EP2199214B1 - Method and device for drawing a tubular film or a film cover over a stack - Google Patents

Method and device for drawing a tubular film or a film cover over a stack Download PDF

Info

Publication number
EP2199214B1
EP2199214B1 EP08022156A EP08022156A EP2199214B1 EP 2199214 B1 EP2199214 B1 EP 2199214B1 EP 08022156 A EP08022156 A EP 08022156A EP 08022156 A EP08022156 A EP 08022156A EP 2199214 B1 EP2199214 B1 EP 2199214B1
Authority
EP
European Patent Office
Prior art keywords
gathering
over
tubular film
hose foil
foil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP08022156A
Other languages
German (de)
French (fr)
Other versions
EP2199214A1 (en
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MSK Verpackungs Systeme GmbH
Original Assignee
MSK Verpackungs Systeme GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to ES11171765T priority Critical patent/ES2389623T3/en
Application filed by MSK Verpackungs Systeme GmbH filed Critical MSK Verpackungs Systeme GmbH
Priority to ES08022156T priority patent/ES2375174T3/en
Priority to DK08022156.7T priority patent/DK2199214T3/en
Priority to DE202008017442U priority patent/DE202008017442U1/en
Priority to DK11171765.8T priority patent/DK2371716T3/en
Priority to EP11171765A priority patent/EP2371716B1/en
Priority to EP08022156A priority patent/EP2199214B1/en
Priority to PCT/EP2009/008915 priority patent/WO2010078915A1/en
Priority to CN200980155559.9A priority patent/CN102300775B/en
Priority to US13/139,298 priority patent/US8875480B2/en
Priority to RU2011129820/13A priority patent/RU2478066C1/en
Priority to UAA201109019A priority patent/UA101244C2/en
Priority to BRPI0923173A priority patent/BRPI0923173A2/en
Priority to MX2012010709A priority patent/MX341026B/en
Priority to MX2011006383A priority patent/MX339958B/en
Publication of EP2199214A1 publication Critical patent/EP2199214A1/en
Application granted granted Critical
Publication of EP2199214B1 publication Critical patent/EP2199214B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B9/00Enclosing successive articles, or quantities of material, e.g. liquids or semiliquids, in flat, folded, or tubular webs of flexible sheet material; Subdividing filled flexible tubes to form packages
    • B65B9/10Enclosing successive articles, or quantities of material, in preformed tubular webs, or in webs formed into tubes around filling nozzles, e.g. extruded tubular webs
    • B65B9/13Enclosing successive articles, or quantities of material, in preformed tubular webs, or in webs formed into tubes around filling nozzles, e.g. extruded tubular webs the preformed tubular webs being supplied in a flattened state
    • B65B9/135Enclosing successive articles, or quantities of material, in preformed tubular webs, or in webs formed into tubes around filling nozzles, e.g. extruded tubular webs the preformed tubular webs being supplied in a flattened state for palletised loads

Definitions

  • the invention relates to a method for coating a tubular film or a film hood over a stack of goods, wherein the tubular film is first ruffled on a gathering device, wherein the retrieved tubular film is subsequently pulled over the stack with a coating device by moving the coating device along the stack of goods is and the tubular film is thereby removed from the pulling-off direction.
  • the invention further relates to a device for coating a tubular film or a film hood over a stack of goods.
  • Good stack means in particular a plurality of packages, packages, sacks or the like units that are suitably stacked to a cuboid stack. It is within the scope of the invention that the stack is received on a pallet.
  • This stack is covered with a tubular film or with a film hood to give the stack on the one hand a higher stability and on the other hand to protect the stack from weather> rivers.
  • the stack may in principle also be a few stacked units or even a single larger unit, for example from the white goods sector (washing machines, refrigerators, dishwashers and the like).
  • the stack does not necessarily have to have a cuboid shape, but in principle can also have other shapes.
  • the tubular film or film hood to be covered adjusts as it were to the shape of the stack of goods.
  • the invention the technical problem of providing a method of the type described above, with which the charge stability can be increased in particular in the lower part of the stack in a simple, inexpensive and reliable manner.
  • the invention is furthermore based on the technical problem of specifying a corresponding device for carrying out the method.
  • the invention teaches a method for coating a tubular film or a film hood over a stack of goods, wherein the tubular film is first picked up on a gathering device, wherein the gathering device is used with at least two roller arrangements, each having at least one gathering roller and at least two counter-rollers, wherein the rapiers are brought into contact with the outside of the tubular film during ramming of the tubular film and only one of the two counter-rollers of each roller assembly with the inside of the tubular film in contact is brought wherein the retrieved tubular film is subsequently drawn over the stack of goods with a coating device by moving the coating device along the stack of goods and thereby removing the tubular film from the coating device, wherein during the removal of the tubular film in the course of the application of a first and a second tubular film section, the gathering rollers of the roller arrangements are in contact with the outside of the tubular film and both counter rollers of each roller assembly are in contact with the inside of the tubular film, wherein, after reaching an end
  • the stack is received on a pallet.
  • the end region of the product stack means the pallet or the region of the pallet and / or the lower region of the product stack arranged directly on the pallet. If the stack of goods is not received on a pallet, the end region of the stack of goods means, in particular, the lower region of the stack of goods.
  • the tubular film already resting against the stack of goods is connected to the subsequently applied first tubular film section and that this first tubular section of the hose is in turn connected to the second tubular film section to be subsequently applied.
  • the tubular film for applying the first tubular film section is turned upwards and then turned down to apply the second tubular film section. It is understood that the end of the tubular film is abolished at the end of the coating process and in particular after the application of the second tubular film section and applied to the stack of goods or to the pallet.
  • the first section of tubular film be applied along the stacking section A and along the pallet or along at least a portion of the pallet's height.
  • the second tubular film section is applied along at least part of the good stacking section A and along the pallet or along at least part of the height of the pallet.
  • the Abraffen the tubular film is substantially parallel to the movement of the overdrawing in over pulling direction or against the coating direction when coating the tubular film over the stack or when creating the tubular film sections.
  • a continuous Abraffen the tubular film from the overdrawing device During the movement of the coating device against the coating direction during application of the first tubular film section and during the movement of the coating device in the coating direction when applying the second tubular film section takes place a continuous Abraffen the tubular film from the overdrawing device.
  • the Abraff Norway or the rotational speed of the driven Raffrollen are variably adjustable.
  • the tubular film or the film hood expediently consists of an elastic plastic film. As far as here and below of a film hood is mentioned, this means the already separated at one end and welded tubular film.
  • the tubular film is supplied from a tubular film supply in the context of the inventive method. Empfohleneworthy the side edges of the tubular film in the stored state folded inwards One speaks then of a gusseted hose. It is within the scope of the invention that the supplied tubular film is opened above or in front of the stack. Appropriately, shirring elements of the shirring device are then retracted into the tube film end of the opened tubular film, so that the inside of the hose film end rests against the shirring elements. Each gathering element preferably has a gathering bar, which extends in a recommended manner transversely to the feed direction of the tubular film or transversely to the vertical direction.
  • the gathering elements are arranged with their Raffbügeln at the four corners of a rectangular cross-sectionally open tubular film.
  • the Raffbügel also called Raffecken.
  • the gathering elements or tiebacks transverse to the feed direction of the tubular film, in particular in horizontal Direction are movable and that are preferably moved independently.
  • the gathering elements or gathering bars can be moved in the feed direction of the tubular film, in particular in the vertical direction.
  • the shirring or Raffbügel are recommended to be connected to a tenter, which is movable in the feed direction of the tubular film, in particular in the vertical direction.
  • a gathering device with at least two roller arrangements, each having at least one gathering roller and at least two counter-rollers is used and according to the invention, the gathering rollers are brought into contact with the outside of the tubular film when the tubular film is pulled open, and only one of the two counter-rollers of each roller arrangement is connected to the inside of the tubular film Brought in contact.
  • each Raffelement or each Raffbügel is associated with such a roller assembly.
  • the counter-roll standing in contact with the inner side of the tubular film during ratcheting is preferably arranged in each case in the feed direction of the tubular film behind or under the associated Raffbügel, in particular arranged in the vertical direction below the associated Raffbügels.
  • each gathering roll and the counter-roll assigned to it receive the tubular film between them in a clamping manner.
  • the gathering rollers are driven when the tubular film is pulled up, and to this end each drive roller is preferably associated with a drive motor.
  • the counter-rollers are not driven and function as other pressure rollers with respect to the associated Roman rollers.
  • each roller assembly has a further counter-roller, which expediently not in Contact with the inside of the tubular film is.
  • the further counter-roller can be folded down, for example, from the assigned Roman roller.
  • the roller assemblies are oriented during Aufraffen so that the axis of rotation of standing in contact with the tubular film counter-roller in the feed direction of the tubular film is arranged behind or in the vertical direction below the axis of rotation of the gathering roller.
  • an intended for the formation of the film hood Schlauchfollenabêt is deducted from the tube film supply and is gathered before or above the stack.
  • two shirring or Raffbügel, preferably four shirring or Raffbügel be introduced into the open Schlauchfollenende.
  • Empfohlene valued each shirring element or shirring is associated with a roller assembly through which the tubular film is guided during the Aufraffen and is gathered in the feed direction behind the roller assembly. When shirring the tubular film is gathered on the shirring elements in a known manner bellows-like or accordion-like.
  • the device for carrying out the method according to the invention has a separating device and a welding device with which the tubular film is separated and welded after shirring at the upper end of the film hood to be formed to form the film hood.
  • the tubular film is transversely stretched after ratcheting.
  • the cross stretches take place with the gathering device.
  • the shirring elements are also used as Querstretchiata with which the tubular film or the film hood is transversely traversed after shirring and expediently before coating over the stack. It is recommended that the gathering elements move apart with their tiebacks transversely to the feeding direction of the tubular films.
  • the transverse stretching is carried out with the proviso that the cross-section or horizontal cross-section of the cross-stretched tubular film is greater than the cross-section or horizontal cross-section of the product stack. After shirring and after the transverse stretch, the tubular film is pulled over the stack with the puller.
  • the shirring is recognized as Kochzieh Rhein.
  • the tubular film is removed from the shirring or Kochzieheiridchtung and is doing on the shirring or Raffbügel, led before it comes to rest on the stack.
  • four shirring elements or four shirring loops are involved, which are preferably arranged at the four corners of the rectangular tubular film in cross-section.
  • the shirring elements or shirring bars can be moved in the direction of coating the foil hood or in the vertical direction.
  • the shirring elements are expediently connected to a tenter, which can be moved in the over direction of the foil hood or in the vertical direction.
  • the Abraffen the tubular film is supported when coating over the stack of the role arrangements. It is also within the scope of the invention that the roller assemblies are also connected to the clamping frame and are movable with the clamping frame in the coating direction of the film hood or in the vertical direction. In accordance with the invention, when the tubular film is pulled off during the application of the first and second tubular film sections, the gathering rollers of the roller assemblies are in contact with the outside of the tubular film and both counter rollers of each roller assembly are in contact with the inside of the tubular film.
  • a particularly preferred embodiment of the invention is characterized in that during the entire Abraffvorgang the tubular film when coated over the stack, the Raffrollen the roller assemblies are in contact with the outside of the tubular film and both counter rollers of each roller assembly with the inside of the tubular film in contact.
  • the gathering rollers are driven in Abraffen the tubular film in Abraffraum.
  • the rotational speed or peripheral speed of the creasing rollers is slower or slightly slower than the speed of the overtravel / downward movement of the shirring / overdrawing device. In this way, a vertical stretch can be generated in the tubular film.
  • the tubular film is held in the course of coating over the stack of goods before clamping it to the stack of material between the gathering roller and the two counter-rollers of each roller assembly when raping the tubular film.
  • the rotation axis of the first counter-roller is arranged in Abraffides behind the axis of rotation of Raffrollen or arranged in the vertical direction above the axis of rotation of the gathering roller when raping.
  • the axis of rotation of the second counter-roller is arranged in Abraffides in front of the axis of rotation of the Rafrolle or arranged in the vertical direction below the axis of rotation of the Rafrolle.
  • this preferred geometric arrangement is realized in all roller assemblies when raping the tubular film. This also applies in particular to the removal of the tubular film during the application of the first and second tubular film sections. If the end region of the product stack is reached during the removal, coating and application of the tubular film to the product stack, the tubular film is turned upwards to produce the first tubular film segment.
  • the end region of the stack of goods means, in particular, a pallet on which the stack of goods is arranged and, above all, the pallet intermediate bottom or pallet bottom of the pallet on which the stack of goods is arranged. In principle, however, the end region of the product stack can also be the lower region or the lower edge of the product stack.
  • the gathering elements of the coating device are moved away from the stack in the horizontal direction so that the distance of the tubular film guided over the gathering elements increases from the stack.
  • the aforementioned transverse movement of a shirring element before the tubular film is turned over is preferably carried out over 50 to 150 mm, preferably over 80 to 120 mm and particularly preferably over about 100 mm.
  • the coating device is moved along a stack of goods counter to the coating direction or upwards, so that the first tube film section is removed and placed along the said product stack section on the tubular film already resting on the product stack.
  • the height H of the first tubular film section is preferably at least 1/20, preferably at least 1/15, more preferably at least 1/10 and more preferably at least 1/8 of the height of the stack of goods or the height of the stack of goods with pallet. Empfohlene vide the height or width of the first tubular film section is at least 100 mm and preferably 200 to 500 mm.
  • the tubular film continues to be turned downwards, so that the second tubular film section is formed or removed in this manner and is deposited on the first tubular film section. It is recommended that the shirring elements of the Kochzteh drove be moved towards the stack after applying the first tubular film section in the horizontal direction, so that the distance of the guided over the shirring tubular film to the stack decreases and then turn the overdrawing device for raping and applying the second tubular film section is moved in Studentsziehraum.
  • the aforementioned horizontal movement or transverse movement of a shirring element before the second turn-up of the tubular film is expediently carried out over 20 to 80 mm, preferably over 35 to 65 mm and preferably over about 50 mm.
  • the height H of the second tubular film section corresponds to the height H of the first tubular film section or approximately the height H of the first tubular film section. It is recommended that the tubular film is released after the application of the second tubular film section of the overdrawing device. It is moreover within the scope of the invention that the tubular film and the first tubular film section as well as the second tubular film section circulate over the entire circumference of the product stack.
  • the counter-rollers are arranged with the proviso that the tubular film wraps around the Roman roller with a wrap angle ⁇ .
  • the wrap angle ⁇ is expediently 25 ° to 60 °, preferably 30 ° to 50 ° and particularly preferably 35 ° to 45 °, in particular about 40 °.
  • the diameter of the counter-rollers are set up with the proviso that the above-described wrap angle can be realized.
  • the invention further teaches a device for coating a tubular film or, a film hood on a stack with a gathering device for Aufraffen the tubular film and with a Kochcieh worn for raping and for coating the tubular film over the stack, wherein with the over-pulling device at least one tubular film section connected to the tubular film already resting on the stack is foldable and can be placed on the tubular film resting on the stack of goods, wherein the overdrawing device has at least two roller assemblies each having at least one Rafrolle and at least two counter-rollers and wherein when gathering the tubular film, the gathering rollers can be brought into contact with the outside of the tubular film and only one of the two counter-rollers of each roller arrangement can be brought into contact with the inside of the tubular film and wherein the gathering roller of the tubular film for placing the at least one tubular film portion, the gathering roller and the two counter-rollers in contact with the abolished tubular film can be brought.
  • the gathering roller of each roller assembly is
  • the gathering device can be used as a pull-on device for off-drawing and for covering the tubular film over the stack of goods.
  • the shirring device and the overdrawing device are then the same device.
  • At least two shirring elements are provided, each associated with a roller assembly, the shirring elements each having at least one Raffbügel over which the tubular film during Aufraffen and Abraffen is feasible and a first (upper) counter-roller of each roller assembly is arranged at the level of the tenter arm when raping the tubular film and the assigned tieback preferably surmounted or slightly surmounted. It is recommended that said first (upper) counter roll protrude upwards a few millimeters from the surface of the gathering bar.
  • the invention is based on the finding that with the method according to the invention and with the device according to the invention a particularly effective Load securing or charge stability can be achieved for a stack covered with a tubular film.
  • inventive method is relatively simple and inexpensive and reliable to carry out.
  • particular importance is attached to the embodiment according to which the gathering roll and the two associated counter-rolls are in each case when the tubular film is pulled off and coated Roller assembly in contact with the shed tubular film stand. In this way, a particularly controlled and reliable Abraffen can be achieved especially in the production of the first and second tubular film section.
  • tubular films which have a high coefficient of friction on their inner surface or a higher coefficient of friction on their inner surface than on their outer surface.
  • Such tubular films are mainly used in the beverage industry to achieve the highest possible coefficient of friction on the cargo.
  • the load securing is to be increased because the tubular films lose the desired bias during transport or during storage less quickly due to the corresponding adhesion to the stack.
  • the invention is based on the finding that such tubular films with a roughened inner surface cause problems when removing the tubular film and, above all, when folding tubular film sections. In the apparatus according to the invention and in the method according to the invention, these problems do not occur and it is a simple and reliable and damage-free grabbing and refolding of the tubular film possible.
  • tubular film 1 a device for coating a tubular film 1 over a stack of goods 2 is shown. Subsequently, the term tubular film 1 is used throughout, although according to a preferred embodiment, the tubular film 1 is present after separation and welding as a film hood.
  • the stock pile 2 may be formed by a plurality of packages stacked on a pallet 3 into a cuboid.
  • the tubular film 1 is first supplied from a tubular film supply 4 and opened above the stack 2 with a ⁇ Stammsvomchtung 5. Subsequently, four shirring elements 6 are retracted into the opened tubular film 1, so that the inside of the tubular film 1 rests against these shirring elements 6.
  • the gathering elements 6 are arranged at the four corners of a tubular film 1 which is open or stretched rectangular in cross-section.
  • the gathering elements 6 each have a curved tieback 7 which extends transversely to the feed direction Z of the tubular film 1 and a vertical wall 8 adjoining the tieback 7.
  • each shirring element 6 is assigned a roller arrangement 9 comprising a gathering roller 10 and a counter-roller 11.
  • Each roller assembly 9 also has an in the Fig. 1 not shown further counter-roller 12.
  • the further counter-roller 12 is preferably not involved in the Aufraffen and in the embodiment and is - as explained below - used in raping and coating the tubular film 1 on the stack 2.
  • the tubular film 1 is from Hose foil stock 4 deducted, each guided over the Raffbügel 7 and each passed between the gathering roller 10 and the counter-roller 11.
  • the gathering rollers 10 are preferably driven by a drive motor 13 while the counter-rollers 11 are not driven and act only as pressure rollers. EmpfohleneIER and in the exemplary embodiment, the gathering rollers 10 have a larger diameter than the counter-rollers 11, 12. Conveniently and in the embodiment, the gathering roller 10 and the counter-roller 11 of each roller assembly during Abraffen arranged so that the axis of rotation of the counter-roller 11 in the feed direction of the tubular film 1 behind the Rotary axis of the associated Rafrolle 10 or in the vertical direction below the axis of rotation of the associated Rafroll 10 is located. After passing through the roller assemblies 9, the tubular film 1 is gathered below the roller assemblies 9.
  • the shirred tubular film 1 is quergestretcht so that its horizontal cross-section is greater than the horizontal cross-section of the stack 2.
  • the shirring elements 6 and the tieback 7 are used as Querstretchiata and transverse stretching of the tubular film 1, the shirring elements 6 are diagonal moved apart.
  • the shirring elements 6 are shown after the Querstretchen over the stack 2. After shirring and Querstretchen the tubular film 1 is then pulled over the stack 2.
  • the shirring R / Ü is also used as Studentszieh adopted R / Ü and the tubular film 1 is stripped off when coating over the stack 2 of the overdrawing R / Ü.
  • the coating device R / Ü is essentially a vertical one formed movable clamping frame, at the four corners of the gathering elements 6 and 9 roller assemblies are connected. The shirring elements 6 and roller assemblies 9 are thus moved when coating the tubular film 1 on the stack 2 with the clamping frame or moved down.
  • the gathering rollers 10 are each driven by a drive motor 13 during the removal of the tubular film 1, namely in the Fig. 3 to 5 indicated by an arrow direction of rotation.
  • the counter-rollers 11, 12 during Abraffen expediently not driven and act only as pressure rollers with respect to the Rafrolle 10.
  • the rotational speed or peripheral speed of the Raffrollen 10 is slightly less than the stall speed of the overdrawing R / Ü.
  • a vertical stretch on the tubular film 1 can be generated. - like in the Fig. 3 to 5 recognizable the tubular film 1 is guided during the raping through the roller assemblies 9 and the tieback 7 of shirring elements 6.
  • Fig. 3 to 5 continue to show that when raping and coating the tubular film 1, the axis of rotation of the first upper counter-roller 12 expediently Empfohleneterrorism and in the embodiment is furthermore the axis of rotation of the second lower counter-roller 11 in Abraffides in front of the axis of rotation of the Raffrollen 10 and in the vertical direction below the axis of rotation of the Rafrolle 10 arranged.
  • the diameter of the gathering roller 10 of the roller assemblies 9 is preferably and in the embodiment larger or significantly larger than the diameter of the counter-rollers 11, 12.
  • the first upper counter-roller 12 is preferably arranged at the level of Raffbügels 7 a shirring member 6 and is preferably and in the embodiment something from the surface of the tieback 7 upwards. EmpfohleneIER is the counter-roller 12 0.5 to 4 mm from the surface of the tieback 7 before.
  • Fig. 3 shows that after coating the tubular film 1 on the stack 2, the overdrawing R / Ü with the units of shirring elements 6 and 9 roller assemblies has reached the end or lower portion of the stack.
  • the upper counter-roller 12 of each roller assembly 9 is at the level of the pallet base 14 of the pallet 3.
  • the units of shirring elements 6 and 9 roller assemblies - as indicated by the arrow in FIG Fig. 3 indicated - moved away from the stack of goods 2 in the horizontal direction, so that increases the distance of the guided over the gathering elements 6 Schlauchfolle 1 to the stack 2.
  • the puller R / Ü is moved with its units of shirring elements 6 and roller assemblies 9 up against the coating direction, so that the tubular film 1 is folded up and a first tubular film section 15 is formed.
  • This first tubular film section 15 is applied after Abraffen along the Gutstapelabschhitts A and along the pallet 3 on the already applied to the stack 2 and the pallet 3 tubular film 1.
  • wrap angle
  • the units of shirring elements 6 and roller assemblies 9 are expediently moved again in the horizontal direction toward the stack, so that the distance between the tubular film 1 guided over the shirring elements 6 to the stack 2 decreases again.
  • the Studentszieheinnchtung R / Ü with the units of shirring elements and roller assemblies 9 is again moved in the direction of pull down, so that the tube sheet 1 is folded down and a second tubular film section 16 is formed.
  • the second Sehlauchfolienabêt 16 is then placed on the first tubular film section 15. After placing the second tubular film section 16, the tubular film 1 is released from the overdrawing device R / Ü.
  • the tubular film sections 15, 16 can be produced in a simple, functionally reliable and informal manner by the tubular film 1 is in Abraffen both with the gathering roller 10 and with two counter-rollers 11, 12 in contact.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Basic Packing Technique (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)
  • Folding Of Thin Sheet-Like Materials, Special Discharging Devices, And Others (AREA)
  • Treatment Of Fiber Materials (AREA)
  • Packaging Of Special Articles (AREA)
  • Stackable Containers (AREA)

Description

Die Erfindung betrifft ein Verfahren zum Überziehen einer Schlauchfolie bzw. einer Folienhaube über einen Gutstapel, wobei die Schlauchfolie zunächst auf einer Raffeinrichtung aufgerafft wird, wobei die aufgeraffte Schlauchfolie im Anschluss daran mit einer Überzieheinrichtung über den Gutstapel gezogen wird, indem die Überzieheinrichtung entlang des Gutstapels bewegt wird und die Schlauchfolie dabei von der Überziehelnrichtung abgerafft wird. Die Erfindung betrifft fernerhin eine Vorrichtung zum Überziehen einer Schlauchfolie bzw. einer Folienhaube über einen Gutstapel.The invention relates to a method for coating a tubular film or a film hood over a stack of goods, wherein the tubular film is first ruffled on a gathering device, wherein the retrieved tubular film is subsequently pulled over the stack with a coating device by moving the coating device along the stack of goods is and the tubular film is thereby removed from the pulling-off direction. The invention further relates to a device for coating a tubular film or a film hood over a stack of goods.

Gutstapel meint insbesondere eine Mehrzahl von Packungen, Paketen, Säcken oder dergleichen Einheiten, die zweckmäßigerweise zu einem quaderförmigen Gutstapel gestapelt sind. Es liegt im Rahmen der Erfindung, dass der Gutstapel auf einer Palette aufgenommen ist. Dieser Gutstapel wird mit einer Schlauchfolie bzw. mit einer Folienhaube überzogen, um dem Gutstapel einerseits eine höhere Stabilität zu verleihen und um den Gutstapel andererseits vor Witterungseir>flüssen zu schützen. Bei dem Gutstapel kann es sich grundsätzlich auch um wenige gestapelte Einheiten handeln oder aber auch um eine einzelne größere Einheit, beispielsweise aus dem Weißwarenbereich (Waschmaschinen, Kühlschränke, Spülmaschinen und dergleichen). Der Gutstapel muss nicht zwingend eine Quaderform haben, sondern kann prinzipiell auch andere Formen aufweisen. Die überzuziehende Schlauchfolie bzw. Folienhaube passt sich gleichsam der Form des Gutstapels an.Good stack means in particular a plurality of packages, packages, sacks or the like units that are suitably stacked to a cuboid stack. It is within the scope of the invention that the stack is received on a pallet. This stack is covered with a tubular film or with a film hood to give the stack on the one hand a higher stability and on the other hand to protect the stack from weather> rivers. The stack may in principle also be a few stacked units or even a single larger unit, for example from the white goods sector (washing machines, refrigerators, dishwashers and the like). The stack does not necessarily have to have a cuboid shape, but in principle can also have other shapes. The tubular film or film hood to be covered adjusts as it were to the shape of the stack of goods.

Verfahren und Vorrichtungen der eingangs beschriebenen Art sind aus der Praxis in unterschiedlichen Ausführungsvarianten bekannt. Bei nach diesen bekannten Maßnahmen übergezogener Schlauchfolie lässt häufig die Ladungsstabilität insbesondere im unteren Bereich des Gutstapels zu wünschen übrig. Man hat bereits versucht, die Ladungsstabilität durch zusätzliche Umreifungen des Gutstapels zu verbessern. Diese Maßnahmen sind allerdings aufwendig und häufig nicht funktionssicher bzw. nicht mit dem gewünschten Erfolg durchführbar.Methods and devices of the type described above are known from practice in different embodiments. When coated by these known measures tubular film often leaves the charge stability, especially in the lower part of the stack to be desired. One has already tried the charge stability through additional strapping to improve the pile of goods. However, these measures are complex and often not reliable or not feasible with the desired success.

Demgegenüber liegt der Erfindung das technische Problem zugrunde, ein Verfahren der eingangs beschriebenen Art anzugeben, mit dem die Ladungsstabilität insbesondere im unteren Bereich des Gutstapels auf einfache, wenig aufwendige und funktionssichere Weise erhöht werden kann. Der Erfindung liegt fernerhin das technische Problem zugrunde eine entsprechende Vorrichtung zur Durchführung des Verfahrens anzugeben.In contrast, the invention, the technical problem of providing a method of the type described above, with which the charge stability can be increased in particular in the lower part of the stack in a simple, inexpensive and reliable manner. The invention is furthermore based on the technical problem of specifying a corresponding device for carrying out the method.

Zur Lösung des technischen Problems lehrt die Erfindung ein Verfahren zum Überziehen einer Schlauchfolie bzw. einer Folienhaube über einen Gutstapel, wobei die Schlauchfolie zunächst auf einer Raffeinrichtung aufgerafft wird,
wobei die Raffeinrichtung mit zumindest zwei Rollenanordnungen mit jeweils zumindest einer Raffrolle und zumindest zwei Gegenrollen eingesetzt wird, wobei beim Aufraffen der Schlauchfolie die Raffrollen mit der Außenseite der Schlauchfolie in Kontakt gebracht werden und lediglich eine der beiden Gegenrollen jeder Rollenanordnung mit der Innenseite der Schlauchfolie in Kontakt gebracht wird,
wobei die aufgeraffte Schlauchfolie im Anschluss daran mit einer Überzieheinrichtung über den Gutstapel gezogen wird, indem die Überzieheinrichtung entlang des Gutstapels bewegt wird und die Schlauchfolie dabei von der Überzieheinrichtung abgerafft wird,
wobei beim Abraffen der Schlauchfolie im Zuge des Anlegens eines ersten und eines zweiten Schlauchfolienabschnittes die Raffrollen der Rollenanordnungen
mit der Außenseite der Schlauchfolie in Kontakt stehen und beide Gegenrollen jeder Rollenanordnung mit der Innenseite der Schlauchfolie in Kontakt stehen,
wobei nach Erreichen eines Endbereiches des Gutstapels die Überzieheinrichtung entlang eines Gutstapelabschnittes entgegen der Überziehrichtung bewegt wird, so dass der erste Schlauchfolienabschnitt auf der bereits an dem Gutstapel anliegenden Schlauchfolie angelegt wird
und wobei die Überzieheinrichtung im Anschluss daran entlang zumindest eines Teils des Gutstapelabschnittes wiederum in Überziehrichtung bewegt wird, so dass der zweite Schlauchfolienabschnitt auf dem ersten Schlauchfolienabschnitt aufgelegt wird.
To solve the technical problem, the invention teaches a method for coating a tubular film or a film hood over a stack of goods, wherein the tubular film is first picked up on a gathering device,
wherein the gathering device is used with at least two roller arrangements, each having at least one gathering roller and at least two counter-rollers, wherein the rapiers are brought into contact with the outside of the tubular film during ramming of the tubular film and only one of the two counter-rollers of each roller assembly with the inside of the tubular film in contact is brought
wherein the retrieved tubular film is subsequently drawn over the stack of goods with a coating device by moving the coating device along the stack of goods and thereby removing the tubular film from the coating device,
wherein during the removal of the tubular film in the course of the application of a first and a second tubular film section, the gathering rollers of the roller arrangements
are in contact with the outside of the tubular film and both counter rollers of each roller assembly are in contact with the inside of the tubular film,
wherein, after reaching an end region of the stack, the overdrawing device is moved along a Gutstapelabschnittes opposite to the coating direction, so that the first tubular film section is applied to the already applied to the stack of goods tubular film
and wherein the overdrawing device is subsequently moved in the overmolding direction along at least part of the good stacking section so that the second tubular film section is laid on the first tubular film section.

Zweckmäßigerweise ist der Gutstapel auf einer Palette aufgenommen. Endbereich des Gutstapels meint insbesondere die Palette bzw. den Bereich der Palette und/oder den unteren, unmittelbar auf der Palette angeordneten Bereich des Gutstapels. Wenn der Gutstapel nicht auf einer Palette aufgenommen ist, meint Endbereich des Gutstapels insbesondere den unteren Bereich des Gutstapels. Es liegt weiterhin im Rahmen der Erfindung, dass die bereits an dem Gutstapel anliegende Schlauchfolie mit dem anschließend angelegten ersten Schlauchfolienabschnitt in Verbindung steht und dass dieser erste Schlauchfollenabschnitt wiederum mit dem anschließend anzulegenden zweiten Schlauchfolienabschnitt in Verbindung steht. Hierzu wird die Schlauchfolie zum Anlegen des ersten Schlauchfolienabschnittes nach oben umgeschlagen und anschließend zum Anlegen des zweiten Schlauchfolienabschnittes nach unten umgeschlagen. Es versteht sich, dass das Schlauchfolienende am Ende des Überziehvorgangs und insbesondere nach dem Anlegen des zweiten Schlauchfolienabschnittes abgerafft und an den Gutstapel bzw, an die Palette angelegt wird.Appropriately, the stack is received on a pallet. In particular, the end region of the product stack means the pallet or the region of the pallet and / or the lower region of the product stack arranged directly on the pallet. If the stack of goods is not received on a pallet, the end region of the stack of goods means, in particular, the lower region of the stack of goods. It is furthermore within the scope of the invention that the tubular film already resting against the stack of goods is connected to the subsequently applied first tubular film section and that this first tubular section of the hose is in turn connected to the second tubular film section to be subsequently applied. For this purpose, the tubular film for applying the first tubular film section is turned upwards and then turned down to apply the second tubular film section. It is understood that the end of the tubular film is abolished at the end of the coating process and in particular after the application of the second tubular film section and applied to the stack of goods or to the pallet.

Wenn der Gutstapel auf einer Palette angeordnet ist, wird der erste Schlauchfolienabschnitt empfohlenermaßen entlang des Gutstapelabschnittes A und entlang der Palette oder entlang zumindest eines Teils der Höhe der Palette angelegt. Vorzugsweise wird der zweite Schlauchfolienabschnitt entlang zumindest eines Teils des Gutstapelabschnittes A und entlang der Palette oder entlang zumindest eines Teils der Höhe der Palette angelegt.When the stack is placed on a pallet, it is recommended that the first section of tubular film be applied along the stacking section A and along the pallet or along at least a portion of the pallet's height. Preferably, the second tubular film section is applied along at least part of the good stacking section A and along the pallet or along at least part of the height of the pallet.

Es liegt im Rahmen der Erfindung, dass das Abraffen der Schlauchfolie im Wesentlichen parallel zur Bewegung der Überzieheinrichtung in Über ziehrichtung bzw. entgegen der Überziehrichtung beim Überziehen der Schlauchfolie über den Gutstapel bzw. beim Anlegen der Schlauchfolienabschnitte erfolgt. Gemäß besonders empfohlener Ausführungsform der Erfindung erfolgt während der Bewegung der Überzieheinrichtung entgegen der Überziehrichtung beim Anlegen des ersten Schlauchfolienabschnittes und während der Bewegung der Überzieheinrichtung in Überziehrichtung beim Anlegen des zweiten Schlauchfolienabschnittes ein kontinuierliches Abraffen der Schlauchfolie von der Überzieheinrichtung. In besonders vorteilhafter Ausgestaltung der Erfindung ist vorgesehen, dass dabei die Abraffgeschwindigkeit bzw. die Drehgeschwindigkeit der angetriebenen Raffrollen variabel einstellbar sind.It is within the scope of the invention that the Abraffen the tubular film is substantially parallel to the movement of the overdrawing in over pulling direction or against the coating direction when coating the tubular film over the stack or when creating the tubular film sections. According to a particularly recommended embodiment of the invention During the movement of the coating device against the coating direction during application of the first tubular film section and during the movement of the coating device in the coating direction when applying the second tubular film section takes place a continuous Abraffen the tubular film from the overdrawing device. In a particularly advantageous embodiment of the invention it is provided that the Abraffgeschwindigkeit or the rotational speed of the driven Raffrollen are variably adjustable.

Die Schlauchfolie bzw. die Folienhaube besteht zweckmäßigerweise aus einer elastischen Kunststofffolie. Soweit hier und nachfolgend von einer Folienhaube die Rede ist, meint dies die an einem Ende bereits abgetrennte und abgeschweißte Schlauchfolie.The tubular film or the film hood expediently consists of an elastic plastic film. As far as here and below of a film hood is mentioned, this means the already separated at one end and welded tubular film.

Zweckmäßigerweise wird die Schlauchfolie im Rahmen des erfindungsgemäßen Verfahrens von einem Schlauchfolienvorrat zugeführt. Empfohlenermaßen sind die Seitenränder der Schlauchfolie Im Vorratszustand nach innen gefaltet Man spricht dann von einem Seitenfaltenschlauch. Es liegt im Rahmen der Erfindung, dass die zugeführte Schlauchfolie über bzw. vor dem Gutstapel geöffnet wird. Zweckmäßigerweise werden anschließend Raffelemente der Raffeinrichtung in das Schlauchfolienende der geöffneten Schlauchfolie eingefahren, so dass die Innenseite des Schlauchfolienendes an den Raffelementen anliegt. Jedes Raffelement weist vorzugsweise einen Raffbügel auf, der sich empfohlenermaßen quer zur Zuführrichtung der Schlauchfolie bzw. quer zur Vertikalrichtung erstreckt. Die Innenseite des Schlauchfolienendes liegt nach dem Einfahren der Raffelemente an den Raffbügeln an. Nach besonders bevorzugter Ausführungsform der Erfindung sind die Raffelemente mit ihren Raffbügeln an den vier Ecken einer im Querschnitt rechteckförmigen geöffneten Schlauchfolie angeordnet. In diesem Fall bezeichnet man die Raffbügel auch als Raffecken. Es liegt im Rahmen der Erfindung, dass die Raffelemente bzw. Raffbügel quer zur Zuführungsrichtung der Schlauchfolie, insbesondere in horizontaler Richtung verfahrbar sind und zwar vorzugsweise unabhängig voneinander verfahrbar sind. Es liegt fernerhin im Rahmen der Erfindung, dass die Raffelemente bzw. Raffbügel in Zuführungsrichtung der Schlauchfolie, insbesondere in vertikaler Richtung verfahrbar sind. Die Raffelemente bzw. Raffbügel sind dazu empfohlenermaßen an einen Spannrahmen angeschlossen, der in Zuführungsrichtung der Schlauchfolie, insbesondere in vertikaler Richtung verfahrbar ist.Appropriately, the tubular film is supplied from a tubular film supply in the context of the inventive method. Empfohlenermaßen the side edges of the tubular film in the stored state folded inwards One speaks then of a gusseted hose. It is within the scope of the invention that the supplied tubular film is opened above or in front of the stack. Appropriately, shirring elements of the shirring device are then retracted into the tube film end of the opened tubular film, so that the inside of the hose film end rests against the shirring elements. Each gathering element preferably has a gathering bar, which extends in a recommended manner transversely to the feed direction of the tubular film or transversely to the vertical direction. The inside of the hose film end rests on the tiebacks after the gathering elements have retracted. According to a particularly preferred embodiment of the invention, the gathering elements are arranged with their Raffbügeln at the four corners of a rectangular cross-sectionally open tubular film. In this case, the Raffbügel also called Raffecken. It is within the scope of the invention that the gathering elements or tiebacks transverse to the feed direction of the tubular film, in particular in horizontal Direction are movable and that are preferably moved independently. It is furthermore within the scope of the invention that the gathering elements or gathering bars can be moved in the feed direction of the tubular film, in particular in the vertical direction. The shirring or Raffbügel are recommended to be connected to a tenter, which is movable in the feed direction of the tubular film, in particular in the vertical direction.

Erfindungsgemäß wird eine Raffeinrichtung mit zumindest zwei Rollenanordnungen mit jeweils zumindest einer Raffrolle und zumindest zwei Gegenrollen eingesetzt und erfindungsgemäß werden beim Aufraffen der Schlauchfolie die Raffrollen mit der Außenseite der Schlauchfolie in Kontakt gebracht und lediglich eine der beiden Gegenrollen jeder Rollenanordnung wird mit der Innenseite der Schlauchfolie in Kontakt gebracht. Es liegt im Rahmen der Erfindung, dass jedem Raffelement bzw. jedem Raffbügel eine solche Rollenanordnung zugeordnet ist. Dann ist die beim Aufraffen in Kontakt mit der Innenseite der Schlauchfolie stehende Gegenrolle vorzugsweise jeweils in Zuführungsrichtung der Schlauchfolie hinter bzw. unter dem zugeordneten Raffbügel angeordnet, insbesondere in vertikaler Richtung unterhalb des zugeordneten Raffbügels angeordnet. Zweckmäßigerweise werden nach dem Einführen der Raffelemente in das geöffnete Schlauchfolienende die Raffrollen herangefahren bzw. angeklappt, so dass jede Raffrolle und die ihr zugeordnete Gegenrolle die Schlauchfolie klemmend zwischen sich aufnehmen. Vorzugsweise werden die Raffrollen beim Aufraffen der Schlauchfolie angetrieben und dazu ist jeder Raffrolle bevorzugt ein Antriebsmotor zugeordnet. Empfohlenermaßen werden die Gegenrollen nicht angetrieben und funktionieren gleichsam als andere Andrückrollen bezüglich der zugeordneten Raffrollen. Wie weiter unten noch erläutert liegt es im Rahmen der Erfindung, dass jede Rollenanordnung eine weitere Gegenrolle aufweist, die beim Aufraffen aber zweckmäßigerweise nicht in Kontakt mit der Innenseite der Schlauchfolie steht. Die weitere Gegenrolle kann hierzu beispielsweise von der zugeordneten Raffrolle abklappbar sein. Vor zugsweise sind die Rollenanordnungen beim Aufraffen so orientiert, dass die Drehachse der in Kontakt mit der Schlauchfolie stehenden Gegenrolle in Zuführungsrichtung der Schlauchfolie hinter bzw. in vertikaler Richtung unterhalb der Drehachse der Raffrolle angeordnet ist.According to the invention, a gathering device with at least two roller arrangements, each having at least one gathering roller and at least two counter-rollers is used and according to the invention, the gathering rollers are brought into contact with the outside of the tubular film when the tubular film is pulled open, and only one of the two counter-rollers of each roller arrangement is connected to the inside of the tubular film Brought in contact. It is within the scope of the invention that each Raffelement or each Raffbügel is associated with such a roller assembly. Then, the counter-roll standing in contact with the inner side of the tubular film during ratcheting is preferably arranged in each case in the feed direction of the tubular film behind or under the associated Raffbügel, in particular arranged in the vertical direction below the associated Raffbügels. Appropriately, after the introduction of the gathering elements into the open end of the tubular film, the gathering rolls are moved up or folded in so that each gathering roll and the counter-roll assigned to it receive the tubular film between them in a clamping manner. Preferably, the gathering rollers are driven when the tubular film is pulled up, and to this end each drive roller is preferably associated with a drive motor. It is recommended that the counter-rollers are not driven and function as other pressure rollers with respect to the associated Roman rollers. As explained below, it is within the scope of the invention that each roller assembly has a further counter-roller, which expediently not in Contact with the inside of the tubular film is. For this purpose, the further counter-roller can be folded down, for example, from the assigned Roman roller. Before preferably, the roller assemblies are oriented during Aufraffen so that the axis of rotation of standing in contact with the tubular film counter-roller in the feed direction of the tubular film is arranged behind or in the vertical direction below the axis of rotation of the gathering roller.

Es liegt im Rahmen der Erfindung, dass ein für die Bildung der Folienhaube vorgesehener Schlauchfollenabschnitt vom Schlauchfolienvorrat abgezogen wird und vor bzw. über dem Gutstapel gerafft wird. Zweckmäßigerweise werden dazu zwei Raffelemente bzw. Raffbügel, vorzugsweise vier Raffelemente bzw. Raffbügel in das geöffnete Schlauchfollenende eingeführt. Empfohlenermaßen ist jedem Raffelement bzw. Raffbügel eine Rollenanordnung zugeordnet, durch die die Schlauchfolie beim Aufraffen geführt wird und in Zuführungsrichtung hinter der Rollenanordnung gerafft wird. Beim Raffen wird die Schlauchfolie auf den Raffelementen in bekannter Weise balgenartig bzw. ziehharmonikaartig gerafft. Aufgrund der oben beschriebenen bevorzugten Anordnung der Drehachsen der Rollen kann beim Raffen eine sehr gleichmäßige Faltenbildung erreicht werden, wobei die Falten jeweils schräg nach unten und (bezüglich des Gutstapels) nach außen weisen. Bei dieser gleichmäßigen Ausrichtung der Falten kann die Folienhaube beim anschließenden Überziehen über den Gutstapel auf einfache, funktionssichere und beschädigungsfreie Weise Falte für Falte abgezogen werden. - Zweckmäßigerweise weist die Vorrichtung zur Durchführung des erfindungsgemäßen Verfahrens eine Trennvonichtung und eine Schweißvorrichtung auf, mit denen die Schlauchfolie nach dem Raffen am oberen Ende der zu bildenden Folienhaube unter Bildung der Folienhaube abgetrennt und abgeschweißt wird.It is within the scope of the invention that an intended for the formation of the film hood Schlauchfollenabschnitt is deducted from the tube film supply and is gathered before or above the stack. Conveniently, two shirring or Raffbügel, preferably four shirring or Raffbügel be introduced into the open Schlauchfollenende. Empfohlenermaßen each shirring element or shirring is associated with a roller assembly through which the tubular film is guided during the Aufraffen and is gathered in the feed direction behind the roller assembly. When shirring the tubular film is gathered on the shirring elements in a known manner bellows-like or accordion-like. Due to the preferred arrangement of the axes of rotation of the rollers described above, a very uniform wrinkling can be achieved when shirring, wherein the folds respectively obliquely downwards and (with respect to the stack of goods) facing outward. In this uniform alignment of the folds, the film hood can be deducted in the subsequent coating over the stack in a simple, reliable and damage-free way fold by fold. - Expediently, the device for carrying out the method according to the invention has a separating device and a welding device with which the tubular film is separated and welded after shirring at the upper end of the film hood to be formed to form the film hood.

Gemäß besonders bevorzugter Ausführungsform des erfindungsgemäßen Verfahrens wird die Schlauchfolie nach dem Aufraffen quergestretcht. Zweckmäßigerweise erfolgt das Querstretchen mit der Raffeinrichtung. Vorzugsweise werden dazu die Raffelemente auch als Querstretchelemente eingesetzt, mit denen die Schlauchfolie bzw. die Folienhaube nach dem Raffen und zweckmäßigerweise vor dem Überziehen über den Gutstapel quergestretcht wird. Empfohlenermaßen fahren dazu die Raffelemente mit ihren Raffbügeln quer zur Zuführungsrichtung der Schlauchfolien auseinander. Das Querstretchen wird mit der Maßgabe ausgeführt, dass der Querschnitt bzw. Horizontalquerschnitt der quergestretchten Schlauchfolie größer ist als der Querschnitt bzw. Horizontalquerschnitt des Gutstapels. Nach dem Raffen und nach dem Querstretchen wird die Schlauchfolie mit der Überziehvorrichtung über den Gutstapel gezogen.According to a particularly preferred embodiment of the method according to the invention, the tubular film is transversely stretched after ratcheting. Conveniently, the cross stretches take place with the gathering device. Preferably, the shirring elements are also used as Querstretchelemente with which the tubular film or the film hood is transversely traversed after shirring and expediently before coating over the stack. It is recommended that the gathering elements move apart with their tiebacks transversely to the feeding direction of the tubular films. The transverse stretching is carried out with the proviso that the cross-section or horizontal cross-section of the cross-stretched tubular film is greater than the cross-section or horizontal cross-section of the product stack. After shirring and after the transverse stretch, the tubular film is pulled over the stack with the puller.

Nach sehr bevorzugter Ausführungsform der Erfindung wird die Raffeinrichtung als Überzieheinrichtung angesetzt. Beim Überziehen über den Gutstapel wird die Schlauchfolie von der Raffeinrichtung bzw. Überzieheiridchtung abgerafft und wird dabei über die Raffelemente bzw. Raffbügel,geführt, bevor sie zur Anlage am Gutstapel kommt. Es wurde bereits dargelegt, dass empfohlenermaßen vier Raffelemente bzw. vier Raffbügel beteiligt sind, die bevorzugt an den vier Ecken der im Querschnitt rechteckförmigen Schlauchfolie angeordnet sind. Zum Überziehen der Folienhaube sind die Raffelemente bzw. Raffbügel in Überziehrichtung der Folienhaube bzw. in vertikaler Richtung verfahrbar. Dazu sind die Raffelemente zweckmäßigerweise an einen Spannrahmen angeschlossen, der in Überiiehrichtung der Folienhaube bzw. in vertikaler Richtung verfahrbar ist.After a very preferred embodiment of the invention, the shirring is recognized as Überzieheinrichtung. When coating over the stack, the tubular film is removed from the shirring or Überzieheiridchtung and is doing on the shirring or Raffbügel, led before it comes to rest on the stack. It has already been stated that it is recommended that four shirring elements or four shirring loops are involved, which are preferably arranged at the four corners of the rectangular tubular film in cross-section. For covering the film hood, the shirring elements or shirring bars can be moved in the direction of coating the foil hood or in the vertical direction. For this purpose, the shirring elements are expediently connected to a tenter, which can be moved in the over direction of the foil hood or in the vertical direction.

Es liegt im Rahmen der Erfindung, dass das Abraffen der Schlauchfolie beim Überziehen über den Gutstapel von den Rollenanordnungen unterstützt wird. Es liegt fernerhin im Rahmen der Erfindung, dass die Rollenanordnungen ebenfalls an den Spannrahmen angeschlossen sind und mit dem Spannrahmen in Überziehrichtung der Folienhaube bzw. in vertikaler Richtung verfahrbar sind. Erfindungsgemäß stehen beim Abraffen der Schlauchfolie im Zuge des Anlegens des ersten und des zweiten Schlauchfolienabschnittes die Raffrollen der Rollenanordnungen mit der Außenseite der Schlauchfolie in Kontakt und es stehen beide Gegenrollen jeder Rollenanordnung mit der Innenseite der Schlauchfolie in Kontakt. Eine besonders bevorzugte Ausführungsform der Erfindung ist dadurch gekennzeichnet, dass beim gesamten Abraffvorgang der Schlauchfolie bei Überziehen über den Gutstapel die Raffrollen der Rollenanordnungen mit der Außenseite der Schlauchfolie in Kontakt stehen und beide Gegenrollen jeder Rollenanordnung mit der Innenseite der Schlauchfolie in Kontakt stehen. Zweckmäßigerweise werden die Raffrollen beim Abraffen der Schlauchfolie in Abraffrichtung angetrieben. Vorzugsweise ist die Drehgeschwindigkeit bzw. Umfangsgeschwindigkeit der Raffrollen dabei langsamer bzw. etwas langsamer als die Geschwindigkeit der Überziehbewegung/Abwärtsbewegung der Raffeinrichtung/Überzieheinrichtung. Auf diese Weise kann ein Vertikalstretch in der Schlauchfolie erzeugt werden.It is within the scope of the invention that the Abraffen the tubular film is supported when coating over the stack of the role arrangements. It is also within the scope of the invention that the roller assemblies are also connected to the clamping frame and are movable with the clamping frame in the coating direction of the film hood or in the vertical direction. In accordance with the invention, when the tubular film is pulled off during the application of the first and second tubular film sections, the gathering rollers of the roller assemblies are in contact with the outside of the tubular film and both counter rollers of each roller assembly are in contact with the inside of the tubular film. A particularly preferred embodiment of the invention is characterized in that during the entire Abraffvorgang the tubular film when coated over the stack, the Raffrollen the roller assemblies are in contact with the outside of the tubular film and both counter rollers of each roller assembly with the inside of the tubular film in contact. Appropriately, the gathering rollers are driven in Abraffen the tubular film in Abraffrichtung. Preferably, the rotational speed or peripheral speed of the creasing rollers is slower or slightly slower than the speed of the overtravel / downward movement of the shirring / overdrawing device. In this way, a vertical stretch can be generated in the tubular film.

Nach besonders bevorzugter Ausführungsform der Erfindung wird beim Abraffen der Schlauchfolie im Zuge des Überziehens über den Gutstapel die Schlauchfolie vor ihrer Anlage an den Gutstapel klemmend zwischen der Raffrolle und den beiden Gegenrollen jeder Rollenanordnung gehalten. Empfohlenermaßen ist beim Abraffen die Drehachse der ersten Gegenrolle in Abraffrichtung hinter der Drehachse der Raffrollen angeordnet bzw. in Vertikalrichtung über der Drehachse der Raffrolle angeordnet. Vorzugsweise ist die Drehachse der zweiten Gegenrolle in Abraffrichtung vor der Drehachse der Raffrolle angeordnet bzw. in Vertikalrichtung unterhalb der Drehachse der Raffrolle angeordnet. Es liegt im Rahmen der Erfindung, dass diese bevorzugte geometrische Anordnung bei allen Rollenanordnungen beim Abraffen der Schlauchfolie verwirklicht ist. Das gilt insbesondere auch beim Abraffen der Schlauchfolie im Zuge des Anlegens des ersten und des zweiten Schlauchfolienabschnittes. Wenn beim Abraffen, beim Überziehen und Anlegen der Schlauchfolie an den Gutstapel der Endbereich des Gutstapels erreicht wird, erfolgt zur Erzeugung des ersten Schlauchfolienabschnittes ein Umschlagen der Schlauchfolie nach oben. Endbereich des Gutstapels meint dabei insbesondere eine Palette auf der der Gutstapel angeordnet ist und vor allem den Palettenzwischenboden oder Palettenunterboden der Palette auf der der Gutstapel angeordnet ist. Endbereich des Gutstapels kann grundsätzlich aber auch der untere Bereich bzw. die untere Kante des Gutstapels sein. Vorzugsweise werden nach Erreichen des Endbereiches des Gutstapels die Raffelemente der Überzieheinrichtung in horizontaler Richtung vom Gutstapel wegbewegt, so dass sich der Abstand der über die Raffelemente geführten Schlauchfolie vom Gutstapel vergrößert. Die vorgenannte Querbewegung eines Raffelementes vor dem Umschlagen der Schlauchfolie erfolgt vorzugsweise über 50 bis 150 mm, bevorzugt über 80 bis 120 mm und besonders bevorzugt über etwa 100 mm. Zweckmäßigerweise wird im Anschluss an diese Querbewegung der Raffelemente die Überzieheinrichtung entlang eines Gutstapelabschnitles entgegen der Überziehrichtung bzw. nach oben bewegt, so dass der erste Schlauchfolienabschnitt abgerafft und entlang des genannten Gutstapelabschnittes auf der bereits an dem Gutstapel anliegenden Schlauchfolie aufgelegt wird. Die Höhe H des ersten Schlauchfolienabschnittes beträgt vorzugsweise zumindest 1/20, bevorzugt zumindest 1/15, sehr bevorzugt zumindest 1/10 und besonders bevorzugt zumindest 1/8 der Höhe des Gutstapels bzw. der Höhe des Gutstapels mit Palette. Empfohlenermaßen beträgt die Höhe bzw. Breite des ersten Schlauchfolienabschnittes mindestens 100 mm und bevorzugt 200 bis 500 mm.According to a particularly preferred embodiment of the invention, the tubular film is held in the course of coating over the stack of goods before clamping it to the stack of material between the gathering roller and the two counter-rollers of each roller assembly when raping the tubular film. Empfohlenermaßen the rotation axis of the first counter-roller is arranged in Abraffrichtung behind the axis of rotation of Raffrollen or arranged in the vertical direction above the axis of rotation of the gathering roller when raping. Preferably, the axis of rotation of the second counter-roller is arranged in Abraffrichtung in front of the axis of rotation of the Rafrolle or arranged in the vertical direction below the axis of rotation of the Rafrolle. It is within the scope of the invention that this preferred geometric arrangement is realized in all roller assemblies when raping the tubular film. This also applies in particular to the removal of the tubular film during the application of the first and second tubular film sections. If the end region of the product stack is reached during the removal, coating and application of the tubular film to the product stack, the tubular film is turned upwards to produce the first tubular film segment. In this case, the end region of the stack of goods means, in particular, a pallet on which the stack of goods is arranged and, above all, the pallet intermediate bottom or pallet bottom of the pallet on which the stack of goods is arranged. In principle, however, the end region of the product stack can also be the lower region or the lower edge of the product stack. Preferably, after reaching the end region of the product stack, the gathering elements of the coating device are moved away from the stack in the horizontal direction so that the distance of the tubular film guided over the gathering elements increases from the stack. The aforementioned transverse movement of a shirring element before the tubular film is turned over is preferably carried out over 50 to 150 mm, preferably over 80 to 120 mm and particularly preferably over about 100 mm. Conveniently, following this transverse movement of the gathering elements, the coating device is moved along a stack of goods counter to the coating direction or upwards, so that the first tube film section is removed and placed along the said product stack section on the tubular film already resting on the product stack. The height H of the first tubular film section is preferably at least 1/20, preferably at least 1/15, more preferably at least 1/10 and more preferably at least 1/8 of the height of the stack of goods or the height of the stack of goods with pallet. Empfohlenermaßen the height or width of the first tubular film section is at least 100 mm and preferably 200 to 500 mm.

Es liegt im Rahmen der Erfindung, dass nach dem Umschlagen und Anlegen des ersten Schlauchfolienabschnittes auf die bereits am Gutstapel anliegende Schlauchfolie ein weiteres Umschlagen der Schlauchfolie nach unten erfolgt, so dass auf diese Weise der zweiten Schlauchfolienabschnitt gebildet bzw. abgerafft und auf dem ersten Schlauchfolienabschnitt abgelegt wird. Es empfiehlt sich, dass die Raffelemente der Überzteheinrichtung nach dem Anlegen des ersten Schlauchfolienabschnittes in horizontaler Richtung zum Gutstapel hinbewegt werden, so dass sich der Abstand der über die Raffelemente geführten Schlauchfolie zum Gutstapel verkleinert und dass danach die Überzieheinrichtung zum Abraffen und Anlegen des zweiten Schlauchfolienabschnittes wiederum in Überziehrichtung bewegt wird. Die vorgenannte Horizontalbewegung bzw. Querbewegung eines Raffelementes vor dem zweiten Umschlagen der Schlauchfolie erfolgt zweckmäßigerweise über 20 bis 80 mm, vorzugsweise über 35 bis 65 mm und bevorzugt über etwa 50 mm. Nach einer bevorzugten Ausführungsform der Erfindung entspricht die Höhe H des zweiten Schlauchfolienabschnittes der Höhe H des ersten Schlauchfolienabschnittes bzw. in etwa der Höhe H des ersten Schlauchfolienabschnittes. Es empfiehlt sich, dass die Schlauchfolie nach dem Anlegen des zweiten Schlauchfolienabschnittes von der Überzieheinrichtung freigegeben wird. - Es liegt im Übrigen im Rahmen der Erfindung, dass die Schlauchfolie und der erste Schlauchfolienabschnitt sowie der zweite Schlauchfolienabschnitt über den gesamten Umfang des Gutstapels umlaufen.It is within the scope of the invention that, after the first tubular film section has been turned over and applied to the tubular film already resting on the product stack, the tubular film continues to be turned downwards, so that the second tubular film section is formed or removed in this manner and is deposited on the first tubular film section. It is recommended that the shirring elements of the Überzteheinrichtung be moved towards the stack after applying the first tubular film section in the horizontal direction, so that the distance of the guided over the shirring tubular film to the stack decreases and then turn the overdrawing device for raping and applying the second tubular film section is moved in Überziehrichtung. The aforementioned horizontal movement or transverse movement of a shirring element before the second turn-up of the tubular film is expediently carried out over 20 to 80 mm, preferably over 35 to 65 mm and preferably over about 50 mm. According to a preferred embodiment of the invention, the height H of the second tubular film section corresponds to the height H of the first tubular film section or approximately the height H of the first tubular film section. It is recommended that the tubular film is released after the application of the second tubular film section of the overdrawing device. It is moreover within the scope of the invention that the tubular film and the first tubular film section as well as the second tubular film section circulate over the entire circumference of the product stack.

Zumindest beim Abraffen der Schlauchfolie im Zuge des Anlegens des ersten Schlauchfolienabschnittes und beim Abraffen der Schlauchfolie im. Zuge des Anlegens des zweiten Schlauchfolienabschnittes sind die Gegenrollen mit der Maßgabe angeordnet, dass die Schlauchfolie die Raffrolle mit einem Umschlingungswinkel α umschlingt. Der Umschlingungswinkel α beträgt zweckmäßiger weise 25° bis 60°, vorzugsweise 30° bis 50° und besonders bevorzugt 35° bis 45°, insbesondere etwa 40°. Es liegt dabei im Rahmen der Erfindung, dass die Durchmesser der Gegenrollen mit der Maßgabe eingerichtet sind, dass die vorstehend angegebenen Umschlingungswinkel realisierbar sind. Vorzugsweise ist die Anordnung der Gegenrollen und der genannte Umschlingungswinkel auch beim Abraffen der Schlauchfolie im Zuge des Überziehens über den Gutstapel vor dem Umschlagen zum ersten Schlauchfolienabschnitt realisiert.At least during the removal of the tubular film during the application of the first tubular film section and during the removal of the tubular film in. During the application of the second tubular film section, the counter-rollers are arranged with the proviso that the tubular film wraps around the Roman roller with a wrap angle α. The wrap angle α is expediently 25 ° to 60 °, preferably 30 ° to 50 ° and particularly preferably 35 ° to 45 °, in particular about 40 °. It is within the scope of the invention that the diameter of the counter-rollers are set up with the proviso that the above-described wrap angle can be realized. Preferably, the arrangement of the counter-rollers and said wrap angle realized during the removal of the tubular film in the course of coating over the stack before turning to the first tubular film section.

Der vorstehend beschriebene Kontakt der Schlauchfolie mit der Raffrolle und den beiden Gegenrollen und insbesondere die angegebenen Umschlingungswinkel haben sich besonders bewährt. Das gilt vor allem für das Abraffen im Zuge des Anlegens des ersten Schlauchfolienabschnittes bzw. bei der Bewegung der Überzieheinrichtung entgegen der Überziehrichtung. Hier entfällt die beim vorherigen Überziehen über den Gutstapel auf die Schlauchfolie einwirkende Vertikalkraft und das Abraffen ist wesentlich schwieriger. Das gilt insbesondere für Schlauchfolien, die auf ihrer Innenseite einen hohen Reibwert bzw. einen höheren Reibwert als auf ihrer Außenseite aufweisen. Nichtsdestoweniger ist bei Einhaltung der erfindungsgemäßen Lehre ein einfaches, probleinioses und funktionssicheres Abraffen auch beim Anlegen des ersten Schlauchfolienabschnittes sowie auch beim Anlegen des zweiten Schlauchfolienabschnittes möglich.The above-described contact of the tubular film with the gathering roller and the two counter-rollers and in particular the specified wrap angle have proven particularly useful. This is especially true for the Abraffen in the course of applying the first tubular film section or during the movement of the overdrawing device against the coating direction. Here, the vertical force acting on the tubular film during the previous coating over the stack does not apply and the removal is much more difficult. This applies in particular to tubular films which have a high coefficient of friction or a higher coefficient of friction on their inner side than on their outer side. Nonetheless, adherence to the teaching of the invention makes possible a simple, problem-free and reliable locking even during the application of the first tubular film section as well as during the application of the second tubular film section.

Zur Lösung des technischen Problems lehrt die Erfindung weiterhin eine Vorrichtung zum Überziehen einer Schlauchfolie bzw, einer Folienhaube über einen Gutstapel mit einer Raffeinrichtung zum Aufraffen der Schlauchfolie und mit einer Übercieheinrichtung zum Abraffen und zum Überziehen der Schlauchfolie über den Gutstapel,
wobei mit der Überzieheinrichtung zumindest ein mit der bereits auf dem Gutstapel aufliegenden Schlauchfolie verbundene Schlauchfolienabschnitt umklappbar und auf der auf dem Gutstapel aufliegenden Schlauchfolie auflegbar ist,
wobei die Überzieheinrichtung zumindest zwei Rollenanordnungen mit jeweils zumindest einer Raffrolle und jeweils zumindest zwei Gegenrollen aufweist und
wobei beim Aufraffen der Schlauchfolie die Raffrollen mit der Außenseite der Schlauchfolie in Kontakt bringbar sind und lediglich eine der beiden Gegenrollen jeder Rollenanordnung mit der Innenseite der Schlauchfolie in Kontakt bringbar ist
und wobei beim Abraffen der Schlauchfolie zum Auflegen des zumindest einen Schlauchfolienabschnittes die Raffrolle und die beiden Gegenrollen in Kontakt mit der abgerafften Schlauchfolie bringbar sind. Die Raffrolle jeder Rollenanordnung steht dabei mit der Außenseite der Schlauchfolie in Kontakt und die beiden Gegenrollen jeder Rollenanordnung stehen jeweils mit der Innenseite der Schlauchfolie in Kontakt.
To solve the technical problem, the invention further teaches a device for coating a tubular film or, a film hood on a stack with a gathering device for Aufraffen the tubular film and with a Übercieheinrichtung for raping and for coating the tubular film over the stack,
wherein with the over-pulling device at least one tubular film section connected to the tubular film already resting on the stack is foldable and can be placed on the tubular film resting on the stack of goods,
wherein the overdrawing device has at least two roller assemblies each having at least one Rafrolle and at least two counter-rollers and
wherein when gathering the tubular film, the gathering rollers can be brought into contact with the outside of the tubular film and only one of the two counter-rollers of each roller arrangement can be brought into contact with the inside of the tubular film
and wherein the gathering roller of the tubular film for placing the at least one tubular film portion, the gathering roller and the two counter-rollers in contact with the abolished tubular film can be brought. The gathering roller of each roller assembly is in contact with the outside of the tubular film and the two counter-rollers of each roller assembly are in contact with the inside of the tubular film.

Wie oben bereits dargelegt ist die Raffeinrichtung als Überzieheinrichtung zum Abraffen und zum Überziehen der Schlauchfolie über den Gutstapel einsetzbar. Bei der Raffeinrichtung und der Überzieheinrichtung handelt es sich dann also um dieselbe Einrichtung.As already explained above, the gathering device can be used as a pull-on device for off-drawing and for covering the tubular film over the stack of goods. The shirring device and the overdrawing device are then the same device.

Nach einer bevorzugten Ausführungsform der erfindungsgemäßen Vorrichtung sind zumindest zwei Raffelemente vorgesehen, denen jeweils eine Rollenanordnung zugeordnet ist, wobei die Raffelemente jeweils zumindest einen Raffbügel aufweisen, über den die Schlauchfolie beim Aufraffen und beim Abraffen führbar ist und wobei eine erste (obere) Gegenrolle jeder Rollenanordnung beim Abraffen der Schlauchfolie auf Höhe des Raffbügels angeordnet ist und den zugeordneten Raffbügel vorzugsweise überragt bzw. geringfügig überragt. Empfohlenermaßen steht die genannte erste (obere) Gegenrolle einige Millimeter aus der Oberfläche des Raffbügels nach oben vor.According to a preferred embodiment of the device according to the invention, at least two shirring elements are provided, each associated with a roller assembly, the shirring elements each having at least one Raffbügel over which the tubular film during Aufraffen and Abraffen is feasible and a first (upper) counter-roller of each roller assembly is arranged at the level of the tenter arm when raping the tubular film and the assigned tieback preferably surmounted or slightly surmounted. It is recommended that said first (upper) counter roll protrude upwards a few millimeters from the surface of the gathering bar.

Der Erfindung liegt die Erkenntnis zugrunde, dass mit dem erfindungsgemäßen Verfahren und mit der erfindungsgemäßen Vorrichtung eine besonders effektive Ladungssicherung bzw. Ladungsstabilität für einen mit einer Schlauchfolie überzogenen Gutstapel erreicht werden kann. Hervorzuheben ist dabei, dass das erfindungsgemäße Verfahren relativ einfach und wenig aufwendig sowie funktionssicher durchführbar ist. Besondere Bedeutung kommt im Rahmen der Erfindung der Ausführungsform zu, gemäß der beim Abraffen und Überziehen der Schlauchfolie die Raffrolle und die beiden zugeordneten Gegenrollen jeder Rollenanordnung in Kontakt mit der abgerafften Schlauchfolie stehen. Auf diese Weise kann ein besonders kontrolliertes und funktionssicheres Abraffen vor allem auch bei der Erzeugung des ersten und des zweiten Schlauchfolienabschnitts erzielt werden. Das gilt insbesondere auch für den Einsatz von Schlauchfolien, die an ihrer Innenoberfläche einen hohen Reibwert bzw. an ihrer Innenoberfläche einen höheren Reibwert als an ihrer Außenoberfläche aufweisen. Solche Schlauchfolien werden vor allem in der Getränkeindustrie eingesetzt um an der Ladung einen möglichst hohen Reibwert zu erreichen. Dadurch soll die Ladungssicherung erhöht werden, weil die Schlauchfolien durch die entsprechende Haftung am Gutstapel die erwünschte Vorspannung während des Transports bzw. während der Lagerung weniger schnell verlieren. Der Erfindung liegt die Erkenntnis zugrunde, dass solche Schlauchfolien mit aufgerauter Innenoberfläche Probleme beim Abraffen der Schlauchfolie und vor allem auch beim Umfalten von Schlauchfolienabschnitten bereiten. Bei der erfindungsgemäßen Vorrichtung und bei dem erfindungsgemäßen Verfahren treten diese Probleme nicht auf und es ist ein einfaches und funktionssicheres sowie beschädigungsfreies Abraffen und Umfalten der Schlauchfolie möglich.The invention is based on the finding that with the method according to the invention and with the device according to the invention a particularly effective Load securing or charge stability can be achieved for a stack covered with a tubular film. It should be emphasized that the inventive method is relatively simple and inexpensive and reliable to carry out. In the context of the invention, particular importance is attached to the embodiment according to which the gathering roll and the two associated counter-rolls are in each case when the tubular film is pulled off and coated Roller assembly in contact with the shed tubular film stand. In this way, a particularly controlled and reliable Abraffen can be achieved especially in the production of the first and second tubular film section. This also applies in particular to the use of tubular films which have a high coefficient of friction on their inner surface or a higher coefficient of friction on their inner surface than on their outer surface. Such tubular films are mainly used in the beverage industry to achieve the highest possible coefficient of friction on the cargo. As a result, the load securing is to be increased because the tubular films lose the desired bias during transport or during storage less quickly due to the corresponding adhesion to the stack. The invention is based on the finding that such tubular films with a roughened inner surface cause problems when removing the tubular film and, above all, when folding tubular film sections. In the apparatus according to the invention and in the method according to the invention, these problems do not occur and it is a simple and reliable and damage-free grabbing and refolding of the tubular film possible.

Nachfolgend wird die Erfindung anhand einer lediglich ein Ausführungsbeispiel darstellenden Zeichnung näher erläutert. Es zeigen in schematischer Dar stellung:

Fig.1 1
eine Seitenansicht einer erfindungsgemäßen Vorrichtung,
Fig. 2
eine Draufsicht auf den Gegenstand nach Fig. 1 im Schnitt,
Fig. 3
einen Ausschnitt aus Fig. 1 im Bereich einer Rollenanordnung in einer ersten Funktionsstellung,
Fig. 4
den Gegenstand nach Fig. 3 in einer zweiten Funktionsstellung und
Fig. 5
den Gegenstand gemäß Fig. 3 in einer dritten Funktionsstellung.
The invention will be explained in more detail with reference to a drawing showing only one exemplary embodiment. In a schematic representation, they show:
Fig.1 1
a side view of a device according to the invention,
Fig. 2
a plan view of the object Fig. 1 on average,
Fig. 3
a section from Fig. 1 in the region of a roller arrangement in a first functional position,
Fig. 4
the object after Fig. 3 in a second functional position and
Fig. 5
the object according to Fig. 3 in a third functional position.

In den Figuren ist eine Vorrichtung zum Überziehen einer Schlauchfolie 1 über einen Gutstapel 2 dargestellt. Nachfolgend wird durchgängig der Begriff Schlauchfolie 1 benutzt, obwohl nach bevorzugter Ausführungsvariante die Schlauchfolie 1 nach dem Abtrennen und Abschweißen als Folienhaube vorliegt. Der Gutstapels 2 mag von einer Mehrzahl von Paketen gebildet sein, die auf einer Palette 3 zu einem Quader gestapelt sind.In the figures, a device for coating a tubular film 1 over a stack of goods 2 is shown. Subsequently, the term tubular film 1 is used throughout, although according to a preferred embodiment, the tubular film 1 is present after separation and welding as a film hood. The stock pile 2 may be formed by a plurality of packages stacked on a pallet 3 into a cuboid.

Im Rahmen des erfindungsgemäßen Verfahrens wird die Schlauchfolie 1 zunächst von einem Schlauchfolienvorrat 4 zugeführt und oberhalb des Gutstapels 2 mit einer Öffnungsvomchtung 5 geöffnet. Anschließend werden vier Raffelemente 6 in die geöffnete Schlauchfolie 1 eingefahren, so dass die Innenseite der Schlauchfolie 1 an diesen Raffelementen 6 anliegt. Vorzugsweise und im Ausführungsbeispiel sind die Raffelemente 6 an den vier Ecken einer im Querschnitt rechteckförmigen geöffneten bzw. aufgespannten Schlauchfolie 1 angeordnet. Zweckmäßigerweise und im Ausführungsbeispiel weisen die Raffelemente 6 jeweils einen gebogenen Raffbügel 7 auf, der sich quer zur Zuführungsrichtung Z der Schlauchfolie 1 erstreckt sowie eine an den Raffbügel 7 anschließende Vertikalwand 8.In the context of the method according to the invention, the tubular film 1 is first supplied from a tubular film supply 4 and opened above the stack 2 with a Öffnungsvomchtung 5. Subsequently, four shirring elements 6 are retracted into the opened tubular film 1, so that the inside of the tubular film 1 rests against these shirring elements 6. Preferably, and in the exemplary embodiment, the gathering elements 6 are arranged at the four corners of a tubular film 1 which is open or stretched rectangular in cross-section. Conveniently and in the exemplary embodiment, the gathering elements 6 each have a curved tieback 7 which extends transversely to the feed direction Z of the tubular film 1 and a vertical wall 8 adjoining the tieback 7.

In der Fig. 1 wird gezeigt, dass die Schlauchfolie 1 vor dem Überziehen über den Gutstapel 2 zunächst auf einer Raffeinrichtung R/Ü aufgerafft wird. Dazu ist jedem Raffelement 6 eine Rollenanordnung 9 aus einer Raffrolle 10 und einer Gegenrolle 11 zugeordnet. Jede Rollenanordnung 9 weist auch noch eine In der Fig. 1 nicht dargestellte weitere Gegenrolle 12 auf. Die weitere Gegenrolle 12 ist vorzugsweise und im Ausführungsbeispiel beim Aufraffen nicht beteiligt und wird - wie weiter unten noch erläutert - beim Abraffen und Überziehen der Schlauchfolie 1 über den Gutstapel 2 eingesetzt. Die Schlauchfolie 1 wird vom Schlauchfolienvorrat 4 abgezogen, jeweils über die Raffbügel 7 geführt sowie jeweils zwischen der Raffrolle 10 und der Gegenrolle 11 hindurchgeführt. Dabei werden die Raffrollen 10 vorzugsweise durch einen Antriebsmotor 13 angetrieben während die Gegenrollen 11 nicht angetrieben werden und lediglich als Andrückrollen wirken. Empfohlenermaßen und im Ausführungsbeispiel haben die Raffrollen 10 einen größen Durchmesser als die Gegenrollen 11, 12. Zweckmäßigerweise und im Ausführungsbeispiel ist die Raffrolle 10 und die Gegenrolle 11 jeder Rollenanordnung beim Abraffen so angeordnet, dass die Drehachse der Gegenrolle 11 in Zuführungsrichtung der Schlauchfolie 1 hinter der Drehachse der zugeordneten Raffrolle 10 bzw in vertikaler Richtung unterhalb der Drehachse der zugeordneten Raffrolle 10 liegt. Nach dem Durchlaufen der Rollenanordnungen 9 wird die Schlauchfolie 1 unterhalb der Rollenanordnungen 9 gerafft. Nach diesem Raffen der Schlauchfolle 1 wird die Schlauchfolie 1 an ihrem oberen Ende zweckmäßigerwelse mit einer nicht dargestellten Trennvorrichtung abgetrennt und mit einer ebenfalls nicht dargestellten Schweißvorrichtung abgeschweißt, so dass eine Folienhaube gebildet wird, die anschließend über den Gutstapel 2 gezogen werden kann.In the Fig. 1 It is shown that the tubular film 1 is first scooped up on a stacker R / Ü before coating over the stack 2. For this purpose, each shirring element 6 is assigned a roller arrangement 9 comprising a gathering roller 10 and a counter-roller 11. Each roller assembly 9 also has an in the Fig. 1 not shown further counter-roller 12. The further counter-roller 12 is preferably not involved in the Aufraffen and in the embodiment and is - as explained below - used in raping and coating the tubular film 1 on the stack 2. The tubular film 1 is from Hose foil stock 4 deducted, each guided over the Raffbügel 7 and each passed between the gathering roller 10 and the counter-roller 11. The gathering rollers 10 are preferably driven by a drive motor 13 while the counter-rollers 11 are not driven and act only as pressure rollers. Empfohlenermaßen and in the exemplary embodiment, the gathering rollers 10 have a larger diameter than the counter-rollers 11, 12. Conveniently and in the embodiment, the gathering roller 10 and the counter-roller 11 of each roller assembly during Abraffen arranged so that the axis of rotation of the counter-roller 11 in the feed direction of the tubular film 1 behind the Rotary axis of the associated Rafrolle 10 or in the vertical direction below the axis of rotation of the associated Rafroll 10 is located. After passing through the roller assemblies 9, the tubular film 1 is gathered below the roller assemblies 9. After this shirring of the tube 1, the tubular film 1 is separated at its upper end zweckmäßigerwelse with a separator, not shown, and welded with a welding device, also not shown, so that a film hood is formed, which can then be pulled over the stack 2.

Gemäß bevorzugter Ausführungsform der Erfindung wird die geraffte Schlauchfolie 1 quergestretcht, so dass ihr Horizontalquerschnitt größer ist als der Horizontalquerschnitt des Gutstapels 2. Vorzugsweise werden die Raffelemente 6 bzw. die Raffbügel 7 dabei als Querstretchelemente eingesetzt und zum Querstretchen der Schlauchfolie 1 werden die Raffelemente 6 diagonal auseinander gefahren. In der Fig. 2 sind die Raffelemente 6 nach dem Querstretchen über dem Gutstapel 2 dargestellt. Im Anschluss an das Raffen und Querstretchen wird die Schlauchfolie 1 dann über den Gutstapel 2 gezogen. Vorzugsweise und im Ausführungsbeispiel wird die Raffeinrichtung R/Ü dabei auch als Überzieheinrichtung R/Ü eingesetzt und die Schlauchfolie 1 wird beim Überziehen über den Gutstapel 2 von der Überzieheinrichtung R/Ü abgerafft. Die Überzieheinrichtung R/Ü wird dabei im Wesentlichen von einem vertikal verfahrbaren Spannrahmen gebildet, an den an vier Ecken die Raffelemente 6 und Rollenanordnungen 9 angeschlossen sind. Die Raffelemente 6 und Rollenanordnungen 9 werden also beim Überziehen der Schlauchfolie 1 über den Gutstapel 2 mit dem Spannrahmen verfahren bzw. nach unten verfahren.According to a preferred embodiment of the invention, the shirred tubular film 1 is quergestretcht so that its horizontal cross-section is greater than the horizontal cross-section of the stack 2. Preferably, the shirring elements 6 and the tieback 7 are used as Querstretchelemente and transverse stretching of the tubular film 1, the shirring elements 6 are diagonal moved apart. In the Fig. 2 the shirring elements 6 are shown after the Querstretchen over the stack 2. After shirring and Querstretchen the tubular film 1 is then pulled over the stack 2. Preferably, and in the embodiment, the shirring R / Ü is also used as Überzieheinrichtung R / Ü and the tubular film 1 is stripped off when coating over the stack 2 of the overdrawing R / Ü. The coating device R / Ü is essentially a vertical one formed movable clamping frame, at the four corners of the gathering elements 6 and 9 roller assemblies are connected. The shirring elements 6 and roller assemblies 9 are thus moved when coating the tubular film 1 on the stack 2 with the clamping frame or moved down.

Bei dem Überziehen über den Gutstapel 2 wird die geraffte Schlauchfolie 1 wieder abgerafft, wobei die Falten der gerafften Schlauchfolie 1 nach und nach abgezogen bzw. aufgelöst werden. Es liegt im Rahmen der Erfindung, dass bei diesem Abraffen der Schlauchfolie 1 die Raffrolle 10 und beide Gegenrollen 11, 12 jeder Rollenanordnung mit der Schlauchfolie 1 in Kontakt stehen. Insbesondere Fig. 3 zeigt, dass die Raffrolle 10 jeder Rollenanordnung mit der Außenseite der Schlauchfolie 1 in Kontakt steht während die beiden Gegenrollen 11, 12 mit der Innenseite der Schlauchfolie 1 in Kontakt stehen. Raffrolle 10 und Gegenrollen 11, 12 nehmen also die abgeraffte Schlauchfolie 1 klemmend zwischen sich auf. Die Raffrolle 10 jeder Rollenanordnung 9 wirkt also gegen beide Gegenrollen 11, 12 beim Abraffen der Schlauchfolie 1. Zweckmäßigerweise werden die Raffrollen 10 beim Abraffen der Schlauchfolie 1 jeweils von einem Antriebsmotor 13 angetrieben und zwar in der in den Fig. 3 bis 5 mit einem Pfeil angedeuteten Drehrichtung. Dagegen werden die Gegenrollen 11, 12 beim Abraffen zweckmäßigerweise nicht angetrieben und wirken lediglich als Andrückrollen bezüglich der Raffrolle 10. Gemäß einer bevorzugten Ausführungsform wird die Drehgeschwindigkeit bzw. Umfangsgeschwindigkeit der Raffrollen 10 etwas geringer gewählt als die Überziehgeschwindigkeit der Überzieheinrichtung R/Ü. Dadurch kann ein Vertikalstretch an der Schlauchfolie 1 erzeugt werden. - Wie in den Fig. 3 bis 5 erkennbar wird die Schlauchfolie 1 beim Abraffen durch die Rollenanordnungen 9 und über die Raffbügel 7 der Raffelemente 6 geführt.When coating over the stack 2, the shirred tubular film 1 is again removed, the folds of the shirred tubular film 1 are gradually removed or dissolved. It is within the scope of the invention that in this Abraffen the tubular film 1, the gathering roller 10 and both counter-rollers 11, 12 of each roller assembly with the tubular film 1 are in contact. Especially Fig. 3 shows that the gathering roller 10 of each roller assembly is in contact with the outside of the tubular film 1 while the two counter rollers 11, 12 are in contact with the inside of the tubular film 1. Raffrolle 10 and counter-rollers 11, 12 so take the stale tubular film 1 by clamping between them. The gathering roller 10 of each roller assembly 9 thus acts against both counter-rollers 11, 12 during the removal of the tubular film 1. Conveniently, the gathering rollers 10 are each driven by a drive motor 13 during the removal of the tubular film 1, namely in the Fig. 3 to 5 indicated by an arrow direction of rotation. In contrast, the counter-rollers 11, 12 during Abraffen expediently not driven and act only as pressure rollers with respect to the Rafrolle 10. According to a preferred embodiment, the rotational speed or peripheral speed of the Raffrollen 10 is slightly less than the stall speed of the overdrawing R / Ü. As a result, a vertical stretch on the tubular film 1 can be generated. - like in the Fig. 3 to 5 recognizable the tubular film 1 is guided during the raping through the roller assemblies 9 and the tieback 7 of shirring elements 6.

Die Fig. 3 bis 5 zeigen weiterhin, dass beim Abraffen und Überziehen der Schlauchfolie 1 die Drehachse der ersten oberen Gegenrolle 12 zweckmäßigerweise in Abraffrichtung hinter der Drehachse der Raffrolle 10 bzw. in Vertikalrichtung oberhalb der Drehachse der Raffrolle 10 angeordnet ist Empfohlenermaßen und im Ausführungsbeispiel ist fernerhin die Drehachse der zweiten unteren Gegenrolle 11 in Abraffrichtung vor der Drehachse der Raffrollen 10 bzw. in Vertikalrichtung unterhalb der Drehachse der Raffrolle 10 angeordnet. Der Durchmesser der Raffrolle 10 der Rollenanordnungen 9 ist vorzugsweise und im Ausführungsbeispiel größer bzw. deutlich größer als die Durchmesser der Gegenrollen 11, 12. Die erste obere Gegenrolle 12 ist bevorzugt auf Höhe des Raffbügels 7 eines Raffelementes 6 angeordnet und steht vorzugsweise und im Ausführungsbeispiel etwas aus der Oberfläche des Raffbügels 7 nach oben vor. Empfohlenermaßen steht die Gegenrolle 12 0,5 bis 4 mm aus der Oberfläche des Raffbügels 7 vor.The Fig. 3 to 5 continue to show that when raping and coating the tubular film 1, the axis of rotation of the first upper counter-roller 12 expediently Empfohlenermaßen and in the embodiment is furthermore the axis of rotation of the second lower counter-roller 11 in Abraffrichtung in front of the axis of rotation of the Raffrollen 10 and in the vertical direction below the axis of rotation of the Rafrolle 10 arranged. The diameter of the gathering roller 10 of the roller assemblies 9 is preferably and in the embodiment larger or significantly larger than the diameter of the counter-rollers 11, 12. The first upper counter-roller 12 is preferably arranged at the level of Raffbügels 7 a shirring member 6 and is preferably and in the embodiment something from the surface of the tieback 7 upwards. Empfohlenermaßen is the counter-roller 12 0.5 to 4 mm from the surface of the tieback 7 before.

Fig. 3 zeigt, dass nach Überziehen der Schlauchfolie 1 über den Gutstapel 2 die Überzieheinrichtung R/Ü mit den Einheiten aus Raffelementen 6 und Rollenanordnungen 9 den Endbereich bzw. unteren Bereich des Gutstapels erreicht hat. Im Ausführungsbeispiel befindet sich die obere Gegenrolle 12 jeder Rollenanordnung 9 auf Höhe des Palettenunterbodens 14 der Palette 3. Anschließend werden die Einheiten aus Raffelementen 6 und Rollenanordnungen 9 - wie durch den Pfeil in Fig, 3 angedeutet - in horizontaler Richtung vom Gutstapel 2 wegbewegt, so dass sich der Abstand der über die Raffelemente 6 geführten Schlauchfolle 1 zum Gutstapel 2 vergrößert. Danach wird die Überzieheinrichtung R/Ü mit ihren Einheiten aus Raffelementen 6 und Rollenanordnungen 9 nach oben entgegen der Überziehrichtung bewegt, so dass die Schlauchfolie 1 nach oben umgeschlagen wird und ein erster Schlauchfolienabschnitt 15 gebildet wird. Dieser erste Schlauchfolienabschnitt 15 wird nach dem Abraffen entlang des Gutstapelabschhitts A und entlang der Palette 3 auf der bereits an dem Gutstapel 2 und an der Palette 3 anliegenden Schlauchfolie 1 angelegt. - In Fig. 4 ist im Übrigen erkennbar, dass die Schlauchfolie 1 die Raffrolle 10 mit einem Umschlingungswinkel α umschlingt, der vorzugsweise und im Ausfühnrngsbeispiel 40° bzw, in etwa 40° beträgt. Fig. 3 shows that after coating the tubular film 1 on the stack 2, the overdrawing R / Ü with the units of shirring elements 6 and 9 roller assemblies has reached the end or lower portion of the stack. In the exemplary embodiment, the upper counter-roller 12 of each roller assembly 9 is at the level of the pallet base 14 of the pallet 3. Subsequently, the units of shirring elements 6 and 9 roller assemblies - as indicated by the arrow in FIG Fig. 3 indicated - moved away from the stack of goods 2 in the horizontal direction, so that increases the distance of the guided over the gathering elements 6 Schlauchfolle 1 to the stack 2. Thereafter, the puller R / Ü is moved with its units of shirring elements 6 and roller assemblies 9 up against the coating direction, so that the tubular film 1 is folded up and a first tubular film section 15 is formed. This first tubular film section 15 is applied after Abraffen along the Gutstapelabschhitts A and along the pallet 3 on the already applied to the stack 2 and the pallet 3 tubular film 1. - In Fig. 4 Incidentally, it can be seen that the tubular film 1, the gathering roller 10 with wraps around a wrap angle α, which is preferably and in the embodiment, 40 ° or, in about 40 °.

Wenn die gewünschte Höhe H des ersten Schlauchfolienabschnittes 15 erreicht ist, werden zweckmäßigerweise die Einheiten aus Raffelementen 6 und Rollenanordnungen 9 wieder in horizontaler Richtung zum Gutstapel hin bewegt, so dass sich der Abstand der über die Raffelemente 6 geführten Schlauchfolie 1 zum Gutstapel 2 wieder verkleinert. Danach wird die Überzieheinnchtung R/Ü mit den Einheiten aus Raffelementen und Rollenanordnungen 9 wiederum in Überziehrichtung nach unten bewegt, so dass die Schlauchfolle 1 nach unten umgeschlagen wird und ein zweiter Schlauchfolienabschnitt 16 gebildet. Der zweite Sehlauchfolienabschnitt 16 wird dann auf den ersten Schlauchfolienabschnitt 15 aufgelegt. Nach dem Auflegen des zweiten Schlauchfolienabschnittes 16 wird die Schlauchfolie 1 von der Überzieheinrichtung R/Ü freigegeben.When the desired height H of the first tubular film section 15 is reached, the units of shirring elements 6 and roller assemblies 9 are expediently moved again in the horizontal direction toward the stack, so that the distance between the tubular film 1 guided over the shirring elements 6 to the stack 2 decreases again. Thereafter, the Überzieheinnchtung R / Ü with the units of shirring elements and roller assemblies 9 is again moved in the direction of pull down, so that the tube sheet 1 is folded down and a second tubular film section 16 is formed. The second Sehlauchfolienabschnitt 16 is then placed on the first tubular film section 15. After placing the second tubular film section 16, the tubular film 1 is released from the overdrawing device R / Ü.

Mit Hilfe der umgelegten Schlauchfollenabschnitte 15, 16 wird eine sehr effektive Ladungssicherheit erzielt. Die Schlauchfolienabschnitte 15, 16 können dabei auf einfache, funktionssichere und zwanglose Weise erzeugt werden, indem die Schlauchfolie 1 beim Abraffen sowohl mit der Raffrolle 10 als auch mit beiden Gegenrollen 11, 12 in Kontakt steht.With the help of the folded hose section 15, 16 a very effective load security is achieved. The tubular film sections 15, 16 can be produced in a simple, functionally reliable and informal manner by the tubular film 1 is in Abraffen both with the gathering roller 10 and with two counter-rollers 11, 12 in contact.

Claims (11)

  1. A method for pulling a hose foil (1) or a foil hood over a material stack (2), wherein the hose foil (1) is initially gathered on a gathering device (R/U),
    wherein the gathering device (R/Ü) is employed with two roller arrangements (9) each with at least one gathering roller (10) and at least two mating rollers (11, 12), wherein during the gathering of the hose foil (1) the gathering rollers (10) are brought into contact with the outside of the hose foil (1) and merely one of the two mating rollers (11) of each roller arrangement (9) is brought into contact with the inside of the hose foil (1),
    wherein the gathered hose foil (1) following this is pulled over the material stack (2) with a pull-over device (R/Ü) in that the pull-over device (R/Ü) is moved along the material stack (2) and the hose foil (1) is de-gathered by the pull-over device (R/Ü) in the process,
    wherein during the de-gathering of the hose foil (1) during the course of putting on a first and a second hose foil section (15, 16) the gathering rollers (10) of the roller arrangements (9) are in contact with the outside of the hose foil (1) and both mating rollers (11, 12) of each roller arrangement (9) are in contact with the inside of the hose foil (1),
    wherein after reaching an end region of the material stack (2) the pull-over device (R/Ü) is moved along a material stack section (A) against the pull-over direction so that the first hose foil section (15) is placed against the hose foil (1) already placed against the material stack (2)
    and wherein following this the pull-over device (R/Ü) is again moved in pull-over direction along at least one part of the material stack section (A), so that the second hose foil section (16) is placed onto the first hose foil section (15).
  2. The method according to Claim 1, wherein the gathering device or pull-over device (R/Ü) comprises at least two gathering elements (6), via which the hose foil (1) de-gathered during the pulling-over is guided.
  3. The method according to Claim 2, wherein the gathering elements (6) having reached the end region of the material stack (2) are moved away from the material stack (2) so that the spacing of the hose foil (1) guided over the gathering elements (6) from the material stack (2) is enlarged and wherein following this the pull-over device (R/Ü) is moved against the pull-over direction.
  4. The method according to any one of the Claims 2 or 3, wherein the gathering elements (6) following the putting on of the first hose foil section (15) are moved towards the material stack (2), so that the spacing of the hose foil (1) guided over the gathering elements (6) from the material stack (2) is reduced and wherein the pull-over device (R/Ü) is again moved in pull-over direction thereafter.
  5. The method according to any one of the Claims 1 to 4, wherein the hose foil (1) following the gathering is transversely stretched.
  6. The method according to any one of the Claims 1 to 5, wherein the gathering device (R/Ü) is employed as pull-over device (R/Ü).
  7. The method according to any one of the Claims 1 to 6, wherein at least during the de-gathering of the hose foil (1) during the course of the putting on of the first and of the second hose foil section (15, 16) the roller arrangements (9) are designed with the instruction that the hose foil (1) wraps the gathering rollers (10) in each case with a wrapping angle α which amounts to 25° to 60°, preferentially 30° to 50° and most preferably 35°to 45°.
  8. The method according to any one of the Claims 1 to 7, wherein following the putting on of the second hose foil section (16) the hose foil (1) is released by the pull-over device (R/Ü).
  9. The device for pulling-over a hose foil (1) or a foil hood over a material stack (2),- with a gathering device (R/Ü) for gathering the hose foil (1) and with a pull-over device (R/Ü) for gathering and for pulling-over the hose foil (1) over the material stack (2),
    wherein with the pull-over device (R/Ü) at least one hose foil section (15, 16) already joined to the hose foil (1) lying on the material stack (2) can be placed on the hose foil (1) lying on the material stack (2),
    wherein the pull-over device (R/Ü) comprises at least two roller arrangements (9) each with at least one gathering roller (10) and each with at least two mating rollers (11, 12),
    wherein during the gathering of the hose foil (1) the gathering rollers (10) can be brought into contact with the outside of the hose foil (1) and merely one of the two mating rollers (11) of each roller arrangement (9) can be brought into contact with the inside of the hose foil (1)
    and wherein during the gathering of the hose foil (1) for the putting on of the at least one hose foil section (15, 16) the gathering roller (10) and the two mating rollers (11, 12) can be brought into contact with the de-gathered hose foil (1).
  10. The device according to Claim 9, wherein the gathering device (R/Ü) can be employed as pull-over device (R/Ü) for the de-gathering and for the pulling-over of the hose foil (1) over the material stack (2).
  11. The device according to any one of the Claims 9 or 10, wherein at least two gathering elements (6) are provided, each of which are assigned a roller arrangement (9), wherein the gathering elements (6) each have at least one gathering frame (7), over which the hose foil (1) can be guided during the gathering and during the de-gathering and wherein a first mating roller (12) of each roller arrangement (9) during the de-gathering of the hose foil (1) is arranged at the height of the gathering frame (7) and preferentially protrudes over the assigned gathering frame (7).
EP08022156A 2008-12-19 2008-12-19 Method and device for drawing a tubular film or a film cover over a stack Active EP2199214B1 (en)

Priority Applications (15)

Application Number Priority Date Filing Date Title
ES08022156T ES2375174T3 (en) 2008-12-19 2008-12-19 PROCEDURE AND DEVICE TO COVER A TUBULAR SHEET OR WELL A SHEET WRAP ON A BATTERY OF PRODUCTS.
DK08022156.7T DK2199214T3 (en) 2008-12-19 2008-12-19 Method and device for coating a hose film or foil sheath over a material stack
DE202008017442U DE202008017442U1 (en) 2008-12-19 2008-12-19 Device for coating a tubular film or a film hood over a stack of goods
DK11171765.8T DK2371716T3 (en) 2008-12-19 2008-12-19 Method and device for coating a hose film or foil sheath over a material stack
EP11171765A EP2371716B1 (en) 2008-12-19 2008-12-19 Method and device for drawing a tubular film or a film cover over a stack
EP08022156A EP2199214B1 (en) 2008-12-19 2008-12-19 Method and device for drawing a tubular film or a film cover over a stack
ES11171765T ES2389623T3 (en) 2008-12-19 2008-12-19 Procedure and device for coating a tubular sheet or a sheet cover on a stack of products
CN200980155559.9A CN102300775B (en) 2008-12-19 2009-12-12 Method And Device For Drawing A Tubular Film Or A Film Cover Over A Stack Of Goods
PCT/EP2009/008915 WO2010078915A1 (en) 2008-12-19 2009-12-12 Method and device for drawing a tubular film or a film cover over a stack of goods
US13/139,298 US8875480B2 (en) 2008-12-19 2009-12-12 Method of pulling a film tube or hood down over a stack of objects
RU2011129820/13A RU2478066C1 (en) 2008-12-19 2009-12-12 Method and device to put sleeved film or film envelope onto parcel stack
UAA201109019A UA101244C2 (en) 2008-12-19 2009-12-12 Method and device for drawing tubular film or film cover over stack of goods
BRPI0923173A BRPI0923173A2 (en) 2008-12-19 2009-12-12 "Method and device for coating a tubular laminate, i.e. a laminated cover, on a stack of products"
MX2012010709A MX341026B (en) 2008-12-19 2009-12-12 Method and device for drawing a tubular film or a film cover over a stack of goods.
MX2011006383A MX339958B (en) 2008-12-19 2009-12-12 Method and device for drawing a tubular film or a film cover over a stack of goods.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP08022156A EP2199214B1 (en) 2008-12-19 2008-12-19 Method and device for drawing a tubular film or a film cover over a stack

Related Child Applications (1)

Application Number Title Priority Date Filing Date
EP11171765.8 Division-Into 2011-06-28

Publications (2)

Publication Number Publication Date
EP2199214A1 EP2199214A1 (en) 2010-06-23
EP2199214B1 true EP2199214B1 (en) 2011-11-09

Family

ID=40740034

Family Applications (2)

Application Number Title Priority Date Filing Date
EP08022156A Active EP2199214B1 (en) 2008-12-19 2008-12-19 Method and device for drawing a tubular film or a film cover over a stack
EP11171765A Active EP2371716B1 (en) 2008-12-19 2008-12-19 Method and device for drawing a tubular film or a film cover over a stack

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP11171765A Active EP2371716B1 (en) 2008-12-19 2008-12-19 Method and device for drawing a tubular film or a film cover over a stack

Country Status (11)

Country Link
US (1) US8875480B2 (en)
EP (2) EP2199214B1 (en)
CN (1) CN102300775B (en)
BR (1) BRPI0923173A2 (en)
DE (1) DE202008017442U1 (en)
DK (2) DK2199214T3 (en)
ES (2) ES2389623T3 (en)
MX (2) MX339958B (en)
RU (1) RU2478066C1 (en)
UA (1) UA101244C2 (en)
WO (1) WO2010078915A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3215421B1 (en) 2014-11-04 2020-03-04 Frank Bruhn APS Horizontally arranged wrap packaging system

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010037770B4 (en) * 2010-09-24 2012-06-14 Illinois Tool Works Inc. Method and device for at least partially wrapping a stack of pieces with a hose section
DE102011000205B4 (en) 2011-01-18 2014-07-17 Illinois Tool Works Inc. Apparatus and method for reefing a tubular film section
DE102011075451B4 (en) 2011-05-06 2014-05-08 Illinois Tool Works Inc. Method and device for impinging a tubular film section on the refining fingers of a packaging installation
FI124180B (en) 2011-09-30 2014-04-15 Illinois Tool Works Method of bringing a winding machine into a transport position and winding machine
ITRN20120003A1 (en) * 2012-01-13 2013-07-14 Cocci Luciano S R L EQUIPMENT FOR LOADING A NETWORK TUBE.
KR20130089035A (en) * 2012-02-01 2013-08-09 삼성전자주식회사 Shrink film packing system
FI125661B (en) 2012-09-07 2015-12-31 Signode Int Ip Holdings Llc Method and apparatus for attaching corner guard to a load
FI125411B (en) 2013-10-31 2015-10-15 Signode Internat Ip Holdings Llc Method and Attachment Device for Attaching the End of a Wrapping Film Web to a Wrapping Machine, and a Wrapping Machine
DE102014106365B4 (en) 2014-05-07 2017-06-14 Lachenmeier Aps Packaging process for packaging a good
DE102015101489A1 (en) 2015-02-02 2016-08-04 Signode Industrial Group Llc Packaging device and method of operating the same
GB201506182D0 (en) * 2015-04-13 2015-05-27 Composite Technology & Applic Ltd Bagging apparatus
DE102016212436B4 (en) * 2016-07-07 2018-07-26 Signode Industrial Group Llc Packaging process and hood stretcher
EP3398861A1 (en) * 2017-05-04 2018-11-07 Erin Intellectual Property Limited Method and computer program for wrapping a stack of goods, and packaging unit
US11492155B2 (en) 2020-05-14 2022-11-08 Signode Industrial Group Llc Stretch-hood machine
WO2022266567A1 (en) * 2021-06-16 2022-12-22 Signode Industrial Group Llc Stretch-hood machine with film-evaluation feature

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1298444B (en) * 1966-10-19 1969-06-26 Alkor Oerlikon Plastic Gmbh Transport and storage unit
FR2473985A1 (en) * 1980-01-17 1981-07-24 Thimon MACHINE FOR PACKING A LOAD IN A SHEET STRING IN A FLEXIBLE MATERIAL
FR2566739B3 (en) * 1984-07-02 1986-11-21 Newtec Internal Sa PROCESS FOR PRODUCING AN ANNULAR END FOLD ON A TUBULAR SHEATH, IN PARTICULAR A PLASTIC PACKING SHEATH AND MACHINE FOR IMPLEMENTING SAME
SU1606382A1 (en) * 1988-12-05 1990-11-15 Дзержинский филиал Ленинградского научно-исследовательского и конструкторского института химического машиностроения Method and apparatus for packing a stack of objects into casing from stretching film
DE4019041C1 (en) * 1990-06-14 1991-10-17 Bernhard Beumer Maschinenfabrik Kg, 4720 Beckum, De
DE19732298C1 (en) * 1997-07-26 1999-02-04 Moellers Maschf Gmbh Machine for covering stacked articles with film packaging
EP1059233A1 (en) * 1999-04-16 2000-12-13 Kl- Lachenmeier A/S Method and device for packaging objects in a film-hood
DE10103261A1 (en) * 2001-01-25 2002-08-14 Msk Verpackung Syst Gmbh Method of covering a flat hose
DE20101909U1 (en) * 2001-01-25 2002-06-13 Msk Verpackung Syst Gmbh Device for wrapping a stack of goods
ES2233726T3 (en) * 2001-06-13 2005-06-16 BEUMER MASCHINENFABRIK GMBH & CO. KG PROCEDURE FOR THE WRAPPING OF GOODS, ESPECIALLY OF BATTERIES OF GOODS, WITH AN ELASTIC SHEET.
DE20109692U1 (en) * 2001-06-13 2002-10-24 Beumer Maschf Gmbh & Co Kg Device for wrapping general cargo by means of a stretch film hood
DE50308120D1 (en) * 2002-04-19 2007-10-18 Msk Verpackung Syst Gmbh DEVICE AND METHOD FOR TURNING PIECE OR PACKING
US7320403B2 (en) * 2004-06-28 2008-01-22 Bsh Home Appliances Corporation Package, method, and kit for stretch hood packaging of home appliances

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3215421B1 (en) 2014-11-04 2020-03-04 Frank Bruhn APS Horizontally arranged wrap packaging system
EP3215421B2 (en) 2014-11-04 2023-08-02 Tentoma A/S Horizontally arranged wrap packaging system

Also Published As

Publication number Publication date
UA101244C2 (en) 2013-03-11
BRPI0923173A2 (en) 2016-02-16
MX339958B (en) 2016-06-20
MX341026B (en) 2016-08-04
WO2010078915A1 (en) 2010-07-15
RU2478066C1 (en) 2013-03-27
EP2371716B1 (en) 2012-06-13
CN102300775B (en) 2014-04-02
CN102300775A (en) 2011-12-28
RU2011129820A (en) 2013-01-27
EP2371716A1 (en) 2011-10-05
DK2371716T3 (en) 2012-09-24
EP2199214A1 (en) 2010-06-23
DE202008017442U1 (en) 2009-08-27
US8875480B2 (en) 2014-11-04
ES2389623T3 (en) 2012-10-29
DK2199214T3 (en) 2012-01-02
US20110258973A1 (en) 2011-10-27
MX2011006383A (en) 2011-09-28
ES2375174T3 (en) 2012-02-27

Similar Documents

Publication Publication Date Title
EP2199214B1 (en) Method and device for drawing a tubular film or a film cover over a stack
EP2060492B1 (en) Device for drawing a tubular film or a film cover over a stack
DE19732298C1 (en) Machine for covering stacked articles with film packaging
DE3101310C2 (en) Packing machine
EP1963187B1 (en) Hood packaging installation with device for producing side folds
EP1184281B1 (en) Method an apparatus for packaging objects
DE102010037770B4 (en) Method and device for at least partially wrapping a stack of pieces with a hose section
DE202007018900U1 (en) Device for coating a tubular film or a film hood over a stack of goods
EP1266828B1 (en) Method and apparatus for wrapping stacks of articles in a stretchable foil cover or sleeve
DE2026860A1 (en)
EP0461667B1 (en) Method and apparatus for wrapping products in stretchable film
EP0399540B1 (en) Method and device for wrapping products in a hood of stretchable film and packaging unit shaped with this
EP0708025A1 (en) Vertical bag forming, filling and sealing machine
EP2130771B1 (en) Device and method for covering a stack of goods with protective film
DE19612372C2 (en) Stretch device for stretching a stretch film hood
EP0043517B1 (en) Apparatus for drawing a shrinkable film hood over a stack of goods
EP0564971A2 (en) Device and method for making a stack of articles
DE60311050T2 (en) Method and apparatus for wrapping a palletized load with a stretch film hood
DE102009014581B4 (en) Method and device for film lining of containers
DE60302588T2 (en) Method and apparatus for covering a stretch film hood over a palletized load
EP2289805A1 (en) Method and device for wrapping stacks of goods
DE2420970A1 (en) METHOD OF MANUFACTURING BAGS AND DEVICE FOR CARRYING OUT THE METHOD
EP0445443B1 (en) Fusseted tubing made of stretch-film for packaging items
DE19933856A1 (en) Method for wrapping general cargo, in particular a stack of bulk goods, with a stretch film hood, and device for carrying out this method
DE19542268C2 (en) Packaging machine for goods hanging on hangers

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20091230

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA MK RS

AKX Designation fees paid

Designated state(s): DE DK ES FR IT NL

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

DAC Divisional application: reference to earlier application (deleted)
GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE DK ES FR IT NL

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502008005509

Country of ref document: DE

Effective date: 20111229

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

REG Reference to a national code

Ref country code: NL

Ref legal event code: T3

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2375174

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20120227

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20120810

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502008005509

Country of ref document: DE

Effective date: 20120810

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 9

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 10

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230525

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20231220

Year of fee payment: 16

Ref country code: IT

Payment date: 20231228

Year of fee payment: 16

Ref country code: FR

Payment date: 20231221

Year of fee payment: 16

Ref country code: DK

Payment date: 20231227

Year of fee payment: 16

Ref country code: DE

Payment date: 20231123

Year of fee payment: 16

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20240126

Year of fee payment: 16