EP2300569A2 - Vorrichtung zur schlackeabführung aus einem kohlevergasungsreaktor - Google Patents

Vorrichtung zur schlackeabführung aus einem kohlevergasungsreaktor

Info

Publication number
EP2300569A2
EP2300569A2 EP09777137A EP09777137A EP2300569A2 EP 2300569 A2 EP2300569 A2 EP 2300569A2 EP 09777137 A EP09777137 A EP 09777137A EP 09777137 A EP09777137 A EP 09777137A EP 2300569 A2 EP2300569 A2 EP 2300569A2
Authority
EP
European Patent Office
Prior art keywords
slag
container
lock
lock container
liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP09777137A
Other languages
German (de)
English (en)
French (fr)
Inventor
Christoph Hanrott
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ThyssenKrupp Industrial Solutions AG
Original Assignee
Uhde GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Uhde GmbH filed Critical Uhde GmbH
Publication of EP2300569A2 publication Critical patent/EP2300569A2/de
Withdrawn legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • C10J3/72Other features
    • C10J3/82Gas withdrawal means
    • C10J3/84Gas withdrawal means with means for removing dust or tar from the gas
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/18Adding fluid, other than for crushing or disintegrating by fluid energy
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • C10J3/46Gasification of granular or pulverulent flues in suspension
    • C10J3/48Apparatus; Plants
    • C10J3/52Ash-removing devices
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J3/00Production of combustible gases containing carbon monoxide from solid carbonaceous fuels
    • C10J3/46Gasification of granular or pulverulent flues in suspension
    • C10J3/48Apparatus; Plants
    • C10J3/52Ash-removing devices
    • C10J3/526Ash-removing devices for entrained flow gasifiers
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/09Details of the feed, e.g. feeding of spent catalyst, inert gas or halogens
    • C10J2300/0913Carbonaceous raw material
    • C10J2300/093Coal
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/09Details of the feed, e.g. feeding of spent catalyst, inert gas or halogens
    • C10J2300/0953Gasifying agents
    • C10J2300/0956Air or oxygen enriched air
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10JPRODUCTION OF PRODUCER GAS, WATER-GAS, SYNTHESIS GAS FROM SOLID CARBONACEOUS MATERIAL, OR MIXTURES CONTAINING THESE GASES; CARBURETTING AIR OR OTHER GASES
    • C10J2300/00Details of gasification processes
    • C10J2300/16Integration of gasification processes with another plant or parts within the plant
    • C10J2300/1625Integration of gasification processes with another plant or parts within the plant with solids treatment
    • C10J2300/1628Ash post-treatment
    • C10J2300/1634Ash vitrification

Definitions

  • the invention is directed to a method and apparatus for removing in particular the resulting in the coal gasification or syngas recovery slags.
  • the device is such that the slag is first collected in an aqueous slag bath which is inside the pressure vessel.
  • the slag is released from the slag bath via a lock container to a lower pressure level.
  • the slag is moved by a liquid flow, so that it can not lead to disturbances in the operation of the process.
  • the invention also relates to a process for the production of synthesis gas which enables a trouble-free discharge of the slag from the process.
  • the lock container When filling the lock container with slag, the lock container is also under increased pressure through the connection to the gasification device.
  • a downward flow of water containing particles flowing through the upper shut-off device is produced. This is achieved by removing water from the top of the lock container.
  • the downward flow is preferably separated from the stream to be removed by a guide plate, so that only a minimum of particles is entrained by the stream to be discharged.
  • DE 60031875 T2 also describes a method for the removal of slag, which is obtained in the production of synthesis gas.
  • this method is located between the gasification device and the lock container another intermediate container.
  • a kind of suction is generated and the solids from the intermediate container are drawn into the lock container and in this way bridge formations are avoided by slag particles.
  • the lock container must be chosen so large that it allows the solids to settle.
  • the intermediate container is also provided with means for removing slag-poor water in order to favor the settling of slag particles from the gasification device into the intermediate container.
  • EP 0290087 A2 describes a way to solve slag deposits and blockages on the shut-off above the lock container.
  • a gas bubble is generated within the closed lock container, which is at a lower pressure than the gasification system.
  • the pressure difference produces an initial downward flow of water and slag which releases the blockages above or on the upper shut-off device.
  • the gas bubble is in this case in an annular space in the upper region of the lock container, which is formed between the container wall and a pipe projecting into the lock container.
  • DE 102008005704.5 describes a method for the removal of slags in the syngas extraction.
  • the slag is discharged from the coal gasification reactor and fed into a liquid-filled slag tank.
  • the liquid is usually water.
  • the slag tank is located in the pressure vessel. Under the slag tank is located in the direction of gravity a lock container, which is separated from the slag tank by a valve. As a result, the slag in a lock container can lead to a lower pressure level.
  • a liquid flow is removed from an annular space formed by internals. In this case, a portion of the slag tank containing downwardly flowing slag containing cooling water is introduced into the lower part of the lock container and flows in countercurrent to the descending slag.
  • a constricted flow channel is formed by internals, so that a sufficient cooling is set below 100 0 C and the formation of vapors in the expansion process of the lock container is avoided.
  • a gas bubble with a pressure above the pressure in the mentioned pressure vessel so that when connecting the lock container with the pressure vessel comes to a jerky backflow to solve there wedged slag bridges.
  • DE 102006040077 A1 also describes a method for the removal of slags in the syngas extraction.
  • the slag is discharged from the coal gasification reactor and fed into a liquid-filled slag tank. Under the slag tank is located in the direction of gravity a lock container, which can be separated from the slag tank by a valve to discharge the slag. From the lock container, a liquid flow is removed and passed into the pressure vessel, there to dissolve deposits and blockages. It can be seen from the sketch in DE 102006040077 A1 that the liquid flow is removed at a slag-poor point of the container in order to avoid the entrainment of larger slag particles.
  • cooling water flows upwardly through the lock container, whereby the slag bed is loosened and a desired cooling is achieved before the expansion device.
  • the cooling of the slag in the lock tank and the amount of water is necessary to prevent the occurrence of swaths when relaxing. The necessary duration depends, inter alia, on the slag and water volume to be cooled in the lock container.
  • the methods described are characterized by significant disadvantages.
  • the provisions for avoiding disturbances during the discharge process and for releasing blockages require a large dead volume within the water-filled lock container, which can not be used for the accumulation of slag.
  • the dead volume may be more than 50% of the total volume in existing methods. Due to the unnecessarily large lock container dimensions, this causes costs in the production of the lock container and an increased space requirement for the introduction into the system complex.
  • the large amount of water in relation to the slag amount charged the downstream equipment parts In addition, the flexibility of the system is limited because the dead volume filled with water must be cooled in addition to the slag. This requires additional time and prolongs the cycle intervals of the lock container.
  • the invention solves this problem by a method according to the features of the first claim and a device according to the features of claim 13th
  • the solution of the invention provides a method for the removal of particular in the coal gasification or syngas recovery resulting, hot slags from a located in a pressure vessel, aqueous slag bath in one or more lock containers for the slag, in the direction of gravity below the slag bath ago below the slag bath a device for breaking and / or a device for accumulating the slag is provided, characterized in that
  • the deflected stream which flows wholly or partly into a gap, preferably an annular space, flows upwards.
  • the current to be dissipated is advantageously equalized. This can be done anywhere.
  • the current to be dissipated is homogenized by means of internals or pinholes, for example. It is advantageous to discharge the liquid stream to be discharged in the head region of the lock container by means of a pump and to supply it directly or indirectly back to the carburetor. Alternatively, the liquid stream to be discharged can also be removed together with a discharge flow of the gasification device by expansion to a lower pressure level.
  • the dissipated fluid flow can be performed well in the head area of the lock container by relaxing to a lower pressure level.
  • the removal by means of a pump can be performed in the head region of the lock container.
  • the liquid stream to be discharged can be conveyed to a circulation flow associated with the pressure vessel of the coal gasification.
  • a considerable dead volume of the lock container is saved.
  • the projecting into the lock container tube serves at the same time the deflection of the liquid flow.
  • the slag is introduced via a projecting into the lock container tube in the lock container.
  • a liquid stream preferably a cooling medium
  • the liquid is brought in the lock container in contact with a gas volume located outside of the lock container.
  • a gas volume located outside of the lock container.
  • This is preferably located in a separate container.
  • this separate container is subjected to a higher pressure than in the gasification system and connected via a piping system with the lock container.
  • the gas volume is subjected to a pressure above the gasifier pressure.
  • the gas volume can be used to produce a shock-like backwash when connecting the lock container with the gasification system and to solve possible blockages.
  • the gas volume can be used to replace the hot water remaining in the lock container after the filling process in the head area of the lock container by cold water. It is particularly advantageous if the separate container can be separated from the lock container by shut-off devices. This dramatically shortens the time required to decompress the lock container, since the gas volume does not have to be relieved.
  • Claimed is in particular a device for removing incurred in the coal gasification or syngas recovery, hot slags from a located in a pressure vessel, aqueous slag bath in a o- more lock container for the slag, in the direction of gravity below the slag bath, below the slag bath is provided with a device for breaking and / or a device for accumulating the slag, wherein a slag-containing liquid stream is maintained from the slag bath to the sluice container and at least part of the liquid flow is discharged in the upper region of the sluice container, characterized in that •
  • the lock container consists of an upper and a lower cylindrical part, wherein
  • the taper is tapered and has an angle similar to the angle of repose of the slag, ie between 30 ° and 60 ° relative to the horizontal.
  • the lock container consists of two cylindrical moldings having a different diameter, wherein the lower part has a larger diameter than the upper, and the two mold parts are connected by an upwardly tapering truncated cone.
  • a storage vessel is connected to the lock containers via a piping system. The storage vessel is partly filled with water and has a gas volume which is in contact with the liquid above the liquid level.
  • the upper cylindrical part of the lock container has a smaller diameter than the lower cylindrical part.
  • the diameter of the upper cylindrical portion is between 0.15 m and 0.8 times the diameter of the lower cylindrical portion.
  • the taper is conical and has particularly advantageous an angle similar to the angle of repose of the slag at 45 ° relative to the horizontal.
  • the device comprises devices for discharging the liquid flow in the head region of the upper cylindrical part. This allows separation between a slag accumulation area and an area for cooling and separating slag particles and discharging a liquid flow.
  • the usable volume for slag accumulation can thus be increased to over 85%.
  • the device according to the invention for discharging the liquid stream comprises devices for reducing of the pressure.
  • the lock container comprises deflection devices, with which the liquid flow within the lock container is deflected.
  • the lock container comprises a circulation tube with a pump, by means of which a circulation flow is made possible between the lock container and the reaction vessel for coal gasification.
  • the device according to the invention comprises a separate container, which is connected via a pipeline system with the lock container.
  • the separate container or the pipeline leading to the lock container preferably contains shut-off devices, by means of which it can be separated from the lock container.
  • the slag container contains a tube which projects out of the slag container into the sluice container and introduces the slag into the sluice container.
  • the storage vessel serves to store water and to maintain the pressure, so that the lock container no longer has to be constructed with an annulus in which a gas bubble is created to dissolve blockages.
  • the function can be assumed in this embodiment by the gas volume in the storage vessel. This has the advantage that no dead volume in the lock container is claimed by the gas volume. In addition, this has the advantage that the gas volume can be separated from the lock container by the shut-off device between the lock container and the storage vessel. This has the advantage that in the expansion process of the lock container, the gas volume in the storage vessel does not have to be relaxed and thus the relaxation process can be done much faster.
  • the water volume can be used together with the gas volume in the storage vessel, not only at the beginning of the lock process dissolve blockages, but also used to replace the hot water located in the upper area quickly and effectively by colder water at the end of the collection process.
  • Synthesis gas can be produced, for example, by a coal gasification process.
  • the coal gasification reaction takes place in a pressure vessel containing the coal gasification reactor and means for supplying the starting materials and means for carrying out the synthesis gas and the resulting solids.
  • the solids are discharged from the reactor in a common gravity direction, Initially, in the direction of gravity, the gasification reactor initially comprises devices for separating the solids from the synthesis gas, for cooling and carrying out the synthesis gas, and a device for collecting and discharging the hot slag and ash particles. This is typically a slag bath.
  • the slag bath is connected in the direction of gravity with a lock container. The lock container is then followed by devices for cleaning, drying and discharging the slag.
  • a stream of water containing continuous slag is maintained from the slag bath to a sluice container by removing water from the connected sluice container.
  • a stream of water containing continuous slag is maintained from the slag bath to a sluice container by removing water from the connected sluice container.
  • Within the lock container to the downstream flowing slag containing water flow is deflected by suitable deflection completely or partially and then flows into a space which is formed by the lock tank wall and the deflection, preferably upwards.
  • suitable internals preferably pinholes
  • a homogenization of the flow over a part or the entire cross section of the intermediate space Before the water flow is discharged at the upper end of the intermediate space from the lock container, by means of suitable internals, preferably pinholes, a homogenization of the flow over a part or the entire cross section of the intermediate space.
  • the equalization of the flow allows over other methods, a significant reduction of the cross-sectional area and the height of
  • the lock containers can also be present several times.
  • two or more slag containers are provided with a distribution element in the form of a flat bottom, a half-shell ball or a horizontal cylinder connected to the outlet of the carburettor and by means of shut-off devices, pipelines and / or compartments.
  • the fastening elements of the lock container can be designed as a suspension or support both in the cylindrical and in the conical part of the slag collector, with claws or Mantelringauflagern and / or with constant spring elements of steel or concrete.
  • two or more lock containers for slag collection with two or more outlet ports of the carburetor by means of shut-off devices, pipes and / or compensators, are connected, wherein the fastening elements of the lock container as a suspension or support both in the cylindrical and may be performed in the conical part of the slag collector, with claws or Mantelringauflagern and / or with constant spring elements of steel or concrete.
  • the device also includes plant components that are necessary for operating a coal gasification plant and for operating a lock container and the slag disposal facilities. These are exemplified valves, pumps, thermocouples, heaters and optionally also cooling devices.
  • the process for removing the slags from a synthesis gas production process is, in particular, coal gasification processes.
  • the process may also be other processes in which slag is discharged from the process in the direction of gravity and the slag must not se any valves and equipment.
  • FIG. 1 shows an embodiment for the lock container (1) of a coal gasification reactor (2a), which adjoins in the direction of gravity the slag bath (2) of a coal gasification reactor (2a).
  • the lock container (1) is completely filled with water. It consists of an upper cylindrical mold part (1a) and a lower cylindrical mold part (1b). The two cylindrical moldings are interconnected by a frusto-conical shaped part (1c). Above the water bath, a reservoir (5) for liquid with a pressure line (5a) for pressurizing the gas space is provided above the water bath.
  • the lock container (1) is emptied in the direction of gravity via a valve (7).
  • slag (8) can accumulate.
  • a feeder for cooling medium (6a) is installed in the lower part of the lock container (1).
  • an execution line (6b) is installed for low-solids liquid in the upper part of the lock container (1).
  • a device (9) for equalizing the liquid flow is installed in the upper part of the lock container (1).
  • this embodiment includes a reservoir (5) with liquid and a gas space (5b).
  • Locking container a Upper cylindrical part of the lock container b Lower cylindrical part of the lock container c Rejuvenation Slag bath of the coal gasification reactor a Pressure vessel for the coal gasification reaction Execution line for slag from the coal gasification reactor Reservoir for cooling liquid a Supplying the reservoir with a pressure line B Gas space of the reservoir a Supply of cooling medium b Discharge line c Upstream liquid flow in the lock vessel Slag accumulation valve Slag accumulation in the sluice container Device for equalizing the volume flow

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Food Science & Technology (AREA)
  • Gasification And Melting Of Waste (AREA)
  • Industrial Gases (AREA)
  • Devices And Processes Conducted In The Presence Of Fluids And Solid Particles (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
EP09777137A 2008-07-15 2009-07-11 Vorrichtung zur schlackeabführung aus einem kohlevergasungsreaktor Withdrawn EP2300569A2 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102008033095A DE102008033095A1 (de) 2008-07-15 2008-07-15 Vorrichtung zur Schlackeabführung aus einem Kohlevergasungsreaktor
PCT/EP2009/005058 WO2010006746A2 (de) 2008-07-15 2009-07-11 Vorrichtung zur schlackeabführung aus einem kohlevergasungsreaktor

Publications (1)

Publication Number Publication Date
EP2300569A2 true EP2300569A2 (de) 2011-03-30

Family

ID=41396286

Family Applications (1)

Application Number Title Priority Date Filing Date
EP09777137A Withdrawn EP2300569A2 (de) 2008-07-15 2009-07-11 Vorrichtung zur schlackeabführung aus einem kohlevergasungsreaktor

Country Status (15)

Country Link
US (2) US8424785B2 (ru)
EP (1) EP2300569A2 (ru)
KR (1) KR101615605B1 (ru)
CN (1) CN102131900A (ru)
AP (1) AP2011005571A0 (ru)
AU (1) AU2009270461B9 (ru)
BR (1) BRPI0916798A2 (ru)
CA (1) CA2730366C (ru)
CU (1) CU23988B1 (ru)
DE (1) DE102008033095A1 (ru)
RU (1) RU2506304C2 (ru)
TW (1) TWI494422B (ru)
UA (1) UA106474C2 (ru)
WO (1) WO2010006746A2 (ru)
ZA (1) ZA201100341B (ru)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6057287A (en) 1994-01-11 2000-05-02 Dyax Corp. Kallikrein-binding "Kunitz domain" proteins and analogues thereof
EP2298278B1 (en) 2002-06-07 2015-11-11 Dyax Corp. Prevention and reduction of blood loss and inflammatory response
US7153829B2 (en) 2002-06-07 2006-12-26 Dyax Corp. Kallikrein-inhibitor therapies
US7235530B2 (en) 2004-09-27 2007-06-26 Dyax Corporation Kallikrein inhibitors and anti-thrombolytic agents and uses thereof
DE102008035386A1 (de) 2008-07-29 2010-02-11 Uhde Gmbh Schlackeaustrag aus Reaktor zur Synthesegasgewinnung
AU2010203712A1 (en) 2009-01-06 2010-07-15 Dyax Corp. Treatment of mucositis with kallikrein inhibitors
RS62853B1 (sr) 2010-01-06 2022-02-28 Takeda Pharmaceuticals Co Proteini koji vezuju kalikrein plazme
AU2012204202A1 (en) 2011-01-06 2013-07-11 Dyax Corp. Plasma kallikrein binding proteins
WO2015072219A1 (ja) * 2013-11-15 2015-05-21 三菱日立パワーシステムズ株式会社 スラグ排出装置及びスラグ排出方法
JP6096105B2 (ja) * 2013-12-20 2017-03-15 三菱日立パワーシステムズ株式会社 チャー回収システムおよびチャー搬送方法
KR101634596B1 (ko) * 2015-08-25 2016-06-29 두산중공업 주식회사 순환수 라인이 간소화된 석탄가스화기 슬래그의 배출 장치 및 배출 방법
US11286307B2 (en) 2015-12-11 2022-03-29 Takeda Pharmaceutical Company Limited Plasma kallikrein inhibitors and uses thereof for treating hereditary angioedema attack
JP6732908B2 (ja) * 2016-06-13 2020-07-29 三菱日立パワーシステムズ株式会社 スラグ排出システム、これを備えたガス化炉、およびスラグ排出システムの運転方法
DE102018101472A1 (de) 2018-01-23 2019-07-25 Z & J Technologies Gmbh Schieberventil und Verwendung eines Schieberventils
CN117509199A (zh) * 2018-09-29 2024-02-06 日照钢铁控股集团有限公司 一种立式磨煤机排渣装置
CN112029538B (zh) * 2020-08-17 2021-09-24 新奥科技发展有限公司 粉煤与块煤的耦合气化系统及方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0101005A2 (de) * 1982-08-13 1984-02-22 Ruhrchemie Aktiengesellschaft Verfahren und Vorrichtung zum Ausschleusen von Rückständen aschehaltiger Brennstoffe

Family Cites Families (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1259425A (ru) * 1970-09-01 1972-01-05
DE2425962C3 (de) * 1974-05-30 1979-04-05 Shell Internationale Research Maatschappij B.V., Den Haag (Niederlande) Gasgenerator für die Vergasung feinzerteilter Brennstoffe
DE2828562C3 (de) * 1978-06-29 1980-12-11 Ruhrkohle Ag, 4300 Essen Schlackenaustrag
DE2829629C2 (de) * 1978-07-06 1982-07-29 Ruhrchemie Ag, 4200 Oberhausen Verfahren und Vorrichtung zum Ausschleusen von Rückständen aus dem Drucksystem einer Druckvergasungsanlage
DE2851533A1 (de) * 1978-11-29 1980-06-12 Ruhrkohle Ag Kohlevergasungsanlage
BR8105270A (pt) 1980-11-12 1982-08-31 Texaco Development Corp Processo para producao de gas de sintese substancialmente isento de particulas
CH661054A5 (de) * 1981-10-23 1987-06-30 Sulzer Ag Gaskuehler an synthesegasgenerator.
DE3207215A1 (de) * 1982-02-27 1983-09-08 Klöckner-Humboldt-Deutz AG, 5000 Köln Vorrichtung zur kontinuierlichen granulierung von schlacken mittels kuehlfluessigkeit
DE3714915A1 (de) 1987-05-05 1988-11-24 Shell Int Research Verfahren und vorrichtung fuer die herstellung von synthesegas
US5545238A (en) * 1994-12-29 1996-08-13 Texaco Inc. Method of monitoring slag removal during controlled oxidation of a partial oxidation reactor
AT403929B (de) * 1996-07-10 1998-06-25 Voest Alpine Ind Anlagen Verfahren zum erzeugen eines für eine reduktion von metallerz dienenden reduktionsgases und anlage zur durchführung des verfahrens
JPH10287886A (ja) * 1997-04-11 1998-10-27 Babcock Hitachi Kk スラグ排出方法及び該方法を用いる装置
EP1224246B1 (en) * 1999-09-21 2006-11-15 Shell Internationale Researchmaatschappij B.V. Process to remove solid slag particles from a mixture of solid slag particles and water
US6264039B1 (en) * 1999-10-21 2001-07-24 The University Of Akron Method for precious metal recovery from slag
US6612444B2 (en) * 2000-03-10 2003-09-02 General Signal Corporation Apparatus and process for recovering a desired fraction of a raw material
US6755980B1 (en) 2000-09-20 2004-06-29 Shell Oil Company Process to remove solid slag particles from a mixture of solid slag particles and water
AU2028802A (en) * 2000-12-08 2002-06-18 Janusz Franciszek Luterek Process and gas generator for generating fuel gas
RU47886U1 (ru) * 2005-05-18 2005-09-10 Открытое акционерное общество "Всероссийский дважды ордена Трудового Красного Знамени теплотехнический научно-исследовательский институт" (ВТИ) Система внутрицикловой газификации для парогазовых установок на твердом топливе
DE102006040077C5 (de) 2006-08-28 2014-06-05 Siemens Aktiengesellschaft Vorrichtung zum Austrag von Schlacke aus Vergasungsreaktoren
US7896955B2 (en) * 2007-11-12 2011-03-01 General Electric Company Low temperature solids removal system for gasification
DE102008005704A1 (de) * 2008-01-24 2009-07-30 Uhde Gmbh Verfahren und Anlage zur Entfernung insbesondere bei der Synthesegas-Gewinnung anfallenden Schlacken aus einem Schlackebad-Behälter

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0101005A2 (de) * 1982-08-13 1984-02-22 Ruhrchemie Aktiengesellschaft Verfahren und Vorrichtung zum Ausschleusen von Rückständen aschehaltiger Brennstoffe

Also Published As

Publication number Publication date
AP2011005571A0 (en) 2011-02-28
US8757528B2 (en) 2014-06-24
DE102008033095A1 (de) 2010-01-28
US8424785B2 (en) 2013-04-23
AU2009270461B9 (en) 2015-08-13
AU2009270461A1 (en) 2010-01-21
KR20110034002A (ko) 2011-04-04
WO2010006746A3 (de) 2010-05-20
CA2730366C (en) 2016-10-25
US20110284673A1 (en) 2011-11-24
AU2009270461B2 (en) 2015-07-16
UA106474C2 (ru) 2014-09-10
KR101615605B1 (ko) 2016-04-26
TWI494422B (zh) 2015-08-01
TW201022428A (en) 2010-06-16
RU2011105427A (ru) 2012-08-20
CN102131900A (zh) 2011-07-20
CU20110007A7 (es) 2012-06-21
US20130228641A1 (en) 2013-09-05
WO2010006746A2 (de) 2010-01-21
ZA201100341B (en) 2011-10-26
RU2506304C2 (ru) 2014-02-10
CU23988B1 (es) 2014-03-26
BRPI0916798A2 (pt) 2018-02-27
CA2730366A1 (en) 2010-01-21

Similar Documents

Publication Publication Date Title
WO2010006746A2 (de) Vorrichtung zur schlackeabführung aus einem kohlevergasungsreaktor
DE69400918T2 (de) Vorrichtung zur durchführung von physikalischen und/oder chemischen verfahren, zum beispiel ein wärmetauscher
DE102006040077B4 (de) Verfahren und Vorrichtung zum Austrag von Schlacke aus Vergasungsreaktoren
DE102005035921B4 (de) Verfahren zur endothermen Vergasung von Kohlenstoff
DE102007042543A1 (de) Verfahren und Vorrichtung zur Behandlung von beladenem Heißgas
EP0101005B1 (de) Verfahren und Vorrichtung zum Ausschleusen von Rückständen aschehaltiger Brennstoffe
WO2013120721A1 (de) Bodenproduktkühlung bei einer wirbelschichtvergasung
EP1218471B1 (de) Verfahren und vorrichtung zum gewinnen heizwertreicher brenngase
DE102014201890A1 (de) Kühlung und Waschung eines Rohgases aus der Flugstromvergasung
EP0278287B1 (de) Verfahren und Einrichtung zur Behandlung von körnigen Feststoffen in einer Wirbelschicht
DE102007009759A1 (de) Verfahren und Vorrichtung zur Aufteilung eines Feststoffstromes
DE2342079A1 (de) Einrichtung zur vergasung feinverteilter, insbesondere fester brennstoffe
DE102012004590A1 (de) Zentrifugalabscheider
AT396254B (de) Vorrichtung zur beschickung eines einschmelzvergasers mit vergasungssubstraten und eisenschwamm
DE1033187B (de) Wirbelschichtreaktor mit zwei getrennten Reaktionskammern
DE3617802A1 (de) Verfahren zur herstellung von wasserstoff und kohlenmonoxid enthaltenen gasen aus festen brennstoffen
DE2828562A1 (de) Schlackeaustrag
EP2300570B1 (de) Vergasungsvorrichtung und vergasungsverfahren mit kontinuierlichem feststoffaustrag
EP2705121A1 (de) Verfahren und vorrichtung zur erzeugung von synthesegas aus kohlestoffhaltigen edukten durch vergasung im wirbelstromreaktor
AT404255B (de) Verfahren und einrichtung zum rückführen eines aus einem reaktorgefäss mit einem trägergas ausgetragenen feinteiligen feststoffes
WO2002103063A2 (de) Verfahren und vorrichtung zum behandeln von teilchenförmigem material
DE3244742C2 (de) Vorrichtung zum Austragen von Feststoffpartikeln aus einem Behälter, insbesondere einem Wirbelschichtreaktor sowie Verfahren zum Betreiben einer solchen Vorrichtung
DE102015121619A1 (de) Fluidisierungsboden mit einem Rührwerk, Druckbehälter für Schüttgut mit Fluidisierungsboden und Verfahren zur Fluidisierung von Schüttgut
DE102013107592B4 (de) Verfahren zum Vergasen von kohlenstoffhaltigen Feststoffen mit gasförmigen, sauerstoffhaltigen Vergasungsmitteln in einem Wirbelschichtgasprozess in einem Hochtemperatur-Winkler-Vergaser
DD249710B1 (de) Vorrichtung zur schlackeausschleusung bei der kohledruckvergasung

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20110202

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: AL BA RS

DAX Request for extension of the european patent (deleted)
RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: THYSSENKRUPP UHDE GMBH

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: THYSSENKRUPP INDUSTRIAL SOLUTIONS AG

17Q First examination report despatched

Effective date: 20160317

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20180201