EP2261434A1 - Roof rafter and wall stud - Google Patents

Roof rafter and wall stud Download PDF

Info

Publication number
EP2261434A1
EP2261434A1 EP10164657A EP10164657A EP2261434A1 EP 2261434 A1 EP2261434 A1 EP 2261434A1 EP 10164657 A EP10164657 A EP 10164657A EP 10164657 A EP10164657 A EP 10164657A EP 2261434 A1 EP2261434 A1 EP 2261434A1
Authority
EP
European Patent Office
Prior art keywords
timber
roof
struts
rafter
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP10164657A
Other languages
German (de)
French (fr)
Other versions
EP2261434B1 (en
Inventor
Anthony Fillingham
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitek Holdings Inc
Original Assignee
Mitek Holdings Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitek Holdings Inc filed Critical Mitek Holdings Inc
Priority to DK12187680.9T priority Critical patent/DK2546428T3/en
Priority to EP12187680.9A priority patent/EP2546428B1/en
Publication of EP2261434A1 publication Critical patent/EP2261434A1/en
Application granted granted Critical
Publication of EP2261434B1 publication Critical patent/EP2261434B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/12Load-carrying floor structures formed substantially of prefabricated units with wooden beams
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/70Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of wood
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/7407Removable non-load-bearing partitions; Partitions with a free upper edge assembled using frames with infill panels or coverings only; made-up of panels and a support structure incorporating posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/20Roofs consisting of self-supporting slabs, e.g. able to be loaded
    • E04B7/22Roofs consisting of self-supporting slabs, e.g. able to be loaded the slabs having insulating properties, e.g. laminated with layers of insulating material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/12Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members
    • E04C3/18Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members with metal or other reinforcements or tensioning members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/291Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures with apertured web
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/292Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being wood and metal

Definitions

  • the present invention relates to a roof rafter and to a roofing system using such a roof rafter, and to a wall stud and a wall using such a stud.
  • roofs are made by positioning a series of roof rafters at spaced intervals across the roof line of a building, connecting them to a wallplate and tying the heads of the wallplate together with a ceiling joist which in turn supports the ceiling lining.
  • An alternative and more popular approach is the use of trussed rafters which are prefabricated offsite and which sit on and are fixed to the wallplate and braced with diagonal and longitudinal braces to keep the trussed rafters vertical and to distribute the forces back to flanking walls.
  • An outer pitched surface is then sometimes boarded and is covered with weatherproof roofing material such as roofing felt and tiles.
  • Braces are known in the building industry for strengthening timber frames and one example is given in US 3,591,997 in which a sheet metal channel member is arranged to form a diagonal brace connecting several upright members of a frame.
  • Metal web members for pre-manufactured wooden trusses are also known of V, U, W or S shapes. They are shown for example in US 5,996,303 and are used for horizontal roof trusses and floor joists.
  • a roof rafter comprising two parallel elongate timber chords joined together by two metal struts on opposite elongate faces of the timber chords so that the two struts form a cross separating the timber chords, wherein the struts each comprise a first short section, a second longer section connected at an obtuse angle to the first section and a third short section connected to the second section at an obtuse angle and being generally parallel to the first section, and wherein the first and the third section of each strut is fixed to and parallel with the respective timber chord so that the second section of each strut forms a bridge connecting the two timber chords.
  • a bearing is provided on one chord for supporting the weight of the rafter.
  • the bearing may be provided by a timber member plated onto one of the chords.
  • a second bearing may be provided by a timber cross piece joining the two chords of the rafter.
  • One of the chords is preferably longer than the other so as to provide an overhang to a roof constructed with a rafter according to the invention.
  • a roof panel may be formed as a rafter cassette by joining together a plurality of the inventive roof rafters. This makes on-site construction of a roof quicker.
  • the rafters may be boarded on the underside with any suitable material such as OSB (Oriented Strand Board). Insulation is preferably fitted between the rafters and between chords and flanges.
  • a stud for use in timber frame walls comprising two parallel elongate timber posts joined together by at least a pair of metal struts, each strut having three conjoined sections comprising a first short section, a second longer section connected at an obtuse angle to the first section and a third short section connected to the second section at an obtuse angle and being generally parallel to the first section, with the first and third sections of each strut fixed to and parallel with the respective timber post so that the second sections form a bridge between the timber posts, and wherein the two struts are on opposing elongate faces of the timber posts, and each one of the pair is arranged in opposite orientations, such that the second sections of each strut form a cross separated by the depth of the timber posts.
  • each wall stud comprises a plurality of crossed struts at spaced intervals along its length.
  • a wall stud constructed in this manner can be used instead of a traditional timber wall stud or can be preassembled into a wall section or complete wall by joining together several such studs.
  • the struts may be formed with protrusions in a region of each of the first and third sections which can be pushed into a timber surface to positively engage and grip the side of the timber chords.
  • protrusions preferably take the form of integral punched metal fasteners, i.e. nailbeds.
  • the struts could be provided with holes to accommodate nails, screws or rivets for fastening to the timber surfaces.
  • the struts are made of steel, and they may be stamped out of metal sheets. They may be formed by stamping V shaped forms and then breaking the V shape in half at the root of the V to make two symmetrical half struts.
  • the steel plate used can be of relatively thin gauge because the arrangement of the crossed struts form very strong structures.
  • the steel plate may be stamped to form struts of uniform width along their length and then peripheral portions along the edges of the second section may be folded over, e.g. at right angles to the plate, so as to add lateral strength to the strut.
  • Such struts make assembly of wall studs and roof rafters relatively easy and quick and provide increased strength to the studs and rafters. They are versatile since they can be made in a variety of sizes and shapes and can be manufactured to close tolerances. Thus any thickness of rafter and roof panel can be constructed to suit particular applications.
  • Wall studs constructed in this way have a cavity running along their length to accommodate insulation and building services such as electric wires or pipes without affecting the integrity of the structure.
  • Using the invention allows the wall thickness to be increased without using thicker timbers with consequent savings in cost and weight.
  • a wall made in accordance with the invention has a cavity running along the whole height and length, rather than just between stud timbers and hence insulation is easier to install. Also building services such as wires and pipes are easier to fit.
  • struts on opposite sides of the rafter in a crossed arrangement increases the rigidity of the rafter since stiff points on the timber chords are provided at each position where a strut is fastened to the timber chords. It also gives equal bending resistance to both chords and reduces the risk of thermal bridging.
  • Roofs constructed with rafters according to the invention have a cavity running along their length which can accommodate insulation and could also accommodate building services such as electric wires or pipes without the need to drill through trusses or braces which could affect the integrity of the finished roof structure.
  • Figures 1 and 2 illustrate a roof rafter 41 according to one aspect of the invention.
  • Figure 1 shows a perspective view of the whole length of the rafter 41 and
  • Figure 2 shows an enlarged schematic view of part of the rafter 41.
  • the rafter 41 comprises two spaced apart parallel timber chords 9 and 10 connected by metal struts 1a and 1b on opposite sides of the chords 9 and 10.
  • a bearing member 45 is plated onto the lower chord 10 (which is on the left hand side as shown in Figure 1 ) by a series of punched metal plate fasteners.
  • a second bearing is provided at the lower end of the rafter by a timber cross piece 47 joining the two chords 9 and 10.
  • An overhang 49 is provided by making the upper chord 9 longer than the lower chord 10.
  • Figure 2 is a side view of part of the rafter showing more detail of the crossed pairs of struts 1a and 1b connecting the chords 9 and 10.
  • one strut 1a is on the near sides of the chords 9 and 10 and one strut 1b is on the far sides of the chords 9 and 10, as viewed in the figure.
  • each pair of struts forms a cross shape, with the diagonals of the crosses keeping the two chords 9 and 10 apart.
  • the crossed pairs of struts 1a and 1b may be fastened to the chords 9 and 10 at any position but, in one example, they are spaced a distance of about 0.6 metres and each extends a total of 0.3 metres along the length of the rafter.
  • each strut has three sections 2, 3 and 4. End sections 2 and 4 are parallel to each other and make an obtuse angle with the middle section 3.
  • Figure 3 on each of the end sections there is a nail plate or a set of protrusions 5, 6 standing out from the surface of the strut 101 for engagement with the timber chord.
  • the protrusions are each tapered to a relatively sharp point to make it easier to insert them into undrilled timber, for example by means of pressing the end sections against the timber. Such pressing will be done using an industrial press to apply an appropriate pressure to fully embed the protrusions in the timber.
  • the struts 1a, 1b are preferably formed of metal which may be pressed or cast, and are advantageously formed of steel. They may be pressed out of a metal blank as a V shape and then split or cut at the base of the V to form two separate struts. The struts may be pressed with uniform width along their length and then the edges folded over along peripheral parts of the sides of the middle section to increase the lateral strength and rigidity of the strut.
  • Figure 4 shows an alternative embodiment of a strut 1a, 1b in which the end sections 2 and 4 are provided with holes 7 and 8 by which the strut may be fixed to the timber chords 9 and 10 using nails, screws or rivets.
  • FIGS 5 to 13 illustrate steps in the construction of a roof using rafters according to the invention.
  • FIG. 5 illustrates the top floor 21 of a building onto which a roof is to be added.
  • This top floor 21 may be formed using prefabricated floor cassettes constructed of double timber floor joists connected by a frame and boarded over. A hole 19 is provided for a staircase (not shown).
  • This top floor 21 is constructed to be level and square so as to provide a good base to work from for construction of the roof.
  • Floor cassettes make it easier to achieve this since they can be constructed to high tolerances in the factory and can be laser levelled on site. However cassettes are not essential and any traditional top floor surface can be used.
  • Two lower flat-top spandrels 23 and 24 are then erected on opposite long sides of the laser levelled top floor 21 as shown in Figure 6 .
  • Each of these spandrels 23 and 24 are approximately trapezoidal in shape with a frame comprising an upper horizontal chord 61 generally parallel to a lower horizontal chord 62 and joined by two sloping chords 71 and 72 and two vertical stub chords 70.
  • a plurality of internal vertical webs 63 are located in the frame to increase strength and rigidity, but no horizontal chords are used since these are more difficult to press. The chords and webs are all joined together with punched metal plate fasteners.
  • one or more ceiling cassette frames 29 are craned into position as shown in Figure 7 , which illustrates two such ceiling cassette frames 29. These rest on the top chords 61 of the lower spandrels 23 and 24 and are located by means of a locator channel 65 in the top surface of one or each upper chord 61. This channel is formed by a three ply construction of the top chord 61, for example using 97mm inner and outer chords and a 72mm internal chord.
  • ceiling cassettes 29 are then insulated and decked as shown in Figure 8 , so that the roof space above is a cold roof space to avoid unnecessary heating of the loft space in the finished building.
  • the ceiling cassettes may be pre-insulated and decked in the factory before being installed on site.
  • the ceiling 29 has upstanding edge beams 46a, 46b to support the roof rafters as explained later.
  • the edge beams 46a and 46b are fitted with ceiling noggins 58 (see Figure 8 ) which are angle cut so as to meet the roof rafters at an appropriate angle.
  • Two relatively low timber frame walls 22 are then built on the other two opposite short sides of the floor 21 as shown in Figure 9 so as to abut the spandrels 23, 24 at the stub beams 70.
  • Triangular shaped upper, apex, spandrels 30 are then lifted into position on top of the ceiling cassette 29 and aligned with the lower spandrels 23, 24 as shown in Figure 10 .
  • These apex spandrels 30 may also incorporate a locator groove in the underside surface of their horizontal beam to make fitting on site easier and more accurate.
  • an elongate rafter cassette 40 is positioned to bridge the gap between the low wall 22 and the edge beam 46b on the ceiling cassette 29.
  • the rafter cassette 40 comprises three of the double chorded rafters 41 of Figure 1 , but it may comprise more rafters as required. These are joined together at the upper end by a timber connecting piece 42 and boarded on the underside for example with OSB 43.
  • the bearing members 45 which are plated onto the lower timber chords 10, rest on the top of the edge beam 46b of the ceiling cassette 29.
  • the rafter cassette 40 is also supported at its lower end by the bearing surface 47 resting on the low wall 22.
  • the rafter cassette 40 overhangs the low wall 22 as shown at 49 because of the extended upper chord 9, and abuts the side of the sloping beam 71 of the spandrel 23.
  • the rafter cassette 40 may be pre-insulated between the rafters and insulation may also be pressed between the timber chords during manufacture.
  • the cassette 40 may also be felted and counter-battened during manufacture in the factory to make roof construction faster on site. Alternatively the roof may be insulated and subsequently felted and counterbattened on site.
  • a second rafter cassette 50 is positioned adjacent the cassette 40.
  • Each rafter cassette 40, 50 comprises three rafters 41 but cassettes of any suitable number of rafters 41 may be produced.
  • Cassette 50 is constructed with an opening 51 for a dormer window.
  • Dormer windows are then installed in the relevant openings such as 51 and the whole roof is then completed with felting and weatherproof roofing material such as tiles.
  • Figure 14 illustrates a skeleton wall structure 15 comprising five wall studs 12 each comprising two generally parallel posts 9 and 10, fastened together with three pairs of struts 1a and 1b.
  • Three of the struts 1a are on the near sides of the posts 9 and 10 and three of the struts 1b are on the far sides of the posts 9 and 10 as viewed in the figure.
  • Each pair of struts forms a cross shape, with the diagonals of the crosses are separated by the depth of the posts.
  • Such a wall stud 12 may be constructed to be any size but typically would be around 2.35 metres long with a depth of 0.200 metres.
  • the crossed pairs of struts 1a and 1b may be fastened to the posts at any position but in one example they are separated by a distance of about 0.6 metres and each extend a total of 0.3 metres in the direction of the stud.
  • the studs 12 are attached together at their ends with planks 13 and 14 to form the skeleton wall structure 15, which is boarded on one side as shown as 16.

Abstract

A roof rafter (41) comprising two parallel elongate timber chords (9, 10) joined together by two metal struts (1a, 1b) on opposite elongate faces of the timber chords so that the two struts (1a, 1b) form a cross separating the timber chords (9, 10). A first bearing is provided on one chord for supporting the weight of the rafter (41).
A roof panel is constructed using a plurality of such roof rafters and a method of constructing a roof uses the rafters and / or the panels.
A stud for use in timber frame walls comprising two parallel elongate timber posts joined together by at least a pair of struts, each strut having three conjoined sections comprising a first short section, a second longer section connected at an obtuse angle to the first section and a third short section connected to the second section at an obtuse angle and being generally parallel to the first section, with the first and third sections of each strut fixed to and parallel with the respective timber post so that the second sections form a bridge between the timber posts, and wherein the two struts are on opposing elongate faces of the timber posts.

Description

    Introduction
  • The present invention relates to a roof rafter and to a roofing system using such a roof rafter, and to a wall stud and a wall using such a stud.
  • Background
  • Traditionally roofs are made by positioning a series of roof rafters at spaced intervals across the roof line of a building, connecting them to a wallplate and tying the heads of the wallplate together with a ceiling joist which in turn supports the ceiling lining. An alternative and more popular approach is the use of trussed rafters which are prefabricated offsite and which sit on and are fixed to the wallplate and braced with diagonal and longitudinal braces to keep the trussed rafters vertical and to distribute the forces back to flanking walls. An outer pitched surface is then sometimes boarded and is covered with weatherproof roofing material such as roofing felt and tiles.
  • Traditional trussed rafters can be heavy and take up a large amount of space because the webs forming the trusses in the loft area render it unusable for living accommodation. Insulation is usually added piece by piece after the roof is constructed, preferably between the bases of the trusses and under the roofing material and this is time consuming on site.
  • There is an increasing need for lower cost housing in which a larger proportion of a building is useable as living space. There is also an increasing need for better insulated buildings and constructions in which a minimum of non-living space is heated, so as to make heating more economical and to reduce the carbon footprint of new buildings both from an ecological point of view and to meet modern legal standards.
  • There is also an increasing need for more insulation to be incorporated into walls to reduce CO2 emissions and meet ever more stringent building regulations. Thicker insulation requires the walls to be deeper. However deeper walls of conventional construction require thicker stud timbers which increases the cost considerably. In addition thicker timbers are heavier and thus more difficult and expensive to transport and handle and walls made of thicker timbers require stronger support.
  • Braces are known in the building industry for strengthening timber frames and one example is given in US 3,591,997 in which a sheet metal channel member is arranged to form a diagonal brace connecting several upright members of a frame.
  • Metal web members for pre-manufactured wooden trusses are also known of V, U, W or S shapes. They are shown for example in US 5,996,303 and are used for horizontal roof trusses and floor joists.
  • Summary of the Invention
  • According to one aspect of the present invention, there is provided a roof rafter comprising two parallel elongate timber chords joined together by two metal struts on opposite elongate faces of the timber chords so that the two struts form a cross separating the timber chords, wherein the struts each comprise a first short section, a second longer section connected at an obtuse angle to the first section and a third short section connected to the second section at an obtuse angle and being generally parallel to the first section, and wherein the first and the third section of each strut is fixed to and parallel with the respective timber chord so that the second section of each strut forms a bridge connecting the two timber chords.
  • Preferably a bearing is provided on one chord for supporting the weight of the rafter. The bearing may be provided by a timber member plated onto one of the chords. A second bearing may be provided by a timber cross piece joining the two chords of the rafter.
  • One of the chords is preferably longer than the other so as to provide an overhang to a roof constructed with a rafter according to the invention.
  • A roof panel may be formed as a rafter cassette by joining together a plurality of the inventive roof rafters. This makes on-site construction of a roof quicker. The rafters may be boarded on the underside with any suitable material such as OSB (Oriented Strand Board). Insulation is preferably fitted between the rafters and between chords and flanges.
  • According to a second aspect of the invention there is provided a stud for use in timber frame walls comprising two parallel elongate timber posts joined together by at least a pair of metal struts, each strut having three conjoined sections comprising a first short section, a second longer section connected at an obtuse angle to the first section and a third short section connected to the second section at an obtuse angle and being generally parallel to the first section, with the first and third sections of each strut fixed to and parallel with the respective timber post so that the second sections form a bridge between the timber posts, and wherein the two struts are on opposing elongate faces of the timber posts, and each one of the pair is arranged in opposite orientations, such that the second sections of each strut form a cross separated by the depth of the timber posts.
  • In a preferred embodiment each wall stud comprises a plurality of crossed struts at spaced intervals along its length.
  • A wall stud constructed in this manner can be used instead of a traditional timber wall stud or can be preassembled into a wall section or complete wall by joining together several such studs.
  • The struts may be formed with protrusions in a region of each of the first and third sections which can be pushed into a timber surface to positively engage and grip the side of the timber chords. Such protrusions preferably take the form of integral punched metal fasteners, i.e. nailbeds. Alternatively the struts could be provided with holes to accommodate nails, screws or rivets for fastening to the timber surfaces.
  • Preferably the struts are made of steel, and they may be stamped out of metal sheets. They may be formed by stamping V shaped forms and then breaking the V shape in half at the root of the V to make two symmetrical half struts. The steel plate used can be of relatively thin gauge because the arrangement of the crossed struts form very strong structures. The steel plate may be stamped to form struts of uniform width along their length and then peripheral portions along the edges of the second section may be folded over, e.g. at right angles to the plate, so as to add lateral strength to the strut.
  • Such struts make assembly of wall studs and roof rafters relatively easy and quick and provide increased strength to the studs and rafters. They are versatile since they can be made in a variety of sizes and shapes and can be manufactured to close tolerances. Thus any thickness of rafter and roof panel can be constructed to suit particular applications.
  • Wall studs constructed in this way have a cavity running along their length to accommodate insulation and building services such as electric wires or pipes without affecting the integrity of the structure.
  • The thicker the wall the more insulation can be installed, increasing the thermal resistance of the wall and decreasing the U value to meet modern building standards. Using the invention allows the wall thickness to be increased without using thicker timbers with consequent savings in cost and weight.
  • In addition a wall made in accordance with the invention has a cavity running along the whole height and length, rather than just between stud timbers and hence insulation is easier to install. Also building services such as wires and pipes are easier to fit.
  • If studs are required for eccentrically loaded locations it is relatively easy to increase the member size of one of the stud sections whilst maintaining the same strut size.
  • Use of such struts increases the bending stiffness in the plane of a stud or rafter without increasing the volume of the timber used. Economy of timber usage is a significant advantage of the invention.
  • Using struts on opposite sides of the rafter in a crossed arrangement increases the rigidity of the rafter since stiff points on the timber chords are provided at each position where a strut is fastened to the timber chords. It also gives equal bending resistance to both chords and reduces the risk of thermal bridging.
  • Roofs constructed with rafters according to the invention have a cavity running along their length which can accommodate insulation and could also accommodate building services such as electric wires or pipes without the need to drill through trusses or braces which could affect the integrity of the finished roof structure.
  • The deeper the rafter the more insulation can be installed in a roof, increasing the thermal resistance of the roof panel and decreasing the U value to meet modern building standards. Using the invention allows the roof panel depths to be increased without using thicker timbers, with consequent savings in cost and weight.
  • Specific embodiments
  • For a better understanding of the present invention and to show how the same may be carried into effect, reference will now be made, by way of example, to the accompanying drawings, in which:
    • Figure 1 is a perspective view of a rafter according to one aspect of the present invention;
    • Figure 2 is a side view of part of the rafter of Figure 1 showing more detail;
    • Figure 3 is a schematic view of a strut used in the construction of the rafter of Figures 1 and 2;
    • Figure 4 is a schematic view of an alternative embodiment of the strut of Figure 3;
    • Figures 5 to 13 illustrate construction of a roof using rafters according to the first aspect of the invention;
    • Figure 14 is a perspective view of a wall section constructed of studs according to the second aspect of the invention.
    Detailed description of drawings
  • Figures 1 and 2 illustrate a roof rafter 41 according to one aspect of the invention. Figure 1 shows a perspective view of the whole length of the rafter 41 and Figure 2 shows an enlarged schematic view of part of the rafter 41. The rafter 41 comprises two spaced apart parallel timber chords 9 and 10 connected by metal struts 1a and 1b on opposite sides of the chords 9 and 10.
  • Towards the upper end of the rafter 41 a bearing member 45 is plated onto the lower chord 10 (which is on the left hand side as shown in Figure 1) by a series of punched metal plate fasteners. A second bearing is provided at the lower end of the rafter by a timber cross piece 47 joining the two chords 9 and 10. An overhang 49 is provided by making the upper chord 9 longer than the lower chord 10.
  • Figure 2 is a side view of part of the rafter showing more detail of the crossed pairs of struts 1a and 1b connecting the chords 9 and 10. In each pair, one strut 1a is on the near sides of the chords 9 and 10 and one strut 1b is on the far sides of the chords 9 and 10, as viewed in the figure. It can be seen that each pair of struts forms a cross shape, with the diagonals of the crosses keeping the two chords 9 and 10 apart. The crossed pairs of struts 1a and 1b may be fastened to the chords 9 and 10 at any position but, in one example, they are spaced a distance of about 0.6 metres and each extends a total of 0.3 metres along the length of the rafter.
  • The design of the struts 1a and 1b is shown in Figures 3 and 4. Each strut has three sections 2, 3 and 4. End sections 2 and 4 are parallel to each other and make an obtuse angle with the middle section 3. In Figure 3 on each of the end sections there is a nail plate or a set of protrusions 5, 6 standing out from the surface of the strut 101 for engagement with the timber chord. Preferably the protrusions are each tapered to a relatively sharp point to make it easier to insert them into undrilled timber, for example by means of pressing the end sections against the timber. Such pressing will be done using an industrial press to apply an appropriate pressure to fully embed the protrusions in the timber. The struts 1a, 1b are preferably formed of metal which may be pressed or cast, and are advantageously formed of steel. They may be pressed out of a metal blank as a V shape and then split or cut at the base of the V to form two separate struts. The struts may be pressed with uniform width along their length and then the edges folded over along peripheral parts of the sides of the middle section to increase the lateral strength and rigidity of the strut.
  • Figure 4 shows an alternative embodiment of a strut 1a, 1b in which the end sections 2 and 4 are provided with holes 7 and 8 by which the strut may be fixed to the timber chords 9 and 10 using nails, screws or rivets.
  • Figures 5 to 13 illustrate steps in the construction of a roof using rafters according to the invention.
  • Figure 5 illustrates the top floor 21 of a building onto which a roof is to be added. This top floor 21 may be formed using prefabricated floor cassettes constructed of double timber floor joists connected by a frame and boarded over. A hole 19 is provided for a staircase (not shown). This top floor 21 is constructed to be level and square so as to provide a good base to work from for construction of the roof. Floor cassettes make it easier to achieve this since they can be constructed to high tolerances in the factory and can be laser levelled on site. However cassettes are not essential and any traditional top floor surface can be used.
  • Two lower flat- top spandrels 23 and 24 are then erected on opposite long sides of the laser levelled top floor 21 as shown in Figure 6. Each of these spandrels 23 and 24 are approximately trapezoidal in shape with a frame comprising an upper horizontal chord 61 generally parallel to a lower horizontal chord 62 and joined by two sloping chords 71 and 72 and two vertical stub chords 70. A plurality of internal vertical webs 63 are located in the frame to increase strength and rigidity, but no horizontal chords are used since these are more difficult to press. The chords and webs are all joined together with punched metal plate fasteners.
  • Subsequently one or more ceiling cassette frames 29 are craned into position as shown in Figure 7, which illustrates two such ceiling cassette frames 29. These rest on the top chords 61 of the lower spandrels 23 and 24 and are located by means of a locator channel 65 in the top surface of one or each upper chord 61. This channel is formed by a three ply construction of the top chord 61, for example using 97mm inner and outer chords and a 72mm internal chord.
  • These ceiling cassettes 29 are then insulated and decked as shown in Figure 8, so that the roof space above is a cold roof space to avoid unnecessary heating of the loft space in the finished building. The ceiling cassettes may be pre-insulated and decked in the factory before being installed on site.
  • As shown in the figures the ceiling 29 has upstanding edge beams 46a, 46b to support the roof rafters as explained later. The edge beams 46a and 46b are fitted with ceiling noggins 58 (see Figure 8) which are angle cut so as to meet the roof rafters at an appropriate angle.
  • Two relatively low timber frame walls 22 are then built on the other two opposite short sides of the floor 21 as shown in Figure 9 so as to abut the spandrels 23, 24 at the stub beams 70.
  • Triangular shaped upper, apex, spandrels 30 are then lifted into position on top of the ceiling cassette 29 and aligned with the lower spandrels 23, 24 as shown in Figure 10. These apex spandrels 30 may also incorporate a locator groove in the underside surface of their horizontal beam to make fitting on site easier and more accurate.
  • As shown in Figure 11 an elongate rafter cassette 40 is positioned to bridge the gap between the low wall 22 and the edge beam 46b on the ceiling cassette 29. In this example the rafter cassette 40 comprises three of the double chorded rafters 41 of Figure 1, but it may comprise more rafters as required. These are joined together at the upper end by a timber connecting piece 42 and boarded on the underside for example with OSB 43.
  • The bearing members 45, which are plated onto the lower timber chords 10, rest on the top of the edge beam 46b of the ceiling cassette 29. The rafter cassette 40 is also supported at its lower end by the bearing surface 47 resting on the low wall 22. The rafter cassette 40 overhangs the low wall 22 as shown at 49 because of the extended upper chord 9, and abuts the side of the sloping beam 71 of the spandrel 23. The rafter cassette 40 may be pre-insulated between the rafters and insulation may also be pressed between the timber chords during manufacture. The cassette 40 may also be felted and counter-battened during manufacture in the factory to make roof construction faster on site. Alternatively the roof may be insulated and subsequently felted and counterbattened on site.
  • In Figure 12 a second rafter cassette 50 is positioned adjacent the cassette 40. Each rafter cassette 40, 50 comprises three rafters 41 but cassettes of any suitable number of rafters 41 may be produced. Cassette 50 is constructed with an opening 51 for a dormer window.
  • In Figures 11 and 12 the apex spandrels 30 are omitted so as to show more detail of the other features.
  • After all of the rafter cassettes 40, 50 have been positioned on one side of the roof to fill the gap between the spandrels 23 and 24 then rafter cassettes are assembled on the other side of the roof from gable to gable as shown in Figure 13.
  • Dormer windows are then installed in the relevant openings such as 51 and the whole roof is then completed with felting and weatherproof roofing material such as tiles.
  • Figure 14 illustrates a skeleton wall structure 15 comprising five wall studs 12 each comprising two generally parallel posts 9 and 10, fastened together with three pairs of struts 1a and 1b. Three of the struts 1a are on the near sides of the posts 9 and 10 and three of the struts 1b are on the far sides of the posts 9 and 10 as viewed in the figure. Each pair of struts forms a cross shape, with the diagonals of the crosses are separated by the depth of the posts. Such a wall stud 12 may be constructed to be any size but typically would be around 2.35 metres long with a depth of 0.200 metres. The crossed pairs of struts 1a and 1b may be fastened to the posts at any position but in one example they are separated by a distance of about 0.6 metres and each extend a total of 0.3 metres in the direction of the stud.
  • The studs 12 are attached together at their ends with planks 13 and 14 to form the skeleton wall structure 15, which is boarded on one side as shown as 16.

Claims (17)

  1. A roof rafter (41) comprising two parallel elongate timber chords (9, 10) joined together by two metal struts (1a, 1b) on opposite elongate faces of the timber chords so that the two struts (1a, 1b) form a cross separating the timber chords (9, 10), wherein the struts (1a, 1b) each comprise a first short section (2), a second longer section (3) connected at an obtuse angle to the first section (2) and a third short section (4) connected to the second section (3) at an obtuse angle and being generally parallel to the first section (2), and wherein the first (2) and the third section (4) of each strut (1a, 1b) is fixed to and parallel with the respective timber chord (9, 10) so that the second section (3) of each strut (1a, 1b) forms a bridge connecting the two timber chords (9, 10).
  2. A roof rafter (41) according to claim 1 wherein a first bearing is provided on one chord for supporting the weight of the rafter (41).
  3. A roof rafter (41) according claim 2 wherein the first bearing is provided by a timber member plated onto one chord (10).
  4. A roof rafter (41) according to claim 2 or 3 comprising a second bearing provided on the one chord (10) for supporting the weight of the rafter (40).
  5. A roof rafter (41) according to claim 4 wherein the second bearing is provided by a timber cross piece joining the two chords (9, 10) of the rafter (41).
  6. A roof rafter (41) according to any one of the preceding claims wherein one of the chords (9) is longer than the other chord (10) so as to provide an overhang (49) for a roof constructed with the rafter(41).
  7. A roof panel (40) comprising a plurality of roof rafters (41) according to any one of the preceding claims.
  8. A roof panel (40) according to claim 7 comprising boarding on one side.
  9. A roof panel (40) according to claim 7 or 8 comprising insulation fitted between the rafters (41) and between the chords (9, 10).
  10. A method of constructing a roof on top of a building comprising: fixing two lower spandrels, one on each of two opposite sides of the top of a building, the lower spandrels each having two parallel sides and two sloping sides; fixing at least one panel to the upper of the parallel sides of the spandrels to form a platform; fitting upper spandrels above the respective lower spandrels on the platform; and fitting roof rafters according to any one of claims 1 to 6, or roof panels according to claims 7 to 9, between the sloping sides of the spandrels to bridge the gap between the top floor of the building and the platform to form a roof.
  11. A stud for use in timber frame walls comprising two parallel elongate timber posts joined together by at least a pair of metal struts, each strut having three conjoined sections comprising a first short section, a second longer section connected at an obtuse angle to the first section and a third short section connected to the second section at an obtuse angle and being generally parallel to the first section, with the first and third sections of each strut fixed to and parallel with the respective timber post so that the second sections form a bridge between the timber posts, and wherein the two struts are on opposing elongate faces of the timber posts, and each one of the pair is arranged in opposite orientations, such that the second sections of each strut form a cross separated by the depth of the timber posts.
  12. A roof rafter (41) according to any one of claims 1 to 6, or a roof panel according to claim 7, 8 or 9, or a stud according to claim 11, wherein the struts (1a, 1b) are formed with protrusions in the form of integral punched metal fasteners in a region of each of the first and third sections which protrusions are adapted to be pushed into a timber surface to positively engage and grip the timber.
  13. A roof rafter (41) according to any one of claims 1 to 6, or a roof panel according to claim 7, 8 or 9, or a stud according to claim 11, wherein the struts (1a, 1b) are provided with holes to accommodate nails or screws or rivets for fastening to the timber surfaces.
  14. A roof rafter (41) according to any one of claims 1 to 6, or a roof panel according to claim 7, 8 or 9, or a stud according to claim 11, wherein the struts are formed by stamping V shaped forms from steel sheets and then breaking the V shape in half at the root of the V to make two symmetrical half struts.
  15. A roof rafter (41) according to any one of claims 1 to 6, or a roof panel according to claim 7, 8 or 9, or a stud according to claim 11, wherein the struts are formed by stamping to form struts of uniform width along their length and then peripheral portions along the edges of the second section are folded over, generally at right angles to the plate.
  16. A roof rafter (41) according to any one of claims 1 to 6, or a stud according to claim 11, comprising a plurality of crossed struts (1a, 1b) at spaced intervals along its length.
  17. A wall section formed by joining together a plurality of studs according to claims 11 or 16.
EP20100164657 2009-06-01 2010-06-01 Roof rafter Active EP2261434B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DK12187680.9T DK2546428T3 (en) 2009-06-01 2010-06-01 wall stud
EP12187680.9A EP2546428B1 (en) 2009-06-01 2010-06-01 Wall stud

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB0909349A GB2470721A (en) 2009-06-01 2009-06-01 A stud for use in timber frame walls
GB0919897A GB2470796A (en) 2009-06-01 2009-11-13 Roof rafter comprising two timber chords joined by metal struts

Publications (2)

Publication Number Publication Date
EP2261434A1 true EP2261434A1 (en) 2010-12-15
EP2261434B1 EP2261434B1 (en) 2012-10-10

Family

ID=40902363

Family Applications (2)

Application Number Title Priority Date Filing Date
EP20100164657 Active EP2261434B1 (en) 2009-06-01 2010-06-01 Roof rafter
EP12187680.9A Active EP2546428B1 (en) 2009-06-01 2010-06-01 Wall stud

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP12187680.9A Active EP2546428B1 (en) 2009-06-01 2010-06-01 Wall stud

Country Status (3)

Country Link
EP (2) EP2261434B1 (en)
DK (2) DK2261434T3 (en)
GB (2) GB2470721A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2973051A1 (en) * 2011-03-23 2012-09-28 Herve Hourman Double hollow bar for use in wall for construction of wooden building, has set of bars located opposite to one another and spaced from each other, and flat attaching units i.e. metal sections, for attaching set of bars
EP2546428A1 (en) 2009-06-01 2013-01-16 MiTek Holdings, Inc. Wall stud

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1405889A (en) * 1921-02-17 1922-02-07 Barling Walter Henry Spar
US3025577A (en) * 1959-03-09 1962-03-20 Automated Building Components Structural element
US3591997A (en) 1969-06-19 1971-07-13 James D Tennison Jr Antiracking support brace for a building wall
GB2041060A (en) * 1978-12-21 1980-09-03 Redland Technology Ltd Rafters; roof structures
US4435929A (en) * 1982-08-23 1984-03-13 Bussell Hugh M Modified A-frame structure
US5996303A (en) 1999-02-18 1999-12-07 Mitek Holdings, Inc. Truss with alternating metal web
EP1609920A1 (en) * 2004-06-21 2005-12-28 MiTek Holdings, Inc Structural wall framework
WO2006096997A1 (en) * 2005-03-18 2006-09-21 3088-7418 Quebec Inc. Modular building structure

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3103262A (en) * 1958-11-14 1963-09-10 Mc Graw Edison Co Box beam
CA1069272A (en) * 1977-11-16 1980-01-08 Fred Haas Wood and metal building component adapted for prefabricated manufacture
US4475328A (en) * 1979-08-06 1984-10-09 Moehlenpah Industries, Inc. Web member
GB2121848B (en) * 1982-06-09 1986-01-22 Hydro Air International Wall studs and connectors therefor
JPH1199354A (en) 1997-09-27 1999-04-13 Tdk Corp Rotary type coating method and coating applicator
GB2470721A (en) 2009-06-01 2010-12-08 Mitek Holdings Inc A stud for use in timber frame walls

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1405889A (en) * 1921-02-17 1922-02-07 Barling Walter Henry Spar
US3025577A (en) * 1959-03-09 1962-03-20 Automated Building Components Structural element
US3591997A (en) 1969-06-19 1971-07-13 James D Tennison Jr Antiracking support brace for a building wall
GB2041060A (en) * 1978-12-21 1980-09-03 Redland Technology Ltd Rafters; roof structures
US4435929A (en) * 1982-08-23 1984-03-13 Bussell Hugh M Modified A-frame structure
US5996303A (en) 1999-02-18 1999-12-07 Mitek Holdings, Inc. Truss with alternating metal web
EP1609920A1 (en) * 2004-06-21 2005-12-28 MiTek Holdings, Inc Structural wall framework
WO2006096997A1 (en) * 2005-03-18 2006-09-21 3088-7418 Quebec Inc. Modular building structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2546428A1 (en) 2009-06-01 2013-01-16 MiTek Holdings, Inc. Wall stud
FR2973051A1 (en) * 2011-03-23 2012-09-28 Herve Hourman Double hollow bar for use in wall for construction of wooden building, has set of bars located opposite to one another and spaced from each other, and flat attaching units i.e. metal sections, for attaching set of bars

Also Published As

Publication number Publication date
DK2546428T3 (en) 2014-03-10
GB0919897D0 (en) 2009-12-30
EP2546428A1 (en) 2013-01-16
EP2261434B1 (en) 2012-10-10
GB2470721A (en) 2010-12-08
GB0909349D0 (en) 2009-07-15
DK2261434T3 (en) 2012-11-05
GB2470796A (en) 2010-12-08
EP2546428B1 (en) 2013-12-25

Similar Documents

Publication Publication Date Title
CN1231647C (en) Cellular-core structural panel and building structure incorporating same
US20080000177A1 (en) Composite floor and composite steel stud wall construction systems
US6510666B1 (en) Sheathing tie down
US20150267407A1 (en) Truss
WO2017048262A1 (en) Shear transfer system
EP2325410B1 (en) Roofing system
US5205098A (en) Long-span decking panel
US4464873A (en) Wall panel system
JP6687681B2 (en) Wooden unit type building structure and its construction method
EP2261434B1 (en) Roof rafter
CN111094673B (en) Building and building construction method thereof
WO2008007325A2 (en) Building method
JP6640162B2 (en) Roof construction method, rafter panel, roof structure and house
GB2480994A (en) Timber I-beams and panels in attic roof structures
US4073103A (en) Building structure and method of construction
US20020116892A1 (en) Elongated structural member
CA1069272A (en) Wood and metal building component adapted for prefabricated manufacture
JP3876507B2 (en) Hut structure and its construction method
US10385583B2 (en) Shear transfer system
EP2770131B1 (en) An Improved Roofing Arrangement
GB2340531A (en) Method of manufacturing pre-fabricated building construction elements
JP6931904B2 (en) Wooden building combined with roof truss unit and its construction method
GB2469032A (en) Floor and ceiling structures
JP6632946B2 (en) Diagonal support structure
Poutanen et al. Glued timber trusses

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME RS

17P Request for examination filed

Effective date: 20110615

17Q First examination report despatched

Effective date: 20110831

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 579058

Country of ref document: AT

Kind code of ref document: T

Effective date: 20121015

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602010003121

Country of ref document: DE

Effective date: 20121206

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: SK

Ref legal event code: T3

Ref document number: E 12903

Country of ref document: SK

REG Reference to a national code

Ref country code: NL

Ref legal event code: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20121010

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 579058

Country of ref document: AT

Kind code of ref document: T

Effective date: 20121010

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130121

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130210

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130211

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130111

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20130110

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

26N No opposition filed

Effective date: 20130711

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602010003121

Country of ref document: DE

Effective date: 20130711

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602010003121

Country of ref document: DE

Representative=s name: DR. RALF KOTITSCHKE, DE

Ref country code: DE

Ref legal event code: R082

Ref document number: 602010003121

Country of ref document: DE

Representative=s name: KOTITSCHKE & HEURUNG PARTNERSCHAFT MBB PATENT-, DE

Ref country code: DE

Ref legal event code: R082

Ref document number: 602010003121

Country of ref document: DE

Representative=s name: KOTITSCHKE & HEURUNG PARTNERSCHAFT MBB, DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140630

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20100601

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130601

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121010

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20230628

Year of fee payment: 14

Ref country code: NL

Payment date: 20230626

Year of fee payment: 14

Ref country code: IE

Payment date: 20230627

Year of fee payment: 14

Ref country code: FR

Payment date: 20230626

Year of fee payment: 14

Ref country code: DK

Payment date: 20230628

Year of fee payment: 14

Ref country code: DE

Payment date: 20230626

Year of fee payment: 14

Ref country code: CZ

Payment date: 20230523

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SK

Payment date: 20230518

Year of fee payment: 14

Ref country code: SE

Payment date: 20230627

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20230627

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230627

Year of fee payment: 14