EP1482098A1 - Water-impermeable cellar and method of its construction - Google Patents

Water-impermeable cellar and method of its construction Download PDF

Info

Publication number
EP1482098A1
EP1482098A1 EP04004917A EP04004917A EP1482098A1 EP 1482098 A1 EP1482098 A1 EP 1482098A1 EP 04004917 A EP04004917 A EP 04004917A EP 04004917 A EP04004917 A EP 04004917A EP 1482098 A1 EP1482098 A1 EP 1482098A1
Authority
EP
European Patent Office
Prior art keywords
foundation
plate
concrete
base plate
impermeable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP04004917A
Other languages
German (de)
French (fr)
Other versions
EP1482098B1 (en
Inventor
Ferdinand Hammerer
Original Assignee
GLATTHAAR FERTIGKELLER GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GLATTHAAR FERTIGKELLER GmbH filed Critical GLATTHAAR FERTIGKELLER GmbH
Priority to EP20040004917 priority Critical patent/EP1482098B1/en
Publication of EP1482098A1 publication Critical patent/EP1482098A1/en
Application granted granted Critical
Publication of EP1482098B1 publication Critical patent/EP1482098B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/16Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
    • E04B1/161Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with vertical and horizontal slabs, both being partially cast in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8611Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers being embedded in at least one form leaf
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8611Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers being embedded in at least one form leaf
    • E04B2/8617Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers being embedded in at least one form leaf with spacers being embedded in both form leaves

Definitions

  • the present invention relates to a waterproof basement Double wall elements as outer walls, which are based on the inner wall panel support the floor slab and with waterproof concrete together with the base plate are made and poured.
  • the invention relates also a method of making a waterproof cellar by means of double wall elements.
  • EP 1 046 758 A1 describes a method for producing a plate and a plate of which rising composite formwork wall as well as a prefabricated Composite formwork element known.
  • prefabricated composite formwork elements are intended for casting the plate underneath necessary parts already in the prefabrication in the composite formwork element integrated and the composite formwork offset before casting the slab. This serves a collision of connecting reinforcements with spacers of the To avoid composite formwork elements, dangers from standing up Reduce reinforcement bars on the construction site and move the To simplify composite formwork.
  • Double wall elements As a base plate acting double wall elements and the space with concrete in pour out in one pour.
  • Ceiling elements placed before pouring and thus the floor in one Concrete casting can be made.
  • This basement is also about to manufacture a basement that is impermeable to water; a so-called "White tub".
  • the double wall elements exist, as in the prior art Technology is discussed in detail from prefabricated prefabricated panels made by Lattice girders are factory-made into a double element with remaining Space are connected. Below are the inner wall panel referred to as the inner panel and the outer wall panel as the outer panel. It is known that a basement or a floor of several such Double wall elements is composed as outer wall segments. in the The following, however, will simplify the description of only the singular used.
  • the production from a single casting is an essential measure for the production of a watertight cellar.
  • impermeable types of concrete can prevent water from entering the concrete beyond a depth of 1.5 cm can be prevented.
  • the present invention has for its object to manufacture such Basement to optimize further, so that the production of the basement with high quality compared to conventional cellars that are not designated as impermeable to water can be done more cheaply.
  • the outer plate is supported on a load-bearing layer as a foundation and the inner plate on the reinforcement of the floor slab.
  • waterproof basement is the foundation that is considered one among the Outside walls surrounding foundation strips is formed, the Space between this circumferential strip as a foundation with a Filling layer, for example made of gravel, earth or lean concrete, is filled.
  • a Filling layer for example made of gravel, earth or lean concrete.
  • any partitions must be used as prefabricated elements be used before laying ceiling elements.
  • the partition walls provided under the Partitions arranged on additional concrete blocks as a foundation or support the load-bearing insulation board.
  • the base plate serve prefabricated support elements between the side walls and the Foundation as a support for the partition walls until the concrete hardens.
  • the penetration of is particularly important for a water-impermeable cellar Water in hairline cracks between the poured concrete and the prefabricated concrete parts, such as in particular Outer plate, to prevent.
  • the outer wall plate is designed in such a way that near the bottom end runs parallel to the ground bitumen-coated sheet is poured into the outer wall panel.
  • the bitumen-coated sheet metal protrudes from the surface of the outer wall panel and into the concrete-filled space.
  • this bitumen-coated sheet will surpass the Interior insulation. This makes it reliable and simple prevents moisture from getting between the outer wall and the foundation or the load-bearing insulation board rises, penetrate further into the wall can.
  • step G To also the ceiling together with the outer walls and the floor slab To be able to produce a casting is expediently carried out before step G at least placed on the inner panels finished ceiling elements.
  • step F expanded metal is preferably applied to the mat baskets or a barrier layer in front of the end resting on the foundation is made of expanded metal.
  • Figure 1 shows a circumferential foundation strip 1, which on the prepared Is concreted in a building pit. Furthermore, the Places where inner walls 2 are to be erected on the ground also concrete blocks 3 concreted, the later edition for the inner walls serve. Usually two such concrete blocks 3 are sufficient.
  • the Gap 4 between the peripheral edge of the foundation strip 1 is with a filling layer of gravel, earth or lean concrete. If one with it Insulated basement is made, will be load-bearing at this point Insulation boards laid. This structure is related to 5 shown.
  • FIG. 2 shows the foundation 1 and the one filled with a filling layer 32 Intermediate space 4.
  • Mat baskets 5 placed for the base plate 30.
  • These mat baskets are preferably, as shown in the figure, U-shaped and be positioned on the foundation 1 in such a way that it rests on the reinforced web 6 the foundation.
  • spacers 8 underlaid to raise the mat basket 5 and in particular in the area of the web 6 to be able to absorb load.
  • a upper reinforcement 9 placed to this Mat baskets 5 and in the remaining inner base plate area. Additional reinforcement can vary depending on the application be introduced inside, as is known to the expert and is expedient or necessary.
  • the vertical outer wall 31 is formed by a double wall element 10, the has a larger outer plate 11 and a smaller inner plate 12 which over a reinforcement 13 are connected.
  • the double wall element 10 is arranged such that the outer plate 11 is on the foundation 1 and the inner plate 12 rests on the leg 7 of the mat basket 5 and over supports the leg 6. So after setting up the double wall element 10 this cannot fall over, is in the figure in the foundation cast mounting iron 14 shown, so that in the space wedging between the mounting iron 14 and the outer plate 11, for example, using a wooden wedge 15.
  • to Improvement of the reinforcement within the double wall element 10 is in the FIG. Also shows a connecting iron 16 cast into the foundation 1 shown.
  • Such measures are familiar to the person skilled in the art and belong to the usual manual measures.
  • a prefabricated ceiling element 17 is also shown, which as self-supporting ceiling rests on the inner plate 12 and especially designed carrier is not shown.
  • the pouring of the space 18 in the double wall element 10 basically take place simultaneously with the floor area and the ceiling.
  • the concrete poured into the space 18 has the property bulging on the other side of the inner plate 12 are against this To take action.
  • this can be prevented by a correspondingly designed, and not shown, angular element, or simply by angled formwork panels that are on the one hand on the Inner plate 12 and, on the other hand, rest on the upper reinforcement 9, be provided.
  • the cover parallel to the Mat basket is larger than the slump of the used waterproof concrete.
  • the spread of the concrete is usually in such buildings not larger than 60 cm. If the requirement for the The spread of the concrete is less, the coverage can also be less.
  • an expanded metal 19 is preferably incorporated on the mat basket 5 but under the upper reinforcement 9 so that it does not can be pushed up.
  • an appropriate expanded metal (not shown) in the space 18 to be installed all around in front of the web 6. Then, however, are for one proper connection chisel, also not shown through stuck because the concrete does not penetrate due to the expanded metal this can penetrate.
  • Figure 2 also shows a special measure to prevent Penetration of moisture through hairline cracks that appear between the new poured concrete in the space 18 and the existing and hardened outer plate 11 can arise.
  • an outer plate 11th used in which a bitumen-coated sheet 20 is already cast, the extends out of the surface. Since this sheet in the waterproof concrete is poured into the space 18 can Moisture only rise up to this sheet and from there no further crawl up along the outer plate 11.
  • An alternative, but more complex Possibility is between the outer plate 11 and the foundation 1 to apply a surrounding bitumen rubber layer, which is also in the Intermediate space 18 protrudes and thus prevents the rise of moisture.
  • This bitumen rubber layer 21 is also shown in the figure, wherein it are alternatives, which are usually not both at the same time applied, although they are shown here in a figure. This serves for illustration only.
  • Figure 3 shows a concrete block 3 with the appropriately filled spaces 4.
  • a support element 21 which consists of a prefabricated concrete slab 22 and a double T-beam cast into it 23, also called IPE carrier, exists.
  • This support element 21 supports it inner wall 2 to be positioned as a finished part.
  • the support element 21 is like this trained that it stays under the area 24 and at the smooth stroke clean connection to the inner wall 2 results.
  • FIG. 4 shows the top view in FIG. 4a and the end view in FIG. 4b.
  • the basement is built in a groundwater area, so will be circulating around the plate 21 tapes 25 glued.
  • a bitumen coated sheet (similar to sheet 20) on top of the sheet 21, outstanding from this, can be arranged.
  • Figure 5 shows a section through the basement according to Figure 2, however here an insulated double wall element 10 is used, which on the Inside of the outer plate 11 contains an insulating material 27. Instead of Foundation 1 and the filled space 4 and the concrete blocks 3 is here a load-bearing insulating plate 28 is arranged as a base.
  • the remaining Measures are the same as those in connection with FIG. 2 were discussed. It should be noted that the bitumen-coated sheet 20 in this case protrudes accordingly far from the material 27, or one Bitumen rubber layer 29 correspondingly far in the water-impermeable Concrete protrudes.
  • Figure 6 shows two outer plates 11 of the Inside with the resulting bitumen-coated sheet 20.
  • the Distance between the outer plates 11 is approximately 1 cm. So that a dense Connection of the sheets 20 in the two outer plates 11 is possible, they have a recess 33 in which one of the two before pouring concrete Sheets 20 connecting tab 34 is glued.

Abstract

The waterproof cellar has double wall elements has exterior walls (31) and with the inner wall panels (12) are supported on a floor slab, and manufactured and cast with the floor slab with water impenetrable concrete. The outer wall panels are supported on a load dispersing course (1) as a foundation and supports the inner panel on the reinforcement (5,9) of the floor slab. A foundation strip extends around under the exterior walls and the intermediate space is filled with a filler course (32). An independent claim is included for a method for the manufacture of a waterproof cellar.

Description

Die vorliegende Erfindung betrifft einen wasserundurchlässigen Keller mit Doppelwandelementen als Außenwände, die sich mit der inneren Wandplatte auf der Bodenplatte abstützen und mit wasserundurchlässigem Beton zusammen mit der Bodenplatte hergestellt und ausgegossen sind. Die Erfindung betrifft außerdem ein Verfahren zur Herstellung eines wasserundurchlässigen Kellers mittels Doppelwandelementen.The present invention relates to a waterproof basement Double wall elements as outer walls, which are based on the inner wall panel support the floor slab and with waterproof concrete together with the base plate are made and poured. The invention relates also a method of making a waterproof cellar by means of double wall elements.

Aus der EP 1 046 758 A1 ist ein Verfahren zur Herstellung einer Platte und einer davon aufgehenden Verbundschalungswand sowie ein vorfabriziertes Verbundschalungselement bekannt. Bei den vorfabrizierten Verbundschalungselementen werden für das Gießen der darunter vorgesehenen Platte notwendige Teile bereits bei der Vorfabrikation in das Verbundschalungselement integriert und die Verbundschalung vor dem Gießen der Platte versetzt. Dies dient dazu eine Kollision von Anschlussbewehrungen mit Distanzhaltern der Verbundschalungselemente zu vermeiden, Gefahren durch aufstehende Bewehrungsstäbe auf der Baustelle zu reduzieren und das Versetzen der Verbundschalung zu vereinfachen. EP 1 046 758 A1 describes a method for producing a plate and a plate of which rising composite formwork wall as well as a prefabricated Composite formwork element known. For prefabricated composite formwork elements are intended for casting the plate underneath necessary parts already in the prefabrication in the composite formwork element integrated and the composite formwork offset before casting the slab. This serves a collision of connecting reinforcements with spacers of the To avoid composite formwork elements, dangers from standing up Reduce reinforcement bars on the construction site and move the To simplify composite formwork.

Aus der DE 202 19 324 U1 ist bekannt, Doppelwandelemente auf als Bodenplatte wirkende Doppelwandelemente aufzusetzen und den Zwischenraum mit Beton in einem Guss auszugießen. Zusätzlich können gleichzeitig auch noch Deckenelemente vor dem Ausgießen aufgelegt und damit das Geschoss in einem Betonguss hergestellt werden. Bei diesem Kellergeschoss geht es auch darum, ein Kellergeschoss herzustellen, das wasserundurchlässig ist; eine sogenannte "Weiße Wanne". Die Doppelwandelemente bestehen, wie es im Stand der Technik ausführlich diskutiert wird, aus vorgefertigten Fertigplatten, die durch Gitterträger werksseitig zu einem Doppelelement mit verbleibendem Zwischenraum verbunden sind. Im nachfolgenden werden die innere Wandplatte als Innenplatte und die äußere Wandplatte als Außenplatte bezeichnet. Es ist bekannt, dass ein Keller oder ein Geschoss aus mehreren derartigen Doppelwandelemente als Außenwandsegmente zusammengesetzt ist. Im Nachfolgenden wird jedoch zur Vereinfachung der Beschreibung nur der Singular verwendet.From DE 202 19 324 U1 it is known to use double wall elements as a base plate acting double wall elements and the space with concrete in pour out in one pour. In addition, at the same time Ceiling elements placed before pouring and thus the floor in one Concrete casting can be made. This basement is also about to manufacture a basement that is impermeable to water; a so-called "White tub". The double wall elements exist, as in the prior art Technology is discussed in detail from prefabricated prefabricated panels made by Lattice girders are factory-made into a double element with remaining Space are connected. Below are the inner wall panel referred to as the inner panel and the outer wall panel as the outer panel. It is known that a basement or a floor of several such Double wall elements is composed as outer wall segments. in the The following, however, will simplify the description of only the singular used.

Die Herstellung aus einem Guss ist eine wesentliche Maßnahme zur Herstellung eines wasserundurchlässigen Kellers. Mit den heute üblichen wasserundurchlässigen Betonarten kann ein Eindringen von Wasser in den Beton über eine Tiefe von 1,5 cm hinaus, verhindert werden.The production from a single casting is an essential measure for the production of a watertight cellar. With the usual today impermeable types of concrete can prevent water from entering the concrete beyond a depth of 1.5 cm can be prevented.

Das in dem Stand der Technik beschriebene Gebäudegeschoss stellt bereits einen enormen Fortschritt im Hinblick auf die Herstellung eines wasserundurchlässigen Kellers dar. Für derartige Keller besteht ein erhöhter Bedarf, da einerseits diese Keller in Feuchtgebiete oder in Grundwassergebiete gebaut werden können und andererseits die übliche Drainage um diese Keller weggelassen werden kann. Letzteres ist seitens der Behörden, zumindest in Deutschland, erwünscht.The building floor described in the prior art already provides a huge step forward in making a water-impermeable cellar. There is an elevated cellar of this type Need, because on the one hand these basements in wetlands or in groundwater areas can be built and on the other hand the usual drainage around this basement can be omitted. The latter is on the part of the authorities, at least in Germany, desired.

Der vorliegenden Erfindung liegt die Aufgabe zugrunde, die Herstellung derartiger Keller weiter zu optimieren, so dass die Fertigung der Keller bei hoher Qualität gegenüber herkömmlichen, nicht als wasserundurchlässig bezeichneten Keller kostengünstiger erfolgen kann.The present invention has for its object to manufacture such Basement to optimize further, so that the production of the basement with high quality compared to conventional cellars that are not designated as impermeable to water can be done more cheaply.

Diese Aufgabe wird erfindungsgemäß durch einen wasserundurchlässigen Keller mit den Merkmalen des Vorrichtungsanspruchs und durch ein Verfahren mit den Merkmalen des unabhängigen Verfahrensanspruchs gelöst. Weitere Vorteilhafte Ausgestaltungen sind den jeweiligen rückbezogenen Unteransprüchen zu entnehmen.This object is achieved by a water-impermeable basement with the features of the device claim and by a method with the Features of the independent process claim solved. More advantageous Refinements are to the respective subordinate claims remove.

Gemäß der Erfindung stützt sich die Außenplatte auf eine lastabtragende Schicht als Fundament und die Innenplatte auf der Bewehrung der Bodenplatte ab. Dies stellt gegenüber dem Stand der Technik, bei dem noch Doppelwandelemente als Gerüst für die Bodenplatte verwendet werden, einen erheblichen Fortschritt hinsichtlich der für den Bau verwendeten Bauelemente als auch für die Herstellung der aus einem Guss hergestellten Verbindung zwischen der Bodenplatte und der Seitenwand dar.According to the invention, the outer plate is supported on a load-bearing layer as a foundation and the inner plate on the reinforcement of the floor slab. This compared to the prior art, in which still double wall elements as Scaffolding used for the floor slab made significant progress with regard to the components used for the construction as well as for the Manufacture of the connection between the Base plate and the side wall.

Ein weiteres bevorzugtes Merkmal des erfindungsgemäßen wasserundurchlässigen Kellers ist das Fundament, das als ein unter den Außenwänden umlaufender Fundamentstreifen ausgebildet ist, wobei der Zwischenraum zwischen diesem umlaufenden Streifen als Fundament mit einer Füllschicht, beispielsweise aus Schotter, Erde oder Magerbeton, gefüllt ist. Bei der Herstellung von isolierten Kellern wird zweckmäßigerweise der Untergrund für die Bodenplatte durch eine lastabtragende Dämmplatte gebildet.Another preferred feature of the invention waterproof basement is the foundation that is considered one among the Outside walls surrounding foundation strips is formed, the Space between this circumferential strip as a foundation with a Filling layer, for example made of gravel, earth or lean concrete, is filled. at the production of insulated cellars is expediently the underground for the floor slab is formed by a load-bearing insulation board.

Da gleichzeitig mit den Seitenwänden und der Bodenplatte auch die Decke ausgegossen werden soll, müssen eventuelle Zwischenwände als Fertigelemente vor dem Auflegen von Deckenelementen eingesetzt werden. Hierzu sind besondere Auflagen für die Zwischenwände vorgesehen, die unter den Zwischenwänden angeordnet, sich auf zusätzlichen Betonblöcken als Fundament oder der lastabtragenden Dämmplatte abstützen. Im Bereich der Bodenplatte, dienen vorgefertigte Stützelemente zwischen den Seitenwänden und dem Fundament als Träger der Zwischenwände bis zum Aushärten des Betons.Because the ceiling and the side walls and the base plate at the same time to be poured out, any partitions must be used as prefabricated elements be used before laying ceiling elements. For this are special requirements for the partition walls provided under the Partitions arranged on additional concrete blocks as a foundation or support the load-bearing insulation board. In the area of the base plate, serve prefabricated support elements between the side walls and the Foundation as a support for the partition walls until the concrete hardens.

Besonders wichtig für einen wasserundurchlässigen Keller ist, das Eindringen von Wasser in sich doch immer wieder bildenden Haarrissen zwischen dem eingegossenen Beton und den vorgefertigten Betonteilen, wie insbesondere der Außenplatte, zu verhindern. Hierzu wird die Außenwandplatte derart ausgebildet, dass nahe des unteren Endes ein parallel zum Boden verlaufendes bitumenbeschichtetes Blech in die Außenwandplatte eingegossen wird. Das bitumenbeschichtete Blech ragt aus der Oberfläche der Außenwandplatte heraus und in den betongefüllten Zwischenraum hinein. Sofern eine Doppelwand mit Innendämmung verwendet wird, überragt dieses bitumenbeschichtete Blech die Innendämmung. Damit wird zuverlässig und auf einfache Art und Weise verhindert, dass Feuchtigkeit, die zwischen der Außenwand und dem Fundament bzw. der lastabtragenden Dämmplatte aufsteigt, weiter in die Wand eindringen kann. Alternativ, jedoch aufwendiger und nicht ganz so wirkungsvoll, besteht die Möglichkeit, zwischen der Außenwand und dem Fundament bzw. der lastabtragenden Dämmplatte eine entsprechende Schicht aus Bitumenkautschuk vor dem Aufsetzen der Doppelwand auszubringen, wobei diese Schicht, entsprechend der Breite des Bleches auch entsprechend weit in den Zwischenraum hineinragen muss.The penetration of is particularly important for a water-impermeable cellar Water in hairline cracks between the poured concrete and the prefabricated concrete parts, such as in particular Outer plate, to prevent. For this purpose, the outer wall plate is designed in such a way that near the bottom end runs parallel to the ground bitumen-coated sheet is poured into the outer wall panel. The bitumen-coated sheet metal protrudes from the surface of the outer wall panel and into the concrete-filled space. Provided a double wall with If internal insulation is used, this bitumen-coated sheet will surpass the Interior insulation. This makes it reliable and simple prevents moisture from getting between the outer wall and the foundation or the load-bearing insulation board rises, penetrate further into the wall can. Alternatively, however, it is more complex and not quite as effective Possibility between the outer wall and the foundation or the load-bearing insulation board a corresponding layer of bitumen rubber before applying the double wall, this layer, according to the width of the sheet also in the corresponding The space must protrude.

Gemäß dem erfindungsgemäßen Verfahren erfolgt die Herstellung mit den folgenden Schritten:

  • A Betonieren eines umlaufenden Randes als Fundamentsreifen;
  • B Füllen des Zwischenraumes mit einer Füllung und glätten derselben;
  • C Anordnen von Mattenkörben auf dem Fundament und der Füllung entlang dem Fundament ohne dabei das Fundament vollständig zu verdecken;
  • D Einbringen von Bewehrungen in den verbleibenden Zwischenraum und Auflegen einer oberen Bewehrung auf die Mattenkörbe;
  • E Aufsetzen von Doppelwandelementen mit einer größeren Außenplatte und einer kleineren Innenplatte mit der Außenplatte auf dem Fundament und mit der Innenplatte auf den Mattenkörben;
  • F Anbringen einer umlaufenden Sperrschicht, die größer ist als das Ausbreitungsmaß des verwendeten Betons angrenzend an die den Kellerraum zugewandten Innenwände der Innenplatten auf den Mattenkörben;
  • G Füllen des Zwischenraumes zwischen den Außenplatten und den Innenplatten der Doppelwandelemente mit wasserundurchlässigem Beton und gleichzeitig der Mattenkörbe und der dazwischen angeordneten Bewehrung zur Herstellung einer Bodenplatte;
  • H Glätten der Oberfläche der Bodenplatte.
  • According to the method according to the invention, production takes place with the following steps:
  • A Concreting a peripheral edge as a foundation tire;
  • B filling the intermediate space with a filling and smoothing it;
  • C Placing mat baskets on the foundation and the filling along the foundation without completely covering the foundation;
  • D placing reinforcement in the remaining space and placing an upper reinforcement on the mesh baskets;
  • E placing double wall elements with a larger outer panel and a smaller inner panel with the outer panel on the foundation and the inner panel on the mat baskets;
  • F applying a circumferential barrier layer that is larger than the spread of the concrete used adjacent to the inner walls of the inner panels facing the basement on the mat baskets;
  • G filling the space between the outer panels and the inner panels of the double wall elements with waterproof concrete and at the same time the mesh baskets and the reinforcement arranged in between to produce a floor panel;
  • H Smooth the surface of the base plate.
  • Um auch die Decke zusammen mit den Außenwänden und der Bodenplatte in einem Guss herstellen zu können, werden zweckmäßigerweise vor Schritt G zumindest auf die Innenplatten Fertigdeckenelemente aufgelegt.To also the ceiling together with the outer walls and the floor slab To be able to produce a casting is expediently carried out before step G at least placed on the inner panels finished ceiling elements.

    Anstelle von Schritt F werden vorzugsweise auf die Mattenkörbe Streckmetall aufgelegt oder vor dem auf dem Fundament aufliegenden Ende eine Sperrschicht aus Streckmetall angeordnet wird.Instead of step F, expanded metal is preferably applied to the mat baskets or a barrier layer in front of the end resting on the foundation is made of expanded metal.

    Bei der Herstellung eines gedämmten Kellers erübrigen sich die Verfahrensschritte A und B, da an diese Stelle dann eine lastabtragende Dämmplatte aufgelegt wird.This is not necessary when producing an insulated cellar Steps A and B, because at this point a load transfer Insulation board is placed.

    Mit dem erfindungsgemäß ausgestalteten Keller und dem Herstellungsverfahren wird eine Möglichkeit geschaffen, die eine wesentlich (kosten)günstigere Herstellung erlaubt.With the basement designed according to the invention and the manufacturing process a possibility is created that is a much (cheaper) cheaper Manufacturing allowed.

    Nachfolgend wird die Erfindung in Verbindung mit den begleitenden Zeichnungen und verschiedenen Ausführungsbeispielen näher erläutert. Es stellen dar:

    Figur 1
    die Draufsicht auf den Untergrund unter einer zu fertigenden Bodenplatte, bzw. Keller;
    Figur 2
    die Teilschnittdarstellung durch einen vorbereiteten Fertigkeller für den Ausguss mit Beton;
    Figur 3
    die Schnittdarstellung durch die für den Ausguss mit Beton vorbereitete Bodenplatte im Bereich der Innenwände;
    Figur 4
    verschiedene Ansichten eines Stützelementes für die Innenwände;
    Figur 5
    eine Darstellung entsprechend Figur 2 für einen gedämmten wasserundurchlässigen Keller; und
    Figur 6
    die Seitenansicht auf zwei aneinanderstoßende Außenplatten von zwei Doppelwandelementen mit einem bitumenbeschichteten Band.
    The invention is explained in more detail below in conjunction with the accompanying drawings and various exemplary embodiments. They represent:
    Figure 1
    the top view of the ground under a floor slab or cellar to be manufactured;
    Figure 2
    the partial sectional view through a prepared prefabricated cellar for pouring concrete;
    Figure 3
    the sectional view through the base plate prepared for pouring concrete in the area of the inner walls;
    Figure 4
    different views of a support element for the inner walls;
    Figure 5
    a representation corresponding to Figure 2 for an insulated waterproof basement; and
    Figure 6
    the side view of two abutting outer panels of two double wall elements with a bitumen-coated tape.

    Figur 1 zeigt einen umlaufenden Fundamentstreifen 1, der auf den vorbereiteten Untergrund in einer Baugrube betoniert wird. Des Weiteren werden an den Stellen, an denen Innenwände 2 errichtet werden sollen, auf dem Untergrund ebenfalls Betonblöcke 3 betoniert, die der späteren Auflage für die Innenwände dienen. Üblicherweise sind zwei derartige Betonblöcke 3 ausreichend. Der Zwischenraum 4 zwischen dem umlaufenden Fundamentstreifenrand 1 wird mit einer Füllschicht aus Schotter, Erde oder Magerbeton gefüllt. Sofern ein damit isolierter Keller hergestellt wird, werden an dieser Stelle lastabtragende Dämmplatten verlegt. Dieser entsprechende Aufbau ist im Zusammenhang mit der Figur 5 gezeigt.Figure 1 shows a circumferential foundation strip 1, which on the prepared Is concreted in a building pit. Furthermore, the Places where inner walls 2 are to be erected on the ground also concrete blocks 3 concreted, the later edition for the inner walls serve. Usually two such concrete blocks 3 are sufficient. The Gap 4 between the peripheral edge of the foundation strip 1 is with a filling layer of gravel, earth or lean concrete. If one with it Insulated basement is made, will be load-bearing at this point Insulation boards laid. This structure is related to 5 shown.

    Figur 2 zeigt das Fundament 1 und den mit einer Füllschicht 32 gefüllten Zwischenraum 4. Auf diesen vorbereiteten Untergrund werden umlaufende Mattenkörbe 5 für die Bodenplatte 30 gelegt. Diese Mattenkörbe sind vorzugsweise, wie in der Figur dargestellt, U-förmig ausgebildet und werden derart auf dem Fundament 1 positioniert, dass sie mit dem verstärkten Steg 6 auf dem Fundament liegen. Unter dem Mattenkorb 5 werden noch allgemein bekannte Abstandshalter 8 untergelegt, um den Mattenkorb 5 anzuheben und insbesondere im Bereich des Steges 6 Last aufnehmen zu können. Auf diese Mattenkörbe 5 und in dem verbleibenden inneren Bodenplattenbereich wird eine obere Bewehrung 9 aufgelegt. Weitere Bewehrung kann je nach Anwendungsfall im Inneren eingebracht werden, so wie es dem Fachmann geläufig und zweckmäßig bzw. erforderlich ist.FIG. 2 shows the foundation 1 and the one filled with a filling layer 32 Intermediate space 4. On this prepared surface, all-round Mat baskets 5 placed for the base plate 30. These mat baskets are preferably, as shown in the figure, U-shaped and be positioned on the foundation 1 in such a way that it rests on the reinforced web 6 the foundation. Under the mat basket 5 are still general known spacers 8 underlaid to raise the mat basket 5 and in particular in the area of the web 6 to be able to absorb load. To this Mat baskets 5 and in the remaining inner base plate area is a upper reinforcement 9 placed. Additional reinforcement can vary depending on the application be introduced inside, as is known to the expert and is expedient or necessary.

    Die vertikale Außenwand 31 wird durch ein Doppelwandelement 10 gebildet, das eine größere Außenplatte 11 und eine kleinere Innenplatte 12 aufweist, die über eine Bewehrung 13 miteinander verbunden sind. Das Doppelwandelement 10 wird derart angeordnet, dass die Außenplatte 11 sich auf das Fundament 1 und die Innenplatte 12 auf den Schenkel 7 des Mattenkorbes 5 aufliegt und sich über den Schenkel 6 abstützt. Damit nach dem Aufstellen des Doppelwandelements 10 dieses nicht umfallen kann, ist in der Figur ein in das Fundament eingegossene Montageeisen 14 dargestellt, so dass in den Zwischenraum zwischen dem Montageeisen 14 und der Außenplatte 11 eine Verkeilung, beispielsweise über einen Holzkeil 15, vorgenommen werden kann. Zur Verbesserung der Bewehrung innerhalb des Doppelwandelements 10 ist in der Figur außerdem ein in das Fundament 1 eingegossenes Anschlusseisen 16 dargestellt. Derartige Maßnahmen sind dem Fachmann geläufig und gehören zu den üblichen handwerklichen Maßnahmen.The vertical outer wall 31 is formed by a double wall element 10, the has a larger outer plate 11 and a smaller inner plate 12 which over a reinforcement 13 are connected. The double wall element 10 is arranged such that the outer plate 11 is on the foundation 1 and the inner plate 12 rests on the leg 7 of the mat basket 5 and over supports the leg 6. So after setting up the double wall element 10 this cannot fall over, is in the figure in the foundation cast mounting iron 14 shown, so that in the space wedging between the mounting iron 14 and the outer plate 11, for example, using a wooden wedge 15. to Improvement of the reinforcement within the double wall element 10 is in the FIG. Also shows a connecting iron 16 cast into the foundation 1 shown. Such measures are familiar to the person skilled in the art and belong to the usual manual measures.

    In der Figur ist außerdem ein Fertigdeckenelement 17 dargestellt, das als selbsttragende Decke auf der Innenplatte 12 aufliegt und über besonders ausgestaltete nicht dargestellte Träger gehalten wird.In the figure, a prefabricated ceiling element 17 is also shown, which as self-supporting ceiling rests on the inner plate 12 and especially designed carrier is not shown.

    Damit kann das Ausgießen des Zwischenraumes 18 in dem Doppelwandelement 10 gleichzeitig mit dem Bodenbereich und der Decke grundsätzlich erfolgen. Da jedoch der in den Zwischenraum 18 eingegossene Beton die Eigenschaft hat, sich auf der anderen Seite der Innenplatte 12 aufzuwölben, sind hiergegen Maßnahmen zu treffen. Dies kann einerseits derart verhindert werden, dass durch ein entsprechend ausgestaltetes, und hier nicht dargestelltes Winkelelement, oder einfacher durch winklig angeordnete Schaltafeln, die einerseits an der Innenplatte 12 und andererseits auf der oberen Bewehrung 9 aufliegen, vorgesehen werden. Wesentlich dabei ist, dass die Abdeckung parallel zu dem Mattenkorb größer ist als das Ausbreitmaß des verwendeten wasserundurchlässigen Betons. Üblicherweise ist das Ausbreitmaß des Betons bei derartigen Bauten nicht größer als 60 cm. Sofern die Vorgabe für das Ausbreitmaß des Betons geringer ist, kann auch die Abdeckung geringer sein. In dem Ausführungsbeispiel ist vorzugsweise ein Streckmetall 19 eingearbeitet, das auf dem Mattenkorb 5 aber unter der oberen Bewehrung 9 liegt, damit es nicht hochgedrückt werden kann. Eine andere grundsätzliche Möglichkeit besteht darin, ein entsprechendes Streckmetall (nicht dargestellt), in den Zwischenraum 18 vor dem Steg 6 umlaufend anzubringen. Dann sind allerdings für eine ordnungsgemäße Verbindung Stecheisen, ebenfalls nicht dargestellt hindurch zu stecken, da aufgrund des Streckmetalls der Beton im Wesentlichen nicht durch dieses hindurchdringen kann.So that the pouring of the space 18 in the double wall element 10 basically take place simultaneously with the floor area and the ceiling. There however, the concrete poured into the space 18 has the property bulging on the other side of the inner plate 12 are against this To take action. On the one hand, this can be prevented by a correspondingly designed, and not shown, angular element, or simply by angled formwork panels that are on the one hand on the Inner plate 12 and, on the other hand, rest on the upper reinforcement 9, be provided. It is essential that the cover parallel to the Mat basket is larger than the slump of the used waterproof concrete. The spread of the concrete is usually in such buildings not larger than 60 cm. If the requirement for the The spread of the concrete is less, the coverage can also be less. In In the embodiment, an expanded metal 19 is preferably incorporated on the mat basket 5 but under the upper reinforcement 9 so that it does not can be pushed up. Another basic possibility exists therein, an appropriate expanded metal (not shown) in the space 18 to be installed all around in front of the web 6. Then, however, are for one proper connection chisel, also not shown through stuck because the concrete does not penetrate due to the expanded metal this can penetrate.

    Figur 2 zeigt außerdem noch eine besondere Maßnahme zur Verhinderung von Eindringenden von Feuchtigkeiten durch Haarrisse, die zwischen dem neu eingegossenen Beton in dem Zwischenraum 18 und der bereits bestehenden und ausgehärteten Außenplatte 11 entstehen können. Um das Eindringen von Feuchtigkeit hier hundertprozentig zu verhindern, wird eine Außenplatte 11 verwendet, in die bereits ein bitumenbeschichtetes Blech 20 eingegossen ist, das sich aus der Oberfläche heraus erstreckt. Da dieses Blech in den wasserundurchlässigen Beton in dem Zwischenraum 18 eingegossen wird, kann Feuchtigkeit lediglich bis zu diesem Blech aufsteigen und von dort nicht weiter an der Außenplatte 11 entlang hoch kriechen. Eine alternative, jedoch aufwendigere Möglichkeit besteht darin, zwischen die Außenplatte 11 und das Fundament 1 eine umlaufende Bitumenkautschukschicht anzubringen, die ebenfalls in den Zwischenraum 18 hineinragt und damit den Aufstieg von Feuchtigkeit verhindert. Diese Bitumenkautschuksicht 21 ist ebenfalls in der Figur dargestellt, wobei es sich um Alternativen handelt, die üblicherweise beide nicht gleichzeitig angewendet werden, obwohl sie hier in einer Figur dargestellt sind. Dies dient lediglich der Veranschaulichung.Figure 2 also shows a special measure to prevent Penetration of moisture through hairline cracks that appear between the new poured concrete in the space 18 and the existing and hardened outer plate 11 can arise. To the intrusion of To prevent moisture here 100 percent, an outer plate 11th used, in which a bitumen-coated sheet 20 is already cast, the extends out of the surface. Since this sheet in the waterproof concrete is poured into the space 18 can Moisture only rise up to this sheet and from there no further crawl up along the outer plate 11. An alternative, but more complex Possibility is between the outer plate 11 and the foundation 1 to apply a surrounding bitumen rubber layer, which is also in the Intermediate space 18 protrudes and thus prevents the rise of moisture. This bitumen rubber layer 21 is also shown in the figure, wherein it are alternatives, which are usually not both at the same time applied, although they are shown here in a figure. This serves for illustration only.

    Nach dem Einbringen des Betons kann in den Bereich 24 oberhalb der oberen Bewehrung 9 eine Glattstrich des Betons durchgeführt werden, so dass die Oberfläche in einen Zustand gebracht wird, dass ein Estrich nicht notwendig ist. Dies ist insbesondere deshalb auch möglich, weil durch das Betonieren in einem Guss bereits eine Decke vorhanden ist, die auch bei ungünstiger Witterung diesen Glattstrich ermöglicht.After the concrete has been poured into the area 24 above the upper one Reinforcement 9 a smooth stroke of the concrete are carried out so that the Surface is brought into a condition that a screed is not necessary. This is particularly possible because the concrete is used in one Cast a blanket is already in place, even in bad weather enables this smooth stroke.

    Figur 3 zeigt einen Betonblock 3 mit den entsprechend gefüllten Zwischenräumen 4. Auf dem Betonblock 3 befindet sich ein Stützelement 21, das aus einer vorgefertigten Betonplatte 22 und einem darin eingegossenen Doppel-T-Träger 23, auch IPE-Träger genannt, besteht. Dieses Stützelement 21 stützt die darauf zu positionierende Innenwand 2 als Fertigteil ab. Das Stützelement 21 ist so ausgebildet, dass es unter dem Bereich 24 bleibt und bei dem Glattstrich ein sauberer Anschluss zu der Innenwand 2 ergibt.Figure 3 shows a concrete block 3 with the appropriately filled spaces 4. On the concrete block 3 there is a support element 21 which consists of a prefabricated concrete slab 22 and a double T-beam cast into it 23, also called IPE carrier, exists. This support element 21 supports it inner wall 2 to be positioned as a finished part. The support element 21 is like this trained that it stays under the area 24 and at the smooth stroke clean connection to the inner wall 2 results.

    Figur 4 zeigt die Draufsicht in Figur 4a und die Stirnansicht in der Figur 4b. Sofern der Keller in einem Grundwasserbereich gebaut wird, so werden umlaufend um die Platte 21 Dichtbänder 25 angeklebt. Zusätzlich befindet sich noch ein Dichtband 26 längs des Steges des IPE-Trägers 23. Alternativ kann auch ein bitumenbeschichtetes Blech (ähnlich dem Blech 20) auf der Oberseite der Platte 21, aus dieser herausragend, angeordnet werden.FIG. 4 shows the top view in FIG. 4a and the end view in FIG. 4b. Provided the basement is built in a groundwater area, so will be circulating around the plate 21 tapes 25 glued. There is also an additional one Sealing tape 26 along the web of the IPE carrier 23. Alternatively, a bitumen coated sheet (similar to sheet 20) on top of the sheet 21, outstanding from this, can be arranged.

    Figur 5 zeigt entsprechend Figur 2 einen Schnitt durch den Keller, wobei jedoch hier ein innen gedämmtes Doppelwandelement 10 verwendet wird, das auf der Innenseite der Außenplatte 11 ein Dämmmaterial 27 enthält. Anstelle des Fundaments 1 sowie des gefüllten Zwischenraums 4 sowie der Betonblöcke 3 ist hier als Untergrund eine lastabtragende Dämmplatte 28 angeordnet. Die übrigen Maßnahmen sind die gleichen, wie sie im Zusammenhang mit der Figur 2 diskutiert wurden. Es ist zu beachten, dass das bitumenbeschichtete Blech 20 in diesem Fall entsprechend weit aus dem Material 27 herausragt, bzw. eine Bitumenkautschuksicht 29 entsprechend weit in den wasserundurchlässigen Beton hineinragt.Figure 5 shows a section through the basement according to Figure 2, however here an insulated double wall element 10 is used, which on the Inside of the outer plate 11 contains an insulating material 27. Instead of Foundation 1 and the filled space 4 and the concrete blocks 3 is here a load-bearing insulating plate 28 is arranged as a base. The remaining Measures are the same as those in connection with FIG. 2 were discussed. It should be noted that the bitumen-coated sheet 20 in this case protrudes accordingly far from the material 27, or one Bitumen rubber layer 29 correspondingly far in the water-impermeable Concrete protrudes.

    In den Figuren 2, 3 und 5 ist der Beton, der in einem Guss für die Herstellung der Decke, der Außenwände und der Bodenplatte eingebracht wird, aus Übersichtlichkeitsgründen nicht dargestellt.In Figures 2, 3 and 5 is the concrete that is in one pour for the manufacture of the Ceiling, the outer walls and the base plate is brought out Not shown for reasons of clarity.

    Die Abdichtung zwischen den einzelnen Außenplatten 11 auf der Außenseite wird in üblicher Art und Weise durch eine Bitumenschicht und ein geeignetes Abdeckprofil erreicht. Figur 6 zeigt zwei Außenplatten 11 jedoch von der Innenseite mit dem daraus hervorstehenden bitumenbeschichteten Blech 20. Der Abstand zwischen den Außenplatten 11 beträgt ca. 1 cm. Damit eine dichte Verbindung der Bleche 20 in den beiden Außenplatten 11 möglich ist, weisen sie eine Aussparung 33 auf, in die vor dem Ausgießen mit Beton eine die beiden Bleche 20 verbindende Lasche 34 eingeklebt wird.The seal between the individual outer plates 11 on the outside in the usual way through a bitumen layer and a suitable one Cover profile reached. Figure 6 shows two outer plates 11 of the Inside with the resulting bitumen-coated sheet 20. The Distance between the outer plates 11 is approximately 1 cm. So that a dense Connection of the sheets 20 in the two outer plates 11 is possible, they have a recess 33 in which one of the two before pouring concrete Sheets 20 connecting tab 34 is glued.

    Durch diese vorstehend beschriebenen Maßnahmen wird somit ein wasserundurchlässiger Keller bereitgestellt, der in einem Grundwasserbereich aufgebaut werden kann, wobei nun auch endlich ein thermisch isolierter Keller mit einer innen liegenden Dämmung an der Außenwand kostengünstig herstellbar ist.Through these measures described above, a watertight basement provided in a groundwater area can be built, and now finally a thermally insulated basement with an internal insulation on the outer wall is inexpensive to manufacture.

    Claims (16)

    Wasserundurchlässiger Keller mit Doppelwandelementen (10) als Außenwände (31), die sich mit der inneren Wandplatte (12) (Innenplatte) auf der Bodenplatte abstützen und mit wasserundurchlässigem Beton zusammen mit der Bodenplatte (30) hergestellt und ausgegossen sind, dadurch gekennzeichnet, dass die äußere Wandplatte (11) (Außenplatte) sich auf einer lastabtragenden Schicht (1, 28) als Fundament und die Innenplatte (12) auf der Bewehrung (5, 9) der Bodenplatte abstützt.Waterproof basement with double wall elements (10) as outer walls (31), which are supported with the inner wall plate (12) (inner plate) on the base plate and are made and poured with waterproof concrete together with the base plate (30), characterized in that the outer wall plate (11) (outer plate) is supported on a load-bearing layer (1, 28) as a foundation and the inner plate (12) on the reinforcement (5, 9) of the base plate. Wasserundurchlässiger Keller nach Anspruch 1, dadurch gekennzeichnet, dass als Fundament ein unter den Außenwänden umlaufender Fundamentstreifen (1) angeordnet und der Zwischenraum (4) mit einer Füllschicht (32) gefüllt ist.Water-impermeable basement according to claim 1, characterized in that a foundation strip (1) running around under the outer walls is arranged as the foundation and the intermediate space (4) is filled with a filling layer (32). Wasserundurchlässiger Keller nach Anspruch 2, dadurch gekennzeichnet, dass zur Abstützung der Innenwände (2) unter der Bodenplatte einzelne Betonblöcke (3) als Fundament, vorzugsweise zwei pro Innenwand, angeordnet sind. Waterproof basement according to claim 2, characterized in that individual concrete blocks (3) are arranged as a foundation, preferably two per inner wall, for supporting the inner walls (2) under the base plate. Wasserundurchlässiger Keller nach Anspruch 1, dadurch gekennzeichnet, dass als Fundament eine lastabtragende Dämmplatte (28), die auf einer Ausgleichsschicht aufliegt, vorgesehen ist.Water-impermeable basement according to claim 1, characterized in that a load-bearing insulating plate (28), which rests on a compensating layer, is provided as the foundation. Wasserundurchlässiger Keller nach Anspruch 3 und 4, dadurch gekennzeichnet, dass zur Abstützung der Innenwände (2) im Bereich der Bodenplatte auf dem Fundament (1, 28) einzelne vorgefertigte Stützelemente (21) angeordnet sind, die in die Bodenplatte von einer dünnen Betonschicht (24) überdeckt, eingegossen sind.Waterproof basement according to claim 3 and 4, characterized in that for supporting the inner walls (2) in the area of the base plate on the foundation (1, 28) individual prefabricated support elements (21) are arranged, which are in the base plate by a thin concrete layer (24 ) are covered, cast in. Wasserundurchlässiger Keller, nach Anspruch 5, dadurch gekennzeichnet, dass die Stützelemente (21) aus einer Betonplatte (22) mit eingegossenem Doppel-T-Träger (23) bestehen.Waterproof basement according to claim 5, characterized in that the support elements (21) consist of a concrete slab (22) with cast-in double T-beam (23). Wasserundurchlässiger Keller nach einem der vorangegangenen Ansprüche, dadurch gekennzeichnet, dass die Bewehrung (5, 9) der Bodenplatte angrenzend an die Innenplatte (12) eine umlaufende Fläche aus Streckmetall (19) aufweist.Waterproof basement according to one of the preceding claims, characterized in that the reinforcement (5, 9) of the base plate adjacent to the inner plate (12) has a circumferential surface made of expanded metal (19). Wasserundurchlässiger Keller nach einem der vorangegangenen Ansprüche, dadurch gekennzeichnet, dass die Außenplatte (11) nahe des unteren Endes ein bitumenbeschichtetes Blech (20) aufweist, das aus der Oberfläche der Außenplatte (11) in den mit Beton gefüllten Zwischenraum (18) zwischen der Außenplatte (11) und der Innenplatte (12) ragt und entlang der Außenplatte (11) parallel zum Untergrund verläuft.Waterproof basement according to one of the preceding claims, characterized in that the outer plate (11) near the lower end has a bitumen-coated sheet (20) which extends from the surface of the outer plate (11) into the intermediate space (18) filled with concrete between the outer plate (11) and the inner plate (12) protrudes and runs along the outer plate (11) parallel to the substrate. Wasserundurchlässiger Keller nach einem der vorangegangenen Ansprüche, dadurch gekennzeichnet, dass die Decke Fertigdeckenelemente (17), die auf der Innenplatte (12) aufliegen und zusammen mit den Außenwänden (31) und der Bodenplatte (30) betoniert ist, aufweist. Water-impermeable basement according to one of the preceding claims, characterized in that the ceiling has prefabricated ceiling elements (17) which rest on the inner plate (12) and are concreted together with the outer walls (31) and the base plate (30). Verfahren zum Herstellen eines wasserundurchlässigen Kellers mittels Doppelwandelementen (10) als Außenwände (31), die nach dem Aufsetzen auf die Bodenplatte oder Teilen der Bodenplatte und/oder Bodenfundament mit wasserundurchlässigem Beton ausgegossen und gleichzeitig mit der Bodenplatte in einem Verbund hergestellt werden, gekennzeichnet durch die folgenden Schritte: A Betonieren eines umlaufenden Randes als Fundamentsreifen (1); B Füllen des Zwischenraumes (4) mit einer Füllung (32) und glätten derselben; C Anordnen von Mattenkörben (5) auf dem Fundament (1) und der Füllung (32) entlang dem Fundament (1) ohne dabei das Fundament (1) vollständig zu verdecken; D Einbringen von Bewehrungen in den verbleibenden Zwischenraum und Auflegen einer oberen Bewehrung (9) auf die Mattenkörbe (5); E Aufsetzen von Doppelwandelementen (10) mit einer größeren Außenplatte (11) und einer kleineren Innenplatte (12) mit der Außenplatte (11) auf dem Fundament (1) und mit der Innenplatte (12) auf den Mattenkörben (5); F Anbringen einer umlaufenden Sperrschicht, die größer ist als das Ausbreitungsmaß des verwendeten Betons angrenzend an die den Kellerraum zugewandten Innenwände der Innenplatten (12) auf den Mattenkörben (5); G Füllen des Zwischenraumes (18) zwischen den Außenplatten (11) und den Innenplatten (12) der Doppelwandelemente (10) mit wasserundurchlässigem Beton und gleichzeitig der Mattenkörbe (5) und der dazwischen angeordneten Bewehrung zur Herstellung einer Bodenplatte (30); H Glätten der Oberfläche der Bodenplatte (30). Method for producing a water-impermeable cellar by means of double wall elements (10) as outer walls (31), which after being placed on the floor slab or parts of the floor slab and / or floor foundation are poured with water-impermeable concrete and simultaneously produced in a composite with the floor slab, characterized by the following steps: A Concreting a peripheral edge as a foundation tire (1); B filling the intermediate space (4) with a filling (32) and smoothing the same; C arranging mat baskets (5) on the foundation (1) and the filling (32) along the foundation (1) without completely covering the foundation (1); D placing reinforcements in the remaining space and placing an upper reinforcement (9) on the mat baskets (5); E placing double wall elements (10) with a larger outer plate (11) and a smaller inner plate (12) with the outer plate (11) on the foundation (1) and with the inner plate (12) on the mat baskets (5); F attaching a circumferential barrier layer which is larger than the spread of the concrete used adjacent to the inner walls of the inner plates (12) facing the basement space on the mat baskets (5); G filling the intermediate space (18) between the outer plates (11) and the inner plates (12) of the double wall elements (10) with water-impermeable concrete and at the same time the mesh baskets (5) and the reinforcement arranged therebetween to produce a floor plate (30); H Smooth the surface of the bottom plate (30). Verfahren nach Anspruch 10, dadurch gekennzeichnet, dass vor Schritt G zumindest auf die Innenplatten (12) Fertigdeckenelemente (17) aufgelegt und zusammen mit dem Zwischenraum (18) und der Bodenplatte (30) betoniert werden.A method according to claim 10, characterized in that, before step G, at least on the inner plates (12) finished ceiling elements (17) are placed and concreted together with the intermediate space (18) and the base plate (30). Verfahren nach Anspruch 10 oder 11, dadurch gekennzeichnet, dass anstelle von Schritt F auf die Mattenkörbe (5) Streckmetall (19) aufgelegt oder vor dem auf dem Fundament (1) aufliegenden Ende eine Sperrschicht aus Streckmetall (19) angeordnet wird.A method according to claim 10 or 11, characterized in that instead of step F, expanded metal (19) is placed on the mat baskets (5) or a barrier layer made of expanded metal (19) is arranged in front of the end resting on the foundation (1). Verfahren nach einem der vorangegangenen Ansprüche 10 bis 12, dadurch gekennzeichnet, dass für die Anordnung von Zwischenwänden (2) in Schritt A zusätzlich in dem Zwischenraum (4) zwischen den Fundamentstreifen (1) pro Zwischenwand (2) mindestens zwei Fundamentklötze (3) betoniert werden.Method according to one of the preceding claims 10 to 12, characterized in that for the arrangement of intermediate walls (2) in step A, at least two foundation blocks (3) are additionally concreted in the intermediate space (4) between the foundation strips (1) per intermediate wall (2) become. Verfahren nach Anspruch 13, dadurch gekennzeichnet, dass auf die Fundamentklötze (3) in Schritt D vorgefertigte Stützelemente (21) mit eingegossenem Doppel-T-Träger (23) aufgesetzt werden.Method according to claim 13, characterized in that support elements (21) with cast-in double T-beams (23) are placed on the foundation blocks (3) in step D. Verfahren nach einem der vorangegangenen Ansprüche (10 bis 14), dadurch gekennzeichnet, dass Doppelwandelemente (10) mit Außenplatten (11) verwendet werden, die nahe des unteren Endes ein bitumenbeschichtetes Blech (20) aufweisen, das aus der Oberfläche der Außenplatte (11) in Richtung der Innenplatte (12) herausragt.Method according to one of the preceding claims (10 to 14), characterized in that double-wall elements (10) with outer plates (11) are used which have a bitumen-coated sheet metal (20) near the lower end which emerges from the surface of the outer plate (11) protrudes in the direction of the inner plate (12). Verfahren nach einem der vorangegangenen Ansprüche 10 bis 15, dadurch gekennzeichnet, dass Doppelwandelemente (10) mit innen angeordneter Dämmung (27) verwendet und anstelle der Schritte A und B lastabtragende Dämmplatten (28) auf den ebenen Untergrund aufgelegt werden.Method according to one of the preceding claims 10 to 15, characterized in that double wall elements (10) with internal insulation (27) are used and instead of steps A and B load-bearing insulating panels (28) are placed on the flat surface.
    EP20040004917 2003-05-26 2004-03-03 Water-impermeable cellar and method of its construction Expired - Lifetime EP1482098B1 (en)

    Priority Applications (1)

    Application Number Priority Date Filing Date Title
    EP20040004917 EP1482098B1 (en) 2003-05-26 2004-03-03 Water-impermeable cellar and method of its construction

    Applications Claiming Priority (3)

    Application Number Priority Date Filing Date Title
    EP03011814 2003-05-26
    EP03011814 2003-05-26
    EP20040004917 EP1482098B1 (en) 2003-05-26 2004-03-03 Water-impermeable cellar and method of its construction

    Publications (2)

    Publication Number Publication Date
    EP1482098A1 true EP1482098A1 (en) 2004-12-01
    EP1482098B1 EP1482098B1 (en) 2008-01-09

    Family

    ID=33133004

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP20040004917 Expired - Lifetime EP1482098B1 (en) 2003-05-26 2004-03-03 Water-impermeable cellar and method of its construction

    Country Status (1)

    Country Link
    EP (1) EP1482098B1 (en)

    Cited By (3)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    ITTO20100595A1 (en) * 2010-07-08 2010-10-07 Fornace Calandra S R L PROCEDURE FOR REALIZING A BILASTRA WITH FOUNDATION
    US11248383B2 (en) 2018-09-21 2022-02-15 Cooper E. Stewart Insulating concrete form apparatus
    GB2604372A (en) * 2021-03-03 2022-09-07 Greenraft Ltd Insulating concrete formwork

    Citations (6)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    FR2570416A1 (en) * 1984-09-19 1986-03-21 Buyse Andre Permanent formwork element for the construction of vertical walls, particularly submerged ones, and its method of use
    US4644718A (en) * 1984-12-21 1987-02-24 Penguin Swimming Pools Limited Foundation arrangement
    FR2660681A1 (en) * 1990-04-06 1991-10-11 Bresson Philippe Connection element and methods for constructing walls which are connected at their base to a sole plate or to a baseplate
    FR2758151A1 (en) * 1997-01-09 1998-07-10 David Lassave Prefabricated shuttering for poured concrete walls for swimming pools
    EP1046758A1 (en) * 1999-04-19 2000-10-25 Rolf Bless Construction method of a slab and a wall-shuttering , prefabricated shuttering element
    DE20219324U1 (en) * 2002-12-12 2003-03-06 Glatthaar Fertigkeller Gmbh building basement

    Patent Citations (6)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    FR2570416A1 (en) * 1984-09-19 1986-03-21 Buyse Andre Permanent formwork element for the construction of vertical walls, particularly submerged ones, and its method of use
    US4644718A (en) * 1984-12-21 1987-02-24 Penguin Swimming Pools Limited Foundation arrangement
    FR2660681A1 (en) * 1990-04-06 1991-10-11 Bresson Philippe Connection element and methods for constructing walls which are connected at their base to a sole plate or to a baseplate
    FR2758151A1 (en) * 1997-01-09 1998-07-10 David Lassave Prefabricated shuttering for poured concrete walls for swimming pools
    EP1046758A1 (en) * 1999-04-19 2000-10-25 Rolf Bless Construction method of a slab and a wall-shuttering , prefabricated shuttering element
    DE20219324U1 (en) * 2002-12-12 2003-03-06 Glatthaar Fertigkeller Gmbh building basement

    Cited By (3)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    ITTO20100595A1 (en) * 2010-07-08 2010-10-07 Fornace Calandra S R L PROCEDURE FOR REALIZING A BILASTRA WITH FOUNDATION
    US11248383B2 (en) 2018-09-21 2022-02-15 Cooper E. Stewart Insulating concrete form apparatus
    GB2604372A (en) * 2021-03-03 2022-09-07 Greenraft Ltd Insulating concrete formwork

    Also Published As

    Publication number Publication date
    EP1482098B1 (en) 2008-01-09

    Similar Documents

    Publication Publication Date Title
    DE60023894T2 (en) PANEL AND METHOD FOR PRODUCING CONCRETE WALLS
    DE102005051316A1 (en) Prefabricated component for producing a building part
    DE10146062A1 (en) Foundation construction for structures with load-bearing insulation
    EP1591595A2 (en) Watertight cellar
    DE10222907A1 (en) Shuttering for constructing building foundation, has side wall braced by buttress against external pressure
    EP0059702B1 (en) Foundation, especially for single-storey buildings without cellar
    DE102005049414A1 (en) Method for manufacturing wall bodies with construction plates involves providing smooth visible surfaces on outside and transporting structural body to site, anchoring it on concrete foundation and filling interspace with concrete
    EP1482098B1 (en) Water-impermeable cellar and method of its construction
    DE2102380A1 (en) Multi-storey building
    EP1431468B1 (en) Section of a building comprising prefinished double walled elements and construction method
    DE102018119213B4 (en) Method of making a building
    DE20311076U1 (en) Method for building waterproof cellar using prefabricated double skin floor plate and wall plates with concrete filling for monobloc construction
    WO2008015278A1 (en) Arrangement for the construction of a structure having prefabricated construction components
    CH627506A5 (en) METHOD OF BUILDING A HOUSE.
    DE3002739C2 (en) Waterproof building structure
    EP1457609B1 (en) Floor for a building
    DE19842742B4 (en) Industrially prefabricated, modular floor slab for buildings, especially residential buildings
    DE2422586A1 (en) Underground or sunken wall prefabricated concrete component - comprises integral panel and ribs at equal intervals
    DE4015474A1 (en) Concrete floor for building - is supported by parallel tubular structural elements
    DE3938541A1 (en) Method of erecting tank under foundations - consists of placing concrete layer on flat sub-base, with walls, spacers and plates
    DE2155456A1 (en) KIT OF PRECAST CONCRETE ELEMENTS FOR CONSTRUCTION OF A BASEMENT FOR A BUILDING
    EP1108823B1 (en) Prefabricated cellar
    DE10046138C2 (en) Prefabricated module for building floors of a house and method for the production and construction of building parts from prefabricated modules
    AT311620B (en) Method for creating masonry
    DE2200367A1 (en) PRE-FABRICATED PART FOR FOUNDATION DRAINAGE

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    17P Request for examination filed

    Effective date: 20040909

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

    AX Request for extension of the european patent

    Extension state: AL LT LV MK

    17Q First examination report despatched

    Effective date: 20041108

    GRAP Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOSNIGR1

    RAP1 Party data changed (applicant data changed or rights of an application transferred)

    Owner name: HAMMERER, FERDINAND

    RIN1 Information on inventor provided before grant (corrected)

    Inventor name: HAMMERER, FERDINAND

    Inventor name: GLATTHAAR, JOACHIM

    RAP1 Party data changed (applicant data changed or rights of an application transferred)

    Owner name: GLATTHAAR FERTIGKELLER GMBH

    GRAS Grant fee paid

    Free format text: ORIGINAL CODE: EPIDOSNIGR3

    AKX Designation fees paid

    Designated state(s): AT CH DE LI

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): AT CH DE LI

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: EP

    REF Corresponds to:

    Ref document number: 502004005883

    Country of ref document: DE

    Date of ref document: 20080221

    Kind code of ref document: P

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PL

    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    26N No opposition filed

    Effective date: 20081010

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20081001

    Ref country code: LI

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20080331

    Ref country code: CH

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20080331

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: AT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20080303