EP2175105B1 - A controlling method of a generator set provided with a bypass system - Google Patents

A controlling method of a generator set provided with a bypass system Download PDF

Info

Publication number
EP2175105B1
EP2175105B1 EP07845794.2A EP07845794A EP2175105B1 EP 2175105 B1 EP2175105 B1 EP 2175105B1 EP 07845794 A EP07845794 A EP 07845794A EP 2175105 B1 EP2175105 B1 EP 2175105B1
Authority
EP
European Patent Office
Prior art keywords
bypass
valve group
bypass valve
header
steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP07845794.2A
Other languages
German (de)
French (fr)
Other versions
EP2175105A4 (en
EP2175105A1 (en
Inventor
Weizhong Feng
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waigaoqiao No3 Power Generation CoLtd
Original Assignee
Shanghai Waigaoqiao No3 Power Generation CoLtd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waigaoqiao No3 Power Generation CoLtd filed Critical Shanghai Waigaoqiao No3 Power Generation CoLtd
Publication of EP2175105A1 publication Critical patent/EP2175105A1/en
Publication of EP2175105A4 publication Critical patent/EP2175105A4/en
Application granted granted Critical
Publication of EP2175105B1 publication Critical patent/EP2175105B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/16Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type
    • F01K7/22Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type the turbines having inter-stage steam heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/22Drums; Headers; Accessories therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22BMETHODS OF STEAM GENERATION; STEAM BOILERS
    • F22B37/00Component parts or details of steam boilers
    • F22B37/02Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
    • F22B37/48Devices for removing water, salt, or sludge from boilers; Arrangements of cleaning apparatus in boilers; Combinations thereof with boilers
    • F22B37/52Washing-out devices

Definitions

  • the present invention relates to the field of electric power thermal automation, and particularly to a control method for alternately opening the bypass valves of a steam turbine.
  • the steam flow rate is maximum on both sides of A/B, and at the O-point in the header, the steam flow rate approximately approaches zero, forming a position of the lowest flow rate where the steam flow rate is the lowest, the impulse is minimum, and it is easy for foreign matters such as oxide skins to accumulate.
  • the steam flow rate at the corresponding point A or point B of the header approximately approaches zero, forming a region of the lowest flow rate (not shown).
  • the foreign matters (such as oxide skins) discharged from the coil pipe will stay in the region of low flow rate after entering the header.
  • the foreign matters which have entered the header will gradually deposit and accumulate in the region of smaller steam impulse. Only under special operating conditions, for example, when the main steam door is unilaterally closed, these foreign matters can be blown out of the header. Large quantities of granular foreign matters such as oxide skins deposited in the region of low flow rate will endanger the safety of the pipelines connected with this region as well as the safety of the whole unit.
  • JP 2002115805A A method using water to discharge sludge in a lower branch pipe at a lower portion of a steam boiler and difficult to be discharged with only a total blow is known from JP 2002115805A .
  • this method is unrelated to the goal of removing the foreign matters such as oxide skins in a header.
  • an issue to be addressed by the present invention is to provide a low-cost but high-efficient control method so as to reach the goal of reducing the foreign matters such as oxide skins in the header, reducing the erosion rate of solid particles in the turbine and thus improving safety of the unit.
  • the present invention provides a bypass control method, comprising the following steps:
  • said boiler shall have completed the starting and be prepared to impulse start the turbine.
  • said steps 2 and 3 can be repeated, until it is sure that the foreign matters in said header are removed and that the quality of said steam reaches an acceptance value.
  • said first-side bypass valve group and/or said second-side bypass valve group are alternately opened /closed in a program-controlled mode.
  • the conventional control mode of said bypass system can be immediately restored and it is prepared to impulse start the turbine.
  • said bypass system is a high-pressure bypass or a low-pressure bypass.
  • the control strategy of this method is also applicable to a low pressure bypass to reduce the accumulation of foreign matters (such as oxide skins) in the outlet header of the reheater.
  • said first-side bypass valve group and said second-side bypass valve group respectively comprise at least one bypass valve.
  • the bypass control method provided by the present invention realizes alternate changing of the steam flow direction in the header by controlling the alternate opening of the two sides of the bypass valves, without need of adding any hardware facility or extra expenditure. Due to the alternate changing of the steam flow direction in the header, the region of the lowest flow rate in the header is alternately shifted along with the alternate changing of the steam flow direction, so that there is no fixed position of the lowest flow rate in the header, i.e., no existence of dead point of flow rate, and all regions in the header are swept in an all-side way, so as to reach the goal of removing such foreign matters as oxide skin in the header, reducing the erosion rate of solid particles in the turbine and thus improving safety of the unit.
  • FIG. 2 is a schematic diagram showing the arrangement of a one-reheating unit provided with a bypass system.
  • At least two main machines are provided in the thermoelectric generating unit: a turbine 10 and a boiler 1, and the bypass system is the main component to adjust and coordinate the two main machines.
  • the steam transmitted from the boiler 1 passes through a superheater 2 and enters a superheater outlet header 5, then, after passing through a main steam pipe 11, the steam enters an HP cylinder of the turbine 10 via a main intake door and an adjusting door (not shown) of the turbine to do work, and the discharged steam enters a reheater 3 in the boiler after passing a cold section 4 of the reheater.
  • the high-pressure bypass is located between the outlet header 5 of the boiler and the cold section 4 of the reheater
  • the low-pressure bypass is located between the outlet header of the reheater and the condenser (not shown)
  • the bypass system to which the present invention is applied comprises a first-side bypass valve group and a second-side bypass valve group or a low-pressure bypass (not shown) that are respectively provided on the main steam pipe and the reheat steam pipe, which are connected with both sides of the outlet header of the superheater or reheater of the boiler.
  • the first-side bypass valve group comprises bypass valves 6 and 7
  • the second-side bypass group comprises bypass valves 8 and 9.
  • an embodiment of the bypass control method according to present invention comprises the following steps (the control method for a low pressure bypass is the same):
  • the alternate changing of the steam flow direction in the header is changed by controlling the alternate opening of the two sides of the bypass valves, without need of adding any hardware facility or extra expenditure. Due to the alternate changing of the steam flow direction in the header, the region of the lowest flow rate in the header alternately changes in position along with the alternate changing of the steam flow direction, so that there is no fixed position of the lowest flow rate in the header, i.e., there is no dead point of the flow rate, and all regions in the header are swept in an all-side way, so as to reach the goal of removing foreign matters such as oxide skins in the header, reducing the erosion rate of the solid particles in the turbine and thus improving the safety of the unit.
  • the method of the present invention is not limited to aforesaid embodiment.
  • a full program-controlled mode can be adopted and all the control systems of the present invention can be included in the unit starting program control, so as to automatically shift and realize the operations of opening/closing the first-side bypass valve group and/or the second-side bypass valve group, without the need of manual participation or intervention.
  • this control method can be designed into the starting mode of the bypass itself, without affecting starting time and operation safety of the unit.
  • control method of the present invention is not limited to a single opening/closing alternate operation in said embodiment.
  • the process of repeating the step 2 and step 3 can be added for one or many times, i.e., it includes unilaterally alternate opening/closing operations for many times, until it is for sure that the foreign matters in said header have been removed and that the quality of said steam reaches the acceptance value.
  • step 4 when the unit has completed the starting process, the conventional control state of the bypass system is to be restored and it is prepared to impulse start the turbine.
  • first-side bypass valve group and the second-side bypass valve group in the present invention have no limitation on the quantity of the valves.
  • the first-side bypass valve group and the second-side bypass valve group respectively comprise two bypass valves in each group.
  • each bypass group may also comprise either one bypass valve or a plurality of bypass valves, and the selection of the quantity of the bypass valves mainly depends on the steam flow rate and the bypass capacity.
  • the method of the present invention can also be used in combination with other control methods for bypass systems.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Control Of Turbines (AREA)

Description

    Field of the Invention
  • The present invention relates to the field of electric power thermal automation, and particularly to a control method for alternately opening the bypass valves of a steam turbine.
  • Background of the invention
  • With continuous improvement in the parameters of steam turbogenerator units, steam oxidation of metal as well as retention of fallen oxide skins in the boiler pipes is increasingly threatening the safe operation of the units. The retention and accumulation of oxide skins may easily happen in the boiler header. As shown in Figure 1, the main reason for the accumulation of oxide skins lies in the fact that: after the inlets of coiled pipes 1 distributed throughout the header have gathered steam 3 into a header 2, the gathered steam 3 is in turn discharged from steam pipes A and B that are connected with both sides of the header 2. The steam flow rate varies from place to place in the header when the steam is passing therethrough. The steam flow rate is maximum on both sides of
    A/B, and at the O-point in the header, the steam flow rate approximately approaches zero, forming a position of the lowest flow rate where the steam flow rate is the lowest, the impulse is minimum, and it is easy for foreign matters such as oxide skins to accumulate.
  • With the same principle, as in other implementations, if the O-point of the header is the steam outlet connected with the steam pipe, the steam flow rate at the corresponding point A or point B of the header approximately approaches zero, forming a region of the lowest flow rate (not shown).
  • The foreign matters (such as oxide skins) discharged from the coil pipe will stay in the region of low flow rate after entering the header. The foreign matters which have entered the header will gradually deposit and accumulate in the region of smaller steam impulse. Only under special operating conditions, for example, when the main steam door is unilaterally closed, these foreign matters can be blown out of the header. Large quantities of granular foreign matters such as oxide skins deposited in the region of low flow rate will endanger the safety of the pipelines connected with this region as well as the safety of the whole unit.
  • Therefore, it is necessary to develop a technology to reach the goal of removing the foreign matters such as oxide skins in the header, reducing the erosion rate of solid particles in the turbine and thus improving the safety of the unit.
  • A method using water to discharge sludge in a lower branch pipe at a lower portion of a steam boiler and difficult to be discharged with only a total blow is known from JP 2002115805A . However, this method is unrelated to the goal of removing the foreign matters such as oxide skins in a header.
  • Summary of the Invention
  • In view of aforesaid deficiency in the prior art, an issue to be addressed by the present invention is to provide a low-cost but high-efficient control method so as to reach the goal of reducing the foreign matters such as oxide skins in the header, reducing the erosion rate of solid particles in the turbine and thus improving safety of the unit.
  • To achieve the aforesaid object, the present invention provides a bypass control method, comprising the following steps:
    • Step 1: during the starting period of the generating unit provided with a bypass system, said boiler is firstly started in a conventional mode by means of said bypass system, and its steam parameters have basically met the conditions for impulse starting the turbine; said bypass system comprises a first-side bypass valve group and a second-side bypass valve group that are respectively set on the main steam pipe and the reheat steam pipe which are connected with both sides of said outlet header of the superheater or reheater of the boiler:
    • Step 2: closing said second-side bypass valve group and at the same time forcing said first bypass valve group to a wide open position, so that said steam that passes through said header is unilaterally discharged only from said first-side bypass valve group in the open state;
    • Step 3: after maintaining said first-side bypass valve group in the open state for a required time period, closing said first-side bypass valve group and at the same time opening said second-side bypass valve group, so that said steam that passes through said header is discharged only from said second-side bypass valve group in the open state via the other side;
    • Step 4: after maintaining said second-side bypass valve group in the turning-up state for a required time period, restoring the conventional control state of said bypass system and being prepared to impulse start the turbine.
  • Preferably□in said step 1, said boiler shall have completed the starting and be prepared to impulse start the turbine.
  • Preferably, after said step 3, said steps 2 and 3 can be repeated, until it is sure that the foreign matters in said header are removed and that the quality of said steam reaches an acceptance value.
  • Preferably, said first-side bypass valve group and/or said second-side bypass valve group are alternately opened /closed in a program-controlled mode.
  • Preferably□after said step 4, the conventional control mode of said bypass system can be immediately restored and it is prepared to impulse start the turbine.
  • Preferably, said bypass system is a high-pressure bypass or a low-pressure bypass. The control strategy of this method is also applicable to a low pressure bypass to reduce the accumulation of foreign matters (such as oxide skins) in the outlet header of the reheater.
  • Preferably, said first-side bypass valve group and said second-side bypass valve group respectively comprise at least one bypass valve.
  • Preferably, the greater the capacity of said bypass valve group is, the better the sweeping effect on the header is.
  • The bypass control method provided by the present invention realizes alternate changing of the steam flow direction in the header by controlling the alternate opening of the two sides of the bypass valves, without need of adding any hardware facility or extra expenditure. Due to the alternate changing of the steam flow direction in the header, the region of the lowest flow rate in the header is alternately shifted along with the alternate changing of the steam flow direction, so that there is no fixed position of the lowest flow rate in the header, i.e., no existence of dead point of flow rate, and all regions in the header are swept in an all-side way, so as to reach the goal of removing such foreign matters as oxide skin in the header, reducing the erosion rate of solid particles in the turbine and thus improving safety of the unit.
  • The concept, the specific configuration and the resulted technical effects of the present invention will be further described hereinafter in conjunction with the attached drawings, in order to adequately understand the objects, features and effects of the present invention.
  • Brief Description of the Drawings
    • Figure 1 is a schematic diagram of the steam flow directions in a unit header according to the conventional bypass control method of prior art.
    • Figure 2 is a schematic diagram of the arrangement of the unit provided with a bypass system.
    • Figure 3 is a schematic diagram of the stream flow rate in the header at a stage of alternately opening of the unit according to the bypass control method of the present invention.
    • Figure 4 is a flow chart of the control method according to the present invention.
    Detailed Description of the Preferred Embodiments
  • Figure 2 is a schematic diagram showing the arrangement of a one-reheating unit provided with a bypass system. At least two main machines are provided in the thermoelectric generating unit: a turbine 10 and a boiler 1, and the bypass system is the main component to adjust and coordinate the two main machines. In the operating process of the unit, the steam transmitted from the boiler 1 passes through a superheater 2 and enters a superheater outlet header 5, then, after passing through a main steam pipe 11, the steam enters an HP cylinder of the turbine 10 via a main intake door and an adjusting door (not shown) of the turbine to do work, and the discharged steam enters a reheater 3 in the boiler after passing a cold section 4 of the reheater. The high-pressure bypass is located between the outlet header 5 of the boiler and the cold section 4 of the reheater, and the low-pressure bypass is located between the outlet header of the reheater and the condenser (not shown), and the embodiment described herein is also applicable to a low pressure bypass. The bypass system to which the present invention is applied comprises a first-side bypass valve group and a second-side bypass valve group or a low-pressure bypass (not shown) that are respectively provided on the main steam pipe and the reheat steam pipe, which are connected with both sides of the outlet header of the superheater or reheater of the boiler. In this embodiment, the first-side bypass valve group comprises bypass valves 6 and 7, and the second-side bypass group comprises bypass valves 8 and 9.
  • Under normal operating conditions, the steam enters the HP cylinder of the turbine 10 via a main steam pipe 11 for doing work. However, under abnormal operating conditions such as in the starting stage, an embodiment of the bypass control method according to present invention comprises the following steps (the control method for a low pressure bypass is the same):
    • Step 1: at the starting stage of the unit provided with a bypass system, the steam transmitted from the superheater 2 of the boiler 1 passes through the bypass system via an outlet header 5, and then enters the reheater of the boiler via the cold section 4. The bypass system comprises bypass valves 6 and 7 of the first-side bypass valve group and bypass valves 8 and 9 of the second-side bypass valve group that are respectively provided on the main steam pipe and the reheat steam pipe, which are connected with both sides of the outlet header of the superheater 2 or the reheater 3 of boiler 1.
    • Step 2: at the starting stage, when the steam parameter has basically met the conditions for impulse starting the turbine (by this time, both bypass valve groups shall be in the open state), firstly closing the bypass valves 8 and 9 mounted on the outlet pipeline on one side of the outlet header 5, and at the same time turning up the bypass valves 6 and 7, so that the steam that has passed through the outlet header 5 is discharged only via the bypass valves 6 and 7 in the open state. As shown in Figure 3, since the bypass valves 6 and 7 are opened while the bypass valves 8 and 9 remain in the closed state, the steam in the outlet header 5 is discharged from the pipeline on the same side with the bypass valves 6 and 7 via Point A, and by this time, Point B is a point of zero flow rate, and such foreign matters as oxide skins that are deposited in the regions, excluding the neighboring regions of Point B, are blown out of the outlet header 5 along with the steam, and the farther the distance from Point B is, the greater the scouring momentum of the steam is.
    • Step 3: maintaining the bypass valves 6 and 7 in a wide open state, after the steam pressure in the pipeline has become stable and remains the same for a required time period, closing the bypass valves 6 and 7 and at the same time starting the bypass valves 8 and 9, so that the steam that passes through the outlet header 5 is discharged from the bypass valves 8 and 9 on the other side; since the bypass valves 8 and 9 are open, the steam that has passed through the outlet header 5 is discharged from the pipeline located on the same side with bypass valves 8 and 9 via Point B, and by this time, Point A is a point of zero flow rate, and such foreign matters as oxide skins that are deposited in the regions, excluding the neighboring regions of Point A, are blown out of the outlet header 5 along with the steam, and the farther the distance from Point A is, the greater the scouring momentum of the steam is.
    • Step 4: maintaining the bypass valves 8 and 9 in the wide open state, after the steam pressure in the pipeline has become stable and remains the same for a required time period, restoring the conventional control state of the bypass system and being prepared to impulse start the turbine.
  • The steps described above are shown in Figure 4.
  • According to the bypass control method of the present invention, the alternate changing of the steam flow direction in the header is changed by controlling the alternate opening of the two sides of the bypass valves, without need of adding any hardware facility or extra expenditure. Due to the alternate changing of the steam flow direction in the header, the region of the lowest flow rate in the header alternately changes in position along with the alternate changing of the steam flow direction, so that there is no fixed position of the lowest flow rate in the header, i.e., there is no dead point of the flow rate, and all regions in the header are swept in an all-side way, so as to reach the goal of removing foreign matters such as oxide skins in the header, reducing the erosion rate of the solid particles in the turbine and thus improving the safety of the unit.
  • The method of the present invention is not limited to aforesaid embodiment.
  • Preferably, in other embodiments of the present invention, a full program-controlled mode can be adopted and all the control systems of the present invention can be included in the unit starting program control, so as to automatically shift and realize the operations of opening/closing the first-side bypass valve group and/or the second-side bypass valve group, without the need of manual participation or intervention. Meanwhile, this control method can be designed into the starting mode of the bypass itself, without affecting starting time and operation safety of the unit.
  • Further, the control method of the present invention is not limited to a single opening/closing alternate operation in said embodiment. According to actual requirements, after said step 3, the process of repeating the step 2 and step 3 can be added for one or many times, i.e., it includes unilaterally alternate opening/closing operations for many times, until it is for sure that the foreign matters in said header have been removed and that the quality of said steam reaches the acceptance value.
  • After the step 4, when the unit has completed the starting process, the conventional control state of the bypass system is to be restored and it is prepared to impulse start the turbine.
  • Said first-side bypass valve group and the second-side bypass valve group in the present invention have no limitation on the quantity of the valves. In aforesaid embodiments, the first-side bypass valve group and the second-side bypass valve group respectively comprise two bypass valves in each group. In other embodiments of the present invention, each bypass group may also comprise either one bypass valve or a plurality of bypass valves, and the selection of the quantity of the bypass valves mainly depends on the steam flow rate and the bypass capacity.
  • The method of the present invention can also be used in combination with other control methods for bypass systems.
  • In summary, only several preferred embodiments of the present invention have been described.

Claims (7)

  1. A bypass control method for a generating unit, comprising the following steps:
    step 1: during the starting period of a generating unit provided with a bypass system, a boiler (1) being firstly started by means of said bypass system in normal mode; wherein said bypass system comprises a first-side bypass valve group and a second-side bypass valve group that are respectively provided on the main steam pipe and/or the reheat steam pipe, which are connected with both sides of an outlet header (5) of a super heater (12) and/or reheater (3) of said boiler (1);
    step 2: closing said second-side by-pass valve group and at the same time forcing said first bypass valve group to a wide open position, so that said steam that passes through said header (5) is unilaterally discharged only from said first-side bypass valve group in an open state;
    step 3: after maintaining said first-side bypass valve group in an open state for a required time period, closing said first-side bypass valve group and at the same time opening said second-side bypass valve group, so that said steam that passes through said header (5) is discharged only from said second-side bypass valve group in the open state;
    step 4: after maintaining said second-side bypass valve group in a starting state for a required time period, restoring a normal control state of said bypass system and being prepared to impulse start a turbine.
  2. The bypass control method of Claim 1, wherein in said step 1 should be carried out prior to impulse starting said turbine.
  3. The bypass control method of Claim 1, wherein after said step 3, said steps 2 and 3 can be repeated, until foreign matters in said header (5) have been removed and that a quality of said steam reaches, an acceptance value.
  4. The bypass control method of Claim 1, wherein said first-side valve group and/or said second-side bypass valve group are alternately opened/closed in a program-controlled mode.
  5. The bypass control method of Claim 1, wherein after said step 4, the normal control mode of said bypass system can be immediately restored and it is prepared to impulse start the turbine.
  6. The bypass control method of Claim 1, wherein said bypass system is a high-pressure bypass or a low-pressure bypass.
  7. The bypass control method of Claim 1, wherein said first-side bypass valve group and said second-side bypass valve group respectively comprise at least one bypass valve.
EP07845794.2A 2007-06-11 2007-12-03 A controlling method of a generator set provided with a bypass system Not-in-force EP2175105B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CNB2007100418370A CN100439659C (en) 2007-06-11 2007-06-11 Electric generating set side road control method
PCT/CN2007/003432 WO2008151485A1 (en) 2007-06-11 2007-12-03 A controlling method of a generator set provided with a bypass system

Publications (3)

Publication Number Publication Date
EP2175105A1 EP2175105A1 (en) 2010-04-14
EP2175105A4 EP2175105A4 (en) 2015-05-20
EP2175105B1 true EP2175105B1 (en) 2016-11-09

Family

ID=39010968

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07845794.2A Not-in-force EP2175105B1 (en) 2007-06-11 2007-12-03 A controlling method of a generator set provided with a bypass system

Country Status (3)

Country Link
EP (1) EP2175105B1 (en)
CN (1) CN100439659C (en)
WO (1) WO2008151485A1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102261269A (en) * 2010-05-28 2011-11-30 中国神华能源股份有限公司 Method for controlling operation of low pressure bypass in thermal power generating unit
JP6058419B2 (en) * 2013-02-19 2017-01-11 株式会社東芝 Steam turbine valve control apparatus and valve control method thereof
CN107503811A (en) * 2017-08-17 2017-12-22 凉山矿业股份有限公司 A kind of afterheat generating system of end Sa boiler and converter boiler
CN109442368B (en) * 2018-09-21 2020-02-14 国网辽宁省电力有限公司电力科学研究院 Bypass system comprehensive control method for improving regulating capacity of heat supply unit
CN110160033A (en) * 2019-06-13 2019-08-23 西安热工研究院有限公司 A kind of station boiler high temperature steam pipeline oxide skin purging structure

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2132732A (en) * 1937-09-03 1938-10-11 Master Steam Equipment Company Steam boiler
GB1309145A (en) * 1970-04-24 1973-03-07 Foster Wheeler Brown Boilers Dual circulation steam boiler
US4471446A (en) * 1982-07-12 1984-09-11 Westinghouse Electric Corp. Control system and method for a steam turbine having a steam bypass arrangement
JPS59170410A (en) * 1983-03-18 1984-09-26 Mitsubishi Heavy Ind Ltd Stand-by method of turbine bypass valve
JPS60228710A (en) * 1984-04-27 1985-11-14 Toshiba Corp Control device for steam turbine
US4598551A (en) * 1985-10-25 1986-07-08 General Electric Company Apparatus and method for controlling steam turbine operating conditions during starting and loading
JPS62206203A (en) * 1986-03-07 1987-09-10 Hitachi Ltd Operation control method for steam turbine
JPH0337304A (en) * 1989-07-05 1991-02-18 Hitachi Ltd Start of steam turbine generation plant provided with turbine bypass device
FI83816C (en) * 1989-10-25 1991-08-26 Ahlstroem Oy Method and apparatus for feeding solid material into a combustion or gasification reactor
US5311844A (en) * 1992-03-27 1994-05-17 Foster Wheeler Energy Corporation Internested superheater and reheater tube arrangement for heat recovery steam generator
JP2002115805A (en) * 2000-10-11 2002-04-19 Samson Co Ltd Boiler having washing water supply port and can bottom washing method
JP4438243B2 (en) * 2001-03-21 2010-03-24 栗田エンジニアリング株式会社 Boiler cleaning method
CN100473805C (en) * 2007-06-11 2009-04-01 上海外高桥第三发电有限责任公司 Electric generating set small side road system and control method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
WO2008151485A1 (en) 2008-12-18
CN100439659C (en) 2008-12-03
EP2175105A4 (en) 2015-05-20
CN101096917A (en) 2008-01-02
EP2175105A1 (en) 2010-04-14

Similar Documents

Publication Publication Date Title
EP2175105B1 (en) A controlling method of a generator set provided with a bypass system
US7987675B2 (en) Provision for rapid warming of steam piping of a power plant
CN105157007B (en) Steam pipe washing method for 1000MW ultra-supercritial double reheat boiler
CN101846311B (en) Systems and methods for pre-warming a heat recovery steam generator and associated steam lines
CN100473805C (en) Electric generating set small side road system and control method thereof
JP5990581B2 (en) Steam turbine equipment and driving method of the steam turbine equipment
US20150184552A1 (en) Controlling apparatus and starting method
KR102307255B1 (en) Condensate and feedwater system of steam power plant and operation method for the same
JP3774487B2 (en) Combined cycle power plant
CN112197610B (en) Primary frequency modulation composite control system of coal-fired unit and working method thereof
JP6495137B2 (en) Combined cycle power plant and control method thereof
JP2010196473A (en) Electric power plant water supply device, and method for controlling the same
EP2556218A1 (en) Method for quickly connecting a steam generator
JP6603526B2 (en) Steam turbine equipment and operation method of steam turbine equipment
CN110132045B (en) Automatic control device for soot blowing of synthetic ammonia three-gas boiler
CN206056385U (en) 1000MW double reheat power generation sets boiler blowpipe switched system stage by stage
CN104696940B (en) Gas power station two drags a unit high pressure steam system and on off control method thereof
US4338789A (en) Method of varying turbine output of a supercritical-pressure steam generator-turbine installation
CN108202056A (en) The blowpipe temporary system and control method of three discard heat boilers
JPH10187211A (en) Control method for power plant sequence
CN112811632B (en) Reverse osmosis step control method
CN114941552B (en) Large supercritical reheating type double-pumping back pressure unit-based rapid switching control method for heat supply without stopping furnace when shutdown
RU2346205C1 (en) Method of sustained gas supply by gas distribution station with power-refrigerating complex using natural gas overpressure energy to produce electric energy and cold and system for method implementation
CN106839867A (en) A kind of boiler steam pipe clean method
CN106545841A (en) The water supply control method that a kind of suppression FCB processes main vapour pressure rises

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20100111

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

DAX Request for extension of the european patent (deleted)
RA4 Supplementary search report drawn up and despatched (corrected)

Effective date: 20150421

RIC1 Information provided on ipc code assigned before grant

Ipc: F01D 19/00 20060101AFI20150415BHEP

Ipc: F22B 37/52 20060101ALI20150415BHEP

Ipc: F01D 15/10 20060101ALI20150415BHEP

Ipc: F22B 37/22 20060101ALI20150415BHEP

Ipc: F01K 13/02 20060101ALI20150415BHEP

Ipc: F01K 7/22 20060101ALI20150415BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20160314

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAL Information related to payment of fee for publishing/printing deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR3

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTC Intention to grant announced (deleted)
INTG Intention to grant announced

Effective date: 20160803

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 844115

Country of ref document: AT

Kind code of ref document: T

Effective date: 20161115

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602007048700

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20161109

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 844115

Country of ref document: AT

Kind code of ref document: T

Effective date: 20161109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170210

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161231

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170309

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170309

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602007048700

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170209

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20170831

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

26N No opposition filed

Effective date: 20170810

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20170209

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170109

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161231

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161231

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161203

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161203

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170209

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20071203

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20161109

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20161203

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20211210

Year of fee payment: 15

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602007048700

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230701