EP2379826A2 - Robe de réservoir pour un réservoir de gnl (gaz naturel liquéfié) externe et son procédé de fabrication - Google Patents

Robe de réservoir pour un réservoir de gnl (gaz naturel liquéfié) externe et son procédé de fabrication

Info

Publication number
EP2379826A2
EP2379826A2 EP09835649A EP09835649A EP2379826A2 EP 2379826 A2 EP2379826 A2 EP 2379826A2 EP 09835649 A EP09835649 A EP 09835649A EP 09835649 A EP09835649 A EP 09835649A EP 2379826 A2 EP2379826 A2 EP 2379826A2
Authority
EP
European Patent Office
Prior art keywords
shell
elements
plates
roof
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP09835649A
Other languages
German (de)
English (en)
Inventor
Lestle R. Shockley
Vincent G. Borov
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chevron USA Inc
Original Assignee
Chevron USA Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chevron USA Inc filed Critical Chevron USA Inc
Publication of EP2379826A2 publication Critical patent/EP2379826A2/fr
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/02Containers for fluids or gases; Supports therefor
    • E04H7/18Containers for fluids or gases; Supports therefor mainly of concrete, e.g. reinforced concrete, or other stone-like material

Definitions

  • the present invention relates generally to the construction of LNG (liquefied natural gas) storage tanks, and more particularly, to methods for constructing shells or tank walls for very large structures.
  • LNG liquefied natural gas
  • Shell walls may be large structures and are often cast in place on top of a ring beam foundation. With very large tanks, this casting in place construction is a time- consuming process and may be problematic at remote site locations. Building with precast concrete elements is a known approach in the construction of various structures when construction time at the site needs to be minimized, and when site conditions and location are problematic for casting in place. However, shells are very specific structural elements due to their function and configuration in large storage tanks and are not easily constructed. Effective connections between the separate precast segments are difficult and time consuming to construct. Cast in place connections between shell elements have been one conventional manner for joining such shell elements.
  • the walls of large storage tanks need to be reinforced to handle construction, operating and earthquake loads.
  • Conventional construction of the shell is to erect the inner metal liner first then erect rebar and forms followed by slip forming the concrete.
  • the elements are spaced a short distance apart to allow rebar connections
  • An example of a full containment LNG tank design is defined in European codes such as British Standard 7777.
  • An outer secondary container or tank acts as a catch basin in case of a leak or tank rupture of an inner container, which is often a steel tank.
  • the outer tank is made of concrete which reduces the fire risk over that of steel.
  • the outer tank shell is either slip formed in place and post tensioned or a steel liner is used as a form and rebar added after the steel liner is erected, then slip or jump formed. Either method can be quite time consuming.
  • a shell for an outer LNG containment tank and a method of making the shell from a plurality of precast reinforced concrete shell elements are described.
  • the method comprises providing a plurality of precast reinforced concrete shell elements. At least some of the shell elements having a precast concrete body to which are anchored a radially inwardly facing liner plate and a pair of radially extending and circumferentially spaced apart side plates which depend from the liner plate.
  • the shell elements are juxtaposed upon a ring beam with side plates abutting one another.
  • the abutting side plates are welded together to at least partially form the shell.
  • the cooperating welded together side plates form radially extending stiffening ribs which are circumferentially spaced around the periphery of the shell.
  • the shell elements include a base plate and a top end cap plate.
  • the base plates are welded to the ring beam and the top end cap plates are welded to one another to form an annular ring of top end cap plates.
  • the liner plates and side plates cooperate to form a continuous inner radial membrane to the shell.
  • at least some of the shell elements have mechanically interlocking surfaces and at least some of the shell elements interlock with one another before being welded together.
  • the shell may be made from a single course of shell elements or from a number of circumferentially extending and vertically arranged courses of shell elements.
  • a shell for an outer LNG containment tank is also described.
  • the shell comprises a plurality of precast reinforced concrete shell elements, at least some of the shell elements having a precast concrete body to which are anchored a radially inwardly facing liner plate and a pair of radially extending and circumferentially spaced apart side plates which depend from the liner plate.
  • At least some of the shell elements are arranged circumferentially with abutting side plates being welded together to at least partially form a shell and to form radially extending stiffening ribs which are circumferentially spaced about the periphery of the shell.
  • at least some of the shell elements further include bottom base plates which are welded to a ring beam to provide additional support to the shell.
  • At least some of the shell elements can have top end cap plates which are welded to one another to form a circumferential extending annular ring of end cap plates. Ideally, the liner plates and side plates cooperate to form a continuous inner radial membrane to the shell. Also, in one embodiment, at least some of the shell elements have mechanically interlocking surfaces and the at least some of the shell elements interlock with one another. The interlocking surfaces can include cooperating projections and receptacles.
  • the shell can include one or multiple courses of circumferentially extending and vertically arranged courses of shell elements which are welded together to form at least a portion of the shell.
  • the shell can have a shell access opening formed therein.
  • the shell access opening can be sealed by at least one cast in place shell element having a liner plate which cooperates with the liner plates and sides plates of the precast shell elements to seal the access opening.
  • Another alternative is to seal the shell access opening with at least one precast shell element having a liner plate, the at least one precast shell element cooperating with other liner plates and sides plates of the shell to seal the access opening.
  • a shell element for constructing the shell of an outer LNG containment tank comprises a precast reinforced concrete body to which are anchored a radially inwardly facing liner plate and a periphery formed by a pair of vertically extending circumferentially spaced apart side plates, a bottom base plate and a top end cap plate.
  • a plurality of the shell elements may be arranged in circumferential abutment and the side plates welded together to form radially extending stiffener ribs and the liner plates form part of radial inwardly facing shell membrane. It is an object to provide precast concrete shell elements that have steel liner plates that can be quickly fit together and the shell elements welded to form a shell circumference.
  • FIG. IA is a perspective view of an inner tank being constructed within an outer containment tank as the roof of the outer tank is being constructed;
  • FIG. IB is a perspective view of a completed outer tank, in partial cutaway, showing a base mat assembly, a ring beam, a shell or tank wall and a roof mounted atop the shell as well as the inner tank;
  • FIG. 2 is a plan view of the base mat assembly or foundation and a ring beam or ring beam foundation which are to be joined by a cast in place concrete connection (not shown);
  • FIG. 3 A is a plan view of a pair of base mat elements juxtaposed and interconnecting with one another;
  • FIG. 3B is a perspective view of a liner plate and attached J-hooks which are to be cast within a concrete body when making a reinforced concrete base mat element;
  • FIG. 3 C is a perspective view of a base mat element, including concrete body, showing a pair of tensile members passing through tensile conduits disposed within the concrete body;
  • FIG. 3D shows a plurality of base mat elements juxtaposed in lateral and longitudinal directions with tensile members and cooperating anchors clamping the base mat elements together in the lateral and longitudinal directions;
  • FIG. 4 shows an exemplary pile with L-shaped brackets mounted thereon which can be used to support base mat elements or ring beam elements at predetermined heights so that the base mat elements or the ring beam elements can be readily welded together;
  • FIG. 5 shows a matrix of piles which can be used to support base mat elements which can then be welded together to form the base mat assembly;
  • FIG. 6A is a plan view of a pair of cooperating juxtaposed ring beam elements
  • FIG. 6B is a perspective view of a liner plate welded to a thicker base plate and attached J-hooks welded beneath the plates which are used in casting a reinforced concrete ring beam element;
  • FIG. 6C is a perspective view of a reinforced concrete ring beam element including the liner plate and base plate anchored to a concrete body with tensile members extending through tensile conduits embedded in the concrete body;
  • FIG. 7 is a fragmentary sectional view of a cast concrete joint joining the base mat assembly and the ring beam with a shell element being welded to the ring beam;
  • FIG. 8A is a perspective view of a shell element
  • FIG. 8B is a perspective view of a pair of shell elements which are welded together to form part of the outer shell with the shell elements also being welded to base plates of ring beam elements;
  • FIG. 8C shows a sectional view of a second embodiment of a shell made with two courses of lower and upper shell elements rather than using a single course as seen in the shell of FIG. 8B;
  • FIG. 8D shows a bottom view of the upper shell element which includes a base plate supporting two downwardly depending alignment pipes;
  • FIG. 8E shows a plan view of a top end cap plate of a lower shell element having two downwardly depending alignment sockets designed to receive the alignment pipes of the upper shell element;
  • FIG. 9 A is a roof frame formed by radial and circumferentially extending wide flange beams
  • FIG. 9B illustrates a typical welded connection between a tubular mounting beam of a roof assembly and a pair of roof elements
  • FIG. 9C shows the roof assembly and attached seal being raised by air pressure within the outer shell so that the roof assembly can be welded to temporary gusset plates mounted to the top of the shell;
  • FIG. 9D is a fragmentary perspective view of the roof assembly and peripheral seal being raised to be temporarily welded to a gusset plate;
  • FIG. 9E is a fragmentary perspective view of a roof membrane of the roof assembly being temporarily welded to a gusset plate;
  • FIG. 9F is a fragmentary perspective view of the roof assembly permanently welded to the shell with the temporary gusset plates and seal having been removed and with a roof element attached to the roof assembly and shell;
  • FIG. 1OA is a perspective view of a roof element frame used in casting a typical roof element
  • FIG. 1OB is a perspective view of an exemplary roof element which is to be mounted to the roof assembly during construction of the roof.
  • a full containment LNG tank 18 is shown in FIGS. 1 and 2.
  • the LNG tank 18 comprises an outer secondary container, hereinafter “outer tank 20"surrounding an inner primary container, hereinafter “inner tank 22".
  • Inner tank 22 is intended to store LNG.
  • Outer tank 20 is preferably a full containment tank in which both LNG and gas vapor are fully contained in the event of a leak from the inner tank 22.
  • outer tank 20 is primarily made of precast reinforced concrete elements which reduce fire risk relative to using a primarily steel outer container or tank.
  • the construction of outer tank 20 involves assembling precast reinforced concrete elements for a foundation 24, including a base mat assembly 100 and an outer ring beam 200, an outer wall or shell 300 and a roof 400.
  • outer tank 20 in this embodiment has a diameter of approximately 80 meters, an overall height (to the top of the dome of roof 400) of about 50 meters, and a height to the top of shell 300 of about 40 meters.
  • Those skilled in the art of LNG facilities construction will appreciate that much larger or smaller tanks can be built and still use the design considerations described herein.
  • tanks having diameters of at least 25 meters are particularly well suited to the construction methods described herein which utilize precast reinforced concrete elements. These elements ideally can be welded together to form structural welds thereby minimizing the number of cast in place concrete structural joints which have to be made to form an outer containment tank.
  • inner tank 22 can be assembled at the same time as roof 400 is being built to save time and money in the overall construction of inner tank 22 and outer tank 20.
  • roof elements 402 are being added ring by ring to a roof assembly 404 while inner tank 22 is being constructed.
  • a construction access or shell opening 350 in shell 300 allows for materials to be carried into outer tank 20 so that inner tank 22 can be built as roof 400 is being constructed.
  • special half height shell elements 302' can be installed to close opening 350.
  • An annular gap of approximately 1.5 meters exists between inner tank 20 and shell 300 to permit circumferential access to build inner tank 22 and to accommodate insulating materials (not shown) which are to be installed between outer and inner tanks 20 and 22.
  • Inner tank 22 can be built in any of a number of ways which may require welding processes to connect individual plates.
  • the plates can be joined using shielded metal arc welding (SMAW) and submerged arc welding (SAW) for 9% nickel tanks of the size described above, i.e. having a diameter greater than 25 meters.
  • inner tank 22 can be friction stir welded (FSW) by plate at a time erection method. A course of plates at a time can be welded with the bottom (thickest) first and then subsequent (thinner) courses welded there above. Scaffolding (not shown) can be used as each course is added.
  • inner tank 22 can be constructed course down either by supporting the tank from the roof to allow insertion of the next course or by supporting on jack stands to allow insertion of the next course.
  • the scaffolding need be erected only one time.
  • another alternative method is to use coil material shaped to the curvature required for the tank. Coil tank building occurs from the top course down either using jacking or by roof supported. Expanded pearlite insulation is typically used in the annulus formed between inner tank 22 and outer tank 22.
  • an under bottom insulating layer which can be made of foam glass, is applied on the top of base mat assembly 100 with inner tank 22 prior to inner tank 22 being placed there on.
  • Foundation 24 i.e., base mat assembly 100 and ring beam 200, is designed to support inner tank 22 and outer shell 300.
  • Outer shell 300 rests upon and transfers loads directly to outer ring beam 200 preferably through welded connections.
  • a particularly significant load is the torsional load applied to ring beam 200 from outer shell 300.
  • Base mat assembly 100 is secured to and transfers loads to outer ring beam 200 as well through a cast in place joint 270, which is best seen in FIG. 7.
  • base mat assembly 100 and/or outer ring beam 200 can be supported upon compacted soil or else on piles, as will be described below.
  • Roof 400 of tank 20 includes a roof assembly 404 comprising a skeletal steel frame 406 (FIG. 9A), a membrane 412 (FIG.
  • FIG. 9B shows a completed outer tank 22 with shell opening 350 being sealed and closed by special half shell elements 302' which are permanently welded to the remainder of shell 300.
  • FIG. 2 shows base mat assembly 100 disposed within outer ring beam 200.
  • a cast in place concrete connection 270 (not shown) is to be formed there between, as best illustrated in FIG. 7.
  • a large number of generally rectangular base mat elements 102 are connected together to form base mat assembly 100 having a contiguous top membrane 140 made from welded together steel liner plates 104.
  • Membrane 140 ideally cooperates with similar membranes formed from liner plates on connection 270, outer ring beam 200, shell 300 and roof 400 to form an overall air tight vapor barrier within outer tank 20.
  • base mat assembly 100 and outer ring beam 200 preferably have discrete reinforced concrete elements that are clamped together by post-tensioned tensile members 150, 250, i.e., steel cables, and anchors 152, 252. Precast elements 102, 202 are then welded to together to form, respectively, base mat assembly 100 and outer ring beam 200.
  • FIG. 3A shows a pair of juxtaposed base mat elements 102.
  • FIG. 3B shows a generally rectangular liner plate 104 having a series of projections 106 and recesses 110.
  • Liner plate 104 is preferably made of carbon steel although it can instead be made of other appropriate metals.
  • the thickness is of liner plate 104 in this exemplary embodiment is about 10 mm.
  • the size of liner plate 104 and base mat elements 102 are approximately 2 meters by 3 meters.
  • a plurality of J-hooks 112 is welded to the lower surface of liner plate 104.
  • FIG. 3 C depicts a base mat element 102 having a concrete body 114 cast about J-hooks 112 to anchor liner plate 104 to concrete body 144.
  • formed in the concrete body 114 are two or more layers of reinforcing bars or welded wire fabric running in two generally perpendicular directions.
  • the reinforcing bars can be ASTM A 615 deformed carbon-steel bars for concrete reinforcement.
  • Also formed within concrete body 114 is a plurality of laterally extending lower and upper tensile conduits 120, 122 and longitudinally extending lower and upper tensile conduits 124, 126 which extend in generally perpendicular directions to one another.
  • These tensile conduits 120, 122, 124 and 126 can be HDPE (high density polyethylene) tubing or steel piping or other appropriate structural conduits.
  • Concrete ribs 130 and grooves 132 are also formed on the longitudinally and laterally extending edge surfaces of concrete body 114. Locating projections 106 and ribs 130 and receiving recesses 110 and grooves 132 allow a plurality of base mat elements 102 to be placed in interlocking juxtaposition as suggested in FIG. 2, FIG. 3A and FIG. 3D when base mat assembly 100 is being constructed. Note that concrete body 114 has downwardly and upwardly opening steps 134 and 136 so mating base mat elements 102 can interlock in the vertical direction as well as in the lateral and longitudinal directions.
  • the rows of tensile conduits are disposed below and above the central horizontal plane 144 of concrete body 114. These laterally and longitudinally extending tensile conduits are designed to receive tensile members 150 there through which allow multiple base mat elements 102 to be clamped together utilizing anchors 152 (FIG. 3D) upon the post- tensioning of the tensile members 150. Only some of the tensile members 150 are shown in FIG. 3D.
  • Base mat assembly 100 is constructed by juxtaposing base mat elements 102 in both first and second generally perpendicular directions as seen in FIG. 2. Locating projections 106 and concrete ribs 130 cooperate with receiving recesses 110 and grooves 132 on adjacent elements 102 to align base mat elements 102 in first and second generally perpendicular directions. Steps 134, 136 allow base mat elements 102 to interlock in the vertical direction as well.
  • Tensile members 150 are fed through tensile conduits 120, 122, 124 and 126 as base mat elements 102 are being juxtaposed to one another. After the mating surfaces on the base mat elements 102 are properly located relatively to one another, tensile members 150, i.e.
  • cables are post-tensioned and anchored by anchors 152 to clamp base mat elements 102 together.
  • tensioning can be accomplished such as by using a Williams Strand Anchor System available from Williams Form Engineering of Belmont, Michigan, USA. Those skilled in the art will appreciate that other tensioning systems can also be used to post-tension and anchor tensile members 150. After the tensioning is complete, anchors 152 are locked in place on tensile members 150 to maintain the tension in tensile members 150 with anchors 152 bearing upon base mat elements 102.
  • Liner plates 104 of each of base mat elements 102 are then welded together to form a part of a generally contiguous membrane 140 on the top of base mat assembly 100.
  • tensile conduits 120, 122, 124 and 126 are located above and below the central horizontal plane 144 of concrete body 114, the top and bottom surfaces of base mat elements 102 are held together and do not separate due to the post tensioning of tensile members 150 with anchors 152 clamping about base mat elements 102, preferably even under construction and operating loads applied to base mat assembly 100.
  • Base mat elements 102 can be assembled on a graded, level surface if the underlying surface or soil is sufficiently stiff. However, if the soil does not provide adequate support, base mat elements 102 can be mounted on piles 160.
  • the upper portion of a typical pile 160 is seen in FIG. 4.
  • Pile 160 includes a post 162 which is driven into the ground such as in soft soil 163.
  • Four L-shaped brackets 164 can be bolted or welded to post 162 at an appropriate location with horizontally extending flanges 166 being at a predetermined height. Ideally, a laser positioning system is used to maintain all of the flanges 166 within a predetermined tolerance of height.
  • FIG. 5 depicts a couple of base mat elements 102 being mounted upon flanges 166 of a matrix of piles 160. Note in this case of utilizing piles 160 for support, base mat elements 102 are notched in their corners and along their long sides to mate with posts 162, as seen in FIG. 5. The corners and long sides of base mat elements 102 will be supported by six cooperating supporting flanges 166.
  • Voids 174 are created by the intersection of the corners and along the sides of cooperating base mat elements 102.
  • base mat elements 102 can include reinforcing bar loops (not shown) which are embedded in concrete body 114 and extend laterally and longitudinally from concrete body 114. The loops will loop over vertically extending reinforcing bars 170. Concrete is cast in these voids 174 about the loops and reinforcing bars 170. Fitted liner plate 176 is anchored by J-hooks in the cast concrete so that liner plates 104 and 176 can be welded together to form generally continuous top membrane 140 on base mat assembly 100.
  • FIG. 2 shows a plan view of the foundation 24 including base mat assembly 100 and outer ring beam 200.
  • the numbers of base mat and ring beam elements 102, 202 needed to construct these components will vary depending on the size of the desired outer tank 20 and the selected size of the various ring beam elements 202 and base mat elements 102.
  • Various methods can be used to join base mat assembly 100 to outer ring beam 200.
  • ring beam elements 202 are clampingly held in a circumferential abutment by post-tensioning tensile members 250 and clamping anchors 252 about the ring beam elements 202.
  • base plates 206 anchored within each of ring beam elements 202 are welded together to form an annular ring of such base plates 206.
  • inner liner plates 204 are also welded to one another to increase strength and stiffness and to form a membrane 244 of liner plates 204.
  • Post-tensioned tensile members 250 and anchors 252 assist outer ring beam 200 in resisting bending, shear and torsional forces applied to ring beam 200 by outer shell 300 and by base mat assembly 100 to maintain ring beam elements 202 in the proper abutting relationship with respect to one another.
  • FIGS. 6A-C illustrate an exemplary embodiment of a ring beam element 202.
  • FIG. 6A shows a pair of ring beam elements 202 interlocking with one another when placed in side by side position.
  • FIG. 6B shows an inner liner plate 204 secured to a thick base plate 206.
  • Liner plate 204 and base plate 206 are preferably made from carbon steel.
  • Liner plate 204 is approximately 10 mm thick and base plate 206 is about 50 mm thick in this example.
  • J-hooks 212 are welded to the bottom sides of liner plate 204 and base plate 206.
  • Projection 214 and recess 216 are formed on the edges of liner plate 204.
  • FIG. 6A shows a pair of ring beam elements 202 interlocking with one another when placed in side by side position.
  • FIG. 6B shows an inner liner plate 204 secured to a thick base plate 206.
  • Liner plate 204 and base plate 206 are preferably made from carbon steel.
  • ring beam element 202 includes a concrete body 220 in which liner plate 204, base plate 206 and J-hooks 212 are embedded.
  • An outer radial surface 222 and an inner radial surface 224 define what will be part of the radially outer and inner surfaces of ring beam 200.
  • a plurality of locating concrete ribs 226 and receiving recesses 230 allow juxtaposed ring beam elements 202 to be cooperatively interlocked with one another, as seen in FIG. 2 and FIG. 6A, to form outer ring beam 200.
  • tensile conduits 232, 234 are also formed within concrete body 220.
  • Two of these tensile conduits 232 are generally arranged below and two conduits 234 are arranged above the horizontal center plane 236 of ring beam element 202.
  • two of the tension conduits 232, 234 are arranged beneath base plate 206 and two are located radially inwardly beneath liner plate 204 closer to the inner radial surface 224.
  • tensile conduits 232, 234 allow tensioning members 250, i.e., cables, to pass through each of ring beam elements 202 and assist in counter balancing the bending, shearing and torsional loads applied to base plate 206 by outer shell 300.
  • tensioning members 250 i.e., cables
  • tensile members 250 and anchors 252 cooperate to clamp about ring beam elements 202 to prevent the abutting ring beam elements 202 from displacing with respect to one another.
  • high density polyethylene (HDPE) tubing is used to form the tensile conduits 232, 234 in concrete body 220.
  • the tensile conduits could be made of other suitable materials such as steel or other structurally strong materials.
  • steps 238 and 240 allow elements 202 to be vertically interlocking as well.
  • a plurality of reinforcing bars (not shown) which are conventional for adding tensile strength to cast concrete bodies. Extending radially inwardly are reinforcing bars or J-hooks 242 which are later to be included in cast concrete connection 270 which connects base mat assembly 100 with ring beam 200.
  • FIG. 6C illustrates a ring beam element 202 having four circumferentially extending tensile conduits 232 and 234 extending there through.
  • This embodiment may be appropriate for cases where outer ring beam 200 is supported by stiff underlying soil or surface.
  • it may be preferably to include an additional pair of tensile conduits located radially outboard of the locations where the tensile conduits 232, 234 are positioned in FIG. 6C. This allows additional clamping force to be applied across the ring beam elements 202.
  • FIG. 7 shows a ring beam element 202 with three pairs of vertical spaced apart tensile conduits 232 and
  • ring beam elements 202 can also be mounted on leveled flanges of piles to insure proper support and vertical alignment between ring beam elements 202 which are to have liner plates 204 and base plates 206 welded together.
  • Ring beam elements 202 are juxtaposed with respect to one another with locating concrete ribs 226 of one ring beam element being held within locating recess 230 of the adjacent ring beam element. Similarly, cooperating steps 238 and 240 assist in vertical alignment between ring beam elements 202.
  • Tensile members 250 are placed through tensile conduits 232 and 234 as the ring beam elements are being positioned adjacent one another. As seen in FIGS. IA and IB, at four locations along the circumference of outer ring beam 200, there are pairs of special abutting ring beam elements 202' through which the ends of tensile members 250 extend.
  • Tensile members 250 are tensioned utilizing tensioning devices 260 and anchors 252 are anchored about ring beam elements 202. In this particular example, tensioning can be accomplished such as by using the aforementioned Williams Strand Anchor System. Those skilled in the art will appreciate that other tensioning systems can also be used to post-tension and anchor tensile members
  • FIG. 7 illustrates an example of how a base mat assembly 100 can be connected to the outer ring beam 200.
  • Concrete is cast in place about reinforcing bars 142, 242 extending outwardly from adjacent base mat elements 102 and radially inwardly from ring beam elements 202 to form a cast in place joint 270 between the base mat assembly 100 and outer ring beam 200.
  • Liner plates 272 are cut to the necessary size and shape to mate between liner plates 104 of base mat assembly 100 and inner liner plates 204 of outer ring beam 100.
  • J-hooks 274 are welded to the bottom side of liner plates 272. Concrete is cast in place between base mat assembly 100 and base ring 200 to create a concrete body
  • appropriate reinforcing bars will also be positioned in the space to be occupied by joint 270 prior to the concrete being cast to enhance tensile strength of joint 270.
  • FIG. 8A shows a perspective view of a typical shell element 302.
  • FIG. 8B depicts a pair of shell elements 302 which are welded together and form a part of outer tank wall or shell 300.
  • shell 300 is built using precast reinforced concrete shell elements 302 that are joined by welding shell elements 302 together to form a generally annular, tapered thickness annular shell 300.
  • Shell elements
  • Shell elements 302 are thicker at their bottoms to handle greater loads applied there to near ring beam 100 as compared to the loads imposed by roof 400. Preferably, there is minimal or no need to cast in place any significant structural connections to join shell elements 302 together or to ring beam 200 or to roof 400.
  • Shell elements 302 will be precast to the number, widths and heights required for the size of outer tank 22. Typically, the inner diameter of outer tank 20 will be about 3 meters larger in diameter than inner tank 22 to allow for construction of inner tank 22 and to provide for insulation in the annulus between the tank shells. Precasting of shell elements 302 can be started as soon as the tank diameter and height are known.
  • Each of shell elements 302 includes a pair of tapered carbon steel side plates 304 and a carbon steel liner plate 306 forming a generally U-shaped steel cross-section.
  • the liner plate 306 is about 10 mm thick and side plates 304 are about 25 mm thick.
  • the width of side plates 304 is about 800 mm at their bottom and 400 mm at the top providing the tapered shape to shell element 302.
  • a base plate 312 connects side plates 304 and liner plate 306 at the bottom of shell element 302.
  • Numerous reinforcing bars 310 are welded to and extend from side plate 304 to the opposing side plate 304 and from base plate 312 to top end cap 314.
  • Base plate 312 is about 50 mm in thickness in this example.
  • Shell 300 is constructed by arranging shell elements 302 vertically upon outer ring beam 200. Initially, base plates 312 are arranged radially slightly outside of their final position for welding with shell elements 312 being slightly radially spaced apart. Shell elements 302 are then moved radially inwardly until all base plates 312 and side plates 304 are brought into abutment at the proper radial position atop of base plates 206 of ring beam 202. Erection gear will be used to finally align and pull the side plates 304 closely together to begin welding.
  • weld joints 320 are made on the inside and outside of abutting side plates 304.
  • Weld joints 320 ideally are designed to be strong enough to carry the loads on shell 300 without any or little other significant reinforcement, in particular, the need for post tensioning or utilizing any type of significant cast in place joints.
  • End cap plates 314 are welded to one another forming weld joints 322 and creating a continuous upper ring on shell 300.
  • base plates 312 of shell 300 and base plates 206 of ring beam 200 are welded together along the inner and outer radial surfaces on base plate 312 to form base plate welds 324.
  • Shell elements 302 are splice welded to accommodate load transfer even under earthquake or missile impact. If additional strength is needed, shell elements 302 may be designed to be mechanically interlocking with one another as well as being joined by welds such as weld 320. Ideally, the welded connections between shell elements 302 will be comparable in strength to conventional cast in place connections formed between shells.
  • shell elements 302 are permanently welded together to form shell 300, with the exception of 2-4 special half shell elements 302'.
  • Half shell elements 302' are similar to shell elements 302 except they are only about half the height of regular shell elements 302. These special shell elements 302' will be temporarily sealed with shell opening 350 to accommodate air raising of roof assembly 404, as suggested in FIG. 9C. These special half shell elements 302' are removed after roof assembly 404 is attached to shell 300 to provide access so that inner tank 22 can be concurrently erected as reinforcing roof elements 402 and 402' are welded to roof assembly 404.
  • liner plates can be welded to close shell opening 350. Then reinforcing bars and steel rib stiffeners can be placed in a form and concrete can be cast in place to form a cast in place shell element similar to that used in the design of the precast shell elements 302.
  • Shell 300 should have great strength when completed due to the welded connections 320 on the inner and outer edges of side plates 304 which cooperate to form a large number of radially extending stiff eners arranged around the circumferential periphery of outer tank 20.
  • FIGS. 8C, 8D and 8E show an alternative shell design. Rather than using a single course of precast reinforced concrete shell elements 302 to form shell 300, multiple courses of similar upper and lower shell elements 302a and 302b are utilized. Those skilled in the art of LNG tank construction will appreciate that any number of courses of shell elements could be used to form a shell. However, shorter shell elements are easier to transport and move but require additional welds as compared to using a single course of shells to construct a shell.
  • Lower shell element 302a includes a concrete body 316a to which a pair of circumferentially spaced apart side plates 304a, liner plate 320a, upper end cap plate 314a and lower base plate 312a are anchored or embedded (anchors and reinforcement bars not shown).
  • Base plate 312a is welded by welds 324a to base plate 206 of ring beam 200.
  • Upper end cap plate 314a has two downwardly depending sockets 362 formed therein.
  • Upper shell element 302b includes a concrete body 316b to which a pair of circumferentially spaced apart side plates 304b, liner plate 320b, upper end cap plate
  • alignment pipes 360 are welded to lower base plate 312b. As seen in FIG. 8C, alignment pipes 360 can be used to align and guide an upper shell element 302b as it is positioned upon lower shell element 302a. Also, alignment pipes 360 held within alignment sockets 362 provide mechanical interlocking between shell elements 302a and 302b.
  • Base plate 312b is welded by horizontal welds 364 to end cap plate 314a of lower shell element 302a along their inner and outer radial edges. A horizontal extending cutout 364 on the outer radial edges of shell elements 302a and 302b permits the outer radial weld 364 to be easily made. After welding, cutout 364 is filled with grout for fire protection.
  • roof 400 has a roof assembly 404 which includes a skeletal roof frame 406 (FIG. 9A), liner plates 410 covering roof frame 406 (FIG. 9B and 9C) to form a generally air tight membrane 412 and tubular mounting beams 414 welded atop membrane 412.
  • roof assembly 404 is air lifted to the top of shell 300 from upon base mat assembly 100 by pressurizing the inside of shell 300, as suggested in FIG. 9C.
  • Roof membrane 412 of roof assembly 404 is welded to circumferentially spaced apart steel gusset plates 450 (FIGS.
  • roof 400 Once enough weld joints have been formed to safely support roof 400, the pressurization within shell 300 is removed. Personnel can then access the inside of the outer tank 20 to construct inner tank 22. Additional welding is done to complete the circumferential weld joint between the roof membrane 412 and shell membrane 340. Special extra strength roof elements 402' are attached to shell 300 and roof frame 404 forming the radial outermost course of roof elements 402. Then typical roof elements 402 are attached to roof frame 404 with the radial outermost course of roof elements 402 being attached first. Then the successive next radial outermost course of roof elements is added until all the rings of roof elements 402 are in place forming roof 400.
  • Roof assembly 404 is built on the ground in this particular preferred exemplary embodiment.
  • Roof frame 406 comprises a plurality of radially and circumferentially extending wide flange beams 420, as best seen in FIG. 9A.
  • eight concentric rings of openings 422a-h are formed between the wide flange beams 420.
  • Wide flange beams 420 used in the radial direction are Wl 8 x 76 in the center and gradually increase in size to Wl 8 x 143 near the outer radial ends.
  • each row of wide flange beams 412 has the same section size such as Wl 8 x 40, Wl 8 x 50, Wl 8 x 76 and Wl 8 x 97 with the larger wide flange beams being used nearer the outer radial edge.
  • Wl 8 x 40, Wl 8 x 50, Wl 8 x 76 and Wl 8 x 97 with the larger wide flange beams being used nearer the outer radial edge.
  • other sizes of wide flange beams can be used, particularly if outer tank 20 is to be of a smaller or larger size than suggested in the present example.
  • FIG. 9B shows a typical joint construction for roof assembly 404.
  • Liner plates 410 are appropriately sized and are welded to the top flange 424 of wide flange beams 420 to cover openings 422 and thus provide a generally air tight roof membrane 416.
  • a tubular mounting beam 414 is shown which is welded atop of adjacent liner plates 410.
  • Tubular mounting beams 414 generally run in the same direction as the web of the underlying wide flange beams 420, i.e., radially and circumferentially.
  • roof elements 402 are designed to mount and be welded to tubular mounting beams 414, as will be described in greater detail below.
  • FIG. 9C shows a roof assembly 404 being raised by air pressure along an outer tank wall or shell element 302.
  • the three dots shown adjacent shell element 302 indicates that shell 300 is comprised of a large number of such shell elements 302, which are not shown.
  • a temporary skirt or seal 424 is attached around the circumferential periphery of roof assembly 404.
  • FIG. 9D shows a fragmentary sectional view of roof assembly 404, seal 424, and end cap plate 314 and liner plate 306. Air pressure is applied to seal 424 from within shell 300. Seal 424 bears against liner plate 306 of shell 300 to minimize the loss of air there between.
  • a temporary gusset plate 450, one of 240 such gusset plates 450 located around the periphery of the ring of end cap plates 314 in this example, is temporarily welded to end cap plate 314 and extends radially inwardly.
  • welds 452 are made between liner plates 410 and gusset plates 450.
  • An outer portion of a circumferential weld 454 is then made between end cap plate 314 and roof liner plates 410 to form an air tight seal there between joining shell membrane 340 and roof membrane 412 of roof assembly 404.
  • weld 454 is a full fusion, full penetration weld requiring welding from both outside and inside outer tank 22.
  • Half shell elements 302' are removed to provide access from within shell 300.
  • the inner portion of circumferential weld 454 is then completed between end cap plate 314 and liner plates 410 to form an air tight seal there between joining shell membrane 340 and roof membrane 412.
  • a series of circumferentially spaced apart permanent flange extension plates 462 are welded between liner plate 306 and beneath the lower flanges of wide flange beams 420.
  • web extension plates 464 are welded on to the web of wide flange beam 420 and to liner plate 306.
  • extension tubular mounting beams 414a and 414b are, respectively, welded atop liner plates 410 and end cap plate 314 extending radially from mounting beam 414. With tubular extensions 414a and 414b in place, the outermost row of roof elements 402' can then be welded to shell 300 and to roof assembly 404, as will be described in greater detail below.
  • FIG. 1OA shows a typical roof element frame 428 which includes four L-shaped brackets 432 welded together to form a generally open rectangular frame. Depending inwardly from brackets 432 are a plurality of J-hooks 434. Reinforcing bars 436 extend laterally and longitudinally between opposing brackets 432.
  • Roof element frame 428 is used to construct precast reinforced concrete roof elements 402, as seen in FIG. 1OB.
  • Roof element 402 includes a cast concrete body 440 which surrounds
  • each roof element 402 is generally between about 2 meters to about 3 meters in width and between about 5 meters to about 6 meters in length in this exemplary embodiment. Of course, other size roof elements could be selected and will depend on the size of outer tank 22.
  • roof element 402' For the outermost concentric course of roof elements 402' which secure to both roof assembly 404 and to shell 300, the design is slightly different from that of roof elements 402 disposed on the inner radial concentric courses.
  • concrete body 440' in this example tapers from a thinner 150 mm on its inner radial end to a maximum thickness of 300 mm adjacent its radial outmost end.
  • the typical concrete body 440 of a typical roof element 402 has a constant thickness of about 150 mm.
  • roof element 402' includes L-shaped bracket 432 on only three edges with the radially outermost fourth side instead having an overhang 470 sized and shaped to fit over end cap plate 314.
  • Provided in concrete body 440' are four access openings 472 (two seen in FIG. 9F) which provide access to four studs 474 which are to be stud welded to end cap plate 314.
  • the outer concentric ring or course of roof elements 402' are located adjacent shell 300 and this outer ring of roof elements 402' is first welded to roof assembly 404 and to shell 300.
  • FIG. IA shows two courses of roof elements 402', 402 mounted to roof assembly 404.
  • L-shaped brackets 432 of roof elements 402 are mounted atop and are welded to tubular mounting beams 414 creating welds such as the weld joint 436 seen in FIG. 9B.
  • roof elements 402' are welded to tubular mounting beams 414, 414a and 414b. Studs 474 are placed in access openings 472 and are stud welded to end cap plate 314.
  • the thickness of tubular mounting beams 414 is less than the thickness of concrete bodies 430, as seen in FIG. 9B. Any voids formed between any of concrete bodies 440, 440' of the roof elements 402, 402' are grouted in place to form concrete joint 442 to provide fire protection to roof 442.
  • An example of a concrete joint 442 is shown in FIG. 9B.
  • any one or more of base mat assembly 100, ring beam 200, outer shell 300 or roof 400 could be constructed using conventional cast in place construction techniques while the other components are constructed using the precast elements as described herein.
  • the roof assembly could be directly built atop shell 300 such as by using a crane. In this instance, roof assembly 404 would not have to be airlifted and attached atop shell 300.
  • the shell elements 402 could be welded to the roof assembly concurrently with the construction of the inner tank 22 to save construction time on building outer tank 20 and inner tank 22.
  • a beam ring could certainly be used in other applications.
  • the ring beam could be used in cases where neither a liner plate or thick structural base plate is necessary.
  • the ring beam need only comprise ring beam elements having precast reinforced concrete bodies with embedded tensile conduits which receive tensile members there through so that the tensile members may be tensioned and anchored by anchors to form the beam ring.
  • the ring beam elements would be interlocking with one another.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

La présente invention concerne une robe de réservoir pour un réservoir de GNL externe et un procédé de fabrication de la robe à partir d'une pluralité d'éléments de robe en béton armé préfabriqué. Les éléments de robe possèdent un corps en béton préfabriqué auquel sont ancrées une plaque de chemisage tournée vers l'intérieur de façon radiale et deux plaques latérales espacées circulairement qui s'avancent radialement vers l'extérieur à partir de la plaque de chemisage. Les éléments de robe peuvent être disposés sur une poutre annulaire, les plaques latérales appuyant l'une contre l'autre. Les plaques latérales sont soudées ensemble pour former des nervures de renfort s'étendant radialement et verticalement qui sont espacées circulairement autour de la robe. Du fait que ces nervures de renfort assurent un important support structurel, la robe peut être construite avec peu ou pas de plâtre en remplacement de joints structurels nécessaires pour construire la robe. Dans l'idéal, les éléments de robe comportent des plaques de base soudées à une poutre annulaire ou à une fondation et des plaques d'extrémité supérieure qui sont soudées ensemble pour former un élément annulaire, ce qui améliore la résistance structurelle de la robe. Un toit peut être monté sur la robe pour créer un réservoir de gaz naturel liquéfié externe.
EP09835649A 2008-12-23 2009-12-17 Robe de réservoir pour un réservoir de gnl (gaz naturel liquéfié) externe et son procédé de fabrication Withdrawn EP2379826A2 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US12/342,486 US20100154319A1 (en) 2008-12-23 2008-12-23 Tank shell for an outer lng containment tank and method for making the same
PCT/US2009/068551 WO2010075182A2 (fr) 2008-12-23 2009-12-17 Robe de réservoir pour un réservoir de gnl (gaz naturel liquéfié) externe et son procédé de fabrication

Publications (1)

Publication Number Publication Date
EP2379826A2 true EP2379826A2 (fr) 2011-10-26

Family

ID=42264066

Family Applications (1)

Application Number Title Priority Date Filing Date
EP09835649A Withdrawn EP2379826A2 (fr) 2008-12-23 2009-12-17 Robe de réservoir pour un réservoir de gnl (gaz naturel liquéfié) externe et son procédé de fabrication

Country Status (4)

Country Link
US (1) US20100154319A1 (fr)
EP (1) EP2379826A2 (fr)
AU (1) AU2009330212A1 (fr)
WO (1) WO2010075182A2 (fr)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7722293B2 (en) * 2008-01-28 2010-05-25 Darin R. Kruse Methods for constructing underground structures
USD656240S1 (en) 2010-07-07 2012-03-20 Apple Inc. Building
KR101158522B1 (ko) * 2011-11-30 2012-06-21 한국건설기술연구원 슬롯을 사용한 무용접 방식의 콘크리트 충전 강관기둥 및 그 제조 방법
JP6127453B2 (ja) * 2012-11-06 2017-05-17 株式会社Ihi 円筒型タンクの構築方法
GB201510442D0 (en) * 2015-06-15 2015-07-29 Sensor Uk Ltd And Mwh Uk Ltd And Carlow Precast Mfg Fluid retaining structure
JP6461757B2 (ja) * 2015-09-11 2019-01-30 株式会社Ihi 円筒型タンクの構築方法
USD827154S1 (en) 2016-02-02 2018-08-28 Apple Inc. Building
US11118733B2 (en) * 2017-12-13 2021-09-14 China National Offshore Oil Corp. Three-dimensional layoutlayout method for splicing vault plates of large LNG storage tank
CN109737300B (zh) * 2019-01-10 2020-08-04 舟山市祥睿船舶科技开发有限责任公司 一种节能型lng燃气供应装置
CN111206686B (zh) * 2020-01-17 2021-02-09 浙江大学 一种由双肢板片组合构件构成的自由曲面网壳结构
CN111288978B (zh) * 2020-03-25 2022-03-01 二十二冶集团装备制造有限公司 壳体车间拼装加工制作的方法
USD1004797S1 (en) 2021-07-16 2023-11-14 North American Glamping, Llc Mobile dwelling unit

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3640038A (en) * 1969-09-19 1972-02-08 Pre Load Co Inc The Concrete structures
FR2110481A5 (fr) * 1970-10-19 1972-06-02 Gaz De France
GB1436109A (en) * 1972-08-10 1976-05-19 Marine Ind Developments Ltd Storage tanks particularly for liquefied gases
US3823842A (en) * 1973-03-15 1974-07-16 C Chang Double ply welded plate tank wall construction
US4015383A (en) * 1973-11-23 1977-04-05 Crowley Francis X Concrete tank of precast concrete panels with pretensioning beam means
US4181237A (en) * 1978-08-30 1980-01-01 Chicago Bridge & Iron Company Liquid storage tank with welded joint drain canal system and wall stiffener system
FR2458740A1 (fr) * 1979-06-08 1981-01-02 Technigaz Procede de construction d'un reservoir de stockage d'un liquide a basse temperature
US5675941A (en) * 1983-12-09 1997-10-14 Dykmans; Maximiliaan J. Method and apparatus for constructing prestressed structures utilizing a membrane and floating dome assembly
US5131201A (en) * 1990-07-11 1992-07-21 Pitt-Des Moines, Inc. Precast concrete panels and support pedestals constructed therefrom
US5201435A (en) * 1991-09-26 1993-04-13 Clawson Tank Company Storage tank for combustible liquids
US5590497A (en) * 1992-07-31 1997-01-07 Moore; Richard G. Circular or generally circular prestressed concrete tank and method of constructing same
JP4015758B2 (ja) * 1998-07-16 2007-11-28 新日本製鐵株式会社 合成構造ライナーとその製作方法
JP4535529B2 (ja) * 1999-08-25 2010-09-01 ジオスター株式会社 簡易合成セグメントおよびその製造方法
FR2821105B1 (fr) * 2001-02-16 2004-03-26 Soc Civ D Brevets Matiere Paroi etanche et resistante pour la construction d'un reservoir
NO314814B1 (no) * 2002-06-25 2003-05-26 Statoil Asa Tank for lagring av fluider og fremgangsmate for bygging av slike tanker
US7162844B2 (en) * 2003-01-09 2007-01-16 Chicago Bridge & Iron Company Use of partial precast panels for construction of concrete walls and shells
JP2005035587A (ja) * 2003-07-18 2005-02-10 Fuji Photo Film Co Ltd 貯留タンク
KR20050047583A (ko) * 2003-11-18 2005-05-23 엘지마이크론 주식회사 새도우 마스크의 버르 개선을 위한 제조방법
JP4727482B2 (ja) * 2006-03-31 2011-07-20 石川島建材工業株式会社 合成セグメント
JP2008076408A (ja) * 2007-10-22 2008-04-03 Mitsubishi Heavy Ind Ltd 放射性物質格納容器

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2010075182A2 *

Also Published As

Publication number Publication date
WO2010075182A3 (fr) 2010-10-14
AU2009330212A1 (en) 2011-07-14
US20100154319A1 (en) 2010-06-24
WO2010075182A2 (fr) 2010-07-01

Similar Documents

Publication Publication Date Title
US20100154318A1 (en) Ring beam and method for constructing the same
US20100154332A1 (en) Base mat assembly and method of constructing the same
US20100154319A1 (en) Tank shell for an outer lng containment tank and method for making the same
EP0641410B1 (fr) Cages de renforcement modulaire pour ossature ductile pour beton arme
US7162844B2 (en) Use of partial precast panels for construction of concrete walls and shells
US8387334B2 (en) LNG containment system and method of assembling LNG containment system
US9441389B2 (en) Method for constructing cylindrical tank
JP4512899B2 (ja) 液化天然ガス地上式貯蔵タンク用大型筒状コンクリート構造物の構築方法。
US20110283638A1 (en) Ring Beam and Method for Constructing the Same
US20100154320A1 (en) Composite concrete roof for an outer lng containment tank and method of making the same
CA2490422C (fr) Reservoir destine au stockage de fluides cryogeniques et procede de construction d'un reservoir etanche aux fluides
US20120023845A1 (en) Base Mat Assembly And Method For Constructing The Same
JP3098359B2 (ja) 柱脚構造体およびその構築方法
JPH06331776A (ja) 鋼板コンクリート原子炉格納容器
WO2023127605A1 (fr) Procédé de construction d'un réservoir à triple enveloppe
JP2023007003A (ja) ハイブリッド梁構造
TW202340589A (zh) 三重殼儲槽之施工方法
CN117286887A (zh) 双环支撑的基坑支护结构
JPH08232338A (ja) 構造体の構築方法
JPH0524304B2 (fr)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20110718

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20130702

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230522