EP1738031A1 - Hydraulic pile cap removal - Google Patents
Hydraulic pile cap removalInfo
- Publication number
- EP1738031A1 EP1738031A1 EP05731118A EP05731118A EP1738031A1 EP 1738031 A1 EP1738031 A1 EP 1738031A1 EP 05731118 A EP05731118 A EP 05731118A EP 05731118 A EP05731118 A EP 05731118A EP 1738031 A1 EP1738031 A1 EP 1738031A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pile
- crack
- fluid
- cut
- level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000012530 fluid Substances 0.000 claims abstract description 44
- 230000002787 reinforcement Effects 0.000 claims abstract description 29
- 239000004567 concrete Substances 0.000 claims abstract description 25
- 230000001939 inductive effect Effects 0.000 claims description 30
- 238000000034 method Methods 0.000 claims description 29
- 239000000463 material Substances 0.000 claims description 11
- 239000011150 reinforced concrete Substances 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000005266 casting Methods 0.000 claims description 3
- 230000008093 supporting effect Effects 0.000 claims description 2
- 230000000977 initiatory effect Effects 0.000 abstract description 3
- 230000000644 propagated effect Effects 0.000 abstract description 2
- 239000006260 foam Substances 0.000 description 10
- 239000004033 plastic Substances 0.000 description 10
- 229920003023 plastic Polymers 0.000 description 10
- 238000000465 moulding Methods 0.000 description 9
- 230000006378 damage Effects 0.000 description 5
- 239000002184 metal Substances 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 238000009412 basement excavation Methods 0.000 description 4
- 229920001971 elastomer Polymers 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 208000027418 Wounds and injury Diseases 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 230000008878 coupling Effects 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000011065 in-situ storage Methods 0.000 description 3
- 208000014674 injury Diseases 0.000 description 3
- 210000003323 beak Anatomy 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000005336 cracking Methods 0.000 description 2
- 230000036541 health Effects 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 239000011800 void material Substances 0.000 description 2
- FBEHFRAORPEGFH-UHFFFAOYSA-N Allyxycarb Chemical compound CNC(=O)OC1=CC(C)=C(N(CC=C)CC=C)C(C)=C1 FBEHFRAORPEGFH-UHFFFAOYSA-N 0.000 description 1
- 241001654170 Caladenia catenata Species 0.000 description 1
- 241000196324 Embryophyta Species 0.000 description 1
- 206010064140 Hand-arm vibration syndrome Diseases 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 125000000484 butyl group Chemical group [H]C([*])([H])C([H])([H])C([H])([H])C([H])([H])[H] 0.000 description 1
- 238000001311 chemical methods and process Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 239000010408 film Substances 0.000 description 1
- 239000012634 fragment Substances 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- ORQBXQOJMQIAOY-UHFFFAOYSA-N nobelium Chemical compound [No] ORQBXQOJMQIAOY-UHFFFAOYSA-N 0.000 description 1
- 238000009527 percussion Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 229920001084 poly(chloroprene) Polymers 0.000 description 1
- 229920002635 polyurethane Polymers 0.000 description 1
- 239000004814 polyurethane Substances 0.000 description 1
- 229920000915 polyvinyl chloride Polymers 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000000246 remedial effect Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000010409 thin film Substances 0.000 description 1
- 238000009966 trimming Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/005—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof removing the top of placed piles of sheet piles
Definitions
- the present invention relates to the breaking of concrete piles in order to remove the surplus concrete cap or head.
- Reinforced concrete piles are widely used in civil engineering for retaining walls and foundations for structures.
- Institution of Civil Engineers “Specification for Piling and Embedding Retaining Walls” published on 17 April 1996 under ISBN 0-7277-2566-1, it is taught to cast a pile to a level above a specified cut-off so that there remains a pile head or cap that must be removed. This is to ensure that: (a) there is a sound concrete connection with the pile when it is incorporated into the remainder of the structure; and
- the concrete comprising the top portion of the pile is of good quality and is not, as would otherwise be the case, contaminated with soil or poorly compacted.
- Asakura also attempts to eliminate the need to use mechanical tools by the use of a hydraulic method.
- a substantially flat metal pipe is placed into the pile cage at the cut-off level. After casting is complete and the concrete has hardened, fluid is supplied with increasing pressure to this pipe to break off the pile cap. The pile cap may then be lifted and removed.
- the metal pipe is annular in plan view and is shown as tied to the pile cage. The coupling for supply of pressurised fluid is shown positioned within the side wall of the pile and excavation would be necessary in order to locate these connectors once the pile had been cast. Crack propagation, especially around the perimeter of the pile, using the Asakura method is unpredictable.
- Skanska teaches a hydraulic method similar to Asakura in which an expandable, ring- shaped element or annular tube is located preferably inside the reinforcement.
- the element is a tube is made of PVC, rubber, polyurethane, neoprene, butyl or other flexible material and is pressurised with water or hydraulic fluid.
- the element is formed of or loaded with HYDROl'HE ® - a material that swells when it comes into contact with water.
- Skanska also states that: "It may also be beneficial to employ the use of a metal loop which is positioned around the outside of the ring-shaped expandable element. This would serve to direct the principal forces generated by the element expansion in a direction which is generally parallel to the axis of the pile.” This loop is not further illustrated or claimed.
- Skanska suggests the use of a frame to mount its expandable element.
- the present invention therefore addresses the technical problem of controlling crack propagation in pile cap removal using hydraulic power.
- the present invention provides a pile cage comprising a reinforcement structure having a first part adapted to remain in a pile, the first part terminating at a predefined cut-off level, and a second part that is protected in order to debond it from concrete cast around it; a crack- inducing ring aligned at the cut-off level; and means for supplying pressurised fluid to the crack- inducing ring; characterised in that the cage further comprises a crack- directing feature on or adjacent the crack- inducing ring and a crack- attracting feature located at the cut-off level outside the crack- inducing ring.
- the preamble of the above claim is based on Skanska or Asakura, but differs from both pieces of prior art in that the crack propagation is controlled and restricted to the cut-off level. This is more effective in achieving a crack in the correct plane than the prior art approach of aiming to ensure that the forces created by the expandable element resolve only parallel to the axis of the pile - usually vertical.
- the application of pressure to a tubular expandable element will produce a radial outward force in all directions. It is difficult to ensure that the pressure at all points around the ring is the same with a single connection point.
- Asakura one end of the metal pipe is closed and the other end is connected to a hose capable of supplying a pressurizing fluid.
- the crack may travel from the ring at any angle up to 45° above or below the cut-off level. If the crack were to travel substantially downwards from the cut-off level in any part of the pile it would result in the crack being formed below the debonded section of the pile head thus precluding the easy removal of the pile head. Inappropriate management of this event in the field could result in a structurally weakened pile. If the crack were to travel substantially upwards from the cut-off level in any part of the pile it would leave a projection that would require further remedial work with percussion tools, thereby negating the main advantage of the invention.
- the crack- inducing ring has a slit or frangible region in a portion of its wall facing towards a centre of the pile.
- a slit is adapted to permit fluid to flow substantially inwardly towards a centre of the pile.
- the crack is propagated and the fluid escapes rather than relying solely on the force created by an expanding metal pipe as described in Asakura. If the Asakura pipe were to burst then its connection with the pile cage would result in the debonding material creating a preferential path for the escape of the fluid.
- the pressurised fluid entering the crack- inducing ring initiates a crack whether by means of the expansion of the ring or directed high pressure water flow or a combination of both effects.
- the crack- attracting feature situated outside the crack- inducing ring ensures that the crack remains substantially planar as it reaches the edge of the pile. By allowing the fluid to flow out towards the centre of the pile, the crack that is initiated is also driven in a substantially planar direction towards the centre of the pile.
- the resultant surface of the concrete is within design tolerances and only minimal trimming is necessary. This greatly reduces the health and safety risks associated with the use of hand operated tools and provides a safer working environment.
- the present invention teaches the use of an assembly comprising a planar support frame having an inner annular member supporting the crack- inducing ring, a concentric outer annular member that is or supports the crack- attracting feature, and a plurality of spaced spokes holding the members together.
- all the essential parts of the invention that enable the pile cap to be removed hydraulically can be assembled together off- site as a single rigid unit. This saves time on- site as the assembly simply has to be lowered over the reinforcement bars and secured in place at the cut-off level. Furthermore, as the outer member of the assembly that fits outside of the reinforcement bars and preferably serves as the crack- attracting feature is in the same horizontal plane as the crack- inducing ring, there is no need for manual alignment By a suitable asymmetric spacing of the spokes, the assembly can be made to fit over various numbers and configurations of reinforcing bars typical of the pile size for which it is made.
- the present invention also provides a method of breaking a reinforced concrete pile comprising the steps of placing a fluid- receiving means into a pile cage at a cut- off level, protecting an upper part of the pile cage with debonding material, casting the pile, and supplying pressurised fluid to the fluid- eceiving means, characterised in that the fluid- receiving means is adapted to permit fluid to flow substantially inwardly towards a centre of the pile at the cut- off level.
- connection point for the fluid supply is preferably located at or near the top of the pile it is easy to access without the need for any excavation.
- connection point at the top of the pile the crack can be formed prior to excavation. This enables the piles to be cracked as soon as they are set, when the concrete is relatively weak and easy to crack. It also reduces the risk of construction plant damaging the main pile body prior to or during excavation and significantly reduces the time spent on the whole piling operation.
- the method of the invention considerably improves the accuracy of the cut.
- Figure 1 shows a vertical section through a pile cast around a first embodiment of a pile cage of the present invention
- Figure 2 shows a horizontal section through the pile cage of Figure 1 at a cut-off level
- Figure 3 shows a cross section of an annular tube that acts as the fluid- receiving means and crack- inducing ring in Figure 1 and 2;
- Figure 4 shows a sectional detail of a connection of the pressurised fluid supply to the tube of Figure 3;
- Figure 5 shows a plan view of the connection of Figure 4.
- Figure 6 shows a plan view of a first embodiment of a support frame for use in creating a pile cage
- Figure 7 shows a vertical section on line B-B of Figure 6 of the support frame after it has been used to create a pile cage
- Figure 8 shows a plan view of a second embodiment of a support frame for use in creating a pile cage
- Figure 9 shows a vertical section on line B-B of Figure 8 of the support frame after it has been used to create a pile cage
- Figure 10 shows a cross section of an alternative embodiment of the annular tube
- Figure 11 shows a vertical section through a pile cast around a third embodiment of a pile cage incorporating crack- inducing plates.
- Figure 12 shows a horizontal section through the pile cage of Figure 11 at a cut- off level
- a pile cage 2 comprises a reinforcement for a pile.
- the reinforcement is typically fabricated from an assembly of rebars 4 held together in the desired configuration by means of a coil or links (not shown). Steel mesh may also be used to create the reinforcement.
- the pile cage 2 has a first part 8 that remains in situ in a cast pile and a second part 10, which will be in a pile head that will be incorporated into reinforced concrete slabs or caps. The first and second parts 8 and 10 are separated by the plane of a cut-off level indicated at 20.
- the rebar 4 of the second part 10 of the reinforcement 2 is protected by means of debonding foam tubing 22.
- debonding foam tubing 22 The type of foam tubing that is slit axially like pipe insulation is preferred as this can be easily assembled to the rebar 4 in order to form a protective layer. Other debonding products or techniques may be employed. The debonding terminates at the cut- off level 20.
- a crack- inducing ring 30 is positioned at the cut-off level 20.
- a crack- inducing ring 30' is shown in profile in Figure 3.
- the ring may have various detailed profiles and these are distinguished in the drawings by different prime superscripts. Where reference is made to any design the reference numeral 30 is used.
- the ring is formed from a tube 30 comprising a length of extruded rubber or plastics tubing with a flattened portion 24 and an axial slit 32 along its length.
- the tube 30 is installed inwardly of the reinforcement structure of the pile cage leaving a sufficiently large central opening to allow passage of a tremmie tube when the concrete is poured. Note that this is not necessary where the pile is constructed using the CFA (continuous flight- auger) piling technique where the concrete column is formed first and the re-inforcement is pushed into it from above. This is a common method for smaller piles.
- CFA continuous flight- auger
- the slit 32 is positioned at the level of the cut-off plane 20 so that it faces the centre of the pile cage.
- the tube 30 can be supported by an inwardly projecting limb 26 of a profile support L bars 28 secured to the sleeved rebars 4 at the correct level.
- a series of, say, six spaced profile support bars 28 are needed for a large pile cage.
- the flattened part 24 of the crack- inducing ring 30 is seated against a face of the limb 26 to ensure the slit 32 is correctly positioned.
- these components are assembled on- site and held together by, for example cable ties and tape.
- the silt 32 is formed between two wedge-shaped fins 34 moulded as part of the tube 30.
- the fins create a beak-like structure 38 that serves as a crack- directing feature.
- the slit 32 is closed by a thin frangible film 36 of rubber material, which is an artefact of the moulding process.
- the crack- inducing ring can be assembled from a length of tubing of an appropriate length, which has been extruded to the required profile.
- the tubing has two free ends 40.
- a pressure supply line hose 50 may be coupled to a free end 40 by inserting it into the open end 40.
- the ends 40 may be taped closed.
- a pressure supply line hose 50 is inserted into one of the two free ends 40 of the length of tubing 30 and secured in place with a plastic cable tie.
- connection piece 42 that also provides a coupling 44 to the pressure supply line hose 50.
- the fins 34 are removed at the ends 40 of the tube to enable the ends 40 to be close- coupled to the connection piece 42 by means of jubilee clips 52 as shown in Figure 5.
- the connection piece 42 has a hole 54 to which the hose 50 is coupled.
- a first end 56 of the hose 50 passes through hole 54 into the piece 42 as shown in Figure 4.
- a flared connection moulding 58 is attached to the exterior of the hose end 56 and is shaped to fit around the exterior of the connection piece 42 in order to ensure a fluid- tight but removable coupling for the hose 50.
- the hose 50 is protected with debonding foam tubing 22 and is attached to a rebar 4 and passes out of the top of the pile cage or is directed out of the cage at a suitable position.
- a remote end 60 of the hose 50 is fitted with a standard connector 64, to enable it to be connected by a pressure line 66 to a pump (not shown).
- a suitable pump for this application for use with very large piles is a MADAN ® Mark 7 air-driven pump capable of producing an output pressure of 240 bar with an air supply of 7 bar.
- a pump that enables the application of pressure to be controlled is preferred so that a pressure appropriate to the size of the pile can be applied. Pressures far less than 240 bar will achieve an acceptable result and the appropriate pressure level can be ascertained by simply ascertained experimentally for any pile size.
- the annular split tube 30 acts as a fluid- receiving means to receive pressurised fluid via the pressure line 64 and hose 50 from the pump.
- the tube 30, because it is embedded in concrete, will initially fill with the fluid.
- As the pressure builds up a crack will be initiated around the tube in the same way as in Asakura, but now the fluid will be forced out between the fins 34 breaking the thin film 36 of rubber material closing the slit thereby permitting the fluid to escape into the pile, providing a jacking mechanism separating the pile head from the remaining pile at the cut-off level.
- the material of the tubing 30 must be sufficiently rigid to avoid being displaced during the concrete pour. This may be achieved by reinforcing that part of the tube wall opposite the slit 32 or inserting a rigid reinforcement link 66 into the tube 30.
- a crack- attracting feature 70 is needed in the cut-off plane 20 outside of the rebars 4.
- a ring of plastics material such as 32 millimetre spiral ducting, hosing or debonding sleeving will serve as a crack- attracting feature 70 and can readily be assembled to the rebar at the appropriate level by means of cable ties as shown in Figures 1 and 2.
- Alternative crack- attracting features 70 can be formed of plastics sections of almost any shape, for example circular, triangular, square or rectangular.
- the dimension of the crack- attracting feature 70 in the cut-off plane 20 should be at least a quarter of the thickness of the nominal cover for the rebar 4 and may be as much as a half of the cover.
- This size of crack- attracting feature 70 considerably improves the effectiveness of the object in preventing the crack generated by the expanding tube 30 and/or escaping pressurised fluid from the slit 32 being directed out of the cut- off plane 20.
- the crack- attracting feature 70 should be semi-rigid or rigid in order to maintain its position during the concreting operations.
- the reinforcement for such piles may only comprise vertical rebars 4 spaced around the periphery of the pile with nominal helical ties. Depending on the specification there may be four, five, six or more rebars.
- the solution is to provide an assembly 110 on a support frame 112 that can be dropped over the ends of the rebars 4 as a completed assembly of frame, crack- inducing ring 30? and crack- attracting feature 70.
- Two such designs are illustrated in Figures 6 to 9.
- a wire assembly 110 comprises a frame 112 made of an inner member 114 and an outer concentric member 116.
- the inner and outer members 114 and 116 are joined together by spokes 118.
- the inner member 114 shown in Figure 6 consists of two annular wires 122 and 124 also connected by the spokes 118.
- This support frame is adapted to be used with a crack- inducing ring made of a tube 30 with a flattened base 24 and grooves 120 along its length either side of the flattened base 24 as shown in Figure 7.
- the wires 122 and 124 fit into the grooves 120 to locate and secure the tube 30 in position.
- the bare outer member 116 cannot function as the crack- attracting feature as it is too small.
- it provides a support for a crack control ring 70 made of clear plastics reinforced hose.
- the outer member 116 may be sleeved in debonding material with a large diameter to act as the crack control ring 70.
- the wire frame must be assembled by welding the wires and this adds to the cost. Therefore an alternative solution is provided by the plastics member illustrated in Figures 8 and 9.
- the inner and outer members 114 and 116 are moulded together with the spokes 118.
- the inner member 114 serves as a support for a flattened base of the tube 30 and the outer member 116 can have sufficient width to be the crack- attracting feature 70.
- the flat plastics support frame 112 is cheaper to mass produce than the wire frame and has greater rigidity and eliminates all manual alignment issues except the positioning of the assembly 110 as a unit at the cut-off level 20.
- the profile of the tube 30'? used with the flat plastics frame has a beak 38 that places the slit 32 in the same plane as the outer member 116 so that the crack directed by the beak 38 will be in the cut-off level 20.
- frames 110 that can be used with a variety of rebar designs possible with the pile diameter for which the frame 112 has been manufactured. This can be achieved by positioning the spokes 118 asymmetrically as shown in Figures 6 and 8 rather than giving them a uniform spacing.
- the rebar positions for a variety of designs have been shown with different chain lines and it is clear that the same spoke positions will allow one design to fit over all the illustrated designs.
- the spokes are at 59°, 59°, 84°, 84° and 74° spacings clockwise from the line B- B.
- Figure 8 an alternative design is shown where the spokes 118 are at 84°, 59°, 75°, 71° and 71° spacings clockwise from the line B-B.
- the assembly 110 is fitted to the pile cage 2 by lowering it over the rebars 4 and securing it in position at the cut-off level 20.
- the outer ring 116 fits outside reinforcement structure 4 and the inner ring 114 fits inside the reinforcement structure 4.
- Figure 10 illustrates a cross section through an alternative design of split tube 30 that does not require a special extrusion as shown in Figures 1 to 9.
- the tube has a simple slit 32 cut into it and a 10 millimetr wire reinforcement link 80 located within the tube 30.
- a folded piece of ribbed plastic sheeting 82 is inserted along its length.
- the sheeting 82 has a W shaped cross section as shown in Figure 10 with the free ends 84, 86 held against the inner wall of the tube 30 at either side of the slit 32, and a longer central fold 88 protruding through the slit 32 in order to keep it open.
- a number of these spacers 82 can be positioned around the periphery of the ring all facing inwardly.
- the projecting fold 88 will act as a crack- directing feature to promote cracking in the plane of the cut-off plane 20.
- each hose 50 has a free end 56 which teiminates within a compressible cavity 90 that has a peripheral projecting feature 92.
- Each of these devices is a crack initiating plate.
- three plates 90 can be positioned around the periphery of the pile inwardly of the rebars 4. The plates 90 need to be spaced away from the debonding foam 22 in order to prevent that foam becoming a preferential path for escaping fluid.
- a U shaped annular flow control moulding, 96 for example a moulding similar in form and construction to a bicycle tyre is fitted in the cut-off plane 20 in order to receive any fluid escaping from the plates 90 and to restrict its flow.
- a moulding in the form of a tyre makes a suitable flow control shield to prevent fluid reaching the debonding foam.
- the combination of the plates 90 and the flow controller 96 acts as the fluid- receiving means.
- the reinforcement 2 is prefabricated and the second part 10 of the reinforcement has debonding tubing foam 22 carefully fitted to the rebar 4 above the cut off level 20.
- the fluid- receiving means either tube 30 or assembly of plates 90 and flow controller 96 is fitted inwardly of the reinforcement and secured to the debonded rebar 4.
- the slit 32 of the tube 30 is positioned facing towards the centre of the pile at the required cut-off level 20.
- a crack- attracting feature is also fitted outwardly of the reinforcement. Where a prefabricated assembly 110 is used this is fitted over the reinforcement and secured to the debonded rebar 4 at the required cut- off level 20.
- the hose 50 is then connected to the fluid- receiving means as previously described.
- the hose 50 is protected by debonding foam 22 and passed out of the top or side of the pile cage 2.
- the hose 50 and the debonding foam 22 are kept in place by attaching them to a rebar 4.
- the pile is bored to the desired depth and fully assembled cage 2 installed.
- the pile is then concreted resulting in a pile as illustrated in Figure 1 or 11.
- the pile is cast as a single reinforced column 100 comprising a structural element 102 that will remain in place and a pile head or cap 104 that will be removed.
- the pile is allowed to set for typically two to five days.
- the connector 64 is connected to a pump (not shown).
- the pump pumps pressurised water down the hose 50 into the fluid- receiving means 30.
- the pressure exerted by the fluid entering the connection piece 42 ensures a tight connection between the connection piece 42 and the flared connection moulding 58 reducing the amount of fluid escaping out of the hole 54.
- the pressure also ensures a tight connection between the flared connection moulding 58 and the surrounding concrete preventing the exterior of the hose 50 and the surrounding foam 22 becoming a preferential path for escaping fluid.
- the pressure of the fluid expands the tube 30 initiating a crack on either side.
- the fins 34 create a feature from which the crack will naturally propagate in the cut-off plane 20.
- a series of apertures or perforations may be provided at the cut- off level 20.
- a projecting fin or other formation adapted to lie in the cut-off plane 20 may be provided between the apertures in order to ensure that the crack propagates in the correct plane.
- crack- inducing plates 90 may comprise a compressible void- former of the required shape.
- a void is formed at the interface between the concrete and the void- former and this opens up a path for the fluid received by the plate 90 to flow into.
- a crack will be initiated by the feature 92.
- the fluid will then pass along this void and crack creating a jacking mechanism and induces the crack in the cut-off plane.
- pile cage and pile cap removal system allows the programme of pile cap removal to be shortened considerably relative to existing methods.
- the hydraulic pump if air powered, can readily be moved from pile to pile with its compressed air supply.
- the time taken to split a pile using this method can be reduced to minutes.
- the removed pile heads can then be lifted away separately as the programme permits.
- the positioning of the connectors 64 in an upper surface means that the piles do not need to be excavated before being split.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Shaping Metal By Deep-Drawing, Or The Like (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB0408364A GB2413350B (en) | 2004-04-14 | 2004-04-14 | Hydraulic pile cap removal |
PCT/GB2005/050049 WO2005100698A1 (en) | 2004-04-14 | 2005-04-12 | Hydraulic pile cap removal |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1738031A1 true EP1738031A1 (en) | 2007-01-03 |
EP1738031B1 EP1738031B1 (en) | 2010-01-27 |
Family
ID=32320846
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP05731118A Not-in-force EP1738031B1 (en) | 2004-04-14 | 2005-04-12 | Hydraulic pile cap removal |
Country Status (7)
Country | Link |
---|---|
US (1) | US20070215383A1 (en) |
EP (1) | EP1738031B1 (en) |
AT (1) | ATE456708T1 (en) |
AU (1) | AU2005233368A1 (en) |
DE (1) | DE602005019146D1 (en) |
GB (1) | GB2413350B (en) |
WO (1) | WO2005100698A1 (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2344050B1 (en) * | 2009-02-13 | 2012-01-12 | Universidad De Granada | PILOTS WITH ASYMMETRIC ARMOR FOR LAND CONTAINMENT. |
JP6211345B2 (en) * | 2013-08-19 | 2017-10-11 | 鹿島建設株式会社 | Pile head processing method and lifting jig |
JP6250430B2 (en) * | 2014-02-19 | 2017-12-20 | 株式会社エアーテック | Pile head treatment method and pile head buried bag used for pile head treatment |
JP6460917B2 (en) * | 2015-06-08 | 2019-01-30 | 株式会社熊谷組 | Pile head processing method and bag assembly provided for its implementation |
GB201602911D0 (en) * | 2016-02-19 | 2016-04-06 | Novais Willian M S | A Device |
CN110820742A (en) * | 2019-11-13 | 2020-02-21 | 贵州省公路工程集团有限公司 | Construction method for breaking underwater cast-in-place pile head |
CN111456006B (en) * | 2020-04-22 | 2022-04-15 | 中铁第五勘察设计院集团有限公司 | Method for breaking existing cast-in-place pile |
CN112854217B (en) * | 2021-01-14 | 2022-03-04 | 中建八局广西建设有限公司 | Pile head breaking assisting device and pile foundation pile head isolating method |
CN113174953B (en) * | 2021-04-30 | 2022-08-16 | 广东君豪高科地下空间建设有限公司 | Pretreatment structure of super-irrigation part of pile top of cast-in-place pile |
CN113585263B (en) * | 2021-07-28 | 2023-07-28 | 中建五局第三建设有限公司 | Pile head breaking equipment and pile head breaking method |
CN117988336B (en) * | 2024-04-07 | 2024-06-14 | 山东雷石工程建设有限公司 | Temporary storage type pile cutting machine for engineering |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS56131712A (en) * | 1980-03-17 | 1981-10-15 | Kensuke Asakura | Removing method of defective concrete at upper part of pile when driving pile in site |
JPS58204216A (en) * | 1982-05-24 | 1983-11-28 | Sekisui Jushi Co Ltd | Treatment of head of on-site concrete pile |
JPS58213916A (en) * | 1982-06-07 | 1983-12-13 | Shimizu Constr Co Ltd | Treatment of head of on-site pile |
JPS59192124A (en) * | 1983-04-13 | 1984-10-31 | Tobishima Kensetsu Kk | Pile head treatment and multiple tube therefor |
JPS6047119A (en) * | 1983-08-22 | 1985-03-14 | Mitsuhiro Ishii | Vibration and noise-free breaking of head of cast-in-place pile |
JPS61176716A (en) * | 1985-01-31 | 1986-08-08 | Arao Kk | Concrete breaker |
GB8610617D0 (en) * | 1986-04-30 | 1986-06-04 | Pilecon Eng Berhad | Piling |
GB0302860D0 (en) * | 2003-02-07 | 2003-03-12 | Cementation Found Skanska Ltd | Pile breaking |
-
2004
- 2004-04-14 GB GB0408364A patent/GB2413350B/en not_active Expired - Fee Related
-
2005
- 2005-04-12 AU AU2005233368A patent/AU2005233368A1/en not_active Abandoned
- 2005-04-12 AT AT05731118T patent/ATE456708T1/en not_active IP Right Cessation
- 2005-04-12 DE DE602005019146T patent/DE602005019146D1/en active Active
- 2005-04-12 US US11/578,474 patent/US20070215383A1/en not_active Abandoned
- 2005-04-12 WO PCT/GB2005/050049 patent/WO2005100698A1/en active Application Filing
- 2005-04-12 EP EP05731118A patent/EP1738031B1/en not_active Not-in-force
Non-Patent Citations (1)
Title |
---|
See references of WO2005100698A1 * |
Also Published As
Publication number | Publication date |
---|---|
ATE456708T1 (en) | 2010-02-15 |
WO2005100698A1 (en) | 2005-10-27 |
GB0408364D0 (en) | 2004-05-19 |
GB2413350B (en) | 2006-04-05 |
DE602005019146D1 (en) | 2010-03-18 |
WO2005100698B1 (en) | 2006-03-02 |
EP1738031B1 (en) | 2010-01-27 |
AU2005233368A1 (en) | 2005-10-27 |
US20070215383A1 (en) | 2007-09-20 |
GB2413350A (en) | 2005-10-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1738031B1 (en) | Hydraulic pile cap removal | |
KR101793037B1 (en) | Construction method of permanent wall with retaining wall combined PHC pile and steel pipe | |
WO1981002757A1 (en) | Method of removing top part of cast-in-place concrete pile | |
WO2004070121A1 (en) | Techniques for pile breaking | |
JP3453664B2 (en) | Shaft construction method | |
JP4048326B2 (en) | Pile head processing method | |
JP4414898B2 (en) | Construction method for joints of water shielding material that can check water-stopping | |
JPS6354093B2 (en) | ||
JPH08209686A (en) | Pile head processing tool and pile head processing construction method for cast-in-place pile | |
JP3696294B2 (en) | Hollow foundation foundation method using air bag | |
KR102581402B1 (en) | Rapid pile head treatment method using flat jack | |
EP1473413A1 (en) | Pile cap removal | |
JPH10219680A (en) | Work execution method of cast-in-place concrete pile | |
CN212294659U (en) | Auxiliary device is abolished to bored concrete pile head convenient to dismantle | |
KR0124132B1 (en) | Method of manufacturing hollow concrete pile and apparatus for manufacturing the same | |
KR102526362B1 (en) | Apparatus for constructing downward vertical structure | |
JP2009121218A (en) | Pile head separating method | |
KR102575701B1 (en) | A method of open cut excavation tunnel using a messer plate | |
JPH08120676A (en) | Earth retaining timbering detaching method and device therefor | |
JP6899277B2 (en) | Construction method of anchor members and soil structures | |
GB2329914A (en) | A method of combating soil movement in foundation trenches | |
GB2417278A (en) | Method and apparatus for trimming concrete foundations | |
JP4683800B2 (en) | Pile head treatment tool and pile head treatment method | |
JP3459917B1 (en) | Composite caisson structure and method of constructing composite caisson | |
JPS62233339A (en) | Setting of underground structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20061114 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR |
|
17Q | First examination report despatched |
Effective date: 20070220 |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAC | Information related to communication of intention to grant a patent modified |
Free format text: ORIGINAL CODE: EPIDOSCIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REF | Corresponds to: |
Ref document number: 602005019146 Country of ref document: DE Date of ref document: 20100318 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20100127 |
|
LTIE | Lt: invalidation of european patent or patent extension |
Effective date: 20100127 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100527 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100508 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100527 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100428 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100430 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100427 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20101028 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100412 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100430 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100412 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100728 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100127 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20150318 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20150227 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20150420 Year of fee payment: 11 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602005019146 Country of ref document: DE |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20160412 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20161230 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160412 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160502 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20161101 |