EP2369057A1 - System for attaching a rail to a base and base board for such a system - Google Patents
System for attaching a rail to a base and base board for such a system Download PDFInfo
- Publication number
- EP2369057A1 EP2369057A1 EP10156436A EP10156436A EP2369057A1 EP 2369057 A1 EP2369057 A1 EP 2369057A1 EP 10156436 A EP10156436 A EP 10156436A EP 10156436 A EP10156436 A EP 10156436A EP 2369057 A1 EP2369057 A1 EP 2369057A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- shim
- rail
- passage opening
- narrow side
- fastened
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000758 substrate Substances 0.000 claims description 14
- 125000006850 spacer group Chemical group 0.000 abstract 3
- 238000009826 distribution Methods 0.000 description 10
- 239000000463 material Substances 0.000 description 7
- 239000004033 plastic Substances 0.000 description 6
- 230000000284 resting effect Effects 0.000 description 4
- 230000007704 transition Effects 0.000 description 4
- 239000007787 solid Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 241001669679 Eleotris Species 0.000 description 1
- 235000019892 Stellar Nutrition 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000002028 premature Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000002990 reinforced plastic Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B9/00—Fastening rails on sleepers, or the like
- E01B9/68—Pads or the like, e.g. of wood, rubber, placed under the rail, tie-plate, or chair
- E01B9/685—Pads or the like, e.g. of wood, rubber, placed under the rail, tie-plate, or chair characterised by their shape
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B9/00—Fastening rails on sleepers, or the like
- E01B9/68—Pads or the like, e.g. of wood, rubber, placed under the rail, tie-plate, or chair
Definitions
- the invention relates to a system for fastening a rail on a substrate, which has a guide plate, which leads to be fastened on its longitudinal side, a braced against a substrate by means of a clamping element spring element which sits on the guide plate and in the assembled system with a free spring arm a hold-down force on a rail of the rail to be fastened and has a transverse to the rail to be fastened across the width of the guide plate extending shim, which is arranged to compensate for height differences between the guide plate and the respective substrate, wherein the shim has a rectangular basic shape and has a through opening for the clamping element used for clamping the spring element.
- the invention relates to a shim for such a system.
- Such documents serve on the one hand to support the other components of the fastening system over a large area on the respective substrate.
- they are used for height regulation when the height level of the respective mounting surface of the ground deviates from one another between two adjacent attachment points beyond a tolerance range. If an impermissible height deviation is detected, it can be compensated for by sliding differently thick or two or more shims under the respective rail. Basically problematic here is the requirement that the shims must be added later or replaced.
- the object of the invention to provide a system of the type specified for securing a rail, on the one hand ensures a sufficiently long life of resting on the shim components and material layers and in which it on the other hand simple manner is possible to mount the washer later or replace.
- a shim should be created, which can also be easily retrofitted and optimized at the same time optimal performance both in terms of their support function and in terms of minimized wear of the material lying in practical use on her layers or components.
- the solution of the above-mentioned object according to the invention consists in the fact that such a shim is designed according to claim 5.
- the invention provides that in a fastening system of the type specified, the shim is divided along a joint line into two parts, which led from one of the transverse to be fastened rail longitudinal sides of the shim starting at a distance from the one narrow side to the through hole and from there, the passage opening is cut in the direction of the narrow side of the shim.
- the shim is divided into two mutually butt abutting parts, of which at least one part extends along the narrow side of the shim over its entire width and to which a in the longitudinal direction of the shim extending portion is formed, which is the passage opening for the respective clamping element receives at least in part.
- the other part of the shim thereby fills the cut-out portion of the first part, wherein it defines the part of the through hole of the shim, which is not bounded by the first part.
- a first advantage of the inventive design of a shim is that the two parts of the shim can be easily retrofitted to a mounting system according to the invention by the one part seen in the longitudinal direction of the rail from one side and the other part from the other side be pushed under the already mounted other components of the fastening system. Once the two parts of the shim are fully inserted, they enclose the clamping elements tight, so that despite the division of the shim the same large-area continuous support of resting on the shim components and layers of material is guaranteed as an undivided shim.
- Another important advantage in practice of the embodiment of a shim according to the invention is that it is undivided at least in the region of its one narrow side. In this way, it is ensured that the components and material layers resting on the base are also securely supported even when very high pressures are applied to the shim or the ground has a certain degree of resilience.
- the portion of its one part extending over the narrow side of the shim ensures that the shim keeps its shape even under heavy load and its two parts are not forced apart.
- a particularly important embodiment of the invention consists in a fastening system of the type according to the invention comprising two guide plates, one of which is arranged on one of the longitudinal sides of the rail to be fastened, wherein the shim extending below both guide plates.
- the joint line in which the two parts of the shim butt against each other, is optimally guided so that the two parts of the shim are point-symmetrical. This has the advantage that on both narrow sides in each case over the entire width of the shim extending portion is present, so that the security against a divergence of the parts of the shim at high load is further increased.
- both parts of the shim are identically shaped, whereby a particularly inexpensive simple production of the lower plate is possible.
- Another advantageous embodiment of the invention for practical use is characterized in that the shim plate on at least one narrow side a shoulder over which this narrow side respectively associated guide plate is supported against a provided on the ground support shoulder.
- This shoulder not only protects the adjacent components of the fastening system against direct, possibly abrasive contact with a corresponding, present on the ground shoulder, but also contributes to the fact that the two parts of the shim are not pressed apart even under high load.
- the large-area support provided by the inventive design of a rail fastening system proves to be particularly advantageous if it comprises an elastic layer which lies on the backing plate and on which the rail to be fastened in fully assembled state is elastically supported.
- a favorable in particular point-symmetrical design of the parts of the backing plate according to the invention course of the joint line is obtained when the coming of the one longitudinal side abutting line is guided starting from the passage opening in the direction of the other longitudinal side kinking.
- a permanently secure positionally correct assignment of the parts of the shim can also be supported by the fact that on the parts of the shim mold elements, as corresponding to each other shaped projections and recesses are formed, which cooperate positively in befindlichem in the mounting position shim plate.
- the adapter piece is thus formed in this case and arranged on the spring arm of the spring element of a system according to the invention that it can be adjusted in the manner of an eccentric to the respect of the tension of the spring element and the Force applied by the spring element to set a substantial distance between the free end of the spring element and the surface of the rail foot.
- the distance and concomitantly exerted by the spring element on the rail hold-down force can be increased by the fact that the adapter piece is supported on the contact surface portion on the rail, which has a large distance to the respective free end of the spring arm of the spring element.
- the effective hold-down force can be reduced by rotating the adapter piece so that it is supported on the rail foot by a contact surface portion arranged at a smaller distance from the free end of the associated spring arm.
- a guide plate is provided, which has on its end face associated with the rail a contact surface and on its free upper side adjacent to the contact surface, rising in the direction of the contact surface sliding surface over which the adapter piece from a through an the guide plate trained stop set pre-assembly, in which it sits with its respective selected contact surface portion on the guide plate, in a mounting position is slidable, in which it sits with the abutment surface portion on the rail of the rail to be fastened in order to transmit the effect of the spring element elastic hold-down force on the rail.
- the spring element is also arranged on the guide plate on which are usually formed for this purpose mold elements that guide the spring element and secure its position.
- the spring element is also arranged on the guide plate on which are usually formed for this purpose mold elements that guide the spring element and secure its position.
- the adapter piece in the pre-assembly position is pressed against the stop by the hold-down force exerted on it, which is exerted by the spring element coupled to the adapter piece via its respective spring arm.
- the adapter piece In order to be pushed into the finished mounting position, the adapter piece must thus be pushed up from the stop obliquely upwardly leading sliding surface with the result that the spring forces exerted by the spring force increase and an additional force load must be overcome. Since this does not happen without intentionally introduced from the outside force, the adapter piece and with him the spring element are automatically held in the preassembly until the Fertigmontagevorgang begins.
- the system 1 for fixing a rail S to a solid substrate U formed by, for example, a concrete sleeper or concrete slab comprises a first shim 2, a second shim 3, an elastic shim 4, a pressure distribution plate 5, a height control plate 6, a first guide plate 7, a second guide plate 8, two spring elements 9, 10 designed as ⁇ -shaped tensioning clamps, two pairs of adapter pieces 11-14 and two tensioning elements 15, 16 formed as tensioning screws, which act on the middle loop of the spring elements 9, 10 via a respective washer 17, 18.
- the fastening system 1 is seated in an integrally formed on the solid substrate U receptacle 19 which is bounded at its parallel to the rail S extending narrow sides by a respective support shoulder 20,21.
- contact surface of the receptacle 19 is adjacent to the support shoulders 20,21 each a plastic dowel 22,23 embedded in the substrate U.
- each one of the clamping elements 15,16 for tensioning the spring elements 9,10 is screwed during assembly of the system 1.
- the respectively composed of two point-symmetrically shaped parts 24,25 Unterlegplatten 2.3 have a rectangular shape with two parallel longitudinal sides 26,27 and two likewise mutually parallel narrow sides 28,29 and extend over the entire width of the receptacle 19th
- the shims 2, 3 are in each case formed with two passage openings 30, 31, one of which is positioned adjacent to one of the narrow sides 28, 29 and centrally between the longitudinal sides 26, 27 in such a way that, when the shim 2 is in the receptacle 19, 3 with the opening of the recessed into the substrate U plastic dowel 22,23.
- the joint line 32 extends from the edge of one longitudinal side 26, initially parallel to the edge of the first through-hole 30 associated with a narrow side 28, wherein the distance a1 to the relevant edge the smallest distance between the edge of the through hole 30 and the edge of the narrow side 28 corresponds.
- This section of the joint line 28 is guided up to the passage opening 30, there to bend substantially perpendicular to the edge of the narrow side 28 and the passage opening 30 at its longitudinal side 26 associated edge cutting in the direction of the other passage opening 31 to be performed.
- the joint line 32 bends in the direction of the other longitudinal side 27 so that it meets the passage opening 31 on its side associated with the longitudinal side 27.
- the joint line 32 again kinks so that it substantially aligned at right angles to the passage opening 31 at its longitudinal side 27 associated edge to the edge of the other narrow side 29, until the passage opening 31 has passed.
- the joint line 32 takes a parallel to the edge of the narrow side 29 aligned course until it has reached the edge of the longitudinal side 27.
- the distance a2 of the parallel to the edge of the narrow side 29 extending portion of the joint line 32 corresponds to the smallest distance between the edge of the through hole 31 and the edge of the narrow side 29th
- the two parts 24,25 of the shims 2,3 each have a over the entire width B of their narrow sides 28,29 extending portion 33.
- From this section 33 is in each case from another section 34, each of which is adjacent to one of the longitudinal sides 26,27 of the respective shim 2,3 and whose width in adjacent to the portion 33 portion of the half width B of the shim plus half the diameter of each formed in it through hole 30,31 corresponds, while its width in the region of its free end is equal to half the width B of the respective shim 2,3 less half the diameter of the other through hole 31,30.
- each correspondingly shaped projections and recesses 35,36 are formed, which overlap one another in the assembled state form-fitting and so in the installed state, even under high load Lift off the parts 24,25 prevent in a direction perpendicular to the ground U direction.
- the shoulders 37, 38 are shaped and aligned so that they lie flush against the support shoulders 20, 21 when inserted into the receptacle 19.
- the two shims 2.3 are stacked on top of each other in the receptacle 19 here.
- the elastic intermediate layer 4 On the uppermost shim 3 is the elastic intermediate layer 4, which ensures the required compliance of the rail fastening formed by the system 1.
- the load taken up by the rail S when passing over a rail vehicle not shown here is by means of lying on the intermediate layer 4 Pressure distribution plate 5 distributed over a large area on the intermediate layer 4.
- the intermediate layer 4 and the pressure distribution plate 5 each have slits on their narrow sides, in which the clamping elements 15, 16 are seated in the fully installed position.
- the width of the intermediate layer 4 and the pressure distribution plate 5 is in each case smaller than the width B of the shims 2.3, so that along the longitudinal sides 26,27 of the shims 2,3, a narrow edge strip is present, on which the guide plates 7,8 with their lateral, the rail foot F associated feet 41,42 stand.
- the guide plates made of a reinforced plastic 7,8 are formed identically. In each case, one of them is arranged in a manner known per se on one of the longitudinal sides of the rail S in order to guide the rail S laterally. At the same time serve the guide plates 7,8 also in a conventional manner as a bearing for the seated on them spring elements 9,10.
- the guide plates 7, 8 At their end face assigned to the rail foot F, the guide plates 7, 8 have a contact surface 42, with which they laterally rest on the rail foot when fully assembled F lie.
- the abutment surface 42 is pierced by two openings which lead to a recess 44 formed by the underside 43 of the guide plates 7, 8.
- stiffening ribs which are not visible here are formed, which support the roof 45 of the guide plates 7, 8 with the spring element 9, 10 clamped thereon.
- a support section 46 provided with recesses and stiffening ribs is integrally formed on the guide plates 7, 8, on whose free upper side a flat support surface 47 is formed. Sitting on this support surface 47 in the pre-assembly position, the transition portions of the spring elements 9,10 which connect the spring arms 48,49 of the spring elements 9,10 with the middle loop. At the same time, the support section 46 delimits a groove 50 which is formed in the upper side of the guide plates 7, 8 and which extends parallel to the contact surface 42 and in which the transition sections of the spring elements 9, 10 sit in the fully assembled position.
- a through hole 51 is formed through which the screw shank of the respective clamping element 15,16 is guided.
- the passage opening 51 is surrounded by a circumferential collar, on the one hand penetration of water into the opening 51 is prevented and on the other hand forms a guide for the middle loop of the respective spring element 9,10.
- the paragraphs 52.53 form in the assembled system on the one hand a lateral guide for the middle loop of each associated spring element 9.10.
- a center post 42a is provided in the region of the abutment surface 42, at the lower end of which a projection 42b pointing away from the respective guide plate 8,9 and oriented normal to the contact surface 42 is integrally formed.
- the projection 42b is positioned so that it engages under the rail foot F in the fully assembled position. In this way, a lifting of the guide plates 8,9 is safely avoided under the loads occurring in practice.
- the trained as an ⁇ -shaped clamps spring elements 9,10 have on their spring arms 48,49 each have a bent end portion, which when finished mounted system 1 is aligned substantially parallel to the rail S.
- one of the adapter pieces 11-14 is rotatably mounted about an axis of rotation D coincident with the longitudinal axis of the relevant end section on these end sections.
- the adapter pieces 11-14 each have a pentagonal shape. At the peripheral surface of the adapter pieces 11-14 are each three equal contact surface portions 58,59,60 formed, which abut each other directly and are separated from each other by an edge 61,62.
- Two marking sections 63, 64 additionally adjoin the two outer contact surface sections 58, 60. These marking sections 63, 64 may be provided with markings which indicate the increase or decrease in the spring tension associated with a rotation in the respective direction.
- the marking portions 63,64 are separated by a slot 65 which is formed from the radial direction in the adapter pieces 11-14 and extends into a receptacle 66 which is formed from its one end face in the adapter pieces 11,14.
- the slot 65 intersects a triangular opening 67 in the bottom 68 of the receptacle 66, so that in the receptacle 66 collecting moisture or vapors can escape through the opening 67 from the receptacle 66.
- the center M of the circular opening of the receptacle 66 is arranged offset relative to the center of the end faces 69 of the adapter pieces 11-14 that the first contact surface portion 58 has a first distance z1, the second contact surface portion 59 has a second distance z2 and the third contact surface portion 60 has a third distance z3 to the center M of the receptacle 66, where z1 ⁇ z2 ⁇ z3.
- the distances z1 - z3 differ, for example, by one millimeter each.
- the adapter pieces 11-14 are made of an electrically non-conductive plastic, which has a certain elasticity at least in its circumferential direction.
- the receptacle 66 of the adapter pieces 11 - 14 has a diameter which is smaller by a small undersize than the likewise circular in diameter end portions of the spring arms 48,49.
- the adapter pieces 11 - 14 are spread accordingly in the circumferential direction, so that they are held by friction in the adapter pieces 11 - 14 then acting restoring forces, but still with a certain amount of force on the respective associated end portion.
- the spreading of the adapter pieces 11 - 14 can be done easily due to the slot 65, which prevents in this way not only the accumulation of moisture in the respective adapter piece 11 - 14, but in addition the attachment of the adapter pieces 11 - 14 on the respective end portion of the spring arms 48,49 and ensures their sufficient elastic compliance.
- the shim 3 is first placed in the receptacle 19 of the substrate U. Subsequently, the elastic layer 4 are placed on the shim 2 and the pressure distribution plate 5 on the elastic layer.
- the guide plates 8, 9 are positioned such that one of them bears with its support section 46 against one of the shoulders 37, 38, which in turn is respectively supported on one of the support shoulders 20, 21 of the substrate U.
- the guide plates 8,9 engage around with their side feet 41,42 the intermediate layer 4 and the pressure distribution plate 5, so that they stand on the shim 3.
- the center post 42a with its projection 42b is in the slot of the intermediate layer 4 and the pressure distribution plate fifth
- the height regulating plate 6 is placed on the pressure distribution plate 5, whose width corresponds to the clear distance between the guide plates 7,8.
- the spring elements 9, 10 with the adapter pieces 11-14 fastened to them are placed on the respectively associated guide plate 7, 8 so that their transition section sits on the support surface 47 of the respective support section 46.
- the adapter pieces 11-14 with their respective sliding surface 56,57 associated contact surface portion 58-60 placed on the respective sliding surface 56,57 and held in contact with the respective stop 54,55.
- the clamping elements 15,16 through the passage opening 51 of the respective angle guide plate 7,8 and the Through holes 30,31 of the shim 2 are screwed into the respective associated plastic dowels 22,23, the system 1 is biased in its pre-assembly.
- the spring elements 9, 10 are displaced in the direction of the rail S until the adapter pieces 11 - 14 on their respectively associated side of the rail foot F and the transition sections of the spring elements 9, 10 in the throat 50 the guide plates 7,8 sit.
- the adapters 11-14 slide up the sliding surfaces 56, 57 until they pass the front free edge of the shoulders 52, 53 and sit on the rail foot F.
- the adapters 11-14 thus allow a fine adjustment of the applied by the spring elements 9.10 hold down forces. At the same time they isolate the spring elements 9,10 against the rail S.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Connection Of Plates (AREA)
- Railway Tracks (AREA)
- Bearings For Parts Moving Linearly (AREA)
- Clamps And Clips (AREA)
Abstract
Description
Die Erfindung betrifft ein System zum Befestigen einer Schiene auf einem Untergrund, das eine Führungsplatte, die die zu befestigende an ihrer Längsseite führt, eine gegen einen Untergrund mittels eines Spannelements verspannbares Federelement, das auf der Führungsplatte sitzt und bei fertig montiertem System mit einem freien Federarm eine Niederhaltekraft auf einen Schienenfuß der zu befestigenden Schiene ausübt, und eine sich quer zur zu befestigenden Schiene über die Breite der Führungsplatte erstreckende Unterlegplatte aufweist, die zum Ausgleich von Höhenunterschieden zwischen der Führungsplatte und dem jeweiligen Untergrund angeordnet ist, wobei die Unterlegplatte eine rechtwinklige Grundform besitzt und eine Durchgangsöffnung für das zum Spannen des Federelements eingesetzte Spannelement aufweist.The invention relates to a system for fastening a rail on a substrate, which has a guide plate, which leads to be fastened on its longitudinal side, a braced against a substrate by means of a clamping element spring element which sits on the guide plate and in the assembled system with a free spring arm a hold-down force on a rail of the rail to be fastened and has a transverse to the rail to be fastened across the width of the guide plate extending shim, which is arranged to compensate for height differences between the guide plate and the respective substrate, wherein the shim has a rectangular basic shape and has a through opening for the clamping element used for clamping the spring element.
Ebenso betrifft die Erfindung eine Unterlegplatte für ein solches System. Solche Unterlagen dienen einerseits dazu, die anderen Bauteile des Befestigungssystems großflächig auf dem jeweiligen Untergrund abzustützen. Andererseits werden sie zur Höhenregulierung genutzt, wenn das Höhenniveau der jeweiligen Montagefläche des Untergrunds zwischen zwei benachbarten Befestigungspunkten über einen Toleranzbereich hinausgehend voneinander abweicht. Wird eine unzulässige Höhenabweichung festgestellt, so kann sie dadurch ausgeglichen werden, dass unterschiedlich dicke oder zwei oder mehrere Unterlegplatten unter die jeweilige Schiene geschoben werden. Grundsätzlich problematisch ist dabei die Anforderung, dass sich die Unterlegplatten nachträglich hinzufügen bzw. austauschen lassen müssen.Likewise, the invention relates to a shim for such a system. Such documents serve on the one hand to support the other components of the fastening system over a large area on the respective substrate. On the other hand, they are used for height regulation when the height level of the respective mounting surface of the ground deviates from one another between two adjacent attachment points beyond a tolerance range. If an impermissible height deviation is detected, it can be compensated for by sliding differently thick or two or more shims under the respective rail. Basically problematic here is the requirement that the shims must be added later or replaced.
Um dieses Problem zu beseitigen, ist in der
Vor dem Hintergrund des voranstehend erläuterten Standes der Technik bestand die Aufgabe der Erfindung darin, ein System der eingangs angegebenen Art zum Befestigen einer Schiene zu schaffen, das einerseits eine ausreichend lange Lebensdauer der auf der Unterlegplatte aufliegenden Bauteile und Materiallagen gewährleistet und bei dem es andererseits auf einfache Weise möglich ist, die Unterlegplatte nachträglich zu montieren oder auszutauschen.Against the background of the above-described prior art, the object of the invention to provide a system of the type specified for securing a rail, on the one hand ensures a sufficiently long life of resting on the shim components and material layers and in which it on the other hand simple manner is possible to mount the washer later or replace.
Ebenso sollte eine Unterlegplatte geschaffen werden, die sich auch nachträglich einfach montieren lässt und gleichzeitig optimale Gebrauchseigenschaften sowohl hinsichtlich ihrer Stützfunktion als auch hinsichtlich eines minimierten Verschleißes des Materials der im praktischen Einsatz auf ihr liegenden Lagen oder Bauteile optimiert ist.Likewise, a shim should be created, which can also be easily retrofitted and optimized at the same time optimal performance both in terms of their support function and in terms of minimized wear of the material lying in practical use on her layers or components.
In Bezug auf das System zum Befestigen einer Schiene ist diese Aufgabe erfindungsgemäß dadurch gelöst worden, dass ein solches System in der in Anspruch 1 angegebenen Weise ausgebildet ist.With regard to the system for fastening a rail, this object has been achieved according to the invention in that such a system is designed in the manner specified in
In Bezug auf die Unterlegplatte besteht die Lösung der oben genannten Aufgabe erfindungsgemäß darin, dass eine solche Unterlegplatte gemäß Anspruch 5 ausgebildet ist.With regard to the shim, the solution of the above-mentioned object according to the invention consists in the fact that such a shim is designed according to claim 5.
Vorteilhafte Ausgestaltungen der Erfindung sind in den abhängigen Ansprüchen angegeben und werden nachfolgend im Einzelnen erläutert.Advantageous embodiments of the invention are specified in the dependent claims and are explained in detail below.
Die Erfindung sieht vor, dass bei einem Befestigungssystem der eingangs angegebenen Art die Unterlegplatte entlang einer Stoßlinie in zwei Teile geteilt ist, die von der einen der quer zur zu befestigenden Schiene ausgerichteten Längsseiten der Unterlegplatte ausgehend mit Abstand zu deren einen Schmalseite zu der Durchgangsöffnung geführt und von dort die Durchgangsöffnung schneidend in Richtung der Schmalseite der Unterlegplatte geführt ist.The invention provides that in a fastening system of the type specified, the shim is divided along a joint line into two parts, which led from one of the transverse to be fastened rail longitudinal sides of the shim starting at a distance from the one narrow side to the through hole and from there, the passage opening is cut in the direction of the narrow side of the shim.
Erfindungsgemäß ist also die Unterlegplatte in zwei stumpf gegeneinander stoßende Teile geteilt, von denen mindestens das eine Teil einen sich entlang der Schmalseite der Unterlegplatte über deren gesamte Breite erstreckt und an den sich ein sich in Längsrichtung der Unterlegplatte erstreckender Abschnitt angeformt ist, der die Durchgangsöffnung für das jeweilige Spannelement zumindest zu einem Teil aufnimmt. Das andere Teil der Unterlegplatte füllt dabei den aus dem ersten Teil ausgeschnittenen Abschnitt aus, wobei es den Teil der Durchgangsöffnung der Unterlegplatte begrenzt, der nicht von dem ersten Teil umgrenzt ist.According to the invention, therefore, the shim is divided into two mutually butt abutting parts, of which at least one part extends along the narrow side of the shim over its entire width and to which a in the longitudinal direction of the shim extending portion is formed, which is the passage opening for the respective clamping element receives at least in part. The other part of the shim thereby fills the cut-out portion of the first part, wherein it defines the part of the through hole of the shim, which is not bounded by the first part.
Ein erster Vorteil der erfindungsgemäßen Ausgestaltung einer Unterlegplatte besteht darin, dass die beiden Teile der Unterlegplatte auf einfache Weise nachträglich an einem erfindungsgemäßen Befestigungssystem montiert werden können, indem das eine Teil in Längsrichtung der Schiene gesehen von der einen und das andere Teil von der anderen Seite her unter die bereits montierten anderen Bauteile des Befestigungssystems geschoben werden. Sobald die beiden Teile der Unterlegplatte fertig eingeschoben sind, umschließen sie die Spannelemente eng, so dass trotz der Teilung der Unterlegplatte dieselbe großflächig durchgehende Unterstützung der auf der Unterlegplatte aufliegenden Bauteile und Materiallagen gewährleistet ist wie bei einer ungeteilten Unterlegplatte.A first advantage of the inventive design of a shim is that the two parts of the shim can be easily retrofitted to a mounting system according to the invention by the one part seen in the longitudinal direction of the rail from one side and the other part from the other side be pushed under the already mounted other components of the fastening system. Once the two parts of the shim are fully inserted, they enclose the clamping elements tight, so that despite the division of the shim the same large-area continuous support of resting on the shim components and layers of material is guaranteed as an undivided shim.
Ein weiterer in der Praxis wichtiger Vorteil der erfindungsgemäßen Ausgestaltung einer Unterlegplatte besteht auch darin, dass sie zumindest im Bereich ihrer einen Schmalseite ungeteilt ist. Auf diese Weise ist gewährleistet, dass die auf der Unterlage aufliegenden Bauteile und Materiallagen auch dann noch sicher abgestützt sind, wenn sehr hohe Drücke auf der Unterlegplatte lasten oder der Untergrund eine gewisse Nachgiebigkeit aufweist. Der sich über die Schmalseite der Unterlegplatte erstreckende Abschnitt ihres einen Teils stellt sicher, dass die Unterlegplatte auch unter der hohen Last ihre Form beibehält und ihre beiden Teile nicht auseinander gedrückt werden.Another important advantage in practice of the embodiment of a shim according to the invention is that it is undivided at least in the region of its one narrow side. In this way, it is ensured that the components and material layers resting on the base are also securely supported even when very high pressures are applied to the shim or the ground has a certain degree of resilience. The portion of its one part extending over the narrow side of the shim ensures that the shim keeps its shape even under heavy load and its two parts are not forced apart.
Durch die erfindungsgemäße Ausgestaltung einer Unterlegplatte steht somit ein System zum Befestigen einer Schiene zur Verfügung, bei dem aufgrund der gleichmäßigen Abstützung seiner Bauteile auf dem festen Untergrund eine optimiert lange Lebensdauer gewährleistet ist und bei dem es dennoch auf einfache Weise möglich ist, die Unterlegplatte nachträglich zu montieren oder auszutauschen.Due to the inventive design of a shim is thus a system for attaching a rail available in which due to the uniform support of its components on the solid surface an optimized long life is guaranteed and in which it is still possible in a simple manner to mount the washer later or replace.
Eine für die Praxis besonders wichtige Ausgestaltung der Erfindung besteht in einem Befestigungssystem der erfindungsgemäßen Art, das zwei Führungsplatten umfasst, von denen jeweils eine an einer der Längsseiten der zu befestigenden Schiene angeordnet ist, wobei sich die Unterlegplatte unterhalb beider Führungsplatten erstreckt.A particularly important embodiment of the invention consists in a fastening system of the type according to the invention comprising two guide plates, one of which is arranged on one of the longitudinal sides of the rail to be fastened, wherein the shim extending below both guide plates.
Die Stoßlinie, in der die beiden Teile der Unterlegplatte stumpf gegeneinander stoßen, ist dabei optimalerweise so geführt, dass die beiden Teile der Unterlegplatte punktsymmetrisch ausgebildet sind. Dies hat den Vorteil dass an beiden Schmalseiten jeweils ein sich über die gesamte Breite der Unterlegplatte erstreckender Abschnitt vorhanden ist, so dass die Sicherheit gegen ein Auseinanderklaffen der Teile der Unterlegplatte bei hoher Belastung weiter erhöht ist.The joint line, in which the two parts of the shim butt against each other, is optimally guided so that the two parts of the shim are point-symmetrical. This has the advantage that on both narrow sides in each case over the entire width of the shim extending portion is present, so that the security against a divergence of the parts of the shim at high load is further increased.
Besonders vorteilhaft ist in diesem Zusammenhang, wenn beide Teile der Unterlegplatte identisch geformt sind, wodurch eine besonders preisgünstige einfache Herstellung der Unterplatte möglich ist.It is particularly advantageous in this context if both parts of the shim are identically shaped, whereby a particularly inexpensive simple production of the lower plate is possible.
Eine weitere für den praktischen Einsatz vorteilhafte Ausgestaltung der Erfindung ist dadurch gekennzeichnet, dass die Unterlegplatte an mindestens einer Schmalseite eine Schulter aufweist, über die dieser Schmalseite jeweils zugeordnete Führungsplatte gegen eine an dem Untergrund vorgesehene Stützschulter abgestützt ist. Diese Schulter schützt nicht nur die an ihr anliegenden Bauteile des Befestigungssystems gegen einen unmittelbaren, möglicherweise abrasiven Kontakt mit einer korrespondierenden, an dem Untergrund vorhandenen Schulter, sondern trägt zusätzlich dazu bei, dass die beiden Teile der Unterlegplatte auch unter hoher Last nicht auseinander gedrückt werden.Another advantageous embodiment of the invention for practical use is characterized in that the shim plate on at least one narrow side a shoulder over which this narrow side respectively associated guide plate is supported against a provided on the ground support shoulder. This shoulder not only protects the adjacent components of the fastening system against direct, possibly abrasive contact with a corresponding, present on the ground shoulder, but also contributes to the fact that the two parts of the shim are not pressed apart even under high load.
Aus den bereits erläuterten Gründen erweist sich die durch die erfindungsgemäße Ausgestaltung eines Schienenbefestigungssystems erzielte großflächige Abstützung der auf der Unterlegplatte aufliegenden Lagen oder Bauteile dann als besonders vorteilhaft, wenn es eine elastische Lage umfasst, die auf der Unterlegplatte liegt und auf der die zu befestigende Schiene im fertig montierten Zustand elastisch abgestützt ist.For the reasons already explained, the large-area support provided by the inventive design of a rail fastening system proves to be particularly advantageous if it comprises an elastic layer which lies on the backing plate and on which the rail to be fastened in fully assembled state is elastically supported.
Eine insbesondere bei punktsymmetrischer Gestaltung der Teile der erfindungsgemäßen Unterlegplatte günstiger Verlauf der Stoßlinie ergibt sich dann, wenn die von der einen Längsseite kommende Stoßlinie ausgehend von der Durchgangsöffnung in Richtung der anderen Längsseite abknickend geführt ist.A favorable in particular point-symmetrical design of the parts of the backing plate according to the invention course of the joint line is obtained when the coming of the one longitudinal side abutting line is guided starting from the passage opening in the direction of the other longitudinal side kinking.
Ein einerseits hinsichtlich der Fügbarkeit der beiden Teile der Unterlegplatte und andererseits hinsichtlich der Gestaltung des sich über die Schmalseite der Unterlegplatte erstreckenden Abschnitts des einen Teils optimaler Verlauf der Stoßlinie ergibt sich dann, wenn diese ausgehend von der einen Längsseite bis zu der Durchgangsöffnung in einem Abstand zu der der Durchgangsöffnung zugeordneten Schmalseite geführt ist, der dem kleinsten Abstand der jeweiligen Durchgangsöffnung von der ihr zugeordneten Schmalseite entspricht.An on the one hand with regard to the availability of the two parts of the shim and on the other hand with regard to the design of the over the narrow side of the shim extending portion of the one part optimum course of the joint line arises when this is performed starting from the one longitudinal side to the passage opening at a distance from the narrow side associated with the passage opening, which corresponds to the smallest distance of the respective passage opening from its associated narrow side.
Letzteres gilt insbesondere dann, wenn die Unterlegplatte zwei Durchgangsöffnungen aufweist und die an der einen Längsseite beginnende Stoßlinie die erste Durchgangsöffnung schneidend bis zur anderen Durchgangsöffnung verläuft, diese schneidet und anschließend mit einem Abstand zu der der zweiten Durchgangsöffnung zugeordneten Schmalseite bis zu der der ersten Längsseite gegenüberliegenden anderen Längsseite der Unterlegplatte verläuft.The latter is particularly true when the shim has two through holes and the beginning of one longitudinal side of the first passage opening intersecting to the other passage opening, this cuts and then with a distance to the second passage opening associated narrow side to the first longitudinal side opposite other longitudinal side of the shim runs.
Eine dauerhaft sichere lagerichtige Zuordnung der Teile der Unterlegplatte lässt sich zudem dadurch unterstützen, dass an den Teilen der Unterlegplatte Formelemente, wie korrespondierend zueinander geformte Vor- und Rücksprünge, ausgebildet sind, die bei in Montageposition befindlicher Unterlegplatte formschlüssig zusammenwirken.A permanently secure positionally correct assignment of the parts of the shim can also be supported by the fact that on the parts of the shim mold elements, as corresponding to each other shaped projections and recesses are formed, which cooperate positively in befindlichem in the mounting position shim plate.
Der für die Herstellung der Führungsplatte benötigte Materialaufwand und damit einhergehend das Gewicht einer erfindungsgemäßen Unterlegplatte können dadurch minimiert werden, dass in die Unterseite der Unterlegplatte Ausnehmungen eingeformt sind. Zur Aussteifung der Führungsplatte können dabei erforderlichenfalls zwischen den Ausnehmungen Verstärkungsrippen ausgebildet sein. Neben der hier im Mittelpunkt stehenden Möglichkeit einer Höhenregulierung mittels einer unter die anderen Bauteile des erfindungsgemäßen Systems geschobenen erfindungsgemäßen Unterlegplatte besteht eine zusätzliche Möglichkeit des Höhenausgleichs zwischen zwei benachbarten Befestigungspunkten der Schiene beispielsweise darin, dass die Höhe des Schienenfußes über der Unterlegplatte mittels einer oder mehrerer Zwischenlagen variiert wird, die zwischen den Schienenfuß und die Unterlegplatte gelegt werden. Wenn gleichzeitig die Führungsplatte dabei direkt auf der Unterlegplatte oder dem Untergrund abgestützt bleibt, ändert sich einhergehend mit der Veränderung des Abstands zwischen Schienenfuß und Untergrund bzw. Unterlegplatte auch die von dem Federelement im fertig montierten Zustand auf den Schienenfuß aufgebrachte Niederhaltekraft. Diese Änderung kann auf einfache Weise dadurch kompensiert werden, dass auf das freie Ende des jeweils auf den Schienenfuß wirkenden Federarms des Federelements ein Adapterstück aufgesetzt wird, das an dem Endabschnitt des Federarms um eine Drehachse drehbar gelagert ist und an seinem Umfang mindestens zwei Anlageflächenabschnitte besitzt, von denen abhängig von der jeweiligen Drehstellung des Adapterstücks jeweils einer an dem Schienenfuß anliegt, wobei der eine Anlageflächenabschnitt des Adapterstücks einen größeren Abstand zu der Drehachse des Adapterstücks besitzt als der andere Anlageflächenabschnitt. Erfindungsgemäß ist in diesem Fall das Adapterstück somit so ausgebildet und an dem Federarm des Federelements eines erfindungsgemäßen Systems angeordnet, dass es nach Art eines Exzenterelements verstellt werden kann, um den hinsichtlich der Verspannung des Federelements und der vom Federelement aufgebrachten Kraft wesentlichen Abstand zwischen dem freien Ende des Federelements und der Oberfläche des Schienenfußes einzustellen. So lässt sich der Abstand und damit einhergehend die vom Federelement auf die Schiene ausgeübte Niederhaltekraft dadurch vergrößern, dass das Adapterstück über den Anlageflächenabschnitt auf dem Schienenfuß abgestützt wird, der einen großen Abstand zum jeweiligen freien Ende des Federarms des Federelements besitzt. Entsprechend lässt sich die wirksame Niederhaltekraft vermindern, indem das Adapterstück so gedreht wird, dass es über einen in kleinerem Abstand zum freien Ende des zugeordneten Federarms angeordneten Anlageflächenabschnitt auf dem Schienenfuß abgestützt ist.The material required for the production of the guide plate and thus the weight of a Unterlegplatte invention can be minimized that are formed in the underside of the washer recesses. If necessary, reinforcing ribs may be formed between the recesses for stiffening the guide plate. In addition to the possibility here of height adjustment by means of a pushed under the other components of the system according to the invention Unterlegplatte an additional way of leveling between two adjacent attachment points of the rail, for example, that the height of the rail foot above the shim by means of one or more intermediate layers varies being placed between the rail foot and the washer. If at the same time the guide plate remains supported directly on the shim or the ground, changes along with the change in the distance between the rail base and substrate or shim and the force applied by the spring element in the assembled state on the rail hold-down force. This change can be easily compensated for by placing on the free end of the respective spring arm of the spring element an adapter piece which is rotatably mounted on the end portion of the spring arm about a rotation axis and has at least two abutment surface portions on its circumference, of which depending on the respective rotational position of the adapter piece in each case one rests against the rail, wherein a contact surface portion of the adapter piece has a greater distance from the axis of rotation of the adapter piece than the other contact surface portion. According to the invention, the adapter piece is thus formed in this case and arranged on the spring arm of the spring element of a system according to the invention that it can be adjusted in the manner of an eccentric to the respect of the tension of the spring element and the Force applied by the spring element to set a substantial distance between the free end of the spring element and the surface of the rail foot. Thus, the distance and concomitantly exerted by the spring element on the rail hold-down force can be increased by the fact that the adapter piece is supported on the contact surface portion on the rail, which has a large distance to the respective free end of the spring arm of the spring element. Accordingly, the effective hold-down force can be reduced by rotating the adapter piece so that it is supported on the rail foot by a contact surface portion arranged at a smaller distance from the free end of the associated spring arm.
Soll im Fall des Einsatzes eines Adapterstücks der voranstehend erläuterten Art mit besonders einfachen Mitteln sichergestellt werden, dass das Adapterstück und mit ihm das mit ihm verkoppelte Federelement die jeweilige Vormontagestellung auch unter den sich in der Praxis stellenden Belastungen sicher beibehält, bis die Fertigmontage vorgenommen wird, so kann dies dadurch erreicht werden, dass eine Führungsplatte vorgesehen ist, die an ihrer dem Schienenfuß zugeordneten Stirnseite eine Anlagefläche und an ihrer freien Oberseite eine an die Anlagefläche grenzende, in Richtung der Anlagefläche ansteigende Gleitfläche aufweist, über die das Adapterstück aus einer durch einen an der Führungsplatte ausgebildeten Anschlag festgelegten Vormontagestellung, in der es mit seinem jeweils ausgewählten Anlageflächenabschnitt auf der Führungsplatte sitzt, in eine Montagestellung schiebbar ist, in der es mit dem Anlageflächenabschnitt auf dem Schienenfuß der zu befestigenden Schiene sitzt, um die von dem Federelement bewirkte elastische Niederhaltekraft auf den Schienenfuß zu übertragen. Das Federelement wird dabei ebenfalls auf der Führungsplatte angeordnet, an der zu diesem Zweck üblicherweise Formelemente ausgebildet sind, die das Federelement führen und seine Position sichern. Das Federelement wird dabei ebenfalls auf der Führungsplatte angeordnet, an der zu diesem Zweck üblicherweise Formelemente ausgebildet sind, die das Federelement führen und seine Position sichern. Bei einer derart erfindungsgemäß ausgebildeten Führungsplatte wird das Adapterstück in Vormontagestellung in Folge der auf ihm lastenden Niederhaltekraft gegen den Anschlag gedrückt, die von dem über seinen jeweiligen Federarm mit dem Adapterstück verkoppelten Federelement ausgeübt wird. Um in die fertige Montageposition geschoben zu werden, muss das Adapterstück somit die ausgehend von dem Anschlag schräg nach oben führende Gleitfläche hinaufgeschoben werden mit der Folge, dass die vom Federelement ausgeübten Federkräfte zunehmen und eine zusätzliche Kraftbelastung überwunden werden muss. Da dies nicht ohne gezielt von außen eingebrachter Kraft passiert, werden das Adapterstück und mit ihm das Federelement selbsttätig in der Vormontageposition gehalten, bis der Fertigmontagevorgang beginnt.Should be ensured in the case of use of an adapter piece of the above-mentioned type with particularly simple means that the adapter piece and with him the spring element coupled with him the respective preassembly position even under the stellar in practice loads until the final assembly is made, so this can be achieved in that a guide plate is provided, which has on its end face associated with the rail a contact surface and on its free upper side adjacent to the contact surface, rising in the direction of the contact surface sliding surface over which the adapter piece from a through an the guide plate trained stop set pre-assembly, in which it sits with its respective selected contact surface portion on the guide plate, in a mounting position is slidable, in which it sits with the abutment surface portion on the rail of the rail to be fastened in order to transmit the effect of the spring element elastic hold-down force on the rail. The spring element is also arranged on the guide plate on which are usually formed for this purpose mold elements that guide the spring element and secure its position. The spring element is also arranged on the guide plate on which are usually formed for this purpose mold elements that guide the spring element and secure its position. In a guide plate designed in accordance with the invention, the adapter piece in the pre-assembly position is pressed against the stop by the hold-down force exerted on it, which is exerted by the spring element coupled to the adapter piece via its respective spring arm. In order to be pushed into the finished mounting position, the adapter piece must thus be pushed up from the stop obliquely upwardly leading sliding surface with the result that the spring forces exerted by the spring force increase and an additional force load must be overcome. Since this does not happen without intentionally introduced from the outside force, the adapter piece and with him the spring element are automatically held in the preassembly until the Fertigmontagevorgang begins.
Nachfolgend wird die Erfindung anhand einer ein Ausführungsbeispiel darstellenden Zeichnung näher erläutert. Es zeigen jeweils schematisch:
- Fig. 1
- ein System zur Befestigung einer Schiene in einer Explosionsdarstellung;
- Fig. 2
- das System im fertig montierten Zustand in einer perspektivischen Ansicht;
- Fig. 3
- eine Unterlegplatte in perspektivischer Ansicht von oben;
- Fig. 4
- die Teile der Unterlegplatte in perspektivischer Ansicht von oben;
- Fig. 5
- die Teile der Unterlegplatte in perspektivischer Ansicht von unten;
- Fig. 6
- eine Führungsplatte in perspektivischer Ansicht;
- Fig. 7
- die Führungsplatte mit darauf aufgesetzten Adapterstücken;
- Fig. 8
- ein Adapterstück in einer frontalen Ansicht;
- Fig. 9
- das Adapterstück in einer perspektivischen Ansicht.
- Fig. 1
- a system for securing a rail in an exploded view;
- Fig. 2
- the system in the assembled state in a perspective view;
- Fig. 3
- a shim in perspective view from above;
- Fig. 4
- the parts of the shim in a perspective view from above;
- Fig. 5
- the parts of the shim in a perspective view from below;
- Fig. 6
- a guide plate in perspective view;
- Fig. 7
- the guide plate with adapter pieces placed thereon;
- Fig. 8
- an adapter piece in a frontal view;
- Fig. 9
- the adapter piece in a perspective view.
Das System 1 zum Befestigen einer Schiene S auf einem beispielsweise durch eine Betonschwelle oder einer Betonplatte gebildeten festen Untergrund U umfasst eine erste Unterlegplatte 2, eine zweite Unterlegplatte 3, eine elastische Zwischenlage 4, eine Druckverteilungsplatte 5, eine Höhenregulierungsplatte 6, eine erste Führungsplatte 7, eine zweite Führungsplatte 8, zwei als ω-förmige Spannklemmen ausgebildete Federelemente 9,10, zwei Paare von Adapterstücken 11-14 sowie zwei als Spannschrauben ausgebildete Spannelemente 15,16, die über jeweils eine Unterlegscheibe 17,18 auf die Mittelschlaufe der Federelemente 9,10 wirken.The
Das Befestigungssystem 1 sitzt in einer an den festen Untergrund U einstückig angeformten Aufnahme 19, die an ihren parallel zur Schiene S verlaufenden Schmalseiten durch jeweils eine Stützschulter 20,21 begrenzt ist. In die zwischen den Stützschultern 20,21 vorhandene Aufstandfläche der Aufnahme 19 ist benachbart zu den Stützschultern 20,21 jeweils ein Kunststoffdübel 22,23 in den Untergrund U eingelassen. In die Kunststoffdübel 22,23 wird bei der Montage des Systems 1 jeweils eines der Spannelemente 15,16 zum Spannen der Federelemente 9,10 eingeschraubt.The
Die jeweils aus zwei punktsymmetrisch geformten Teilen 24,25 zusammengesetzten Unterlegplatten 2,3 weisen eine rechteckige Form mit zwei parallel verlaufenden Längsseiten 26,27 und zwei ebenfalls parallel zueinander verlaufenden Schmalseiten 28,29 auf und erstrecken sich über die gesamte Breite der Aufnahme 19. In die Unterlegplatten 2,3 sind dabei jeweils zwei Durchgangsöffnungen 30,31 eingeformt, von denen jeweils eine benachbart zu einer der Schmalseiten 28,29 und mittig zwischen den Längsseiten 26,27 so positioniert ist, dass sie bei in die Aufnahme 19 eingelegter Unterlegplatte 2,3 mit der Öffnung der in den Untergrund U eingelassenen Kunststoffdübel 22,23 fluchten.The respectively composed of two point-symmetrically shaped
Die Stoßlinie 32, an der die beiden Teile 24,25 der Unterlegplatten 2,3 jeweils zusammengefügt sind, verläuft ausgehend vom Rand der einen Längsseite 26 zunächst parallel zum Rand der der ersten Durchgangsöffnung 30 zugeordneten einen Schmalseite 28, wobei der Abstand a1 zum betreffenden Rand dem kleinsten Abstand zwischen dem Rand der Durchgangsöffnung 30 und dem Rand der Schmalseite 28 entspricht. Dieser Abschnitt der Stoßlinie 28 ist bis zur Durchgangsöffnung 30 geführt, um dort im Wesentlichen rechtwinklig zum Rand der Schmalseite 28 abzuknicken und die Durchgangsöffnung 30 an ihrem der Längsseite 26 zugeordneten Rand schneidend in Richtung der anderen Durchgangsöffnung 31 geführt zu werden. Sobald die Durchgangsöffnung 30 passiert ist, knickt die Stoßlinie 32 in Richtung der anderen Längsseite 27 so ab, dass sie die Durchgangsöffnung 31 auf ihrer der Längsseite 27 zugeordneten Seite trifft. Dort knickt die Stoßlinie 32 wiederum so um, dass sie im Wesentlichen rechtwinklig ausgerichtet die Durchgangsöffnung 31 an ihrem der Längsseite 27 zugeordneten Rand schneidend auf den Rand der anderen Schmalseite 29 zuläuft, bis die Durchgangsöffnung 31 passiert ist. An dieser Stelle nimmt die Stoßlinie 32 einen parallel zum Rand der Schmalseite 29 ausgerichteten Verlauf, bis sie den Rand der Längsseite 27 erreicht hat. Dabei entspricht der Abstand a2 des parallel zum Rand der Schmalseite 29 verlaufenden Abschnitts der Stoßlinie 32 dem kleinsten Abstand zwischen dem Rand der Durchgangsöffnung 31 und dem Rand der Schmalseite 29.The
Durch diesen Verlauf der Stoßlinie 32 weisen die beiden Teile 24,25 der Unterlegplatten 2,3 jeweils einen sich über die gesamte Breite B ihrer Schmalseiten 28,29 erstreckenden Abschnitt 33 auf. Von diesem Abschnitt 33 steht jeweils ein weiterer Abschnitt 34 ab, der jeweils an eine der Längsseiten 26,27 der jeweiligen Unterlegplatte 2,3 angrenzt und dessen Breite im an den Abschnitt 33 angrenzenden Bereich der halben Breite B der Unterlegplatte zuzüglich dem halben Durchmesser der jeweils in ihn eingeformten Durchgangsöffnung 30,31 entspricht, während seine Breite im Bereich seines freien Endes gleich der halben Breite B der jeweiligen Unterlegplatte 2,3 abzüglich des halben Durchmessers der jeweils anderen Durchgangsöffnung 31,30 ist.By this course of the
An die einander zugeordneten, im zusammengefügten Zustand aneinanderstoßenden Ränder der Teile 24,25 der Unterlegplatten 2,3 sind jeweils korrespondierend zueinander geformte Vor- und Rücksprünge 35,36 angeformt, die im zusammengefügten Zustand einander formschlüssig überlappen und so im Einbauzustand auch unter hoher Last ein Abheben der Teile 24,25 in eine senkrecht zum Untergrund U gerichtete Richtung verhindern.At the mutually associated, abutting in the assembled state edges of the
An die Schmalseiten 28,29 der Unterlegplatten 2,3 ist jeweils eine Schulter 37,38 angeformt, die in Einbaustellung von den Abschnitten 33,34 nach oben wegweisend ausgerichtet sind und sich über die gesamte Breite B der jeweiligen Unterlegplatte 2,3 erstrecken. Die Schultern 37,38 sind so geformt und ausgerichtet, dass sie in die Aufnahme 19 eingesetztem Zustand bündig an den Stützschultern 20,21 anliegen.On the
Zur Minimierung ihres Gewichts und zur Materialeinsparung sind im Bereich der Abschnitte 33,34 in die Unterseite der Teile 24,25 regelmäßig angeordnete Ausnehmungen 39 eingeformt, zwischen denen jeweils Rippen 40 ausgebildet sind, die im Einbauzustand auf der Aufstandfläche der Aufnahme 19 stehen.To minimize their weight and to save material in the area of the
Um den im vorliegenden Ausführungsbeispiel erforderlichen Höhenausgleich zu erzielen, sind in der Aufnahme 19 hier die beiden Unterlegplatten 2,3 aufeinander gestapelt angeordnet.In order to achieve the height compensation required in the present embodiment, the two shims 2.3 are stacked on top of each other in the
Bei einer gegebenenfalls nachträglichen Montage der Unterlegplatten 2 werden deren Teile 24,25 jeweils von einer Längsseite der Aufnahme 19 her unter die anderen Bauteile des Systems 1 geschoben, bis sie auf Stoß aneinander gefügt sind und ihre Vor- und Rücksprünge 35,36 ineinander greifen. In dieser Stellung umfassen die Teile mit ihren Durchgangsöffnungen 30,31 die Schraubenschäfte der Spannelemente 15,16 mit engem Abstand, so dass trotz der Teilung der Unterlegplatten 2,3 eine maximal großflächige Abstützung der jeweils über ihnen liegenden Bauteile des Systems 1 gesichert ist.In an optional subsequent assembly of the
Auf der zuoberst liegenden Unterlegplatte 3 liegt die elastische Zwischenlage 4, die die geforderte Nachgiebigkeit der durch das System 1 gebildeten Schienenbefestigung gewährleistet.On the
Die von der Schiene S beim Überfahren durch ein hier nicht gezeigtes Schienenfahrzeug aufgenommene Last wird mittels der auf der Zwischenlage 4 liegenden Druckverteilungsplatte 5 großflächig auf die Zwischenlage 4 verteilt.The load taken up by the rail S when passing over a rail vehicle not shown here is by means of lying on the intermediate layer 4 Pressure distribution plate 5 distributed over a large area on the intermediate layer 4.
Die Zwischenlage 4 und die Druckverteilungsplatte 5 weisen jeweils an ihren Schmalseiten Schlitze auf, in denen in fertig montierter Einbaustellung die Spannelemente 15,16 sitzen.The intermediate layer 4 and the pressure distribution plate 5 each have slits on their narrow sides, in which the
Die Breite der Zwischenlage 4 und der Druckverteilungsplatte 5 ist jeweils kleiner als die Breite B der Unterlegplatten 2,3, so dass entlang der Längsseiten 26,27 der Unterlegplatten 2,3 ein schmaler Randstreifen vorhanden ist, auf dem die Führungsplatten 7,8 mit ihren seitlichen, dem Schienenfuß F zugeordneten Füßen 41,42 stehen.The width of the intermediate layer 4 and the pressure distribution plate 5 is in each case smaller than the width B of the shims 2.3, so that along the
Um gegebenenfalls weitere Höhentoleranzen auszugleichen, liegt auf der Druckverteilungsplatte 5 die Höhenregulierungsplatte 6 auf, auf der die Schiene S mit ihrem Schienenfuß F steht.In order optionally to compensate for further height tolerances, is located on the pressure distribution plate 5, the
Die aus einem verstärkten Kunststoff hergestellten Führungsplatten 7,8 sind identisch geformt. Jeweils eine von ihnen ist in an sich bekannter Weise auf einer der Längsseiten der Schiene S angeordnet, um die Schiene S seitlich zu führen. Gleichzeitig dienen die Führungsplatten 7,8 ebenfalls in an sich bekannter Weise als Lager für die auf ihnen sitzenden Federelemente 9,10.The guide plates made of a reinforced
An ihrer dem Schienenfuß F zugeordneten Stirnseite weisen die Führungsplatten 7,8 eine Anlagefläche 42 auf, mit der sie im fertig montierten Zustand seitlich am Schienenfuß F anliegen. Die Anlagefläche 42 ist dabei durch zwei Öffnungen durchbrochen, die zu einer von der Unterseite 43 der Führungsplatten 7,8 her in diese eingeformten Ausnehmung 44 führen. Im Bereich der Ausnehmung 44 sind hier nicht sichtbare Versteifungsrippen ausgebildet, die das Dach 45 der Führungsplatten 7,8 mit dem darauf verspannten Federelement 9,10 tragen.At their end face assigned to the rail foot F, the
An der von der Anlagefläche 42 abgewandten Seite ist an die Führungsplatten 7,8 ein mit Ausnehmungen und Versteifungsrippen versehener Stützabschnitt 46 angeformt, an dessen freier Oberseite eine ebene Stützfläche 47 ausgebildet ist. Auf dieser Stützfläche 47 sitzen in der Vormontagestellung die Übergangsabschnitte der Federelemente 9,10, die die Federarme 48,49 der Federelemente 9,10 mit deren Mittelschlaufe verbinden. Gleichzeitig begrenzt der Stützabschnitt 46 eine in die Oberseite der Führungsplatten 7,8 eingeformte Kehle 50, die sich parallel zur Anlagefläche 42 erstreckt und in der die Übergangsabschnitte der Federelemente 9,10 in fertig montierter Stellung sitzen.On the side remote from the
An zentraler Stelle ist in das Dach 45 der Führungsplatten 7,8 eine Durchgangsöffnung 51 eingeformt, durch die der Schraubenschaft des jeweiligen Spannelements 15,16 geführt ist. Die Durchgangsöffnung 51 ist dabei von einem umlaufenden Kragen umgeben, durch den einerseits ein Eindringen von Wasser in die Öffnung 51 verhindert wird und der andererseits eine Führung für die Mittelschlaufe des jeweiligen Federelements 9,10 bildet. Beidseits der Durchgangsöffnung 51 und mit einem gleichmäßigen Abstand zu dieser ist auf der Oberseite der Führungsplatten 7,8 jeweils ein Absatz 52,53 ausgebildet, der bis zur stirnseitigen Anlagefläche 42 reicht. Die Absätze 52,53 bilden bei fertig montiertem System einerseits eine seitliche Führung für die Mittelschlaufe des jeweils zugeordneten Federelements 9,10. Andererseits ist von ihrer Oberseite aus in die Absätze 52,53 jeweils eine keilförmige Ausnehmung eingeformt. Auf diese Weise sind am dem Stützabschnitt 46 zugeordneten Ende der Absätze 52,53 jeweils ein nach oben stehender Anschlag 54,55 und eine ebene Gleitfläche 56,57 gebildet. Diese Gleitflächen 56,57 steigen ausgehend vom jeweiligen Anschlag 54,55 in Richtung der Anlagefläche 42 kontinuierlich an, bis sie die vordere, der Anlagefläche 42 zugeordnete Kante des jeweiligen Absatzes 52,53 erreichen.At a central location in the
Zwischen den in die Anlagefläche 42 eingeformten Öffnungen ist im Bereich der Anlagefläche 42 ein Mittelpfosten 42a vorhanden, an dessen unteres Ende ein von der jeweiligen Führungsplatte 8,9 wegweisender, normal zur Anlagefläche 42 ausgerichteter Vorsprung 42b angeformt ist. Der Vorsprung 42b ist dabei so positioniert, dass er in fertig montierter Stellung unter den Schienenfuß F greift. Auf diese Weise wird ein Abheben der Führungsplatten 8,9 unter den in der Praxis auftretenden Belastungen sicher vermieden.Between the openings formed in the
Die als ω-förmige Spannklemmen ausgebildeten Federelemente 9,10 besitzen an ihren Federarmen 48,49 jeweils einen abgekröpften Endabschnitt, der bei fertig montiertem System 1 im Wesentlichen parallel zur Schiene S ausgerichtet ist. Auf diesen Endabschnitten ist jeweils eines der Adapterstücke 11-14 um eine mit der Längsachse des betreffenden Endabschnitts zusammenfallenden Drehachse D verdrehbar gelagert.The trained as an ω-shaped clamps spring
Von ihrer Stirnseite her gesehen weisen die Adapterstücke 11-14 jeweils eine fünfeckige Form auf. An der Umfangsfläche der Adapterstücke 11-14 sind dabei jeweils drei gleich große Anlageflächenabschnitte 58,59,60 ausgebildet, die unmittelbar aneinander anstoßen und voneinander jeweils durch eine Kante 61,62 getrennt sind. An die beiden äußeren Anlageflächenabschnitte 58,60 schließen sich zusätzlich zwei Markierungsabschnitte 63,64 an. Diese Markierungsabschnitte 63,64 können mit Kennzeichnungen versehen sein, die die mit einer Drehung in die jeweilige Richtung einhergehende Zu- oder Abnahme der Federspannung anzuzeigen.Seen from its front side, the adapter pieces 11-14 each have a pentagonal shape. At the peripheral surface of the adapter pieces 11-14 are each three equal
Die Markierungsabschnitte 63,64 sind durch einen Schlitz 65 getrennt, der aus radialer Richtung in die Adapterstücke 11-14 eingeformt ist und bis in eine Aufnahme 66 reicht, die von ihrer einen Stirnseite her in die Adapterstücke 11,14 eingeformt ist. Der Schlitz 65 schneidet eine dreiecksförmige Öffnung 67 in den Boden 68 der Aufnahme 66, so dass in der Aufnahme 66 sich sammelnde Feuchtigkeit oder Dämpfe über die Öffnung 67 aus der Aufnahme 66 entweichen können.The marking
Der Mittelpunkt M der kreisrunden Öffnung der Aufnahme 66 ist bezogen auf den Mittelpunkt der Stirnseiten 69 der Adapterstücke 11-14 so versetzt angeordnet, dass der erste Anlageflächenabschnitt 58 einen ersten Abstand z1, der zweite Anlageflächenabschnitt 59 einen zweiten Abstand z2 und der dritte Anlageflächenabschnitt 60 einen dritten Abstand z3 zum Mittelpunkt M der Aufnahme 66 hat, wobei gilt z1 < z2 < z3. Die Abstände z1 - z3 unterscheiden sich beispielsweise um jeweils einen Millimeter.The center M of the circular opening of the
Die Adapterstücke 11 - 14 bestehen aus einem elektrisch nicht leitenden Kunststoff, der zumindest in ihrer Umfangsrichtung eine gewisse Elastizität besitzt.The adapter pieces 11-14 are made of an electrically non-conductive plastic, which has a certain elasticity at least in its circumferential direction.
Im entspannten, nicht auf den jeweils zugeordneten Endabschnitt der Federarme 48,49 aufgesetzten Zustand weist die Aufnahme 66 der Adapterstücke 11 - 14 einen Durchmesser auf, der um ein geringes Untermaß kleiner ist als die ebenfalls im Durchmesser kreisrunden Endabschnitte der Federarme 48,49. Beim Aufstecken auf die Endabschnitte werden die Adapterstücke 11 - 14 dementsprechend in Umfangsrichtung gespreizt, so dass sie in Folge der in den Adapterstücken 11 - 14 dann wirkenden Rückstellkräfte reibschlüssig, jedoch mit noch einem gewissen Kraftaufwand verdrehbar auf dem jeweils zugeordneten Endabschnitt gehalten sind. Das Aufspreizen der Adapterstücke 11 - 14 kann dabei aufgrund des Schlitzes 65 einfach erfolgen, welcher auf diese Weise nicht nur die Ansammlung von Feuchtigkeit in dem jeweiligen Adapterstück 11 - 14 verhindert, sondern zusätzlich das Aufstecken der Adapterstücke 11 - 14 auf den jeweiligen Endabschnitt der Federarme 48,49 erleichtert und ihre ausreichende elastische Nachgiebigkeit sichert.In the relaxed, not attached to the respectively associated end portion of the
Zur Vormontage des Systems 1 wird zunächst die Unterlegplatte 3 in die Aufnahme 19 des Untergrunds U gelegt. Anschließend werden die elastische Lage 4 auf die Unterlegplatte 2 und die Druckverteilungsplatte 5 auf die elastische Lage gelegt.For pre-assembly of the
Daraufhin werden die Führungsplatten 8,9 so positioniert, dass jeweils eine von ihnen mit ihrem Stützabschnitt 46 an einer der Schultern 37,38 anliegt, die wiederum jeweils an einer der Stützschultern 20,21 des Untergrunds U abgestützt ist. Die Führungsplatten 8,9 umgreifen dabei mit ihren seitlichen Füßen 41,42 die Zwischenlage 4 und die Druckverteilungsplatte 5, so dass sie auf der Unterlegplatte 3 stehen. Dabei steht der Mittelpfosten 42a mit seinem Vorsprung 42b in dem Schlitz der Zwischenlage 4 und der Druckverteilungsplatte 5.Subsequently, the
Anschließend wird auf die Druckverteilungsplatte 5 die Höhenregulierplatte 6 gelegt, deren Breite dem lichten Abstand zwischen den Führungsplatten 7,8 entspricht.Subsequently, the
Im Anschluss daran werden die Federelemente 9,10 mit den an ihnen befestigten Adapterstücken 11 - 14 auf die ihnen jeweils zugeordnete Führungsplatte 7,8 so gesetzt, dass ihr Übergangsabschnitt auf der Stützfläche 47 des jeweiligen Stützabschnitts 46 sitzt. In dieser Position sind die Adapterstücke 11 - 14 mit ihrem der jeweiligen Gleitfläche 56,57 zugeordneten Anlageflächenabschnitt 58-60 auf der jeweiligen Gleitfläche 56,57 platziert und in Anlage an dem jeweiligen Anschlag 54,55 gehalten. Nachdem dann die Spannelemente 15,16 durch die Durchgangsöffnung 51 der jeweiligen Winkelführungsplatte 7,8 und die Durchgangsöffnungen 30,31 der Unterlegplatte 2 in den jeweils zugeordneten Kunststoffdübel 22,23 geschraubt sind, ist das System 1 in seiner Vormontagestellung vorgespannt.Following this, the
Nachdem nun die Schiene S positioniert worden ist, werden die Federelemente 9,10 in Richtung der Schiene S soweit verschoben, bis die Adapterstücke 11 - 14 auf der ihnen jeweils zugeordneten Seite des Schienenfußes F und die Übergangsabschnitte der Federelemente 9,10 in der Kehle 50 der Führungsplatten 7,8 sitzen. Die Adapterstücke 11 - 14 gleiten dabei die Gleitflächen 56,57 hinauf, bis sie die vordere freie Kante der Absätze 52,53 passiert haben und auf dem Schienenfuß F sitzen.After the rail S has now been positioned, the
Wird festgestellt, dass in Folge einer übergroßen oder zu kleinen Höhendifferenz zwischen der Oberseite des Schienenfußes F und der Oberseite der jeweiligen Führungsplatte 7,8 von einem der Federelemente 9,10 eine unzureichende oder zu große Niederhaltekraft auf den Schienenfuß F ausgeübt wird, kann dies dadurch ausgeglichen werden, dass das dem jeweiligen Federelement 9,10 zugeordnete Adapterstücke 11 - 14 um seine jeweilige Drehachse D so verdreht wird, dass das jeweilige Adapterstück 11 - 14 über einen Anlageflächenabschnitt 58,59,60 mit geringerem Abstand (Abnahme der Niederhaltekraft) bzw. größerem Abstand (Zunahme der Niederhaltekraft) zu der dann durch den Mittelpunkt M der Aufnahme 66 verlaufenden Drehachse D auf dem Schienenfuß F abgestützt ist.If it is determined that an insufficient or too great hold-down force is exerted on the rail foot F as a result of an excessively large or too small height difference between the upper side of the rail foot F and the upper side of the
Die Adapterstücke 11 - 14 erlauben so eine Feinjustage der von den Federelementen 9,10 aufgebrachten Niederhaltekräfte. Gleichzeitig isolieren sie die Federelemente 9,10 gegen die Schiene S.The adapters 11-14 thus allow a fine adjustment of the applied by the spring elements 9.10 hold down forces. At the same time they isolate the
Wird festgestellt, dass die Höhe des durch das System 1 geschaffenen Befestigungspunktes für die Schiene S insgesamt zu gering ist, können nachträglich die zusätzliche Unterlegplatte 2 und erforderlichenfalls weitere Unterlegplatten in der voranstehend schon erwähnten Weise unterhalb der Unterlegplatte 3 montiert werden.
Claims (12)
dadurch gekennzeichnet, dass die Stoßlinie (32) ausgehend von der einen Längsseite (26,27) bis zu der Durchgangsöffnung (30,31) in einem Abstand (a1) zu der der Durchgangsöffnung (30,31) zugeordneten Schmalseite (28,29) geführt ist, der dem kleinsten Abstand (a1) der jeweiligen Durchgangsöffnung (30,31) von der ihr zugeordneten Schmalseite (28,29) entspricht.Shim according to claim 6 or 7,
characterized in that starting from the one longitudinal side (26, 27) up to the passage opening (30, 31) at a distance (a1) from the one longitudinal side (28, 29) to the narrow side (28, 29) associated with the passage opening (30, 31) is guided, which corresponds to the smallest distance (a1) of the respective passage opening (30,31) from its associated narrow side (28,29).
Priority Applications (11)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PT101564367T PT2369057E (en) | 2010-03-12 | 2010-03-12 | System for attaching a rail to a base and base board for such a system |
DE202010009778U DE202010009778U1 (en) | 2010-03-12 | 2010-03-12 | System for securing a rail to a substrate and shim for such a system |
EP10156436.7A EP2369057B1 (en) | 2010-03-12 | 2010-03-12 | System for attaching a rail to a base and base board for such a system |
PL10156436T PL2369057T3 (en) | 2010-03-12 | 2010-03-12 | System for attaching a rail to a base and base board for such a system |
ES10156436.7T ES2524798T3 (en) | 2010-03-12 | 2010-03-12 | System for fixing a rail on a substrate and support plate for such a system |
PCT/EP2011/053077 WO2011110456A1 (en) | 2010-03-12 | 2011-03-02 | System for fastening a rail on a subsurface and underlay plate for such a system |
CN201180013658.0A CN102803610B (en) | 2010-03-12 | 2011-03-02 | System for fastening a rail on a subsurface and underlay plate for such a system |
JP2012557471A JP5822240B2 (en) | 2010-03-12 | 2011-03-02 | System for fixing rails on a foundation and support plate for the system |
CA2790323A CA2790323A1 (en) | 2010-03-12 | 2011-03-02 | System for fixing a rail onto a foundation and support plate for such a system |
EA201201282A EA023346B1 (en) | 2010-03-12 | 2011-03-02 | System for fastening a rail on a subsurface and underlay plate for such a system |
US13/583,364 US8777122B2 (en) | 2010-03-12 | 2011-03-02 | System for fixing a rail onto a foundation and support plate for such a system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP10156436.7A EP2369057B1 (en) | 2010-03-12 | 2010-03-12 | System for attaching a rail to a base and base board for such a system |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2369057A1 true EP2369057A1 (en) | 2011-09-28 |
EP2369057B1 EP2369057B1 (en) | 2014-09-03 |
Family
ID=42537914
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10156436.7A Active EP2369057B1 (en) | 2010-03-12 | 2010-03-12 | System for attaching a rail to a base and base board for such a system |
Country Status (11)
Country | Link |
---|---|
US (1) | US8777122B2 (en) |
EP (1) | EP2369057B1 (en) |
JP (1) | JP5822240B2 (en) |
CN (1) | CN102803610B (en) |
CA (1) | CA2790323A1 (en) |
DE (1) | DE202010009778U1 (en) |
EA (1) | EA023346B1 (en) |
ES (1) | ES2524798T3 (en) |
PL (1) | PL2369057T3 (en) |
PT (1) | PT2369057E (en) |
WO (1) | WO2011110456A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202013102504U1 (en) | 2013-05-13 | 2013-06-18 | Vossloh-Werke Gmbh | System for securing rails intended for rail vehicles, fastening point for rails, device for laying rails and shim |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202010009778U1 (en) * | 2010-03-12 | 2010-10-14 | Vossloh-Werke Gmbh | System for securing a rail to a substrate and shim for such a system |
ES2525249T3 (en) * | 2010-03-12 | 2014-12-19 | Vossloh-Werke Gmbh | System for fixing a rail and adapter piece for such a system |
CA2809062A1 (en) * | 2010-08-24 | 2012-03-01 | Vossloh-Werke Gmbh | System for fastening a rail and method for renovating a rail fastening point |
AU2014218005B2 (en) | 2013-02-12 | 2017-08-31 | Hf Holding Sa | Adjustable rail fastening assembly |
JP6204169B2 (en) * | 2013-11-29 | 2017-09-27 | 東日本旅客鉄道株式会社 | Rail fastening device for track |
EP3227494B1 (en) * | 2014-12-02 | 2018-07-25 | Vossloh-Werke GmbH | Lightweight tie plate for a railway rail profile |
DE102016122062A1 (en) | 2016-11-16 | 2018-05-17 | Vossloh-Werke Gmbh | Clamp, guide plate and attachment point for securing a rail to a substrate |
DE102017111781A1 (en) | 2017-05-30 | 2018-12-06 | Vossloh-Werke Gmbh | Clamp and attachment point for securing a rail to a substrate |
JP6864740B2 (en) | 2016-11-16 | 2021-04-28 | フォスロー−ベルケ ゲゼルシャフト ミット ベシュレンクテル ハフツング | Tension clamps and fixing points for fixing the rail to the foundation |
DE102018117453A1 (en) | 2018-07-19 | 2020-01-23 | Schwihag Ag Gleis- Und Weichentechnik | Rail fastening system |
DE202018106074U1 (en) | 2018-10-24 | 2018-11-07 | Voestalpine Bwg Gmbh | Support for a rail |
RU195273U1 (en) * | 2019-11-27 | 2020-01-22 | Общество с ограниченной ответственностью "КомПласт" | Gasket |
DE202021103063U1 (en) | 2021-06-07 | 2021-06-14 | Vossloh Fastening Systems Gmbh | Rail fastening point in which a rail for a rail vehicle is fastened to an underground |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19745326A1 (en) | 1997-10-14 | 1999-04-29 | Krupp Ag Hoesch Krupp | Bed plate for rail fastening on permanent way or sleeper |
DE10148411A1 (en) * | 2001-09-29 | 2003-04-17 | Hada Gmbh & Co Kg Kunststoffve | Device for elastic mounting of rails on sleepers comprises at least one plastic base element which is joinable to at least one elastic insert |
WO2005124025A1 (en) * | 2004-06-21 | 2005-12-29 | Bwg Gmbh & Co. Kg | Rail fixing device |
WO2010017843A1 (en) * | 2008-08-14 | 2010-02-18 | Vossloh Werke Gmbh | Device for mounting railroad tracks on a substructure |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4715533A (en) * | 1986-04-01 | 1987-12-29 | Bucksbee James H | Rail fastener assembly with horizontal flanges |
CN2236502Y (en) * | 1995-12-27 | 1996-10-02 | 安康铁路分局勉县工务段铸件厂 | Fastening base plate for point |
GB0019197D0 (en) * | 2000-08-05 | 2000-09-27 | Molyneux Godfrey M O | Improvement to rail support plates |
DE10048787B4 (en) * | 2000-09-29 | 2020-05-07 | Bwg Gmbh & Co. Kg | Storage for a track section |
US7533829B2 (en) * | 2005-02-25 | 2009-05-19 | Osler Wilbur F | Rail-mounting assembly |
JP4878996B2 (en) * | 2006-11-20 | 2012-02-15 | 大和グラビヤ株式会社 | Railway rail support pad |
DE102007025708B4 (en) * | 2007-06-01 | 2009-06-18 | Schwihag Ag | Frictional elastic rail fastening for track systems |
CN201284450Y (en) * | 2008-09-08 | 2009-08-05 | 义马煤业(集团)有限责任公司 | Conveniently detachable sleeper |
CN201411603Y (en) * | 2009-06-05 | 2010-02-24 | 洛阳双瑞橡塑科技有限公司 | Vibration absorbing rubber pad for entire track-bed of ballastless track |
DE202009014434U1 (en) * | 2009-09-18 | 2010-02-11 | Vossloh-Werke Gmbh | Shim for fixing a rail to a solid surface and fixing a rail |
DE202009014462U1 (en) * | 2009-09-18 | 2010-02-18 | Vossloh-Werke Gmbh | System for securing a rail to a solid surface and fastening a rail |
DE202010009778U1 (en) * | 2010-03-12 | 2010-10-14 | Vossloh-Werke Gmbh | System for securing a rail to a substrate and shim for such a system |
EP2369055B1 (en) * | 2010-03-12 | 2014-04-30 | Vossloh-Werke GmbH | System for attaching a rail and guide board for such a system |
ES2525249T3 (en) * | 2010-03-12 | 2014-12-19 | Vossloh-Werke Gmbh | System for fixing a rail and adapter piece for such a system |
CA2809062A1 (en) * | 2010-08-24 | 2012-03-01 | Vossloh-Werke Gmbh | System for fastening a rail and method for renovating a rail fastening point |
-
2010
- 2010-03-12 DE DE202010009778U patent/DE202010009778U1/en not_active Expired - Lifetime
- 2010-03-12 ES ES10156436.7T patent/ES2524798T3/en active Active
- 2010-03-12 EP EP10156436.7A patent/EP2369057B1/en active Active
- 2010-03-12 PL PL10156436T patent/PL2369057T3/en unknown
- 2010-03-12 PT PT101564367T patent/PT2369057E/en unknown
-
2011
- 2011-03-02 CN CN201180013658.0A patent/CN102803610B/en active Active
- 2011-03-02 US US13/583,364 patent/US8777122B2/en active Active
- 2011-03-02 EA EA201201282A patent/EA023346B1/en not_active IP Right Cessation
- 2011-03-02 WO PCT/EP2011/053077 patent/WO2011110456A1/en active Application Filing
- 2011-03-02 JP JP2012557471A patent/JP5822240B2/en not_active Expired - Fee Related
- 2011-03-02 CA CA2790323A patent/CA2790323A1/en not_active Abandoned
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19745326A1 (en) | 1997-10-14 | 1999-04-29 | Krupp Ag Hoesch Krupp | Bed plate for rail fastening on permanent way or sleeper |
DE10148411A1 (en) * | 2001-09-29 | 2003-04-17 | Hada Gmbh & Co Kg Kunststoffve | Device for elastic mounting of rails on sleepers comprises at least one plastic base element which is joinable to at least one elastic insert |
WO2005124025A1 (en) * | 2004-06-21 | 2005-12-29 | Bwg Gmbh & Co. Kg | Rail fixing device |
WO2010017843A1 (en) * | 2008-08-14 | 2010-02-18 | Vossloh Werke Gmbh | Device for mounting railroad tracks on a substructure |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202013102504U1 (en) | 2013-05-13 | 2013-06-18 | Vossloh-Werke Gmbh | System for securing rails intended for rail vehicles, fastening point for rails, device for laying rails and shim |
DE102013104907A1 (en) | 2013-05-13 | 2014-11-13 | Vossloh-Werke Gmbh | System for securing rails intended for rail vehicles, fastening point for rails, device for laying rails and shim |
WO2014184059A1 (en) | 2013-05-13 | 2014-11-20 | Vossloh-Werke Gmbh | System for attaching rails for rail vehicles |
Also Published As
Publication number | Publication date |
---|---|
JP2013522501A (en) | 2013-06-13 |
CA2790323A1 (en) | 2011-09-15 |
JP5822240B2 (en) | 2015-11-24 |
ES2524798T3 (en) | 2014-12-12 |
DE202010009778U1 (en) | 2010-10-14 |
CN102803610B (en) | 2014-10-22 |
WO2011110456A1 (en) | 2011-09-15 |
US20130168460A1 (en) | 2013-07-04 |
PT2369057E (en) | 2014-12-03 |
CN102803610A (en) | 2012-11-28 |
PL2369057T3 (en) | 2015-04-30 |
US8777122B2 (en) | 2014-07-15 |
EA023346B1 (en) | 2016-05-31 |
EA201201282A1 (en) | 2013-04-30 |
EP2369057B1 (en) | 2014-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2369057B1 (en) | System for attaching a rail to a base and base board for such a system | |
EP2369055B1 (en) | System for attaching a rail and guide board for such a system | |
EP2245226B1 (en) | System for fastening a rail on a base | |
EP2971354B1 (en) | Rail fastening system comprising a snap-fit connection between the guide plate and the base plate | |
EP2318587B1 (en) | Angular guide plate and system for fixing a rail | |
EP2229479B1 (en) | Support for a rail fastening system and rail fastening system | |
WO2007082553A1 (en) | System for fixing a rail | |
EP2369056B1 (en) | System for attaching a rail and adapter piece for such a system | |
EP2643520B1 (en) | Combination of a guide plate and a wedge element and system for attaching a rail for a rail vehicle on an underlying surface | |
EP0420882A1 (en) | Rail for vehicles. | |
DE202009004399U1 (en) | Guide plate for a system for securing a rail to a substrate and a system comprising such a guide plate | |
EP2997195B1 (en) | Fastening point of rails for rail vehicles | |
DE102007044098B3 (en) | Railway track fixing system, has elastic members supported on guidance plates, and bulges and recesses of bearing faces extended in parallel with horizontal rigid foundation under assembling condition of wedge-shaped members | |
WO2003046284A1 (en) | Device for laterally supporting a rail | |
EP2363529B1 (en) | System for attaching a rail | |
DE102020132029A1 (en) | ELASTIC INTERMEDIATE PLATE AND ASSEMBLY FOR ATTACHING A RAIL FOR A RAILWAY VEHICLE | |
EP3870756A1 (en) | Support for a rail | |
DE102019130379A1 (en) | RAIL FASTENING POINT IN WHICH A RAIL FOR A RAIL VEHICLE IS FASTENED TO A SUBSTRATE | |
DE2921720A1 (en) | DEVICE FOR FASTENING RAILWAY TRACKS ON SLEEPERS | |
WO2016086979A1 (en) | Lightweight bedplate for a rail profile | |
DD300552A5 (en) | CLAMPING ELEMENT FOR QUICKLY FIXING AN RAILWAY RAIL AND THRESHOLD WITH SUCH A CLAMPING ELEMENT | |
DE19941662A1 (en) | Brake shield for a drum brake | |
DE7837197U1 (en) | CHECKING PROFILE RAIL FOR A CHAIN MAKING MACHINE | |
DE10143808A1 (en) | Secondary part of a linear motor | |
WO2019141625A1 (en) | Intermediate plate for arranging between a base and a rail for a rail vehicle at a rail fastening point, and rail fastening system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
17P | Request for examination filed |
Effective date: 20120228 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20140204 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
INTG | Intention to grant announced |
Effective date: 20140721 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 685703 Country of ref document: AT Kind code of ref document: T Effective date: 20140915 Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502010007793 Country of ref document: DE Effective date: 20141016 |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: SC4A Free format text: AVAILABILITY OF NATIONAL TRANSLATION Effective date: 20141125 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2524798 Country of ref document: ES Kind code of ref document: T3 Effective date: 20141212 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: TROESCH SCHEIDEGGER WERNER AG, CH |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: T3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141203 |
|
REG | Reference to a national code |
Ref country code: GR Ref legal event code: EP Ref document number: 20140402370 Country of ref document: GR Effective date: 20141223 |
|
REG | Reference to a national code |
Ref country code: EE Ref legal event code: FG4A Ref document number: E010067 Country of ref document: EE Effective date: 20141202 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140903 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140903 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150103 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140903 |
|
REG | Reference to a national code |
Ref country code: PL Ref legal event code: T3 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502010007793 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140903 |
|
26N | No opposition filed |
Effective date: 20150604 |
|
REG | Reference to a national code |
Ref country code: RO Ref legal event code: EPE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150312 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140903 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140903 |
|
REG | Reference to a national code |
Ref country code: HU Ref legal event code: AG4A Ref document number: E023872 Country of ref document: HU |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150312 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: LT Payment date: 20160224 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: RO Payment date: 20160307 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140903 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160312 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140903 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140903 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160312 |
|
PGRI | Patent reinstated in contracting state [announced from national office to epo] |
Ref country code: IT Effective date: 20170710 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MM4D Effective date: 20170312 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170312 Ref country code: RO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170312 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20180321 Year of fee payment: 9 Ref country code: FI Payment date: 20180321 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: EE Payment date: 20180131 Year of fee payment: 9 Ref country code: PT Payment date: 20180221 Year of fee payment: 9 Ref country code: SE Payment date: 20180321 Year of fee payment: 9 Ref country code: LV Payment date: 20180228 Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20140903 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: HU Payment date: 20181220 Year of fee payment: 16 Ref country code: GR Payment date: 20190208 Year of fee payment: 10 |
|
REG | Reference to a national code |
Ref country code: EE Ref legal event code: MM4A Ref document number: E010067 Country of ref document: EE Effective date: 20190331 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: EUG |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190313 Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190312 Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190912 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20190401 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190312 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190401 Ref country code: EE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200313 Ref country code: GR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201008 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20230323 Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20230209 Year of fee payment: 14 Ref country code: PL Payment date: 20230208 Year of fee payment: 14 Ref country code: IT Payment date: 20230323 Year of fee payment: 14 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230515 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20230421 Year of fee payment: 14 Ref country code: CH Payment date: 20230402 Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20240322 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240321 Year of fee payment: 15 Ref country code: CZ Payment date: 20240216 Year of fee payment: 15 Ref country code: GB Payment date: 20240321 Year of fee payment: 15 |