  • removable formworks 3 are mounted onto the building unit spatial light steel frame before the concrete is poured, and the formworks 3 are selectively removed after the concrete is solidified, thus reusing the formworks 3.
  • the fact that "the formworks 3 are selectively removed after the concrete is solidified” means that whether the formworks 3 are removed may depend on requirements.
  • the formwork 3 at an outer side of the wall spatial light steel frame 1 forming an outer wall of the spatial light steel frame concrete building may not be removed, but may be permanently reserved, and consequently an insulation board 8 may be attached to the formwork 3 at the outer side of the wall spatial light steel frame 1 forming the outer wall of the spatial light steel frame concrete building. That is, an insulation layer is disposed on the outer wall of the spatial light steel frame concrete building, thus enhancing the thermal insulation performance of the building.
  • the formworks 3 under the floor slab spatial light steel frame 2 and the formworks 3 on the wall spatial light steel frame 1 which do not form the outer wall of the spatial light steel frame concrete building may be removed.
  • all the formworks 3 may be removed.
  • Each of the wall spatial light steel frame 1 and the floor slab spatial light steel frame 2 comprises a welded mesh reinforcement 4 and a plurality of trellis profile steels 11, the plurality of trellis profile steels 11 are spaced apart from each other and each has a plurality of stretching holes 113, and the welded mesh reinforcement 4 is welded to the trellis profile steels 11 so as to connect the plurality of trellis profile steels 11 together.
  • Each trellis profile steel 11 comprises two wing edges 111 parallel to each other and a plurality of web members 112 connected between the two wing edges 111, the two wing edges 111 and the plurality of web members 112 are integrally formed, the plurality of stretching holes 113 are defined by the plurality of web members 112 between the two wing edges 111, and the plurality of web members 112 and the plurality of stretching holes 113 are formed by stretching the two wing edges 111.
  • the wall spatial light steel frame 1 and the floor slab spatial light steel frame 2 are formed by welding the welded mesh reinforcement 4 and the plurality of trellis profile steels 11 together respectively, and the plurality of web members 112 and the plurality of stretching holes 113 are formed by stretching the two wing edges 111, such that the trellis profile steels 11 may be simple to manufacture, materials may be saved, and investments on production apparatuses, the labor cost and the construction cost may be reduced.
  • the spatial light steel frame concrete building may be a multistorey building, as shown in Fig. 2 .
  • Fig. 2 an eight-storey building is shown.
  • Each storey of the spatial light steel frame concrete building is formed by one storey of integral building unit, and each integral building unit is formed by horizontally arranging one or more building units.
  • one integral building unit is formed by 10 building units.
  • Each building unit is formed by pouring the concrete in one building unit spatial light steel frame formed by one wall spatial light steel frame 1 and one floor slab spatial light steel frame 2, and a plurality of integral building units are sequentially stacked upwardly to form the multistorey spatial light steel frame concrete building, in which the wall spatial light steel frame 1 of an upper storey of integral building unit is fixed on the wall spatial light steel frame 1 of a lower storey of integral building unit adjacent thereto.
  • the wall spatial light steel frame 1 of the upper storey of integral building unit may be connected to the wall spatial light steel frame 1 of the lower storey of integral building unit adjacent thereto by a connection member.
  • a lower end of the wall spatial light steel frame 1 of a bottom storey of integral building unit is fixed on a foundation 13.
  • An upper end of the wall spatial light steel frame 1 of a top storey of integral building unit is connected to the floor slab spatial light steel frame 2 as a roof.
  • the floor slab spatial light steel frame 2 may be connected to the wall spatial light steel frame 1 by welding to form the building unit spatial light steel frame.
  • the floor slab spatial light steel frame 2 may be connected to the wall spatial light steel frame 1 by a connection member.
  • the formwork 3 may be permanently disposed onto the outer side of the wall spatial light steel frame 1 forming the outer wall of the spatial light steel frame concrete building.
  • the formwork 3 at the outer side of the wall spatial light steel frame 1 forming the outer wall of the spatial light steel frame concrete building may not be removed, and the insulation board 8 may be attached to the formwork 3, thus enhancing the thermal insulation effect of the building.
  • each trellis profile steel 11 in the wall spatial light steel frame 1 and the floor slab spatial light steel frame 2 may be formed by using one steel sheet, forming a plurality of slits extended between the two wing edges 111 in a longitudinal direction (i.e., a left and right direction in Fig. 4 ) of the two wing edges 111 and then stretching the two wing edges 111 in a transversal direction (i.e., an up and down direction in Fig. 4 ) of the two wing edges 111, such that the plurality of web members 112 and the plurality of stretching holes 113 defined by the plurality of web members 112 are formed between the two wing edges 111. Therefore, the trellis profile steels 11 may be very simple to process, materials may be saved, and the time and the effort may be reduced.
  • the structure of the wall spatial light steel frame 1 is substantially the same as the structure of the floor slab spatial light steel frame 2, except that: before the concrete is poured, removable formworks 3 are mounted onto two sides of the wall spatial light steel frame 1, while removable formworks 3 are merely mounted onto a bottom surface of the floor slab spatial light steel frame 2.
  • a window and a door of the building may be designed according to practical requirements. For this reason, a door opening and a window opening are reserved in portions of the wall spatial light steel frame 1 respectively so as to form the window and the door of the building respectively.
  • a plurality of edge members 6 are disposed at two sides of the door opening and the window opening which are reserved in portions of the wall spatial light steel frame 1 in a horizontal direction respectively. Each edge member 6 comprises longitudinal reinforcing steel bars and horizontal stirrups or comprises vertical reinforcing steel bars, vertical profile steels and horizontal stirrups.
  • a plurality of connection beams 7 are disposed above the door opening and the window opening. Each connection beam 7 comprises horizontal reinforcing steel bars and vertical stirrups.
  • a stairwell opening may be previously formed in the floor slab spatial light steel frame 2 according to design requirements.
  • the welded mesh reinforcement 4 may be formed by welding reinforcing steel bars 41 arranged horizontally and reinforcing steel bars 41 arranged vertically.
  • the welded mesh reinforcement 4 is welded to the plurality of trellis profile steels 11, which are spaced apart from each other and each having a plurality of stretching holes 113, to form the wall spatial light steel frame 1 and the floor slab spatial light steel frame 2 respectively.
  • the insulation board 8 disposed on the outer wall of the spatial light steel frame concrete building may be a composite insulation board.
  • the insulation board 8 comprises a polybenzene or rockwool insulation layer 801, an anti-crack mortar or board protection layer 802 and a decoration surface layer 803 from inside to outside.
  • the method for constructing the spatial light steel frame concrete building according to an embodiment of the present disclosure comprises steps of:
  • steps (1) to (4) are repeated to form multiple storeys of the integral building units, in which a lower end of the wall spatial light steel frame 1 of an upper storey of integral building unit is fixed on the wall spatial light steel frame 1 of a lower storey of integral building unit adjacent thereto, for example, by a steel connection member, so as to form a multistory spatial light steel frame concrete building.
  • Each integral building unit may be formed by horizontally arranging one or more building units, each building unit is formed by pouring the concrete in one building unit spatial light steel frame formed by one wall spatial light steel frame 1 and one floor slab spatial light steel frame 2, and a plurality of integral building units are sequentially stacked upwardly to form the multistorey spatial light steel frame concrete building.
  • the floor slab spatial light steel frame 2 may be connected to the wall spatial light steel frame 1 by welding or by a connection member.
  • each trellis profile steel 11 is formed by forming a plurality of slits extended between the two wing edges 111 in a longitudinal direction of the two wing edges 111 and then stretching the two wing edges 111 in a transversal direction of the two wing edges 111.
  • the method for constructing the spatial light steel frame concrete building further comprises: disposing an insulation board 8 on an outer wall of the spatial light steel frame concrete building, in which the formwork 3 at an outer side of the wall spatial light steel frame 1 forming the outer wall of the spatial light steel frame concrete building is permanently reserved, and the insulation board 8 is attached to the formwork 3 at the outer side of the wall spatial light steel frame 1 forming the outer wall of the spatial light steel frame concrete building.
  • the trellis profile steels 11 forming the wall spatial light steel frame 1 and the floor slab spatial light steel frame 2 may be simple to process, materials may be saved, and the cost, investments on production apparatuses, the time and the effort may be reduced. Moreover, the formworks 3 may be removed to be reused, thus further reducing the cost.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
EP11736649.2A 2010-01-29 2011-01-28 Constrution de surfaces en beton a charpente metallique legere et son procede de construction Active EP2530211B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2010101042592A CN101736809B (zh) 2010-01-29 2010-01-29 一种空间轻钢构架混凝土建筑及其建造方法
PCT/CN2011/070772 WO2011091767A1 (fr) 2010-01-29 2011-01-28 Constrution de surfaces en beton a charpente metallique legere et son procede de construction

Publications (3)

Publication Number Publication Date
EP2530211A1 true EP2530211A1 (fr) 2012-12-05
EP2530211A4 EP2530211A4 (fr) 2014-04-09
EP2530211B1 EP2530211B1 (fr) 2016-09-07

Family

ID=42460792

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11736649.2A Active EP2530211B1 (fr) 2010-01-29 2011-01-28 Constrution de surfaces en beton a charpente metallique legere et son procede de construction

Country Status (6)

Country Link
US (1) US20120304563A1 (fr)
EP (1) EP2530211B1 (fr)
CN (1) CN101736809B (fr)
CA (1) CA2788118C (fr)
RU (1) RU2506376C1 (fr)
WO (1) WO2011091767A1 (fr)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736809B (zh) * 2010-01-29 2011-05-11 清华大学建筑设计研究院 一种空间轻钢构架混凝土建筑及其建造方法
CN105317109A (zh) * 2014-08-01 2016-02-10 吴瑞金 三维网固整体浇筑发泡墙体房屋及施工方法
CN105735545A (zh) * 2016-02-03 2016-07-06 安徽晋马环保节能科技有限公司 以工业副产石膏为胶凝材料建造轻钢房屋楼面施工方法
IL253294A0 (en) * 2017-02-08 2017-09-28 Schillinger Ervin Rapid construction of energy efficient buildings
US10538907B2 (en) 2017-08-01 2020-01-21 SkyStone Group LLC Modular assemblies and methods of construction thereof
US10208483B1 (en) 2017-08-01 2019-02-19 SkyStone Group LLC Façades of modular units and methods of construction thereof
CN109555310B (zh) * 2018-12-24 2024-01-02 上海建工二建集团有限公司 一种墙柱的整体式模板及其施工方法
CN111482776B (zh) * 2019-05-31 2022-06-03 成都辟思航空科技有限公司 一种整体式格构柱加工装置
CN112900923A (zh) * 2021-01-18 2021-06-04 四川省星光钢结构有限公司 一种具有抗震效果的轻钢结构的别墅
CN114412013B (zh) * 2022-01-20 2024-03-29 江苏沪宁钢机股份有限公司 一种建筑墙体节段及施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US804614A (en) * 1905-04-07 1905-11-14 Robert R Moorman Means for reinforcing concrete structures.
US1006047A (en) * 1910-04-18 1911-10-17 Albert J Bates Trussed structure.
FR1337089A (fr) * 1962-10-24 1963-09-06 Travaux Pour La Construction E Procédé de coffrage dit coffrage-tunnel
US4107886A (en) * 1974-03-25 1978-08-22 Systems Concept, Inc. Prefabricated building module
CN100451257C (zh) * 2005-12-01 2009-01-14 清华大学建筑设计研究院 钢网构架混凝土复合建筑及其建造方法

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1968045A (en) * 1930-02-25 1934-07-31 Ferrocon Corp Building construction
US2104869A (en) * 1935-10-22 1938-01-11 Austin T Levy Prefabricated building
US2201504A (en) * 1938-05-20 1940-05-21 Frederick H Ruppel Roof structure and truss therefor
US4292775A (en) * 1976-04-26 1981-10-06 David Howard Building wall structure
LU77320A1 (fr) * 1976-05-14 1977-08-24
US4185423A (en) * 1978-03-27 1980-01-29 Systems Concept, Inc. Lightweight building module
FR2499612B1 (fr) * 1981-02-09 1986-05-30 Sambuchi Boisbluche & Cie Element de construction a vide d'air interieur, destine notamment a la fabrication des murs exterieurs d'une maison d'habitation
US4974387A (en) * 1989-08-15 1990-12-04 Karl Dufour Factory made light steel joint for roof trusses
GB9026730D0 (en) * 1990-12-08 1991-01-30 Kubik Leszek A Space frame structure
US5487248A (en) * 1993-11-22 1996-01-30 Artzer; Richard F. Structural panel
US5522194A (en) * 1994-03-25 1996-06-04 Graulich; Peter W. P. Structural bearing panel and panel core for building
FI96440C (fi) * 1995-02-13 1996-06-25 Rautaruukki Oy Solmukappaleeton avaruusristikkorakenne
US5737895A (en) * 1995-12-20 1998-04-14 Perrin; Arthur Prefabricated construction panels and modules for multistory buildings and method for their use
JPH1025854A (ja) * 1996-07-12 1998-01-27 Jiyoisuto:Kk 軽量コンクリート板
US6532710B2 (en) * 2000-02-03 2003-03-18 Leonard R. Terry Solid monolithic concrete insulated wall system
AUPR022300A0 (en) * 2000-09-19 2000-10-12 James Hardie International Finance B.V. Cement render system
CN1587560A (zh) * 2004-07-12 2005-03-02 大连爱特钢建筑产业有限公司 冷弯薄壁格构型钢与混凝土复合的建筑构件及其生产工艺
RU2353735C2 (ru) * 2004-12-07 2009-04-27 Александр Семенович Нечаев Способ возведения монолитных каркасных зданий
WO2007085076A1 (fr) * 2006-01-24 2007-08-02 Greiner Waldemar H Appareil composite pour plancher et procede de fabrication et d'utilisation associe comprenant l'utilisation de supports de construction
US20080178551A1 (en) * 2007-01-31 2008-07-31 Porter William H Flexible modular building framework
CN101654925B (zh) 2009-09-15 2011-03-16 清华大学建筑设计研究院 一种空间固模桁架混凝土建筑及其建造方法
CN101736809B (zh) * 2010-01-29 2011-05-11 清华大学建筑设计研究院 一种空间轻钢构架混凝土建筑及其建造方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US804614A (en) * 1905-04-07 1905-11-14 Robert R Moorman Means for reinforcing concrete structures.
US1006047A (en) * 1910-04-18 1911-10-17 Albert J Bates Trussed structure.
FR1337089A (fr) * 1962-10-24 1963-09-06 Travaux Pour La Construction E Procédé de coffrage dit coffrage-tunnel
US4107886A (en) * 1974-03-25 1978-08-22 Systems Concept, Inc. Prefabricated building module
CN100451257C (zh) * 2005-12-01 2009-01-14 清华大学建筑设计研究院 钢网构架混凝土复合建筑及其建造方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of WO2011091767A1 *

Also Published As

Publication number Publication date
CA2788118A1 (fr) 2011-08-04
CA2788118C (fr) 2014-10-14
US20120304563A1 (en) 2012-12-06
WO2011091767A1 (fr) 2011-08-04
CN101736809A (zh) 2010-06-16
CN101736809B (zh) 2011-05-11
RU2506376C1 (ru) 2014-02-10
EP2530211B1 (fr) 2016-09-07
EP2530211A4 (fr) 2014-04-09

Similar Documents

Publication Publication Date Title
CA2788118C (fr) Constrution de surfaces en beton a charpente metallique legere et son procede de construction
CN208473116U (zh) 一种部分预制装配型钢混凝土腹板开洞梁
EP3133220B1 (fr) Plateforme pour balcon et son procédé de production
WO2009059036A1 (fr) Système de panneaux muraux préfabriqués
KR101456366B1 (ko) 개방형 채널과 수직부 천공 h형강으로 구성된 보 춤 저감형 합성보 및 이를 이용한 철골 구조물
KR200383490Y1 (ko) 영구 구조체로 이용되는 frp 구조체를 사용한 복합 철근콘크리트 보 구축 시스템
RU2510635C2 (ru) Несъемная строительная опалубка
CN113006346A (zh) 一种新型预制装配整体式剪力墙结构
CN209429309U (zh) 一种夹心保温叠合剪力墙l形连接节点构造
ZA200901736B (en) Improved construction system for buildings
CN217975039U (zh) 预制夹芯保温承重墙板层间连接系统
RU2421580C1 (ru) Способ возведения монолитно-каркасного здания с декоративной наружной отделкой
US7700024B1 (en) Corrugated concrete wall panel form and method of construction thereof
JP5532468B1 (ja) スラブ内の型枠支持部材
CN116265671A (zh) 保温预制墙板及采用该保温预制墙板构建墙的施工方法
CN212582914U (zh) 预制梁连接结构及包括其的建筑结构
CN101560800B (zh) 一种超长超高钢丝网架轻质墙板施工方法
KR101440556B1 (ko) 모듈러 건축물의 바닥판 구조체
KR101202300B1 (ko) 조립식 거푸집 제조방법
RU105645U1 (ru) Сборный железобетонный кессон
KR101202296B1 (ko) 조립식 거푸집
CN106436973B (zh) 一种钢剪结构后浇段内内置钢柱及其浇注方法
CN217897279U (zh) 一种变形缝定型模板及模板组件
KR101078292B1 (ko) 슬래브 거푸집 조립체 및 슬래브 시공 방법
EP2063041B1 (fr) Élément mural prefabriqué avec une ossature pour fixer des plaques

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20120725

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20140307

RIC1 Information provided on ipc code assigned before grant

Ipc: E04B 1/19 20060101AFI20140304BHEP

Ipc: E04B 1/30 20060101ALI20140304BHEP

17Q First examination report despatched

Effective date: 20150129

REG Reference to a national code

Ref country code: DE

Ref legal event code: R079

Ref document number: 602011030118

Country of ref document: DE

Free format text: PREVIOUS MAIN CLASS: E04B0001190000

Ipc: E04B0001160000

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIC1 Information provided on ipc code assigned before grant

Ipc: E04C 3/08 20060101ALI20160315BHEP

Ipc: E04B 1/16 20060101AFI20160315BHEP

INTG Intention to grant announced

Effective date: 20160331

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 827019

Country of ref document: AT

Kind code of ref document: T

Effective date: 20161015

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602011030118

Country of ref document: DE

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20160907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161207

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 827019

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161208

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170109

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161207

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602011030118

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

26N No opposition filed

Effective date: 20170608

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170128

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20110128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160907

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602011030118

Country of ref document: DE

Representative=s name: DEHNS GERMANY PARTNERSCHAFT MBB, DE

Ref country code: DE

Ref legal event code: R082

Ref document number: 602011030118

Country of ref document: DE

Representative=s name: DEHNSGERMANY PARTNERSCHAFT VON PATENTANWAELTEN, DE

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231115

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IS

Payment date: 20231220

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IE

Payment date: 20231220

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20240115

Year of fee payment: 14

Ref country code: CH

Payment date: 20240202

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20240124

Year of fee payment: 14