EP1931836B1 - Ensemble element support - Google Patents

Ensemble element support Download PDF

Info

Publication number
EP1931836B1
EP1931836B1 EP06784278.1A EP06784278A EP1931836B1 EP 1931836 B1 EP1931836 B1 EP 1931836B1 EP 06784278 A EP06784278 A EP 06784278A EP 1931836 B1 EP1931836 B1 EP 1931836B1
Authority
EP
European Patent Office
Prior art keywords
support member
elongate
engagement portion
slots
assembly according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP06784278.1A
Other languages
German (de)
English (en)
Other versions
EP1931836A1 (fr
EP1931836A4 (fr
Inventor
Wee Beng Ng
Gary Donald Wyatt
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dyntek Pte Ltd
Original Assignee
Dyntek Pte Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dyntek Pte Ltd filed Critical Dyntek Pte Ltd
Priority to MEP-2015-710A priority Critical patent/ME02263B/fr
Priority to SI200631982T priority patent/SI1931836T1/sl
Priority to PL06784278T priority patent/PL1931836T3/pl
Publication of EP1931836A1 publication Critical patent/EP1931836A1/fr
Publication of EP1931836A4 publication Critical patent/EP1931836A4/fr
Application granted granted Critical
Publication of EP1931836B1 publication Critical patent/EP1931836B1/fr
Priority to CY20151100974T priority patent/CY1117131T1/el
Priority to HRP20151167TT priority patent/HRP20151167T1/hr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/76Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal
    • E04B2/762Cross connections
    • E04B2/765Cross connections with one continuous profile, the perpendicular one being interrupted
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • E04B2/04Walls having neither cavities between, nor in, the solid elements
    • E04B2/06Walls having neither cavities between, nor in, the solid elements using elements having specially-designed means for stabilising the position
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/76Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal
    • E04B2/78Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal characterised by special cross-section of the frame members as far as important for securing wall panels to a framework with or without the help of cover-strips
    • E04B2/7809Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal characterised by special cross-section of the frame members as far as important for securing wall panels to a framework with or without the help of cover-strips of single or multiple tubular form
    • E04B2/7818Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal characterised by special cross-section of the frame members as far as important for securing wall panels to a framework with or without the help of cover-strips of single or multiple tubular form of substantially rectangular form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/82Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • E04B1/5825Connections for building structures in general of bar-shaped building elements with a closed cross-section
    • E04B1/5831Connections for building structures in general of bar-shaped building elements with a closed cross-section of substantially rectangular form

Definitions

  • the invention relates to a support member assembly, and especially for at least partially supporting a wall.
  • brick wall have been supported by erecting concrete supports at intervals along the brick wall, both horizontally and vertically, to support the wall.
  • metal rods which are fixed to the mortar joints of the brick wall and to the concrete supports to tie the brick wall to the concrete supports.
  • one of the disadvantages of this conventional approach is that the construction and use of the concrete supports is both time consuming and labour intensive.
  • the shuttering is normally constructed from wooden boards and the services of a carpenter are required to construct the shuttering.
  • the metal rods which will be used to tie the brick wall to the concrete support, through the side walls of the shuttering so that the metal rods extend outside the shuttering and into the internal volume of the shuttering where the concrete is to be poured. This requires the services of a steel bender to bend and install the metal rods as required.
  • WO03/102321 discloses a support member system including a set of elongate members.
  • An end member includes an elongate member engagement portion adapted to engage with a first end of the elongate member and a support structure engagement portion fixedly connected to the elongate member engagement portion.
  • Such an arrangement lacks flexibility in the manufacturing and installation of the support member system.
  • FR2712323 relates to a temporary partition made from vertical steel posts, top and bottom rails, covering panels and aluminum extrusions to cover the joints between panels.
  • the posts are of rectangular-section tubing, able to expand freely between the top and bottom rails, each equipped with an adjustable telescopic element at top or bottom, connected to the post by fixings which separate under the effect of heat.
  • the upper part of the telescopic element is connected to the upper rail by a connecting device but this arrangement is complex.
  • WO92/08014 relates to a framework of partition walls for rooms of houses comprising in cross-section U-shaped floor, ceiling and wall profiles which are designed to be fastened to the room's floor, ceiling and walls, together with upright profiles, the bottom of the ceiling and floor profiles having an engagement section which projects from this, midway between the flanges, and which is designed to engage the respective end sections of the uprights to prevent mutual movement of the ceiling and floor profiles and the uprights in the ceiling and floor profiles' longitudinal direction during assembly of the wall.
  • an arrangement lacks flexibility in the manufacturing and installation of the framework.
  • US5,803,653 relates to a telescoping wall mount which includes two long structural bars having specific lengths and that are coupled together telescopically. Ends of the telescoping wall mount are then placed in respective grooves. However, the telescoping wall mount is not securely connected to the respective grooves.
  • a support member assembly comprising an elongate support member having an effective length, an elongate member engagement portion arranged to engage with one end of the elongate support member to extend the member's effective length, and a base portion including connection means for releasably connecting to the elongate support member; characterized in that, the elongate support member comprises slots on two opposite side walls of the elongate support member, each slot including two recesses, and wherein the connection means includes projections arranged to selectively engage the at least one recess of the slots.
  • An advantage of the described embodiment is that the parts of the assembly i.e. the elongate support member, the elongate member engagement portion and the base portion can be manufactured separately and may be assembled on site thus increasing productivity. Further, each part can be packed together with like parts to reduce space thus easier for shipment. On site, the user can then decide based on the design requirements, whether the base portion is to be connected to the elongate member engagement portion or directly to the elongate support member.
  • connection means is adapted to be connectable to the elongate member engagement portion.
  • the elongate support member and the elongate member engagement portion each may have a side wall adapted to be located adjacent an end of a wall to be supported, in use.
  • Each side wall may then include the slots which permit a tie member to be mounted on the side wall, the tie member having a portion projecting from the side wall to engage with the wall to be supported.
  • the slots are provided at discrete locations along the side walls of the elongate member and the elongate member engagement portion such that position of the tie members are adjustable.
  • the slots may be provided on opposite sides or on all four sides of the elongate member.
  • the support member assembly may further comprise engagement portion slots which are provided on opposite sides or on all four sides of the elongate member engagement portion.
  • the slots and the engagement portion slots may be elongate and comprise an opening extending in a first direction substantially perpendicular to the longitudinal direction of the slots.
  • the slots may be arranged along at least two substantially parallel axes along the longitudinal axis of the elongate support member and the elongate support member engagement portion with the openings of slots along one of the axis facing in a direction opposite to the openings of slots along the other axis, the directions of both openings being substantially perpendicular to the longitudinal axis of the elongate support member and the elongate support member engagement portion.
  • each slot comprises two recesses extending in a direction opposite the direction of the opening of the same slot.
  • the two recesses are adapted to extend along the same direction as the opening of one of the slots.
  • a slot along one axis is offset from an adjacent slot along the other axis such that the openings of the slots are not aligned with each other.
  • the recess of one slot is aligned with the recess of an adjacent slot.
  • each slot is used as a guide for selectively cutting the elongate member to a desired length.
  • the aligned recesses of the adjacent slots are arranged to be connectable with the connecting means of the base portion.
  • connection means may be arranged to engage respective aligned recesses.
  • the projections may be angled to form generally L-shaped projections.
  • One projection pair may be arranged to connect with one side surface of the elongate support member and the other projection pair may be arranged to connect with the opposing said surface of the elongate support member.
  • the base portion includes stoppers arranged to abut against a side surface of the elongate support member to limit movement along one direction.
  • the base portion may be arranged to engage with a support structure.
  • the base portion may include a bent edge.
  • the base portion may be adapted to engage with a said elongate support member.
  • the base portion may have an attachment section for attachment to a side wall of one of the elongate members.
  • the attachment section includes lugs.
  • the support member engagement portion is engageable with both ends of the elongate member.
  • the base portion may also be releasably connectable to the elongate member engagement portion.
  • Figure 1 shows a section of a wall 1 which is supported by a support member system 100 according to the preferred embodiment of the present invention.
  • the support member system 100 includes a number of elongate members 101 and in this embodiment, these are arranged as vertical stiffeners 102 (only one shown) and horizontal stiffeners 103 which interconnects the vertical stiffener 102.
  • the vertical stiffener 102 supports three portions 4, 5, 6 of the wall 1 and the vertical and horizontal edges of the portions 4, 5, 6 adjacent respectively to the vertical stiffener 102 and horizontal stiffener 103 are mechanically connected to respective stiffeners 102,103 by means of a number of ties 7 engageable with engagement means 120 formed on a side surface of the stiffeners 102,103 (in Figure 1 , only one tie member 7 is shown and the wall portion to which it engages has been removed to show the tie member clearly).
  • the vertical stiffener 102 is connected at each of its upper and lower ends to an upper support 8 and to a lower support 9, respectively by a connector 110.
  • each end of the horizontal stiffeners 103 is connected to the side of the vertical stiffener 102 by a connector 111.
  • the support member system 100 also includes elongate member engagement portions in the form of sleeve members 130,135 for engaging with an end of the stiffeners 102,103 to extend the stiffener's effective length.
  • the support member system 100 also includes base portions and in this embodiment, these are in the form of base plates 110,111 arranged to engage with the upper support 8 or the lower support 9 of Figure 1 , or with a vertical stiffener 102, in the case of the side base plate 111 being used with a horizontal stiffener 103.
  • Mechanical fasteners may be inserted through the base plate 110 to attach the plate 110 to the underside of the upper support surface 8 and the upper side of the lower support surface 9.
  • the mechanical fasteners are preferably powder actuated fasteners but may, alternatively, be any type of suitable fastener, such as nails, masonry nails or anchor bolts. If the fasteners are not powder actuated preferably, holes for fasteners are pre-drilled in the base plate 110.
  • each of the vertical and horizontal stiffeners 102, 103 are fabricated by roll-forming from sheets of pre-galvanised steel and laser welded at the sheet's edges to form a hollow box section. In this way, it helps to reduce production time than if the stiffeners are formed from two separate extrusions. Further, the stiffeners 102,103 are generally the same and thus, this allows a user freedom to use the stiffeners 102,103 in whichever orientation.
  • FIG. 2 shows the system of Figure 1 in more detail since the wall 1 and support surfaces 8,9 are not shown.
  • each stiffener has four side surfaces and in this embodiment, two of the opposing side surfaces 102a,102b,103a,103b (102b and 103b not shown) of each stiffener 102,103 have a plurality of engagement means and in this embodiment, the engagement means are in the form of elongate slots 120 which are arranged along two substantially parallel axes and which extend in a direction substantially parallel to the longitudinal axes of the stiffeners 102,103.
  • Each slot 120 has a respective opening 121 formed near the centre of the slot 120, and first and second recesses 122,123 arranged at either side of the opening 121 and which extend in a direction opposite to the opening 121.
  • the sleeve members 130,135 are used and which are also fabricated from pre-galvanised steel in the same manner as the stiffeners 102, 103. Both sleeve members 130,135 are the same and thus, only one will be described in relation to the vertical stiffener 102.
  • the sleeve member 130 also includes engagement means in the form of slots 131 having an opening 132 and recesses 133,134 which are similar in shape and configuration as the slots 120 of the elongate member 102.
  • the sleeve member 130 of the present embodiment also has the slots formed on two opposing side surfaces 130a,130b (103b not shown).
  • the sleeve member 130 are generally similar in construction as the stiffener 102 except that the cross-sectional perimeter of the sleeve member 130 is less than the cross-sectional perimeter of the stiffener 102 so that a sleeve member 130 is slidably receivable within a stiffener 102 (at both ends). The effective length of the stiffener 102 is then extended by sliding the sleeve member 130 such that a desired effective length is reached.
  • each of the slots 120 of the stiffener 102 along the same vertical axis are spaced from each other in a predefined manner.
  • each slot 120 along one axis is offset from adjacent slots 120', 120" along the other substantially parallel axis such that a first and second recesses 122,123 of the slot 120 is aligned with one recess of each adjacent slot 120,120".
  • first recess 122 is aligned with a second recess 123' of an adjacent slot 120' to form a first recess pair 126 as shown in Figure 3 .
  • second recess 123 of the slot 120 is also aligned in the same manner as the first recess 122" of the slot 120" to form a second recess pair 128.
  • the location of the recesses 122,123 along the slot 120 and the slot's length are strategically selected, the reason of which will become apparent later.
  • Figure 10 shows a rear perspective view of the tie 7 which includes a planar section 20 having two lugs 21 formed thereon. It can be seen that the lugs 21 extend both rearwardly and to the side of the planar section 20. The lugs 21 are arranged to be inserted through openings 121,121' to engage with slots 120,120' in the side wall of the stiffener 102 to attach the tie 7 thereto. The length of the slots 120,120' is greater than the length of the lugs 21 to permit movement of the tie 7 and therefore, adjustment of the position of the tie 7 with respect to the stiffener 102.
  • the planar section 20 of the tie 7 is connected to a ribbed section 23.
  • the ribbed section 23 has a rib formation 25.
  • the ribbed section 23 makes an angle of approximately 90° with the planar section 20, such that when the lugs 21 are inserted into the slots 120,120', the ribbed section 23 of the tie 7 extends substantially perpendicularly to the side wall of the stiffener 102.
  • Figure 13 depicts different views of a variation 7' of the tie member.
  • the tie member 7' is also generally L-shaped with a planar section 20 connected to an extended section 23'.
  • the tie member 7' also has lugs 21' to engage to the slots 120 of the stiffeners 102,103.
  • the extended section 23' does not have a rib formation 25.
  • perforations 27 are formed on the extended section 23' and in this example, the perforations 27 formed the word StiflexTM in different representations (see view A of Figure 13 ).
  • This variation 7' is particularly useful where joints between layers of bricks are thinner than the height of the rib formation 25, for example, when other adhesives are used instead of cement mortar.
  • the presence of the perforations 27 allows the adhesive to adhere more readily to the tie member 7' and thus the tie member 7' can engage the wall better.
  • the base plate 110 is press-formed from pre-galvanised steel and includes a generally flat member 112 and connection means in the form of two pairs of substantially L-shaped angled projections 114,116, each pair being of different lengths and are spaced apart according to the width of stiffener 102,103 and sleeve members 130,135.
  • the base plate 110 also includes stoppers 118a, 118b,119a,119b each arranged at one end of respective angled projections 114,116 such that the stoppers are disposed at the ends between the two projection pairs 114,116.
  • Each pair of projections 114,116 includes opposing lugs 114a,114b,116a,116b which faces inwards to each other and are arranged to be received in respective recess of the recess pair 126 (or 128) of adjacent slots formed on respective side surfaces 102a,102b of the stiffener 102,103.
  • Figures 5a to 5d shows how one base plate 110 mates with an end of one stiffener 102 (which is shown at an angle merely for the purposes of illustrating the connection process although in use, this is not necessary so).
  • the stiffener 102 is selectively cut, either on site or from the factory, such that the distance of the recess pairs 128 from the edge 102e matches the effective height of the projection pairs 114,116. It should be apparent that although Figures 5a to 5d illustrate only one side surface 102a, the recess pair of adjacent slots 120 on the other side surface 102b are also arranged in the same manner as the side surface 102a shown in the figures.
  • the base plate 110 is first held at an acute angle with respect to the edge of the stiffener and with the projections 114,116 facing towards the stiffener 102 as shown in Figure 5a , the base plate 110 is brought towards the stiffener in the direction X so that the lugs 116a,116b of the longer angled projections 116 slides into corresponding recesses of recess pair 128b (the suffix "b" to represent the hidden recess pair) from the inner surface of the other side surface 102b of the stiffener 102, as shown in Figure 5b .
  • FIG. 5d is a view from the direction AA showing more clearly how the projections 114,116 engages respective recess pairs 128,128b.
  • Figure 6 is a view from the direction AA showing more clearly how the projections 114,116 engages respective recess pairs 128,128b.
  • any lateral sliding movement along the axis Z parallel to the longitudinal axis of the base plate 110 would not disconnect the plate 110 from the stiffener 102 but only if the plate 102 is lifted away from the stiffener when the plate is slid such that the side surface 102a is beyond the shorter projection 114 as shown in Figure 5c .
  • reversing the steps shown in Figures 5a to 5d disconnects the plate 110 from the stiffener.
  • the base plate 110 is selectively connectable releasably with the stiffener 102 as explained above or to the sleeve member 130. Since the base plate 110 can be connected to either the sleeve member 130 or the stiffener 102, the user assembling the support member system 100 can decide when the base plate 110 is to be connected to the stiffener 102, for example, when fixing to a lower support structure such as the lower support 9 of Figure 1 , the base plate 110 can be connected directly to the lower end of the vertical stiffener 102. Direct connection would thus reduce the number of sleeve members 130 required.
  • the base plate 110 is connected to a sleeve member 130 and the sleeve member 130 inserted within the upper end of the vertical stiffener 102.
  • Selecting whether to connect the base plate 110 to either the stiffener 102 or to the sleeve member 130 also applies when the stiffener is used in a horizontal orientation, in the case of the horizontal stiffener 103 of Figure 2 .
  • the present system affords the flexibility of ordering stiffeners of a common length (thus easier to manage) and the effective length of each stiffener extended using the sleeve members 130, if necessary.
  • a sleeve member 135 is inserted therein to extend the stiffener's effective length.
  • the configuration of the horizontal sleeve member 135 is the same as that of the "vertical" sleeve member 130 and the difference in reference numerals is for ease of explanation.
  • a horizontal sleeve member 135. is only required at one end of the stiffener and thus, the other end of the stiffener can be directly connected to a base plate 110.
  • a side base plate 111 is required which is a variation of the base plate 110 and this is shown in Figure 7 which has different views of the base plate variation.
  • the side base plate 111 is similar in design as the base plate 110 (and thus similar parts have similar reference signs with a prime') except that the side base plate 111 includes a rear attachment section in the form of four rear lugs 117 which are arranged in accordance with the positions of the openings 121 of the slots 120 on the stiffener.
  • the lugs 117 are formed by punching our sections of the plate 111' to from the lugs 117 which extend rearwardly behind the plate 111'.
  • the vertical base plate 111 is preferably used only at one orientation i.e. with the shorter projections 114' at the top. With this orientation, the side surface 135a of the sleeve member 135 (see Figure 2 ) abuts against the stoppers 118a',118b' while the other surface 135b of the sleeve member 135 remains engaged with the respective recesses on the other surface 135b due to the length of the longer projections 116'. Thus, the base plate 111 remains slidably engaged with the sleeve member 135. If the orientation is reversed (i.e. with the longer projection 116' at the top), the side surface 135b will slide beyond the shorter projections 114' and thus this is not preferred.
  • the length of the stiffener 102,103 (and also the sleeve member 130,135) is selectively cut so that the stiffener or the sleeve member can mate with the projections of the base plate 110,111.
  • the arrangement of the slots 120,131 on the stiffener 102,103 and the sleeve member 130 are strategically offset from each other so that two opposing recesses from adjacent slots 120 are aligned with each other as explained above.
  • the spacing between slots 120 along the same vertical axis is 100mm, and the length of each slot is chosen so that it can be used as a guide to cut the stiffener 102,103 or the sleeve member 130,135 so that these are suitable to be connected to the base plate 110,111.
  • each end of the slot 120 serves as an indicator for cutting the sleeve member 130,135 and when cut, the distance of the recess pair 128 from the cut edge will be suitable for mating with the projections 114,116,114',116' of the base plate 110,111.
  • the stiffeners 102,103 are installed by first installing the vertical stiffener 102.
  • the vertical stiffener 102 is installed by inserting the base plates 110 to either the stiffener 102, 103 or the sleeve member 130,135.
  • the length of the vertical stiffener 102 is chosen to be nominally shorter than the height of the vertical gap into which the stiffener has to fit and difference is compensated by the sleeve member 130 to ensure that the combination of the sleeve member 130 and stiffener 2 extend from the lower support surface 9 to the upper support surface 8 (using Figure 1 as an example).
  • the base plate 110 is first connected to one end of the sleeve member 130 in the manner explained earlier.
  • the sleeve member 130 with the upper base plate 110 connected is inserted into the top end of the hollow vertical stiffener 102.
  • the bottom end of the vertical stiffener 102 is directly connected to a lower base plate 110 in the manner explained earlier..
  • fasteners are driven through the holes (not shown) in the lower plate 110 to secure the plate 110 (and thus the lower end of the vertical stiffener 102) to the lower support 9.
  • the sleeve member 130 is withdrawn from the vertical stiffener until the upper base plate 110 contacts the upper support 8.
  • the length of the sleeve member 130 is chosen such that when the upper base plate 110 contacts the upper support 8, a portion of the sleeve member 130 remains inserted in the stiffener 102. Again fasteners are used to attach the upper base plate 110 fixedly to the upper support 8 and thereby retain the vertical stiffener 102 in the correct position.
  • the wall 1 is constructed and tie members 7 are mounted at appropriate intervals (typically every 300 to 400mm vertically) to engage with the slots 120 on the side surfaces of the vertical stiffener 102 such that the ribbed section 23 is mechanically locked to the wall 1 by the ribbed section 23 being located between layers of bricks and held by the cement mortar between the layers.
  • tie members 7 are mounted at appropriate intervals (typically every 300 to 400mm vertically) to engage with the slots 120 on the side surfaces of the vertical stiffener 102 such that the ribbed section 23 is mechanically locked to the wall 1 by the ribbed section 23 being located between layers of bricks and held by the cement mortar between the layers.
  • the side plate 111 is inserted to an end of the horizontal stiffener 103 that is to be connected to the vertical stiffener 102 whereas the other end is inserted with a base plate 110 since the other end is connected to a side support structure such as a column.
  • the base plate 110 is similarly fastened to the column as explained above whereas, the lugs 117 in the side plate 111 are inserted into the slots 120 of the adjacent vertical stiffener 102 to mount the horizontal stiffener 103 onto the last layer of bricks. Each end brick is then laid.
  • Continuation of construction of the wall 1 above the horizontal stiffener 103 then continues by construction of the wall portion 6 above the horizontal stiffener 103, with ties 7 inserted along the side surfaces 102a,102b of the stiffener 102 and/or the side surface 130a,130b of the sleeve member 130 at appropriate intervals to engage between the adjacent layers of bricks to tie the wall portion 6 to the vertical stiffener 102.
  • tie members 7 can similarly be engaged to the slots 120 on the side surface 103a of the horizontal stiffeners 103 (and the sleeve member 135) to engage between adjacent layers of bricks as the wall portion 6 is being constructed.
  • sleeve member 130,135 is used to extend the effective length of the stiffeners 102,103. It will be noted that the sleeve member 130,135 need not be fully inserted into each respective stiffener 102,103 and this enables the stiffeners 102,103 to support wall portions that are higher/longer than the length of the stiffeners 102,103. It is only necessary for a portion of the sleeve member 130,135 to be maintained within with the stiffener 102,103 and the minimum engagement portion required for each stiffener assembly is calculated based on geometry and loading considerations.
  • the preferred embodiment has an advantage of providing a support member system in which the length of the stiffeners 102,103 do not have to be specially manufactured for each application.
  • Figure 8 shows the flexibility of the support member system 100 of the preferred embodiment of the present invention for supporting different masonry wall structures 150 with concrete columns 160. It should be noted that the system 100 is depicted in simplified form without the slots 120, the base plates 110 or the sleeve members 130 for ease of showing the flexibility of the system.
  • the stiffeners 102,103 can have different shapes other than a rectangular box construction as shown by the elbow shaped obtuse angle stiffener 152.
  • a corner base plate 154 which is a variation of the base plate 110 and an example of which is shown in Figure 9 and includes views from different angles.
  • Projections 155,156 are similar in shape and configuration as the projections 114,116 of the base plate 110, although the projections 155,156 can be of the same size.
  • the plate 154 is bent at an end 157 as shown in Figure 9 which functions like a stopper.
  • the corner base plate 154 is used when installing the end stiffener 153 to support the wall section 158 such that the bent end 157 abuts against the free side surface of the stiffener 153 as indicated by arrow DD in Figure 8 .
  • Figure 11 is a top view of a variation 160 of the side plate 111.
  • the variant side plate 160 has projections 161,162 and stoppers 163,164 similar in construction as the projections 114',116' and stoppers 118',119' of the side plate 111.
  • the variant side plate 160 also has lugs 165 formed rearwardly providing the same function as the lugs 117 of the side plate 111. However, it would be apparent (by a comparison between Figure 11 and View C of Figure 7 ) that a difference is that in the variant plate 160, the projections 161,162 are off centre of the plate 160.
  • the stiffeners 102,103 are shown in simplified form for ease of explanation.
  • one side surface of the vertical stiffener 102 is used to support a first wall section 170 and the other side surface of the vertical stiffener 102 is arranged to support a second wall section (not shown in order to show the horizontal stiffener 103).
  • the first and second wall sections are offset from each other and thus, the plate 160 can be used to connect the horizontal stiffener 103 to the vertical stiffener 102 and yet carry out the function of supporting the second wall section.
  • the relative positions of the projections 161,162 and the lugs 165 can be adapted to suit different applications.
  • Figure 14 shows another application of the variation side plate 160.
  • one side surface 102f of the vertical stiffener 102" is used to support a first wall section 170' and the other side surface 102g of the vertical stiffener 102" is arranged to support a second wall section (not shown in order to show the horizontal stiffener 103").
  • the width of the side surface 102g does not match the width of the horizontal stiffener 103" as can be seen from the figure and thus, if the horizontal stiffener 103" is mounted to the vertical stiffener 102" with the side base plate 111 of Figure 7 , the side surface 103h of the horizontal stiffener 103" will not be flushed with the side surface 102h of the vertical stiffener 102". Consequently, using the variation side plate 160 would alleviate the above problem so that, after engagement, the horizontal stiffener 103" is offset of the central axis of the vertical stiffener 102 but allows the side surfaces 103h to be flushed with the side surface 102h of the vertical stiffener 102".
  • the described embodiment is not to be construed as limitation.
  • only two of the four side surfaces of the stiffeners 102,103 and sleeve members 130,135 have the slots 120. This is not necessary so and the other two side surfaces can also be incorporated with the slots 120 so that the other two side surfaces can also be used to support a wall depending on application.
  • the size and dimension of the vertical and horizontal stiffeners 102,103 need not be the same although this is shown to be so in the described embodiment. Depending on the wall to be supported, the size and dimension of the stiffeners 102,103 can vary as can be appreciated from Figure 8 .
  • the preferred embodiment shows the horizontal stiffener 103 being mounted to a side surface 102a of the vertical stiffener 102 but the horizontal stiffener 103 can also be mounted to the sleeve member 130 since the sleeve member 130 also has the slots 120 to engage with the rear lugs 117 of the side base plate 111, although normally, the horizontal stiffener 103 is more likely to be mounted to the vertical stiffener 102 rather than to the sleeve 130.
  • the base plate 110 is selectively connectable to the stiffener 102,103 or to the sleeve member 130,135 but the base plate 110 may be adapted to be releasably connectable to just the sleeve member 130,135. This would provide the advantage of faster production since each part can be produced separately, but not the flexibility of being able to be connected to the stiffener directly.
  • the stiffener is used in a vertical orientation, the lower end can then be connected to a conventional base plate, although this is not preferred.
  • the sleeve member 130 can be configured to be insertable only in one end of the vertical and/or horizontal stiffener 102,103 although it is preferred for the sleeve member to be selectively insertable in either end.
  • the base plate 110 may be adapted to be connectable only to the stiffener.
  • the preferred embodiment shows the sleeve member 130,135 being insertable and receivable within the stiffener 102,103.
  • this is not necessarily so and other releasable attachments are envisaged (eg. the stiffener is receivable within the sleeve members).
  • the base plate 110 has two short and two long projections but it is envisaged that just one of each is sufficient although the mating with the recesses of the stiffener or the sleeve member would not be as good as if pairs of projections are used.
  • the orientation of the aligned recess pairs 126, 128 of the slot 120,120', 120" faces inwards towards each other.
  • the recess pairs can also face outwards (in the same direction as the openings of the slots) but it is apparent that lugs of the projection pairs 114,116 need to be modified accordingly.
  • the recess pairs 126,128 are shown to be aligned but this is not essential since it is envisaged that the recess pairs 126,128 can also be offset from each other and the projections 114,116 will have to be modified accordingly (i.e. one set of projection could be higher than the other).
  • lugs 117 are shown in the side plates 111,160 but it should be understood that more/less lugs could be provided depending on the dimension of the side surface (and the configuration of the slots 120) of the vertical stiffener 102 to which the side plates 111,160 are to be attached.
  • the base plate 110 After the base plate 110 are connected to the sleeve member 130,135 or the stiffener 102,103, the base plate 110 can be fixedly connected thereto by any suitable means.

Claims (25)

  1. Ensemble formant élément de soutien (100) comprenant
    un élément de soutien allongé (102, 103) présentant une longueur efficace, et une partie de mise en prise d'élément allongé (130, 135) agencée pour venir en prise avec une extrémité de l'élément de soutien allongé (102, 103) afin d'étendre la longueur efficace de l'élément ; et
    une partie base (110) comprenant un moyen de raccordement (114, 116, 114', 116') permettant un raccordement détachable à l'élément de soutien allongé (102, 103) ou à la partie de mise en prise d'élément allongé (130, 135) ;
    caractérisé en ce que,
    l'élément de soutien allongé (102, 103) comprend des fentes (120, 120', 120") sur deux parois latérales opposées (102a, 102b, 103a, 103b) de l'élément de soutien allongé (102, 103), chaque fente (120, 120', 120") comprenant deux renfoncements (122, 123), et
    la partie de mise en prise d'élément allongé (130, 135) comprend des fentes (131) formant partie de mise en prise sur deux parois latérales opposées (130a, 130b, 135a, 135b) de la partie de mise en prise d'élément allongé (130, 135), chaque fente formant partie de mise en prise (131) comprenant deux renfoncements (133, 134) ;
    dans lequel le moyen de raccordement (114, 116, 114', 116') comprend des saillies (114, 116, 114', 116') agencées pour venir en prise de manière sélective avec au moins un des renfoncements (122, 123) des fentes (120, 120', 120") ou au moins un des renfoncements (133, 134) des fentes formant partie de mise en prise (131).
  2. Ensemble formant élément de soutien selon la revendication 1, dans lequel l'élément de soutien allongé (102, 103) et la partie de mise en prise d'élément allongé (130, 135) présentent respectivement une paroi latérale (102a, 102b, 103a, 103b, 130a, 130b, 135a, 135b) conçue pour être située adjacente à une extrémité d'une paroi (4, 5, 6) à supporter, en cours d'utilisation.
  3. Ensemble formant élément de soutien selon la revendication 2, dans lequel chaque paroi latérale (102a, 102b, 103a, 103b, 130a, 130b, 135a, 135b) de l'élément de soutien allongé (102, 103) et de la partie de mise en prise d'élément allongé (130, 135) comprend respectivement les fentes (120, 120', 120") et les fentes formant partie de mise en prise (131), qui permettent de monter un élément formant tirant (7, 7') sur la paroi latérale, l'élément formant tirant (7, 7') présentant une partie (23) faisant saillie à partir de la paroi latérale (102a, 102b, 103a, 103b, 130a, 130b, 135a, 135b) pour venir en prise avec le mur (4, 5, 6) à soutenir.
  4. Ensemble formant élément de soutien selon la revendication 3, dans lequel les fentes (120, 120', 120") et les fentes formant partie de mise en prise (131) sont fournies au niveau d'emplacements distincts le long de parois latérales (102a, 102b, 103a, 103b, 130a, 130b, 135a, 135b) de l'élément allongé (102, 103) et de la partie de mise en prise d'élément allongé (130, 135), respectivement, de telle manière qu'une position des éléments formant tirant (7, 7') peut être ajustée.
  5. Ensemble formant élément de soutien selon la revendication 3 ou 4, dans lequel les fentes (120, 120', 120") sont fournies sur l'ensemble des quatre côtés (102a, 102b, 103a, 103b) de l'élément de soutien allongé (102, 103).
  6. Ensemble formant élément de soutien selon l'une quelconque des revendications 3, 4 et 5, dans lequel les fentes formant partie de mise en prise (131) sont fournies sur l'ensemble des quatre côtés (130a, 130b) de la partie de mise en prise d'élément allongé (130, 135).
  7. Ensemble formant élément de soutien selon l'une quelconque des revendications 1 à 6, dans lequel les fentes (120, 120', 120") et les fentes formant partie de mise en prise (131) sont allongées et comprennent une ouverture (121, 121', 132) s'étendant dans une première direction essentiellement perpendiculaire à la direction longitudinale des fentes (120, 120', 120").
  8. Ensemble formant élément de soutien selon la revendication 7, dans lequel les fentes (120, 120', 120") et les fentes formant partie de mise en prise (131) sont agencées le long d'au moins deux axes essentiellement parallèles le long de l'axe longitudinal de l'élément de soutien allongé (102, 103) et de la partie de mise en prise d'élément allongé (130, 135), respectivement, avec les ouvertures (121, 121', 132) des fentes (120, 120', 120") et des fentes formant partie de mise en prise (131) le long dudit axe qui regarde dans une direction opposée aux ouvertures (121, 121', 132) des fentes (120, 120', 120") et des fentes formant partie de mise en prise (131) le long dudit autre axe, les directions des deux ouvertures (121, 121', 132) étant essentiellement perpendiculaires à l'axe longitudinale de l'élément de soutien rallongé (102, 103) et de la partie de mise en prise d'élément allongé (130, 135).
  9. Ensemble formant élément de soutien selon la revendication 8, dans lequel ladite fente (120, 120', 120", 131) comprend deux renfoncements (122, 123, 122", 123', 133, 134) s'étendant dans une direction opposée à la direction de l'ouverture (121, 121', 132) de ladite fente (120, 120', 120", 131).
  10. Ensemble formant élément de soutien selon la revendication 8 ou 9, dans lequel ladite fente (120, 120', 120", 131) le long d'un axe est décalée par rapport à une fente adjacente (120, 120', 120", 131) le long de l'autre axe de telle manière que les ouvertures (121, 121', 132) des fentes (120, 120', 120", 131) ne sont pas alignées les unes avec les autres.
  11. Ensemble formant élément de soutien selon la revendication 10, dans lequel ledit renfoncement (122, 123, 133) de ladite fente (120, 131) est aligné avec un renfoncement (123', 122", 134) de la fente adjacente (120', 120", 131).
  12. Ensemble formant élément de soutien selon la revendication 11, dans lequel la position de chaque fente (120, 120', 120", 131) est utilisée comme guide pour couper de manière sélective l'élément de soutien allongé (102, 103) ou la partie de mise en prise d'élément allongé (130, 135) selon une longueur souhaitée.
  13. Ensemble formant élément de soutien selon la revendication 12, dans lequel, lorsque l'élément de soutien allongé (102, 103) ou la partie de mise en prise d'élément allongé (130, 135) est coupé(e) conformément au guide de coupe, les renfoncements (123, 122", 122, 123', 133, 134) alignés des fentes (120, 120', 120", 131) adjacentes sont agencés pour pouvoir être raccordés au moyen de raccordement (114, 116, 114', 116') de la partie base (110).
  14. Ensemble formant élément de soutien selon la revendication 13, dans lequel les saillies (114, 116, 114', 116') du moyen de raccordement sont agencées pour venir en prise avec des renfoncements (123, 122", 122, 123', 133, 134) alignés respectifs.
  15. Ensemble formant élément de soutien selon la revendication 1 ou 14, dans lequel les saillies (114, 116, 114', 116') font un angle pour former des saillies essentiellement en forme de L.
  16. Ensemble formant élément de soutien selon la revendication 14 ou 15, dans lequel les saillies (114, 116, 114', 116') comprennent deux paires de saillies, dont une paire (116, 116') est plus longue que l'autre paire (114, 114').
  17. Ensemble formant élément de soutien selon la revendication 16, dans lequel une paire de saillies (116, 116') est agencée pour se raccorder à une surface latérale (102b) de l'élément de soutien allongé (102) ou de la partie de mise en prise d'élément allongé (130, 135) et l'autre paire de saillies (114, 114') est agencée pour se raccorder à ladite surface (102a) opposée de l'élément de soutien allongé (102) ou de la partie de mise en prise d'élément allongé (130, 135), respectivement.
  18. Ensemble formant élément de soutien selon la revendication 17, dans lequel la partie base (110) comprend des obturateurs (118a, 118b, 119a, 119b) agencés pour buter contre une surface latérale (102a, 102b, 103a, 103b, 130a, 130b, 135a, 135b) de l'élément de soutien allongé (102, 103) ou de la partie de mise en prise d'élément allongé (130, 135) afin de limiter un déplacement le long d'une direction.
  19. Ensemble formant élément de soutien selon l'une quelconque des revendications précédentes, dans lequel la partie base (110) est agencée pour venir en prise avec une structure de soutien (8, 9).
  20. Ensemble formant élément de soutien selon la revendication 19, dans lequel la partie base (110) comprend un bord recourbé (157).
  21. Ensemble formant élément de soutien selon l'une quelconque des revendications 1 à 18, dans lequel la partie base (110) est agencée pour venir en prise avec ledit élément de soutien allongé (102, 103) ou ladite partie de mise en prise d'élément allongé (130, 135).
  22. Ensemble formant élément de soutien selon la revendication 21, dans lequel la partie base (110) présente une section de fixation (117, 165) permettant une fixation à une paroi latérale de l'élément de soutien allongé (102, 103) ou de la partie de mise en prise d'élément allongé (130, 135).
  23. Ensemble formant élément de soutien selon la revendication 22, dans lequel la section de fixation comprend des tenons (117, 165).
  24. Ensemble formant élément de soutien selon l'une quelconque des revendications précédentes, dans lequel la partie de mise en prise d'élément allongé (130, 135) peut être mise en prise avec les deux extrémités de l'élément de soutien allongé (102, 103).
  25. Ensemble formant élément de soutien selon la revendication 8, dans lequel ladite fente (120, 120', 120", 131) comprend deux renfoncements (122, 123, 122", 123', 133, 134) s'étendant le long de la même direction que l'ouverture (121, 121', 132) de ladite fente (120, 120', 120", 131).
EP06784278.1A 2005-09-16 2006-09-12 Ensemble element support Active EP1931836B1 (fr)

Priority Applications (5)

Application Number Priority Date Filing Date Title
MEP-2015-710A ME02263B (fr) 2005-09-16 2006-09-12 Ensemble element support
SI200631982T SI1931836T1 (sl) 2005-09-16 2006-09-12 Sklop podpornega člena
PL06784278T PL1931836T3 (pl) 2005-09-16 2006-09-12 Zespół elementów nośnych
CY20151100974T CY1117131T1 (el) 2005-09-16 2015-11-02 Συναρμολογημα μελων στηριξης
HRP20151167TT HRP20151167T1 (hr) 2005-09-16 2015-11-03 Konstrukcija noseä†eg elementa

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
SG200505952-2A SG130956A1 (en) 2005-09-16 2005-09-16 A support member assembly
PCT/SG2006/000266 WO2007032746A1 (fr) 2005-09-16 2006-09-12 Ensemble element support

Publications (3)

Publication Number Publication Date
EP1931836A1 EP1931836A1 (fr) 2008-06-18
EP1931836A4 EP1931836A4 (fr) 2012-08-22
EP1931836B1 true EP1931836B1 (fr) 2015-08-05

Family

ID=37865234

Family Applications (1)

Application Number Title Priority Date Filing Date
EP06784278.1A Active EP1931836B1 (fr) 2005-09-16 2006-09-12 Ensemble element support

Country Status (27)

Country Link
EP (1) EP1931836B1 (fr)
KR (1) KR101307027B1 (fr)
CN (1) CN101278096B (fr)
AR (1) AR054960A1 (fr)
BR (1) BRPI0616244B1 (fr)
CY (1) CY1117131T1 (fr)
DK (1) DK1931836T3 (fr)
EG (1) EG24989A (fr)
ES (1) ES2550581T3 (fr)
HK (1) HK1118315A1 (fr)
HR (1) HRP20151167T1 (fr)
HU (1) HUE025912T2 (fr)
IL (1) IL190071A (fr)
JO (1) JO3124B1 (fr)
ME (1) ME02263B (fr)
MY (1) MY153661A (fr)
PE (1) PE20080860A1 (fr)
PL (1) PL1931836T3 (fr)
PT (1) PT1931836E (fr)
RS (1) RS54341B1 (fr)
RU (1) RU2412310C2 (fr)
SG (1) SG130956A1 (fr)
SI (1) SI1931836T1 (fr)
TW (1) TWI402401B (fr)
UY (1) UY29792A1 (fr)
WO (1) WO2007032746A1 (fr)
ZA (1) ZA200803282B (fr)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2390751B1 (es) * 2010-09-03 2013-09-30 Talleres Electromecanica Moreno, S.L.U. Mejoras introducidas en la patente de invencion 200800144 relativa a una estructura metalica modular para conformar un hueco de ascensor.
RU2013116401A (ru) * 2010-09-24 2014-10-27 2Элмс Пте. Лтд. Соединитель для перераспределения нагрузки в узле опорных элементов
SG10201508699YA (en) * 2015-10-21 2017-05-30 2Elms Pte Ltd Wall support apparatus and its components

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2566622A (en) * 1949-09-01 1951-09-04 Cresswell Roll Forming Company Structural member
DE3602308C2 (de) 1986-01-27 1994-06-16 Modersohn Gmbh & Co Kg Wilh Verankerung von Vormauerwerk im Attikabereich
NO169910C (no) * 1990-11-05 1992-09-02 Starka As Deler til modulvegg
US5274973A (en) * 1991-11-27 1994-01-04 Liang Steve S T Stud spacer and mounting system
CA2089989A1 (fr) * 1993-02-19 1994-08-20 Warren Eberschlag Entretoise pour elements de charpente
FR2712323B1 (fr) * 1993-11-08 1996-01-05 Hoyez Sa Système de cloisons amovibles à performances acoustiques et au feu perfectionnées.
IT242513Y1 (it) * 1996-02-02 2001-06-14 Gianfranco Zuffetti Montante telescopico per pareti amovibili
KR20010013649A (ko) * 1997-06-11 2001-02-26 씨디에스 누-스틸 피티와이 엘티디 건물의 구조형성 시스템
ATE307935T1 (de) * 1998-04-27 2005-11-15 Dyntek Pte Ltd Ein stützelement und verfahren zur stützung eines mauers
EP1513988B1 (fr) * 2002-05-16 2008-10-08 Dyntek Pte Ltd. Systeme d'elements porteurs

Also Published As

Publication number Publication date
MY153661A (en) 2015-03-13
IL190071A0 (en) 2008-08-07
HRP20151167T1 (hr) 2015-12-04
EP1931836A1 (fr) 2008-06-18
RU2008110845A (ru) 2009-10-27
UY29792A1 (es) 2007-03-30
SI1931836T1 (sl) 2015-12-31
ME02263B (fr) 2016-02-29
KR20080057278A (ko) 2008-06-24
AR054960A1 (es) 2007-07-25
CY1117131T1 (el) 2017-04-05
KR101307027B1 (ko) 2013-09-11
CN101278096B (zh) 2012-07-18
CN101278096A (zh) 2008-10-01
DK1931836T3 (en) 2015-11-09
EP1931836A4 (fr) 2012-08-22
PE20080860A1 (es) 2008-09-07
BRPI0616244B1 (pt) 2017-10-17
ZA200803282B (en) 2009-08-26
EG24989A (en) 2011-04-12
SG130956A1 (en) 2007-04-26
BRPI0616244A2 (pt) 2011-06-14
PT1931836E (pt) 2015-11-04
WO2007032746A1 (fr) 2007-03-22
IL190071A (en) 2011-12-29
RS54341B1 (en) 2016-02-29
TWI402401B (zh) 2013-07-21
HUE025912T2 (en) 2016-04-28
HK1118315A1 (en) 2009-02-06
PL1931836T3 (pl) 2016-03-31
RU2412310C2 (ru) 2011-02-20
ES2550581T3 (es) 2015-11-10
JO3124B1 (ar) 2017-09-20

Similar Documents

Publication Publication Date Title
US20100071306A1 (en) Reinforcing bracket for use with insulated concrete forms
EP1513988B1 (fr) Systeme d'elements porteurs
RU2380499C2 (ru) Строительная система для сооружения плоских конструкций
RU2370602C2 (ru) Строительная конструкция
CN111719855A (zh) 用于楼板模板的连接条
EP1931836B1 (fr) Ensemble element support
US20170314276A1 (en) Multi-Flex Forming System
JP4568136B2 (ja) 棟瓦梁支持金具。
EP1075574B1 (fr) Element de support et procede pour supporter un mur
KR20130012422A (ko) 벽면에 내/외장재로 시공되는 조립식 패널 구조체 및 그 시공방법
KR102299680B1 (ko) 갭 마감용 거푸집
RU76357U1 (ru) Каркасно-панельное здание
JPS60105747A (ja) タイルパネル構成体を利用した吊天井構造
JP2002242358A (ja) 天井施工方法及びこれに用いる野縁材
JP6134949B2 (ja) 板張り壁構造及びこれを備えた建物外部構築物
JPH0122825Y2 (fr)
KR102408249B1 (ko) 내진 성능을 가진 건축외장용 복합패널
CA2245149A1 (fr) Systeme de separation modulaire en blocs de beton deplacable
JP3126572B2 (ja) 建物ユニットの界壁構造および界壁施工方法
RU2290482C2 (ru) Система опорного элемента
JPH0784773B2 (ja) 間仕切り壁の骨組み
JP3127972B2 (ja) 建物ユニットの界壁施工方法
CN113323130A (zh) 门洞口结构及其施工方法
JP2010077606A (ja) ベタ基礎外周立上り部の型枠取付け金物
JP2001254465A (ja) 壁の断熱工法、断熱壁及び壁用捨て型枠パネル

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20080319

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1118315

Country of ref document: HK

A4 Supplementary search report drawn up and despatched

Effective date: 20120725

RIC1 Information provided on ipc code assigned before grant

Ipc: E04B 2/58 20060101AFI20120719BHEP

Ipc: E04B 2/06 20060101ALI20120719BHEP

17Q First examination report despatched

Effective date: 20130315

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20150220

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 740809

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150815

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602006046196

Country of ref document: DE

REG Reference to a national code

Ref country code: RO

Ref legal event code: EPE

REG Reference to a national code

Ref country code: HR

Ref legal event code: TUEP

Ref document number: P20151167

Country of ref document: HR

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20151020

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20151105

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2550581

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20151110

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: MARKS AND CLERK (LUXEMBOURG) LLP, CH

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: HR

Ref legal event code: T1PR

Ref document number: P20151167

Country of ref document: HR

REG Reference to a national code

Ref country code: EE

Ref legal event code: FG4A

Ref document number: E011171

Country of ref document: EE

Effective date: 20151030

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: SK

Ref legal event code: T3

Ref document number: E 19778

Country of ref document: SK

REG Reference to a national code

Ref country code: HK

Ref legal event code: GR

Ref document number: 1118315

Country of ref document: HK

REG Reference to a national code

Ref country code: HU

Ref legal event code: AG4A

Ref document number: E025912

Country of ref document: HU

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602006046196

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: GR

Ref legal event code: EP

Ref document number: 20150402282

Country of ref document: GR

Effective date: 20160201

26N No opposition filed

Effective date: 20160509

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 11

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 12

REG Reference to a national code

Ref country code: AT

Ref legal event code: UEP

Ref document number: 740809

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150805

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 13

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20151167

Country of ref document: HR

Payment date: 20180912

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20180904

Year of fee payment: 13

Ref country code: MC

Payment date: 20180912

Year of fee payment: 13

Ref country code: FR

Payment date: 20180913

Year of fee payment: 13

Ref country code: LT

Payment date: 20180904

Year of fee payment: 13

Ref country code: LU

Payment date: 20180910

Year of fee payment: 13

Ref country code: EE

Payment date: 20180925

Year of fee payment: 13

Ref country code: IE

Payment date: 20180911

Year of fee payment: 13

Ref country code: RO

Payment date: 20180912

Year of fee payment: 13

Ref country code: IT

Payment date: 20180919

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LV

Payment date: 20181001

Year of fee payment: 13

Ref country code: IS

Payment date: 20180906

Year of fee payment: 13

Ref country code: CZ

Payment date: 20180912

Year of fee payment: 13

Ref country code: DK

Payment date: 20180911

Year of fee payment: 13

Ref country code: PL

Payment date: 20180907

Year of fee payment: 13

Ref country code: GR

Payment date: 20180911

Year of fee payment: 13

Ref country code: BG

Payment date: 20180926

Year of fee payment: 13

Ref country code: SK

Payment date: 20180912

Year of fee payment: 13

Ref country code: AT

Payment date: 20180910

Year of fee payment: 13

Ref country code: NL

Payment date: 20180912

Year of fee payment: 13

Ref country code: BE

Payment date: 20180914

Year of fee payment: 13

Ref country code: HU

Payment date: 20180919

Year of fee payment: 13

Ref country code: GB

Payment date: 20180912

Year of fee payment: 13

Ref country code: CH

Payment date: 20180913

Year of fee payment: 13

Ref country code: FI

Payment date: 20180910

Year of fee payment: 13

Ref country code: SE

Payment date: 20180910

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20180910

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20181001

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CY

Payment date: 20180911

Year of fee payment: 13

REG Reference to a national code

Ref country code: HR

Ref legal event code: PBON

Ref document number: P20151167

Country of ref document: HR

Effective date: 20190912

Ref country code: DE

Ref legal event code: R119

Ref document number: 602006046196

Country of ref document: DE

REG Reference to a national code

Ref country code: EE

Ref legal event code: MM4A

Ref document number: E011171

Country of ref document: EE

Effective date: 20190930

REG Reference to a national code

Ref country code: FI

Ref legal event code: MAE

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

Effective date: 20190930

Ref country code: LT

Ref legal event code: MM4D

Effective date: 20190912

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190912

Ref country code: LV

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190912

Ref country code: FI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190912

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200312

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190913

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20191001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190930

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190912

Ref country code: CY

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190912

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: SK

Ref legal event code: MM4A

Ref document number: E 19778

Country of ref document: SK

Effective date: 20190912

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190930

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190912

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190912

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200422

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200416

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191001

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190930

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190930

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200401

Ref country code: LT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190912

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20190930

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 740809

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190912

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190930

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190912

Ref country code: SK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190912

Ref country code: BG

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200531

Ref country code: HU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190913

Ref country code: SI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190913

REG Reference to a national code

Ref country code: SI

Ref legal event code: KO00

Effective date: 20200723

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20190912

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190930

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190912

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190930

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20200903

Year of fee payment: 15

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190912

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20210127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190913

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190912