EP2175105B1 - A controlling method of a generator set provided with a bypass system - Google Patents
A controlling method of a generator set provided with a bypass system Download PDFInfo
- Publication number
- EP2175105B1 EP2175105B1 EP07845794.2A EP07845794A EP2175105B1 EP 2175105 B1 EP2175105 B1 EP 2175105B1 EP 07845794 A EP07845794 A EP 07845794A EP 2175105 B1 EP2175105 B1 EP 2175105B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- bypass
- valve group
- bypass valve
- header
- steam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K13/00—General layout or general methods of operation of complete plants
- F01K13/02—Controlling, e.g. stopping or starting
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K7/00—Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
- F01K7/16—Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type
- F01K7/22—Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type the turbines having inter-stage steam heating
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/22—Drums; Headers; Accessories therefor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/48—Devices for removing water, salt, or sludge from boilers; Arrangements of cleaning apparatus in boilers; Combinations thereof with boilers
- F22B37/52—Washing-out devices
Definitions
- the present invention relates to the field of electric power thermal automation, and particularly to a control method for alternately opening the bypass valves of a steam turbine.
- the steam flow rate is maximum on both sides of A/B, and at the O-point in the header, the steam flow rate approximately approaches zero, forming a position of the lowest flow rate where the steam flow rate is the lowest, the impulse is minimum, and it is easy for foreign matters such as oxide skins to accumulate.
- the steam flow rate at the corresponding point A or point B of the header approximately approaches zero, forming a region of the lowest flow rate (not shown).
- the foreign matters (such as oxide skins) discharged from the coil pipe will stay in the region of low flow rate after entering the header.
- the foreign matters which have entered the header will gradually deposit and accumulate in the region of smaller steam impulse. Only under special operating conditions, for example, when the main steam door is unilaterally closed, these foreign matters can be blown out of the header. Large quantities of granular foreign matters such as oxide skins deposited in the region of low flow rate will endanger the safety of the pipelines connected with this region as well as the safety of the whole unit.
- JP 2002115805A A method using water to discharge sludge in a lower branch pipe at a lower portion of a steam boiler and difficult to be discharged with only a total blow is known from JP 2002115805A .
- this method is unrelated to the goal of removing the foreign matters such as oxide skins in a header.
- an issue to be addressed by the present invention is to provide a low-cost but high-efficient control method so as to reach the goal of reducing the foreign matters such as oxide skins in the header, reducing the erosion rate of solid particles in the turbine and thus improving safety of the unit.
- the present invention provides a bypass control method, comprising the following steps:
- said boiler shall have completed the starting and be prepared to impulse start the turbine.
- said steps 2 and 3 can be repeated, until it is sure that the foreign matters in said header are removed and that the quality of said steam reaches an acceptance value.
- said first-side bypass valve group and/or said second-side bypass valve group are alternately opened /closed in a program-controlled mode.
- the conventional control mode of said bypass system can be immediately restored and it is prepared to impulse start the turbine.
- said bypass system is a high-pressure bypass or a low-pressure bypass.
- the control strategy of this method is also applicable to a low pressure bypass to reduce the accumulation of foreign matters (such as oxide skins) in the outlet header of the reheater.
- said first-side bypass valve group and said second-side bypass valve group respectively comprise at least one bypass valve.
- the bypass control method provided by the present invention realizes alternate changing of the steam flow direction in the header by controlling the alternate opening of the two sides of the bypass valves, without need of adding any hardware facility or extra expenditure. Due to the alternate changing of the steam flow direction in the header, the region of the lowest flow rate in the header is alternately shifted along with the alternate changing of the steam flow direction, so that there is no fixed position of the lowest flow rate in the header, i.e., no existence of dead point of flow rate, and all regions in the header are swept in an all-side way, so as to reach the goal of removing such foreign matters as oxide skin in the header, reducing the erosion rate of solid particles in the turbine and thus improving safety of the unit.
- FIG. 2 is a schematic diagram showing the arrangement of a one-reheating unit provided with a bypass system.
- At least two main machines are provided in the thermoelectric generating unit: a turbine 10 and a boiler 1, and the bypass system is the main component to adjust and coordinate the two main machines.
- the steam transmitted from the boiler 1 passes through a superheater 2 and enters a superheater outlet header 5, then, after passing through a main steam pipe 11, the steam enters an HP cylinder of the turbine 10 via a main intake door and an adjusting door (not shown) of the turbine to do work, and the discharged steam enters a reheater 3 in the boiler after passing a cold section 4 of the reheater.
- the high-pressure bypass is located between the outlet header 5 of the boiler and the cold section 4 of the reheater
- the low-pressure bypass is located between the outlet header of the reheater and the condenser (not shown)
- the bypass system to which the present invention is applied comprises a first-side bypass valve group and a second-side bypass valve group or a low-pressure bypass (not shown) that are respectively provided on the main steam pipe and the reheat steam pipe, which are connected with both sides of the outlet header of the superheater or reheater of the boiler.
- the first-side bypass valve group comprises bypass valves 6 and 7
- the second-side bypass group comprises bypass valves 8 and 9.
- an embodiment of the bypass control method according to present invention comprises the following steps (the control method for a low pressure bypass is the same):
- the alternate changing of the steam flow direction in the header is changed by controlling the alternate opening of the two sides of the bypass valves, without need of adding any hardware facility or extra expenditure. Due to the alternate changing of the steam flow direction in the header, the region of the lowest flow rate in the header alternately changes in position along with the alternate changing of the steam flow direction, so that there is no fixed position of the lowest flow rate in the header, i.e., there is no dead point of the flow rate, and all regions in the header are swept in an all-side way, so as to reach the goal of removing foreign matters such as oxide skins in the header, reducing the erosion rate of the solid particles in the turbine and thus improving the safety of the unit.
- the method of the present invention is not limited to aforesaid embodiment.
- a full program-controlled mode can be adopted and all the control systems of the present invention can be included in the unit starting program control, so as to automatically shift and realize the operations of opening/closing the first-side bypass valve group and/or the second-side bypass valve group, without the need of manual participation or intervention.
- this control method can be designed into the starting mode of the bypass itself, without affecting starting time and operation safety of the unit.
- control method of the present invention is not limited to a single opening/closing alternate operation in said embodiment.
- the process of repeating the step 2 and step 3 can be added for one or many times, i.e., it includes unilaterally alternate opening/closing operations for many times, until it is for sure that the foreign matters in said header have been removed and that the quality of said steam reaches the acceptance value.
- step 4 when the unit has completed the starting process, the conventional control state of the bypass system is to be restored and it is prepared to impulse start the turbine.
- first-side bypass valve group and the second-side bypass valve group in the present invention have no limitation on the quantity of the valves.
- the first-side bypass valve group and the second-side bypass valve group respectively comprise two bypass valves in each group.
- each bypass group may also comprise either one bypass valve or a plurality of bypass valves, and the selection of the quantity of the bypass valves mainly depends on the steam flow rate and the bypass capacity.
- the method of the present invention can also be used in combination with other control methods for bypass systems.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Control Of Turbines (AREA)
Description
- The present invention relates to the field of electric power thermal automation, and particularly to a control method for alternately opening the bypass valves of a steam turbine.
- With continuous improvement in the parameters of steam turbogenerator units, steam oxidation of metal as well as retention of fallen oxide skins in the boiler pipes is increasingly threatening the safe operation of the units. The retention and accumulation of oxide skins may easily happen in the boiler header. As shown in
Figure 1 , the main reason for the accumulation of oxide skins lies in the fact that: after the inlets ofcoiled pipes 1 distributed throughout the header have gatheredsteam 3 into aheader 2, the gatheredsteam 3 is in turn discharged from steam pipes A and B that are connected with both sides of theheader 2. The steam flow rate varies from place to place in the header when the steam is passing therethrough. The steam flow rate is maximum on both sides of
A/B, and at the O-point in the header, the steam flow rate approximately approaches zero, forming a position of the lowest flow rate where the steam flow rate is the lowest, the impulse is minimum, and it is easy for foreign matters such as oxide skins to accumulate. - With the same principle, as in other implementations, if the O-point of the header is the steam outlet connected with the steam pipe, the steam flow rate at the corresponding point A or point B of the header approximately approaches zero, forming a region of the lowest flow rate (not shown).
- The foreign matters (such as oxide skins) discharged from the coil pipe will stay in the region of low flow rate after entering the header. The foreign matters which have entered the header will gradually deposit and accumulate in the region of smaller steam impulse. Only under special operating conditions, for example, when the main steam door is unilaterally closed, these foreign matters can be blown out of the header. Large quantities of granular foreign matters such as oxide skins deposited in the region of low flow rate will endanger the safety of the pipelines connected with this region as well as the safety of the whole unit.
- Therefore, it is necessary to develop a technology to reach the goal of removing the foreign matters such as oxide skins in the header, reducing the erosion rate of solid particles in the turbine and thus improving the safety of the unit.
- A method using water to discharge sludge in a lower branch pipe at a lower portion of a steam boiler and difficult to be discharged with only a total blow is known from
JP 2002115805A - In view of aforesaid deficiency in the prior art, an issue to be addressed by the present invention is to provide a low-cost but high-efficient control method so as to reach the goal of reducing the foreign matters such as oxide skins in the header, reducing the erosion rate of solid particles in the turbine and thus improving safety of the unit.
- To achieve the aforesaid object, the present invention provides a bypass control method, comprising the following steps:
- Step 1: during the starting period of the generating unit provided with a bypass system, said boiler is firstly started in a conventional mode by means of said bypass system, and its steam parameters have basically met the conditions for impulse starting the turbine; said bypass system comprises a first-side bypass valve group and a second-side bypass valve group that are respectively set on the main steam pipe and the reheat steam pipe which are connected with both sides of said outlet header of the superheater or reheater of the boiler:
- Step 2: closing said second-side bypass valve group and at the same time forcing said first bypass valve group to a wide open position, so that said steam that passes through said header is unilaterally discharged only from said first-side bypass valve group in the open state;
- Step 3: after maintaining said first-side bypass valve group in the open state for a required time period, closing said first-side bypass valve group and at the same time opening said second-side bypass valve group, so that said steam that passes through said header is discharged only from said second-side bypass valve group in the open state via the other side;
- Step 4: after maintaining said second-side bypass valve group in the turning-up state for a required time period, restoring the conventional control state of said bypass system and being prepared to impulse start the turbine.
- Preferably□in said
step 1, said boiler shall have completed the starting and be prepared to impulse start the turbine. - Preferably, after said
step 3, saidsteps - Preferably, said first-side bypass valve group and/or said second-side bypass valve group are alternately opened /closed in a program-controlled mode.
- Preferably□after said step 4, the conventional control mode of said bypass system can be immediately restored and it is prepared to impulse start the turbine.
- Preferably, said bypass system is a high-pressure bypass or a low-pressure bypass. The control strategy of this method is also applicable to a low pressure bypass to reduce the accumulation of foreign matters (such as oxide skins) in the outlet header of the reheater.
- Preferably, said first-side bypass valve group and said second-side bypass valve group respectively comprise at least one bypass valve.
- Preferably, the greater the capacity of said bypass valve group is, the better the sweeping effect on the header is.
- The bypass control method provided by the present invention realizes alternate changing of the steam flow direction in the header by controlling the alternate opening of the two sides of the bypass valves, without need of adding any hardware facility or extra expenditure. Due to the alternate changing of the steam flow direction in the header, the region of the lowest flow rate in the header is alternately shifted along with the alternate changing of the steam flow direction, so that there is no fixed position of the lowest flow rate in the header, i.e., no existence of dead point of flow rate, and all regions in the header are swept in an all-side way, so as to reach the goal of removing such foreign matters as oxide skin in the header, reducing the erosion rate of solid particles in the turbine and thus improving safety of the unit.
- The concept, the specific configuration and the resulted technical effects of the present invention will be further described hereinafter in conjunction with the attached drawings, in order to adequately understand the objects, features and effects of the present invention.
-
-
Figure 1 is a schematic diagram of the steam flow directions in a unit header according to the conventional bypass control method of prior art. -
Figure 2 is a schematic diagram of the arrangement of the unit provided with a bypass system. -
Figure 3 is a schematic diagram of the stream flow rate in the header at a stage of alternately opening of the unit according to the bypass control method of the present invention. -
Figure 4 is a flow chart of the control method according to the present invention. -
Figure 2 is a schematic diagram showing the arrangement of a one-reheating unit provided with a bypass system. At least two main machines are provided in the thermoelectric generating unit: aturbine 10 and aboiler 1, and the bypass system is the main component to adjust and coordinate the two main machines. In the operating process of the unit, the steam transmitted from theboiler 1 passes through asuperheater 2 and enters a superheater outlet header 5, then, after passing through amain steam pipe 11, the steam enters an HP cylinder of theturbine 10 via a main intake door and an adjusting door (not shown) of the turbine to do work, and the discharged steam enters areheater 3 in the boiler after passing a cold section 4 of the reheater. The high-pressure bypass is located between the outlet header 5 of the boiler and the cold section 4 of the reheater, and the low-pressure bypass is located between the outlet header of the reheater and the condenser (not shown), and the embodiment described herein is also applicable to a low pressure bypass. The bypass system to which the present invention is applied comprises a first-side bypass valve group and a second-side bypass valve group or a low-pressure bypass (not shown) that are respectively provided on the main steam pipe and the reheat steam pipe, which are connected with both sides of the outlet header of the superheater or reheater of the boiler. In this embodiment, the first-side bypass valve group comprises bypass valves 6 and 7, and the second-side bypass group comprisesbypass valves 8 and 9. - Under normal operating conditions, the steam enters the HP cylinder of the
turbine 10 via amain steam pipe 11 for doing work. However, under abnormal operating conditions such as in the starting stage, an embodiment of the bypass control method according to present invention comprises the following steps (the control method for a low pressure bypass is the same): - Step 1: at the starting stage of the unit provided with a bypass system, the steam transmitted from the
superheater 2 of theboiler 1 passes through the bypass system via an outlet header 5, and then enters the reheater of the boiler via the cold section 4. The bypass system comprises bypass valves 6 and 7 of the first-side bypass valve group andbypass valves 8 and 9 of the second-side bypass valve group that are respectively provided on the main steam pipe and the reheat steam pipe, which are connected with both sides of the outlet header of thesuperheater 2 or thereheater 3 ofboiler 1. - Step 2: at the starting stage, when the steam parameter has basically met the conditions for impulse starting the turbine (by this time, both bypass valve groups shall be in the open state), firstly closing the
bypass valves 8 and 9 mounted on the outlet pipeline on one side of the outlet header 5, and at the same time turning up the bypass valves 6 and 7, so that the steam that has passed through the outlet header 5 is discharged only via the bypass valves 6 and 7 in the open state. As shown inFigure 3 , since the bypass valves 6 and 7 are opened while thebypass valves 8 and 9 remain in the closed state, the steam in the outlet header 5 is discharged from the pipeline on the same side with the bypass valves 6 and 7 via Point A, and by this time, Point B is a point of zero flow rate, and such foreign matters as oxide skins that are deposited in the regions, excluding the neighboring regions of Point B, are blown out of the outlet header 5 along with the steam, and the farther the distance from Point B is, the greater the scouring momentum of the steam is. - Step 3: maintaining the bypass valves 6 and 7 in a wide open state, after the steam pressure in the pipeline has become stable and remains the same for a required time period, closing the bypass valves 6 and 7 and at the same time starting the
bypass valves 8 and 9, so that the steam that passes through the outlet header 5 is discharged from thebypass valves 8 and 9 on the other side; since thebypass valves 8 and 9 are open, the steam that has passed through the outlet header 5 is discharged from the pipeline located on the same side withbypass valves 8 and 9 via Point B, and by this time, Point A is a point of zero flow rate, and such foreign matters as oxide skins that are deposited in the regions, excluding the neighboring regions of Point A, are blown out of the outlet header 5 along with the steam, and the farther the distance from Point A is, the greater the scouring momentum of the steam is. - Step 4: maintaining the
bypass valves 8 and 9 in the wide open state, after the steam pressure in the pipeline has become stable and remains the same for a required time period, restoring the conventional control state of the bypass system and being prepared to impulse start the turbine. - The steps described above are shown in
Figure 4 . - According to the bypass control method of the present invention, the alternate changing of the steam flow direction in the header is changed by controlling the alternate opening of the two sides of the bypass valves, without need of adding any hardware facility or extra expenditure. Due to the alternate changing of the steam flow direction in the header, the region of the lowest flow rate in the header alternately changes in position along with the alternate changing of the steam flow direction, so that there is no fixed position of the lowest flow rate in the header, i.e., there is no dead point of the flow rate, and all regions in the header are swept in an all-side way, so as to reach the goal of removing foreign matters such as oxide skins in the header, reducing the erosion rate of the solid particles in the turbine and thus improving the safety of the unit.
- The method of the present invention is not limited to aforesaid embodiment.
- Preferably, in other embodiments of the present invention, a full program-controlled mode can be adopted and all the control systems of the present invention can be included in the unit starting program control, so as to automatically shift and realize the operations of opening/closing the first-side bypass valve group and/or the second-side bypass valve group, without the need of manual participation or intervention. Meanwhile, this control method can be designed into the starting mode of the bypass itself, without affecting starting time and operation safety of the unit.
- Further, the control method of the present invention is not limited to a single opening/closing alternate operation in said embodiment. According to actual requirements, after said
step 3, the process of repeating thestep 2 andstep 3 can be added for one or many times, i.e., it includes unilaterally alternate opening/closing operations for many times, until it is for sure that the foreign matters in said header have been removed and that the quality of said steam reaches the acceptance value. - After the step 4, when the unit has completed the starting process, the conventional control state of the bypass system is to be restored and it is prepared to impulse start the turbine.
- Said first-side bypass valve group and the second-side bypass valve group in the present invention have no limitation on the quantity of the valves. In aforesaid embodiments, the first-side bypass valve group and the second-side bypass valve group respectively comprise two bypass valves in each group. In other embodiments of the present invention, each bypass group may also comprise either one bypass valve or a plurality of bypass valves, and the selection of the quantity of the bypass valves mainly depends on the steam flow rate and the bypass capacity.
- The method of the present invention can also be used in combination with other control methods for bypass systems.
- In summary, only several preferred embodiments of the present invention have been described.
Claims (7)
- A bypass control method for a generating unit, comprising the following steps:step 1: during the starting period of a generating unit provided with a bypass system, a boiler (1) being firstly started by means of said bypass system in normal mode; wherein said bypass system comprises a first-side bypass valve group and a second-side bypass valve group that are respectively provided on the main steam pipe and/or the reheat steam pipe, which are connected with both sides of an outlet header (5) of a super heater (12) and/or reheater (3) of said boiler (1);step 2: closing said second-side by-pass valve group and at the same time forcing said first bypass valve group to a wide open position, so that said steam that passes through said header (5) is unilaterally discharged only from said first-side bypass valve group in an open state;step 3: after maintaining said first-side bypass valve group in an open state for a required time period, closing said first-side bypass valve group and at the same time opening said second-side bypass valve group, so that said steam that passes through said header (5) is discharged only from said second-side bypass valve group in the open state;step 4: after maintaining said second-side bypass valve group in a starting state for a required time period, restoring a normal control state of said bypass system and being prepared to impulse start a turbine.
- The bypass control method of Claim 1, wherein in said step 1 should be carried out prior to impulse starting said turbine.
- The bypass control method of Claim 1, wherein after said step 3, said steps 2 and 3 can be repeated, until foreign matters in said header (5) have been removed and that a quality of said steam reaches, an acceptance value.
- The bypass control method of Claim 1, wherein said first-side valve group and/or said second-side bypass valve group are alternately opened/closed in a program-controlled mode.
- The bypass control method of Claim 1, wherein after said step 4, the normal control mode of said bypass system can be immediately restored and it is prepared to impulse start the turbine.
- The bypass control method of Claim 1, wherein said bypass system is a high-pressure bypass or a low-pressure bypass.
- The bypass control method of Claim 1, wherein said first-side bypass valve group and said second-side bypass valve group respectively comprise at least one bypass valve.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2007100418370A CN100439659C (en) | 2007-06-11 | 2007-06-11 | Electric generating set side road control method |
PCT/CN2007/003432 WO2008151485A1 (en) | 2007-06-11 | 2007-12-03 | A controlling method of a generator set provided with a bypass system |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2175105A1 EP2175105A1 (en) | 2010-04-14 |
EP2175105A4 EP2175105A4 (en) | 2015-05-20 |
EP2175105B1 true EP2175105B1 (en) | 2016-11-09 |
Family
ID=39010968
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP07845794.2A Not-in-force EP2175105B1 (en) | 2007-06-11 | 2007-12-03 | A controlling method of a generator set provided with a bypass system |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2175105B1 (en) |
CN (1) | CN100439659C (en) |
WO (1) | WO2008151485A1 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102261269A (en) * | 2010-05-28 | 2011-11-30 | 中国神华能源股份有限公司 | Method for controlling operation of low pressure bypass in thermal power generating unit |
JP6058419B2 (en) * | 2013-02-19 | 2017-01-11 | 株式会社東芝 | Steam turbine valve control apparatus and valve control method thereof |
CN107503811A (en) * | 2017-08-17 | 2017-12-22 | 凉山矿业股份有限公司 | A kind of afterheat generating system of end Sa boiler and converter boiler |
CN109442368B (en) * | 2018-09-21 | 2020-02-14 | 国网辽宁省电力有限公司电力科学研究院 | Bypass system comprehensive control method for improving regulating capacity of heat supply unit |
CN110160033A (en) * | 2019-06-13 | 2019-08-23 | 西安热工研究院有限公司 | A kind of station boiler high temperature steam pipeline oxide skin purging structure |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2132732A (en) * | 1937-09-03 | 1938-10-11 | Master Steam Equipment Company | Steam boiler |
GB1309145A (en) * | 1970-04-24 | 1973-03-07 | Foster Wheeler Brown Boilers | Dual circulation steam boiler |
US4471446A (en) * | 1982-07-12 | 1984-09-11 | Westinghouse Electric Corp. | Control system and method for a steam turbine having a steam bypass arrangement |
JPS59170410A (en) * | 1983-03-18 | 1984-09-26 | Mitsubishi Heavy Ind Ltd | Stand-by method of turbine bypass valve |
JPS60228710A (en) * | 1984-04-27 | 1985-11-14 | Toshiba Corp | Control device for steam turbine |
US4598551A (en) * | 1985-10-25 | 1986-07-08 | General Electric Company | Apparatus and method for controlling steam turbine operating conditions during starting and loading |
JPS62206203A (en) * | 1986-03-07 | 1987-09-10 | Hitachi Ltd | Operation control method for steam turbine |
JPH0337304A (en) * | 1989-07-05 | 1991-02-18 | Hitachi Ltd | Start of steam turbine generation plant provided with turbine bypass device |
FI83816C (en) * | 1989-10-25 | 1991-08-26 | Ahlstroem Oy | Method and apparatus for feeding solid material into a combustion or gasification reactor |
US5311844A (en) * | 1992-03-27 | 1994-05-17 | Foster Wheeler Energy Corporation | Internested superheater and reheater tube arrangement for heat recovery steam generator |
JP2002115805A (en) * | 2000-10-11 | 2002-04-19 | Samson Co Ltd | Boiler having washing water supply port and can bottom washing method |
JP4438243B2 (en) * | 2001-03-21 | 2010-03-24 | 栗田エンジニアリング株式会社 | Boiler cleaning method |
CN100473805C (en) * | 2007-06-11 | 2009-04-01 | 上海外高桥第三发电有限责任公司 | Electric generating set small side road system and control method thereof |
-
2007
- 2007-06-11 CN CNB2007100418370A patent/CN100439659C/en active Active
- 2007-12-03 EP EP07845794.2A patent/EP2175105B1/en not_active Not-in-force
- 2007-12-03 WO PCT/CN2007/003432 patent/WO2008151485A1/en active Application Filing
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
WO2008151485A1 (en) | 2008-12-18 |
CN100439659C (en) | 2008-12-03 |
EP2175105A4 (en) | 2015-05-20 |
CN101096917A (en) | 2008-01-02 |
EP2175105A1 (en) | 2010-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2175105B1 (en) | A controlling method of a generator set provided with a bypass system | |
US7987675B2 (en) | Provision for rapid warming of steam piping of a power plant | |
CN105157007B (en) | Steam pipe washing method for 1000MW ultra-supercritial double reheat boiler | |
CN101846311B (en) | Systems and methods for pre-warming a heat recovery steam generator and associated steam lines | |
CN100473805C (en) | Electric generating set small side road system and control method thereof | |
JP5990581B2 (en) | Steam turbine equipment and driving method of the steam turbine equipment | |
US20150184552A1 (en) | Controlling apparatus and starting method | |
KR102307255B1 (en) | Condensate and feedwater system of steam power plant and operation method for the same | |
JP3774487B2 (en) | Combined cycle power plant | |
CN112197610B (en) | Primary frequency modulation composite control system of coal-fired unit and working method thereof | |
JP6495137B2 (en) | Combined cycle power plant and control method thereof | |
JP2010196473A (en) | Electric power plant water supply device, and method for controlling the same | |
EP2556218A1 (en) | Method for quickly connecting a steam generator | |
JP6603526B2 (en) | Steam turbine equipment and operation method of steam turbine equipment | |
CN110132045B (en) | Automatic control device for soot blowing of synthetic ammonia three-gas boiler | |
CN206056385U (en) | 1000MW double reheat power generation sets boiler blowpipe switched system stage by stage | |
CN104696940B (en) | Gas power station two drags a unit high pressure steam system and on off control method thereof | |
US4338789A (en) | Method of varying turbine output of a supercritical-pressure steam generator-turbine installation | |
CN108202056A (en) | The blowpipe temporary system and control method of three discard heat boilers | |
JPH10187211A (en) | Control method for power plant sequence | |
CN112811632B (en) | Reverse osmosis step control method | |
CN114941552B (en) | Large supercritical reheating type double-pumping back pressure unit-based rapid switching control method for heat supply without stopping furnace when shutdown | |
RU2346205C1 (en) | Method of sustained gas supply by gas distribution station with power-refrigerating complex using natural gas overpressure energy to produce electric energy and cold and system for method implementation | |
CN106839867A (en) | A kind of boiler steam pipe clean method | |
CN106545841A (en) | The water supply control method that a kind of suppression FCB processes main vapour pressure rises |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20100111 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK RS |
|
DAX | Request for extension of the european patent (deleted) | ||
RA4 | Supplementary search report drawn up and despatched (corrected) |
Effective date: 20150421 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F01D 19/00 20060101AFI20150415BHEP Ipc: F22B 37/52 20060101ALI20150415BHEP Ipc: F01D 15/10 20060101ALI20150415BHEP Ipc: F22B 37/22 20060101ALI20150415BHEP Ipc: F01K 13/02 20060101ALI20150415BHEP Ipc: F01K 7/22 20060101ALI20150415BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20160314 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
GRAL | Information related to payment of fee for publishing/printing deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR3 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTC | Intention to grant announced (deleted) | ||
INTG | Intention to grant announced |
Effective date: 20160803 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 844115 Country of ref document: AT Kind code of ref document: T Effective date: 20161115 Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602007048700 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20161109 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 844115 Country of ref document: AT Kind code of ref document: T Effective date: 20161109 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170210 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20161231 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170309 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170309 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602007048700 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170209 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20170831 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
26N | No opposition filed |
Effective date: 20170810 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20170209 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170109 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20161231 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20161231 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20161203 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20161203 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170209 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20071203 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161109 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20161203 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20211210 Year of fee payment: 15 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602007048700 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230701 |