EP1780165B1 - Method and device for the assembly of a crane with a lifting jib - Google Patents
Method and device for the assembly of a crane with a lifting jib Download PDFInfo
- Publication number
- EP1780165B1 EP1780165B1 EP06356102A EP06356102A EP1780165B1 EP 1780165 B1 EP1780165 B1 EP 1780165B1 EP 06356102 A EP06356102 A EP 06356102A EP 06356102 A EP06356102 A EP 06356102A EP 1780165 B1 EP1780165 B1 EP 1780165B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- jib
- cable
- lifting
- auxiliary
- hoist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 238000000034 method Methods 0.000 title claims description 16
- 230000007246 mechanism Effects 0.000 claims description 17
- 238000004804 winding Methods 0.000 claims description 6
- 238000004873 anchoring Methods 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 4
- 230000000717 retained effect Effects 0.000 description 3
- 230000014759 maintenance of location Effects 0.000 description 2
- 241001080024 Telles Species 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000008531 maintenance mechanism Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/72—Counterweights or supports for balancing lifting couples
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/16—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
- B66C23/34—Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
Definitions
- the present invention generally relates to luffing jib cranes, of the type comprising a fixed or movable support structure, in particular a vertical mast, surmounted by an orientable rotating part about a vertical axis, consisting of a swiveling pivot, a luffing arrow pointing forwards and hinged at its rear end about a horizontal axis on the swivel pivot, with an arrow holder extending obliquely upwards and backwards from the revolving pivot, and a substantially horizontal against-arrow directed rearward and linked by its front end to the rotating pivot, the counter-boom bearing mechanisms of the crane, and an arrow lifting device being provided , the latter comprising a lifting winch belonging to said mechanisms, a lifting cable passing over the top of the boom carrier and in a lifting muffle connected by at least one lifting tie to the front part of the the boom, and the aforementioned mechanisms also comprising a hoist winch with lifting cable.
- this invention is concerned with the mounting of the rotating part of such a luffing jib crane, and even more especially with the assembly of the components of the jib lifting device, and incidentally mechanisms that equip the counter-jib, so the final assembly operations that make the crane operational.
- the object of the present invention is to avoid the drawbacks previously described, and it is therefore intended to simplify the assembly of the additional elements of the rotating part of a luffing jib crane of the kind in question, in particular the mounting of the muffle and the cable of lifting, sling or temporary restraint slings, and line of tie rods, so as to reduce the assembly time and facilitate the work of the operator, while limiting the risk of accident.
- the subject of the invention is essentially a method of mounting a luffing jib crane, of the type indicated in the introduction, according to which an auxiliary winch is used, in particular a winch carried by the rotating part of the crane.
- this winch being equipped with an auxiliary cable of diameter substantially smaller than that of the hoisting and lifting cables, to carry out a cabling operation of the lifting muffle with the lifting cable and / or to carry out the assembly of at least one temporary sling, provided for the temporary retention of the boom, and / or to perform a mounting operation of the line of tie rods.
- the operation of cabling of the lifting muffle consists, after having pre-wired in the workshop muffle lifting with the auxiliary cable diameter substantially less than that of the cable of lifting, to connect one end of the auxiliary cable to the lifting cable wound on the drum of the lifting winch, to connect the other end of the auxiliary cable to the auxiliary winch, and to simultaneously operate the lifting winch and the auxiliary winch so as to unroll the lifting cable and engage it in the lifting muffle, while the auxiliary cable is re-wound on the auxiliary winch.
- the operation of mounting at least one temporary boom retaining sling consists, for each temporary sling, in storing a first sling element along the boom carrier and a second sling member, extending the first along the boom, the forward end of the second sling member being attached to the forward portion of the boom, attaching the upper end of the first member sling to the cable of the auxiliary winch, to operate this auxiliary winch in the direction of the winding of its cable to stretch the provisional sling, and to attach the upper end of the first sling element to the top of the boom carrier .
- the elements of these slings are advantageously stored respectively on both sides of the boom carrier and the boom, and one proceeds successively to the assembly of the first provisional sling, and then to the assembly of the second provisional sling using the auxiliary winch and its cable.
- the mounting operation of the line of tie rods consists, after passing the cable of the auxiliary winch on a pulley of forward direction of the arrow tying the end of the auxiliary cable to the lifting muffle, the rear end of the line of tie rods also being attached to the lifting muffle, actuating the auxiliary winch in the winding direction of its cable, and Operate the lifting winch in the direction of the unwinding of the rope, in such a way as to pull the lifting block towards the front, and finally hook the front end of the line of tie rods to the front part of the boom.
- the auxiliary winch can also be used, in combination with a bracket supported by the platform of the mechanisms itself carried by the counter-boom, for the maintenance or the maintenance of the mechanisms carried by this counter-boom, the cable of the auxiliary winch being then directed to the gallows and guided along this gallows.
- the subject of the invention is also a device for mounting a luffing jib crane intended for implementing the method defined above, this device essentially comprising an auxiliary winch carried by the party rotating the crane, this auxiliary winch being equipped with an auxiliary cable of diameter substantially smaller than that of lifting and lifting cables.
- the auxiliary winch can in particular be mounted at the base of the crane boom holder.
- the device also advantageously comprises, on the rotating part of the crane, means for guiding the auxiliary cable, in particular pulleys, adapted to the operations performed with the aid of the auxiliary winch and detailed above.
- the invention also relates to a luffing jib crane, which is equipped with a mounting device with auxiliary winch, as defined above.
- the invention thus facilitates the assembly operations of the crane, through the use of an auxiliary winch whose cable is smaller, and therefore more easily handled, than the hoisting cables of the load and raising of the boom, the same auxiliary winch being used during several assembly operations successively carried out.
- the luffing jib crane shown on the figure 1 here is a tower crane which comprises in known manner a base frame 2, fixed or movable on the ground, above which rises a vertical mast 3. At the top of the mast 3 is mounted, via an orientation device, a rotating part 4, consisting mainly of a rotating pivot 5, an arrow holder 6, a counter-boom 7, a platform mechanisms 8 and a luffing boom 9.
- the rotating pivot 5 is orientable about the vertical axis A of the mast 3. It supports a cab 10 of the crane.
- the arrow holder 6, also designated as a "punch”, is integral with the rotating pivot 5 and extends from the latter upwards and obliquely with a backward inclination.
- the counter-boom 7 extends substantially horizontally rearwardly from the pivoting pivot 5. It carries the platform of the mechanisms 8, as well as the counterweight 11. This against-arrow 7 is suspended from the arrow holder 6, in its rear part, by means of tie rods 12.
- the luffing jib 9 constituted by a lattice structure for example of triangular section, has a hinged rear end, about a horizontal axis 15, on the rotary pivot 5.
- the lifting winch 13 has a drum, around which is wound a lifting cable 16 which passes over pulleys 17 disposed at the top of the boom holder 6, and which also passes over the pulleys of a lifting block 18, located in before the arrow holder 6.
- the lifting block 18 is connected, by a line of tie rods 19, to the front part or "point" of the luffing jib 9.
- the hoist winch 14 has a drum on which is wound a hoisting rope 20, which passes over pulleys disposed on the boom holder 6, then is directed towards the tip of the luffing boom 9 and extends to a lifting hook 21, with or without hauling, the lifting loads being suspended from the hook 21 when using the crane.
- This equipment includes, in particular, an auxiliary winch 22, mounted at the base of the boom holder 6, on one of the sides thereof.
- the auxiliary winch 22 has a drum on which is wound an auxiliary cable 23, whose diameter is substantially smaller than the diameter of the cable for example, if the lifting cable 16 and the lifting cable 20 have a usual diameter of the order of 18 millimeters, the auxiliary cable 23 may have a diameter of 1 mm. order of 9 millimeters.
- the equipment in question still includes two temporary slings 24 for retaining the boom 9, which are visible on the figure 3 .
- Each of these two temporary slings 24 comprises a first sling element 25, storable along the boom carrier 6, and a second sling element 26, storable along the arrow 9 (see the basic position I indicated on the figure 3 ).
- the two sling elements 25 and 26 are hinged together at a point 27 and the second sling element 26 is hinged at a point 28 on the front part of the boom 9.
- One of the temporary slings 24 thus formed is stored on the right side of the arrow holder 6 and the arrow 9, while the other provisional sling 24 is stored symmetrically on the left side of the arrow holder 6 and the arrow 9.
- the mounting equipment includes, as shown in particular by figure 5 , a bracket 29 carried by the platform mechanisms 8, and used with one of the winches, as specified below.
- the lifting muffle 18 has been prewired in the workshop with a temporary cable of small diameter, for example of the order of 9 millimeters, which is the auxiliary cable 23 initially separated from the auxiliary winch 22. It is then proceeded as illustrates it figure 2 to the final wiring of the lifting muffle 18.
- the lifting muffle 18 being retained at the top of the boom holder 6, one end of the auxiliary cable 23 is connected to the lifting cable 16 larger, having for example a diameter of the order of 18 millimeters, which is wound on the drum of the lifting winch 13.
- the other end of the auxiliary cable 23 is attached to the drum of the auxiliary winch 22.
- the simultaneous electrical control of the two winches 13 is then actuated and 22, so that the auxiliary cable 23 is wound on the drum of the auxiliary winch 22, while the lifting cable 16 is unwound from the drum of the lifting winch 13.
- the auxiliary cable 23 pulls the lifting cable 16 by driving it through the lifting muffle 18, and bringing it on the pulleys of this muffle 18 where it comes to take the place of the auxiliary cable 23 provisionally installed.
- the auxiliary cable 23 is separate from the lifting cable 16, which makes this auxiliary cable 23 available for the following operations.
- the cable 23 of the auxiliary winch 22 is first pinned to the upper end 31 of the first sling member 25, while the front end of the second sling member 26 has already been attached. by broaching at 28 on the front part of the arrow 9. It then controls only the auxiliary winch 22, in the winding direction of its cable 23, which passes on a pulley 32 at the top of the boom holder 6, so gradually stretching the sling 24 through intermediate positions, such as that indicated in II. The sling 24 is thus stretched, being pulled upwards, until the upper end 31 of its first element 25 can be attached by broaching the top of the boom holder 6 (position III).
- the first sling element 25 After the first sling element 25 has been thus attached to the top of the boom carrier 6, it is separated from the auxiliary cable 23, and the same operation is repeated on the other side of the crane, for mounting the second provisional sling 24.
- the two temporary slings 24, thus installed, provide the provisional retention of the arrow 9, pending the following operation which consists of the installation of the line of tie rods 19.
- the mounting of the tie rods 19 is illustrated by the figure 4 .
- the cable 23 of the auxiliary winch 22 passes over a deflection pulley 33 located forward of the boom 9, and the end 34 of this auxiliary cable 23 is moored to the lifting block 18, which is initially near the top of the arrow holder 6.
- the rear end 35 of the line of tie rods 19 is attached to the lifting muffle 18, while its anterior end is still free. It is then proceeded to actuate the control of the auxiliary winch 22, in the direction of the winding of its cable 23, while the lifting winch 13 is actuated in the direction of unwinding of its cable 16.
- the muffle of lift 18 is thus pulled forward by the auxiliary cable 23, which removes it from the arrow holder 6 and finally allows to hang the front end of the line of tie rods 19 to the front part of the arrow 9, as suggested in 30 on the figure 4 .
- the front part of the boom 9 will be connected to the lifting block 18 via the line of tie rods 19.
- the bracket 29 is used in combination with the auxiliary winch 22 and with its cable 23 of relatively small diameter. More particularly, the auxiliary cable 23, unwinding from the drum of the winch 22, is first directed rearward to the foot of the bracket 29, then it extends along the mast and the arm of this bracket 29 , with suitable guides and references by pulleys 36, 37 and 38.
- the auxiliary cable 23 can thus be used for example, as illustrated by FIG. figure 5 for dismounting a winch, such as the hoisting winch 14.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Transportation (AREA)
- Jib Cranes (AREA)
Description
La présente invention concerne, d'une manière générale, les grues à flèche relevable, du type comprenant une structure de support fixe ou mobile, en particulier un mât vertical, surmonté d'une partie tournante orientable autour d'un axe vertical, constituée d'un pivot tournant, d'une flèche relevable dirigée vers l'avant et articulée à son extrémité arrière autour d'un axe horizontal sur le pivot tournant, d'un porte-flèche s'étendant obliquement vers le haut et vers l'arrière à partir du pivot tournant, et d'une contre-flèche sensiblement horizontale dirigée vers l'arrière et liée par son extrémité avant au pivot tournant, la contre-flèche portant des mécanismes de la grue, et un dispositif de relevage de flèche étant prévu, ce dernier comprenant un treuil de relevage appartenant auxdits mécanismes, un câble de relevage passant sur le sommet du porte-flèche et dans une moufle de relevage reliée par au moins un tirant de relevage à la partie avant de la flèche, et les mécanismes précités comprenant aussi un treuil de levage avec câble de levage.The present invention generally relates to luffing jib cranes, of the type comprising a fixed or movable support structure, in particular a vertical mast, surmounted by an orientable rotating part about a vertical axis, consisting of a swiveling pivot, a luffing arrow pointing forwards and hinged at its rear end about a horizontal axis on the swivel pivot, with an arrow holder extending obliquely upwards and backwards from the revolving pivot, and a substantially horizontal against-arrow directed rearward and linked by its front end to the rotating pivot, the counter-boom bearing mechanisms of the crane, and an arrow lifting device being provided , the latter comprising a lifting winch belonging to said mechanisms, a lifting cable passing over the top of the boom carrier and in a lifting muffle connected by at least one lifting tie to the front part of the the boom, and the aforementioned mechanisms also comprising a hoist winch with lifting cable.
Plus particulièrement, cette invention s'intéresse au montage de la partie tournante d'une telle grue à flèche relevable, et encore plus spécialement au montage des composants du dispositif de relevage de flèche, et accessoirement des mécanismes qui équipent la contre-flèche, donc les opérations finales de montage qui rendent la grue opérationnelle.More particularly, this invention is concerned with the mounting of the rotating part of such a luffing jib crane, and even more especially with the assembly of the components of the jib lifting device, and incidentally mechanisms that equip the counter-jib, so the final assembly operations that make the crane operational.
Une grue à flèche relevable, du genre ici concerné, est décrite par exemple dans la demande de brevet
Pour effectuer le montage d'une telle grue à flèche relevable, sur un lieu d'utilisation et notamment sur un chantier de construction, il est procédé d'abord à l'assemblage de la structure principale de la grue, comprenant le châssis de base, le mât, la contre-flèche et le porte-flèche, ces opérations étant effectuées à l'aide d'un engin auxiliaire de levage, qui est habituellement un camion-grue avec grue hydraulique. Ensuite, la flèche est montée, en étant retenue temporairement par au moins une élingue provisoire la reliant au sommet du porte-flèche. Il faut alors terminer le montage par les opérations suivantes :
- montage d'une élingue provisoire ou des élingues provisoires de retenue de la flèche,
- installation du câble de relevage de la flèche dans la moufle de relevage,
- montage de la ligne de tirants définitive, à relier à la moufle et au câble de relevage,
- démontage de l'élingue provisoire ou des élingues provisoires,
- passage du câble de levage dans les poulies correspondantes.
- installation of a temporary sling or temporary slings for retaining the boom,
- installation of the boom lift cable in the lift block,
- assembly of the final tie line, to be connected to the muffle and the lifting cable,
- dismantling the temporary sling or temporary slings,
- passage of the lifting cable in the corresponding pulleys.
De plus, il convient d'assurer, sur la plateforme destinée à les recevoir, l'entretien et la maintenance des mécanismes équipant la contre-flèche.In addition, it is advisable to ensure, on the platform intended to receive them, the maintenance and the maintenance of the mechanisms equipping the counter-arrow.
Ces opérations manuelles s'effectuent habituellement à l'aide du treuil de levage de la grue, déjà mis en place, treuil qui peut lever des charges très importantes. Ce treuil est ainsi équipé d'un câble de levage de gros diamètre, typiquement un câble d'un diamètre de l'ordre de 18 millimètres, qui par conséquent est un câble lourd et difficile à manipuler. Ainsi, les opérations finales de montage d'une grue à flèche relevable restent, pour l'opérateur, des opérations longues et pénibles, qui comportent des risques d'accident.These manual operations are usually carried out using the crane hoist winch, already in place, winch that can lift very large loads. This winch is thus equipped with a large diameter lifting cable, typically a cable with a diameter of the order of 18 millimeters, which consequently is a heavy cable and difficult to handle. Thus, the final operations of mounting a luffing jib crane remain, for the operator, long and arduous operations, which involve risks of accident.
La présente invention vise à éviter les inconvénients précédemment exposés, et elle a donc pour but de simplifier le montage des éléments additionnels de la partie tournante d'une grue à flèche relevable du genre concerné, en particulier le montage de la moufle et du câble de relevage, de l'élingue ou des élingues provisoires de retenue, et de la ligne de tirants, de manière à réduire le temps de montage et à faciliter le travail de l'opérateur, tout en limitant les risques d'accident.The object of the present invention is to avoid the drawbacks previously described, and it is therefore intended to simplify the assembly of the additional elements of the rotating part of a luffing jib crane of the kind in question, in particular the mounting of the muffle and the cable of lifting, sling or temporary restraint slings, and line of tie rods, so as to reduce the assembly time and facilitate the work of the operator, while limiting the risk of accident.
A cet effet, l'invention a essentiellement pour objet un procédé de montage d'une grue à flèche relevable, du genre indiqué en introduction, procédé selon lequel on utilise un treuil auxiliaire, en particulier un treuil porté par la partie tournante de la grue, ce treuil étant équipé d'un câble auxiliaire de diamètre sensiblement plus petit que celui des câbles de levage et de relevage, pour réaliser une opération de câblage de la moufle de relevage avec le câble de relevage et/ou pour réaliser le montage d'au moins une élingue provisoire, prévue pour la retenue provisoire de la flèche, et/ou pour réaliser une opération de montage de la ligne de tirants.For this purpose, the subject of the invention is essentially a method of mounting a luffing jib crane, of the type indicated in the introduction, according to which an auxiliary winch is used, in particular a winch carried by the rotating part of the crane. , this winch being equipped with an auxiliary cable of diameter substantially smaller than that of the hoisting and lifting cables, to carry out a cabling operation of the lifting muffle with the lifting cable and / or to carry out the assembly of at least one temporary sling, provided for the temporary retention of the boom, and / or to perform a mounting operation of the line of tie rods.
Selon le mode de mise en oeuvre du procédé de l'invention, l'opération de câblage de la moufle de relevage consiste, après avoir pré-câblé en atelier la moufle de relevage avec le câble auxiliaire de diamètre sensiblement inférieur à celui du câble de relevage, à relier une extrémité du câble auxiliaire au câble de relevage enroulé sur le tambour du treuil de relevage, à relier l'autre extrémité du câble auxiliaire au treuil auxiliaire, et à actionner simultanément le treuil de relevage et le treuil auxiliaire de manière à dérouler le câble de relevage et à l'engager dans la moufle de relevage, tandis que la câble auxiliaire est ré-enroulé sur le treuil auxiliaire.According to the mode of implementation of the method of the invention, the operation of cabling of the lifting muffle consists, after having pre-wired in the workshop muffle lifting with the auxiliary cable diameter substantially less than that of the cable of lifting, to connect one end of the auxiliary cable to the lifting cable wound on the drum of the lifting winch, to connect the other end of the auxiliary cable to the auxiliary winch, and to simultaneously operate the lifting winch and the auxiliary winch so as to unroll the lifting cable and engage it in the lifting muffle, while the auxiliary cable is re-wound on the auxiliary winch.
Selon un autre mode de mise en oeuvre du procédé de l'invention, l'opération de montage d'au moins une élingue provisoire de retenue de la flèche consiste, pour chaque élingue provisoire, à stocker un premier élément d'élingue le long du porte-flèche et un second élément d'élingue, prolongeant le premier, le long de la flèche, l'extrémité avant du second élément d'élingue étant attachée sur la partie avant de la flèche, à attacher l'extrémité supérieure du premier élément d'élingue au câble du treuil auxiliaire, à actionner ce treuil auxiliaire dans le sens de l'enroulement de son câble pour tendre l'élingue provisoire, et à attacher l'extrémité supérieure du premier élément d'élingue au sommet du porte-flèche.According to another embodiment of the method of the invention, the operation of mounting at least one temporary boom retaining sling consists, for each temporary sling, in storing a first sling element along the boom carrier and a second sling member, extending the first along the boom, the forward end of the second sling member being attached to the forward portion of the boom, attaching the upper end of the first member sling to the cable of the auxiliary winch, to operate this auxiliary winch in the direction of the winding of its cable to stretch the provisional sling, and to attach the upper end of the first sling element to the top of the boom carrier .
Dans le cas où sont prévues deux élingues provisoires, les éléments de ces élingues sont avantageusement stockés respectivement sur les deux côtés du porte-flèche et de la flèche, et l'on procède successivement au montage de la première élingue provisoire, puis au montage de la seconde élingue provisoire à l'aide du treuil auxiliaire et de son câble.In the case where two temporary slings are provided, the elements of these slings are advantageously stored respectively on both sides of the boom carrier and the boom, and one proceeds successively to the assembly of the first provisional sling, and then to the assembly of the second provisional sling using the auxiliary winch and its cable.
Selon encore un autre mode de mise en oeuvre du procédé de l'invention, l'opération de montage de la ligne de tirants consiste, après avoir fait passer le câble du treuil auxiliaire sur une poulie de renvoi située vers l'avant de la flèche, à amarrer l'extrémité du câble auxiliaire sur la moufle de relevage, l'extrémité postérieure de la ligne de tirants étant aussi attachée à la moufle de relevage, à actionner le treuil auxiliaire dans le sens de l'enroulement de son câble et à actionner le treuil de relevage dans le sens du déroulement de son câble, de manière à tirer la moufle de relevage vers l'avant, et à accrocher finalement l'extrémité antérieure de la ligne de tirants à la partie avant de la flèche.According to yet another embodiment of the method of the invention, the mounting operation of the line of tie rods consists, after passing the cable of the auxiliary winch on a pulley of forward direction of the arrow tying the end of the auxiliary cable to the lifting muffle, the rear end of the line of tie rods also being attached to the lifting muffle, actuating the auxiliary winch in the winding direction of its cable, and Operate the lifting winch in the direction of the unwinding of the rope, in such a way as to pull the lifting block towards the front, and finally hook the front end of the line of tie rods to the front part of the boom.
Le treuil auxiliaire peut également être utilisé, en combinaison avec une potence portée par la plateforme des mécanismes elle-même portée par la contre-flèche, pour l'entretien ou la maintenance des mécanismes portés par cette contre-flèche, le câble du treuil auxiliaire étant alors dirigé vers la potence et guidé le long de cette potence.The auxiliary winch can also be used, in combination with a bracket supported by the platform of the mechanisms itself carried by the counter-boom, for the maintenance or the maintenance of the mechanisms carried by this counter-boom, the cable of the auxiliary winch being then directed to the gallows and guided along this gallows.
L'invention a aussi pour objet un dispositif de montage d'une grue à flèche relevable, destiné à la mise en oeuvre du procédé défini ci-dessus, ce dispositif comprenant essentiellement un treuil auxiliaire porté par la partie tournante de la grue, ce treuil auxiliaire étant équipé d'un câble auxiliaire de diamètre sensiblement plus petit que celui des câbles de levage et de relevage. Le treuil auxiliaire peut notamment être monté à la base du porte-flèche de la grue.The subject of the invention is also a device for mounting a luffing jib crane intended for implementing the method defined above, this device essentially comprising an auxiliary winch carried by the party rotating the crane, this auxiliary winch being equipped with an auxiliary cable of diameter substantially smaller than that of lifting and lifting cables. The auxiliary winch can in particular be mounted at the base of the crane boom holder.
Le dispositif comprend encore avantageusement, sur la partie tournante de la grue, des moyens de guidage du câble auxiliaire, en particulier des poulies, adaptés aux opérations réalisées à l'aide du treuil auxiliaire et détaillées ci-dessus.The device also advantageously comprises, on the rotating part of the crane, means for guiding the auxiliary cable, in particular pulleys, adapted to the operations performed with the aid of the auxiliary winch and detailed above.
Enfin, l'invention a également pour objet une grue à flèche relevable, laquelle est équipée d'un dispositif de montage avec treuil auxiliaire, tel que défini précédemment.Finally, the invention also relates to a luffing jib crane, which is equipped with a mounting device with auxiliary winch, as defined above.
Dans l'ensemble, l'invention facilite ainsi les opérations de montage de la grue, grâce à l'utilisation d'un treuil auxiliaire dont le câble est moins gros, donc plus facilement manipulable, que les câbles de levage de la charge et de relevage de la flèche, le même treuil auxiliaire étant utilisé au cours de plusieurs opérations de montage successivement réalisées.Overall, the invention thus facilitates the assembly operations of the crane, through the use of an auxiliary winch whose cable is smaller, and therefore more easily handled, than the hoisting cables of the load and raising of the boom, the same auxiliary winch being used during several assembly operations successively carried out.
L'invention sera mieux comprise à l'aide de la description qui suit, en référence au dessin schématique annexé illustrant, à titre d'exemple, un mode de mise en oeuvre de ce procédé de montage d'une grue à flèche relevable :
-
Figure 1 est une vue d'ensemble, de côté, d'une grue à tour à flèche relevable susceptible d'être montée par le procédé selon l'invention ; -
Figure 2 est un schéma illustrant l'opération de câblage de la moufle de relevage de la flèche d'une telle grue ; -
Figure 3 est un schéma illustrant, dans ses phases successives, l'opération de montage des élingues provisoires de retenue de la flèche ; -
Figure 4 est un schéma illustrant l'opération de montage de la ligne de tirants ; -
Figure 5 est un dernier schéma, illustrant l'opération d'entretien des mécanismes équipant la contre-flèche.
-
Figure 1 is an overall view, from the side, of a luffing tower tower crane that can be mounted by the method according to the invention; -
Figure 2 is a diagram illustrating the wiring operation of the boom lifting muffle of such a crane; -
Figure 3 is a diagram illustrating, in its successive phases, the mounting operation of the provisional slings retaining the boom; -
Figure 4 is a diagram illustrating the assembly operation of the line of tie rods; -
Figure 5 is a last diagram, illustrating the operation of maintenance mechanisms equipping the counter-arrow.
La grue à flèche relevable, représentée sur la
Le pivot tournant 5 est orientable autour de l'axe vertical A du mât 3. Il supporte une cabine de conduite 10 de la grue.The rotating
Le porte-flèche 6, aussi désigné comme "poinçon", est solidaire du pivot tournant 5 et s'étend à partir de ce dernier vers le haut et en oblique avec une inclinaison vers l'arrière.The
La contre-flèche 7 s'étend sensiblement horizontalement vers l'arrière, à partir du pivot tournant 5. Elle porte la plateforme des mécanismes 8, ainsi que des contrepoids 11. Cette contre-flèche 7 est suspendue au porte-flèche 6, dans sa partie arrière, au moyen de tirants de liaison 12.The
Sur la plateforme des mécanismes 8, également visible sur la
La flèche relevable 9, constituée par une structure en treillis par exemple de section triangulaire, possède une extrémité arrière articulée, autour d'un axe horizontal 15, sur le pivot tournant 5.The
Le treuil de relevage 13 possède un tambour, autour duquel est enroulé un câble de relevage 16 qui passe sur des poulies 17 disposées au sommet du porte-flèche 6, et qui passe aussi sur les poulies d'une moufle de relevage 18, située en avant du porte-flèche 6. La moufle de relevage 18 est reliée, par une ligne de tirants 19, à la partie avant ou "pointe" de la flèche relevable 9.The
Le treuil de levage 14 possède un tambour sur lequel est enroulé un câble de levage 20, lequel passe sur des poulies disposées sur le porte-flèche 6, puis est dirigé vers la pointe de la flèche relevable 9 et s'étend jusqu'à un crochet de levage 21, avec ou sans mouflage, les charges à lever étant suspendues au crochet 21 lors de l'utilisation de la grue.The
La grue à flèche relevable ayant ainsi été décrite dans sa configuration entièrement montée, on décrira maintenant les équipements additionnels permettant le montage de cette grue.The luffing jib crane has thus been described in its fully assembled configuration, we will now describe the additional equipment for mounting this crane.
Ces équipements comprennent, en particulier, un treuil auxiliaire 22, monté à la base du porte-flèche 6, sur l'un des côtés de celui-ci. Le treuil auxiliaire 22 possède un tambour sur lequel est enroulable un câble auxiliaire 23, dont le diamètre est sensiblement inférieur au diamètre du câble de relevage 16 et au diamètre du câble de levage 20. Par exemple, si le câble de relevage 16 et le câble de levage 20 possèdent un diamètre habituel de l'ordre de 18 millimètres, le câble auxiliaire 23 peut posséder un diamètre de l'ordre de 9 millimètres.This equipment includes, in particular, an
Les équipements en question comprennent encore deux élingues provisoires 24 de retenue de la flèche 9, qui sont visibles sur la
Enfin, les équipements de montage comprennent, comme le montre notamment la
Le mode opératoire, utilisant les équipements de montage précédemment décrits, est le suivant.The procedure, using the editing equipment described above, is as follows.
En premier lieu, la moufle de relevage 18 a été précâblée en atelier avec un câble provisoire de petit diamètre, par exemple de l'ordre de 9 millimètres, qui est le câble auxiliaire 23 initialement séparé du treuil auxiliaire 22. Il est alors procédé comme l'illustre la
Ensuite, il est procédé au montage des deux élingues provisoires 24 de retenue de la flèche, ce qu'illustre la
Sur un premier côté, le câble 23 du treuil auxiliaire 22 est d'abord attaché par brochage à l'extrémité supérieure 31 du premier élément d'élingue 25, tandis que l'extrémité avant du second élément d'élingue 26 avait déjà été attachée par brochage en 28 sur la partie avant de la flèche 9. On commande alors uniquement le treuil auxiliaire 22, dans le sens de l'enroulement de son câble 23, qui passe sur une poulie 32 au sommet du porte-flèche 6, de manière à tendre progressivement l'élingue 24 en passant par des positions intermédiaires, telles que celle indiquée en II. L'élingue 24 est ainsi tendue, en étant tirée vers le haut, jusqu'à ce que l'extrémité supérieure 31 de son premier élément 25 puisse être attachée par brochage au sommet du porte-flèche 6 (position III).On one side, the
Après que le premier élément d'élingue 25 a été ainsi attaché au sommet du porte-flèche 6, il est séparé du câble auxiliaire 23, et la même opération est répétée de l'autre côté de la grue, pour le montage de la seconde élingue provisoire 24. Les deux élingues provisoires 24, ainsi mises en place, assurent la retenue provisoire de la flèche 9, en attendant l'opération suivante qui consiste en l'installation de la ligne de tirants 19.After the
Le montage des tirants 19 est illustré par la
Il devient alors possible de démonter les deux élingues provisoires 24, qui jusque là retenaient provisoirement la flèche 9.It then becomes possible to disassemble the two
Enfin, comme illustré par la
L'on ne s'éloignerait pas du cadre de l'invention, telle que définie dans les revendications annexées, en modifiant la position du treuil auxiliaire sur la partie tournante de la grue, ou en utilisant des câbles de diamètres autres que ceux indiqués, ou en utilisant une seule élingue provisoire, au lieu de deux, ou encore en modifiant l'ordre de certaines opérations de montage de la grue.One would not depart from the scope of the invention, as defined in the appended claims, by changing the position of the auxiliary winch on the rotating part of the crane, or by using cables of diameters other than those indicated, or using only one temporary sling, instead of two, or by changing the order of certain crane mounting operations.
Claims (10)
- Luffing jib crane erection process, the crane comprising a fixed or mobile supporting structure, in particular a vertical tower (3), surmounted by a rotating part (4), which can be swivelled around a vertical axis (A) made up of a rotating pivot (5), a luffing jib (9) directed forwards and articulated at its rear end around a horizontal shaft (15) on the rotating pivot (5), a jib gantry (6) extending obliquely upwards and rearwards from the rotating pivot (5) and an essentially horizontal counter-jib (7) directed rearwards and connected via its front end to the rotating pivot (5), the counter-jib (7) carrying mechanisms (8) of the crane and, a jib lifting system being provided, the latter comprising a jib lifting hoist (13) belonging to the said mechanisms, a jib lifting cable (16) passing over the top end of the jib gantry (6) and through a jib lifting block (18) connected by at least one lifting tie bar (19) to the front part of the jib (9), the aforementioned mechanisms also comprising a load lifting hoist (14) with a load lifting cable (20), characterized in that an auxiliary hoist (22), in particular a hoist carried by the rotating part (4) of the crane, is used, this hoist (22) being fitted with an auxiliary cable (23) with a diameter significantly smaller than that of the load (20) and jib (16) lifting cables, to perform an operation of cabling the jib lifting block, (18) with the jib lifting cable (16) and/or to perform an operation of fitting at least one temporary sling (24) intended for temporarily retaining the jib (9) and/or to perform an operation of mounting the line of tie bars (19).
- Process according to Claim 1, characterized in that the operation of cabling the jib lifting block (18) comprises, after having pre-cabled in the workshop the jib lifting block (18) with the auxiliary cable (23) with a diameter significantly smaller than that of the jib lifting cable (16), connecting one end of the auxiliary cable (23) to the jib lifting cable (16) wound onto the drum of the jib lifting hoist (13), connecting the other end of the auxiliary cable (23) to the auxiliary hoist (22) and actuating simultaneously the jib lifting hoist (13) and the auxiliary hoist (22) such that the jib lifting cable (16) is unwound and engaged in the jib lifting block (18), whilst the auxiliary cable (23) is rewound onto the auxiliary hoist (22).
- Process according to Claim 1 or 2, characterized in that the operation of fitting at least one temporary sling (24) for retaining the jib (9) comprises, for each temporary sling (24), storing a first sling element (25) along the jib gantry (6) and a second sling element (26), prolonging the first, along the jib (9), the front end of the second sling element (25) being attached (28) to the front part of the jib (9), attaching the top end (31) of the first sling element (25) to the cable (23) of the auxiliary hoist (22), actuating this auxiliary hoist (22) in the winding direction of its cable (23) to tension the temporary sling (24) and attaching the top end (31) of the first sling element (25) to the top of the jib gantry (6).
- Process according to Claim 3, characterized in that, in the case of two temporary slings (24), the elements (25, 26) of these slings are stored on both sides of the jib gantry (6) and of the jib (9) respectively, and in that fitting of the first temporary sling (24), then fitting of the second temporary sling (24) is successively undertaken using the auxiliary hoist (22) and its cable (23).
- Process according to one of Claims 1 to 4, characterized in that the operation of mounting the
line of tie bars (19) comprises, after passing the cable (23) of the auxiliary hoist (22) over a return pulley (33) located towards the front of the jib (9), anchoring the end (34) of the auxiliary cable (23) on the jib lifting block (18), the rear end (35) of the line of tie bars (19) being also attached to the jib lifting block (18), actuating the auxiliary hoist (22) in the winding direction of its cable (23) and actuating the jib lifting hoist (13) in the unwinding direction of its cable (16) to pull the jib lifting block (18) forwards and to connect finally the front end (35) of the line of tie bars (19) to the front part of the jib (9). - Process according to one of Claims 1 to 5, characterized in that the auxiliary hoist (22) is also used, in combination with a bracket (29) carried by the mechanism platform (8), itself carried by the counter-jib (7), for servicing or maintaining the mechanisms carried by this counter-jib (7), the cable (23) of the auxiliary hoist (22) then being directed towards the bracket (29) and guided (36, 37, 38) along this bracket (29).
- Erection system for a luffing jib crane, for implementing the process according to one of Claims 1 to 6, characterized in that it comprises an auxiliary hoist (22) carried by the rotating part (4) of the crane, this auxiliary hoist (22) being fitted with an auxiliary cable (23) with a diameter significantly smaller than that of the load (20) and jib (16) lifting cables.
- System according to Claim 7, characterized in that the auxiliary hoist (22) is mounted at the base of the jib gantry (6) of the crane.
- System according to Claim 7 or 8, characterized in that it comprises, on the rotating part (4) of the
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0510954A FR2892405B1 (en) | 2005-10-26 | 2005-10-26 | METHOD AND DEVICE FOR MOUNTING A CRANE WITH AN ADJUSTABLE ARROW |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1780165A1 EP1780165A1 (en) | 2007-05-02 |
EP1780165B1 true EP1780165B1 (en) | 2010-04-07 |
Family
ID=36628343
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP06356102A Not-in-force EP1780165B1 (en) | 2005-10-26 | 2006-08-30 | Method and device for the assembly of a crane with a lifting jib |
Country Status (8)
Country | Link |
---|---|
EP (1) | EP1780165B1 (en) |
KR (1) | KR101330716B1 (en) |
CN (1) | CN1955102B (en) |
AU (1) | AU2006233182B2 (en) |
DE (1) | DE602006013385D1 (en) |
ES (1) | ES2342969T3 (en) |
FR (1) | FR2892405B1 (en) |
MY (1) | MY141399A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012019248A1 (en) * | 2012-09-28 | 2014-04-03 | Liebherr-Werk Biberach Gmbh | Tower Crane |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102007019747B4 (en) * | 2007-04-20 | 2009-02-05 | Wilbert Turmkrane Gmbh | Luffing crane with transport bracket for roller blocks |
DE102009020338B4 (en) * | 2009-05-07 | 2011-07-21 | Manitowoc Crane Group France Sas | Telescopic crane with self-assembling guying fixture and mounting method for a guying fixture |
CN101792091B (en) * | 2010-03-12 | 2012-07-11 | 广州文冲船厂有限责任公司 | Moment hoisting method for three connecting rods of gantry crane |
ES2371710B1 (en) * | 2010-03-29 | 2012-09-18 | Linden Comansa, S.L. | PERFECTION IN FOLDING CRANES. |
DE102010020016B4 (en) * | 2010-05-10 | 2021-04-29 | Liebherr-Werk Ehingen Gmbh | Crane and method of erecting the crane |
CN102992213A (en) * | 2012-12-20 | 2013-03-27 | 中联重科股份有限公司 | Steel wire rope winding device and tower crane |
CN103663189B (en) * | 2014-01-02 | 2015-06-17 | 中联重科股份有限公司 | Swing arm tower crane installation method |
CN104340907A (en) * | 2014-10-31 | 2015-02-11 | 徐州重型机械有限公司 | Hoisting and winching control device capable of preventing rope from messing and control method |
FR3071489A1 (en) | 2017-09-28 | 2019-03-29 | Manitowoc Crane Group France | METHOD FOR SECURING A CRANE ARROW CRANE AND ASSOCIATED CRANE |
BE1026086B1 (en) * | 2018-07-27 | 2019-10-04 | DEME Offshore Holding N.V. | Lifting block for a crane |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE8709267U1 (en) * | 1987-07-04 | 1987-08-20 | Man Ghh Logistics Gmbh, 74076 Heilbronn | Tower tip of a rotating construction crane designed as a transport and assembly unit |
CN2032611U (en) * | 1987-10-15 | 1989-02-15 | 中国建筑科学研究院建筑机械化研究所 | Folding type fast erecting tower crane |
FR2641773B1 (en) * | 1989-01-18 | 1991-03-15 | Potain Sa | LIFT BOOM CRANE WITH BOOM RETURN DEVICE |
JPH0912272A (en) * | 1995-06-26 | 1997-01-14 | Kyushu Koatsu Concrete Kogyo Kk | Tower crane assembling method and towing device to be used for it |
-
2005
- 2005-10-26 FR FR0510954A patent/FR2892405B1/en active Active
-
2006
- 2006-08-30 ES ES06356102T patent/ES2342969T3/en active Active
- 2006-08-30 DE DE602006013385T patent/DE602006013385D1/en active Active
- 2006-08-30 EP EP06356102A patent/EP1780165B1/en not_active Not-in-force
- 2006-10-02 MY MYPI20064252A patent/MY141399A/en unknown
- 2006-10-20 KR KR1020060102348A patent/KR101330716B1/en not_active IP Right Cessation
- 2006-10-24 AU AU2006233182A patent/AU2006233182B2/en not_active Ceased
- 2006-10-25 CN CN200610150308XA patent/CN1955102B/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012019248A1 (en) * | 2012-09-28 | 2014-04-03 | Liebherr-Werk Biberach Gmbh | Tower Crane |
Also Published As
Publication number | Publication date |
---|---|
FR2892405B1 (en) | 2007-12-07 |
KR101330716B1 (en) | 2013-11-26 |
AU2006233182A1 (en) | 2007-05-10 |
EP1780165A1 (en) | 2007-05-02 |
ES2342969T3 (en) | 2010-07-20 |
FR2892405A1 (en) | 2007-04-27 |
CN1955102A (en) | 2007-05-02 |
MY141399A (en) | 2010-04-30 |
DE602006013385D1 (en) | 2010-05-20 |
KR20070045098A (en) | 2007-05-02 |
CN1955102B (en) | 2010-07-21 |
AU2006233182B2 (en) | 2011-08-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1780165B1 (en) | Method and device for the assembly of a crane with a lifting jib | |
EP2041429B1 (en) | Device and method for rapidly dismantling the rotor and the nacelle from a wind turbine mast, and wind turbine provided with such device | |
EP1369374A1 (en) | Device for changing the reeving arrangement for a crane | |
FR2912450A1 (en) | WIND TURBINE WITH FOLDING MAT AND METHOD OF USING SUCH A WINDMILL. | |
EP0635450B1 (en) | Method and device for mounting the jibs of tower cranes | |
FR2487318A1 (en) | METHOD FOR EXTENDING A TELESCOPIC CRANE ARM | |
EP1184328B1 (en) | Cable arrangement for tower crane | |
EP1048605B1 (en) | Multiple function crane with telescope jib | |
EP0846650B1 (en) | Method and device for mounting jib tension elements on tower cranes | |
US3630243A (en) | Tree-bunching mechanism and tree-skidder vehicle incorporating the same | |
TWI275347B (en) | Roller device to assist in net hauling and net hauling method using the same | |
EP2133261B1 (en) | Device for winding and stretching a front sail roped or with free hoist for a sail boat | |
FR2705640A1 (en) | Method and device for lifting cargo handling at sea. | |
FR2485500A1 (en) | Cable hoist mounted at end of jib - has locking plate for pulleys and additional suspended side hook | |
JP7322528B2 (en) | Jib mooring device | |
EP1927570B1 (en) | Crane tower with counterweight | |
CH367957A (en) | Luffing mast crane | |
EP0254619B1 (en) | Procedure and apparatus to assist in the treatment of a floating load | |
JP4141558B2 (en) | Overwind warning device for crane with hook storage device | |
FR2670526A1 (en) | Device for tearing up pillars, in particular pillars anchored in a mass of concrete | |
EP1930286B1 (en) | Tower crane with automated assembly | |
JP7484944B2 (en) | Jib mooring device and method for mooring a jib | |
JP2004256240A (en) | Crane | |
FR2636616A1 (en) | Folding crane with a gib having two or three mutually articulated elements. | |
CH665621A5 (en) | Ropeway conveyor for building sites etc. - comprises vehicle-mounted support frame and winching system controlling load-carrying and load-moving cables |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK YU |
|
17P | Request for examination filed |
Effective date: 20070507 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: MANITOWOC CRANE GROUP FRANCE |
|
AKX | Designation fees paid |
Designated state(s): DE ES IT |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE ES IT |
|
REF | Corresponds to: |
Ref document number: 602006013385 Country of ref document: DE Date of ref document: 20100520 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2342969 Country of ref document: ES Kind code of ref document: T3 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20110110 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20180823 Year of fee payment: 13 Ref country code: IT Payment date: 20180830 Year of fee payment: 13 Ref country code: ES Payment date: 20180921 Year of fee payment: 13 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602006013385 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200303 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190830 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20210108 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190831 |