EP2090492B1 - Procédé de réalisation d'une technique de sécurisation de voies universelle à l'aide de composants SPS disponibles de manière industrielle - Google Patents
Procédé de réalisation d'une technique de sécurisation de voies universelle à l'aide de composants SPS disponibles de manière industrielle Download PDFInfo
- Publication number
- EP2090492B1 EP2090492B1 EP09000741.0A EP09000741A EP2090492B1 EP 2090492 B1 EP2090492 B1 EP 2090492B1 EP 09000741 A EP09000741 A EP 09000741A EP 2090492 B1 EP2090492 B1 EP 2090492B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- block
- plc
- stw
- signal box
- new
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 238000000034 method Methods 0.000 title description 10
- 238000005516 engineering process Methods 0.000 claims description 23
- 230000005540 biological transmission Effects 0.000 claims description 13
- 230000006978 adaptation Effects 0.000 claims description 7
- 238000003745 diagnosis Methods 0.000 claims description 3
- 238000013461 design Methods 0.000 claims description 2
- 238000012546 transfer Methods 0.000 claims description 2
- 230000008569 process Effects 0.000 description 5
- 238000012545 processing Methods 0.000 description 4
- 238000006243 chemical reaction Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000002955 isolation Methods 0.000 description 2
- 238000012544 monitoring process Methods 0.000 description 2
- 230000011664 signaling Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000002457 bidirectional effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000001143 conditioned effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 125000000524 functional group Chemical group 0.000 description 1
- 230000005764 inhibitory process Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L21/00—Station blocking between signal boxes in one yard
- B61L21/04—Electrical locking and release of the route; Electrical repeat locks
Definitions
- the invention relates to a device for implementing a universal route safety technology by means of industrially available PLC components. It is used to adapt interlockings of any type with block devices that secure the block sections belonging to this interlocking free route to a new adjacent electronic interlocking.
- rail vehicle operation can be centrally managed and secured by the interlocking systems responsible for the corresponding infrastructure areas and decentralized route safety systems.
- an automation platform which comprises a plurality of modules, in particular CPU, power supply, module for safety-related signal processing, module for non-safety-related signal processing, communication module, connected via special interfaces with safety-related and non-safety-relevant components of the railway safety system.
- the automation platform is a programmable logic controller (PLC).
- PLC programmable logic controller
- the predefined software structure of the automation platform is modular or hierarchical in that the logistics of the railway safety system, in particular the interlocking logistics, can be organized in function-specific software programs.
- the EP 0 787 639 B1 describes a device for coupling an electronic interlocking to a relay interlocking.
- the device is on relay interlocking limited and requires a sensor IS for measuring the loop current I. Based on the measured loop current are controlled by a processor MP, a variable impedance and a switch such that all states of the relay block to be replaced are adjustable.
- the operation of the block logic is thus translated into another logic defined by variable impedance values and interpreted in the detour via a table to be evaluated by a microprocessor.
- metrological components such as the current sensor and a transformation into its own logic unfavorably for the self-contained route safety technology a complete - and indeed new for both endpoints - total safety evidence must be performed.
- the circuit of the coupling device EB behaves basically like a transmitter / receiver, ie as a link between a self-contained transmission system and adjacent block devices, the block-technical dependencies are essentially realized only in the adjacent new interlocking (ESTW).
- ESTW adjacent new interlocking
- the new construction projects for regional and long - distance networks at DB AG are concentrated on route networks with mechanical signal boxes, electromechanical signal boxes and relay interlockings.
- a direct adaptation of a new type of interlocking to existing and to maintain track safety systems is usually difficult and expensive.
- a renewal of interlocking technology therefore requires a costly adaptation of the existing interlocking or track safety to the respective new interlocking technology.
- the current adaptations to existing route safety techniques are carried out via individual and company-specific technical solutions with the help of relay modules.
- the project-specific conditions demand a high level of hardware and project planning, testing and downtime performance.
- the previous use of basic circuits tried to counteract this, but leads in individual cases to very complex and therefore complex solutions.
- the basic circuits take into account a wide range of applications, although only a fraction of the realizable by the basic circuit options is required in the project-specific case.
- a matching circuit together with existing or new industrially available transmission technology, creates a universal interface via which arbitrary link block devices are adapted to new interlockings. From the existing block devices of an old signal box, the approved transmission modules can continue to be used. Only the relay circuits of the block groups which are relevant for the function of the block logic are replaced by a PLC system which exactly simulates the block logic and processes the electrical signals of the block logic in standardized form in such a way that the new interlocking can record and further process the specified data. Likewise, the device can record specified information of the new interlocking and process it in the block logic. For this purpose, the relay circuits of the block groups which are relevant for the function of the block logic are replaced, for example, by a ladder diagram with which the
- PLC system is programmed so that it takes over the functions of the block logic.
- the existing track-free signaling technology of the line safety device can, if required by the company, be left or replaced by axle counting technology.
- the existing or new transmission technology ensures secure data transmission between the adjacent interlockings.
- the PLC system may be placed at the location of the at least one new interlocking or at the location of the existing neighboring interlocking or in at least one decentralized switching house.
- an advantageous embodiment of the invention is to build the PLC system by means of at least two diverse PLC controls, in each of which the block matching logic is implemented to the neighboring interlocking.
- Both PLCs are programmed using the proprietary programming tools of the PLC manufacturers.
- Each PLC checks the states determined by the block logic for plausibility.
- the PLC system then compares the results and function of the two diverse PLC controls in a comparator. If there is a match, it is ensured that the signal from both PLC channels was formed without error. Thus, the data can be forwarded to the new interlocking for internal processing. If the data does not match, it can not be assumed that the system is working properly. The system recognizes this as an implausible state.
- Claim 4 describes how status and diagnostic information is provided by the diagnostic unit to the non-secure diagnostics interface for maintenance / suppression.
- the diagnostic interface supports the common serial interface types, such as RS 232 C, ETHERnet, fieldbuses (Profibus, CAN bus, etc.) as well as a bit-parallel interface.
- the diagnostic unit provides all essential states of the block. In the event of a fault, targeted and rapid fault clearance is possible due to the displayed diagnostic information.
- the self-block frame is replaced by a universal block interface (3, 4, 5, 6) with internal block logic (3), the device according to the invention being connected, on the one hand, to the existing transmission system (2) and, on the other hand, to the input and output modules (7 ) of the STW new (13).
- the universal block interface takes on the side of STW-new all the tasks of the previous self-block technology.
- the device according to the invention can be installed in the location of the STW-old or in the STW-new.
- the exchange and processing of the block information between the device according to the invention and the new and old interlocking is shown below using the example of an exit from STW old (1) in the direction block with entry into STW new (13).
- the functions permit release and "permission handles" are in the concrete example the possible block operations.
- the block Before driving a train from left to right, ie from the area of the STW old in the direction of STW new, as a prerequisite must first be the permission on the side of the deflating neighboring station STW old (left), the block must be in basic position and allowed not be disturbed. The track section must be clear and the track vacancy notice must not be disturbed.
- STW-old the following reactions and processes occur:
- the extension train N1 at the neighboring STW-alt (STW-old) is set by the operator of the STW-old. If the block basic position is given and the permission exists in the STW old, a renewed permission change is first technically blocked and the successful basic position check is saved.
- the block lock is now active and prevents further routes in the direction of the route.
- the active block lock is indicated by the illuminated exit blocking detector.
- the extension signal N1 may now show travel. The continuous monitoring of the track track approval and the permission becomes active in the STW old.
- the train now leaves and occupies the last train detection section 1.4, then the extension signal N1 stops.
- the associated track occupancy checker in the block group stores this information of the last station section until all the conditions of the block basic position have been met. Occupying the section N / P drop off the free fields of the route and the busy message of the route is turned on via the associated track occupancy tester and transmitted to STW new.
- the corresponding block relays and the stop signal of the signal F drop off.
- the following reactions and sequences occur:
- the track occupied information sent by the neighbor STW-old is received and processed in the device according to the invention in such a way that the block segment detector in the STW red is switched on and the block alarm clock or the associated acoustic alarm is activated.
- the hold notification information of the signal A is disabled in the block logic. This has the consequence that neither stop nor drive message are transmitted to STW-old.
- the device according to the invention switches off the relevant track vacancy information in the block logic. With occupancy of section 1.2 drops the entry signal A in stop position, the device of the invention then switches off the state "driving message signal A" to STW old.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Programmable Controllers (AREA)
Claims (4)
- Dispositif d'adaptation universelle sûre de la technique de signalisation d'au moins un poste d'aiguillage avec au moins un dispositif de cantonnement de type de construction quelconque pour la sécurisation des cantons de la voie libre appartenant à ce poste d'aiguillage au niveau d'au moins un poste d'aiguillage adjacent, dans lequel les modules de transmission existants et/ou autorisés peuvent être utilisés, caractérisé en ce que le circuit d'adaptation se compose dea. au moins un système d'automates programmables (SPS) etb. une technique de transmission sûre disponible via laquelle le système SPS et les postes d'aiguillage impliqués échangent des informations de manière normée,dans lequel le système SPS remplace les circuits relais pertinents des groupes de cantons et reproduit exactement ce faisant les fonctions de la logique de canton au moins de l'un poste d'aiguillage existant sur le côté à adapter au nouveau poste d'aiguillage, dans lequel les circuits relais des groupes de cantons pertinents pour la fonction de la logique de canton sont programmés dans le système SPS de sorte qu'il prenne en charge les fonctions de la logique de canton.
- Dispositif de réalisation d'une technique de sécurisation de voies universelle sûre de la technique de signalisation selon la revendication 1, caractérisé en ce que le système SPS est placé à l'endroit de l'au moins un nouveau poste d'aiguillage ou à l'endroit de l'au moins un poste d'aiguillage existant ou dans au moins un poste de distribution décentralisé.
- Dispositif de réalisation d'une technique de sécurisation de voies universelle sûre de la technique de signalisation selon au moins l'une quelconque des revendications précédentes, caractérisé en ce que le système SPS se compose d'au moins deux commandes SPS différenciées, dans lesquelles respectivement la logique d'adaptation de canton est réalisée, dans lequel chaque SPS contrôle la plausibilité des états et ensuite le système SPS compare entre eux les fonctions et résultats des commandes SPS différenciées et, en cas de correspondance, libère les données pour transmission au nouveau poste d'aiguillage.
- Dispositif de réalisation d'une technique de sécurisation de voies universelle sûre de la technique de signalisation selon au moins l'une quelconque des revendications précédentes, caractérisé en ce qu'une unité de diagnostic fournit des informations d'état et de diagnostic, qui affiche tous les états d'information importants du canton.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102008009746A DE102008009746A1 (de) | 2008-02-18 | 2008-02-18 | Verfahren zur Realisierung einer universellen Streckensicherungstechnik mittels industriell verfügbarer SPS-Komponenten |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2090492A2 EP2090492A2 (fr) | 2009-08-19 |
EP2090492A3 EP2090492A3 (fr) | 2015-04-15 |
EP2090492B1 true EP2090492B1 (fr) | 2018-11-21 |
Family
ID=40361583
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP09000741.0A Not-in-force EP2090492B1 (fr) | 2008-02-18 | 2009-01-21 | Procédé de réalisation d'une technique de sécurisation de voies universelle à l'aide de composants SPS disponibles de manière industrielle |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP2090492B1 (fr) |
DE (1) | DE102008009746A1 (fr) |
DK (1) | DK2090492T3 (fr) |
ES (1) | ES2702613T3 (fr) |
PT (1) | PT2090492T (fr) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH701344A1 (de) * | 2009-06-23 | 2010-12-31 | Anton Gunzinger | Stellwerksteuerung. |
CN103350708B (zh) * | 2013-08-02 | 2015-08-19 | 兰州交通大学 | 一种电力机车整备作业系统 |
EP2853465B1 (fr) * | 2013-09-27 | 2016-03-16 | Siemens Schweiz AG | Circuit logique et procédé de remplacement d'un relais de sécurité à guidage forcé |
AT515096B1 (de) * | 2014-05-15 | 2015-06-15 | Vamed Kmb Krankenhausman Und Betr Sführungs Gesmbh | Transportsystem und -verfahren für in einem Schienennetz bewegte Kleintransportbehälter |
EP3450281B1 (fr) * | 2017-09-01 | 2024-10-23 | GTS Deutschland GmbH | Procédé de couplage vital d'un système de protection à base de routes et système de protection à base de blocs, système de protection de mouvement de train |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29516138U1 (de) * | 1995-10-11 | 1996-04-04 | Kammler, Markus, 50170 Kerpen | Signaltechnik für Nebenbahnen |
EP0787639B1 (fr) * | 1996-02-02 | 2003-01-02 | Siemens Schweiz AG | Dispositif de connexion d'un poste d'aiguillage électronique à un poste d'aiguillage à relais |
DE202005020802U1 (de) * | 2004-11-15 | 2007-03-15 | Abb As | Steuersystem für Schienenfahrzeuge |
DE102005043305A1 (de) | 2005-09-07 | 2007-03-15 | Siemens Ag | System-Architektur zur Steuerung und Überwachung von Komponenten einer Eisenbahnsicherungsanlage |
-
2008
- 2008-02-18 DE DE102008009746A patent/DE102008009746A1/de not_active Withdrawn
-
2009
- 2009-01-21 PT PT09000741T patent/PT2090492T/pt unknown
- 2009-01-21 DK DK09000741.0T patent/DK2090492T3/en active
- 2009-01-21 EP EP09000741.0A patent/EP2090492B1/fr not_active Not-in-force
- 2009-01-21 ES ES09000741T patent/ES2702613T3/es active Active
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
DE102008009746A1 (de) | 2009-08-27 |
ES2702613T3 (es) | 2019-03-04 |
PT2090492T (pt) | 2018-12-28 |
EP2090492A3 (fr) | 2015-04-15 |
EP2090492A2 (fr) | 2009-08-19 |
DK2090492T3 (en) | 2019-01-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102009042368B4 (de) | Steuerungssystem zum Steuern von sicherheitskritischen Prozessen | |
EP0875810B1 (fr) | Méthode et dispositif de surveillance d'une installation comprenant plusieurs unités fonctionnelles | |
EP3405377B1 (fr) | Dispositif de conduite automatique d'un véhicule ferroviaire, véhicule ferroviaire et procédé de conduite automatique d'un véhicule ferroviaire | |
EP1642179B1 (fr) | Dispositif pour commander de maniere automatisee le deroulement d'une operation dans une installation technique | |
DE3522418C2 (fr) | ||
EP2445771B1 (fr) | Procede de creation d'un poste d'aiguillage electronique pour remplacer un poste d'aiguillage existant | |
EP2090492B1 (fr) | Procédé de réalisation d'une technique de sécurisation de voies universelle à l'aide de composants SPS disponibles de manière industrielle | |
DE19632609A1 (de) | Fertigungsanlage | |
EP1589386A1 (fr) | Système de commande de processus | |
WO2016008948A1 (fr) | Système de commande et de transmission de données, module de passerelle, module e/a et procédé de commande de processus | |
EP1912846A1 (fr) | Procede et dispositif pour mettre hors service des portes defectueuses | |
DE2701925C3 (de) | Fahrzeugsteuerung mit zwei Bordrechnern | |
DE102012202046A1 (de) | System zur Steuerung, Sicherung und/oder Überwachung von Fahrwegen spurgebundener Fahrzeuge sowie Verfahren zum Betreiben eines solchen Systems | |
EP2154587B1 (fr) | Système de positionnement d'un actionneur | |
WO2007076939A2 (fr) | Dispositif pour commander au moins une machine | |
EP2088051B1 (fr) | Procédé et dispositif destinés au réglage sécurisé d'une voie de circulation pour un véhicule sur rail | |
EP2236389B1 (fr) | Procédé de dépôt de signalements des perturbations d'une unité de fonctionnement décentralisée dans un système de sécurisation pour trafic sur rails | |
EP1197418B1 (fr) | Pocédé de commande pour un processus à sécurité critique dans le service ferroviaire et dispositif pour mettre en oeuvre ce procédé | |
EP2978654B1 (fr) | Procédé pour remplacer un premier poste d'aiguillage par un deuxième poste d'aiguillage | |
DE19632608A1 (de) | Steuerungssystem | |
EP3470939B1 (fr) | Procédé et système de surveillance de l'intégrité de sécurité d'une fonction de sécurité fournie par un système de sécurité | |
DE102005043305A1 (de) | System-Architektur zur Steuerung und Überwachung von Komponenten einer Eisenbahnsicherungsanlage | |
EP3612429B1 (fr) | Procédé d'exploitation d'une installation de voie et contrôleur au sol pour une telle installation de voie | |
EP2036800A2 (fr) | Commande d'élément de signal électronique et sûre destinée à l'exécution d'une marche de véhicules sur rail | |
EP2804798B1 (fr) | Procédé de commande, de protection et/ou de surveillance de la circulation ferroviaire et système d'exploitation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA RS |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: DB NETZ AKTIENGESELLSCHAFT |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA RS |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B61L 21/04 20060101AFI20150311BHEP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R108 |
|
AKY | No designation fees paid | ||
AXX | Extension fees paid |
Extension state: BA Extension state: RS Extension state: AL |
|
17P | Request for examination filed |
Effective date: 20151202 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: DEUTSCHE BAHN AG |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20180723 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502009015461 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1067201 Country of ref document: AT Kind code of ref document: T Effective date: 20181215 |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: SC4A Ref document number: 2090492 Country of ref document: PT Date of ref document: 20181228 Kind code of ref document: T Free format text: AVAILABILITY OF NATIONAL TRANSLATION Effective date: 20181219 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20190106 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20181121 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2702613 Country of ref document: ES Kind code of ref document: T3 Effective date: 20190304 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190221 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190321 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: VALIPAT S.A. C/O BOVARD SA NEUCHATEL, CH |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190222 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502009015461 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190121 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190131 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20190221 |
|
26N | No opposition filed |
Effective date: 20190822 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190221 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20090121 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FI Payment date: 20220119 Year of fee payment: 14 Ref country code: DK Payment date: 20220121 Year of fee payment: 14 Ref country code: CH Payment date: 20220125 Year of fee payment: 14 Ref country code: AT Payment date: 20220119 Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20220125 Year of fee payment: 14 Ref country code: PT Payment date: 20220120 Year of fee payment: 14 Ref country code: NO Payment date: 20220121 Year of fee payment: 14 Ref country code: NL Payment date: 20220120 Year of fee payment: 14 Ref country code: IT Payment date: 20220124 Year of fee payment: 14 Ref country code: FR Payment date: 20220120 Year of fee payment: 14 Ref country code: ES Payment date: 20220216 Year of fee payment: 14 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181121 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: EBP Effective date: 20230131 |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: MMEP |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: EUG |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20230201 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1067201 Country of ref document: AT Kind code of ref document: T Effective date: 20230121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230122 Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230721 Ref country code: NO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230131 Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230201 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230131 Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230121 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230131 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230121 Ref country code: DK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230131 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20240402 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230122 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230122 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240223 Year of fee payment: 16 |