EP1738041B1 - Multifunctional urban complex - Google Patents
Multifunctional urban complex Download PDFInfo
- Publication number
- EP1738041B1 EP1738041B1 EP04761510A EP04761510A EP1738041B1 EP 1738041 B1 EP1738041 B1 EP 1738041B1 EP 04761510 A EP04761510 A EP 04761510A EP 04761510 A EP04761510 A EP 04761510A EP 1738041 B1 EP1738041 B1 EP 1738041B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- construction
- yard
- approach
- intermediate pillars
- storeyed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H14/00—Buildings for combinations of different purposes not covered by any single one of main groups E04H1/00-E04H13/00 of this subclass, e.g. for double purpose; Buildings of the drive-in type
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H3/00—Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
- E04H3/08—Hospitals, infirmaries, or the like; Schools; Prisons
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H3/00—Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
- E04H3/10—Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons for meetings, entertainments, or sports
Definitions
- the invention refers to multifunctional urban complex intended for civil engineering application in urban conditions for the provision of usable areas.
- a multifunctional urban complex is known from BG 556Y Y1, consisting of a yard situated between surrounding roadways and railed off by a fence with entrance door seeing to the yard.
- BG 556Y Y1 consisting of a yard situated between surrounding roadways and railed off by a fence with entrance door seeing to the yard.
- the construction has an approach connected to the roadways.
- the approach area is located remotely from the entrance door of the yard's fence.
- the underground construction is designed with reinforced build-in plates.
- the connection of the approach with the roadway is made with a ramp to provide antifire protection.
- the underground construction is equipped with security system, antifire system, drain, ventilation and filtration systems, as well as lightning systems independent from those of the school building.
- JP 08004343 A A construction of underground garages is also known from JP 08004343 A , consisting of bottom slab and multiple precast reinforced concrete walls, mounted laterally on the bottom slab, with an entrance shaped in the walls for access of the vehicles in the garage.
- the supporting intermediate pillars are arranged regularly in both directions and a monolithic ceiling slab is cast over them with its supporting beams.
- the beams are set on the pillars and are arranged in a perpendicular direction to the way of the vehicles from the entrance to the bottom of the garage.
- the shortcomings of the cited structure consist in the fact that it is intended for one-storey garages only, determined by the connections between the ceiling slab and the columns.
- the location of the monolithic beams transversely to the base line of vehicle motion supposes a definition of a substantial construction height which makes it very expensive.
- the need to fix on place the installation pillars so that the concrete of the ceiling slab and over the beams could be cast simultaneously is another factor that makes the construction extremely expensive and very difficult to erect.
- the monolithic structure of the construction extends the period of its erection, which makes it difficult to apply in the central urban areas.
- the invention is intended to create a multifunctional urban complex allowing the formation of a multifunctional structure in densely populated city areas, providing a space to be used without disturbing the architectural outlook of the city, making possible the erection works in the narrow central parts of the city and providing convenient communications and good safety with the possibility to erect in a short time and with relatively low costs the construction.
- a solution to this task has been found with the multifunctional urban complex that comprises a yard located between surrounding roadways and railed off by a fence with entrance door seeing to the yard.
- a school building is located in the yard and an area for sports, games and common activities is provided. In this area, and under the yard level there is a structure to which an approach is given, connected to the roadways remote from the entrance door in the yard's fence.
- the construction according to the invention is at least two-storeyed with an at least single-storeyed building over the ground level in the approach area.
- the at least two-storeyed construction comprises reinforcing walls, supporting intermediate pillars and floor panels standing on supporting beams.
- the length of the supporting intermediate pillars corresponds to the height of at least two-storeyed building, and the supporting intermediate pillars have also short consoles on the place of the floor.
- the supporting intermediate pillars are arranged in rows parallel to the basic traverse line.
- the bearing intermediate pillars are restrained in monolithic footings on foundations by their bottom ribbed end placed in preliminary prepared cups encompassing this ribbed end.
- the cups have internal ribbed surface and partial outer ribbing in its bottom part which is monolithically fixed in the monolithic footings.
- the short consoles of the bearing intermediate pillars are directed parallel to the basic traverse line, and the bearing beams are mounted to them in the same direction.
- the bearing beams have longitudinal footings on which footings the floor panels are fixed.
- the floor panels are prestressed cast fitting together elements with longitudinal cavities.
- the distance between the center lines of the two rows of bearing intermediate pillars shall pereferably be greater than the distances between the other centre lines.
- bearing intermediate pillars should be of square cross section.
- the approach should preferably include a ramp.
- the approach should preferably comprise at least one elevator cage and/or staircase for disabled people.
- the invention allows to preserve the architectural, urbanization and space structure of the city, making optimal use of the urban territories and the available construction density.
- a possibility is created for multifunctional use of the school yards underground, included for the need of the education process and the needs of the society.
- the rate of use of the city areas is increased.
- the school building remains with its yard to be used according to the urbanization planning available, completely safe and wide enough, with novel pavement, geoplastics, garden design, sculptures, playing spots, etc.
- the mutual disposition of the elements in the multifunctional urban complex and the construction peculiarities of the underground structure allow its building not only as a new construction, but as an ancillary too, which may be fulfilled for a short period of time and does not affect the existing functions of the surrounding buildings and equipment, preserving the underground urban infrastructure too.
- the specialized entrance available with access control equipment provides the safety use of the complex.
- the multifunctional urban complex comprises a yard 1, situated between surrounding roadways 2 and railed off by a fence 3 with entrance door 4 seeing to the yard, in which yard 1 a school-building 5 is situated and a sports-, play- and common activities zone is shaped Fig. 1-3.
- the at least two-storeyed construction 7 occupies a space 8, located under the level of the yard 1 in its area 6 intended for sports, games and common activities. This construction may be situated depending on the reinforcing methods used, i.e. distance from the outline 9 of the school-building 5.
- the at least two-storeyed construction 7 is underground and has an approach 10 that is situated on the distant side of the entrance door 4 of the fence 3 of the yard 1 of the school-building 5: figures 1 and 3.
- the at least two-storeyed construction in the area of the approach 10 has at least one floor over the ground level 11. This ground floor shall be preferably located in the school yard 1 which does not ignore other possibilities too.
- the at least one ground floor 11 is intended for the location of access checkpoints to the underground part of the at least two-storeyed construction 7, as well as the placement of a staircase and elevator for disabled people and/or shops.
- the outline of the at least two-storeyed construction 7 match the outline of the fence 3. This is possible in all individual cases of location of the school-building 5 in the yard 1, although it is not the only possible way to dispose the at least two-storeyed construction 7. It may be located so that its outline does not match the fence outline 3.
- the at least two-storeyed construction 7 comprises reinforcing walls 12, bearing intermediate pillars 13 and floor panels 14, placed on bearing beams 15.
- the length of the bearing intermediate pillars 13 in the case shown corresponds to the length of the at least two-storeyed construction 7. They have short consoles 16 on the place of the floor.
- the bearing intermediate pillars 13 may be erected as high as several floors which is however limited by the possibilities to transport them in the central urban zone for which this invention is intended. If the erection of a multi-storeyed building is needed, the bearing intermediate pillars 13 may be composed by various elements placed one over the other that may be fit together (not shown). This solution shall be used if the conditions imply it.
- the bearing intermediate pillars 13 may have a differently shaped cross section, selected in accordance with the calculated loadings for this size. In the preferred embodiment (fig. 4) they have a square section because this makes easier their transportation and fitting.
- the bearing intermediate pillars 13 are arranged in rows parallel to the basic traverse line 17 where the centre line distance 18 of both rows of bearing intermediate pillars 13 shaping the basic traverse line 17 is greater than the other centre distances 18.
- the bearing intermediate pillars 13 are retained in monolithic footings 20 on foundations by their bottom ribbed end 21, placed in preliminary prepared cups 22 encompassing this ribbed end 21 (fig. 5).
- the cups 22 have an internal ribbed surface 23 and partial outer ribbing 24, shaped in its bottom end, which is restrained in the monolithic footings 22 (fig. 6)..
- the short consoles 16 of the bearing intermediate pillars 13 are directed parallel to the basic traverse line 17 and the bearing beams 15 are mounted to them in the same direction.
- the bearing beams 15 have longitudinal footings 25 on which footings the floor panels 14 are fixed.
- the floor panels 14 are prestressed precast elements with longitudinal cavities 26.
- To the at least two-storeyed construction 7 in the preferred embodiment the approach 10 is traced to every floor that may be connected directly to the roadway 2 or to be one to all floors (fig. 1 and 3). Multiple versions to perform the connections are possible, however preferred for antifire reasons is the connection by means of ramps 27 that may be monolithic or made by fitting together elements.
- the bearing intermediate pillars 13 may have a longer lenght enlarged with the length of the storey, their upper part being on the ground level with a cover of a known kind.
- the at least two-storied construction 7 shall be equipped with safety system, and anti-fire, ventilation and filtration systems, with lightning and drain systems that are not shown on the figures, independent of this school-building 5. Besides the security provision for emergency cases this detachment of the indicated systems allows the accomplishment of additional activities in the premises of the underground construction 7, i.e. car cleaning and washing, eventual sale of some spares and needed accessories, etc.
- the available pavement (not shown) of the school yard 1 is removed and excavation works are made for the underground structure 7.
- the earth extracted is transported to a. place designated for that purpose, performing simultaneously reinforcement depending on the depth of the excavation and its proximity to the school-building 5 and various surrounding units if any.
- the at least two-storeyed construction 7 is erected.
- the supporting walls 12 are erected following the monolithic way and, as usual, the monolithic footings 20 for the bearing intermediate pillars 13 are cast, simultaneously in them are restrained the preliminary prepared cups 22 with inner 23 and partial outer ribbing 24, restraining into the monolithic footings to the level of the partial outer ribbing 24.
- the bearing intermediate pillars 13 are installed into the monolithically attached cups 22, being also monolithically attached there.
- the bearing beams 15 are arranged and their connection to the short consoles 16 of the bearing intermediate pillars 13 is effected in the known way (preferably by welding).
- Over the bilateral longitudinal footings 25 of the bearing beams 15 the floor panels 14 are installed so that their longitudinal cavities 26 are placed transversely to the bearing beams 15 thus making their connection.
- the preferred flooring 28 is made.
- the connections may be made following any of the known ways, however a monolithic connection is preferred.
- the required pavement is placed, which may be bitumen, "zebran", tiles etc.
- the operations of fulfillment of the equipment of the garage and the internal engineering structures are placed in the already outlined space 8 and are detached and independent from the school-building 5 and the yard 1. It is convenient to use electronic systems indicating available parking places.
- the approach 10 to the underground construction 7 that in this preferred embodiment is a garage has a signal system and is specially secured.
- the cars of the living in the neighbourhood or of the teachers and students may find place here, as well as cars that visit the central metropolitan area for a part of the day, for which a special regulation may be considered.
- a special regulation may be considered.
- the preferred embodiment described illustrates only one application of the urban complex according to the invention.
- a lot of other useful for the society spaces may be created in the included in the complex at least two-storied construction 7.
- the space shaped this way may be used also as exhibition area or a trade center, sports facilities, for common or refrigerated warehouses, computer halls and halls for connection to the global network, civil protection shelters, not requiring sun light industrial premises etc. If used for garages it gives chance to provide a safe access of the students to the school yard and building as the underground construction is approached from the distant side.
Landscapes
- Architecture (AREA)
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Residential Or Office Buildings (AREA)
- Road Paving Structures (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Agricultural Chemicals And Associated Chemicals (AREA)
- Steps, Ramps, And Handrails (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Fencing (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
- The invention refers to multifunctional urban complex intended for civil engineering application in urban conditions for the provision of usable areas.
- A multifunctional urban complex is known from BG 556Y Y1, consisting of a yard situated between surrounding roadways and railed off by a fence with entrance door seeing to the yard. There is a school building erected in the yard and an area for sports, games and common activities is shaped. There is at least single-storeyed underground construction, situated completely under the yard level. The construction has an approach connected to the roadways. The approach area is located remotely from the entrance door of the yard's fence. The underground construction is designed with reinforced build-in plates. The connection of the approach with the roadway is made with a ramp to provide antifire protection. The underground construction is equipped with security system, antifire system, drain, ventilation and filtration systems, as well as lightning systems independent from those of the school building.
- The shortcomings of the multifunctional urban complex known in the art are that substantial investments are needed for the use of reinforced build-in plates, the supply of these plates to the site being very difficult due to the place they have to be installed, i.e. in the city centers, where the roadways are relatively narrow and do not allow the use of heavy construction machines for the supply of reinforced build-in plates that are large in size, i.e. covering the distance between the center lines. Control of unauthorized malevolent access to the construction is not provided with the given civil engineering solution.
- A construction of underground garages is also known from
JP 08004343 A - The shortcomings of the cited structure consist in the fact that it is intended for one-storey garages only, determined by the connections between the ceiling slab and the columns. Thus the location of the monolithic beams transversely to the base line of vehicle motion supposes a definition of a substantial construction height which makes it very expensive. The need to fix on place the installation pillars so that the concrete of the ceiling slab and over the beams could be cast simultaneously is another factor that makes the construction extremely expensive and very difficult to erect. The monolithic structure of the construction extends the period of its erection, which makes it difficult to apply in the central urban areas.
- The invention is intended to create a multifunctional urban complex allowing the formation of a multifunctional structure in densely populated city areas, providing a space to be used without disturbing the architectural outlook of the city, making possible the erection works in the narrow central parts of the city and providing convenient communications and good safety with the possibility to erect in a short time and with relatively low costs the construction.
- A solution to this task has been found with the multifunctional urban complex that comprises a yard located between surrounding roadways and railed off by a fence with entrance door seeing to the yard. A school building is located in the yard and an area for sports, games and common activities is provided. In this area, and under the yard level there is a structure to which an approach is given, connected to the roadways remote from the entrance door in the yard's fence. The construction according to the invention is at least two-storeyed with an at least single-storeyed building over the ground level in the approach area. The at least two-storeyed construction comprises reinforcing walls, supporting intermediate pillars and floor panels standing on supporting beams. The length of the supporting intermediate pillars corresponds to the height of at least two-storeyed building, and the supporting intermediate pillars have also short consoles on the place of the floor. The supporting intermediate pillars are arranged in rows parallel to the basic traverse line. The bearing intermediate pillars are restrained in monolithic footings on foundations by their bottom ribbed end placed in preliminary prepared cups encompassing this ribbed end. The cups have internal ribbed surface and partial outer ribbing in its bottom part which is monolithically fixed in the monolithic footings. The short consoles of the bearing intermediate pillars are directed parallel to the basic traverse line, and the bearing beams are mounted to them in the same direction. The bearing beams have longitudinal footings on which footings the floor panels are fixed. The floor panels are prestressed cast fitting together elements with longitudinal cavities.
- The distance between the center lines of the two rows of bearing intermediate pillars shall pereferably be greater than the distances between the other centre lines.
- It is convenient that the bearing intermediate pillars should be of square cross section.
- The approach should preferably include a ramp.
- The approach should preferably comprise at least one elevator cage and/or staircase for disabled people.
- It is possible that the approach could have a shop section.
- The invention allows to preserve the architectural, urbanization and space structure of the city, making optimal use of the urban territories and the available construction density. A possibility is created for multifunctional use of the school yards underground, included for the need of the education process and the needs of the society. The rate of use of the city areas is increased. Simultaneously, the school building remains with its yard to be used according to the urbanization planning available, completely safe and wide enough, with novel pavement, geoplastics, garden design, sculptures, playing spots, etc. The mutual disposition of the elements in the multifunctional urban complex and the construction peculiarities of the underground structure allow its building not only as a new construction, but as an ancillary too, which may be fulfilled for a short period of time and does not affect the existing functions of the surrounding buildings and equipment, preserving the underground urban infrastructure too. There is a high level of completeness of the construction, and no finishing works are needed after the installation of the supporting elements. The specialized entrance available with access control equipment provides the safety use of the complex.
- The invention is clarified with an example illustrated on the figures attached, where
- Fig. 1 is a top view of the multifunctional urban complex according to the invention;
- Fig. 2 is an architecture model of one floor of the underground structure of the urban complex for the case when it is intended for garage;
- Fig. 3 is section A-A of fig. 1;
- Fig. 4 is a partial construction drawing of the location of the bearing elements of the structure;
- Fig. 5 is a vertical section along B-B of fig. 4;
- Fig. 6 is detailed drawing B of fig. 5;
- Fig. 7 is detailed drawing D of fig. 5;
- Fig. 8 is view along E-E of fig. 7.
- The multifunctional urban complex according to the invention comprises a
yard 1, situated between surroundingroadways 2 and railed off by afence 3 with entrance door 4 seeing to the yard, in which yard 1 a school-building 5 is situated and a sports-, play- and common activities zone is shaped Fig. 1-3. There is at least two-storeyed construction 7 in theyard 1 intended in the preferred embodiment for garage. The at least two-storeyed construction 7 occupies aspace 8, located under the level of theyard 1 in itsarea 6 intended for sports, games and common activities. This construction may be situated depending on the reinforcing methods used, i.e. distance from theoutline 9 of the school-building 5. It is appropriate that this distance is at least 3 meters in view of increasing the safetiness not only with regards to the technologic aspect, but with regards to the use too. The at least two-storeyed construction 7 is underground and has anapproach 10 that is situated on the distant side of the entrance door 4 of thefence 3 of theyard 1 of the school-building 5: figures 1 and 3. The at least two-storeyed construction in the area of theapproach 10 has at least one floor over theground level 11. This ground floor shall be preferably located in theschool yard 1 which does not ignore other possibilities too. The at least oneground floor 11 is intended for the location of access checkpoints to the underground part of the at least two-storeyed construction 7, as well as the placement of a staircase and elevator for disabled people and/or shops. In the preferred embodiment shown in figures 1 and 3 the outline of the at least two-storeyed construction 7 match the outline of thefence 3. This is possible in all individual cases of location of the school-building 5 in theyard 1, although it is not the only possible way to dispose the at least two-storeyed construction 7. It may be located so that its outline does not match thefence outline 3. In the example of fig. 2 and 3 the at least two-storeyed construction 7 comprises reinforcingwalls 12, bearingintermediate pillars 13 andfloor panels 14, placed on bearing beams 15. The length of the bearingintermediate pillars 13 in the case shown corresponds to the length of the at least two-storeyed construction 7. They haveshort consoles 16 on the place of the floor. If there are three or more floors, the bearingintermediate pillars 13 may be erected as high as several floors which is however limited by the possibilities to transport them in the central urban zone for which this invention is intended. If the erection of a multi-storeyed building is needed, the bearingintermediate pillars 13 may be composed by various elements placed one over the other that may be fit together (not shown). This solution shall be used if the conditions imply it. The bearingintermediate pillars 13 may have a differently shaped cross section, selected in accordance with the calculated loadings for this size. In the preferred embodiment (fig. 4) they have a square section because this makes easier their transportation and fitting. The bearingintermediate pillars 13 are arranged in rows parallel to thebasic traverse line 17 where thecentre line distance 18 of both rows of bearingintermediate pillars 13 shaping thebasic traverse line 17 is greater than the other centre distances 18. The bearingintermediate pillars 13 are retained inmonolithic footings 20 on foundations by their bottomribbed end 21, placed in preliminaryprepared cups 22 encompassing this ribbed end 21 (fig. 5). Thecups 22 have an internalribbed surface 23 and partialouter ribbing 24, shaped in its bottom end, which is restrained in the monolithic footings 22 (fig. 6)..The short consoles 16 of the bearingintermediate pillars 13 are directed parallel to thebasic traverse line 17 and the bearing beams 15 are mounted to them in the same direction. The bearing beams 15 have longitudinal footings 25 on which footings thefloor panels 14 are fixed. Thefloor panels 14 are prestressed precast elements withlongitudinal cavities 26. To the at least two-storeyed construction 7 in the preferred embodiment theapproach 10 is traced to every floor that may be connected directly to theroadway 2 or to be one to all floors (fig. 1 and 3). Multiple versions to perform the connections are possible, however preferred for antifire reasons is the connection by means oframps 27 that may be monolithic or made by fitting together elements. In theapproach 10 area the bearingintermediate pillars 13 may have a longer lenght enlarged with the length of the storey, their upper part being on the ground level with a cover of a known kind. As a version in this area may be erected additional overground pillars of another known kind that shall be installed independent of the bearingintermediate pillars 13 of the at least two-storeyed construction 7 with their corresponding cover. The at least two-storied construction 7 shall be equipped with safety system, and anti-fire, ventilation and filtration systems, with lightning and drain systems that are not shown on the figures, independent of this school-building 5. Besides the security provision for emergency cases this detachment of the indicated systems allows the accomplishment of additional activities in the premises of theunderground construction 7, i.e. car cleaning and washing, eventual sale of some spares and needed accessories, etc. - The invention is intended for application in densely populated cities and central city areas and may be fulfilled as a new construction and as an additionally inserted structure as it is indicated in the preferred embodiment when done in the following succession:
- The available pavement (not shown) of the
school yard 1 is removed and excavation works are made for theunderground structure 7. The earth extracted is transported to a. place designated for that purpose, performing simultaneously reinforcement depending on the depth of the excavation and its proximity to the school-building 5 and various surrounding units if any. Then the at least two-storeyed construction 7 is erected. The supportingwalls 12 are erected following the monolithic way and, as usual, themonolithic footings 20 for the bearingintermediate pillars 13 are cast, simultaneously in them are restrained the preliminaryprepared cups 22 with inner 23 and partialouter ribbing 24, restraining into the monolithic footings to the level of the partialouter ribbing 24. Then the bearingintermediate pillars 13 are installed into the monolithically attachedcups 22, being also monolithically attached there. The bearing beams 15 are arranged and their connection to theshort consoles 16 of the bearingintermediate pillars 13 is effected in the known way (preferably by welding). Over the bilateral longitudinal footings 25 of the bearing beams 15 thefloor panels 14 are installed so that theirlongitudinal cavities 26 are placed transversely to the bearing beams 15 thus making their connection. Then thepreferred flooring 28 is made. The connections may be made following any of the known ways, however a monolithic connection is preferred. Finally over the last underground level of the at least two-storeyed construction 7 the required pavement is placed, which may be bitumen, "zebran", tiles etc. laying underneath and on the last underground level of the at least two-storeyed construction 7 the corresponding hydroinsulation is laid. It is possible to perform the herewith stated operations for approximately 90 days so that the vacation period of the students could be used without interrupting the regular use of the yard during the education process. The operations of fulfillment of the equipment of the garage and the internal engineering structures are placed in the already outlinedspace 8 and are detached and independent from the school-building 5 and theyard 1. It is convenient to use electronic systems indicating available parking places. Theapproach 10 to theunderground construction 7 that in this preferred embodiment is a garage has a signal system and is specially secured. The cars of the living in the neighbourhood or of the teachers and students may find place here, as well as cars that visit the central metropolitan area for a part of the day, for which a special regulation may be considered. Thus the problem of cars theft and their equipment is solved as they do not remain on the street. - The preferred embodiment described illustrates only one application of the urban complex according to the invention. A lot of other useful for the society spaces may be created in the included in the complex at least two-
storied construction 7. The space shaped this way may be used also as exhibition area or a trade center, sports facilities, for common or refrigerated warehouses, computer halls and halls for connection to the global network, civil protection shelters, not requiring sun light industrial premises etc. If used for garages it gives chance to provide a safe access of the students to the school yard and building as the underground construction is approached from the distant side.
Claims (6)
- Multifunctional urban complex, comprising a yard, situated between surrounding roadways and railed off by a fence with entrance door seeing to the yard, in which yard a school-building is situated and a sports-, play- and common activities zone is shaped; in this zone, and under the yard level there is a construction to which an approach is shaped, linked to the roadways and situated remotely from the yard fence entrance door characterised in that the construction (7) is at least two-storeyed, and in the approach area (10) there is an at least one-floor over-ground part (11), and the at least two-storeyed construction (7) includes reinforcing walls (12), bearing intermediate pillars (13) and floor panels (14), founding on supporting beams (15), and the bearing intermediate pillars' (13) length matches the height of the at least two-storeyed construction (7), as well as short consoles (16) in the place where the floor is, and the bearing intermediate pillars (13) are arranged in rows, parallel to the basic traverse line (17), and the bearing intermediate pillars (13) are restrained in monolithic footings (20) on foundations by their bottom ribbed end (21) placed in preliminary prepared cups (22) encompassing this ribbed end, which cups (22) have an internal ribbed surface (23) and partial outer ribbing (24), shaped in their bottom edge that is monolithically restrained in the monolithic footings (20), and the short consoles (16) of the bearing intermediate pillars (13) are arranged in direction parallel to the basic traverse line (17) and the bearing beams (15) are mounted to them in the same direction and the bearing beams have longitudinal footings (25) over which the floor panels (14) are affixed, the latter being prestressed precast elements with longitudinal cavities (26).
- A multifunctional urban complex according to claim 1, characterised in that the centre distance of two rows bearing intermediate pillars (13) tracing the basic traverse line (17) is greater than the other centre distances.
- A multifunctional urban complex according to claims 1 or 2, characterised in that the section of the bearing intermediate pillars (13) is a square.
- A multifunctional urban complex according to claims 1, 2 or 3, characterised in that the approach (10) comprises a ramp (27).
- A multifunctional urban complex according any of the claims 1 to 4 characterised in that the approach (10) comprises at least one elevator cage and/or staircase for disabled people.
- A multifunctional urban complex according to any of the claims 1 to 5, characterised in that the approach (10) comprises a shop section.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BG108667A BG65319B1 (en) | 2004-04-06 | 2004-04-06 | Town multifunctional complex |
PCT/BG2004/000018 WO2005098171A1 (en) | 2004-04-06 | 2004-09-15 | Multifunctional urban complex |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1738041A1 EP1738041A1 (en) | 2007-01-03 |
EP1738041B1 true EP1738041B1 (en) | 2008-02-06 |
Family
ID=34958997
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP04761510A Not-in-force EP1738041B1 (en) | 2004-04-06 | 2004-09-15 | Multifunctional urban complex |
Country Status (10)
Country | Link |
---|---|
US (1) | US20080222968A1 (en) |
EP (1) | EP1738041B1 (en) |
JP (1) | JP4764873B2 (en) |
KR (1) | KR20070007886A (en) |
AT (1) | ATE385533T1 (en) |
AU (1) | AU2004318257B2 (en) |
BG (1) | BG65319B1 (en) |
DE (1) | DE602004011690T2 (en) |
ES (1) | ES2302014T3 (en) |
WO (1) | WO2005098171A1 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2919645A1 (en) * | 2007-07-31 | 2009-02-06 | Remy Charles Michel | Secured parking area for e.g. heavy truck, has blocks i.e. confined platforms, receiving transporting vehicle that transports dangerous materials of determined category, where each block is provided with run-off fluid collecting unit |
CN102140862B (en) * | 2011-03-08 | 2013-12-25 | 张文举 | Ecological energy-saving building |
BG66627B1 (en) * | 2011-05-20 | 2017-12-15 | "Форма" Еоод | Town-planned space structure and a method of its creation |
WO2015004545A2 (en) * | 2013-07-12 | 2015-01-15 | Satya Venkata Srinivas B | Sports theme based property development |
CN105735350A (en) * | 2016-03-01 | 2016-07-06 | 上海市政工程设计研究总院(集团)有限公司 | Laterally exposed city underground road structure form |
CN108533027A (en) * | 2018-04-17 | 2018-09-14 | 中铁第四勘察设计院集团有限公司 | A kind of rail transport vehicle base structure in combination sponge city |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1830518A (en) * | 1931-11-03 | Building with facilities for automobile pakking and transportation | ||
US1842740A (en) * | 1930-11-22 | 1932-01-26 | Henry L Woolfenden | Garage structure |
US3422581A (en) * | 1966-06-08 | 1969-01-21 | Harold K Allen | Dome drive-in theatre |
US3708933A (en) * | 1971-07-16 | 1973-01-09 | Y Yang | Demountable garage building |
US4186160A (en) * | 1977-01-19 | 1980-01-29 | Landreth George H | Method and apparatus for forming building foundations |
JPS6347427A (en) * | 1986-08-12 | 1988-02-29 | Penta Ocean Constr Co Ltd | Construction of structure under groundwater |
JPH0737747B2 (en) * | 1990-12-18 | 1995-04-26 | 株式会社総合駐車場コンサルタント | Multistory parking lot |
AU677050B2 (en) * | 1993-06-10 | 1997-04-10 | Ko Muroi | Underground construction |
JPH0748845A (en) * | 1993-08-05 | 1995-02-21 | Shimizu Corp | Execution method for underground structure by artificial ground |
JP2579120B2 (en) * | 1994-06-09 | 1997-02-05 | 旭コンクリート工業株式会社 | garage |
BG556Y1 (en) * | 1995-09-18 | 2002-08-30 | "Форма 1 МП" ЕТ | Urban complex |
JPH09203239A (en) * | 1996-01-25 | 1997-08-05 | Yukihiko Nitta | Building method for stockpiling preservation structure for earthquake disaster |
JP2002275956A (en) * | 2001-03-13 | 2002-09-25 | Abekogyosho Co Ltd | Storage equipment and evacuation facility where storage equipment is disposed |
US6832452B1 (en) * | 2001-07-28 | 2004-12-21 | Robert R. Simens | Mega pyramid stadium complex |
US20030086574A1 (en) * | 2001-11-02 | 2003-05-08 | Roy Higgs | Drive-in movie theater |
-
2004
- 2004-04-06 BG BG108667A patent/BG65319B1/en unknown
- 2004-09-15 AU AU2004318257A patent/AU2004318257B2/en not_active Ceased
- 2004-09-15 WO PCT/BG2004/000018 patent/WO2005098171A1/en active IP Right Grant
- 2004-09-15 DE DE602004011690T patent/DE602004011690T2/en active Active
- 2004-09-15 KR KR1020067022931A patent/KR20070007886A/en not_active Application Discontinuation
- 2004-09-15 EP EP04761510A patent/EP1738041B1/en not_active Not-in-force
- 2004-09-15 AT AT04761510T patent/ATE385533T1/en not_active IP Right Cessation
- 2004-09-15 JP JP2007506620A patent/JP4764873B2/en not_active Expired - Fee Related
- 2004-09-15 US US10/599,277 patent/US20080222968A1/en not_active Abandoned
- 2004-09-15 ES ES04761510T patent/ES2302014T3/en active Active
Also Published As
Publication number | Publication date |
---|---|
JP2007531838A (en) | 2007-11-08 |
DE602004011690D1 (en) | 2008-03-20 |
ATE385533T1 (en) | 2008-02-15 |
US20080222968A1 (en) | 2008-09-18 |
JP4764873B2 (en) | 2011-09-07 |
AU2004318257B2 (en) | 2010-03-25 |
WO2005098171A1 (en) | 2005-10-20 |
AU2004318257A1 (en) | 2005-10-20 |
ES2302014T3 (en) | 2008-07-01 |
DE602004011690T2 (en) | 2009-02-05 |
BG65319B1 (en) | 2008-01-31 |
BG108667A (en) | 2005-10-31 |
EP1738041A1 (en) | 2007-01-03 |
KR20070007886A (en) | 2007-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2013147652A2 (en) | Metro station and method for constructing same | |
AU2023202575A1 (en) | Beam support cable and building structure | |
EP1738041B1 (en) | Multifunctional urban complex | |
US20030167725A1 (en) | Method for constructing, transporting, and permanently installing modular building | |
EP3498912B1 (en) | Urban transportation and logistics system | |
CN114277843A (en) | Underground passage structure and construction method | |
JP2987475B2 (en) | Multi-story artificial land type house | |
BG556Y1 (en) | Urban complex | |
Stewart et al. | Curved precast facade adds elegance to IJL financial center and parking structure | |
RU109779U1 (en) | PARKING GARAGE | |
BG1116U1 (en) | Multifunctional urban complex | |
No | NOTICE FOR CA | |
AU2017100222B4 (en) | Building Structure | |
MANZONI | THE INNER RING ROAD, BIRMINGHAM.(INCLUDES PLATES). | |
Zabalueva et al. | Building-Bridges and Building-Platforms as Impact Into Sustainable Development of City Architecture | |
Nisbet | TYNE AND WEAR METRO: INTERCHANGES AND SURFACE STATIONS. | |
RU141316U1 (en) | PUBLIC COMPLEX OF THE MUSEUM AND / OR EXHIBITION CENTER ESTABLISHED OVER THE STATION OF THE METRO WITH USE OF THE BACK FILLING ZONE BY THE GROUND | |
Garg | Construction Works Outside the Main Building | |
Graham | Western Michigan University Main Campus Parking Garage | |
RU2139398C1 (en) | Multitier garage complex | |
Charuet | A parking garage shopping center lift-slab construction | |
Verhoef et al. | Change of Identity of “Geldershoofd” in Amsterdam–Bijlmermeer | |
Williams | HEATHROW AIRPORT TERMINAL 4: MANAGEMENT AND CONSTRUCTION. | |
Trees et al. | Basic information | |
Lipp et al. | Austria: Attack on the World Heritage Site “Historic Centre of Vienna”/The Historic Centre of the City of Salzburg/World Heritage Semmering Railway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20061101 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REF | Corresponds to: |
Ref document number: 602004011690 Country of ref document: DE Date of ref document: 20080320 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2302014 Country of ref document: ES Kind code of ref document: T3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080206 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080206 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080206 Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080206 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080206 |
|
ET | Fr: translation filed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080707 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080506 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080206 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080206 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080206 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080206 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080206 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20081107 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080206 Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080930 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080506 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080206 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080930 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080930 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IE Payment date: 20090717 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080915 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080807 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080206 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080507 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20100922 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20100907 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20100916 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20101008 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20100930 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100915 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20110915 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110915 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20120531 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602004011690 Country of ref document: DE Effective date: 20120403 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120403 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110915 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110930 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20130418 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110916 |