EP1738041B1 - Multifunctional urban complex - Google Patents

Multifunctional urban complex Download PDF

Info

Publication number
EP1738041B1
EP1738041B1 EP04761510A EP04761510A EP1738041B1 EP 1738041 B1 EP1738041 B1 EP 1738041B1 EP 04761510 A EP04761510 A EP 04761510A EP 04761510 A EP04761510 A EP 04761510A EP 1738041 B1 EP1738041 B1 EP 1738041B1
Authority
EP
European Patent Office
Prior art keywords
construction
yard
approach
intermediate pillars
storeyed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP04761510A
Other languages
German (de)
French (fr)
Other versions
EP1738041A1 (en
Inventor
Mihail Danev Petkov
Lyudmil Ivanov Ivanov
Asen Strashimirov Strashimirov
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP1738041A1 publication Critical patent/EP1738041A1/en
Application granted granted Critical
Publication of EP1738041B1 publication Critical patent/EP1738041B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H14/00Buildings for combinations of different purposes not covered by any single one of main groups E04H1/00-E04H13/00 of this subclass, e.g. for double purpose; Buildings of the drive-in type
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H3/00Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
    • E04H3/08Hospitals, infirmaries, or the like; Schools; Prisons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H3/00Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
    • E04H3/10Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons for meetings, entertainments, or sports

Definitions

  • the invention refers to multifunctional urban complex intended for civil engineering application in urban conditions for the provision of usable areas.
  • a multifunctional urban complex is known from BG 556Y Y1, consisting of a yard situated between surrounding roadways and railed off by a fence with entrance door seeing to the yard.
  • BG 556Y Y1 consisting of a yard situated between surrounding roadways and railed off by a fence with entrance door seeing to the yard.
  • the construction has an approach connected to the roadways.
  • the approach area is located remotely from the entrance door of the yard's fence.
  • the underground construction is designed with reinforced build-in plates.
  • the connection of the approach with the roadway is made with a ramp to provide antifire protection.
  • the underground construction is equipped with security system, antifire system, drain, ventilation and filtration systems, as well as lightning systems independent from those of the school building.
  • JP 08004343 A A construction of underground garages is also known from JP 08004343 A , consisting of bottom slab and multiple precast reinforced concrete walls, mounted laterally on the bottom slab, with an entrance shaped in the walls for access of the vehicles in the garage.
  • the supporting intermediate pillars are arranged regularly in both directions and a monolithic ceiling slab is cast over them with its supporting beams.
  • the beams are set on the pillars and are arranged in a perpendicular direction to the way of the vehicles from the entrance to the bottom of the garage.
  • the shortcomings of the cited structure consist in the fact that it is intended for one-storey garages only, determined by the connections between the ceiling slab and the columns.
  • the location of the monolithic beams transversely to the base line of vehicle motion supposes a definition of a substantial construction height which makes it very expensive.
  • the need to fix on place the installation pillars so that the concrete of the ceiling slab and over the beams could be cast simultaneously is another factor that makes the construction extremely expensive and very difficult to erect.
  • the monolithic structure of the construction extends the period of its erection, which makes it difficult to apply in the central urban areas.
  • the invention is intended to create a multifunctional urban complex allowing the formation of a multifunctional structure in densely populated city areas, providing a space to be used without disturbing the architectural outlook of the city, making possible the erection works in the narrow central parts of the city and providing convenient communications and good safety with the possibility to erect in a short time and with relatively low costs the construction.
  • a solution to this task has been found with the multifunctional urban complex that comprises a yard located between surrounding roadways and railed off by a fence with entrance door seeing to the yard.
  • a school building is located in the yard and an area for sports, games and common activities is provided. In this area, and under the yard level there is a structure to which an approach is given, connected to the roadways remote from the entrance door in the yard's fence.
  • the construction according to the invention is at least two-storeyed with an at least single-storeyed building over the ground level in the approach area.
  • the at least two-storeyed construction comprises reinforcing walls, supporting intermediate pillars and floor panels standing on supporting beams.
  • the length of the supporting intermediate pillars corresponds to the height of at least two-storeyed building, and the supporting intermediate pillars have also short consoles on the place of the floor.
  • the supporting intermediate pillars are arranged in rows parallel to the basic traverse line.
  • the bearing intermediate pillars are restrained in monolithic footings on foundations by their bottom ribbed end placed in preliminary prepared cups encompassing this ribbed end.
  • the cups have internal ribbed surface and partial outer ribbing in its bottom part which is monolithically fixed in the monolithic footings.
  • the short consoles of the bearing intermediate pillars are directed parallel to the basic traverse line, and the bearing beams are mounted to them in the same direction.
  • the bearing beams have longitudinal footings on which footings the floor panels are fixed.
  • the floor panels are prestressed cast fitting together elements with longitudinal cavities.
  • the distance between the center lines of the two rows of bearing intermediate pillars shall pereferably be greater than the distances between the other centre lines.
  • bearing intermediate pillars should be of square cross section.
  • the approach should preferably include a ramp.
  • the approach should preferably comprise at least one elevator cage and/or staircase for disabled people.
  • the invention allows to preserve the architectural, urbanization and space structure of the city, making optimal use of the urban territories and the available construction density.
  • a possibility is created for multifunctional use of the school yards underground, included for the need of the education process and the needs of the society.
  • the rate of use of the city areas is increased.
  • the school building remains with its yard to be used according to the urbanization planning available, completely safe and wide enough, with novel pavement, geoplastics, garden design, sculptures, playing spots, etc.
  • the mutual disposition of the elements in the multifunctional urban complex and the construction peculiarities of the underground structure allow its building not only as a new construction, but as an ancillary too, which may be fulfilled for a short period of time and does not affect the existing functions of the surrounding buildings and equipment, preserving the underground urban infrastructure too.
  • the specialized entrance available with access control equipment provides the safety use of the complex.
  • the multifunctional urban complex comprises a yard 1, situated between surrounding roadways 2 and railed off by a fence 3 with entrance door 4 seeing to the yard, in which yard 1 a school-building 5 is situated and a sports-, play- and common activities zone is shaped Fig. 1-3.
  • the at least two-storeyed construction 7 occupies a space 8, located under the level of the yard 1 in its area 6 intended for sports, games and common activities. This construction may be situated depending on the reinforcing methods used, i.e. distance from the outline 9 of the school-building 5.
  • the at least two-storeyed construction 7 is underground and has an approach 10 that is situated on the distant side of the entrance door 4 of the fence 3 of the yard 1 of the school-building 5: figures 1 and 3.
  • the at least two-storeyed construction in the area of the approach 10 has at least one floor over the ground level 11. This ground floor shall be preferably located in the school yard 1 which does not ignore other possibilities too.
  • the at least one ground floor 11 is intended for the location of access checkpoints to the underground part of the at least two-storeyed construction 7, as well as the placement of a staircase and elevator for disabled people and/or shops.
  • the outline of the at least two-storeyed construction 7 match the outline of the fence 3. This is possible in all individual cases of location of the school-building 5 in the yard 1, although it is not the only possible way to dispose the at least two-storeyed construction 7. It may be located so that its outline does not match the fence outline 3.
  • the at least two-storeyed construction 7 comprises reinforcing walls 12, bearing intermediate pillars 13 and floor panels 14, placed on bearing beams 15.
  • the length of the bearing intermediate pillars 13 in the case shown corresponds to the length of the at least two-storeyed construction 7. They have short consoles 16 on the place of the floor.
  • the bearing intermediate pillars 13 may be erected as high as several floors which is however limited by the possibilities to transport them in the central urban zone for which this invention is intended. If the erection of a multi-storeyed building is needed, the bearing intermediate pillars 13 may be composed by various elements placed one over the other that may be fit together (not shown). This solution shall be used if the conditions imply it.
  • the bearing intermediate pillars 13 may have a differently shaped cross section, selected in accordance with the calculated loadings for this size. In the preferred embodiment (fig. 4) they have a square section because this makes easier their transportation and fitting.
  • the bearing intermediate pillars 13 are arranged in rows parallel to the basic traverse line 17 where the centre line distance 18 of both rows of bearing intermediate pillars 13 shaping the basic traverse line 17 is greater than the other centre distances 18.
  • the bearing intermediate pillars 13 are retained in monolithic footings 20 on foundations by their bottom ribbed end 21, placed in preliminary prepared cups 22 encompassing this ribbed end 21 (fig. 5).
  • the cups 22 have an internal ribbed surface 23 and partial outer ribbing 24, shaped in its bottom end, which is restrained in the monolithic footings 22 (fig. 6)..
  • the short consoles 16 of the bearing intermediate pillars 13 are directed parallel to the basic traverse line 17 and the bearing beams 15 are mounted to them in the same direction.
  • the bearing beams 15 have longitudinal footings 25 on which footings the floor panels 14 are fixed.
  • the floor panels 14 are prestressed precast elements with longitudinal cavities 26.
  • To the at least two-storeyed construction 7 in the preferred embodiment the approach 10 is traced to every floor that may be connected directly to the roadway 2 or to be one to all floors (fig. 1 and 3). Multiple versions to perform the connections are possible, however preferred for antifire reasons is the connection by means of ramps 27 that may be monolithic or made by fitting together elements.
  • the bearing intermediate pillars 13 may have a longer lenght enlarged with the length of the storey, their upper part being on the ground level with a cover of a known kind.
  • the at least two-storied construction 7 shall be equipped with safety system, and anti-fire, ventilation and filtration systems, with lightning and drain systems that are not shown on the figures, independent of this school-building 5. Besides the security provision for emergency cases this detachment of the indicated systems allows the accomplishment of additional activities in the premises of the underground construction 7, i.e. car cleaning and washing, eventual sale of some spares and needed accessories, etc.
  • the available pavement (not shown) of the school yard 1 is removed and excavation works are made for the underground structure 7.
  • the earth extracted is transported to a. place designated for that purpose, performing simultaneously reinforcement depending on the depth of the excavation and its proximity to the school-building 5 and various surrounding units if any.
  • the at least two-storeyed construction 7 is erected.
  • the supporting walls 12 are erected following the monolithic way and, as usual, the monolithic footings 20 for the bearing intermediate pillars 13 are cast, simultaneously in them are restrained the preliminary prepared cups 22 with inner 23 and partial outer ribbing 24, restraining into the monolithic footings to the level of the partial outer ribbing 24.
  • the bearing intermediate pillars 13 are installed into the monolithically attached cups 22, being also monolithically attached there.
  • the bearing beams 15 are arranged and their connection to the short consoles 16 of the bearing intermediate pillars 13 is effected in the known way (preferably by welding).
  • Over the bilateral longitudinal footings 25 of the bearing beams 15 the floor panels 14 are installed so that their longitudinal cavities 26 are placed transversely to the bearing beams 15 thus making their connection.
  • the preferred flooring 28 is made.
  • the connections may be made following any of the known ways, however a monolithic connection is preferred.
  • the required pavement is placed, which may be bitumen, "zebran", tiles etc.
  • the operations of fulfillment of the equipment of the garage and the internal engineering structures are placed in the already outlined space 8 and are detached and independent from the school-building 5 and the yard 1. It is convenient to use electronic systems indicating available parking places.
  • the approach 10 to the underground construction 7 that in this preferred embodiment is a garage has a signal system and is specially secured.
  • the cars of the living in the neighbourhood or of the teachers and students may find place here, as well as cars that visit the central metropolitan area for a part of the day, for which a special regulation may be considered.
  • a special regulation may be considered.
  • the preferred embodiment described illustrates only one application of the urban complex according to the invention.
  • a lot of other useful for the society spaces may be created in the included in the complex at least two-storied construction 7.
  • the space shaped this way may be used also as exhibition area or a trade center, sports facilities, for common or refrigerated warehouses, computer halls and halls for connection to the global network, civil protection shelters, not requiring sun light industrial premises etc. If used for garages it gives chance to provide a safe access of the students to the school yard and building as the underground construction is approached from the distant side.

Landscapes

  • Architecture (AREA)
  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Residential Or Office Buildings (AREA)
  • Road Paving Structures (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Agricultural Chemicals And Associated Chemicals (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Fencing (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The complex, intended for application in big cities or city centers, where space for garages, storehouses and similar facilities is to be ensured, comprises a yard ( 1 ), situated between roadways ( 2 ) and railed off by a fence ( 3 ) with entrance door ( 4 ). In the yard ( 1 ) a school building ( 5 ) is situated and a sports-, play- and common activities zone ( 6 ) is shaped. In this zone ( 6 ), there is an at least two-storeyed underground construction ( 7 ), to which an approach ( 10 ) is shaped. In the approach area ( 10 ) there is a single-storeyed over-ground part ( 11 ). The construction ( 7 ) includes walls ( 12 ), bearing intermediate pillars ( 13 ) and floor panels ( 14 ) founding on the longitudinal footings of supporting beams ( 15 ). The pillars ( 13 ) have short consoles ( 16 ), where the beams ( 15 ) are mounted and they are restrained in monolithic footings ( 20 ), with their bottom ribbed ends ( 21 ) placed in preliminary prepared cups ( 22 ) encompassing this ribbed ends ( 21 ). The cups ( 22 ) have an internal ribbed surface ( 23 ) and partial outer ribbing ( 24 ).

Description

    FIELD OF THE INVENTION
  • The invention refers to multifunctional urban complex intended for civil engineering application in urban conditions for the provision of usable areas.
  • BACKGROUND OF THE INVENTION
  • A multifunctional urban complex is known from BG 556Y Y1, consisting of a yard situated between surrounding roadways and railed off by a fence with entrance door seeing to the yard. There is a school building erected in the yard and an area for sports, games and common activities is shaped. There is at least single-storeyed underground construction, situated completely under the yard level. The construction has an approach connected to the roadways. The approach area is located remotely from the entrance door of the yard's fence. The underground construction is designed with reinforced build-in plates. The connection of the approach with the roadway is made with a ramp to provide antifire protection. The underground construction is equipped with security system, antifire system, drain, ventilation and filtration systems, as well as lightning systems independent from those of the school building.
  • The shortcomings of the multifunctional urban complex known in the art are that substantial investments are needed for the use of reinforced build-in plates, the supply of these plates to the site being very difficult due to the place they have to be installed, i.e. in the city centers, where the roadways are relatively narrow and do not allow the use of heavy construction machines for the supply of reinforced build-in plates that are large in size, i.e. covering the distance between the center lines. Control of unauthorized malevolent access to the construction is not provided with the given civil engineering solution.
  • A construction of underground garages is also known from JP 08004343 A , consisting of bottom slab and multiple precast reinforced concrete walls, mounted laterally on the bottom slab, with an entrance shaped in the walls for access of the vehicles in the garage. The supporting intermediate pillars are arranged regularly in both directions and a monolithic ceiling slab is cast over them with its supporting beams. The beams are set on the pillars and are arranged in a perpendicular direction to the way of the vehicles from the entrance to the bottom of the garage.
  • The shortcomings of the cited structure consist in the fact that it is intended for one-storey garages only, determined by the connections between the ceiling slab and the columns. Thus the location of the monolithic beams transversely to the base line of vehicle motion supposes a definition of a substantial construction height which makes it very expensive. The need to fix on place the installation pillars so that the concrete of the ceiling slab and over the beams could be cast simultaneously is another factor that makes the construction extremely expensive and very difficult to erect. The monolithic structure of the construction extends the period of its erection, which makes it difficult to apply in the central urban areas.
  • SUMMARY OF THE INVENTION
  • The invention is intended to create a multifunctional urban complex allowing the formation of a multifunctional structure in densely populated city areas, providing a space to be used without disturbing the architectural outlook of the city, making possible the erection works in the narrow central parts of the city and providing convenient communications and good safety with the possibility to erect in a short time and with relatively low costs the construction.
  • A solution to this task has been found with the multifunctional urban complex that comprises a yard located between surrounding roadways and railed off by a fence with entrance door seeing to the yard. A school building is located in the yard and an area for sports, games and common activities is provided. In this area, and under the yard level there is a structure to which an approach is given, connected to the roadways remote from the entrance door in the yard's fence. The construction according to the invention is at least two-storeyed with an at least single-storeyed building over the ground level in the approach area. The at least two-storeyed construction comprises reinforcing walls, supporting intermediate pillars and floor panels standing on supporting beams. The length of the supporting intermediate pillars corresponds to the height of at least two-storeyed building, and the supporting intermediate pillars have also short consoles on the place of the floor. The supporting intermediate pillars are arranged in rows parallel to the basic traverse line. The bearing intermediate pillars are restrained in monolithic footings on foundations by their bottom ribbed end placed in preliminary prepared cups encompassing this ribbed end. The cups have internal ribbed surface and partial outer ribbing in its bottom part which is monolithically fixed in the monolithic footings. The short consoles of the bearing intermediate pillars are directed parallel to the basic traverse line, and the bearing beams are mounted to them in the same direction. The bearing beams have longitudinal footings on which footings the floor panels are fixed. The floor panels are prestressed cast fitting together elements with longitudinal cavities.
  • The distance between the center lines of the two rows of bearing intermediate pillars shall pereferably be greater than the distances between the other centre lines.
  • It is convenient that the bearing intermediate pillars should be of square cross section.
  • The approach should preferably include a ramp.
  • The approach should preferably comprise at least one elevator cage and/or staircase for disabled people.
  • It is possible that the approach could have a shop section.
  • The invention allows to preserve the architectural, urbanization and space structure of the city, making optimal use of the urban territories and the available construction density. A possibility is created for multifunctional use of the school yards underground, included for the need of the education process and the needs of the society. The rate of use of the city areas is increased. Simultaneously, the school building remains with its yard to be used according to the urbanization planning available, completely safe and wide enough, with novel pavement, geoplastics, garden design, sculptures, playing spots, etc. The mutual disposition of the elements in the multifunctional urban complex and the construction peculiarities of the underground structure allow its building not only as a new construction, but as an ancillary too, which may be fulfilled for a short period of time and does not affect the existing functions of the surrounding buildings and equipment, preserving the underground urban infrastructure too. There is a high level of completeness of the construction, and no finishing works are needed after the installation of the supporting elements. The specialized entrance available with access control equipment provides the safety use of the complex.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The invention is clarified with an example illustrated on the figures attached, where
    • Fig. 1 is a top view of the multifunctional urban complex according to the invention;
    • Fig. 2 is an architecture model of one floor of the underground structure of the urban complex for the case when it is intended for garage;
    • Fig. 3 is section A-A of fig. 1;
    • Fig. 4 is a partial construction drawing of the location of the bearing elements of the structure;
    • Fig. 5 is a vertical section along B-B of fig. 4;
    • Fig. 6 is detailed drawing B of fig. 5;
    • Fig. 7 is detailed drawing D of fig. 5;
    • Fig. 8 is view along E-E of fig. 7.
    DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • The multifunctional urban complex according to the invention comprises a yard 1, situated between surrounding roadways 2 and railed off by a fence 3 with entrance door 4 seeing to the yard, in which yard 1 a school-building 5 is situated and a sports-, play- and common activities zone is shaped Fig. 1-3. There is at least two-storeyed construction 7 in the yard 1 intended in the preferred embodiment for garage. The at least two-storeyed construction 7 occupies a space 8, located under the level of the yard 1 in its area 6 intended for sports, games and common activities. This construction may be situated depending on the reinforcing methods used, i.e. distance from the outline 9 of the school-building 5. It is appropriate that this distance is at least 3 meters in view of increasing the safetiness not only with regards to the technologic aspect, but with regards to the use too. The at least two-storeyed construction 7 is underground and has an approach 10 that is situated on the distant side of the entrance door 4 of the fence 3 of the yard 1 of the school-building 5: figures 1 and 3. The at least two-storeyed construction in the area of the approach 10 has at least one floor over the ground level 11. This ground floor shall be preferably located in the school yard 1 which does not ignore other possibilities too. The at least one ground floor 11 is intended for the location of access checkpoints to the underground part of the at least two-storeyed construction 7, as well as the placement of a staircase and elevator for disabled people and/or shops. In the preferred embodiment shown in figures 1 and 3 the outline of the at least two-storeyed construction 7 match the outline of the fence 3. This is possible in all individual cases of location of the school-building 5 in the yard 1, although it is not the only possible way to dispose the at least two-storeyed construction 7. It may be located so that its outline does not match the fence outline 3. In the example of fig. 2 and 3 the at least two-storeyed construction 7 comprises reinforcing walls 12, bearing intermediate pillars 13 and floor panels 14, placed on bearing beams 15. The length of the bearing intermediate pillars 13 in the case shown corresponds to the length of the at least two-storeyed construction 7. They have short consoles 16 on the place of the floor. If there are three or more floors, the bearing intermediate pillars 13 may be erected as high as several floors which is however limited by the possibilities to transport them in the central urban zone for which this invention is intended. If the erection of a multi-storeyed building is needed, the bearing intermediate pillars 13 may be composed by various elements placed one over the other that may be fit together (not shown). This solution shall be used if the conditions imply it. The bearing intermediate pillars 13 may have a differently shaped cross section, selected in accordance with the calculated loadings for this size. In the preferred embodiment (fig. 4) they have a square section because this makes easier their transportation and fitting. The bearing intermediate pillars 13 are arranged in rows parallel to the basic traverse line 17 where the centre line distance 18 of both rows of bearing intermediate pillars 13 shaping the basic traverse line 17 is greater than the other centre distances 18. The bearing intermediate pillars 13 are retained in monolithic footings 20 on foundations by their bottom ribbed end 21, placed in preliminary prepared cups 22 encompassing this ribbed end 21 (fig. 5). The cups 22 have an internal ribbed surface 23 and partial outer ribbing 24, shaped in its bottom end, which is restrained in the monolithic footings 22 (fig. 6)..The short consoles 16 of the bearing intermediate pillars 13 are directed parallel to the basic traverse line 17 and the bearing beams 15 are mounted to them in the same direction. The bearing beams 15 have longitudinal footings 25 on which footings the floor panels 14 are fixed. The floor panels 14 are prestressed precast elements with longitudinal cavities 26. To the at least two-storeyed construction 7 in the preferred embodiment the approach 10 is traced to every floor that may be connected directly to the roadway 2 or to be one to all floors (fig. 1 and 3). Multiple versions to perform the connections are possible, however preferred for antifire reasons is the connection by means of ramps 27 that may be monolithic or made by fitting together elements. In the approach 10 area the bearing intermediate pillars 13 may have a longer lenght enlarged with the length of the storey, their upper part being on the ground level with a cover of a known kind. As a version in this area may be erected additional overground pillars of another known kind that shall be installed independent of the bearing intermediate pillars 13 of the at least two-storeyed construction 7 with their corresponding cover. The at least two-storied construction 7 shall be equipped with safety system, and anti-fire, ventilation and filtration systems, with lightning and drain systems that are not shown on the figures, independent of this school-building 5. Besides the security provision for emergency cases this detachment of the indicated systems allows the accomplishment of additional activities in the premises of the underground construction 7, i.e. car cleaning and washing, eventual sale of some spares and needed accessories, etc.
  • APPLICABILITY OF THE INVENTION
  • The invention is intended for application in densely populated cities and central city areas and may be fulfilled as a new construction and as an additionally inserted structure as it is indicated in the preferred embodiment when done in the following succession:
  • The available pavement (not shown) of the school yard 1 is removed and excavation works are made for the underground structure 7. The earth extracted is transported to a. place designated for that purpose, performing simultaneously reinforcement depending on the depth of the excavation and its proximity to the school-building 5 and various surrounding units if any. Then the at least two-storeyed construction 7 is erected. The supporting walls 12 are erected following the monolithic way and, as usual, the monolithic footings 20 for the bearing intermediate pillars 13 are cast, simultaneously in them are restrained the preliminary prepared cups 22 with inner 23 and partial outer ribbing 24, restraining into the monolithic footings to the level of the partial outer ribbing 24. Then the bearing intermediate pillars 13 are installed into the monolithically attached cups 22, being also monolithically attached there. The bearing beams 15 are arranged and their connection to the short consoles 16 of the bearing intermediate pillars 13 is effected in the known way (preferably by welding). Over the bilateral longitudinal footings 25 of the bearing beams 15 the floor panels 14 are installed so that their longitudinal cavities 26 are placed transversely to the bearing beams 15 thus making their connection. Then the preferred flooring 28 is made. The connections may be made following any of the known ways, however a monolithic connection is preferred. Finally over the last underground level of the at least two-storeyed construction 7 the required pavement is placed, which may be bitumen, "zebran", tiles etc. laying underneath and on the last underground level of the at least two-storeyed construction 7 the corresponding hydroinsulation is laid. It is possible to perform the herewith stated operations for approximately 90 days so that the vacation period of the students could be used without interrupting the regular use of the yard during the education process. The operations of fulfillment of the equipment of the garage and the internal engineering structures are placed in the already outlined space 8 and are detached and independent from the school-building 5 and the yard 1. It is convenient to use electronic systems indicating available parking places. The approach 10 to the underground construction 7 that in this preferred embodiment is a garage has a signal system and is specially secured. The cars of the living in the neighbourhood or of the teachers and students may find place here, as well as cars that visit the central metropolitan area for a part of the day, for which a special regulation may be considered. Thus the problem of cars theft and their equipment is solved as they do not remain on the street.
  • The preferred embodiment described illustrates only one application of the urban complex according to the invention. A lot of other useful for the society spaces may be created in the included in the complex at least two-storied construction 7. The space shaped this way may be used also as exhibition area or a trade center, sports facilities, for common or refrigerated warehouses, computer halls and halls for connection to the global network, civil protection shelters, not requiring sun light industrial premises etc. If used for garages it gives chance to provide a safe access of the students to the school yard and building as the underground construction is approached from the distant side.

Claims (6)

  1. Multifunctional urban complex, comprising a yard, situated between surrounding roadways and railed off by a fence with entrance door seeing to the yard, in which yard a school-building is situated and a sports-, play- and common activities zone is shaped; in this zone, and under the yard level there is a construction to which an approach is shaped, linked to the roadways and situated remotely from the yard fence entrance door characterised in that the construction (7) is at least two-storeyed, and in the approach area (10) there is an at least one-floor over-ground part (11), and the at least two-storeyed construction (7) includes reinforcing walls (12), bearing intermediate pillars (13) and floor panels (14), founding on supporting beams (15), and the bearing intermediate pillars' (13) length matches the height of the at least two-storeyed construction (7), as well as short consoles (16) in the place where the floor is, and the bearing intermediate pillars (13) are arranged in rows, parallel to the basic traverse line (17), and the bearing intermediate pillars (13) are restrained in monolithic footings (20) on foundations by their bottom ribbed end (21) placed in preliminary prepared cups (22) encompassing this ribbed end, which cups (22) have an internal ribbed surface (23) and partial outer ribbing (24), shaped in their bottom edge that is monolithically restrained in the monolithic footings (20), and the short consoles (16) of the bearing intermediate pillars (13) are arranged in direction parallel to the basic traverse line (17) and the bearing beams (15) are mounted to them in the same direction and the bearing beams have longitudinal footings (25) over which the floor panels (14) are affixed, the latter being prestressed precast elements with longitudinal cavities (26).
  2. A multifunctional urban complex according to claim 1, characterised in that the centre distance of two rows bearing intermediate pillars (13) tracing the basic traverse line (17) is greater than the other centre distances.
  3. A multifunctional urban complex according to claims 1 or 2, characterised in that the section of the bearing intermediate pillars (13) is a square.
  4. A multifunctional urban complex according to claims 1, 2 or 3, characterised in that the approach (10) comprises a ramp (27).
  5. A multifunctional urban complex according any of the claims 1 to 4 characterised in that the approach (10) comprises at least one elevator cage and/or staircase for disabled people.
  6. A multifunctional urban complex according to any of the claims 1 to 5, characterised in that the approach (10) comprises a shop section.
EP04761510A 2004-04-06 2004-09-15 Multifunctional urban complex Not-in-force EP1738041B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
BG108667A BG65319B1 (en) 2004-04-06 2004-04-06 Town multifunctional complex
PCT/BG2004/000018 WO2005098171A1 (en) 2004-04-06 2004-09-15 Multifunctional urban complex

Publications (2)

Publication Number Publication Date
EP1738041A1 EP1738041A1 (en) 2007-01-03
EP1738041B1 true EP1738041B1 (en) 2008-02-06

Family

ID=34958997

Family Applications (1)

Application Number Title Priority Date Filing Date
EP04761510A Not-in-force EP1738041B1 (en) 2004-04-06 2004-09-15 Multifunctional urban complex

Country Status (10)

Country Link
US (1) US20080222968A1 (en)
EP (1) EP1738041B1 (en)
JP (1) JP4764873B2 (en)
KR (1) KR20070007886A (en)
AT (1) ATE385533T1 (en)
AU (1) AU2004318257B2 (en)
BG (1) BG65319B1 (en)
DE (1) DE602004011690T2 (en)
ES (1) ES2302014T3 (en)
WO (1) WO2005098171A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2919645A1 (en) * 2007-07-31 2009-02-06 Remy Charles Michel Secured parking area for e.g. heavy truck, has blocks i.e. confined platforms, receiving transporting vehicle that transports dangerous materials of determined category, where each block is provided with run-off fluid collecting unit
CN102140862B (en) * 2011-03-08 2013-12-25 张文举 Ecological energy-saving building
BG66627B1 (en) * 2011-05-20 2017-12-15 "Форма" Еоод Town-planned space structure and a method of its creation
WO2015004545A2 (en) * 2013-07-12 2015-01-15 Satya Venkata Srinivas B Sports theme based property development
CN105735350A (en) * 2016-03-01 2016-07-06 上海市政工程设计研究总院(集团)有限公司 Laterally exposed city underground road structure form
CN108533027A (en) * 2018-04-17 2018-09-14 中铁第四勘察设计院集团有限公司 A kind of rail transport vehicle base structure in combination sponge city

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1830518A (en) * 1931-11-03 Building with facilities for automobile pakking and transportation
US1842740A (en) * 1930-11-22 1932-01-26 Henry L Woolfenden Garage structure
US3422581A (en) * 1966-06-08 1969-01-21 Harold K Allen Dome drive-in theatre
US3708933A (en) * 1971-07-16 1973-01-09 Y Yang Demountable garage building
US4186160A (en) * 1977-01-19 1980-01-29 Landreth George H Method and apparatus for forming building foundations
JPS6347427A (en) * 1986-08-12 1988-02-29 Penta Ocean Constr Co Ltd Construction of structure under groundwater
JPH0737747B2 (en) * 1990-12-18 1995-04-26 株式会社総合駐車場コンサルタント Multistory parking lot
AU677050B2 (en) * 1993-06-10 1997-04-10 Ko Muroi Underground construction
JPH0748845A (en) * 1993-08-05 1995-02-21 Shimizu Corp Execution method for underground structure by artificial ground
JP2579120B2 (en) * 1994-06-09 1997-02-05 旭コンクリート工業株式会社 garage
BG556Y1 (en) * 1995-09-18 2002-08-30 "Форма 1 МП" ЕТ Urban complex
JPH09203239A (en) * 1996-01-25 1997-08-05 Yukihiko Nitta Building method for stockpiling preservation structure for earthquake disaster
JP2002275956A (en) * 2001-03-13 2002-09-25 Abekogyosho Co Ltd Storage equipment and evacuation facility where storage equipment is disposed
US6832452B1 (en) * 2001-07-28 2004-12-21 Robert R. Simens Mega pyramid stadium complex
US20030086574A1 (en) * 2001-11-02 2003-05-08 Roy Higgs Drive-in movie theater

Also Published As

Publication number Publication date
JP2007531838A (en) 2007-11-08
DE602004011690D1 (en) 2008-03-20
ATE385533T1 (en) 2008-02-15
US20080222968A1 (en) 2008-09-18
JP4764873B2 (en) 2011-09-07
AU2004318257B2 (en) 2010-03-25
WO2005098171A1 (en) 2005-10-20
AU2004318257A1 (en) 2005-10-20
ES2302014T3 (en) 2008-07-01
DE602004011690T2 (en) 2009-02-05
BG65319B1 (en) 2008-01-31
BG108667A (en) 2005-10-31
EP1738041A1 (en) 2007-01-03
KR20070007886A (en) 2007-01-16

Similar Documents

Publication Publication Date Title
WO2013147652A2 (en) Metro station and method for constructing same
AU2023202575A1 (en) Beam support cable and building structure
EP1738041B1 (en) Multifunctional urban complex
US20030167725A1 (en) Method for constructing, transporting, and permanently installing modular building
EP3498912B1 (en) Urban transportation and logistics system
CN114277843A (en) Underground passage structure and construction method
JP2987475B2 (en) Multi-story artificial land type house
BG556Y1 (en) Urban complex
Stewart et al. Curved precast facade adds elegance to IJL financial center and parking structure
RU109779U1 (en) PARKING GARAGE
BG1116U1 (en) Multifunctional urban complex
No NOTICE FOR CA
AU2017100222B4 (en) Building Structure
MANZONI THE INNER RING ROAD, BIRMINGHAM.(INCLUDES PLATES).
Zabalueva et al. Building-Bridges and Building-Platforms as Impact Into Sustainable Development of City Architecture
Nisbet TYNE AND WEAR METRO: INTERCHANGES AND SURFACE STATIONS.
RU141316U1 (en) PUBLIC COMPLEX OF THE MUSEUM AND / OR EXHIBITION CENTER ESTABLISHED OVER THE STATION OF THE METRO WITH USE OF THE BACK FILLING ZONE BY THE GROUND
Garg Construction Works Outside the Main Building
Graham Western Michigan University Main Campus Parking Garage
RU2139398C1 (en) Multitier garage complex
Charuet A parking garage shopping center lift-slab construction
Verhoef et al. Change of Identity of “Geldershoofd” in Amsterdam–Bijlmermeer
Williams HEATHROW AIRPORT TERMINAL 4: MANAGEMENT AND CONSTRUCTION.
Trees et al. Basic information
Lipp et al. Austria: Attack on the World Heritage Site “Historic Centre of Vienna”/The Historic Centre of the City of Salzburg/World Heritage Semmering Railway

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20061101

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 602004011690

Country of ref document: DE

Date of ref document: 20080320

Kind code of ref document: P

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2302014

Country of ref document: ES

Kind code of ref document: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080206

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080206

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080206

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080206

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080206

ET Fr: translation filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080707

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080506

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080206

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080206

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080206

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080206

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080206

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20081107

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080206

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080930

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080506

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080206

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080930

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080930

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IE

Payment date: 20090717

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080915

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080807

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080206

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080507

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20100922

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20100907

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20100916

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20101008

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20100930

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100915

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20110915

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110915

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20120531

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602004011690

Country of ref document: DE

Effective date: 20120403

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120403

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110915

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110930

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20130418

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110916