EP1496173A1 - Method and arrangement for installing sandwich panels in tall buildings - Google Patents

Method and arrangement for installing sandwich panels in tall buildings Download PDF

Info

Publication number
EP1496173A1
EP1496173A1 EP04102656A EP04102656A EP1496173A1 EP 1496173 A1 EP1496173 A1 EP 1496173A1 EP 04102656 A EP04102656 A EP 04102656A EP 04102656 A EP04102656 A EP 04102656A EP 1496173 A1 EP1496173 A1 EP 1496173A1
Authority
EP
European Patent Office
Prior art keywords
panels
panel
set forth
arrangement
frame structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP04102656A
Other languages
German (de)
French (fr)
Other versions
EP1496173B1 (en
Inventor
Jim Willberg
Esko Brunila
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Paroc Hold Oy AB
Original Assignee
Paroc Group Oy AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Paroc Group Oy AB filed Critical Paroc Group Oy AB
Publication of EP1496173A1 publication Critical patent/EP1496173A1/en
Application granted granted Critical
Publication of EP1496173B1 publication Critical patent/EP1496173B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Definitions

  • the present invention relates to a method for installing sandwich panels in tall buildings, said method comprising mounting the panels to a previously erected frame structure of the building.
  • the invention relates further to an arrangement for implementing the method.
  • Sandwich panels are prefabricated panels, comprising a core member of a thermally insulating material and surface sheets on its opposite main surfaces, each of said surface sheets having a tongue at least in one edge thereof and a groove in its opposite edge.
  • Sandwich panels are installed on a wall in such a way that said tongues and grooves of adjacent sandwich panels are set to face each other for a tongue-and-groove joint between the sandwich panels.
  • a method of the invention comprises providing the top portion of a building frame structure with bearer members, upon which are suspended control cables which extend in a vertical direction of the building spaced from each other by a distance substantially matching the installation width of a sandwich panel, and that the panel to be installed has each of its edge regions adjacent to the control cable provided with at least one guide lug, including a guide member fitting around the control cable, and that the method comprises lifting a panel to the mounting location by means of a lifter fastenable to the panel's top edge, under the guidance of the control cables and the guide members.
  • an arrangement of the invention for implementing the method is characterized in that the arrangement comprises:
  • the inventive solution enables a simultaneous lifting of two or more panels.
  • Another preferred way of practicing the inventive method is the use of two separate lifters with associated winches for speeding up installation work even further in such a way that, as one panel or set of panels is being lifted upwards to its mounting location, the other lifter can be lowered down to pick up the next panel or set of panels and bring it near the installation level while the preceding pair is being fixed to the frame.
  • installation is performed one panel at a time. Only after one attachment to the frame has been completed has it been possible to start a pick-up process for the next panel, which has taken plenty of time with the lifter descending, a fresh panel being secured and lifted up to the installation level again.
  • the inventive method enables assembling two or more panels in the factory for a ready-to-use installation set, which is then shipped to an installation site and lifted to a mounting location under the guidance of control cables and guide members included in guide lugs mounted on the installation set.
  • Two panels are secured to each other in the factory, for example by using preferably a joint structure described in publication WO98/19023, wherein a cross-sectionally G-shaped fastening bar is fitted in a tongue-and-groove joint between panels and the sets of panels are then carried on a truck to a construction site in a pre-established correct lifting position.
  • a traditional way of shipping such panels comprises a stack of panels, in which 5-10 panels lies on top of each other, with two of such stacks, having a pallet thereunder, on top of each other in a truck.
  • the new way provides a more efficient use of load-carrying space as temporary stacks are not needed by virtue of the rigidity of a panel in the new position. This reduces damages, as well.
  • the panel can be picked up directly from a truck, which reduces the number of operations.
  • the method is capable of providing a quadruple installation speed with respect to a traditional way of installation, the savings being achieved relating not only to installation costs but also to a shorter construction time, which is a major factor regarding the overall costs of a building.
  • traditional installation plenty of working days are lost as wind conditions prevent the installation of large-size and relatively light panels which are damaged as a result of bumping against the finished wall during a lifting process.
  • the inventive installation method enables installation also in windy conditions by fitting the panels in the edge regions thereof with guide members intended for cooperation with control cables. In high wind, the optimal attachment could be by all four corners.
  • the tightness of a building will be secured, even in the case of major rain storms.
  • the arrangement used in a method of the invention comprises bearer members 11, for example cantilever beams, fastened to a previously erected building frame structure 10, to its upper portion, upon which are suspended control cables 5 extending in a vertical direction of the building, at a distance from each other matching substantially the installation width of a sandwich panel, and which are securely anchored in position, for example by means of a counterweight 3 of concrete.
  • the arrangement preferably further includes two winches 7a, 7b, having their hoisting cables adapted to extend over a lifting bracket 12 mounted on a top portion of the frame structure 10 and having their free ends provided at a specific time with a lifter 8a, 8b, which can be for example a lifter as set forth in patent EP 0,634,987 for attachment to the tongue-and-groove edge of a panel 1 to be hoisted.
  • a lifter 8a, 8b which can be for example a lifter as set forth in patent EP 0,634,987 for attachment to the tongue-and-groove edge of a panel 1 to be hoisted.
  • the described embodiment illustrates two panels 1a and 1b to be hoisted, attached with a fastener 13 to each other for a set of two panels placed on top of a fitting stand 6.
  • the pair of panels constituted by the panels 1a, 1b has its upper and lower corners both provided with guide lugs 4, including a protruding link member 9 fitting around a control cable 5. While being lifted, the pair of panels is guided by the control cables 5 and the link members 9 reliably to its mounting place, in which the pair of panels is placed on top of a previously fitted pair of panels and secured to frame structures, whereafter the link members 9 can be disengaged from the control cable 5 and the lifter 8 can be released from the top edge of the pair of panels and lowered down for lifting subsequent panels.
  • the link member 9 can be e.g. a clevis or a pigtail hook.
  • the arrangement is preferably provided with two winches 7a, 7b, whereby one winch can be used for hoisting a panel or a set of panels and the other winch can be used simultaneously for lowering down the lifter 8b of a previously lifted panel or set of panels for engaging it with the edge of a panel or set of panels to be hoisted next.
  • the arrangement may further employ a third control cable (not shown), located centrally in terms of the installation width, as well as a lifter-mounted guide lug, whereby an unloaded lifter can be brought down without battering the wall with it.
  • the guide lug 4 has been described above as located in each corner of a pair of panels to be hoisted, in which case it is preferably provided with an engagement element insertable inside the tongue-and-groove edge for attachment to the panel.
  • the guide lug may also be provided with e.g. a suction pad attachment for placing it as desired within the lateral edge region of a panel or set of panels to be lifted.
  • Coupling the sandwich panels 1a, 1b to each other for a set of panels can be effected by using a previously mentioned G-bar, which can be fitted in a tongue-and-groove joint between the panels and which is described more closely in publication WO98/19023.
  • Figs. 3 and 4 depict the attachment of panels to a frame.
  • Fig. 3 illustrates superimposed panels 1a-1c coincident with one vertical column 10a of a frame structure, as well as panels 1d-1f adjacent thereto.
  • the superimposed panels 1a-1c and 1d-1f, respectively, are coupled to each other with a tongue-and-groove joint 24.
  • the panels 1a-1f are fastened to the frame columns 10a by the ends thereof.
  • the currently used way of securing the panels with drill screws directly to a frame is slow because of the frame thickness. The time required for fastening all screws is as much as 10-15 minutes per panel.
  • holes are first drilled in a steel frame for the equidistant attachment of panels and threads are formed for fastening bolts or, if the frame comprises a concrete-filled column, a threaded bushing is secured. These threaded holes 25 are then fitted with fastening screws 21 for securing the panels to the frame. The screws are preferably tightened with a moment drill.
  • the attachment of panels is preferably effected by means of fastening plates 23, which are provided with sealing (not shown) against the external surface of the panels.
  • the fastening plates 23 are secured to the frame by means of bolts 21, fitting in the threaded holes 25 and extending through a joint 26 between adjacent panels 1a, 1d. Consequently, the panels do not require any separate fastening holes.
  • the fastening plate 23 has a length which is slightly more than the width of a panel, e.g. 1250 mm while the width of a panel is 1200 mm, the fastening plate of a higher panel being preferably adapted to extend over the fastening plate of a panel therebelow.
  • the fastening plates function also as a moisture barrier, making sure that rain water has no access inside the panels through the joint 26 (fig. 4) between the ends of adjacent panels 1a, 1d.
  • the covering strips are of such a length which is sufficient to always cover the combined height of panels to be hoisted together.
  • the covering strips are provided with automatic locking to match the fastening plates 23, the covering strips being merely pressed in place during panel installation. There is no tightness requirement for them like before. Being a tedious process, it has also often been the case that the fitting thereof has been performed later in a separate operation.
  • One end of the panels is preferably pre-fitted on the ground with a packing strip 20, preferably of rock wool, for sealing the joint 26 between the ends of adjacent panels as the panels are installed. Thus, no packing is required afterwards.
  • the fastening plate 23 is preferably provided with pre-drilled holes, through which are screwed self-tapping screws 22 which secure a panel and transfer the weight of a panel to the frame structure, whereby the weight of the panels is not allowed to accumulate on top of the lowermost panels to break them.
  • window units or the like e.g. ventilation grates
  • Window units can be installed the same way as wall panels.
  • Window units have tongues and grooves matching those of a panel, as described e.g. in publication WO 01/51749.
  • This installation method eliminates the need of retrofitting a window or the like and the subsequent lining work from a high scaffold.
  • the inventive solution can also be used for installing panels in a vertical position, wherein the tongue-and-groove edged sides of the panels are essentially in a vertical orientation during a lifting and fitting process and the frame structure is provided with horizontal beams for fixing the ends of the panels thereto.
  • the lifter 8a, 8b is preferably employed at each vertical edge of a panel or set of panels.

Abstract

The invention relates to a method and an arrangement for installing sandwich panels (1, 1a, 1b) in tall buildings, said panels being fastened to a previously erected frame structure (10) of the building. The method comprises providing a top portion of the frame structure (10) with bearer members (11), upon which are suspended control cables (5) which extend in a vertical direction of the building spaced from each other by a distance substantially matching the installation width of a sandwich panel. The panel to be installed has each of its edge regions adjacent to the control cable provided with at least one guide lug (4), including a guide member (9) fitting around the control cable (5). The method comprises lifting a panel to a mounting location by means of a lifter (8) fastenable to the panel, under the guidance of the control cables (5) and the guide members (9).

Description

  • The present invention relates to a method for installing sandwich panels in tall buildings, said method comprising mounting the panels to a previously erected frame structure of the building. The invention relates further to an arrangement for implementing the method.
  • Particularly, the installation of sandwich panels in tall buildings by currently available methods is largely at the mercy of weather due to a relative lightness of such panels with respect to the area thereof, the installation thereof in high-rise jobs in windy weather becoming difficult or virtually impossible. Sandwich panels are prefabricated panels, comprising a core member of a thermally insulating material and surface sheets on its opposite main surfaces, each of said surface sheets having a tongue at least in one edge thereof and a groove in its opposite edge. Sandwich panels are installed on a wall in such a way that said tongues and grooves of adjacent sandwich panels are set to face each other for a tongue-and-groove joint between the sandwich panels. Hence, it is an object of the invention to provide a relatively simple method and arrangement for installing sandwich panels in tall buildings, said solution enabling installation also in windy weather and generally improving the occupational safety of installation work. Another object of the invention is to increase installation speed, resulting in major cost savings. In order to accomplish these objects of the invention, a method of the invention is characterized in that the method comprises providing the top portion of a building frame structure with bearer members, upon which are suspended control cables which extend in a vertical direction of the building spaced from each other by a distance substantially matching the installation width of a sandwich panel, and that the panel to be installed has each of its edge regions adjacent to the control cable provided with at least one guide lug, including a guide member fitting around the control cable, and that the method comprises lifting a panel to the mounting location by means of a lifter fastenable to the panel's top edge, under the guidance of the control cables and the guide members.
  • On the other hand, an arrangement of the invention for implementing the method is characterized in that the arrangement comprises:
    • bearer members in the top portion of a frame structure, upon which are suspended control cables which extend in a vertical direction of the building spaced from each other by a distance substantially matching the installation width of a sandwich panel;
    • a guide lug mounted at least on each upper corner of a panel to be installed and including a guide link fitting around the control cable; and
    • a lifter fastenable to the top edge of a panel for lifting the panel to the mounting location under the guidance of the control cables.
  • The inventive solution enables a simultaneous lifting of two or more panels. Another preferred way of practicing the inventive method is the use of two separate lifters with associated winches for speeding up installation work even further in such a way that, as one panel or set of panels is being lifted upwards to its mounting location, the other lifter can be lowered down to pick up the next panel or set of panels and bring it near the installation level while the preceding pair is being fixed to the frame. Traditionally, installation is performed one panel at a time. Only after one attachment to the frame has been completed has it been possible to start a pick-up process for the next panel, which has taken plenty of time with the lifter descending, a fresh panel being secured and lifted up to the installation level again.
  • The inventive method enables assembling two or more panels in the factory for a ready-to-use installation set, which is then shipped to an installation site and lifted to a mounting location under the guidance of control cables and guide members included in guide lugs mounted on the installation set. Two panels are secured to each other in the factory, for example by using preferably a joint structure described in publication WO98/19023, wherein a cross-sectionally G-shaped fastening bar is fitted in a tongue-and-groove joint between panels and the sets of panels are then carried on a truck to a construction site in a pre-established correct lifting position.
  • A traditional way of shipping such panels comprises a stack of panels, in which 5-10 panels lies on top of each other, with two of such stacks, having a pallet thereunder, on top of each other in a truck. The new way provides a more efficient use of load-carrying space as temporary stacks are not needed by virtue of the rigidity of a panel in the new position. This reduces damages, as well. At construction site, the panel can be picked up directly from a truck, which reduces the number of operations.
  • The method is capable of providing a quadruple installation speed with respect to a traditional way of installation, the savings being achieved relating not only to installation costs but also to a shorter construction time, which is a major factor regarding the overall costs of a building. In traditional installation, plenty of working days are lost as wind conditions prevent the installation of large-size and relatively light panels which are damaged as a result of bumping against the finished wall during a lifting process. The inventive installation method enables installation also in windy conditions by fitting the panels in the edge regions thereof with guide members intended for cooperation with control cables. In high wind, the optimal attachment could be by all four corners. By virtue of the inventive solution, it is estimated that 20% more working days can be provided for installation. In addition, the tightness of a building will be secured, even in the case of major rain storms.
  • The invention will now be described in more detail with reference to the accompanying drawings, in which:
  • Fig. 1
    shows an arrangement of the invention in a schematic view from the front,
    Fig. 2
    shows the arrangement of fig. 1 in a side view,
    Fig. 3
    shows in a schematic front view the mounting of adjacent panels to a frame, and
    Fig. 4
    shows a cross-section of fig. 3 on a larger scale.
  • In reference to figs. 1 and 2, the arrangement used in a method of the invention comprises bearer members 11, for example cantilever beams, fastened to a previously erected building frame structure 10, to its upper portion, upon which are suspended control cables 5 extending in a vertical direction of the building, at a distance from each other matching substantially the installation width of a sandwich panel, and which are securely anchored in position, for example by means of a counterweight 3 of concrete. The arrangement preferably further includes two winches 7a, 7b, having their hoisting cables adapted to extend over a lifting bracket 12 mounted on a top portion of the frame structure 10 and having their free ends provided at a specific time with a lifter 8a, 8b, which can be for example a lifter as set forth in patent EP 0,634,987 for attachment to the tongue-and-groove edge of a panel 1 to be hoisted.
  • The described embodiment illustrates two panels 1a and 1b to be hoisted, attached with a fastener 13 to each other for a set of two panels placed on top of a fitting stand 6. The pair of panels constituted by the panels 1a, 1b has its upper and lower corners both provided with guide lugs 4, including a protruding link member 9 fitting around a control cable 5. While being lifted, the pair of panels is guided by the control cables 5 and the link members 9 reliably to its mounting place, in which the pair of panels is placed on top of a previously fitted pair of panels and secured to frame structures, whereafter the link members 9 can be disengaged from the control cable 5 and the lifter 8 can be released from the top edge of the pair of panels and lowered down for lifting subsequent panels. The link member 9 can be e.g. a clevis or a pigtail hook. The arrangement is preferably provided with two winches 7a, 7b, whereby one winch can be used for hoisting a panel or a set of panels and the other winch can be used simultaneously for lowering down the lifter 8b of a previously lifted panel or set of panels for engaging it with the edge of a panel or set of panels to be hoisted next. The arrangement may further employ a third control cable (not shown), located centrally in terms of the installation width, as well as a lifter-mounted guide lug, whereby an unloaded lifter can be brought down without battering the wall with it.
  • The guide lug 4 has been described above as located in each corner of a pair of panels to be hoisted, in which case it is preferably provided with an engagement element insertable inside the tongue-and-groove edge for attachment to the panel. The guide lug may also be provided with e.g. a suction pad attachment for placing it as desired within the lateral edge region of a panel or set of panels to be lifted.
  • Coupling the sandwich panels 1a, 1b to each other for a set of panels can be effected by using a previously mentioned G-bar, which can be fitted in a tongue-and-groove joint between the panels and which is described more closely in publication WO98/19023.
  • Figs. 3 and 4 depict the attachment of panels to a frame. Fig. 3 illustrates superimposed panels 1a-1c coincident with one vertical column 10a of a frame structure, as well as panels 1d-1f adjacent thereto. The superimposed panels 1a-1c and 1d-1f, respectively, are coupled to each other with a tongue-and-groove joint 24. The panels 1a-1f are fastened to the frame columns 10a by the ends thereof. The currently used way of securing the panels with drill screws directly to a frame is slow because of the frame thickness. The time required for fastening all screws is as much as 10-15 minutes per panel. When applying an installation method of the invention, holes are first drilled in a steel frame for the equidistant attachment of panels and threads are formed for fastening bolts or, if the frame comprises a concrete-filled column, a threaded bushing is secured. These threaded holes 25 are then fitted with fastening screws 21 for securing the panels to the frame. The screws are preferably tightened with a moment drill.
  • The attachment of panels is preferably effected by means of fastening plates 23, which are provided with sealing (not shown) against the external surface of the panels. The fastening plates 23 are secured to the frame by means of bolts 21, fitting in the threaded holes 25 and extending through a joint 26 between adjacent panels 1a, 1d. Consequently, the panels do not require any separate fastening holes. The fastening plate 23 has a length which is slightly more than the width of a panel, e.g. 1250 mm while the width of a panel is 1200 mm, the fastening plate of a higher panel being preferably adapted to extend over the fastening plate of a panel therebelow. The fastening plates function also as a moisture barrier, making sure that rain water has no access inside the panels through the joint 26 (fig. 4) between the ends of adjacent panels 1a, 1d. The moisture barrier used to be provided by covering strips, which had to be screwed tightly to the surface to prevent rain water from getting inside the panel. When applying a method of the invention, the covering strips (not shown) are of such a length which is sufficient to always cover the combined height of panels to be hoisted together. The covering strips are provided with automatic locking to match the fastening plates 23, the covering strips being merely pressed in place during panel installation. There is no tightness requirement for them like before. Being a tedious process, it has also often been the case that the fitting thereof has been performed later in a separate operation.
  • One end of the panels is preferably pre-fitted on the ground with a packing strip 20, preferably of rock wool, for sealing the joint 26 between the ends of adjacent panels as the panels are installed. Thus, no packing is required afterwards.
  • The fastening plate 23 is preferably provided with pre-drilled holes, through which are screwed self-tapping screws 22 which secure a panel and transfer the weight of a panel to the frame structure, whereby the weight of the panels is not allowed to accumulate on top of the lowermost panels to break them.
  • In an installation method of the invention, window units or the like (e.g. ventilation grates) can be installed the same way as wall panels. Window units have tongues and grooves matching those of a panel, as described e.g. in publication WO 01/51749. This installation method eliminates the need of retrofitting a window or the like and the subsequent lining work from a high scaffold.
  • The inventive solution can also be used for installing panels in a vertical position, wherein the tongue-and-groove edged sides of the panels are essentially in a vertical orientation during a lifting and fitting process and the frame structure is provided with horizontal beams for fixing the ends of the panels thereto. In this case, the lifter 8a, 8b is preferably employed at each vertical edge of a panel or set of panels.

Claims (16)

  1. A method for installing sandwich panels (1, 1a, 1b) in tall buildings, said method comprising mounting the panels to a previously erected frame structure (10) of the building, characterized in that the method comprises providing a top portion of the frame structure (10) with bearer members (11), upon which are suspended control cables (5) which extend in a vertical direction of the building spaced from each other by a distance substantially matching the installation width of a sandwich panel, and that the panel to be installed has each of its edge regions adjacent to the control cable provided with at least one guide lug (4), including a guide member (9) fitting around the control cable (5), and that the method comprises lifting a panel to the mounting location by means of one or more lifters (8) fastenable to the panel, under the guidance of the control cables (5) and the guide members (9).
  2. A method as set forth in claim 1, characterized in that the method comprises providing the guide lug (4) in both top corners of the panel.
  3. A method as set forth in claim 1 or 2, characterized in that the method comprises lifting up two or more panels at a time, the panels (1a, 1b) to be lifted being clamped to each other.
  4. A method as set forth in any of claims 1-3, characterized in that the method comprises using a twin lifter, having its drive mechanism constituted by winches (7a, 7b).
  5. A method as set forth in any of the preceding claims, characterized in that the method comprises assembling two or more panels in the factory for a ready-to-use installation set, which is then shipped to an installation site and lifted to a mounting location under the guidance of the control cables (5) and the guide members (9) of the guide lugs (4) mounted to the installation set.
  6. A method as set forth in claim 5, wherein the sandwich panels comprise sandwich panels, characterized in that the method comprises fastening the panels to each other in the factory by means of a G-bar fitted in a tongue-and-groove joint between the panels, and shipping the same by a truck to a construction site in a pre-established correct lifting position.
  7. A method as set forth in any of claims 1-5, characterized in that the sandwich panels to be installed in the method comprise window units.
  8. A method as set forth in any of the preceding claims, characterized in that the panels (1a-1f) are fastened to a frame structure (10a) by the ends thereof by means of fastening plates (23) provided with sealing coming against the panel's outer surface, whereby the fastening plates function at the same time as a moisture barrier.
  9. A method as set forth in claim 8, characterized in that the fastening plate (23) has a length which is slightly more than the width of the panel (1a-1f).
  10. A method as set forth in any of claims 1-9, characterized in that the panels are installed in a horizontal position, whereby, during a lifting process, each side edge of the panel or set of panels has one or more lifters (8) secured thereto.
  11. A method as set forth in any of claims 1-9, characterized in that the panels are installed in a vertical position, whereby, during a lifting process, each side edge of the panel or set of panels has a lifter (8) secured thereto.
  12. An arrangement for installing sandwich panels (1, 1a, 1b) in a previously erected frame structure (10) of a tall building, characterized in that the arrangement comprises:
    bearer members (11) in the frame structure's (10) top portion, upon which are suspended control cables (5) which extend in a vertical direction of the building spaced from each other by a distance substantially matching the installation width of a sandwich panel;
    a guide lug (4) mounted on the panel to be installed in each of panels edge regions adjacent to the control cable and including a guide member (9) fitting around the control cable (5); and
    a lifter (8) fastenable to the top edge of a panel for lifting the panel to the mounting location under the guidance of the control cables (5) and the guide members (9).
  13. An arrangement as set forth in claim 10, characterized in that there are two or more liftable panels clamped to each other.
  14. An arrangement as set forth in claim 12 or 13, characterized in that the liftable panel comprises a window unit.
  15. An arrangement as set forth in any of claims 12-14, characterized in that the arrangement comprises a fastening plate (23), by means of which the panels are fastenable by the ends thereof to frame structures (10a).
  16. An arrangement as set forth in claim 15, characterized in that the frame structure (10a) is pre-fitted with threaded holes (25) and the fastening plates (23) are fastenable to the frame by means of fastening bolts (21), which are insertable in the threaded holes and extend through a joint area (26) between the ends of adjacent panels.
EP04102656A 2003-07-11 2004-06-11 Method and arrangement for installing sandwich panels in tall buildings Active EP1496173B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FI20031057A FI20031057A (en) 2003-07-11 2003-07-11 Method and arrangement for installing building elements in tall buildings
FI20031057 2003-07-11

Publications (2)

Publication Number Publication Date
EP1496173A1 true EP1496173A1 (en) 2005-01-12
EP1496173B1 EP1496173B1 (en) 2008-03-19

Family

ID=27636090

Family Applications (1)

Application Number Title Priority Date Filing Date
EP04102656A Active EP1496173B1 (en) 2003-07-11 2004-06-11 Method and arrangement for installing sandwich panels in tall buildings

Country Status (5)

Country Link
EP (1) EP1496173B1 (en)
AT (1) ATE389764T1 (en)
DE (1) DE602004012488T2 (en)
FI (1) FI20031057A (en)
NO (1) NO328278B1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2304735A1 (en) * 1975-03-17 1976-10-15 Bassi Roger Erecting outer building panels - using pulleys and rails to move panels vertically, then horizontally to correct positions at which panels attached to support links
JPS6030743A (en) * 1983-07-29 1985-02-16 ワイケイケイ株式会社 Attachment of curtain wall unit in unit curtain wall
DE8506952U1 (en) * 1985-03-09 1985-07-04 Müller, Volker, 6520 Worms Curtain wall for buildings
US5152369A (en) * 1991-09-10 1992-10-06 Mori Nakaoka Apparatus and method for hoisting a platform adjacent a scaffolding
US5181825A (en) * 1988-11-28 1993-01-26 Yoshida Kogyo K.K. Method for lifting and guiding elements on building site
JPH1181682A (en) * 1997-09-09 1999-03-26 Asahi Chem Ind Co Ltd Election for large panel
JP2001317207A (en) * 2000-05-02 2001-11-16 Toda Constr Co Ltd Method of lifting exterior-wall panel

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2304735A1 (en) * 1975-03-17 1976-10-15 Bassi Roger Erecting outer building panels - using pulleys and rails to move panels vertically, then horizontally to correct positions at which panels attached to support links
JPS6030743A (en) * 1983-07-29 1985-02-16 ワイケイケイ株式会社 Attachment of curtain wall unit in unit curtain wall
DE8506952U1 (en) * 1985-03-09 1985-07-04 Müller, Volker, 6520 Worms Curtain wall for buildings
US5181825A (en) * 1988-11-28 1993-01-26 Yoshida Kogyo K.K. Method for lifting and guiding elements on building site
US5152369A (en) * 1991-09-10 1992-10-06 Mori Nakaoka Apparatus and method for hoisting a platform adjacent a scaffolding
JPH1181682A (en) * 1997-09-09 1999-03-26 Asahi Chem Ind Co Ltd Election for large panel
JP2001317207A (en) * 2000-05-02 2001-11-16 Toda Constr Co Ltd Method of lifting exterior-wall panel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 1999, no. 08 30 June 1999 (1999-06-30) *
PATENT ABSTRACTS OF JAPAN vol. 2002, no. 03 3 April 2002 (2002-04-03) *

Also Published As

Publication number Publication date
DE602004012488T2 (en) 2009-03-05
DE602004012488D1 (en) 2008-04-30
NO20042944L (en) 2005-01-12
FI20031057A0 (en) 2003-07-11
FI20031057A (en) 2005-01-12
NO328278B1 (en) 2010-01-18
EP1496173B1 (en) 2008-03-19
ATE389764T1 (en) 2008-04-15

Similar Documents

Publication Publication Date Title
EP2894269B1 (en) System for mounting facade elements
US5063718A (en) Curtain wall for a building
WO2009093948A1 (en) Profile for the facade of a multi-storey building and a multi-storey building with such a facade
RU2762583C1 (en) Modular assembly of steel structure of lifting equipment
CN112112418B (en) Construction method of high-rise building aluminum formwork climbing frame combined system
EP1496173B1 (en) Method and arrangement for installing sandwich panels in tall buildings
WO2006056062A1 (en) Curtain wall construction and fastening system
US4441285A (en) Prefabricated balcony unit
US20060179745A1 (en) Method of building a building
WO2009093974A1 (en) Frame system for supporting facade elements and use of the frame system
CA2604547A1 (en) Ring beam structure and method of constructing a timber frame
AU2018247335A1 (en) Lift shaft assembly and construction and installation thereof
IE20180303A1 (en) A bracket assembly
JP2557161B2 (en) Roof unit with parapet
JP2664037B2 (en) Roof panel
IE20180454A1 (en) A modular roofing component
CN115557377A (en) Indoor monorail hanging beam installation method
JPS6233383B2 (en)
JPS61158565A (en) Construction of outer wall by alc panel
JPH02101251A (en) Wall material fitting method for alc construction
SK9411Y1 (en) Elevator and method of its assembly
JPH0886021A (en) Fitting structure of balcony and fitting method thereof
CZ32273U1 (en) A composed assembly of a steel structure for a lifting device
WO2008096353A2 (en) Formwork system and wall construction method therewith
JPH1061024A (en) Reinforcing structure for balcony unit

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL HR LT LV MK

17P Request for examination filed

Effective date: 20050712

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

AXX Extension fees paid

Extension state: LV

Payment date: 20050712

Extension state: LT

Payment date: 20050712

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: PAROC OY AB

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: LT LV

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 602004012488

Country of ref document: DE

Date of ref document: 20080430

Kind code of ref document: P

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20080319

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080630

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080826

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

EN Fr: translation not filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080630

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

26N No opposition filed

Effective date: 20081222

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080611

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080619

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080630

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080611

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080920

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080319

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080620

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090109

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20120627

Year of fee payment: 9

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20130611

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130611

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20150618

Year of fee payment: 12

Ref country code: DE

Payment date: 20150624

Year of fee payment: 12

Ref country code: FI

Payment date: 20150618

Year of fee payment: 12

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602004012488

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160611

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160612

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170103