EP1496173B1 - Method and arrangement for installing sandwich panels in tall buildings - Google Patents
Method and arrangement for installing sandwich panels in tall buildings Download PDFInfo
- Publication number
- EP1496173B1 EP1496173B1 EP04102656A EP04102656A EP1496173B1 EP 1496173 B1 EP1496173 B1 EP 1496173B1 EP 04102656 A EP04102656 A EP 04102656A EP 04102656 A EP04102656 A EP 04102656A EP 1496173 B1 EP1496173 B1 EP 1496173B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- panels
- panel
- set forth
- arrangement
- frame structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims abstract description 49
- 238000009434 installation Methods 0.000 claims abstract description 34
- 238000010276 construction Methods 0.000 claims description 4
- 230000004888 barrier function Effects 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 210000002105 tongue Anatomy 0.000 description 3
- 238000012856 packing Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 239000011490 mineral wool Substances 0.000 description 1
- 238000009420 retrofitting Methods 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
Definitions
- Sandwich panels are prefabricated panels, comprising a core member of a thermally insulating material and surface sheets on its opposite main surfaces, each of said surface sheets having a tongue at least in one edge thereof and a groove in its opposite edge.
- Sandwich panels are installed on a wall in such a way that said tongues and grooves of adjacent sandwich panels are set to face each other for a tongue-and-groove joint between the sandwich panels.
- JP 11081682 A discloses a method and an arrangement for installing sandwich panels in a previously erected frame structure of a building.
- a traditional way of shipping such panels comprises a stack of panels, in which 5-10 panels lies on top of each other, with two of such stacks, having a pallet thereunder, on top of each other in a truck.
- the new way provides a more efficient use of load-carrying space as temporary stacks are not needed by virtue of the rigidity of a panel in the new position. This reduces damages, as well.
- the panel can be picked up directly from a truck, which reduces the number of operations.
- the described embodiment illustrates two panels 1a and 1b to be hoisted, attached with a fastener 13 to each other for a set of two panels placed on top of a fitting stand 6.
- the pair of panels constituted by the panels 1a, 1b has its upper and lower corners both provided with guide lugs 4, including a protruding link member 9 fitting around a control cable 5. While being lifted, the pair of panels is guided by the control cables 5 and the link members 9 reliably to its mounting place, in which the pair of panels is placed on top of a previously fitted pair of panels and secured to frame structures, whereafter the link members 9 can be disengaged from the control cable 5 and the lifter 8 can be released from the top edge of the pair of panels and lowered down for lifting subsequent panels.
- the link member 9 can be e.g. a clevis or a pigtail hook.
- the arrangement is preferably provided with two winches 7a, 7b, whereby one winch can be used for hoisting a panel or a set of panels and the other winch can be used simultaneously for lowering down the lifter 8b of a previously lifted panel or set of panels for engaging it with the edge of a panel or set of panels to be hoisted next.
- the arrangement may further employ a third control cable (not shown), located centrally in terms of the installation width, as well as a lifter-mounted guide lug, whereby an unloaded lifter can be brought down without battering the wall with it.
- Coupling the sandwich panels 1a, 1b to each other for a set of panels can be effected by using a previously mentioned G-bar, which can be fitted in a tongue-and-groove joint between the panels and which is described more closely in publication WO98/19023 .
- Figs. 3 and 4 depict the attachment of panels to a frame.
- Fig. 3 illustrates superimposed panels 1a-1c coincident with one vertical column 10a of a frame structure, as well as panels 1d-1f adjacent thereto.
- the superimposed panels 1a-1c and 1d-1f, respectively, are coupled to each other with a tongue-and-groove joint 24.
- the panels 1a-1f are fastened to the frame columns 10a by the ends thereof.
- the currently used way of securing the panels with drill screws directly to a frame is slow because of the frame thickness. The time required for fastening all screws is as much as 10-15 minutes per panel.
- the attachment of panels is preferably effected by means of fastening plates 23, which are provided with sealing (not shown) against the external surface of the panels.
- the fastening plates 23 are secured to the frame by means of bolts 21, fitting in the threaded holes 25 and extending through a joint 26 between adjacent panels 1a, 1d. Consequently, the panels do not require any separate fastening holes.
- the fastening plate 23 has a length which is slightly more than the width of a panel, e.g. 1250 mm while the width of a panel is 1200 mm, the fastening plate of a higher panel being preferably adapted to extend over the fastening plate of a panel therebelow.
- the fastening plates function also as a moisture barrier, making sure that rain water has no access inside the panels through the joint 26 ( fig. 4 ) between the ends of adjacent panels 1a, 1d.
- the covering strips are of such a length which is sufficient to always cover the combined height of panels to be hoisted together.
- the covering strips are provided with automatic locking to match the fastening plates 23, the covering strips being merely pressed in place during panel installation. There is no tightness requirement for them like before. Being a tedious process, it has also often been the case that the fitting thereof has been performed later in a separate operation.
- One end of the panels is preferably pre-fitted on the ground with a packing strip 20, preferably of rock wool, for sealing the joint 26 between the ends of adjacent panels as the panels are installed. Thus, no packing is required afterwards.
- the fastening plate 23 is preferably provided with pre-drilled holes, through which are screwed self-tapping screws 22 which secure a panel and transfer the weight of a panel to the frame structure, whereby the weight of the panels is not allowed to accumulate on top of the lowermost panels to break them.
- window units or the like e.g. ventilation grates
- Window units have tongues and grooves matching those of a panel, as described e.g. in publication WO 01/51749 .
- This installation method eliminates the need of retrofitting a window or the like and the subsequent lining work from a high scaffold.
- the inventive solution can also be used for installing panels in a vertical position, wherein the tongue-and-groove edged sides of the panels are essentially in a vertical orientation during a lifting and fitting process and the frame structure is provided with horizontal beams for fixing the ends of the panels thereto.
- the lifter 8a, 8b is preferably employed at each vertical edge of a panel or set of panels.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Joining Of Building Structures In Genera (AREA)
- Building Environments (AREA)
- Other Air-Conditioning Systems (AREA)
- Connection Of Plates (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
Description
- The present invention relates to a method for installing sandwich panels in tall buildings, said method comprising mounting the panels to a previously erected frame structure of the building. The invention relates further to an arrangement for implementing the method.
- Particularly, the installation of sandwich panels in tall buildings by currently available methods is largely at the mercy of weather due to a relative lightness of such panels with respect to the area thereof, the installation thereof in high-rise jobs in windy weather becoming difficult or virtually impossible. Sandwich panels are prefabricated panels, comprising a core member of a thermally insulating material and surface sheets on its opposite main surfaces, each of said surface sheets having a tongue at least in one edge thereof and a groove in its opposite edge. Sandwich panels are installed on a wall in such a way that said tongues and grooves of adjacent sandwich panels are set to face each other for a tongue-and-groove joint between the sandwich panels.
JP 11081682 A - On the other hand, an arrangement of the invention for implementing the method is characterized in that the arrangement comprises:
- bearer members suitable for being provided in the top portion of a frame structure, upon which are suspended control cables which extend in a vertical direction of the building spaced from each other by a distance substantially matching the installation width of a sandwich panel;
- a guide lug suitable for being mounted at least on each upper corner of a panel to be installed and including a guide link fitting around the control cable; and
- a lifter fastenable to the top edge of a panel for lifting the panel to the mounting location under the guidance of the control cables.
- The inventive solution enables a simultaneous lifting of two or more panels. Another preferred way of practicing the inventive method is the use of two separate lifters with associated winches for speeding up installation work even further in such a way that, as one panel or set of panels is being lifted upwards to its mounting location, the other lifter can be lowered down to pick up the next panel or set of panels and bring it near the installation level while the preceding pair is being fixed to the frame. Traditionally, installation is performed one panel at a time. Only after one attachment to the frame has been completed has it been possible to start a pick-up process for the next panel, which has taken plenty of time with the lifter descending, a fresh panel being secured and lifted up to the installation level again.
- The inventive method enables assembling two or more panels in the factory for a ready-to-use installation set, which is then shipped to an installation site and lifted to a mounting location under the guidance of control cables and guide members included in guide lugs mounted on the installation set. Two panels are secured to each other in the factory, for example by using preferably a joint structure described in
publication WO98/19023 - A traditional way of shipping such panels comprises a stack of panels, in which 5-10 panels lies on top of each other, with two of such stacks, having a pallet thereunder, on top of each other in a truck. The new way provides a more efficient use of load-carrying space as temporary stacks are not needed by virtue of the rigidity of a panel in the new position. This reduces damages, as well. At construction site, the panel can be picked up directly from a truck, which reduces the number of operations.
- The method is capable of providing a quadruple installation speed with respect to a traditional way of installation, the savings being achieved relating not only to installation costs but also to a shorter construction time, which is a major factor regarding the overall costs of a building. In traditional installation, plenty of working days are lost as wind conditions prevent the installation of large-size and relatively light panels which are damaged as a result of bumping against the finished wall during a lifting process. The inventive installation method enables installation also in windy conditions by fitting the panels in the edge regions thereof with guide members intended for cooperation with control cables. In high wind, the optimal attachment could be by all four corners. By virtue of the inventive solution, it is estimated that 20% more working days can be provided for installation. In addition, the tightness of a building will be secured, even in the case of major rain storms.
- The invention will now be described in more detail with reference to the accompanying drawings, in which:
- Fig. 1
- shows an arrangement of the invention in a schematic view from the front,
- Fig. 2
- shows the arrangement of
fig. 1 in a side view, - Fig. 3
- shows in a schematic front view the mounting of adjacent panels to a frame, and
- Fig. 4
- shows a cross-section of
fig. 3 on a larger scale. - In reference to
figs. 1 and2 , the arrangement used in a method of the invention comprisesbearer members 11, for example cantilever beams, fastened to a previously erectedbuilding frame structure 10, to its upper portion, upon which are suspendedcontrol cables 5 extending in a vertical direction of the building, at a distance from each other matching substantially the installation width of a sandwich panel, and which are securely anchored in position, for example by means of acounterweight 3 of concrete. The arrangement preferably further includes twowinches lifting bracket 12 mounted on a top portion of theframe structure 10 and having their free ends provided at a specific time with alifter patent EP 0,634,987 for attachment to the tongue-and-groove edge of apanel 1 to be hoisted. - The described embodiment illustrates two
panels fastener 13 to each other for a set of two panels placed on top of a fitting stand 6. The pair of panels constituted by thepanels guide lugs 4, including a protrudinglink member 9 fitting around acontrol cable 5. While being lifted, the pair of panels is guided by thecontrol cables 5 and thelink members 9 reliably to its mounting place, in which the pair of panels is placed on top of a previously fitted pair of panels and secured to frame structures, whereafter thelink members 9 can be disengaged from thecontrol cable 5 and the lifter 8 can be released from the top edge of the pair of panels and lowered down for lifting subsequent panels. Thelink member 9 can be e.g. a clevis or a pigtail hook. The arrangement is preferably provided with twowinches lifter 8b of a previously lifted panel or set of panels for engaging it with the edge of a panel or set of panels to be hoisted next. The arrangement may further employ a third control cable (not shown), located centrally in terms of the installation width, as well as a lifter-mounted guide lug, whereby an unloaded lifter can be brought down without battering the wall with it. - The
guide lug 4 has been described above as located in each corner of a pair of panels to be hoisted, in which case it is preferably provided with an engagement element insertable inside the tongue-and-groove edge for attachment to the panel. The guide lug may also be provided with e.g. a suction pad attachment for placing it as desired within the lateral edge region of a panel or set of panels to be lifted. - Coupling the
sandwich panels publication WO98/19023 -
Figs. 3 and4 depict the attachment of panels to a frame.Fig. 3 illustratessuperimposed panels 1a-1c coincident with onevertical column 10a of a frame structure, as well aspanels 1d-1f adjacent thereto. Thesuperimposed panels 1a-1c and 1d-1f, respectively, are coupled to each other with a tongue-and-groove joint 24. Thepanels 1a-1f are fastened to theframe columns 10a by the ends thereof. The currently used way of securing the panels with drill screws directly to a frame is slow because of the frame thickness. The time required for fastening all screws is as much as 10-15 minutes per panel. When applying an installation method of the invention, holes are first drilled in a steel frame for the equidistant attachment of panels and threads are formed for fastening bolts or, if the frame comprises a concrete-filled column, a threaded bushing is secured. These threadedholes 25 are then fitted with fasteningscrews 21 for securing the panels to the frame. The screws are preferably tightened with a moment drill. - The attachment of panels is preferably effected by means of
fastening plates 23, which are provided with sealing (not shown) against the external surface of the panels. Thefastening plates 23 are secured to the frame by means ofbolts 21, fitting in the threadedholes 25 and extending through ajoint 26 betweenadjacent panels fastening plate 23 has a length which is slightly more than the width of a panel, e.g. 1250 mm while the width of a panel is 1200 mm, the fastening plate of a higher panel being preferably adapted to extend over the fastening plate of a panel therebelow. The fastening plates function also as a moisture barrier, making sure that rain water has no access inside the panels through the joint 26 (fig. 4 ) between the ends ofadjacent panels fastening plates 23, the covering strips being merely pressed in place during panel installation. There is no tightness requirement for them like before. Being a tedious process, it has also often been the case that the fitting thereof has been performed later in a separate operation. - One end of the panels is preferably pre-fitted on the ground with a
packing strip 20, preferably of rock wool, for sealing the joint 26 between the ends of adjacent panels as the panels are installed. Thus, no packing is required afterwards. - The
fastening plate 23 is preferably provided with pre-drilled holes, through which are screwed self-tappingscrews 22 which secure a panel and transfer the weight of a panel to the frame structure, whereby the weight of the panels is not allowed to accumulate on top of the lowermost panels to break them. - In an installation method of the invention, window units or the like (e.g. ventilation grates) can be installed the same way as wall panels. Window units have tongues and grooves matching those of a panel, as described e.g. in
publication WO 01/51749 - The inventive solution can also be used for installing panels in a vertical position, wherein the tongue-and-groove edged sides of the panels are essentially in a vertical orientation during a lifting and fitting process and the frame structure is provided with horizontal beams for fixing the ends of the panels thereto. In this case, the
lifter
Claims (16)
- A method for installing sandwich panels (1, 1a, 1b) in tall buildings, said method comprising mounting the panels to a previously erected frame structure (10) of the building, characterized in that the method comprises providing a top portion of the frame structure (10) with bearer members (11), upon which are suspended control cables (5) which extend in a vertical direction of the building spaced from each other by a distance substantially matching the installation width of a sandwich panel, and that the panel to be installed has each of its edge regions adjacent to the control cable provided with at least one guide lug (4), including a guide member (9) fitting around the control cable (5), and that the method comprises lifting a panel to the mounting location by means of one or more lifters (8) fastenable to the panel, under the guidance of the control cables (5) and the guide members (9).
- A method as set forth in claim 1, characterized in that the method comprises providing the guide lug (4) in both top corners of the panel.
- A method as set forth in claim 1 or 2, characterized in that the method comprises lifting up two or more panels at a time, the panels (1a, 1b) to be lifted being clamped to each other.
- A method as set forth in any of claims 1-3, characterized in that the method comprises using a twin lifter, having its drive mechanism constituted by winches (7a, 7b).
- A method as set forth in any of the preceding claims, characterized in that the method comprises assembling two or more panels in the factory for a ready-to-use installation set, which is then shipped to an installation site and lifted to a mounting location under the guidance of the control cables (5) and the guide members (9) of the guide lugs (4) mounted to the installation set.
- A method as set forth in claim 5, wherein the sandwich panels comprise sandwich panels, characterized in that the method comprises fastening the panels to each other in the factory by means of a G-bar fitted in a tongue-and-groove joint between the panels, and shipping the same by a truck to a construction site in a pre-established correct lifting position.
- A method as set forth in any of claims 1-5, characterized in that the sandwich panels to be installed in the method comprise window units.
- A method as set forth in any of the preceding claims, characterized in that the panels (1a-1f) are fastened to a frame structure (10a) by the ends thereof by means of fastening plates (23) provided with sealing coming against the panel's outer surface, whereby the fastening plates function at the same time as a moisture barrier.
- A method as set forth in claim 8, characterized in that the fastening plate (23) has a length which is slightly more than the width of the panel (1a-1f).
- A method as set forth in any of claims 1-9, characterized in that the panels are installed in a horizontal position, whereby, during a lifting process, each side edge of the panel or set of panels has one or more lifters (8) secured thereto.
- A method as set forth in any of claims 1-9, characterized in that the panels are installed in a vertical position, whereby, during a lifting process, each side edge of the panel or set of panels has a lifter (8) secured thereto.
- An arrangement for installing sandwich panels (1, 1a, 1b) in a previously erected frame structure (10) of a tall building, characterized in that the arrangement comprises:- bearer members (11) suitable for being provided in the frame structure's (10) top portion, upon which are suspended control cables (5) which extend in a vertical direction of the building spaced from each other by a distance substantially matching the installation width of a sandwich panel;- a guide lug (4) suitable for being mounted on the panel to be installed in each of panels edge regions adjacent to the control cable and including a guide member (9) fitting around the control cable (5); and- a lifter (8) fastenable to the top edge of a panel for lifting the panel to the mounting location under the guidance of the control cables (5) and the guide members (9).
- An arrangement as set forth in claim 10, characterized in that there are two or more liftable panels clamped to each other.
- An arrangement as set forth in claim 12 or 13, characterized in that the liftable panel comprises a window unit.
- An arrangement as set forth in any of claims 12-14, characterized in that the arrangement comprises a fastening plate (23), by means of which the panels are fastenable by the ends thereof to frame structures (10a).
- An arrangement as set forth in claim 15, characterized in that the frame structure (10a) is pre-fitted with threaded holes (25) and the fastening plates (23) are fastenable to the frame by means of fastening bolts (21), which are insertable in the threaded holes and extend through a joint area (26) between the ends of adjacent panels.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI20031057A FI20031057A (en) | 2003-07-11 | 2003-07-11 | Method and arrangement for installing building elements in tall buildings |
FI20031057 | 2003-07-11 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1496173A1 EP1496173A1 (en) | 2005-01-12 |
EP1496173B1 true EP1496173B1 (en) | 2008-03-19 |
Family
ID=27636090
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP04102656A Expired - Lifetime EP1496173B1 (en) | 2003-07-11 | 2004-06-11 | Method and arrangement for installing sandwich panels in tall buildings |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP1496173B1 (en) |
AT (1) | ATE389764T1 (en) |
DE (1) | DE602004012488T2 (en) |
FI (1) | FI20031057A (en) |
NO (1) | NO328278B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115215208B (en) * | 2022-07-01 | 2024-07-30 | 北京城建七建设工程有限公司 | Detachable and telescopic ALC board mounting tool |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2304735A1 (en) * | 1975-03-17 | 1976-10-15 | Bassi Roger | Erecting outer building panels - using pulleys and rails to move panels vertically, then horizontally to correct positions at which panels attached to support links |
JPS6030743A (en) * | 1983-07-29 | 1985-02-16 | ワイケイケイ株式会社 | Attachment of curtain wall unit in unit curtain wall |
DE8506952U1 (en) * | 1985-03-09 | 1985-07-04 | Müller, Volker, 6520 Worms | Curtain wall for buildings |
US5181825A (en) * | 1988-11-28 | 1993-01-26 | Yoshida Kogyo K.K. | Method for lifting and guiding elements on building site |
US5152369A (en) * | 1991-09-10 | 1992-10-06 | Mori Nakaoka | Apparatus and method for hoisting a platform adjacent a scaffolding |
JPH1181682A (en) * | 1997-09-09 | 1999-03-26 | Asahi Chem Ind Co Ltd | Election for large panel |
JP2001317207A (en) * | 2000-05-02 | 2001-11-16 | Toda Constr Co Ltd | Method of lifting exterior-wall panel |
-
2003
- 2003-07-11 FI FI20031057A patent/FI20031057A/en not_active Application Discontinuation
-
2004
- 2004-06-11 EP EP04102656A patent/EP1496173B1/en not_active Expired - Lifetime
- 2004-06-11 DE DE602004012488T patent/DE602004012488T2/en not_active Expired - Lifetime
- 2004-06-11 AT AT04102656T patent/ATE389764T1/en not_active IP Right Cessation
- 2004-07-09 NO NO20042944A patent/NO328278B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
EP1496173A1 (en) | 2005-01-12 |
DE602004012488T2 (en) | 2009-03-05 |
NO20042944L (en) | 2005-01-12 |
FI20031057A (en) | 2005-01-12 |
DE602004012488D1 (en) | 2008-04-30 |
NO328278B1 (en) | 2010-01-18 |
FI20031057A0 (en) | 2003-07-11 |
ATE389764T1 (en) | 2008-04-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2894269B1 (en) | System for mounting facade elements | |
US5063718A (en) | Curtain wall for a building | |
CA2711076C (en) | Profile for the facade of a multi-storey building and a multi-storey building with such a facade | |
CZ308008B6 (en) | Stacked steel structure for lifting equipment | |
CN112112418B (en) | Construction method of high-rise building aluminum formwork climbing frame combined system | |
US5934038A (en) | Method of pre-glazing a structural frame and window assembly for an office/commercial building in a controlled factory environment | |
EP1496173B1 (en) | Method and arrangement for installing sandwich panels in tall buildings | |
WO2006056062A1 (en) | Curtain wall construction and fastening system | |
JP2016094788A (en) | Outer wall panel/column layout structure and layout construction method | |
SK9411Y1 (en) | Elevator and method of its assembly | |
AU2018247335A1 (en) | Lift shaft assembly and construction and installation thereof | |
IE20180303A1 (en) | A bracket assembly | |
CN115557377A (en) | Indoor monorail hanging beam installation method | |
JP2664037B2 (en) | Roof panel | |
IE20180454A1 (en) | A modular roofing component | |
JPS61158565A (en) | Construction of outer wall by alc panel | |
JPS6233383B2 (en) | ||
JPH02101251A (en) | Wall material fitting method for alc construction | |
JPH0886021A (en) | Fitting structure of balcony and fitting method thereof | |
JPH0754487A (en) | Fitting application of exterior curtain wall | |
JP2698063B2 (en) | Building with built-in elevator | |
CZ32273U1 (en) | A composed assembly of a steel structure for a lifting device | |
JPH0420070B2 (en) | ||
JP2002349002A (en) | Coupling construction of alc panels and application method for the alc panels | |
JPH05222773A (en) | Lifter structure of roof unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL HR LT LV MK |
|
17P | Request for examination filed |
Effective date: 20050712 |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
AXX | Extension fees paid |
Extension state: LV Payment date: 20050712 Extension state: LT Payment date: 20050712 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: PAROC OY AB |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: LT LV |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REF | Corresponds to: |
Ref document number: 602004012488 Country of ref document: DE Date of ref document: 20080430 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
LTIE | Lt: invalidation of european patent or patent extension |
Effective date: 20080319 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080319 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080319 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080319 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080319 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080319 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080630 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080319 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080826 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080319 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080319 |
|
EN | Fr: translation not filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080319 Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080630 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
26N | No opposition filed |
Effective date: 20081222 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080319 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080611 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080619 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080630 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080319 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080319 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080611 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080920 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080319 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080620 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090109 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20120627 Year of fee payment: 9 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20130611 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130611 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20150618 Year of fee payment: 12 Ref country code: DE Payment date: 20150624 Year of fee payment: 12 Ref country code: FI Payment date: 20150618 Year of fee payment: 12 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602004012488 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160611 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: EUG |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160612 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170103 |