EP1699999B2 - Method and system for controlling power consumption during a rock drilling process and a rock drilling apparatus therefore - Google Patents
Method and system for controlling power consumption during a rock drilling process and a rock drilling apparatus therefore Download PDFInfo
- Publication number
- EP1699999B2 EP1699999B2 EP04820890.4A EP04820890A EP1699999B2 EP 1699999 B2 EP1699999 B2 EP 1699999B2 EP 04820890 A EP04820890 A EP 04820890A EP 1699999 B2 EP1699999 B2 EP 1699999B2
- Authority
- EP
- European Patent Office
- Prior art keywords
- power
- flush
- rock drilling
- hole depth
- percussion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 63
- 239000011435 rock Substances 0.000 title claims abstract description 57
- 238000000034 method Methods 0.000 title claims abstract description 49
- 230000008569 process Effects 0.000 title claims abstract description 22
- 238000009527 percussion Methods 0.000 claims abstract description 15
- 238000011010 flushing procedure Methods 0.000 claims abstract description 10
- 230000006870 function Effects 0.000 claims description 11
- 238000001816 cooling Methods 0.000 description 6
- 239000000446 fuel Substances 0.000 description 6
- 230000008901 benefit Effects 0.000 description 5
- 238000005520 cutting process Methods 0.000 description 5
- 239000000654 additive Substances 0.000 description 2
- 230000000996 additive effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
Definitions
- the invention relates to a method for controlling power consumption during a rock drilling process of the kind defined in the preamble of claim 1.
- the invention further relates to a system and a rock drilling apparatus of the kind defined in the preamble of claims 8 and 15, respectively.
- Rock drilling apparatuses may be used in a number of fields.
- rock drilling apparatuses may be used in tunnelling, underground mining, rock reinforcement, raise boring, and for drilling of blast holes, grout holes and holes for installing rock bolts.
- Rock drilling is often performed by percussion rock drilling, in which a drill tool mounted at one end of a drill rod is provided with impact pulses by a hammer piston, arranged on the opposite side of the drill rod, and arranged to be powered to repeatedly impact upon the drill rod. At the outermost end of the drill tool there are drill bits that penetrate the rock and break it upon the impacts by the hammer piston.
- the drill tool also may be pressed against the rock to maintain contact between the tool and the rock in order to make sure that as much impact energy as possible from the hammer piston is transmitted to the rock.
- the drill tool may further be rotated somewhat between the impacts so that the drill bits hit a new location at every impact.
- the drill cuttings are flushed away from the hole with a suitable medium.
- This medium usually is air in surface drilling apparatuses, water in underground working apparatuses. Alternatively, watermist with or without a chemical additive may be used in both types of apparatuses.
- the rock drilling apparatus further comprises main power supply means, such as a diesel engine that is used to produce power for power requiring functions of the rock drilling apparatus.
- main power supply means such as a diesel engine that is used to produce power for power requiring functions of the rock drilling apparatus.
- These functions may include a compressor for producing flushing pressure/flow, percussion power, rotational power, feeding power, feeding rate, hydraulic pumps, cooling fans.
- Rock drilling may further be carried out by apparatuses utilising only rotation and applied pressure to break the rock, or apparatuses only utilising rotation to break the rock.
- the main power supply means is dimensioned such that all functions may be used using their maximum output power rate simultaneously at all times to ensure proper function.
- a problem with existing rock drilling equipment is that they often consume more power than necessary during a drilling process, which results in excessive fuel consumption, and heat and noise generation.
- US-B-6637522 discloses a method for controlling power consumption during a rock drilling process with a rock drilling apparatus, wherein the rock drilling apparatus includes main power supply means for supplying power for the rock drilling process, which includes at least the sub-processes of percussion and/or rotation and flushing. If there is an increase in flush pressure above a threshold, e.g., due to the flushing mechanism being about to getting clogged, the feed pressure, rotation pressure and/or percussion pressure can be reduced so that clogging, with costly downtime for cleaning as result, can be avoided.
- Another object of the present invention is to provide a system for controlling power consumption during a rock drilling process, which solves the above mentioned problem. This object is achieved by a system as defined in the characterising portion of claim 11.
- the method for controlling power consumption during a rock drilling process with a rock drilling apparatus includes adjusting the flush power at least partly as a function of hole depth, and controlling at least the percussion power and/or rotational power and the flush power such that the total power consumption of each sub-process is controlled such that the power output from the main power supply means is kept at or below a predetermined level.
- the flush power may further be adjusted at least partly as a function of hole diameter and/or diameter of the drill rod.
- the flow of the flush medium may be kept substantially constant throughout the drilling process, i.e. the flush power increases with increased hole depth.
- the hole depth is further continuously measured. This has the advantage that the flow may be kept at precisely the flow level needed for managing to flush the drill hole, and thus the flush power may be kept at lowest possible value throughout the drilling process, at all times.
- the flow of the flush medium may be increased at least slightly with increasing hole depth. This has the advantage that as the hole depth increases, the flow may be increased somewhat in order to further compensate for the hole depth and/or drill rod joints and/or drill cuttings tending to get stuck on the wall of the drill hole.
- the required flush power may be determined by computer means.
- the computer means may be connected to a memory in which is stored a table comprising one or more of lists of types of drill tools and/or types of drill rods, and preferably calculation parameters to be used with a selected combination.
- the flush power may be determined based on stored data concerning type of drill tool and/or type of drill rod and/or hole depth. This has the advantage that the flow of the flush medium may be kept at a desired value independent of for example which drill tool diameter and/or drill rod diameter that is used.
- the invention may be used in conventional rock drilling apparatuses, for example in apparatuses utilising percussion or rotation or a combination thereof.
- Fig. 1 depicts an exemplary rock drilling apparatus according to the present invention.
- a rock drilling apparatus 1 in this exemplary a surface drill rig.
- the drill rig 1 is shown in use drilling a hole 2, starting from a ground level, at present having reached a depth a and destined to result in a hole of depth ⁇ , for example 30 meters, the finished hole being indicated by interrupted lines.
- the shown relation of drill rig height/hole depth is not intended to be exact.
- the total height y of the drill might for example be 10 meters.
- the drill rig 1 is provided with a top hammer 11 mounted via a rock drill cradle 13 on a feed 5.
- the feed 5 is attached to a boom 15 via a feed holder 12.
- the top hammer 11 provides percussive action to a drill tool 3 with one or more drill bits 4 via a drill rod 6 supported by a rod support 14.
- the top hammer 11 is power supplied from a hydraulic pump 10, driven by a diesel engine 9, via a conduit attached to the feed 5 (the hydraulic feed is not shown in the figure).
- the drill cuttings are flushed out of the hole 2 by compressed air that is fed through a tube, preferably in the center of the drill rod 6, and is discharged near the drill tool 3.
- the compressed air flushes the drill cuttings upwards through and out of the hole 2, as indicated by the upwardly directed arrows in fig 1 .
- other flushing media may be used as well, for example watermist with or without a chemical additive.
- the compressed air is fed to the drill rod 6 from a compressor 8 via a tube 7.
- the compressor 8, in turn is powered by the diesel engine 9.
- the diesel engine 9 has to be large enough to be able to simultaneously drive both the compressor and the hydraulic pump at full rate as well as cooling fans and other appliances.
- the compressor is always driven at or near its maximum rate during drilling, and since the compressor may consume for example 120 hp of a diesels total output of for example 300 hp, the compressor consumes a large amount of fuel, which results in the generation of large amounts of exhaust gases and of noise and heat, which further results in even more noise and fuel consumption due to the fact that cooling fans need to be driven harder.
- these drawbacks may be reduced by driving the compressor at the power level that is currently required.
- the flush power that is required to produce a flow of the flush medium being sufficient to evacuate the drill cuttings is relatively small, and thus the compressor need not deliver more than this required power.
- the diesel engine in turn can be driven with reduced power output, thus resulting in decreased fuel consumption, less generated heat and less generated noise.
- the power thus saved by driving the compressor with reduced input power may be used to allow more power to be allocated to the top hammer than otherwise is possible, which results in faster drilling in the first and/or most part of the hole.
- the compressor power reduction may be accomplished in different ways depending on compressor type.
- the power may be reduced by either reducing the R.P.M. or unloading the compressor by shutting the inlet.
- FIG. 2 showing a block diagram of a control system.
- the figure shows a drill rig 21 with a diesel engine 22.
- the diesel engine is directly or indirectly connected to a compressor 23, a hydraulic pump 29, cooling fan(s) 24, other appliance(s) 25, a top hammer 26 and a controller 27, such as a computer.
- the controller is further connected to the compressor 23 and/or the hydraulic pump and/or the cooling fans(s) 24 and/or of the appliances 25.
- a sensor 28 for example mounted on the feed, provides the controller 27 with information regarding the current hole depth, and the controller 27 then transmits, for example via a CAN bus, control signals to the compressor 23 including information about which power/pressure it should deliver in order to produce a desired flow of the flush medium.
- the controller may further send control signals to the diesel engine and/or cooling fans(s) and/or other appliances as needed, for example desired power values.
- the controller 27 may include a memory 30 in or connected to it, in which is stored desired values for the compressor settings versus hole depths so that the compressor may be correctly adjusted. Alternatively or in addition, there may further be stored calculation parameters to be used with the hole depth to calculate a desired compressor power.
- calculation parameters may be dependent on type of drill tool and/or type of drill rod. Preferably calculation parameters are stored for each possible combination of drill tool and/or drill rod. In an alternative embodiment there are listings stored in the memory, wherein each listing includes compressor settings versus depth for each combination. For example, there may be values stored for each cm or dm or m increased hole depth. It is also possible to store values resulting in an increasing flow as the hole depth increases in order to compensate for the factors mentioned above.
- a sensor sensing the actual flow may be connected to the controller, which enables the controller to continuously send control signals to the compressor based on the flow values.
- the flow may for example be calculated as litres per revolution of the compressor * revolutions per minute (R.P.M) * working time/total time.
- the desired flow may in an alternative exemplary embodiment be set by the operator by setting a value on a control or by inputting a desired value to the controller via a man machine interface such as a display and/or a keyboard.
- the present invention has for example the advantage that when drilling narrow holes, the compressor need not be working at full power at all during the drilling process, thus resulting in a fuel save and/or extra power for the top hammer throughout the drilling process.
- the invention has been described in connection with a surface drill rig with a hydraulic top hammer drill rig.
- the present invention may, however, equally well be used with any other type of drilling apparatus with separately powered flushing and drilling.
- the invention may be used with rock drilling apparatuses utilising both percussion and rotation to perform the rock drilling.
- the invention may also be used in rock drilling where only rotation and applied pressure is utilised to break the rock, or where only rotation is used, which for example might be the case in soft rock drilling, such as in coal mines. In the cases where rotation is used to break the rock, the power saved from reduced flushing may be utilised for faster rotation and thereby faster drilling.
- sensors for example temperature sensors, may be connected to the controller in order to provide it with information useful in controlling the operation of the rock drilling apparatus.
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE0303548A SE526923C2 (sv) | 2003-12-29 | 2003-12-29 | Metod, system och anordning för att styra effektförbrukningen under en bergborrningsprocess |
PCT/SE2004/001758 WO2005064111A1 (en) | 2003-12-29 | 2004-11-29 | Method and system for controlling power consumption during a rock drilling process and a rock drilling apparatus therefore |
Publications (3)
Publication Number | Publication Date |
---|---|
EP1699999A1 EP1699999A1 (en) | 2006-09-13 |
EP1699999B1 EP1699999B1 (en) | 2009-04-08 |
EP1699999B2 true EP1699999B2 (en) | 2017-04-05 |
Family
ID=30768861
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP04820890.4A Active EP1699999B2 (en) | 2003-12-29 | 2004-11-29 | Method and system for controlling power consumption during a rock drilling process and a rock drilling apparatus therefore |
Country Status (15)
Country | Link |
---|---|
US (1) | US20070089907A1 (pt) |
EP (1) | EP1699999B2 (pt) |
JP (1) | JP4759520B2 (pt) |
CN (1) | CN1890452B (pt) |
AT (1) | ATE428044T1 (pt) |
AU (1) | AU2004309309B2 (pt) |
BR (1) | BRPI0417711B1 (pt) |
CA (1) | CA2546364C (pt) |
DE (1) | DE602004020511D1 (pt) |
ES (1) | ES2322367T3 (pt) |
NO (1) | NO336946B1 (pt) |
RU (1) | RU2367767C2 (pt) |
SE (1) | SE526923C2 (pt) |
WO (1) | WO2005064111A1 (pt) |
ZA (1) | ZA200604179B (pt) |
Families Citing this family (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7395788B2 (en) * | 2005-03-22 | 2008-07-08 | Atlas Copco Rock Drills Ab | Drill rig and a method for controlling a fan therein |
SE530829C2 (sv) * | 2005-06-17 | 2008-09-23 | Atlas Copco Rock Drills Ab | Metod, system och bergborrningsanordning för styrning av effektförbrukning under en bergborrningsprocess |
FI123636B (fi) | 2006-04-21 | 2013-08-30 | Sandvik Mining & Constr Oy | Menetelmä kallionporauslaitteen toiminnan ohjaamiseksi ja kallionporauslaite |
FI118778B (fi) * | 2006-06-01 | 2008-03-14 | Sandvik Mining & Constr Oy | Menetelmä kallionporauslaitteen toiminnan ohjaamiseksi ja kallionporauslaite |
US20080203734A1 (en) * | 2007-02-22 | 2008-08-28 | Mark Francis Grimes | Wellbore rig generator engine power control |
SE531521C2 (sv) * | 2007-09-07 | 2009-05-05 | Svenska Maskin Och Tryckluft I | Anordning vid utförande av borrning i jordlager och berg |
US20090312885A1 (en) * | 2008-06-11 | 2009-12-17 | Buiel Edward R | Management system for drilling rig power supply and storage system |
JP5396467B2 (ja) * | 2009-04-29 | 2014-01-22 | アトラス コプコ ロツク ドリルス アクチボラグ | 削岩装置における空気流監視構造及び空気流監視方法 |
US8646549B2 (en) * | 2009-10-08 | 2014-02-11 | Atlas Copco Drilling Solutions Llc | Drilling machine power pack which includes a clutch |
US8443916B2 (en) * | 2009-12-17 | 2013-05-21 | Caterpillar Global Mining Equipment Llc | Hose tensioner for a rock drill system |
EP2369127A1 (en) * | 2010-03-09 | 2011-09-28 | Sandvik Intellectual Property AB | A rock drill bit, a drilling assembly and a method for percussive rock drilling |
US9011107B2 (en) * | 2010-04-20 | 2015-04-21 | Sandvik Intellectual Property Ab | Air compressor system and method of operation |
DE102011010675A1 (de) * | 2010-05-21 | 2011-11-24 | Max Wild Gmbh | Bohranlage, insbesondere Horizontalbohranlage |
SE535421C2 (sv) * | 2010-08-26 | 2012-07-31 | Atlas Copco Rock Drills Ab | Förfarande och system för bestämning av en förändring av ett spolmediumflöde samt bergborrningsanordning |
SE535418C2 (sv) * | 2010-08-26 | 2012-07-31 | Atlas Copco Rock Drills Ab | Metod och system för styrning av en kompressor vid en bergborrningsanordning samt bergborrningsanordning |
SE535475C2 (sv) * | 2010-08-26 | 2012-08-21 | Atlas Copco Rock Drills Ab | Metod och system för styrning av en kraftkälla vid en bergborrningsanordning samt bergborrningsanordning |
EP2572793B1 (en) | 2011-09-23 | 2017-04-26 | Sandvik Intellectual Property AB | A wear tip holder for a VSI crusher, a kit comprising a wear tip holder, and a method of reducing the wear rate of a wear tip holder |
WO2015025299A1 (en) * | 2013-08-23 | 2015-02-26 | Master Drilling South Africa (Pty) Ltd. | Integrated inspection and maintenance raise boring method and an associated drill string arrangement |
CN103510847B (zh) * | 2013-09-10 | 2016-03-30 | 安徽三山机械制造有限公司 | 一种可控压缩气体喷射速率的牙轮钻机 |
US10132130B2 (en) | 2015-08-18 | 2018-11-20 | Joy Global Surface Mining Inc | Combustor for heating of airflow on a drill rig |
CN106640390B (zh) * | 2016-11-04 | 2022-10-18 | 中国石油大学(华东) | 一种钻井用柴油机节能控制系统及方法 |
US10920540B2 (en) * | 2016-12-02 | 2021-02-16 | Halliburton Energy Services, Inc. | Reducing noise produced by well operations |
KR101932753B1 (ko) | 2017-05-17 | 2019-03-20 | 주식회사수산중공업 | 시추굴착기의 에너지 절감방법 |
CN115066193A (zh) | 2019-10-07 | 2022-09-16 | 迷尼美斯公司 | 具有重量分布系统的儿童承载设备 |
PL4041034T3 (pl) | 2019-10-07 | 2024-08-05 | HTS Hans Torgersen & Sønn AS | Urządzenie do noszenia z podparciem rozkładającym ciężar |
RU2770472C1 (ru) * | 2021-05-27 | 2022-04-18 | федеральное государственное бюджетное образовательное учреждение высшего образования «Санкт-Петербургский горный университет» | Система для разрушения горных пород |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3550697A (en) * | 1966-04-27 | 1970-12-29 | Henry Hobhouse | Drilling condition responsive drive control |
US3550696A (en) * | 1969-07-25 | 1970-12-29 | Exxon Production Research Co | Control of a well |
US4793421A (en) * | 1986-04-08 | 1988-12-27 | Becor Western Inc. | Programmed automatic drill control |
FI86008C (fi) * | 1989-04-06 | 1992-06-25 | Tampella Oy Ab | Foerfarande och anordning foer reglering av en bergborrningsmaskin. |
FI90276C (fi) * | 1991-01-03 | 1994-01-10 | Tamrock Oy | Menetelmä reiän poraamiseksi kallioon |
FI87830C (fi) * | 1991-05-23 | 1993-02-25 | Tamrock Oy | Foerfarande och anordning foer styrande av en bergborrmaskins luftmatning |
SE508003C2 (sv) * | 1992-04-09 | 1998-08-10 | Atlas Copco Rock Drills Ab | Bergborrningsanordning med uppslagarenhet |
JPH06146254A (ja) * | 1992-11-16 | 1994-05-27 | Kawasaki Chishitsu Kk | 地盤岩盤の乾式ボーリング工法及びその装置 |
US5358058A (en) * | 1993-09-27 | 1994-10-25 | Reedrill, Inc. | Drill automation control system |
US5704436A (en) * | 1996-03-25 | 1998-01-06 | Dresser Industries, Inc. | Method of regulating drilling conditions applied to a well bit |
US6637522B2 (en) * | 1998-11-24 | 2003-10-28 | J. H. Fletcher & Co., Inc. | Enhanced computer control of in-situ drilling system |
JP2000337074A (ja) * | 1999-05-27 | 2000-12-05 | Furukawa Co Ltd | 自動穿孔装置 |
SE0003916L (sv) * | 2000-10-27 | 2002-02-19 | Sandvik Ab | Styrrör för mekanisk hantering i en rigg för bergborrning samt borrsträng för mekanisk hantering |
FI115553B (fi) * | 2001-05-15 | 2005-05-31 | Sandvik Tamrock Oy | Järjestely porauksen ohjaukseen |
-
2003
- 2003-12-29 SE SE0303548A patent/SE526923C2/sv not_active IP Right Cessation
-
2004
- 2004-11-29 JP JP2006546890A patent/JP4759520B2/ja not_active Expired - Fee Related
- 2004-11-29 US US10/578,081 patent/US20070089907A1/en not_active Abandoned
- 2004-11-29 CA CA2546364A patent/CA2546364C/en not_active Expired - Fee Related
- 2004-11-29 ES ES04820890T patent/ES2322367T3/es active Active
- 2004-11-29 CN CN2004800363442A patent/CN1890452B/zh not_active Expired - Fee Related
- 2004-11-29 ZA ZA200604179A patent/ZA200604179B/en unknown
- 2004-11-29 AT AT04820890T patent/ATE428044T1/de active
- 2004-11-29 AU AU2004309309A patent/AU2004309309B2/en not_active Ceased
- 2004-11-29 BR BRPI0417711-8A patent/BRPI0417711B1/pt not_active IP Right Cessation
- 2004-11-29 EP EP04820890.4A patent/EP1699999B2/en active Active
- 2004-11-29 WO PCT/SE2004/001758 patent/WO2005064111A1/en not_active Application Discontinuation
- 2004-11-29 RU RU2006123038/03A patent/RU2367767C2/ru not_active IP Right Cessation
- 2004-11-29 DE DE602004020511T patent/DE602004020511D1/de active Active
-
2006
- 2006-07-21 NO NO20063385A patent/NO336946B1/no not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
EP1699999B1 (en) | 2009-04-08 |
ATE428044T1 (de) | 2009-04-15 |
SE526923C2 (sv) | 2005-11-22 |
SE0303548D0 (sv) | 2003-12-29 |
AU2004309309B2 (en) | 2010-04-08 |
ZA200604179B (en) | 2008-03-26 |
ES2322367T3 (es) | 2009-06-19 |
CN1890452B (zh) | 2010-08-25 |
CA2546364A1 (en) | 2005-07-14 |
NO336946B1 (no) | 2015-11-30 |
EP1699999A1 (en) | 2006-09-13 |
AU2004309309A1 (en) | 2005-07-14 |
DE602004020511D1 (de) | 2009-05-20 |
CA2546364C (en) | 2013-09-17 |
US20070089907A1 (en) | 2007-04-26 |
CN1890452A (zh) | 2007-01-03 |
RU2006123038A (ru) | 2008-01-10 |
NO20063385L (no) | 2006-09-21 |
WO2005064111A1 (en) | 2005-07-14 |
RU2367767C2 (ru) | 2009-09-20 |
SE0303548L (sv) | 2005-06-30 |
JP2007517150A (ja) | 2007-06-28 |
JP4759520B2 (ja) | 2011-08-31 |
BRPI0417711B1 (pt) | 2015-08-04 |
BRPI0417711A (pt) | 2007-03-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1699999B2 (en) | Method and system for controlling power consumption during a rock drilling process and a rock drilling apparatus therefore | |
RU2397305C2 (ru) | Способ управления работой буровой установки и буровая установка | |
EP1451444B1 (en) | Method and equipment for controlling operation of rock drilling apparatus | |
CN102171411B (zh) | 用于控制岩钻的方法和配置 | |
EP2609281B1 (en) | Method and system for controlling a compressor at a rock drilling apparatus and a rock drilling apparatus | |
US12006770B2 (en) | Method and system for estimating wear of a drill bit | |
EP2609288B1 (en) | Method and system for controlling a power source at a rock drilling apparatus and rock drilling apparatus | |
WO2007138170A1 (en) | Rock drilling rig and method of controlling thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20060523 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LU MC NL PL PT RO SE SI SK TR |
|
DAX | Request for extension of the european patent (deleted) | ||
17Q | First examination report despatched |
Effective date: 20070803 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LU MC NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REF | Corresponds to: |
Ref document number: 602004020511 Country of ref document: DE Date of ref document: 20090520 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2322367 Country of ref document: ES Kind code of ref document: T3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090408 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090908 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090408 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090708 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090808 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090408 |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090408 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090408 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090408 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090408 |
|
PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
26 | Opposition filed |
Opponent name: SANDVIK MINING AND CONSTRUCTION OY Effective date: 20100107 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090408 Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090408 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090708 |
|
PLBB | Reply of patent proprietor to notice(s) of opposition received |
Free format text: ORIGINAL CODE: EPIDOSNOBS3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091130 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20100730 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091130 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091130 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091129 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090709 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091129 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20091009 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090408 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090408 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20141127 Year of fee payment: 11 Ref country code: ES Payment date: 20141126 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20141103 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20141126 Year of fee payment: 11 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602004020511 Country of ref document: DE Representative=s name: PATENTANWAELTE OLBRICHT, BUCHHOLD, KEULERTZ PA, DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 428044 Country of ref document: AT Kind code of ref document: T Effective date: 20151129 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20151129 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151129 |
|
APBM | Appeal reference recorded |
Free format text: ORIGINAL CODE: EPIDOSNREFNO |
|
APBP | Date of receipt of notice of appeal recorded |
Free format text: ORIGINAL CODE: EPIDOSNNOA2O |
|
APAH | Appeal reference modified |
Free format text: ORIGINAL CODE: EPIDOSCREFNO |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151129 |
|
APBU | Appeal procedure closed |
Free format text: ORIGINAL CODE: EPIDOSNNOA9O |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151129 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20161230 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151130 |
|
PUAH | Patent maintained in amended form |
Free format text: ORIGINAL CODE: 0009272 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: PATENT MAINTAINED AS AMENDED |
|
GRAT | Correction requested after decision to grant or after decision to maintain patent in amended form |
Free format text: ORIGINAL CODE: EPIDOSNCDEC |
|
27A | Patent maintained in amended form |
Effective date: 20170405 |
|
AK | Designated contracting states |
Kind code of ref document: B2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LU MC NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R102 Ref document number: 602004020511 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602004020511 Country of ref document: DE Representative=s name: BOULT WADE TENNANT LLP, DE Ref country code: DE Ref legal event code: R082 Ref document number: 602004020511 Country of ref document: DE Representative=s name: PATENTANWAELTE OLBRICHT, BUCHHOLD, KEULERTZ PA, DE Ref country code: DE Ref legal event code: R081 Ref document number: 602004020511 Country of ref document: DE Owner name: EPIROC ROCK DRILLS AKTIEBOLAG, SE Free format text: FORMER OWNER: ATLAS COPCO ROCK DRILLS AB, OEREBRO, SE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602004020511 Country of ref document: DE Representative=s name: BOULT WADE TENNANT LLP, DE |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20191127 Year of fee payment: 16 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602004020511 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210601 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FI Payment date: 20231019 Year of fee payment: 20 |