EP2175104B1 - A small bypass system of a generator set and a controlling method thereof - Google Patents

A small bypass system of a generator set and a controlling method thereof Download PDF

Info

Publication number
EP2175104B1
EP2175104B1 EP07845793.4A EP07845793A EP2175104B1 EP 2175104 B1 EP2175104 B1 EP 2175104B1 EP 07845793 A EP07845793 A EP 07845793A EP 2175104 B1 EP2175104 B1 EP 2175104B1
Authority
EP
European Patent Office
Prior art keywords
bypass
small
valves
bypass system
big
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP07845793.4A
Other languages
German (de)
French (fr)
Other versions
EP2175104A4 (en
EP2175104A1 (en
Inventor
Weizhong Feng
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waigaoqiao No3 Power Generation CoLtd
Original Assignee
Shanghai Waigaoqiao No3 Power Generation CoLtd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waigaoqiao No3 Power Generation CoLtd filed Critical Shanghai Waigaoqiao No3 Power Generation CoLtd
Publication of EP2175104A1 publication Critical patent/EP2175104A1/en
Publication of EP2175104A4 publication Critical patent/EP2175104A4/en
Application granted granted Critical
Publication of EP2175104B1 publication Critical patent/EP2175104B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D19/00Starting of machines or engines; Regulating, controlling, or safety means in connection therewith
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D21/00Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/16Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type
    • F01K7/22Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type the turbines having inter-stage steam heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/48Devices for removing water, salt, or sludge from boilers; Arrangements of cleaning apparatus in boilers; Combinations thereof with boilers
    • F22B37/52Washing-out devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2220/00Application
    • F05D2220/30Application in turbines
    • F05D2220/31Application in turbines in steam turbines

Definitions

  • the present invention relates to the field of electric power heat engine and thermal automation, and more particularly, to a small bypass system and a control method thereof.
  • a coal-fired generating unit mainly comprises three main machines: a boiler, a turbine and a generator.
  • a boiler In the control strategies, since the boiler with a huge volume has a relatively big inertia to change its state, the change is relatively slow. However, as compared to the state change of the boiler, the change of the rotation speed and the output state of a turbine is much faster.
  • the bypass system is an indispensable part in the process of coordinating the operation of the two machines.
  • the high-capacity bypass systems for coal-fired generating units both at home and abroad including 100% capacity bypass systems, are always directly led out from the outlet pipes of the boiler superheater header at the side close to the boiler and then connected into the cold section of the reheater, resulting in that only little live steam passes through each of the main steam pipe extending from the big bypass valves to the steam turbine.
  • the temperature of this pipe section is relatively low, however, in the operating mode, this pipe section endures the highest temperature in the whole steam-water circulation. Therefore, in general, oxidation in this pipe section is rather serious. In the cold starting mode, due to thermal impact, the fallen oxide skins in the pipe will directly enter the HP cylinder of the steam turbine, thus causing tremendous damage to the turbine blades.
  • the starting of a unit always involves a process of starting with a bypass system.
  • the main steam passes the big bypass valves and enters the cold section of the boiler reheater, and then returns to the boiler reheater.
  • all the pipes from the big bypass valves to the turbine only allow a small amount of steam flow to pass through a drain valve, causing a considerable lag between the temperature of this section of the main steam line and the actual main steam temperature.
  • the steam quality sampled from this pipe section is not authentic, and it is not easy to meet the conditions for turbine impulse start, thus resulting in a delay of the starting of the turbine and a waste of lots of fuel, station-service power and time.
  • a technical issue to be addressed by the present invention is to provide a control method of a small by pass system, which is to be used at the starting stage of a generating unit to protect a high-capacity bypass valve and to solve the problem that the steam flow in the main steam pipe is too small in quantity.
  • the present invention provides a small bypass system, wherein said generating unit comprises at least a boiler and a turbine as well as a main steam pipe, and a big bypass system which is connected with said boiler and said turbine.
  • a small bypass system is provided on said main steam pipe close to said turbine.
  • Said small bypass system comprises a small bypass steam pipe and at least one group of small bypass adjusting valves.
  • said small bypass adjusting valves are small capacity adjusting valves for reducing temperature and pressure, and in said small bypass steam pipe, stop valves are also provided in front of and/or behind said small bypass adjusting valves.
  • the flow of said small bypass system is 1% - 50% of the flow of said main steam pipe.
  • the flow of said small bypass system is 5% - 30% of the flow of said main steam pipe.
  • the present invention provides a control method of a small bypass system, comprising the following steps:
  • Step 4 after said Step 3: after the load on said generating unit has gradually increased, firstly gradually closing said small bypass adjusting valves, then gradually closing said big bypass system until the steam flow in said big bypass system is slightly less than the maximum flow of said small bypass system, quickly closing said big bypass system; and at the same time quickly opening said small bypass system, so as to shift all the steam flow in said big bypass system to said small bypass system, and then closing said small bypass adjusting valves, until the steam flow of the whole bypass system becomes zero.
  • the main steam pressure of said generating unit remains substantially stable.
  • the operation steps of the small bypass can be the reverse of the unit starting process, in a sequence from Step 4 to Step 1.
  • the opening/closing operations of said small bypass system as well as its coordination with said big bypass system are controlled by way of a programmed control.
  • said small bypass adjusting valves and the valves of said big bypass system jointly constitute a first bypass valve group and a second bypass valve group, which are respectively located on two steam inlet sides of said turbine.
  • said bypass valve group Before said turbine is prepared for impulse start, it is feasible to firstly enter the alternate opening and closing operations of the bypass valve group, firstly opening said the first bypass valve group and then closing said second valve group, so that said steam in said boiler outlet header is unilaterally discharged only via said first bypass valve group in an open state. Then, after maintaining said first bypass valve group in the open state for a predetermined time period, closing said first bypass valve group, and at the same time opening said second bypass valve group, so that said steam in said header is discharged only from said second bypass valve group in an open state.
  • the present invention avoids the big bypass valves from operating at a smaller opening, and significantly reduces the erosion of the spools of the big bypass valves by foreign matters such as fallen oxide skins in the boiler.
  • the steam of a certain flow rate can enter the cold section of the reheater via the small bypass system, thus improving the pipe warming efficiency of this section of the main steam pipe.
  • the fallen oxide skins in the main steam pipe at the starting stage can be discharged via the small bypass system, thus reducing the erosion of the turbine by solid particles, and thus improving the safety of the unit.
  • the steam of a certain flow rate can enter the cooling section via the small bypass system and the main steam pipe can obtain a great amount of steam to warm up this pipe section.
  • a large amount of foreign matters such as solid particles causes serious erosion to the spools of the big bypass valves.
  • the small bypass adjusting valves are firstly opened without an action of the big bypass valves, thus properly avoiding the damage to the spools of the big bypass valves caused by the oxide skins and solid particles in the pipe.
  • the body of the small bypass adjusting valves is of smaller size and thus the price is much lower than that of the big bypass valves.
  • the steam in this pipe section has a very small impulse, it is very difficult to completely sweep out the oxide skins in this pipe section.
  • the small bypass can be opened at the starting time and thus integrated into the existing control of the starting process of the big bypass, so that the steam firstly passes through the small bypass. In this way, the impulse of the steam in this pipe section can be greatly increased, removing the solid particles accumulated in this pipe section, reducing the erosion of the turbine by solid particles, and improving the safety of the unit.
  • the small bypass adjusting valves can act together with the big bypass valves, firstly performing unilateral opening/closing actions, and protecting the big bypass valves in this continuous opening/closing process. Meanwhile, at the early stage of starting, if it is in a cold state, the small bypass adjusting valves need to be opened to avoid the throttled steam from scouring the big bypass valves. If in a hot state or in an extremely hot state, it is necessary to firstly open the big bypass valves to avoid supercooled steam and water from entering the high-temperature pipes and thus resulting in the falling of a large quantity of oxide skins in the pipes. The above described steps are adopted to reduce the generation of oxide skins in the header, with a good effect of sweeping the pipes.
  • FIG. 1 is a schematic diagram showing an arrangement of a unit to which a small bypass system of the present invention is applied.
  • At least two main machines are provided in one thermal power unit: a turbine 12 and a boiler 1, as well as a pipe system.
  • the bypass system is a main component to adjust and coordinate the two main machines.
  • the steam from the boiler 1 passes through a superheater 2 and enters the superheater outlet header 5, then, after passing through the main steam pipe 13, enters an HP cylinder (not shown) of the turbine 12 via the turbine 12 to do work.
  • the discharged steam enters the reheater 3 in the boiler after passing the cold section 4.
  • the big bypass is located between the boiler outlet header 5 and the cold section 4 of the reheater.
  • the big bypass comprises big bypass valves 6, 7, 8 and 9, which are respectively located on both sides of the superheater outlet header of the boiler 1, as well as communicating pipes connected with the cold section of the reheater.
  • the specialty of the present invention lies in the fact that: a small bypass system is installed on the main steam pipe, between the side close to the turbine 12 and the cold section 4 of the reheater.
  • this small bypass system comprises two small bypass adjusting valves 10 and 11 which are respectively located on both sides of the HP cylinder of the turbine 12, as well as communicating pipes.
  • the adjusting valves of the small bypass system are not required to have a quick opening/closing function. These adjusting valves are only used at the starting/stop stages of the unit, and are not required to endure the full pressure of the unit.
  • the present invention provides a control method for a bypass system described above.
  • the steam enters the HP cylinder of turbine 12 via the main steam pipe 13 to do work.
  • the big bypass valves are firstly opened.
  • the small bypass adjusting valve system prior to opening the big bypass valves 6, 7, 8 and 9, firstly the small bypass adjusting valve system are gradually opened, i.e., the small bypass adjusting valves 10 and 11 are slowly opened, so that the steam from the boiler 1 passes through the superheater outlet header and enters the cold section pipe of the reheater via the small bypass adjusting valves 10 and 11, until the small bypass system is fully opened.
  • the flow of the small bypass system is 20% of the steam flow in the unit, therefore this small bypass system is called for short as a 20% small bypass system.
  • the big bypass valves 6, 7, 8 and 9 need to be quickly opened, and at the same time the small bypass adjusting valves 10 and 11 are closed, so that the steam is transferred from the small bypass adjusting valves 10 and 11 to the big bypass valves 6, 7, 8 and 9 and then enters the cold section 4 of the reheater .
  • the big bypass valves 6, 7, 8 and 9 need to be closed gradually until the steam flow in the pipe is less than or equal to 20% of the total amount of steam.
  • the big bypass valves 6, 7, 8 and 9 need to be quickly closed completely, and at the same time the small bypass adjusting valves 10 and 11 need to be opened to keep the pressure of the main steam to decrease steadily.
  • the small bypass adjusting valves 10 and 11 need to be closed gradually, until the steam flow in the pipe becomes zero.
  • the unit continues to carry out the following starting procedures in a conventional starting mode.
  • the main steam pipe in the section from the big bypass valves to the small bypass adjusting valves is pre-warmed, and the solid particles and oxide skins in this pipe section are removed.
  • a large quantity of solid particles accumulated at the early stage of starting are firstly discharged via the small bypass adjusting valves, reducing the impact of foreign matters of solid particles on the spools of the big bypass valves, and thus protecting the spools of the big bypass valves from being damaged.
  • control method of the present invention can also realize the control on the opening/closing of the small bypass system in a program-controlled mode.
  • the small bypass control system can be included in the control system of the whole unit, so as to realize a full automatic management.
  • the safety of the small bypass adjusting valves is improved, and the small bypass adjusting valves are prevented from being scoured or wounded, which may result in steam leakage in the normal operating modes.
  • the flow of the small bypass system is not limited to 20% of the steam flow in the unit.
  • any bypass with a flow less than 50% of the steam flow in the unit can be called as a small bypass.
  • the flow of the small bypass system is selected at 5%- 30% of the steam flow in the unit.
  • FIG 2 is the simplified block diagram of the starting process of the unit as shown in Figure 1 ("small bypass valves" in this figure refers to the small bypass adjusting valves).
  • the starting procedures of the unit with a bypass system can be basically divided into the following stages: the stage of the minimum opening, the stage of the minimum pressure, the stage of increasing pressure, the stage of fixed pressure, and the stage of following mode.
  • the main steam pipe 13 extending from the big bypass valves 6, 7, 8 and 9 to the small bypass adjusting valves 10 and 11 is also pre-warmed and scoured, and a large quantity of solid particles have been discharged via the small bypass adjusting valves 10 and 11. Furthermore, since the big bypass valves 6, 7, 8 and 9 are quickly opened, their working time under throttle operating mode is also reduced, and the spools of the big bypass valves are also protected.
  • the starting operation When the starting operation has proceeded to a certain stage (set as the stage of fixed pressure in this embodiment), it is started to take the unilaterally alternate opening/closing actions on the bypass and scour the superheater outlet header 5. Since this stage is transited from the stage of increasing pressure, by this time the big bypass valves 6, 7, 8 and 9 are in the open state, it is required to firstly close the first group of the big bypass valves located on the same side with the superheater header, and then slowly close the big bypass valves 6 and 7. At this moment, in order to maintain a stable pressure, the second group of the big bypass valves 8 and 9, which are located on the other side of the HP cylinder 12, remain a open state.
  • the small bypass adjusting valves need to be quickly opened, and at the same time the closing of the second group of the big bypass valves 6 and 7 need to speeded up.
  • the big bypass valves act together with the small bypass adjusting valves to keep the pressure to change according to the preset curve.
  • the steam generated from the superheater 3 of the boiler 1 passes through the superheater outlet header 5 and unilaterally enters the cold section 4 of the reheater via the first group of the big bypass valves 8 and 9, and at the same time partial steam passes through the main steam pipe 13 on the same side with the first group of the big bypass valves 8 and 9 and also enters the cold section 4 of the reheater via the small bypass adjusting valve 11, and returns to the reheater 2.
  • the main steam pipe 13 and the outlet header 3 on this side are scoured, and the foreign matters of solid particles therein are discharged from the outlet header 5.
  • the small bypass adjusting valves are to be slowly opened, and at this time the first group of the big bypass valves 8 and 9 need to be slowly closed.
  • the second group of the big bypass valves 6 and 7 located on the same side need to be opened, and at the same time the small bypass adjusting valve 10 are quickly closed, resulting in that the second group of big bypass valves 6 and 7 are quickly opened.
  • the specifics of the process here are similar to those of the process described above.
  • the small bypass adjusting valves 10 and 11 need to be closed, and then the big bypass valves 6, 7, 8 and 9 are closed, and are quickly closed when the flow of the small bypass adjusting valves has been reached.
  • the small bypass adjusting valves are opened to keep the pressure stable.
  • the small bypass adjusting valves are used to maintain a stable pressure until these small bypass adjusting valves are closed, so as to avoid the throttled steam from scouring the spools of the big bypass valves.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)
  • Control Of Turbines (AREA)

Description

    Field of the Invention
  • The present invention relates to the field of electric power heat engine and thermal automation, and more particularly, to a small bypass system and a control method thereof.
  • Background of the invention
  • Document US 4598 551 discloses an apparatus and method for controlling steam turbine operating conditions during starting and loading.
  • A coal-fired generating unit mainly comprises three main machines: a boiler, a turbine and a generator. In the control strategies, since the boiler with a huge volume has a relatively big inertia to change its state, the change is relatively slow. However, as compared to the state change of the boiler, the change of the rotation speed and the output state of a turbine is much faster. The bypass system is an indispensable part in the process of coordinating the operation of the two machines.
  • At present, the high-capacity bypass systems for coal-fired generating units both at home and abroad, including 100% capacity bypass systems, are always directly led out from the outlet pipes of the boiler superheater header at the side close to the boiler and then connected into the cold section of the reheater, resulting in that only little live steam passes through each of the main steam pipe extending from the big bypass valves to the steam turbine. As a result, on the one hand, the temperature of this pipe section is relatively low, however, in the operating mode, this pipe section endures the highest temperature in the whole steam-water circulation. Therefore, in general, oxidation in this pipe section is rather serious. In the cold starting mode, due to thermal impact, the fallen oxide skins in the pipe will directly enter the HP cylinder of the steam turbine, thus causing tremendous damage to the turbine blades.
  • Secondly, when starting the unit, a large quantity of foreign matters such as oxide skins and solid particles will pass through the big bypass valves along with a high speed steam flow, while in the conventional starting process, because the gaps between the valve spools and the valve seats are very small when the big bypass valves have a relatively small opening, the flow speed at this position is very high, and the solid foreign matters carried by the high-speed steam will scour the spools of the bypass valves at a high speed, easily causing wounds on the spools of the bypass valves. When a valve spool has returned to the valve base, the leak tightness between the valve spool with the wounds and the valve body is considerably reduced, and the high-speed steam flow will continuously scour the wounds, causing the wounds to become increasingly large, and in serious cases it will directly result in discarding of expensive spools. During the operation, a great amount of steam will leak from the wounds, affecting the economical efficiency of unit operation.
  • Thirdly, under usual conditions, the starting of a unit always involves a process of starting with a bypass system. The main steam passes the big bypass valves and enters the cold section of the boiler reheater, and then returns to the boiler reheater. During this process, when the steam is passing through the big bypass valves, all the pipes from the big bypass valves to the turbine only allow a small amount of steam flow to pass through a drain valve, causing a considerable lag between the temperature of this section of the main steam line and the actual main steam temperature. Furthermore, the steam quality sampled from this pipe section is not authentic, and it is not easy to meet the conditions for turbine impulse start, thus resulting in a delay of the starting of the turbine and a waste of lots of fuel, station-service power and time.
  • Summary of the Invention
  • In view of the deficiencies in the prior art as described above, a technical issue to be addressed by the present invention is to provide a control method of a small by pass system, which is to be used at the starting stage of a generating unit to protect a high-capacity bypass valve and to solve the problem that the steam flow in the main steam pipe is too small in quantity.
  • To achieve the above objects, the present invention provides a small bypass system, wherein said generating unit comprises at least a boiler and a turbine as well as a main steam pipe, and a big bypass system which is connected with said boiler and said turbine. A small bypass system is provided on said main steam pipe close to said turbine. Said small bypass system comprises a small bypass steam pipe and at least one group of small bypass adjusting valves.
  • Preferably, said small bypass adjusting valves are small capacity adjusting valves for reducing temperature and pressure, and in said small bypass steam pipe, stop valves are also provided in front of and/or behind said small bypass adjusting valves.
  • Preferably, the flow of said small bypass system is 1% - 50% of the flow of said main steam pipe.
  • Preferably, the flow of said small bypass system is 5% - 30% of the flow of said main steam pipe.
  • The present invention provides a control method of a small bypass system, comprising the following steps:
    • Step 1: prior to opening said big bypass system of said generating unit, firstly opening the small bypass stop valves, and gradually opening said small bypass adjusting valves, so that the main steam from said boiler is discharged to the reheat system of said generating unit via said bypass system, until said bypass system reaches the maximum flow;
    • Step 2: immediately after said small bypass system has reached the maximum flow, adjusting said big bypass system to an opening that corresponds to the maximum flow of said small bypass, and at the same time closing said small bypass adjusting valves, so that the flow of said small bypass system is quickly shifted to said big bypass system;
    • Step 3: when said big bypass system has gradually reached a relatively larger opening, gradually opening said small bypass adjusting valves to the maximum flow.
  • Preferably, it further includes a Step 4 after said Step 3: after the load on said generating unit has gradually increased, firstly gradually closing said small bypass adjusting valves, then gradually closing said big bypass system until the steam flow in said big bypass system is slightly less than the maximum flow of said small bypass system, quickly closing said big bypass system; and at the same time quickly opening said small bypass system, so as to shift all the steam flow in said big bypass system to said small bypass system, and then closing said small bypass adjusting valves, until the steam flow of the whole bypass system becomes zero. In the whole process of Step 4, the main steam pressure of said generating unit remains substantially stable.
  • Preferably, in the process of shutdown operation of the unit, when the load of turbogenerator gradually decreases until parallel off and the load of boiler gradually decreases until shutdown of the boiler, the operation steps of the small bypass can be the reverse of the unit starting process, in a sequence from Step 4 to Step 1.
  • Preferably, the opening/closing operations of said small bypass system as well as its coordination with said big bypass system are controlled by way of a programmed control.
  • Preferably, said small bypass adjusting valves and the valves of said big bypass system jointly constitute a first bypass valve group and a second bypass valve group, which are respectively located on two steam inlet sides of said turbine. Before said turbine is prepared for impulse start, it is feasible to firstly enter the alternate opening and closing operations of the bypass valve group, firstly opening said the first bypass valve group and then closing said second valve group, so that said steam in said boiler outlet header is unilaterally discharged only via said first bypass valve group in an open state. Then, after maintaining said first bypass valve group in the open state for a predetermined time period, closing said first bypass valve group, and at the same time opening said second bypass valve group, so that said steam in said header is discharged only from said second bypass valve group in an open state. Subsequently, after maintaining said second bypass valve group in the open state for a predetermined time period, terminating the alternate opening/closing operations and shifting to the normal control mode. In the process of said alternate opening/closing operations, the main steam pressure of said generating unit maintains substantially stable.
  • Only by adding a small bypass system in an existing generating unit, the present invention avoids the big bypass valves from operating at a smaller opening, and significantly reduces the erosion of the spools of the big bypass valves by foreign matters such as fallen oxide skins in the boiler. On the other hand, the steam of a certain flow rate can enter the cold section of the reheater via the small bypass system, thus improving the pipe warming efficiency of this section of the main steam pipe. Moreover, the fallen oxide skins in the main steam pipe at the starting stage can be discharged via the small bypass system, thus reducing the erosion of the turbine by solid particles, and thus improving the safety of the unit. At the same time, the steam in this section and the steam generated in the boiler can be substantially synchronized in terms of quality, and the starting time of the unit is thus reduced. In this way, the technical object of protecting the spools of the big bypass valves is achieved. This small bypass system is easy for installation and setting, low in cost and wide in applications.
  • According to the control method of a small bypass system of the present invention, with a small bypass system added in the existing unit, the steam of a certain flow rate can enter the cooling section via the small bypass system and the main steam pipe can obtain a great amount of steam to warm up this pipe section. At the starting stage of the unit, a large amount of foreign matters such as solid particles causes serious erosion to the spools of the big bypass valves. With the small bypass system added, at the starting stage, the small bypass adjusting valves are firstly opened without an action of the big bypass valves, thus properly avoiding the damage to the spools of the big bypass valves caused by the oxide skins and solid particles in the pipe. Although the solid particles of foreign matters in the pipe can also cause damage to the body of the small bypass valves, the body of the small bypass adjusting valves is of smaller size and thus the price is much lower than that of the big bypass valves. At the same time, it is also feasible to install stop valves in front of or behind the small bypass adjusting valves. After the starting process is complete, the stop valves installed in front of or behind the small bypass adjusting valves can bring an excellent sealing effect, causing no leakage even if the small bypass adjusting valves have cracks or wounds, and the economical efficiency of the unit operation will not be affected.
  • In the meantime, with the adoption of the control method of the small bypass system according to the present invention, since the steam that enters the cold section of the reheater via the whole main steam pipe and the steam that enters the cold section of the reheater via the big bypass valves have substantially the same quality, the quality of the steam in the pipe extending from the big bypass valves to the front of the turbine is more close to the authentic value of the main steam, and therefore the time of waiting for the steam in the pipe section extending from the big bypass valves to the front of the turbine to become acceptable is significantly reduced, and at the same time the starting time is also reduced.
  • In addition, regarding the oxide skins in the pipe extending from the big bypass valves to the front of the turbine, since in the conventional starting process, the steam in this pipe section has a very small impulse, it is very difficult to completely sweep out the oxide skins in this pipe section. However, after a small bypass system has been installed, the small bypass can be opened at the starting time and thus integrated into the existing control of the starting process of the big bypass, so that the steam firstly passes through the small bypass. In this way, the impulse of the steam in this pipe section can be greatly increased, removing the solid particles accumulated in this pipe section, reducing the erosion of the turbine by solid particles, and improving the safety of the unit.
  • If in combination with the existing big bypass, the small bypass adjusting valves can act together with the big bypass valves, firstly performing unilateral opening/closing actions, and protecting the big bypass valves in this continuous opening/closing process. Meanwhile, at the early stage of starting, if it is in a cold state, the small bypass adjusting valves need to be opened to avoid the throttled steam from scouring the big bypass valves. If in a hot state or in an extremely hot state, it is necessary to firstly open the big bypass valves to avoid supercooled steam and water from entering the high-temperature pipes and thus resulting in the falling of a large quantity of oxide skins in the pipes. The above described steps are adopted to reduce the generation of oxide skins in the header, with a good effect of sweeping the pipes.
  • The concept, the specific configuration and the resulted technological effects of the present invention will be further described hereinafter in conjunction with the attached drawings, in order to fully understand the objects, features and effects of the present invention.
  • Brief Description of the Drawings
    • Figure 1 is a schematic diagram showing an arrangement of a unit to which a small bypass system of the present invention is applied;
    • Figure 2 is a simplified block diagram of the starting process of the unit as shown in Figure 1 ("small bypass valves" in this figure refers to the small bypass adjusting valves).
    Detailed Description of the Preferred Embodiments
  • Figure 1 is a schematic diagram showing an arrangement of a unit to which a small bypass system of the present invention is applied. At least two main machines are provided in one thermal power unit: a turbine 12 and a boiler 1, as well as a pipe system. The bypass system is a main component to adjust and coordinate the two main machines. In the operation process of the unit, the steam from the boiler 1 passes through a superheater 2 and enters the superheater outlet header 5, then, after passing through the main steam pipe 13, enters an HP cylinder (not shown) of the turbine 12 via the turbine 12 to do work. The discharged steam enters the reheater 3 in the boiler after passing the cold section 4. The big bypass is located between the boiler outlet header 5 and the cold section 4 of the reheater. In this embodiment, the big bypass comprises big bypass valves 6, 7, 8 and 9, which are respectively located on both sides of the superheater outlet header of the boiler 1, as well as communicating pipes connected with the cold section of the reheater. The specialty of the present invention lies in the fact that: a small bypass system is installed on the main steam pipe, between the side close to the turbine 12 and the cold section 4 of the reheater. In this embodiment, this small bypass system comprises two small bypass adjusting valves 10 and 11 which are respectively located on both sides of the HP cylinder of the turbine 12, as well as communicating pipes. The adjusting valves of the small bypass system are not required to have a quick opening/closing function. These adjusting valves are only used at the starting/stop stages of the unit, and are not required to endure the full pressure of the unit.
  • The present invention provides a control method for a bypass system described above.
  • Under normal operating conditions, the steam enters the HP cylinder of turbine 12 via the main steam pipe 13 to do work. At the starting stage of the unit, the big bypass valves are firstly opened. Different from the prior art, in the small bypass system of the present invention, prior to opening the big bypass valves 6, 7, 8 and 9, firstly the small bypass adjusting valve system are gradually opened, i.e., the small bypass adjusting valves 10 and 11 are slowly opened, so that the steam from the boiler 1 passes through the superheater outlet header and enters the cold section pipe of the reheater via the small bypass adjusting valves 10 and 11, until the small bypass system is fully opened. In this embodiment, the flow of the small bypass system is 20% of the steam flow in the unit, therefore this small bypass system is called for short as a 20% small bypass system.
  • After the small bypass system has been fully opened, the big bypass valves 6, 7, 8 and 9 need to be quickly opened, and at the same time the small bypass adjusting valves 10 and 11 are closed, so that the steam is transferred from the small bypass adjusting valves 10 and 11 to the big bypass valves 6, 7, 8 and 9 and then enters the cold section 4 of the reheater .
  • In performing the bypass closing operations, firstly the big bypass valves 6, 7, 8 and 9 need to be closed gradually until the steam flow in the pipe is less than or equal to 20% of the total amount of steam. The big bypass valves 6, 7, 8 and 9 need to be quickly closed completely, and at the same time the small bypass adjusting valves 10 and 11 need to be opened to keep the pressure of the main steam to decrease steadily. Subsequently, the small bypass adjusting valves 10 and 11 need to be closed gradually, until the steam flow in the pipe becomes zero.
  • By this time, the unit continues to carry out the following starting procedures in a conventional starting mode.
  • According to the control method of the small bypass system of the present invention, at the starting stage of the unit, the main steam pipe in the section from the big bypass valves to the small bypass adjusting valves is pre-warmed, and the solid particles and oxide skins in this pipe section are removed. At the same time, a large quantity of solid particles accumulated at the early stage of starting are firstly discharged via the small bypass adjusting valves, reducing the impact of foreign matters of solid particles on the spools of the big bypass valves, and thus protecting the spools of the big bypass valves from being damaged.
  • As a further improvement, the control method of the present invention can also realize the control on the opening/closing of the small bypass system in a program-controlled mode. Preferably, the small bypass control system can be included in the control system of the whole unit, so as to realize a full automatic management.
  • In this embodiment, by adding the front or rear stop valves (not shown) in front of or behind the small bypass adjusting valves, the safety of the small bypass adjusting valves is improved, and the small bypass adjusting valves are prevented from being scoured or wounded, which may result in steam leakage in the normal operating modes.
  • It is obvious that, in other embodiments of the present invention, the flow of the small bypass system is not limited to 20% of the steam flow in the unit. Theoretically, any bypass with a flow less than 50% of the steam flow in the unit can be called as a small bypass. In practical applications, as considered in combination with the effects in various aspects, it is preferred that the flow of the small bypass system is selected at 5%- 30% of the steam flow in the unit.
  • Figure 2 is the simplified block diagram of the starting process of the unit as shown in Figure 1 ("small bypass valves" in this figure refers to the small bypass adjusting valves).
  • The starting procedures of the unit with a bypass system can be basically divided into the following stages: the stage of the minimum opening, the stage of the minimum pressure, the stage of increasing pressure, the stage of fixed pressure, and the stage of following mode.
  • As shown in Figure 2, in conjunction with Figure 1, at the early stage of starting, it is necessary to firstly judge whether the unit is started in a cold state. If it is to start in cold state, firstly the small bypass adjusting valves 10 and 11 need to be opened. At several stages described above, the pressure is to be kept in accordance with the preset procedures, until the small bypass adjusting valves have been fully opened. Then, the big bypass valves 6, 7 , 8 and 9 are quickly opened, and at the same time the small bypass adjusting valves 10 and 11 need to be closed. By this time, the main steam pipe 13 extending from the big bypass valves 6, 7, 8 and 9 to the small bypass adjusting valves 10 and 11 is also pre-warmed and scoured, and a large quantity of solid particles have been discharged via the small bypass adjusting valves 10 and 11. Furthermore, since the big bypass valves 6, 7, 8 and 9 are quickly opened, their working time under throttle operating mode is also reduced, and the spools of the big bypass valves are also protected.
  • When the starting operation has proceeded to a certain stage (set as the stage of fixed pressure in this embodiment), it is started to take the unilaterally alternate opening/closing actions on the bypass and scour the superheater outlet header 5. Since this stage is transited from the stage of increasing pressure, by this time the big bypass valves 6, 7, 8 and 9 are in the open state, it is required to firstly close the first group of the big bypass valves located on the same side with the superheater header, and then slowly close the big bypass valves 6 and 7. At this moment, in order to maintain a stable pressure, the second group of the big bypass valves 8 and 9, which are located on the other side of the HP cylinder 12, remain a open state. When the first group of the big bypass valves 6 and 7 have been closed to correspond to the capacity of the small bypass, the small bypass adjusting valves need to be quickly opened, and at the same time the closing of the second group of the big bypass valves 6 and 7 need to speeded up. The big bypass valves act together with the small bypass adjusting valves to keep the pressure to change according to the preset curve. After all the small bypass adjusting valves have been closed, the steam generated from the superheater 3 of the boiler 1 passes through the superheater outlet header 5 and unilaterally enters the cold section 4 of the reheater via the first group of the big bypass valves 8 and 9, and at the same time partial steam passes through the main steam pipe 13 on the same side with the first group of the big bypass valves 8 and 9 and also enters the cold section 4 of the reheater via the small bypass adjusting valve 11, and returns to the reheater 2. The main steam pipe 13 and the outlet header 3 on this side are scoured, and the foreign matters of solid particles therein are discharged from the outlet header 5.
  • Subsequently, it enters the stage of the alternate opening/closing of the unilateral valves. Firstly the small bypass adjusting valves are to be slowly opened, and at this time the first group of the big bypass valves 8 and 9 need to be slowly closed. After the small bypass adjusting valve 10 has been fully opened, the second group of the big bypass valves 6 and 7 located on the same side need to be opened, and at the same time the small bypass adjusting valve 10 are quickly closed, resulting in that the second group of big bypass valves 6 and 7 are quickly opened. The specifics of the process here are similar to those of the process described above.
  • After the completion of opening unilateral valves, it enters the impulse stage. By this time, firstly the small bypass adjusting valves 10 and 11 need to be closed, and then the big bypass valves 6, 7, 8 and 9 are closed, and are quickly closed when the flow of the small bypass adjusting valves has been reached. At the same time the small bypass adjusting valves are opened to keep the pressure stable. Then, the small bypass adjusting valves are used to maintain a stable pressure until these small bypass adjusting valves are closed, so as to avoid the throttled steam from scouring the spools of the big bypass valves.
  • If it is started in a hot state, the whole starting process will be performed in the original mode. Finally, at the fixed pressure stage, as the process as mentioned above, it is required to perform an unilateral valve opening action in combination with the small bypass adjusting valves.

Claims (5)

  1. A control method of the small bypass system for a steam-driven generating unit, wherein said generating unit comprises at least a boiler (1) and a turbine (12) as well as a main steam pipe (13) and a big bypass system that are connected with said boiler (1) and said turbine (12), wherein a small bypass system is provided on the main steam pipe (13) close to said turbine (12), and said small bypass system comprises a steam pipe of a small bypass and at least one group of small bypass adjusting valves (10, 11); said small bypass adjusting valves (10, 11) are small capacity adjusting valves for reducing temperature and pressure, and in said steam pipe of the small bypass, stop valves are also provided in front of and/or behind said small bypass adjusting valves (10, 11); and the flow of said bypass system is 5% - 30% of the flow of said main steam pipe (13),
    characterized in that the control method comprises the following steps:
    step 1: prior to opening said big bypass system of said generating unit, firstly opening the small bypass stop valves, and gradually open said small bypass adjusting valves (10, 11), so that the main steam from said boiler (1) is discharged to a reheat system of said generating unit via said bypass system, until said bypass system reaches a maximum flow;
    step 2 : after said small bypass system has reached the maximum flow, immediately adjusting said big bypass system to an opening that corresponds to a maximum flow of said small bypass, and at the same time closing said small bypass adjusting valves (10, 11), so that the flow of said small bypass system is quickly shifted to said big bypass system;
    step 3: when said big bypass system has gradually reached a relatively bigger opening, gradually opening said small bypass adjusting valves (10, 11) to the maximum flow.
  2. The control method of Claim 1, further includes a step 4 after said step 3; after the load on said generating unit has gradually increased, firstly gradually closing said small bypass adjusting valves (10, 11), then gradually closing said big bypass system; until the steam flow in said big bypass system is slightly less than the maximum flow of said small bypass system, immediately closing said big bypass system, and at the same time quickly opening said small bypass system, so as to shift all the steam flow in said big bypass system to said small bypass system; and then, closing said small bypass adjusting valves (10, 11), until the steam flow of the whole bypass system becomes zero; finally, closing the small bypass stop valves; in the whole process of step 4, a main steam pressure in said generating unit being kept substantially stable.
  3. The control method of Claim 2, wherein in the process of shutdown operation of the unit when a load of the turbo generator gradually decreases until parallel off and a load of the boiler (1) gradually decreases until shutdown of the boiler (1), the operation steps of the small bypass are the reverse to the starting process of the unit, in a sequence from step 4 to step 1.
  4. The control method of Claim 1, wherein the opening/closing operations of said small bypass system as well as its coordination with said big bypass system are controlled in a program-controlled mode.
  5. The control method of the small bypass system of Claim 1, wherein said small bypass adjusting valves (10, 11) and the valves of said big bypass system jointly compose a first bypass valve group and a second bypass valve group, which are respectively located on two steam inlet sides of said turbine (12); before said turbine (12) is prepared for impulse start, it is feasible to firstly enter the alternate opening and closing operations of the bypass valve group; firstly opening said first bypass valve group, then closing said second valve group, so that said steam in said boiler (1) outlet header is unilaterally discharged only via said first bypass valves in an open state; then after keeping said first bypass valve group in the open state for a predetermined time period, closing said first bypass valve group, and at the same time opening said second bypass valve group, so that said steam in said header is discharged only from said second bypass valve group in said open state; subsequently, after keeping said second bypass valve group in the open state for a predetermined time period, terminating the alternate opening/closing operation and shifting to a normal control mode; in the process of said alternate opening/closing operations, the main steam pressure of said generating unit being kept substantially stable.
EP07845793.4A 2007-06-11 2007-12-03 A small bypass system of a generator set and a controlling method thereof Not-in-force EP2175104B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN 200710041839 CN100473805C (en) 2007-06-11 2007-06-11 Electric generating set small side road system and control method thereof
PCT/CN2007/003431 WO2008151484A1 (en) 2007-06-11 2007-12-03 A small bypass system of a generator set and a controlling method thereof

Publications (3)

Publication Number Publication Date
EP2175104A1 EP2175104A1 (en) 2010-04-14
EP2175104A4 EP2175104A4 (en) 2012-06-06
EP2175104B1 true EP2175104B1 (en) 2016-06-08

Family

ID=39010969

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07845793.4A Not-in-force EP2175104B1 (en) 2007-06-11 2007-12-03 A small bypass system of a generator set and a controlling method thereof

Country Status (3)

Country Link
EP (1) EP2175104B1 (en)
CN (1) CN100473805C (en)
WO (1) WO2008151484A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100439659C (en) * 2007-06-11 2008-12-03 上海外高桥第三发电有限责任公司 Electric generating set side road control method
CN102261268A (en) * 2010-05-28 2011-11-30 中国神华能源股份有限公司 Control method of required desuperheater cooling water of low-pressure bypass in thermal power generating set
WO2014175871A1 (en) * 2013-04-24 2014-10-30 International Engine Intellectual Property Company, Llc Turbine protection system
CN103528630B (en) * 2013-10-16 2016-06-08 国家电网公司 The method of calculation of high pressure reject steam spillage and attemperation water flow
CN110159363B (en) * 2019-06-26 2023-10-27 国能龙源蓝天节能技术有限公司 Control method for on-load starting of low-pressure steam turbine dragging asynchronous generator
CN111472847B (en) * 2020-05-11 2024-04-12 中国电力工程顾问集团西南电力设计院有限公司 System for preventing bearing seal steam source pipeline ponding
CN115788612B (en) * 2022-12-12 2024-06-11 东方电气集团东方汽轮机有限公司 Start-stop mode of differential pressure turbine expansion unit

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4471446A (en) * 1982-07-12 1984-09-11 Westinghouse Electric Corp. Control system and method for a steam turbine having a steam bypass arrangement
JPS59170410A (en) * 1983-03-18 1984-09-26 Mitsubishi Heavy Ind Ltd Stand-by method of turbine bypass valve
JPS60228710A (en) * 1984-04-27 1985-11-14 Toshiba Corp Control device for steam turbine
US4598551A (en) * 1985-10-25 1986-07-08 General Electric Company Apparatus and method for controlling steam turbine operating conditions during starting and loading
JPS62101809A (en) * 1985-10-29 1987-05-12 Hitachi Ltd Single-shaft combined plant having reheating system
JPS62206203A (en) * 1986-03-07 1987-09-10 Hitachi Ltd Operation control method for steam turbine
JPH0337304A (en) * 1989-07-05 1991-02-18 Hitachi Ltd Start of steam turbine generation plant provided with turbine bypass device
JPH09303114A (en) * 1996-05-14 1997-11-25 Mitsubishi Heavy Ind Ltd Steam cycle for combined cycle using steam cooling type gas turbine
DE19921023A1 (en) * 1999-03-31 2000-07-13 Siemens Ag Nuclear power plant comprises reactor, steam generator with at least one high pressure turbine, steam line branch, and steam main with steam control member
JP4503995B2 (en) * 2003-12-02 2010-07-14 株式会社東芝 Reheat steam turbine plant and operation method thereof
CN1554856A (en) * 2003-12-26 2004-12-15 东方汽轮机厂 Turbine jet nozzle static and moving blade preventing solid microparticle from etching and its heat treatment method
EP1854964A1 (en) * 2006-05-10 2007-11-14 Siemens Aktiengesellschaft Use of the steam turbine for primary frequency control in power generating plants

Also Published As

Publication number Publication date
WO2008151484A1 (en) 2008-12-18
CN100473805C (en) 2009-04-01
EP2175104A4 (en) 2012-06-06
CN101096918A (en) 2008-01-02
EP2175104A1 (en) 2010-04-14

Similar Documents

Publication Publication Date Title
EP2175104B1 (en) A small bypass system of a generator set and a controlling method thereof
US6647727B2 (en) Method for controlling a low-pressure bypass system
JP7308042B2 (en) Thermal storage device, power plant, and operation control method during fast cutback
JP5558686B2 (en) Method for operating a combined cycle power plant and a combined cycle power plant implementing the method
EP0615061A1 (en) Combined cycle power plant and method of operating it
WO2019011326A1 (en) Steam turbine quick start warming system, pre-warming system and warming method therefor
JP7167136B2 (en) Steam turbine plant and its cooling method
CN111042881A (en) Wide-load high-efficiency steam turbine generator unit with part of cylinders capable of being cut off
CN113107616B (en) BEST small steam turbine system and application method thereof
CN112627923B (en) Steam turbine rotating speed control method based on valve characteristic curve under extreme working condition
EP2175105B1 (en) A controlling method of a generator set provided with a bypass system
JP5178575B2 (en) Power plant water supply apparatus and control method
CN211975088U (en) Reverse-heating cold-state starting system of condensing turbine generator set
JP3919966B2 (en) Operation method of combined cycle power plant
US20140000259A1 (en) Method for quickly connecting a steam generator
CN203395585U (en) Steam main pipeline structure for ultra supercritical unit
CN113464416B (en) Initial parameter design method for emergency starting test of high-capacity electric pump
CN114060114B (en) One-key start-stop control method for IGCC power station
JP5780807B2 (en) Exhaust gas economizer soot blow system
JP3641518B2 (en) Steam temperature control method and apparatus for combined cycle plant
CN115929426B (en) Exhaust pressure control method for steam turbine of supercritical double-extraction back pressure unit
CN210178425U (en) Steam turbine
Wang et al. IP start-up control for 300MW turbine unit with bypass system
CN110593962B (en) Automatic load-increasing control method for supercritical steam turbine generator set after grid connection
JPS60159311A (en) Starting method for steam turbine

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20100111

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20120509

RIC1 Information provided on ipc code assigned before grant

Ipc: F01D 21/00 20060101ALI20120503BHEP

Ipc: F22B 37/52 20060101ALI20120503BHEP

Ipc: F01K 13/02 20060101ALI20120503BHEP

Ipc: F01K 7/22 20060101ALI20120503BHEP

Ipc: F01D 19/00 20060101AFI20120503BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIC1 Information provided on ipc code assigned before grant

Ipc: F22B 37/52 20060101ALI20151116BHEP

Ipc: F01D 21/00 20060101ALI20151116BHEP

Ipc: F01K 13/02 20060101ALI20151116BHEP

Ipc: F01D 19/00 20060101AFI20151116BHEP

Ipc: F01K 7/22 20060101ALI20151116BHEP

INTG Intention to grant announced

Effective date: 20151204

GRAR Information related to intention to grant a patent recorded

Free format text: ORIGINAL CODE: EPIDOSNIGR71

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

INTG Intention to grant announced

Effective date: 20160503

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 805400

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160715

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602007046619

Country of ref document: DE

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20160608

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 805400

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160608

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160909

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161008

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161010

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602007046619

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20170309

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20161203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20170831

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161231

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161231

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170102

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161203

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20071203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160608

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161203

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20211210

Year of fee payment: 15

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602007046619

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230701