DE102005051316A1 - Prefabricated component for producing a building part - Google Patents

Prefabricated component for producing a building part Download PDF

Info

Publication number
DE102005051316A1
DE102005051316A1 DE200510051316 DE102005051316A DE102005051316A1 DE 102005051316 A1 DE102005051316 A1 DE 102005051316A1 DE 200510051316 DE200510051316 DE 200510051316 DE 102005051316 A DE102005051316 A DE 102005051316A DE 102005051316 A1 DE102005051316 A1 DE 102005051316A1
Authority
DE
Germany
Prior art keywords
layer
prefabricated component
geomembrane
concrete
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE200510051316
Other languages
German (de)
Inventor
Roman SCHWÖRER
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schwoerer Haus & Co GmbH
Schworer Haus & Co GmbH
Original Assignee
Schwoerer Haus & Co GmbH
Schworer Haus & Co GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schwoerer Haus & Co GmbH, Schworer Haus & Co GmbH filed Critical Schwoerer Haus & Co GmbH
Priority to DE200510051316 priority Critical patent/DE102005051316A1/en
Priority to EP06120337A priority patent/EP1780348A3/en
Publication of DE102005051316A1 publication Critical patent/DE102005051316A1/en
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/044Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres of concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

Die Erfindung betrifft ein vorgefertigtes Bauteil zum Herstellen eines Bauwerkteils, mit mindestens drei Schichten, wobei die erste Schicht eine Dichtungsbahn (22) aufweist, die zweite Schicht (18) einen Wärmedämmstoff aufweist und die dritte Schicht (16) Beton aufweist. Die zweite Schicht (18) ist zwischen der ersten und der dritten Schicht angeordnet. Die drei Schichten (16, 18, 22) sind miteinander verbunden. Ferner betrifft die Erfindung ein Verfahren zum Herstellen eines solchen Fertigbauteils (14) sowie die Verwendung des Fertigbauteils (14) zum Herstellen eines Kellers und eines Beckens.The invention relates to a prefabricated component for producing a structural part, with at least three layers, the first layer having a sealing membrane (22), the second layer (18) having a thermal insulation material and the third layer (16) having concrete. The second layer (18) is arranged between the first and third layers. The three layers (16, 18, 22) are connected to one another. The invention also relates to a method for producing such a prefabricated component (14) and the use of the prefabricated component (14) for producing a cellar and a basin.

Description

Die Erfindung betrifft ein Fertigbauteil mit einem mehrschichtigen Aufbau zum Herstellen eines Bauwerkteils. Ferner betrifft die Erfindung ein Verfahren zum Herstellen eines solchen Fertigbauteils.The The invention relates to a prefabricated component with a multilayer structure for producing a building part. Furthermore, the invention relates a method for producing such a prefabricated component.

Es sind Fertigbauteile zum Herstellen von wasserdichten und druckwasserdichten Bauwerksteilen bekannt, die eine Betonwand und eine wärmedämmende Wand umfassen, wobei auf der zur Betonwand gerichteten Seite der wärmedämmenden Wand eine Schicht aus Bitumen vorhanden ist, die mit der Betonwand in Kontakt steht. Diese Fertigbauteile werden insbesondere zum Errichten von Kellern als Kellerwand verwendet. Die Höhe einer solchen Kellerwand ist vorzugsweise eine Geschosshöhe. Eine solche Kellerwand ist beispielsweise aus dem deutschen Gebrauchsmuster DE 20 2004 005 037 U1 bekannt.Prefabricated components are known for producing watertight and pressure-tight structural parts comprising a concrete wall and a heat-insulating wall, wherein on the side facing the concrete wall of the heat-insulating wall there is a layer of bitumen in contact with the concrete wall. These prefabricated components are used in particular for building basements as a basement wall. The height of such a basement wall is preferably a storey height. Such a basement wall is for example from the German utility model DE 20 2004 005 037 U1 known.

Bei bekannten Fertigbauteilen ist jedoch eine wasserdichte, insbesondere eine druckwasserdichte, Verbindung von Bitumenschichten zweier benachbarter Fertigbauteile relativ aufwändig. Insbesondere kann im angrenzenden Bereich einer Stoßstelle zwischen zwei Fertigbauteilen vor dem Verbinden der Bitumenschichten keine wärmedämmende Wand ausgebildet werden, so dass nach dem Ver binden zweier benachbarter Wandelemente die Fertigbauteile noch nachträglich auf der Baustelle mit einer wärmedämmenden Wand versehen werden müssen, damit eine geschlossene Wärmedämmung der äußeren Kellerwände ausgebildet wird. Ferner ist es relativ aufwändig, die zwei Bitumenschichten benachbarter Fertigbauteile sicher und dauerhaft wasserdicht miteinander zu verbinden. Auch das nachträgliche Abdichten undichter Stellen gestaltet sich bei einem solchen Aufbau eines Fertigbauteils relativ aufwändig, da die Wärmedämmwand zur Suche nach diesen undichten Stellen entfernt werden muss. Erschwerend ist dabei, dass die wärmedämmende Wand auf der zur Betonwand gerichteten Seite zum Abdichten des Bauwerks mit einer Schicht aus Bitumen versehen ist.at However, known prefabricated components is a waterproof, in particular a watertight, connection of bitumen layers of two adjacent Prefabricated parts relatively expensive. In particular, in the adjacent area of a joint between two prefabricated components before joining the bituminous layers no heat-insulating wall be formed so that after the United bind two adjacent Wall elements the prefabricated even later on the site with a thermally insulating Wall must be provided so that a closed thermal insulation of the outer basement walls is formed becomes. Furthermore, it is relatively expensive, the two bitumen layers of adjacent prefabricated components safely and permanently waterproof together. Also, the subsequent sealing leaking Jobs designed in such a structure of a prefabricated component relatively expensive, because the thermal barrier to Finding these leaks needs to be removed. aggravating is doing that the heat-insulating wall on the side facing the concrete wall to seal the structure with a layer of bitumen is provided.

Aufgabe der Erfindung ist es, ein Fertigbauteil zum Herstellen eines Bauwerkteils anzugeben, das einen einfachen Aufbau hat und einfach herzustellen ist. Ferner ist ein Verfahren zum Herstellen eines solchen Fertigbauteils anzugeben.task The invention is a prefabricated component for producing a building part which has a simple construction and easy to manufacture is. Furthermore, a method for producing such a prefabricated component specify.

Diese Aufgabe wird durch ein Fertigbauteil zum Herstellen eines Bauwerkteils mit den Merkmalen des Patentanspruchs 1 gelöst. Vorteilhafte Weiterbildungen der Erfindung sind in den abhängigen Patentansprüchen angegeben.These Task is a prefabricated part for producing a building part solved with the features of claim 1. Advantageous developments The invention are set forth in the dependent claims.

Bei dem Fertigbauteil mit den Merkmalen des Patentanspruchs 1 ist insbesondere durch die außen an der Wärmedämmschicht angeordneten Dichtungsbahn ein einfacher Zugang zu dieser Dichtungsbahn möglich, wobei die Dichtungsbahn auf einfache Art und Weise mit Dichtungsbahnen vorzugsweise gleichartiger an das Fertigbauteil stoßender Fertigbauteile verbunden werden kann. Ferner ist die Wärmedämmfähigkeit der Wärmedämmschicht durch die außen angeordnete Dichtbahn erhöht, da keine Feuchtigkeit in die Wärmedämmschicht eindringen und die Wärmedämmfähigkeit mindern kann.at the prefabricated component with the features of claim 1 is in particular through the outside on the thermal barrier coating arranged geomembrane easy access to this geomembrane possible, wherein the geomembrane in a simple manner with geomembranes preferably more similar prefabricated components to the prefabricated component can be connected. Furthermore, the thermal insulation of the thermal barrier coating is the outside arranged sealing web increases, there is no moisture in the thermal barrier coating penetrate and the thermal insulation ability can reduce.

Vorzugsweise ist das Dämmmaterial auf der Innenseite der Dichtungsbahn aufgebracht, so dass eine dauerhafte dichte Verbindung zwischen der Dichtungsbahn und der Wärmedämmschicht erzeugt wird. Insbesondere wird die Wärmedämmschicht mit Hilfe von Ortschaum auf die Dichtungsbahn gegossen oder auf die Dichtungsbahn gespritzt. Eine solche Verbindung ist nur noch durch eine Zerstörung der Dichtungsbahn und/oder der Wärmedämmschicht lösbar.Preferably is the insulating material Applied to the inside of the waterproofing membrane, leaving a permanent tight connection between the geomembrane and the thermal barrier coating is produced. In particular, the thermal barrier coating with the help of Ortschaum poured onto the waterproofing membrane or sprayed onto the waterproofing membrane. Such a connection is only through a destruction of the Geomembrane and / or the thermal barrier coating solvable.

Die Ränder des Fertigbauteils können vorzugsweise in Stoßbereichen mit benachbarten Fertigbauteilen derart ausgebildet sein, dass die Wärmedämmschicht, die Dichtungsbahn und/oder die Betonschicht aus mindestens einer der anderen Schichten hervorsteht, so dass ein Teil der Betonschicht und/oder ein Teil der Wärmedämmschicht an die Betonschicht bzw. die Wärmedämmschicht des benachbarten Fertigteils stößt.The margins of the finished component can preferably in joints be formed with adjacent prefabricated components such that the Thermal barrier coating, the geomembrane and / or the concrete layer of at least one the other layers protruding, leaving part of the concrete layer and / or a part of the thermal barrier coating to the concrete layer or the thermal barrier coating of the adjacent precast abuts.

Ein zweiter Aspekt der Erfindung betrifft ein Verfahren zum Herstellen eines Fertigbauteils, bei dem eine eine erste Schicht bildende Dichtungsbahn in eine das herzustellende Fertigbauteil begrenzende nach oben offene Form eingelegt wird, wobei die die Außenseite des Fertigbauteils bildende Oberfläche der Dichtungsbahn die Unterseite der Form kontaktiert. Auf die Innenseite der in der Form eingelegten Dichtungsbahn wird mit Hilfe von Ortschaum eine Wärmedämmschicht aufgetragen. Nach dem zumindest teilweisen Erhärten des Ortschaums wird eine Beton aufweisende Schicht auf den Ortschaum in der Form aufgebracht. Insbesondere kann mit Hilfe eines solchen Verfahrens ein Fertigbauteil mit den Merkmalen des Patentanspruchs 1 oder eines auf den Patentanspruch 1 rückbezogenen Patentanspruchs einfach und kostengünstig hergestellt werden.One Second aspect of the invention relates to a method for manufacturing a prefabricated component, in which a first layer forming geomembrane in a prefabricated component limiting the upwardly open Form is inserted, taking the outside of the prefabricated part forming surface of Geomembrane contacted the bottom of the mold. On the inside the embedded geomembrane is made using local foam a thermal barrier coating applied. After the at least partial hardening of the local foam becomes a concrete having applied layer on the local foam in the mold. Especially can with the help of such a method a prefabricated with the Features of claim 1 or one to the claim 1 back Patent claim can be easily and inexpensively manufactured.

Mit Hilfe eines solchen Verfahrens ist ein Fertigbauteil nach Anspruch 1 einfach und kostengünstig herzustellen. Vorzugsweise ist die Dichtungsbahn einstückig ausgebildet, so dass sie die gesamte Bodenfläche der Form bedeckt. Zur Verbindung des Ortschaums mit der Betonschicht können geeignete Verbindungsmittel vorgesehen werden. Insbesondere kann auf eine bereits erhärtete Schicht des Ortschaums eine Klebstoffschicht aufgetragen werden, auf die die Betonschicht vor dem Erhärten bzw. vor dem vollständigen Erhärten der Klebstoffschicht in die Form eingebracht wird.With the help of such a method, a prefabricated component according to claim 1 is simple and inexpensive to manufacture. Preferably, the geomembrane is integrally formed so as to cover the entire bottom surface of the mold. For connecting the local foam with the concrete layer suitable connection means can be provided. In particular, on an already hardened layer of the place an adhesive layer is applied to which the concrete layer is introduced into the mold before it hardens or before the adhesive layer has completely hardened.

Die Klebstoffschicht kann einen mineralischen Klebstoff, einen Kunststoffklebstoff und/oder einen Harzklebstoff enthalten.The Adhesive layer can be a mineral adhesive, a plastic adhesive and / or a resin adhesive.

Dadurch wird eine feste Verbindung sowohl zwischen der Dichtungsbahn und der Wärmedämmschicht als auch zwischen der Wärmedämmschicht und der Betonschicht auf einfache Art und Weise erreicht.Thereby is a firm connection both between the geomembrane and the thermal barrier coating as well as between the thermal barrier coating and achieved the concrete layer in a simple manner.

Ein dritter Aspekt der Erfindung betrifft ein zweites Verfahren zum Herstellen eines Fertigbauteils, bei dem eine Beton aufweisende Schicht in eine das herzustellende Fertigbauteil begrenzende nach oben offene Form eingebracht wird. Mit Hilfe von Ortschaum wird auf die in der Form befindlichen Betonschicht eine Wärmedämmschicht aufgetragen. Eine Dichtungsbahn wird auf den vorzugsweise noch nicht oder noch nicht vollständig erhärteten Ortschaum aufgebracht. Alternativ oder zusätzlich zur Ortschaumschicht können Dämmplatten, insbesondere Polysterolplatten, zum Ausbilden der Wärmedämmschicht verwendet werden, wodurch auf einfache Art und Weise eine ebene Anordnung der Dichtungsbahn 22 auf diesen Dämmplatten möglich ist. Zwischen den Dämmplatten und der Dichtungsbahn wird dann vorzugsweise eine Klebstoffschicht vorgesehen. Vor dem Auftragen der Ortschaumschicht auf die Beton aufweisende Schicht sollte die Oberfläche der Beton aufweisenden Schicht mit geeigneten Mitteln aufgeraut werden, um die Haftung des Ortschaums auf der Oberfläche der Beton aufweisenden Schicht und damit die Verbindung zwischen der Beton aufweisenden Schicht und der Wärmedämmschicht zu verbessern.A third aspect of the invention relates to a second method for producing a prefabricated component, in which a layer comprising concrete is introduced into an upwardly open mold delimiting the prefabricated component to be produced. With the help of Ortschaum a thermal barrier coating is applied to the concrete layer in the form. A geomembrane is applied to the preferably not or not yet fully hardened local foam. Alternatively or in addition to the Ortschaumschicht insulation boards, especially Polysterolplatten, can be used to form the thermal barrier coating, which in a simple manner a planar arrangement of the geomembrane 22 is possible on these insulation boards. An adhesive layer is then preferably provided between the insulating panels and the geomembrane. Prior to applying the topping foam layer to the concrete containing layer, the surface of the concrete containing layer should be roughened by suitable means to improve the adhesion of the topping foam to the surface of the concrete containing layer and thus the bond between the concrete containing layer and the thermal barrier coating.

Mit Hilfe eines solchen erfindungsgemäßen Verfahrens wird eine einfache und sichere Verbindung sowohl zwischen der Dichtungsbahn und der Wärmedämmschicht als auch zwischen der Wärmedämmschicht und der Betonschicht erzeugt. Dadurch lässt sich das aus den mindestens drei Schichten bestehende Fertigbauteil einfach transportieren und vor Ort mit weiteren gleichartigen Bauteilen zusammensetzen. Durch die außen angeordnete Dichtungsbahn kann die Dichtungsbahn einfach mit anderen Dichtelementen des Bauwerkteils verbunden werden. Dazu kann die Dichtungsbahn zumindest an einer Seite des Fertigbauteiles über die Wärmedämmschicht und/oder Betonschicht überstehen. Die Beton aufweisende Schicht enthält vorzugsweise Armierungsmittel, insbesondere Bewehrungsstahl. Die Beton aufweisende Schicht mit oder ohne möglichen in dieser Schicht enthaltenen weiteren Mitteln wird im Folgenden allgemein als Betonschicht bezeichnet.With Help of such a method according to the invention is a simple and secure connection between both the geomembrane and the thermal barrier coating as well as between the thermal barrier coating and the concrete layer produced. This can be the least of Simply transport and transport three-layer prefabricated components put together on site with other similar components. By the outside arranged sealing membrane, the geomembrane simply with other sealing elements be connected to the building part. For this purpose, the geomembrane at least on one side of the prefabricated over the thermal barrier coating and / or concrete layer survive. The concrete-containing layer preferably contains reinforcing agents, especially reinforcing steel. The concrete-containing layer with or without possible In this layer, further agents will be described below commonly referred to as a concrete layer.

Ein vierter Aspekt der Erfindung betrifft die Verwendung eines erfindungsgemäßen Fertigbauteils mit mindestens einem mit dem Fertigbauteil verbundenen weiteren Fertigbauteil zum Herstellen eines flüssigkeitsdichten Behälters. Ein solcher flüssigkeitsdichter Behälter ist insbesondere ein Keller oder ein Becken. Bei dem Herstellen eines Kellers eines Gebäudes, d.h. eines Bauwerkteils, ist die Dichtungsbahn an der Außenseite des Kellers angeordnet und die Beton aufweisende Schicht an der Innenseite des Kellers. Bei einem Becken, das ebenfalls ein Bauwerkteil im Sinne der Erfindung ist, ist die Dichtungsbahn an der Innenseite des Beckens und die Beton aufweisende Schicht an der Außenseite des Beckens angeordnet. Sowohl auf der durch die Dichtungsbahn gebildeten Außenseite des Fertigbauteils als auch auf der durch die Beton aufweisende Schicht gebildeten Außenseite des Fertigbauteils kann jeweils mindestens eine weitere Schicht, insbesondere zum mechanischen Schutz der Dichtbahn, angeordnet werden.One Fourth aspect of the invention relates to the use of a finished component according to the invention with at least one further connected to the prefabricated component Prefabricated component for producing a liquid-tight container. One such liquid-tight container is in particular a cellar or a basin. In manufacturing a cellar of a building, i.e. of a building part, is the geomembrane on the outside arranged the basement and the concrete-containing layer at the Inside the cellar. For a pool, which is also a building part Within the meaning of the invention, the geomembrane is on the inside of the basin and the concrete layer on the outside of the Basin arranged. Both on the formed by the geomembrane outside the Fertigbauteils as well as on the concrete having Layer formed outside of the prefabricated component can in each case at least one further layer, in particular for the mechanical protection of the sealing web, are arranged.

Zum besseren Verständnis der vorliegenden Erfindung wird im Folgenden auf die in den Zeichnungen dargestellten bevorzugten Ausführungsbeispiele Bezug genommen, die anhand spezifischer Terminologie beschrieben sind. Es sei jedoch darauf hingewiesen, dass der Schutzumfang der Erfindung dadurch nicht eingeschränkt werden soll, da derartige Veränderungen und weitere Modifizierungen an den gezeigten Vorrichtungen und/oder den beschriebenen Verfahren sowie derartige weitere Anwendungen der Erfindung, wie sie darin aufgezeigt sind, übliches derzeitiges oder künftiges Fachwissen eines Fachmanns angesehen werden.To the better understanding The present invention is described below in the drawings illustrated preferred embodiments reference taken from specific terminology. It should be noted, however, that the scope of the invention not restricted should be, because such changes and further modifications to the devices shown and / or the described method and such other applications of the Invention as shown therein, common present or future Expertise of a person skilled in the art.

Die Figuren zeigen Ausführungsbeispiele der Erfindung, nämlich:The Figures show embodiments of the Invention, namely:

1 eine Schnittdarstellung eines auf eine Bodenplatte aufgesetzten Fertigbauteils gemäß einer ersten Ausführungsform der Erfindung; 1 a sectional view of a patch on a bottom plate prefabricated component according to a first embodiment of the invention;

2 einen Ablaufplan zum Herstellen des Fertigbauteils nach 1; 2 a flowchart for producing the prefabricated component according to 1 ;

3 eine Schnittdarstellung eines auf eine Bodenplatte aufgesetzten Fertigbauteils gemäß einer zweiten Ausführungsform der Erfindung; und 3 a sectional view of a patch on a bottom plate prefabricated component according to a second embodiment of the invention; and

4 eine Schnittdarstellung einer auf eine Bodenplatte aufgesetzten Hohlwand gemäß einer dritten Ausführungsform der Erfindung. 4 a sectional view of a patch on a bottom plate cavity wall according to a third embodiment of the invention.

In 1 ist eine Schnittdarstellung eines Ausschnitts eines Bauwerkteils 10 gemäß einer ersten Ausführungsform der Erfindung gezeigt, das eine waagerecht angeordnete Bodenplatte 12 und ein im Randbereich der Bodenplatte 12 senkrecht angeordnetes Fertigbauteil 14 enthält. Dieses Bauwerkteil 10 ist im vorliegenden Ausführungsbeispiel ein Keller, auf dem nachfolgend weitere Stockwerke errichtet werden. An den äußeren Stirnflächen der Bodenplatte 12 ist umlaufend ein mehrstegiges Fugenband 13 aus einem Kunststoff eingegossen. Die Bodenplatte 12 ist vorzugsweise vor Ort mit Hilfe von Ortbeton hergestellt worden, wobei als Beton vorzugsweise stahlarmierter wasserundurchlässiger Beton verwendet worden ist. Das Fertigbauteil 14 umfasst eine stahlarmierte Betonschicht 16. Ferner umfasst das Fertigbauteil 14 eine Wärmedämmschicht 18, die mit der Betonschicht 16 über eine Kleberschicht 20 verbunden ist. Das Fertigbauteil 14 umfasst weiterhin eine Dichtungsbahn 22, auf deren Innenseite, d.h. auf der der Wärmedämmschicht 18 zugewandten Seite, eine kaschierte Vliesschicht 24 vorhanden ist. Eine solche Dichtungsbahn 22 wird auch als vlieskaschierte Dichtungsbahn 22 bezeichnet. Die Dichtungsbahn 22 selbst ist eine Kunststoffdichtungsbahn mit einer Schichtdicke von vorzugsweise 2 mm oder 2,5 mm, die zweilagig mit einer Glasvlieseinlage ausgebildet ist.In 1 is a sectional view of a section of a building part 10 according to a first embodiment of the invention, showing a horizontally arranged base plate 12 and an im Edge area of the floor slab 12 vertically arranged prefabricated component 14 contains. This building part 10 is in the present embodiment, a basement, are built on the following more floors. At the outer end faces of the bottom plate 12 is circumferentially a multi-layered joint tape 13 cast in a plastic. The bottom plate 12 has preferably been produced locally with the aid of in-situ concrete, the concrete used being preferably steel-reinforced water-impermeable concrete. The prefabricated component 14 includes a steel-reinforced concrete layer 16 , Furthermore, the prefabricated component comprises 14 a thermal barrier coating 18 that with the concrete layer 16 over an adhesive layer 20 connected is. The prefabricated component 14 further includes a geomembrane 22 , on the inside, ie on the thermal barrier coating 18 facing side, a laminated nonwoven layer 24 is available. Such a geomembrane 22 is also called fleece laminated geomembrane 22 designated. The geomembrane 22 itself is a plastic sealing strip with a layer thickness of preferably 2 mm or 2.5 mm, which is formed in two layers with a glass fleece insert.

Die Wärmedämmschicht 18 ist aus einem Polyurethanschaum hergestellt, der auf die Vliesschicht 24 der Dichtungsbahn 22 in flüssigem Zustand gegossen oder gespritzt ist. Ferner sind Kunststoffanker 25a, 25b mit Widerhaken 26a, 26b mit Hilfe eines geeigneten Klebstoffs auf die Vliesschicht 24 der Dichtungsbahn 22 geklebt. Insbesondere können die Kunststoffanker 25a, 25b mit Hilfe des Polyurethanschaums auf die Vliesschicht 24 der Dichtungsbahn 22 geklebt werden. Die Kunststoffanker 25a, 25b stehen im Wesentlichen senkrecht von der Innenseite der Dichtungsbahn 22 ab und haben eine Länge, durch die ein Teil der Kunst stoffanker 25a, 25b durch die Wärmedämmschicht 18 bis in die Betonschicht 16 ragen. Die Kunststoffanker 25a, 25b haben seitlich abstehende Widerhaken 26a, 26b, die ein Herausziehen des jeweiligen Kunststoffankers 25a, 25b aus der Betonschicht 16 verhindern. Die Kunststoffanker 25a, 25b und die Klebeschicht 20 sorgen somit für eine sichere Verbindung zwischen der Wärmedämmschicht 18 und der Betonschicht 16. Das Fertigbauteil 14 dient als Außenwandelement des zu errichtenden Kellers und wird auf eine am Rand der Bodenplatte 12 vorgesehene Vertiefung aufgesetzt. Vorzugsweise sind Verbindungsmittel zum Verbinden der Bodenplatte 12 mit dem Fertigbauteil 14 vorgesehen. Beispielsweise wird in die Vertiefung 28 im Anschlussbereich zwischen der Bodenplatte 12 und dem Fertigbauteil 14 ein Epoxydharz, insbesondere durch Verpressen mit Epoxydharz, eingebracht. Alternativ kann eine Mörtelfuge oder ein mineralischer Kleber im Stoßbereich zwischen der Vertiefung 28 der Bodenplatte 12 und der Betonwand 16 vorgesehen werden. Die Krafteinleitung in die Bodenplatte 12 erfolgt somit durch die auch als Falzbezeichnete Vertiefung 28 in der Bodenplatte 12. In Abschnitten entlang des Randes der Bodenplatte 12 kann die Vertiefung 28 ein oder mehrere Stahleinbauteile 29 enthalten. Alternativ kann umlaufend ein Stahlprofil, vorzugsweise ein L-Profil, in der Vertiefung 28 vorgesehen werden. Beim abschnittsweisen Einbringen eines oder mehrerer Stahleinbauteile 29 in die Vertiefung 28 werden diese an Stellen eingebracht, bei denen es aufgrund der Statik des zu errichtenden Gebäudes sinnvoll ist, die in die Bodenplatte 12 eingeleiteten Kräfte über einen Bereich zu verteilen. Zusätzlich kann ein weiteres Stahlbauteil (nicht dargestellt) an der Unterseite und/oder im unteren Bereich der Innenseite des Fertigbauteils 14 vorgesehen sein, wobei die Stahlbauteile zumindest in einem Teilbereich mit Hilfe von Dichtungsmitteln und/oder durch Verschweißen miteinander verbunden sind. Das Stahleinbauteil 29 ist vorzugsweise in die durch eine Ausnehmung hergestellte Vertiefung 28 der Bodenplatte 12 eingelassen, wobei das Stahleinbauteil 29 fest mit der Bodenplatte 12 abgebunden ist. Ebenso ist das am Fertigbauteil 14 vorzugsweise vorgesehene Stahleinbauteil bei der Herstellung des Fertigbauteils 14 bereits mit dem Einbringen der Betonschicht 16 durch Abbinden dieser Betonschicht 16 verbunden.The thermal barrier coating 18 is made of a polyurethane foam, which is on the nonwoven layer 24 the geomembrane 22 poured or sprayed in the liquid state. Furthermore, plastic anchors 25a . 25b with barbs 26a . 26b with the help of a suitable adhesive on the fleece layer 24 the geomembrane 22 glued. In particular, the plastic anchors can 25a . 25b with the help of the polyurethane foam on the nonwoven layer 24 the geomembrane 22 to be glued. The plastic anchors 25a . 25b are substantially perpendicular from the inside of the geomembrane 22 off and have a length through which a part of the plastic anchor 25a . 25b through the thermal barrier coating 18 into the concrete layer 16 protrude. The plastic anchors 25a . 25b have laterally projecting barbs 26a . 26b pulling out the respective plastic anchor 25a . 25b from the concrete layer 16 prevent. The plastic anchors 25a . 25b and the adhesive layer 20 thus ensure a secure connection between the thermal barrier coating 18 and the concrete layer 16 , The prefabricated component 14 serves as an outer wall element of the cellar to be built and is placed on one at the edge of the bottom plate 12 provided depression set. Preferably, connecting means for connecting the bottom plate 12 with the prefabricated component 14 intended. For example, in the recess 28 in the connection area between the base plate 12 and the prefabricated part 14 an epoxy resin, in particular by compression with epoxy resin introduced. Alternatively, a mortar joint or a mineral adhesive in the joint area between the recess 28 the bottom plate 12 and the concrete wall 16 be provided. The introduction of force into the base plate 12 thus takes place through the recess also known as fold 28 in the bottom plate 12 , In sections along the edge of the bottom plate 12 can the depression 28 one or more steel components 29 contain. Alternatively, all around a steel profile, preferably an L-profile, in the recess 28 be provided. For the section-wise insertion of one or more steel components 29 into the depression 28 These are placed in places where it makes sense due to the statics of the building to be built, which in the bottom plate 12 distributed forces across an area to distribute. In addition, a further steel component (not shown) on the underside and / or in the lower region of the inside of the prefabricated component 14 be provided, wherein the steel components are connected to each other at least in a partial area by means of sealing means and / or by welding. The steel component 29 is preferably in the recess made by a recess 28 the bottom plate 12 let in, with the steel component 29 firmly with the bottom plate 12 is tied. Likewise, this is the prefabricated part 14 preferably provided steel component in the manufacture of the prefabricated component 14 already with the introduction of the concrete layer 16 by setting this concrete layer 16 connected.

Die Herstellung der Vertiefung 28 in der Bodenplatte 12 erfolgt vorzugsweise durch Einbringen eines Kantholzes oder eines anderen geeigneten Elements auf der Oberseite der Bodenplatte 12 bei der Herstellung. Die Vertiefung 28 hat eine Tiefe im Bereich zwischen 3 cm und 5 cm. Vorzugsweise wird sie als ein 5 cm tiefer Falz ausgeführt. Durch diese Vertiefung werden die Horizontallasten sicher in die Bodenplatte 12 über diese Vertiefung eingeleitet. Die Horizontallasten ergeben sich aus den Kräften bei der Erdanschüttung des Kellers sowie durch den dann dauerhaft vorhandenen Erddruck und beim Anstehen von Grund- oder Oberflächenwasser der Wasserdruck des außen am Keller anstehenden Wassers.The production of the depression 28 in the bottom plate 12 is preferably done by introducing a square timber or other suitable element on top of the bottom plate 12 in the preparation of. The depression 28 has a depth in the range between 3 cm and 5 cm. Preferably, it is designed as a 5 cm deep fold. Through this depression, the horizontal loads are safely in the bottom plate 12 initiated on this depression. The horizontal loads result from the forces in the earth filling of the basement and by the then permanently existing earth pressure and the presence of ground or surface water, the water pressure of the outside of the basement upcoming water.

Im vorliegenden Ausführungsbeispiel hat die Polyurethan-Wärmedämmschicht 18 eine Schichtdicke von 100 mm und die stahlarmierte Betonschicht 16 hat eine Dicke von 140 mm, wodurch eine Gesamtstärke des Fertigbauteils 14 von etwa 240 mm erreicht wird. Auf der Oberseite der Bodenplatte 12 ist ein Fußbodenaufbau 30 vorgesehen, der insbesondere eine Wärmedämmschicht und eine Estrichschicht umfasst, wobei insbesondere Trockenestrichelemente zum Herstellen des Fußbodenaufbaus verwendet werden können. Alternativ kann die Bodenplatte 12 auch unterseitig wärmegedämmt werden.In the present embodiment, the polyurethane thermal barrier coating 18 a layer thickness of 100 mm and the steel-reinforced concrete layer 16 has a thickness of 140 mm, which gives a total thickness of the prefabricated part 14 of about 240 mm is achieved. On top of the bottom plate 12 is a floor construction 30 provided, which in particular comprises a thermal barrier coating and a screed layer, wherein in particular dry screed elements can be used for producing the floor structure. Alternatively, the bottom plate 12 also thermally insulated on the underside.

Beim Errichten des Kellers wird die Bodenplatte 12 zuerst vorzugsweise vor Ort hergestellt. Das die Kellerwand bildende Fertigbauteil 14 wird dann auf die Bodenplatte 12 gestellt. Das Fertigbauteil 14 wird, wie bereits beschrieben, mit der Bodenplatte 12 sowie mit benachbarten Fertigbauteilen 14 verbunden. Vorzugsweise werden zum Errichten der Wände eines rechteckigen Kellers mindestens vier Fertigbauteile 14 verwendet, für jede Seite des rechteckigen Kellers ein Fertigbauteil 14. Alternativ können die Fertigbauteile 14 auch L-förmig ausgebildet sein, so dass eine Ecke des Bauwerkteils 10 durch ein Fertigbauteil 14 bereits vorgefertigt ist und die Verbindung zwischen benachbarten Fertigbauteilen 14 dann vorzugsweise an einer Seite der Kellers erfolgt. Weitere Formen des Fertigbauteils 14 sind möglich und werden im Wesentlichen nur von den zur Verfügung stehenden Transportmöglichkeiten beschränkt. So können an das Fertigbauteil 14 auch druckwasserfeste Lichtschächte angeformt oder angebracht sein.When building the basement becomes the bottom plate 12 first preferably made on site. The prefabricated building forming the basement wall 14 will then be on the bottom plate 12 posed. The prefabricated component 14 is, as already described, with the bottom plate 12 as well as with neighboring prefabricated components 14 connected. Preferably, to build the walls of a rectangular basement at least four prefabricated components 14 used, for each side of the rectangular basement a Fertigbauteil 14 , Alternatively, the prefabricated components 14 also be L-shaped, so that a corner of the building part 10 through a prefabricated component 14 is already prefabricated and the connection between adjacent prefabricated components 14 then preferably done on one side of the cellar. Other forms of prefabricated construction 14 are possible and are essentially limited only by the available transport options. So can to the prefabricated part 14 Even water-resistant light wells are molded or mounted.

Ferner können zwischen der Bodenplatte 12 und dem Fertigbauteil 14 sowie zwischen benachbarten Fertigbauteilen 14 Bewehrungsanschlüsse vorgesehen sein, wodurch die betreffenden Bauteile 12, 14 durch nachträglichen Betonverguss miteinander verbunden werden. Alternativ oder zusätzlich kann auch eine Schweißverbindung vorgesehen werden, wobei am Fertigteil 14 und an der Bodenplatte 12 vorgesehene Stahlelemente sowie an den Fertigbauteilen 14 vorgesehenen Stahlelemente miteinander verschweißt werden.Furthermore, between the bottom plate 12 and the prefabricated part 14 as well as between adjacent prefabricated components 14 Reinforcement connections are provided, whereby the relevant components 12 . 14 be connected by subsequent Betonverguss. Alternatively or additionally, a welded joint may be provided, wherein the finished part 14 and at the bottom plate 12 provided steel elements as well as on the prefabricated components 14 provided steel elements are welded together.

Das mehrstegige Fugenband 13, das den Randabschluss der Bodenplatte 12 bildet, ist durch die angeformten und in den Beton der Bodenplatte 12 eingegossenen Stege wasserdicht mit der Bodenplatte 12 verbunden. Nach dem Anordnen des Fertigbauteils 14 auf der Bodenplatte 12 und der vorzugsweise vorgesehenen mechanischen Verbindung zwischen dem Fertigbauteil 14 und der Bodenplatte 12 wird ein Dichtungsbahnstreifen 32 sowohl mit der Außenseite der Dichtungsbahn 22 als auch mit der Außenseite des Fugenbandes 13 verbunden. Diese Verbindung wird vorzugsweise mit Hilfe von Heißluftschweißen, chemischen Schweißen oder Kleben erzeugt. Dadurch wird eine wasserdichte Verbindung zwischen dem Fugenband 13 und der Dichtungsbahn 22 erreicht. Eine solche Verbindung zwischen der Dichtungsbahn 22 und dem Fugenband 13 mit Hilfe des Dichtungsbahnstreifens 32 erfolgt umlaufend um den Keller, so dass eine druckwasserdichte Verbindung zwischen der Bodenplatte 12 und den Fertigbauteilen 14 des Kellers erfolgt.The multi-layered joint tape 13 that the edge of the bottom plate 12 is formed by the molded and in the concrete of the bottom plate 12 cast-in bars waterproof with the bottom plate 12 connected. After placing the prefabricated part 14 on the bottom plate 12 and the preferably provided mechanical connection between the prefabricated component 14 and the bottom plate 12 becomes a geomembrane strip 32 both with the outside of the geomembrane 22 as well as with the outside of the joint tape 13 connected. This connection is preferably produced by means of hot air welding, chemical welding or gluing. This creates a watertight connection between the joint tape 13 and the geomembrane 22 reached. Such a connection between the geomembrane 22 and the joint tape 13 with the help of the sealing strip 32 takes place circumferentially around the basement, allowing a watertight connection between the bottom plate 12 and the prefabricated components 14 the cellar is done.

2 zeigt ein Flussdiagramm mit Verfahrensschritten zur Herstellung der Kellerwand als Fertigbauteil 14 in einem Fertigbauteilwerk. Das Verfahren wird im Schritt S10 gestartet. Im Schritt S12 wird die Dichtungsbahn 22 mit ihrer Außenseite nach unten in eine Form gelegt, die das Fertigbauteil 14 begrenzt. Die Vliesschicht 24 zeigt dabei nach oben. Falls erforderlich, kann die Dichtungsbahn 22 auf dem Boden der Form mit geeigneten Mitteln fixiert werden, insbesondere mit Hilfe von Unterdruck, Klebstoff oder anderen geeigneten Mitteln. Die Dichtungsbahn 22 ist vorzugsweise von einer Rolle, die eine der Höhe des Fertigbauteils 14 entsprechende Breite hat, abgerollt worden und auf die Länge des Fertigbauteils 14 zugeschnitten worden. Alternativ kann die Dichtungsbahn 22 eine der Breite des Fertigbauteils 14 entsprechende Breite haben, wobei die Dichtungsbahn 22 von der Rolle abgerollt und nach einer der Höhe des Fertigbauteils 14 entsprechenden Länge abgeschnitten und in die Form eingelegt wird. Anschließend werden im Schritt S14 Aussparungskästen auf der Dichtungsbahn 22 angeordnet, durch die Aussparungen, insbesondere für Fensteröffnungen und Rohrdurchführungen sowie für Kabeldurchführungen, erforderlich sind. Die Aussparungskästen haben eine Höhe, die mindestens der Wanddicke des herzustellenden Fertigbauteils 14 entspricht. 2 shows a flowchart with process steps for the preparation of the basement wall as prefabricated component 14 in a prefabricated building. The process is started in step S10. In step S12, the geomembrane becomes 22 placed with their outside down in a mold, which is the prefabricated part 14 limited. The fleece layer 24 points upwards. If necessary, the geomembrane can 22 be fixed on the bottom of the mold by suitable means, in particular by means of negative pressure, adhesive or other suitable means. The geomembrane 22 is preferably of a roll that is one of the height of the prefabricated part 14 has corresponding width, unrolled and on the length of the prefabricated part 14 been cut. Alternatively, the geomembrane 22 one of the width of the prefabricated part 14 have appropriate width, the geomembrane 22 unrolled from the roll and after one of the height of the prefabricated part 14 corresponding length cut and inserted into the mold. Subsequently, in step S14 recess boxes on the geomembrane 22 arranged, are required by the recesses, in particular for window openings and pipe penetrations and for cable penetrations. The recess boxes have a height which is at least the wall thickness of the prefabricated component to be produced 14 equivalent.

Bei anderen Ausführungsbeispielen ist die Breite der Dichtungsbahn 22 geringer als die Höhe des Fertigbauteils 14, wobei die Dichtungsbahn 22 dann nur die abzudichtende Höhe des Fertigbauteils 14 bedeckt. Die Wärmedämmschicht 16 wird über die gesamte Höhe des Fertigbauteils 14 aufgetragen. Die Dichtungsbahn 22 reicht vorzugsweise zumindest von der Unterseite des Fertigbauteils 14 bis zur Unterseite des niedrigsten Kellerfensters oder bis zur Oberkante des Erdreichs nach Fertigstellung des Bauwerks. Ab der Oberkante der Dichtungsbahn 22 bis zur Oberkante des Fertigbauteils 14 kann dann anstatt der Dichtungsbahn 22 eine kostengünstige Folie eingesetzt werden, die insbesondere eine Isolierschicht zwischen dem Boden der Form und der Wärmedämmschicht 16 bildet. Beispielsweise ist daher eine PE-Folie geeignet.In other embodiments, the width of the geomembrane is 22 less than the height of the prefabricated part 14 , where the geomembrane 22 then only the sealed height of the finished component 14 covered. The thermal barrier coating 16 is over the entire height of the prefabricated part 14 applied. The geomembrane 22 preferably extends at least from the underside of the prefabricated component 14 to the bottom of the lowest basement window or to the top of the ground after completion of the structure. From the upper edge of the waterproofing membrane 22 to the top of the prefabricated part 14 can then instead of the geomembrane 22 a cost-effective film are used, in particular an insulating layer between the bottom of the mold and the thermal barrier coating 16 forms. For example, therefore, a PE film is suitable.

Anschließend werden im Schritt S16 Kunststoffanker 25a, 25b mit ihrem tellerförmigen Rücken auf die Vliesschicht 24 der Dichtungsbahn 22 gestellt. Zur Lagesicherung können diese Kunststoffanker 25a, 25b auch mit Hilfe eines geeigneten Klebstoffs oder eines anderen Verbindungsmittels auf der Innenseite der Dichtungsbahn 22 bzw. auf der Vliesschicht 24 in ihre Lage fixiert werden. Dies ist insbesondere zum Fixieren der Lage der Kunststoffanker 25 während des nachfolgenden im Schritt S18 durchgeführten Einbringens der Wärmedämmschicht 18 vorteilhaft. Die stabförmigen der Kunststoffanker 25a, 25b mit den im vorderen Bereich der Kunststoffanker 25a, 25b angeordneten Widerhaken 26a, 26b stehen somit von der Innenseite der Dichtungsbahn 22 in der Form des Fertigbauteils 14 nach oben ab.Subsequently, in step S16 plastic anchors 25a . 25b with its plate-shaped back on the fleece layer 24 the geomembrane 22 posed. To secure the position of these plastic anchors 25a . 25b also with the help of a suitable adhesive or other bonding agent on the inside of the geomembrane 22 or on the nonwoven layer 24 be fixed in their position. This is in particular for fixing the position of the plastic anchors 25 during the subsequent introduction of the thermal barrier coating performed in step S18 18 advantageous. The rod-shaped plastic anchors 25a . 25b with the front of the plastic anchor 25a . 25b arranged barbs 26a . 26b thus stand from the inside of the geomembrane 22 in the form of prefabricated part 14 upwards.

Im Schritt S18 wird die Wärmedämmschicht 18 in Form von Ortschaum in die Form gegossen bzw, gespritzt, so dass eine Wärmedämmschicht 18 mit im wesentlichen gleicher Schichtdicke auf der Innenseite der Dichtungsbahn 22 erzeugt wird. Dabei verbindet sich der flüssige Ortschaum der Vliesschicht 24, indem der Ortschaum zumindest teilweise in die Vliesschicht 24 eindringt. Nach dem Aushärten des Ortschaums sind die Dichtungsbahn 22 und die Wärmedämmschicht 18 einstückig miteinander verbunden. Nach diesem Verarbeitungsschritt S22 stehen zumindest die Widerhaken 26a, 26b der Kunststoffanker 25a, 25b aus der Wärmedämmschicht 18 nach oben. Nach dem Erhärten des Ortschaums der Wärmedämmschicht 18 werden Bewehrungselemente, insbesondere Stahlmatten und/oder der Bewehrungseisen in der Form über der Wärmedämmschicht 18 angeordnet, so dass sie die über der Wärmedämmschicht 18 zu erzeugenden Betonschicht 16 für das mit Hilfe des Fertigbauteils 14 zu errichtende Bauwerk ausreichend bewehren. Alternativ kann die Bewehrung bereits vor dem Einbringen des Ortschaums der Wärmedämmschicht 18 in der Form angeordnet werden. Die Bewehrung kann beispielsweise zumindest teilweise durch die Kunststoffanker 25a, 25b gehalten werden.In step S18, the thermal barrier coating 18 In the form of local foam poured into the mold or, sprayed, leaving a thermal barrier coating 18 with substantially the same layer thickness on the inside of the geomembrane 22 is produced. In this case, the liquid local foam of the fleece connects layer 24 by the local foam at least partially in the nonwoven layer 24 penetrates. After curing the local foam are the geomembrane 22 and the thermal barrier coating 18 integrally connected. After this processing step S22 are at least the barbs 26a . 26b the plastic anchor 25a . 25b from the thermal barrier coating 18 up. After hardening of the local foam of the thermal barrier coating 18 Be reinforcement elements, in particular steel mats and / or the reinforcing iron in the form of the thermal barrier coating 18 arranged so that they are above the thermal barrier coating 18 concrete layer to be produced 16 for that with the help of the prefabricated part 14 sufficient to reconstruct building to be erected. Alternatively, the reinforcement can already before the introduction of the local foam of the thermal barrier coating 18 be arranged in the mold. The reinforcement can, for example, at least partially by the plastic anchors 25a . 25b being held.

Anschließend wird im Schritt S20 eine Schicht 20 Klebstoff auf den erhärteten Ortschaum der Wärmedämmschicht 18 aufgetragen. Diese Klebestoffschicht 20 kann insbesondere durch eine weitere Ortschaumschicht oder alternativ oder zusätzlich einen mineralischen Klebstoff, einen Kunststoffklebstoff und/oder einen Harzklebstoff umfassen. erzeugt werden. Anschließend wird im Schritt S22 Frischbeton auf die noch nicht oder noch nicht vollständig erhärtete Klebstoffschicht 20 in die Form eingebracht.Subsequently, in step S20, a layer 20 Adhesive on the hardened local foam of the thermal barrier coating 18 applied. This adhesive layer 20 may in particular comprise a further local foam layer or alternatively or additionally a mineral adhesive, a plastic adhesive and / or a resin adhesive. be generated. Subsequently, in step S22, fresh concrete is applied to the adhesive layer which has not yet or not yet been completely hardened 20 placed in the mold.

Nach dem Erhärten des eingefüllten Betons bis zu einer gewünschten Festigkeit wird das Fertigbauteil 14 im Schritt S24 von der Form getrennt, indem vorzugsweise die Randschalung der Form entfernt und das Bauteil 14 von der Unterseite der Form. Die Unterseite der Form ist vorzugsweise durch einen Schalungstisch gebildet. Nachfolgend werden im Schritt S26 die Aussparungskästen entfernt und die für diese Aussparungen vorgesehenen Einbauten, wie beispielsweise Rohrdurchführungen, Kabeldurchführungen oder Fenster, eingebaut. An den Steilen, an denen Aussparungskästen angeordnet waren und im Fertigbauteil 14 Aussparungen vorhanden sind, wird im Schritt S28 die Dichtungsbahn 22 geöffnet und mit geeigneten Anschlussdichtungen verschweißt und/oder mit Anschlussprofilen verbunden. Im Schritt S30 ist der Ablauf beendet. Durch ein solches Verfahren wird eine sehr ebene Anordnung der Dichtungsbahn 22 erreicht. Insbesondere kann eine Faltenbildung der Dichtungsbahn 22 einfach vermieden werden. Eine ebene und faltenfreie Ausführung der Dichtungsbahn 22 an der Außenseite des Fertigbauteils 14 ist eine optimale Voraussetzung für eine wasserdichte Abdichtung des Kellers. Insbesondere die Verdichtung der Dichtungsbahnen 22 mehrere benachbarter Fertigbauteile 14 wird durch die ebene Anordnung der Dichtungsbahn 22 am Fertigbauteil 14 erheblich erleichtert, wodurch die Herstellung einer dichten Verbindung in hoher Qualität vereinfacht ist. Die ebene und faltenfreie Anordnung der Dichtungsbahn 22 wird insbesondere durch das Einlegen der Dichtungsbahn 22 in die Form auf deren ebenen Unterseite erreicht. Alternativ zu dem in 2 dargestellten und beschriebenen Verfahren zum Herstellen eines Fertigbauteils 14 können die einzelnen Schichten 16, 18, 22 in umgedrehter Reihenfolge in die Form eingebracht werden. Dabei wird zuerst die Betonschicht und die möglicherweise in der Betonschicht erforderliche Bewehrung als erste Schicht 16 in die Form eingebracht. Anschließend werden Dämmplatten zum Ausbilden der Wärmedämmschicht 18 auf der Betonschicht aufgebracht. Zum Verbinden der Dämmplatten mit der Betonschicht können die Dämmplatten in den noch flüssigen Beton gedrückt und durch Abbinden des Betons mit diesem verbunden werden oder alternativ mit Hilfe einer zusätzlichen Klebeschicht zwischen der Betonschicht 16 und den Dämmplatten mit der Betonschicht 16 verbunden werden. Anschließend wird die Dichtungsbahn 22 mit Hilfe eines geeigneten Klebstoffs auf die Wärmedämmplatten der Wärmedämmschicht 18 geklebt. Die Wärmedämmplatten sind beispielsweise Polysterol-, Styrodur- und/oder andere geeignete Dämmstoffplatten.After hardening of the filled concrete to a desired strength, the prefabricated part becomes 14 separated from the mold in step S24, preferably by removing the edge form of the mold and the component 14 from the bottom of the mold. The underside of the mold is preferably formed by a formwork table. Subsequently, the recess boxes are removed in step S26 and provided for these recesses internals, such as pipe penetrations, cable glands or windows installed. On the parts where the boxes were arranged and in the prefabricated part 14 Recesses are present, in step S28, the geomembrane 22 opened and welded with suitable connection seals and / or connected with connection profiles. In step S30, the process is ended. By such a method is a very flat arrangement of the geomembrane 22 reached. In particular, a wrinkling of the geomembrane can 22 simply avoided. A flat and wrinkle-free design of the waterproofing membrane 22 on the outside of the prefabricated part 14 is an optimal condition for a watertight seal of the cellar. In particular, the compression of the geomembranes 22 several neighboring prefabricated components 14 is due to the planar arrangement of the geomembrane 22 on the prefabricated part 14 greatly facilitated, making the production of a tight connection in high quality is simplified. The flat and wrinkle-free arrangement of the geomembrane 22 in particular by the insertion of the geomembrane 22 reached into the mold on the flat bottom. Alternatively to the in 2 illustrated and described method for producing a prefabricated component 14 can the individual layers 16 . 18 . 22 be introduced in inverted order in the mold. First, the concrete layer and possibly the reinforcement required in the concrete layer is the first layer 16 placed in the mold. Subsequently, insulation boards for forming the thermal barrier coating 18 applied to the concrete layer. To connect the insulation boards with the concrete layer, the insulation boards can be pressed into the still liquid concrete and connected by setting the concrete with this or alternatively using an additional adhesive layer between the concrete layer 16 and the insulation boards with the concrete layer 16 get connected. Subsequently, the sealing membrane 22 with the help of a suitable adhesive on the thermal insulation panels of the thermal barrier coating 18 glued. The thermal insulation boards are, for example, polystyrene, Styrodur and / or other suitable insulation boards.

Nachfolgend werden weitere vorteilhafte Ausgestaltungen der zum Herstellen des Fertigbauteils 14 verwendeten Materialien sowie des Herstellungsverfahrens zum Herstellen des Fertigbauteils 14 beschrieben.Below are further advantageous embodiments of the manufacturing of the prefabricated component 14 used materials and the manufacturing process for producing the prefabricated component 14 described.

Mit Hilfe der beschriebenen Herstellungsverfahren können Massivwandsysteme mit einer geringen optimierten Dicke und somit mit einem geringen Gewicht ausgeführt werden. Insbesondere Kellerwände müssen eine Vielzahl von Lasten aufnehmen. So müssen die Kellerwände Vertikallasten der Kellerdecke und des auf der Kellerdecke errichteten Gebäudes und durch Erdanfüllungen und anstehendes Grundwasser erzeugten Horizontallasten. Kellerwände haben im Allgemeinen eine zweilagige Stahlbewehrung, wobei durch den Aufbau des erfindungsgemäßen Fertigbauteils 14 die Wandstärke der Betonschicht 16 auf etwa 14 cm reduziert werden kann. Für andere Anwendungen des Fertigbauteils 14, insbesondere zum Errichten von Schwimmbecken oder Behältern können auch geringere Wandstärken der Betonschicht 16 ausreichend sein. Die Wandstärke der Betonschicht 16 richtet sich nach der Statik, wobei jedoch eine Mindestbetondeckung der Bewehrung erforderlich ist, wodurch Wandstärken von ≥ 8 cm sinnvoll eingesetzt werden können.With the aid of the described production methods, solid wall systems with a low optimized thickness and thus with a low weight can be implemented. In particular, basement walls must accommodate a variety of loads. Thus, the basement walls have vertical loads of the basement ceiling and the building erected on the basement ceiling and horizontal loads generated by Erdanfüllungen and upcoming groundwater. Basement walls generally have a two-layer steel reinforcement, with the construction of the prefabricated building according to the invention 14 the wall thickness of the concrete layer 16 can be reduced to about 14 cm. For other applications of prefabricated components 14 , in particular for the construction of swimming pools or containers can also lower wall thicknesses of the concrete layer 16 be enough. The wall thickness of the concrete layer 16 depends on the static, but a minimum concrete cover of the reinforcement is required, which wall thickness of ≥ 8 cm can be used meaningfully.

Für Wohnräume im Kellerbereich eines Gebäudes ist eine Wärmedämmung erforderlich, die durch die Wärmedämmschicht 18 erreicht wird. Im vorliegenden Ausführungsbeispiel weist das Fertigbauteil 14 eine Polyurethan-Wärmedämmschicht 18 auf. Die Polyurethan-Wärmedämmschicht 18 wird bei dem beschriebenen Herstellungsverfahren des Fertigbauteils 14 in flüssiger Form als Zweikomponentengemisch auf die Dichtungsbahn 22 aufgebracht. Abhängig von dem erforderlichen Wärmeschutz wird eine Wärmedämmschicht 18 mit einer Dicke von 6 cm bis 20 cm auf die Dichtungsbahn 22 aufgebracht.For living rooms in the basement area of a building, a thermal insulation is required, which is due to the thermal barrier coating 18 is reached. In the present embodiment, the prefabricated component 14 a polyurethane thermal barrier coating 18 on. The polyurethane thermal barrier coating 18 is in the described manufacturing method of the prefabricated component 14 in liquid form as a two-component mixture on the geomembrane 22 applied. Depending on the required thermal protection, a thermal barrier coating will be used 18 with a thickness of 6 cm to 20 cm on the geomembrane 22 applied.

Bei anderen Ausführungsbeispielen, insbesondere zum Herstellen eines Behälters mit Hilfe des Fertigbauteils 14, kann die Wärmedämmschicht 18 auch wesentlich dünner ausgebildet sein und nur wenige Millimeter betragen, wobei die Wärmedämmschicht 18 dann im wesentlichen zur Verbindung zwischen der Dichtungsbahn 22 und der Betonschicht 16 dient. Die Wärmedämmschicht 18 fungiert dann als Klebeschicht.In other embodiments, in particular for producing a container by means of the prefabricated component 14 , can the thermal barrier coating 18 also be much thinner and be only a few millimeters, the thermal barrier coating 18 then essentially to the connection between the geomembrane 22 and the concrete layer 16 serves. The thermal barrier coating 18 then acts as an adhesive layer.

Die Dichtungsbahn 22 verhindert allgemein das Eindringen bzw. das Ausdringen von Wasser oder anderen Flüssigkeiten. Zur Abdichtung sind handelsübliche Kunststoffdichtungsbahnen mit einer Stärke von ≥ 2 mm vorteilhaft einsetzbar. Diese Kunststoffdichtungsbahnen lassen sich einfach verarbeiten und können mit Hilfe von Dichtungsbahnstreifen 32 einfach miteinander verbunden werden, indem ein Dichtungsbahnstreifen 32 auf jede von zwei benachbarten Dichtungsbahnen 22 aufgeschweißt oder aufgeklebt wird.The geomembrane 22 generally prevents the penetration or the discharge of water or other liquids. For sealing commercial plastic waterproofing membranes with a thickness of ≥ 2 mm are advantageously used. These plastic waterproofing membranes are easy to process and can be achieved with the help of waterproofing membrane strips 32 simply be joined together by a geomembrane strip 32 on each of two adjacent geomembranes 22 welded or glued on.

Die Gesamtwandstärke des Fertigbauteils 14 beträgt beispielsweise 24 cm. Die Fertigbauteile können eine Wandhöhe von üblicherweise bis zu 3 m und eine vorzugsweise Wandlänge von größer 5 m haben. Die maximale Wandlänge ist durch vorhandene Transportmöglichkeiten beschränkt und sollte für einen kostengünstigen Transport 13 m nicht oder nicht wesentlich übersteigen. Die in einem Fertigbauteilwerk vorgefertigten Fertigbauteile werden dann mit Hilfe eines Lkws zur Baustelle transportiert und dort montiert. Die Erfindung ist jedoch nicht auf die angegebenen Abmessungen beschränkt.The total wall thickness of the prefabricated part 14 is for example 24 cm. The prefabricated components can have a wall height of usually up to 3 m and a preferably wall length of more than 5 m. The maximum wall length is limited by existing transport options and should not or not significantly exceed 13 m for a cost-effective transport. The pre-fabricated prefabricated components are then transported to the construction site with the help of a truck and assembled there. However, the invention is not limited to the dimensions given.

Die als Dichtungsbahn 22 verwendete Kunststoffdichtungsbahn ist im vorliegenden Ausführungsbeispiel im Koextrusionsverfahren als Zwei-Schicht-Bahn vorzugsweise mit einem mittig angeordneten Glasvlies von beispielsweise 50 g/m2 hergestellt. Vorzugsweise ist die Kunststoffdichtungsbahn aus einem Ethylen-Copolymerisat hergestellt und hat eine handelsübliche Dicke von 2,0 mm oder 2,5 mm. Die Kunststoffdichtungsbahn ist flüssigkeitsundurchlässig und chemisch beständig gegen Flüssigkeiten wie z.B. Leistungswasser, sulfathaltiges Grund- und Oberflächenwasser sowie Wasser mit Chlorzusätzen. Ferner ist eine solche Kunststoffabdichtungsbahn alterungs- und witterungsbeständig, microorganismenbeständig, wurzelfest und nagetierbeständig. Somit sind solche Kunststoffdichtungsbahnen auch als Abdichtungsmittel von Auffangwannen, Auffangräumen und Kellerräumen geeignet. Auf der Innenseite der Kunststoffdichtungsbahn ist, wie bereits erwähnt, ein zusätzliches Vlies 24 aufkaschiert, das bei einer Ausführungsform der vorliegenden Erfindung zur Verbindung mit der Wärmedämmschicht 18 genutzt wird. Die Kunststoffdichtungsbahn 22 wird als Rollenware mit einer Breite von beispielsweise 2 m und einer variablen Rollenlänge hergestellt. Es sind aber auch größere Rollenbreiten erhältlich und vorteilhaft einsetzbar. Vorzugsweise entspricht die Rollenbreite mindestens der Höhe des Fertigbauteils 14.The as sealing membrane 22 used plastic sealant web is produced in the present embodiment in the coextrusion process as a two-layer web, preferably with a centrally arranged glass fleece, for example, 50 g / m 2 . Preferably, the plastic sealing sheet is made of an ethylene copolymer and has a commercial thickness of 2.0 mm or 2.5 mm. The plastic waterproofing membrane is impermeable to liquids and chemically resistant to liquids such as power water, sulphate-containing ground and surface water and water with chlorine additives. Furthermore, such a plastic waterproofing membrane is resistant to aging and weathering, microorganism resistant, root resistant and rodent resistant. Thus, such plastic waterproofing membranes are also suitable as a sealant of drip pans, catch basins and basements. On the inside of the plastic waterproofing membrane, as already mentioned, an additional fleece 24 laminated in an embodiment of the present invention for connection to the thermal barrier coating 18 is being used. The plastic waterproofing membrane 22 is manufactured as a roll product with a width of for example 2 m and a variable roll length. But there are also larger roller widths available and can be used advantageously. The roller width preferably corresponds at least to the height of the prefabricated component 14 ,

Die Kunststoffdichtungsbahn wird dann entsprechend der Länge des Fertigbauteils 14 zugeschnitten. Es kann vorgesehen werden, dass die Kunststoffdichtungsbahn an mindestens einer Seite über mindestens eine breitere Schicht 16, 18 des Fertigbauteils 14 übersteht und einen Anschlussbereich zu einem weiteren Bauteil 14 bildet. In diesem überstehenden Bereich ist beispielsweise auf der Rückseite der Dichtungsbahn 22 keine Vliesschicht 24 vorgesehen, so dass dieser überstehende Bereich direkt auf eine benachbarte Kunststoffabdichtungsbahn 22 oder ein anderes Dichtelement, wie beispielsweise das Fugenband 13, aufgeschweißt werden kann. Alternativ ist auf der Innenseite der Dichtungsbahn 22 keine Vliesschicht 24 aufkaschiert.The plastic sealing sheet is then corresponding to the length of the prefabricated component 14 tailored. It can be provided that the plastic sealing strip on at least one side over at least one wider layer 16 . 18 of the prefabricated component 14 survives and a connection area to another component 14 forms. In this projecting area, for example, on the back of the geomembrane 22 no fleece layer 24 provided so that this projecting area directly onto an adjacent plastic waterproofing membrane 22 or another sealing element, such as the joint tape 13 , can be welded on. Alternatively, on the inside of the geomembrane 22 no fleece layer 24 laminated.

Nach dem Zuschnitt der Kunststoffdichtungsbahn 22 wird diese auf einen Fertigungstisch aufgelegt, auf dem Randschalungen für das zu produzierende Fertigbauteil 14 angeordnet sind. Somit wird die Kunststoffdichtungsbahn 22 in die durch den Fertigungstisch und die Wandschalungen gebildete Form eingelegt. Die vorzugsweise glatte Außenschicht der Dichtungsbahn 22 ist dabei unten angeordnet und steht in Kontakt mit dem Fertigungstisch. Die Rückseite der Dichtungsbahn 22, auf der eine Vliesschicht 24 angeordnet ist, zeigt nach oben und ist somit zum Inneren des herzustellenden Fertigbauteils 14 gerichtet. Nach dem Anordnen der Kunststoffanker 25a, 25b wird flüssiges zweikomponentiges Polyurethan als Schicht in die Form auf die Vliesschicht 24 aufgebracht. Das flüssige zweikomponentige Polyurethan wird durch eine chemische Reaktion von Polyisocyanaten mit akidem Wasserstoff enthaltenden Verbindungen unter Mitwirkung eines Treibmittels hergestellt. Bei dem Polyurethan handelt es sich vorzugsweise um einen Polyurethan-Ortschaum nach DIN 18159 bzw. nach DIN 18164. Der Polyurethan-Ortschaum wird mittels einer Schäumeinrichtung im Gießverfahren in die Form eingefüllt. Dabei wird ein flüssiges Reaktionsgemisch über Schlauchleitungen einem Mischkopf zugeführt, die Komponenten und ein Treibmittel zu dem Polyurethan-Ortschaum abgegeben. Mit Hilfe des Mischkopfs wird der Polyurethan-Ortschaum in die Form eingebracht und auf die Vliesschicht 24 der Dichtungsbahn 22 aufgetragen. Dadurch wird eine Wärmedämmschicht 18 in Form eines Schaumstoffs nach dem Aushärten des Polyurethan-Ortschaums erzeugt. Bei alternativen Ausführungsformen können auch andere geeignete Stoffe zum Erzeugen der Wärmedämmschicht 18 genutzt werden.After cutting the plastic waterproofing membrane 22 this is placed on a production table, on the edge formwork for the finished component to be produced 14 are arranged. Thus, the plastic sealing sheet becomes 22 inserted in the form formed by the manufacturing table and the wall formworks. The preferably smooth outer layer of the geomembrane 22 is arranged below and is in contact with the production table. The back of the geomembrane 22 , on a fleece layer 24 is arranged, points upwards and is thus the interior of the prefabricated component to be produced 14 directed. After arranging the plastic anchors 25a . 25b Liquid two-component polyurethane is as a layer in the mold on the nonwoven layer 24 applied. The liquid two-component polyurethane is prepared by a chemical reaction of polyisocyanates with compounds containing the amide of hydrogen with the aid of a blowing agent. The polyurethane is preferably a polyurethane local foam according to DIN 18159 or according to DIN 18164. The polyurethane local foam is filled by means of a foaming device in the casting process in the mold. In this case, a liquid reaction mixture is supplied via hose lines to a mixing head, the components and a propellant delivered to the polyurethane-local foam. With the help of the mixing head, the polyurethane-local foam is introduced into the mold and on the fleece layer 24 the geomembrane 22 applied. This will create a thermal barrier coating 18 produced in the form of a foam after curing of the polyurethane Ortschaums. In alternative embodiments, other suitable materials for producing the thermal barrier coating may also be used 18 be used.

Beim Auftragen des Polyurethan-Ortschaums auf die Innenseite der mit der Vliesschicht 24 kaschierten Dichtungsbahn 22 dringt der Polyurethan-Ortschaum in die Vliesschicht 24 ein, wodurch eine Verbindung zwischen der Wärmedämmschicht 18 und der Dichtungsbahn 22 erzeugt wird, durch die zumindest die Dichtungsbahn 22 und die Wärmedämmschicht 18 ein homogenes Bauteil bilden. Dieses Bauteil weist dann zumindest die Dichtungsbahn 22 und die Wärmedämmschicht 18 auf.When applying the polyurethane local foam on the inside of the nonwoven layer 24 laminated geomembrane 22 penetrates the polyurethane-local foam in the nonwoven layer 24 a, creating a bond between the thermal barrier coating 18 and the geomembrane 22 is generated by the at least the geomembrane 22 and the thermal barrier coating 18 form a homogeneous component. This component then has at least the geomembrane 22 and the thermal barrier coating 18 on.

Nachfolgend wird Beton oder alternativ Leichtbeton auf die Wärmedämmschicht 18 aufgebracht. Zur Verbindung der Wärmedämmschicht 18 und der Betonschicht 16 wird vor dem Einbringen des Betons in die Form eine geeignete Kleberschicht 20 auf die Wärmedämmschicht 18 aufgebracht. Diese Kleberschicht 20 kann alternativ oder zusätzlich zu den Kunststoffankern 25a, 25b vorgesehen sein. Ferner wird vor dem Einbringen des Betons oder während des Einbringens des Betons eine Stahlarmierung in die Betonschicht 16 eingebracht, wodurch eine stahlarmierte Betonschicht 16 erzeugt wird. Die Kunststoffanker 25a, 25b haben in den in die Betonschicht 16 ragenden Bereich zumindest eine Verbreiterung, die von dem in die Form gegossenen Beton umschlossen wird, wodurch ein Herausziehen der Kunststoffanker 25a, 25b aus der Betonschicht 16 nach dem Erhärten des Betons nicht mehr möglich ist. Diese vorstehenden Elemente werden allgemein als Widerhaken 26a, 26b bezeichnet. Alternativ zu dem Beton kann auch ein Leichtbeton verwendet werden, durch den in gleicher Weise die Betonschicht 16 gebildet wird, wobei die dann mit Hilfe des Leichbetans gebildete Betonschicht 16 ein geringeres Gewicht gegenüber einer aus Beton erzeugten Betonschicht 16 hat. Nach dem Härten der Betonschicht bzw. der Leichtbetonschicht bis zu einem erforderlichen Härtegrad ist ein mehrschichtiges Wandsystem als Fertigbauteil 14 hergestellt, das dann mit Hilfe eines Lastkraftwagens zu einer Baustelle transportiert wird, auf der ein Bauwerksteil mit Hilfe des Fertigbauteils 14 hergestellt werden soll. Auf der Baustelle wird das Fertigbauteil 14, wie bereits zuvor beschrieben, vorzugsweise mit einer Bodenplatte 12 und weiteren Fertigbauteilen verbun den. Das Fertigbauteil 14 bildet im vorliegenden Ausführungsbeispiel ein Wandelement. Bei anderen Ausführungsbeispielen kann das Fertigbauteil auch als Bodenplatte dienen.Subsequently, concrete or alternatively lightweight concrete on the thermal barrier coating 18 applied. To connect the thermal barrier coating 18 and the concrete layer 16 becomes a suitable adhesive layer prior to placing the concrete in the mold 20 on the thermal barrier coating 18 applied. This adhesive layer 20 may alternatively or in addition to the plastic anchors 25a . 25b be provided. Furthermore, prior to the introduction of the concrete or during the introduction of the concrete, a steel reinforcement into the concrete layer 16 introduced, creating a steel-reinforced concrete layer 16 is produced. The plastic anchors 25a . 25b have in the in the concrete layer 16 projecting area at least one widening, which is enclosed by the poured into the mold concrete, thereby pulling out the plastic anchors 25a . 25b from the concrete layer 16 after the hardening of the concrete is no longer possible. These protruding elements are commonly called barbs 26a . 26b designated. As an alternative to the concrete, a lightweight concrete can be used by the same way the concrete layer 16 is formed, wherein the concrete layer then formed using the Leichbetans 16 a lower weight compared to a concrete layer produced from concrete 16 Has. After curing the concrete layer or the lightweight concrete layer to a required degree of hardness is a multi-layer wall system as a prefabricated component 14 produced, which is then transported by a truck to a construction site on which a building part using the finished component 14 to be produced. On the construction site, the prefabricated part 14 as previously described, preferably with a bottom plate 12 and other prefabricated components verbun the. The prefabricated component 14 forms in the present embodiment, a wall element. In other embodiments, the prefabricated component can also serve as a base plate.

Zur Abdichtung des gesamten Bauwerksteils, zu dessen Herstellung das Fertigbauteil 14 verwendet wird, werden Verschweißungen der Kunststoffdichtungsbahnen 22 untereinander vorgesehen. Vorzugsweise werden Wandfugen zwischen zwei benachbarten Fertigbauteilen 14 mit Hilfe eines Streifens 32 einer Kunststoffdichtungsbahn überbrückt und mit den jeweils angrenzenden Wandelementen verbunden.For sealing the entire structure part, for its production, the prefabricated building 14 used, are welds of plastic waterproofing membranes 22 provided with each other. Preferably, wall joints between two adjacent prefabricated components 14 with the help of a strip 32 bridged a plastic sealing strip and connected to the respective adjacent wall elements.

Wie in 1 gezeigt, ist auch das Verbinden der Dichtungsbahn 22 mit einem in die Bodenplatte 12 eingebrachten Fugenband 13 möglich, wodurch der Bereich zwischen Bodenplatte 12 und Wandelement 14 wasserdicht abgedichtet werden kann, in dem ein Dichtungsbahnstreifen 32 sowohl mit der Dichtungsbahn 22 als auch mit dem Fugenband 13 verschweißt wird. Das Durchführen der Verbindungen der Dichtungsbahnen 22 untereinander und der Dichtungsbahn 22 mit dem Fugenband 13 erfolgen vorzugsweise nach den Richtlinien des Deutschen Verbandes für Schweißtechnik. Insbesondere können Schweißverbindungen mit Hilfe eines Warmgasschweißverfahrens, insbesondere mit Hilfe eines Heißluftschweißverfahrens, durchgeführt werden. Alternativ kann ein Heizkeilschweißverfahren oder ein chemisches Schweißverfahren angewendet werden. Die Dichtungsbahnstreifen 32 überlappen die Dichtungsbahn 22 und/oder das Fugenband 13 mindestens auf einer Breite von 10 cm. Alternativ zu dem Dichtungsbahnstreifen 32 kann auch die Dichtungsbahn 22 entsprechend über den Rand der Schichten 16 und 18 des Fertigbauteils 14 überstehen, wobei die Dichtungsbahn 22 zumindest in diesem überstehenden Bereich auf ihrer Rückseite nicht vlieskaschiert ist, um ein Verschweißen mit dem Fugenband 13 oder mit einer weiteren Dichtungsbahn zu ermöglichen.As in 1 shown is also connecting the geomembrane 22 with one in the bottom plate 12 introduced joint tape 13 possible, reducing the area between the bottom plate 12 and wall element 14 waterproof can be sealed, in which a sealing strip 32 both with the geomembrane 22 as well as with the joint tape 13 is welded. Carrying out the joints of the geomembranes 22 with each other and the geomembrane 22 with the joint tape 13 are preferably carried out according to the guidelines of the German Association for Welding. In particular, welded joints can be carried out by means of a hot gas welding process, in particular by means of a hot air welding process. Alternatively, a hot wedge welding method or a chemical welding method may be used. The geomembrane strip 32 overlap the geomembrane 22 and / or the joint tape 13 at least on a width of 10 cm. Alternative to the sealing strip 32 can also the geomembrane 22 correspondingly over the edge of the layers 16 and 18 of the prefabricated component 14 survive, with the geomembrane 22 at least in this projecting area is not fleece laminated on its back to a welding with the joint tape 13 or to allow with another geomembrane.

Die mindestens drei Schichten 22, 18, 16 des Fertigbauteils 14 bilden ein einheitliches Wandsystem, das einen Transport des kompletten Fertigbauteils 14 ermöglicht. Die Dichtungsbahn 22 hat eine vollflächige Verbindung mit der Wärme dämmschicht 18. Ferner sind die Dichtungsbahn 22 und die Wärmedämmschicht 18 fest mit der Betonschicht 16 verbunden. Die drei Schichten 16, 18, 22 des Fertigbauteils 14 sind nach dem Fertigen des Fertigbauteils 14 nur noch mit Gewalt trennbar. Bei dem Fertigbauteil 14 handelt es sich um ein massives, vollständig hergestelltes, vorgefertigtes Bauteil und somit, im Unterschied zu Halbfertigteilen, um ein Vollfertigteil. Das Fertigbauteil 14 ist somit eine als Vollfertigteil ausgebildete Massivwand. Im Unterschied dazu haben Halbfertigteile den Nachteil, dass diese auf der Baustelle noch mit einer Ortbetonschicht ergänzt und fertig gestellt werden müssen. Bei diesen Halbfertigteilen sind im Allgemeinen größere Wandstärken erforderlich als bei Vollfertigteilen.The at least three layers 22 . 18 . 16 of the prefabricated component 14 form a uniform wall system, which is a transport of the complete prefabricated part 14 allows. The geomembrane 22 has a full-surface connection with the thermal insulation layer 18 , Furthermore, the geomembrane 22 and the thermal barrier coating 18 stuck with the concrete layer 16 connected. The three layers 16 . 18 . 22 of the prefabricated component 14 are after finishing the prefabricated part 14 only separable by force. In the prefabricated part 14 It is a massive, fully manufactured, prefabricated component and thus, in contrast to semi-finished parts, a complete finished part. The prefabricated component 14 is thus a trained as a full prefabricated solid wall. In contrast, semi-finished parts have the disadvantage that they still have to be supplemented with a layer of in-situ concrete on the construction site and finished. These semi-finished parts generally require larger wall thicknesses than complete prefabricated parts.

In 3 ist eine Schnittdarstellung eines Ausschnitts eines Bauwerkteils ähnlich dem Bauwerkteil 10 nach 1 gemäß einer zweiten Ausführungsform der Erfindung gezeigt. Gleiche Elemente haben gleiche Bezugszeichen. Im Unterschied zu dem in 1 dargestellten Bauwerkteil 10 ist bei dem Bauwerkteil nach 3 die Bodenplatte 12 um den Bereich 12a verbreitert, wobei die Bodenplatte 12 eine weitere Vertiefung 21 hat, in die ein vom Fertigteil 14 nach unten überstehender Bereich 23 der Dichtungsbahn 22 ragt, nach dem das Fertigbauteil 14 korrekt auf der Bodenplatte 12 in der Vertiefung 28 positioniert ist. Die Vertiefung 21 wird nach diesem Positionieren des Fertigbauteils 14 mit einem geeigneten Vergussstoff zum dichten Verbinden des unteren Bereichs 23 der Dichtungsbahn 22 mit der Bodenplatte 12 vergossen. Dadurch erfolgt eine Abdichtung zwischen der Bodenplatte 12 und der senkrecht dazu angeordneten, durch das Fertigbauteil 14 gebildeten Kellerwand. Die Vertiefung 21 dient somit als Vergussnut und wird vorzugsweise in einem Arbeitsgang mit der Vertiefung 28 beim Herstellen der Bodenplatte 12 erzeugt. Beispielsweise wird an dem bereits erwähnten zum Herstellen der Vertiefung 28 genutzten Kantholz eine Latte befestigt, die zur Ausschalung der oben erwähnten Vergussnut dient. Andere Schalungselemente können alternativ oder zusätzlich zu dem erwähnten Kantholz und/oder der Latte verwendet werden. Im Unterschied zu der in 1 gezeigten Bodenplatte ist die in 3 gezeigte Bodenplatte um den Bereich 12a vergrößert, um die Vertiefung 21 ausbilden zu können. Alternativ zu der in 3 gezeigten Ausführungsform wird die Vertiefung 21 am Rand der Bodenplatte 12 angebracht, so dass der die Boden platte 12 verbreitende Bereich 12a dann nicht erforderlich ist. Zum Vergießen der Vertiefung 21 wird dann eine temporäre oder eine verlorene Schalung genutzt. Somit muss die Bodenplatte 12 nicht zwingend seitlich über die Vertiefung 21 hinaus stehen. Als Schalung kann insbesondere die bei der Herstellung der Bodenplatte 12 genutzte Randschalung genutzt werden.In 3 is a sectional view of a Detail of a building part similar to the building part 10 to 1 according to a second embodiment of the invention. Like elements have the same reference numerals. Unlike the in 1 illustrated building part 10 is in the building part after 3 the bottom plate 12 around the area 12a widened, with the bottom plate 12 another depression 21 has, in the one of the finished part 14 downwards projecting area 23 the geomembrane 22 sticks out, after which the Fertigbauteil 14 correctly on the bottom plate 12 in the depression 28 is positioned. The depression 21 will be after this positioning of the prefabricated part 14 with a suitable grout for sealing the lower portion 23 the geomembrane 22 with the bottom plate 12 shed. This results in a seal between the bottom plate 12 and arranged perpendicular thereto, through the prefabricated part 14 formed basement wall. The depression 21 thus serves as Vergussnut and is preferably in one operation with the recess 28 when making the bottom plate 12 generated. For example, the already mentioned for producing the recess 28 used squared lumber attached a lath, which serves for Ausschalung the above-mentioned Vergussnut. Other formwork elements can be used alternatively or in addition to the mentioned squared timber and / or the slat. Unlike the in 1 bottom plate shown is the in 3 bottom plate shown around the area 12a enlarged to the recess 21 to be able to train. Alternatively to the in 3 Shown embodiment, the recess 21 at the edge of the bottom plate 12 attached so that the plate is the bottom 12 spreading area 12a then not required. To potting the depression 21 then a temporary or a lost formwork is used. Thus, the bottom plate needs 12 not necessarily laterally over the depression 21 stand out. As a formwork can in particular in the manufacture of the bottom plate 12 used edge formwork can be used.

Die in 3 dargestellte Ausführungsform hat den Vorteil, dass das relativ aufwändige Verbinden mehrerer Fugenbänder 13 insbesondere an Außenecken der Bodenplatte 12 entfallen kann. Zum Verbinden dieser Fugenbänder müssen sowohl die senkrechten Bereich der benachbarten Fugenbänder als auch die einzelnen Stege der benachbarten Fugenbänder miteinander verschweißt oder auf eine andere geeignete Art und Weise relativ aufwändig miteinander verbunden werden. Ferner ist es erforderlich, dass die Dichtungsbahn 22 und das Fugenband 13 nach dem Aufsetzen des Fertigbauteils 14 auf die Bodenplatte 12 dicht miteinander verbunden werden müssen. Dies erfolgt beispielsweise mit Hilfe des im Zusammenhang mit 1 erwähnten Dichtungsbahnstreifens 32, der sowohl mit der Dichtungsbahn 22 als auch mit dem Fugenband 13 verbunden werden muss. Bei der in 3 gezeigten Ausführungsform kann das Fugenband vollständig entfallen. Die Vertiefung 21 ist in einer Flucht mit der Dichtungsbahn 22 angeordnet, wobei der untere Bereich 23 der Dichtungsbahn 22 in die Vertiefung 21 ragt und vorzugsweise nicht bis zur Unterseite der Vertiefung 21 ragt, damit Vergussmasse um den unteren Bereich 23 der Dichtungsbahn 22 herum fließen und die gesamte Vertiefung 21 ausfüllen kann. Nach der Montage des Fertigbauteils 14 auf der Bodenplatte 12 wird dann der in die Vertiefung 21 ragende Bereich 23 der Dichtungsbahn 22 mit einer geeigneten Vergussmasse, wie beispielsweise Epoxydharz oder einem dauerelastischen Vergussstoff vergossen.In the 3 illustrated embodiment has the advantage that the relatively complex connecting a plurality of joint tapes 13 especially on outside corners of the bottom plate 12 can be omitted. To connect these joint tapes, both the vertical region of the adjacent joint tapes and the individual webs of the adjacent joint tapes must be welded together or connected to each other in a relatively complicated manner in a relatively suitable manner. Furthermore, it is necessary that the geomembrane 22 and the joint tape 13 after placing the prefabricated component 14 on the bottom plate 12 must be tightly interconnected. This is done, for example, with the help of 1 mentioned sealing web strip 32 that with both the geomembrane 22 as well as with the joint tape 13 must be connected. At the in 3 the embodiment shown, the joint tape can be completely eliminated. The depression 21 is in flight with the geomembrane 22 arranged, the lower area 23 the geomembrane 22 into the depression 21 protrudes and preferably not to the bottom of the recess 21 sticks out so potting compound around the bottom area 23 the geomembrane 22 flow around and the entire well 21 can fill. After assembly of the prefabricated component 14 on the bottom plate 12 will then be in the depression 21 outstanding area 23 the geomembrane 22 cast with a suitable potting compound, such as epoxy resin or a permanently elastic potting compound.

In 4 ist eine Schnittdarstellung eines Ausschnitts eines Bauwerkteils ähnlich den Schnittdarstellungen der Ausschnitte von Bauwerkteilen nach den 1 und 3 gemäß einer dritten Ausführungsform der Erfindung gezeigt. Im Unterschied zu den in den 1 und 3 gezeigten Anordnungen ist bei der Ausführungsform nach 4 das Wandelement als Halbfertigteil in einem Fertigteilwerk vorgefertigt. Dieses Halbfertigteil umfasst eine Hohlwand 38, die zwei in einem Ab stand zueinander angeordnete Betonschalen 50 und 52 hat, die jeweils eine Bewehrungslage 44, 46 enthalten. Durch den Abstand zwischen den beiden Betonschalen 50, 52 wird ein Zwischenraum 51 zwischen diesen Betonschalen 50, 52 gebildet. Die erste Betonschale 50 ist mit der zweiten Betonschale 52 über mindestens einen so genannten Stahlgitterträger 48 verbunden. Die Bodenplatte 12 weist eine Anschlussbewehrung auf, deren Bewehrungsstäbe 40, 41 im Wesentlichen senkrecht nach oben aus der Bodenplatte 12 herausstehen. Die Anschlussbewehrung ist derart angeordnet, dass die Anschlussstäbe 40, 41 bei einer auf der Bodenplatte 12 angeordneten und ausgerichteten Hohlwand 38 in den Zwischenraum 51 zwischen der ersten Betonschale 50 und der zweiten Betonschale 52 ragen. Die Hohlwand 38 hat somit ebenfalls einen mindestens dreischichtigen Aufbau, wobei die erste äußere Schicht durch die Dichtungsbahn 22 gebildet wird, auf deren Innenseite eine Vlieslage 24 aufkaschiert ist. Die Kunststoffanker 25a, 25b sind auf geeignete Art und Weise mit der Innenseite der Dichtungsbahn bzw. mit dem auf die Dichtungsbahn 22 kaschierten Vlies 24 verbunden und stehen von der Innenseite der Dichtungsbahn 22 bzw. des auf die Dichtungsbahn kaschierten Vlieses 24 nach innen ab, wie in Zusammenhang mit den 1 bis 3 bereits ausführlich beschrieben. Eine aus Ortschaum gebildete Wärmedämmschicht 18 ist an der Innenseite der Dichtungsbahn 22 bzw. des auf die Dichtungsbahn 24 aufkaschierten Vlieses 24 vorgesehen.In 4 is a sectional view of a section of a building part similar to the sectional views of the sections of building parts after the 1 and 3 shown according to a third embodiment of the invention. Unlike the ones in the 1 and 3 shown arrangements is in the embodiment according to 4 prefabricated the wall element as a semi-finished part in a precast plant. This semi-finished part comprises a cavity wall 38 , the two stood in a distance from one another arranged concrete shells 50 and 52 has, each one a rebar position 44 . 46 contain. By the distance between the two concrete shells 50 . 52 becomes a gap 51 between these concrete shells 50 . 52 educated. The first concrete shell 50 is with the second concrete shell 52 via at least one so-called steel lattice girder 48 connected. The bottom plate 12 has a connection reinforcement, their reinforcing bars 40 . 41 essentially vertically upward from the bottom plate 12 stand out. The connection reinforcement is arranged such that the connecting rods 40 . 41 at one on the bottom plate 12 arranged and aligned hollow wall 38 in the gap 51 between the first concrete shell 50 and the second concrete shell 52 protrude. The cavity wall 38 thus also has an at least three-layer structure, wherein the first outer layer through the geomembrane 22 is formed, on the inside of a nonwoven layer 24 is laminated. The plastic anchors 25a . 25b are in a suitable manner with the inside of the geomembrane or with the on the geomembrane 22 laminated fleece 24 connected and stand from the inside of the geomembrane 22 or of the nonwoven laminated to the geomembrane 24 inward, as related to the 1 to 3 already described in detail. A heat insulation layer formed from local foam 18 is on the inside of the geomembrane 22 or on the geomembrane 24 laminated fleece 24 intended.

Zumindest die Widerhaken 26a und 26b der Kunststoffanker 25a, 25b stehen nach innen aus der Wärmedämmschicht 18 hervor und ragen in eine an die Innenseite der Wärmedämmschicht 18 grenzende Betonschicht, die zusammen mit der zweiten Bewehrungsschicht die zweite äußere Betonschale 52 der Hohlwand 38 bildet. Die zweite äußere Betonschale 52 der Hohlwand 38 ist jeweils beschrieben mit Hilfe des Stahlgitterträgers 48 oder eines anderen geeigneten Verbindungsmittels mit der ersten Betonschale 50 verbunden, wobei die durch die erste Betonschale 50 gebildete Außenseite der Hohlwand 38 vorzugsweise die Innenseite eines zu errichtenden Kellers bildet.At least the barbs 26a and 26b the plastic anchor 25a . 25b stand inward of the thermal barrier coating 18 protrude and protrude into one on the inside of the thermal barrier coating 18 bordering concrete layer, which together with the second Be defense layer the second outer concrete shell 52 the cavity wall 38 forms. The second outer concrete shell 52 the cavity wall 38 is described in each case with the help of the steel lattice girder 48 or another suitable bonding agent with the first concrete shell 50 connected, passing through the first concrete shell 50 formed outside of the cavity wall 38 preferably forms the inside of a cellar to be built.

Die Hohlwand 38 wird vorzugsweise mit einem geringen Abstand zur Bodenplatte 12 angeordnet und ausgerichtet. Der Zwischenraum 51 der Hohlwand 38 wird in dem in 4 dargestellten Zustand mit Ortbeton vergossen, der dann auch in den durch den Abstand zwischen der Unterseite der Betonschalen 50, 52 und der Oberseite der Bodenplatte 12 gebildeten Spalt fließt und dadurch eine Verbindung zwischen Bodenplatte 12 und Hohlwand 38 bildet. Alternativ oder zusätzlich kann dieser Spalt mit einem geeigneten Material, wie z.B. Epoxydharz vor dem Vergießen oder nach dem Vergießen des Zwischenraums 51 mit Ortbeton mit Hilfe geeigneter Verfahren verfüllt und/oder verpresst werden. Um ein Ausfüllen des Spalts zwischen der Unterseite der Wärmedämmschicht 18 und der Oberseite der Bodenplatte 12 mit Ortbeton zu verhindern, kann vor dem Vergießen des Zwischenraums 51 mit Ortbeton ein Dämmstreifen aus einem geeigneten Dämmmaterial in diesen Spalt eingebracht oder mit Hilfe von Ortschaum ausgefüllt werden.The cavity wall 38 is preferably at a small distance from the bottom plate 12 arranged and aligned. The gap 51 the cavity wall 38 will be in the in 4 shown state cast with in-situ concrete, which then also in by the distance between the bottom of the concrete shells 50 . 52 and the top of the bottom plate 12 formed gap flows and thereby a connection between the bottom plate 12 and cavity wall 38 forms. Alternatively or additionally, this gap may be filled with a suitable material such as epoxy before casting or after casting the gap 51 be filled with in situ concrete using suitable methods and / or pressed. To complete the gap between the bottom of the thermal barrier coating 18 and the top of the bottom plate 12 with in-situ concrete can prevent, before pouring the gap 51 In situ concrete, an insulating strip made of a suitable insulating material introduced into this gap or filled with the help of Ortschaum.

Wie bereits im Zusammenhang mit 1 beschriebnen, ist ein Kunststoffdichtungsbahnstreifen 32 als Verschweißband zwischen der Kunststoffdichtbahn 22 und dem mehrstegigen Fugenband 13 vorgesehen, der sowohl mit der Außenseite der Dichtungsbahn 22 als auch mit der Außenseite des Fugenbands 13 nach dem Aufsetzen und Ausrichten der Hohlwand 38 auf die Bodenplatte 12, vorzugsweise nach dem Verguss der Hohlwand 38 mit Ortbeton, verschweißt wird.As already related to 1 is a plastic sealing strip 32 as a Verschweißband between the plastic sealing strip 22 and the multi-level joint tape 13 provided with both the outside of the geomembrane 22 as well as with the outside of the joint tape 13 after placing and aligning the cavity wall 38 on the bottom plate 12 , preferably after the casting of the cavity wall 38 with in-situ concrete, is welded.

Zum Herstellen der Hohlwand 38 nach 4 kann ein ähnliches Verfahren angewendet werden, wie im Zusammenhang mit den 1 bis 3 zum Herstellen des Fertigbauteils 14 beschrieben. Zunächst wird die Dichtungsbahn 22 in die Form eingelegt und nach dem Positionieren der Kunststoffanker 25a, 25b auf der Dichtungsbahn 22 bzw. auf der mit der Dichtungsbahn 22 verbundenen Vliesschicht 24 wird die Dämmschicht 18 mit Hilfe von Ortschaum aufgetragen. Anschließend wird auf die Dämmschicht 18 eine Schicht 20 aus einem geeigneten Klebstoff aufgetragen und eine Betonschicht zum Bilden der zweiten Betonschale 52 auf den noch nicht erhärteten Klebstoff der Schicht 20 aufgebracht, so dass die Widerhaken 26a, 26b der Kunststoffanker 25a, 25b zumindest in die Betonschicht zum Erzeugen der zweiten Schale 52 ragen. In dieser Betonschicht der zweiten Schale ist eine Bewehrungslage 44 eingebracht, die vorzugsweise aus einer oder mehreren Bewehrungsmatten und erforderlichenfalls durch weitere Bewehrungszulagen gebildet ist. Die zweite Betonschale 52 hat eine Stärke von etwa 7 cm. In die Betonschicht der zweiten Betonschale 52 ist ein Teil eines Stahlgitterträgers 48 derart eingebracht, dass dieser Stahlgitterträger 48 soweit aus der zweiten Betonschale 52 hervorsteht, dass er bis in eine nachfolgend herzustellende erste Betonschale 50 ragt. Der Stahlgitterträger 48 ist vorzugsweise mit der Bewehrungslage 44 der zweiten Betonschale 52 verbunden, insbesondere mit Hilfe von Bewehrungsdraht, der sowohl um Bewehrungsstäbe der Bewehrungslage 44 als auch um Stäbe des Stahlgitterträgers 48 gewunden ist. Alternativ oder zusätzlich kann der Stahlgitterträger 48 auch mit der Bewehrungslage 44 durch eine Schweißverbindung verbunden sein.For producing the cavity wall 38 to 4 a similar procedure can be used as in connection with the 1 to 3 for producing the prefabricated component 14 described. First, the geomembrane 22 inserted into the mold and after positioning the plastic anchor 25a . 25b on the geomembrane 22 or on the with the geomembrane 22 bonded nonwoven layer 24 becomes the insulating layer 18 applied with the help of local foam. Subsequently, on the insulation layer 18 a layer 20 applied from a suitable adhesive and a concrete layer for forming the second concrete shell 52 on the not yet hardened adhesive of the layer 20 applied, so the barbs 26a . 26b the plastic anchor 25a . 25b at least in the concrete layer for producing the second shell 52 protrude. In this concrete layer of the second shell is a reinforcement layer 44 introduced, which is preferably formed from one or more reinforcing mats and, if necessary, by further reinforcement allowances. The second concrete shell 52 has a thickness of about 7 cm. In the concrete layer of the second concrete shell 52 is part of a steel lattice girder 48 introduced in such a way that this steel lattice girder 48 so far from the second concrete shell 52 protrudes that he into a subsequently produced first concrete shell 50 protrudes. The steel lattice girder 48 is preferably with the reinforcement layer 44 the second concrete shell 52 connected, in particular by means of reinforcing wire, both to the reinforcing bars of the reinforcement layer 44 as well as around bars of the steel lattice girder 48 is winding. Alternatively or additionally, the steel lattice girder 48 also with the reinforcement layer 44 be connected by a welded joint.

Nach dem Einbringen des Betons zum Herstellen der zweiten Betonschale 52 ist eine Aushärtephase zum Erstarren und Aushärten des zum Herstellen der zweiten Betonschale 52 verwendeten Betons vorgesehen. Eine solche Aushärtephase dauert im vorliegenden Ausführungsbeispiel beispielsweise 8 Stunden. Nach dem Erstarren und Erhärten der zweiten Betonschale 52 bis zumindest einem erforderlichen Aushärtegrad wird die mit dem Stahlgitterträger 48, der Wärmedämmschicht 18 und der Dichtungsbahn 22 verbundene zweite Betonschale 52 gewendet und in eine noch nicht erhärtete Betonschicht zum Herstellen der ersten Betonschale 50 eingewendet. Die Betonschicht der ersten Betonschale 50 hat etwa eine Stärke von 6 cm. Zwischen den beiden Betonschalen 50, 52 bleibt ein Zwischenraum 51 von beispielsweise 7 cm. Als Abstandshalter zwischen der zweiten Betonschale 52 und der ersten Betonschale 50 können zusätzliche Abstandshalter vorgesehen sein, die dann nachfolgend im Herstellungsprozess der Hohlwand 38 zu dem Abstand zwischen der zum Hohlraum 51 gerichteten Seite der ersten Betonschale 50 und der zum Zwischenraum 51 gerichteten Seite der zweiten Betonschale 52 erzeugt und sicherstellt. Alternativ oder zusätzlich kann der Stahlgitterträger 48 als Abstandshalter zwischen der zweiten Betonschale 52 und der ersten Betonschale 50 auch schon bei der Herstellung der Hohlwand 38 dienen. Beim Verfüllen des Zwischenraums 51 mit Ortbeton wird dieser Ortbeton mit geeigneten Mitteln verdichtet, so dass er sowohl den Zwischenraum 51 vollständig ausfüllt als auch in den Spalt zwischen der Bodenplatte 12 und den Unterseiten der Betonschalen 52, 50 eindringen kann.After the introduction of the concrete to produce the second concrete shell 52 is a curing phase for solidification and curing of the manufacture of the second concrete shell 52 used concrete. Such a curing phase lasts for example 8 hours in the present embodiment. After solidification and hardening of the second concrete shell 52 to at least one required degree of cure is the with the steel lattice girder 48 , the thermal barrier coating 18 and the geomembrane 22 connected second concrete shell 52 turned and in a not yet hardened concrete layer for producing the first concrete shell 50 objected. The concrete layer of the first concrete shell 50 has about a thickness of 6 cm. Between the two concrete shells 50 . 52 remains a gap 51 for example, 7 cm. As a spacer between the second concrete shell 52 and the first concrete shell 50 additional spacers may be provided, which are then subsequently in the production process of the cavity wall 38 to the distance between the cavity 51 directed side of the first concrete shell 50 and the gap 51 directed side of the second concrete shell 52 generates and ensures. Alternatively or additionally, the steel lattice girder 48 as a spacer between the second concrete shell 52 and the first concrete shell 50 even in the production of the cavity wall 38 serve. When filling the gap 51 with in-situ concrete, this in-situ concrete is compacted by suitable means so that it both the gap 51 completely fills as well as in the gap between the bottom plate 12 and the bottoms of concrete shells 52 . 50 can penetrate.

Auch bei der Verwendung des Fertigbauteils 14 als Kellerwand, bei der kein Verguss mit Ortbeton auf der Baustelle erforderlich ist, muss das Fertigbauteil 14 aus statischen Gründen zwei Bewehrungsschichten haben. Somit sind die zum Herstellen der zweischaligen Hohlwand 38 erforderlichen zwei Bewehrungsschichten 44, 46 auch bei werksseitig vorgefertigten Vollmassivwänden erforderlich. Jedoch können die als Vollmassivwände ausgebildeten Fertigbauteile 14 nach den 1 bis 3 mit einer geringeren Betonwandstärke von etwa 14 cm hergestellt werden. Bei diesen Vollmassivwänden wird die zweilagige Bewehrung vorzugsweise als so genannter Bewehrungskorb eingelegt.Also when using the prefabricated part 14 As a basement wall, where no casting with in-situ concrete on the construction site is required, the prefabricated building 14 for static reasons have two layers of reinforcement. Thus, the for producing the double-shell cavity wall 38 required two layers of reinforcement 44 . 46 also required in factory prefabricated solid walls. However, trained as solid solid walls prefabricated components 14 after the 1 to 3 be made with a smaller concrete wall thickness of about 14 cm. In these solid walls, the two-layer reinforcement is preferably inserted as a so-called reinforcement cage.

Bei der Hohlwand 38 nach 4 sind die Bewehrungsschichten 44, 46 jeweils einlagig in der jeweiligen Schale 50, 52 vorgesehen, wobei die Bewehrungslagen 44, 46 über den Stahlgitterträger 48 miteinander verbunden sind. Eine derart hergestellte Hohlwand 38 hat den Vorteil, dass die eine Außenseite der Hohlwand 38 bildende Seite der ersten Betonschale 50 beim Herstellen der Hohlwand 38 von der Unterseite einer Schalungsform begrenzt wird, wodurch eine sehr glatte Oberflächenbeschaffenheit der Außenseite der ersten Betonschale 50 erzeugt werden kann, die zumindest die Anforderungen an eine tapezierfähige Oberfläche erfüllt.In the cavity wall 38 to 4 are the reinforcement layers 44 . 46 each in one layer in the respective shell 50 . 52 provided, with the reinforcement layers 44 . 46 over the steel lattice girder 48 connected to each other. A hollow wall produced in this way 38 has the advantage that the one outside of the cavity wall 38 forming side of the first concrete shell 50 when making the cavity wall 38 is bounded by the underside of a formwork, whereby a very smooth surface finish of the outside of the first concrete shell 50 can be generated, which meets at least the requirements of a wallpaperable surface.

Dies ist je nach Herstellungsverfahren bei den Fertigbauteilen nach den 1 bis 3 insbesondere dann nicht gegeben, wenn die Betonschicht 16 als letzte Schicht in eine Form eingebracht wird. Dadurch entsteht eine relativ raue Oberfläche, die ohne Nachbehandlung üblicherweise nicht den Anforderungen an eine tapezierfähige Oberfläche erfüllt. Zum Erzeugen einer tapezierfähigen Oberfläche muss dadurch die Oberfläche, die die spätere Rauminnenseite bildet, noch zusätzlich abgeglättet, insbesondere gespachtelt oder verputzt werden, damit diese Oberfläche tapezierfähig wird.This is depending on the manufacturing process in the prefabricated after the 1 to 3 especially not given if the concrete layer 16 is introduced as a last layer in a mold. This results in a relatively rough surface, which usually does not meet the requirements for a wallpaperable surface without aftertreatment. In order to produce a wallpaperable surface, the surface, which forms the later interior side of the room, must then additionally be smoothed, in particular trowelled or plastered, so that this surface can be wallpapered.

Alternativ oder zusätzlich kann die Wärmedämmschicht 18 Dämmplatten enthalten.Alternatively or additionally, the thermal barrier coating 18 Insulation boards included.

Die im Zusammenhang mit den einzelnen Figuren beschriebenen Ausgestaltungen, Anordnungen und Ausführungen der Dichtungsbahn 22, der Wärmedämm schicht 18 und der Betonschicht 16, 50, 52 sowie der Klebstoffschicht 20 und der Kunststoffanker 25a, 25b sowie der Vliesschicht 24 können in beliebiger Art und Weise auch mit den Ausführungsformen der anderen Figuren kombiniert werden. Insbesondere kann auch bei dem Ausführungsbeispiel nach 3 die Dichtungsbahn 22 nach unten über die Betonschalen 50, 52 und/oder die Dämmschicht 18 überstehen und in eine dann in der Bodenplatte 12 vorgesehene Vertiefung ähnlich der Vertiefung 21 nach 3 ragen, um mit Hilfe geeigneter Mittel in der Nut abgedichtet zu werden, wie bereits ausführlich in Zusammenhang mit 3 beschrieben. Auch bei der Ausführungsform nach 4 können an der Unterseite der Betonschalen 50, 52 sowie der Oberseite der Bodenplatte 12 im Bereich der Hohlwand 38 Stahleinlagen 29 vorgesehen sein, die ähnlich wie die Stahleinlagen 29 nach den 1 und 3 ausgebildet und angeordnet sein können.The embodiments described in connection with the individual figures, arrangements and embodiments of the geomembrane 22 , the thermal insulation layer 18 and the concrete layer 16 . 50 . 52 and the adhesive layer 20 and the plastic anchor 25a . 25b and the nonwoven layer 24 can be combined in any way with the embodiments of the other figures. In particular, can also in the embodiment according to 3 the geomembrane 22 down over the concrete shells 50 . 52 and / or the insulating layer 18 survive and into one then in the bottom plate 12 provided depression similar to the depression 21 to 3 to be sealed in the groove by suitable means, as already described in detail in connection with 3 described. Also in the embodiment according to 4 can be at the bottom of concrete shells 50 . 52 as well as the top of the bottom plate 12 in the area of the cavity wall 38 steel inserts 29 be provided, similar to the steel inserts 29 after the 1 and 3 may be formed and arranged.

Ein vorgefertigtes Bauteil im Sinne der Erfindung ist sowohl ein Fertigbauteil 14 nach den 1 und 3 sowie eine Hohlwand 38 nach 4.A prefabricated component according to the invention is both a prefabricated component 14 after the 1 and 3 and a cavity wall 38 to 4 ,

Obgleich in der Zeichnungen und in der vorhergehenden Beschreibung bevorzugte Ausführungsbeispiele aufgezeigt und detailliert beschrieben worden sind, sollen diese lediglich als beispielhaft und die Erfindung nicht einschränkend angesehen werden. Es wird darauf hingewiesen, dass nur die bevorzugten Ausführungsbeispiele dargestellt und beschrieben sind und sämtliche Veränderungen und Modifizierungen, die derzeit und künftig im Schutzumfang der Erfindung liegen, geschützt werden sollen.Although in the drawings and in the preceding description preferred embodiments have been shown and described in detail, they should merely by way of example and not limiting the invention. It should be noted that only the preferred embodiments shown and described and all changes and modifications, currently and in the future are within the scope of the invention, to be protected.

1010
Bauwerksteilbuilding component
1212
Bodenplattebaseplate
12a12a
Bereich BodenplatteArea baseplate
1313
Fugenbandjoint tape
1414
FertigbauteilPrecast
1616
Betonschichtconcrete layer
1818
Wärmedämmschichtthermal barrier
2020
Klebeschichtadhesive layer
2121
Vertiefungdeepening
2222
Dichtungsbahngeomembrane
2323
Bereich Dichtungsbahn 22 Area sealing membrane 22
2424
Vliesschichtfleece layer
25a, 25b25a, 25b
KunststoffankerPlastic anchor
26a, 26b26a, 26b
Widerhakenbarb
2828
Vertiefungdeepening
2929
Stahleinbauteil/StahleinlageSteel fitting / steel insert
3030
Fußbodenaufbaufloor construction
3232
DichtungsbahnstreifenGeomembrane strips
3838
Hohlwandcavity wall
40, 4140 41
Bewehrungsstäberebars
44, 4644 46
Bewehrungsschichtreinforcement layer
4848
StahlgitterträgerSteel girder
50, 5250, 52
Betonschaleconcrete shell
5151
Zwischenraumgap
S10 bis S32S10 to S32
Verfahrensschrittesteps

Claims (35)

Vorgefertigtes Bauteil zum Herstellen eines Bauwerkteils, mit mindestens drei Schichten, wobei die erste Schicht (22) eine Dichtungsbahn aufweist, die zweite Schicht (18) einen Wärmedämmstoff aufweist, die dritte Schicht (16) Beton aufweist, die zweite Schicht (18) zwischen der ersten und der dritten Schicht angeordnet ist, und die drei Schichten (16, 18, 22) miteinander verbunden sind.Prefabricated component for producing a structural part, having at least three layers, wherein the first layer ( 22 ) has a geomembrane, the second layer ( 18 ) has a thermal insulation material, the third layer ( 16 ) Concrete, the second layer ( 18 ) is arranged between the first and the third layer, and the three layers ( 16 . 18 . 22 ) are interconnected. Vorgefertigtes Bauteil nach Anspruch 1, dadurch gekennzeichnet, dass die Dichtungsbahn (22) eine im Koextrusionsverfahren hergestellte Zweischicht-Kunststoffbahn mit mittig angeordneten Bewehrungsmitteln ist und/oder eine Vlieskaschierung (24) an ihrer Innenseite aufweist, wobei die Bewehrungsmittel und/oder die Vlieskaschierung vorzugsweise ein Glasvlies und/der Polyestervlies aufweisen.Prefabricated component according to claim 1, characterized in that the geomembrane ( 22 ) is a two-layer plastic web produced by the coextrusion process with centrally arranged reinforcing means and / or a fleece lamination ( 24 ) on its inside, the reinforcing means and / or the fleece lamination preferably comprising a glass fleece and / or the polyester fleece. Vorgefertigtes Bauteil nach Anspruch 2, dadurch gekennzeichnet, dass die Kunststoffbahn (22) ein Ethylen-Copolymerisat aufweist.Prefabricated component according to claim 2, characterized in that the plastic sheet ( 22 ) comprises an ethylene copolymer. Vorgefertigtes Bauteil nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Dichtungsbahn (22) eine erste Außenfläche und dass die Beton aufweisende dritte Schicht (16) eine der ersten Außenfläche gegenüberliegende zweite Außenfläche des vorgefertigten Bauteils (14) bilden, wobei die Dichtungsbahn (22) an der ersten Außenfläche einstückig ist.Prefabricated component according to one of the preceding claims, characterized in that the geomembrane ( 22 ) a first outer surface and that the concrete having third layer ( 16 ) a first outer surface opposite the second outer surface of the prefabricated component ( 14 ), wherein the geomembrane ( 22 ) is integral with the first outer surface. Vorgefertigtes Bauteil nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Dichtungsbahn (22) eine Bahnstärke im Bereich von 1,5 mm bis 4 mm, vorzugsweise im Bereich von 2 mm bis 2,5 mm, hat.Prefabricated component according to one of the preceding claims, characterized in that the geomembrane ( 22 ) has a web thickness in the range of 1.5 mm to 4 mm, preferably in the range of 2 mm to 2.5 mm. Vorgefertigtes Bauteil nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Wärmedämmstoff der zweiten Schicht (18) ein geschäumtes Wärmedämmmittel aufweist, das vorzugsweise einen Polyurethanschaum aufweist.Prefabricated component according to one of the preceding claims, characterized in that the thermal insulation material of the second layer ( 18 ) comprises a foamed heat-insulating agent, which preferably comprises a polyurethane foam. Vorgefertigtes Bauteil nach Anspruch 6, dadurch gekennzeichnet, dass der Polyurethanschaum als Polyurethan-Ortschaum nach DIN 18159 und DIN 18164 hergestellt und vorzugsweise auf eine auf der Innenseite der Dichtungsbahn (22) vorgesehene Vlieskaschierung (24) aufgespritzt und/oder mittels einer Schäumeinrichtung im Gießverfahren auf die Innenseite der Dichtungsbahn (22) aufgebracht ist.Prefabricated component according to claim 6, characterized in that the polyurethane foam is produced as a polyurethane Ortschaum according to DIN 18159 and DIN 18164 and preferably on a on the inside of the geomembrane ( 22 ) intended fleece lamination ( 24 ) and / or by means of a foaming device by casting on the inside of the geomembrane ( 22 ) is applied. Vorgefertigtes Bauteil nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Wärmedämmstoff der zweiten Schicht (18) eine Wandstärke im Bereich von 2,5 cm bis 25 cm, vorzugsweise im Bereich zwischen 6 cm und 20 cm, hat.Prefabricated component according to one of the preceding claims, characterized in that the thermal insulation material of the second layer ( 18 ) has a wall thickness in the range of 2.5 cm to 25 cm, preferably in the range between 6 cm and 20 cm. Vorgefertigtes Bauteil nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die dritte Schicht (16) armierten Beton und/oder armierten Leichtbeton umfasst.Prefabricated component according to one of the preceding claims, characterized in that the third layer ( 16 ) comprises reinforced concrete and / or reinforced lightweight concrete. Vorgefertigtes Bauteil nach Anspruch 9, dadurch gekennzeichnet, dass die dritte Schicht (16) Stahlbeton, vorzugsweise wasserundurchlässigen Stahlbeton, aufweist.Prefabricated component according to claim 9, characterized in that the third layer ( 16 ) Reinforced concrete, preferably water-impermeable reinforced concrete. Vorgefertigtes Bauteil nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass zwischen der zweiten und der dritten Schicht eine Klebeverbindung vorgesehen ist, wobei zwischen der zweiten und der dritten Schicht vorzugsweise eine vierte Schicht (20) angeordnet ist, die einen Klebstoff aufweist.Prefabricated component according to one of the preceding claims, characterized in that between the second and the third layer, an adhesive connection is provided, wherein between the second and the third layer, preferably a fourth layer ( 20 ) is arranged, which has an adhesive. Vorgefertigtes Bauteil nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die dritte Schicht (16) eine Wandstärke im Bereich zwischen 6 cm und 36 cm, vorzugsweise im Bereich zwischen 8 cm und 24 cm hat.Prefabricated component according to one of the preceding claims, characterized in that the third layer ( 16 ) has a wall thickness in the range between 6 cm and 36 cm, preferably in the range between 8 cm and 24 cm. Vorgefertigtes Bauteil nach einem der vorgehenden Ansprüche, dadurch gekennzeichnet, dass zum Verbinden der zweiten und der dritten Schicht mechanische Verbindungsmittel (25a, 25b) vorgesehen sind, die zumindest die zweite und die dritte Schicht miteinander verbinden.Prefabricated component according to one of the preceding claims, characterized in that for connecting the second and the third layer mechanical connection means ( 25a . 25b ) are provided, which connect at least the second and the third layer with each other. Vorgefertigtes Bauteil nach Anspruch 13, dadurch gekennzeichnet, dass mindestens ein Kunststoffanker (25a, 25b) auf die Innenseite der Dichtungsbahn (22) angeordnet ist, der vorzugsweise auf die Innenseite der Dichtungsbahn (22) aufgeklebt ist, wobei ein Teil des Kunststoffankers (25a, 25b) in den Wärmedämmstoff der zweiten Schicht (18) und in den Beton der dritten Schicht (16) ragt.Prefabricated component according to claim 13, characterized in that at least one plastic anchor ( 25a . 25b ) on the inside of the geomembrane ( 22 ) is arranged, which preferably on the inside of the geomembrane ( 22 ) is glued, wherein a part of the plastic anchor ( 25a . 25b ) in the thermal insulation of the second layer ( 18 ) and in the concrete of the third layer ( 16 protrudes. Vorgefertigtes Bauteil nach Anspruch 13 oder 14, dadurch gekennzeichnet, dass die Verbindungsmittel (25a, 25b) mindestens einen Widerhaken (26a, 26b) aufweisen, der zumindest in den Beton der dritten Schicht (16) ragt.Prefabricated component according to claim 13 or 14, characterized in that the connecting means ( 25a . 25b ) at least one barb ( 26a . 26b ), at least in the concrete of the third layer ( 16 protrudes. Vorgefertigtes Bauteil nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Dichtungsbahn (22) an der Außenseite des Bauwerkteils (10) angeordnet ist.Prefabricated component according to one of the preceding claims, characterized in that the geomembrane ( 22 ) on the outside of the building part ( 10 ) is arranged. Vorgefertigtes Bauteil nach Anspruch 16, dadurch gekennzeichnet, dass an der Außenseite der Dichtungsbahn (22) mindestens eine weitere Schicht angeordnet ist, die die Dichtungsbahn (22) vor mechanischer Beschädigung schützt und/oder die Hohlräume zum Ableiten von Flüssigkeit hat.Prefabricated component according to claim 16, characterized in that on the outside of the geomembrane ( 22 ) at least one further layer is arranged, which the geomembrane ( 22 ) protects against mechanical damage and / or has the cavities for the discharge of liquid. Vorgefertigtes Bauteil nach einem der Ansprüche 1 bis 16, dadurch gekennzeichnet, dass die Dichtungsbahn (22) eine Innenseite des Bauwerkteils (10) bildet.Prefabricated component according to one of claims 1 to 16, characterized in that the geomembrane ( 22 ) an inside of the building part ( 10 ). Vorgefertigtes Bauteil nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass das vorgefertigte Bauteil (14) ein werksmäßig vorgefertigtes großformatiges Bauteil ist, vorzugsweise mit einer Höhe im Bereich von 2 m bis 3 m und einer Länge im Bereich zwischen 5 m und 15 m.Prefabricated component according to one of the preceding claims, characterized in that the prefabricated component ( 14 ) is a prefabricated large-sized component, preferably with a height in the range of 2 m to 3 m and a length in the range between 5 m and 15 m. Vorgefertigtes Bauteil nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass das vorgefertigte Bauteil ein Fertigbauteil (14) oder ein Halbfertigbauteil (38) ist, wobei das Halbfertigbauteil (38) vorzugsweise zwei in einem festen Abstand zueinander angeordnete Betonschalen (50, 52) aufweist.Prefabricated component according to one of the preceding claims, characterized in that the prefabricated component is a prefabricated component ( 14 ) or a semi-finished component ( 38 ), wherein the semi-finished component ( 38 ) preferably two in a fixed distance from each other arranged concrete shells ( 50 . 52 ) having. Vorgefertigtes Bauteil nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die dritte Beton aufweisende Schicht eine erste Betonschale (50) mit einer ersten Bewehrungsschicht (44) und eine zweite Betonschale (52) mit einer zweiten Bewehrungsschicht (46) umfasst, die mit Hilfe eines Verbindungsmittels (48) in einem Abstand (51) zueinander angeordnet sind, durch den ein Zwischenraum (51) zum Verguss der Hohlwand mit Beton gebildet ist.Prefabricated component according to one of the preceding claims, characterized in that the third layer comprising concrete has a first concrete shell ( 50 ) with a first reinforcement layer ( 44 ) and a second concrete shell ( 52 ) with a second reinforcement layer ( 46 ), which by means of a bonding agent ( 48 ) at a distance ( 51 ) are arranged to each other through which a gap ( 51 ) is formed for the casting of the cavity wall with concrete. Verfahren zum Herstellen eines vorgefertigten Bauteils, bei dem eine Dichtungsbahn (22) in eine das herzustellende vorgefertigte Bauteil (14) begrenzende nach oben offene Form eingelegt wird, wobei die eine Außenseite des vorgefertigten Bauteils (14) bildende Oberfläche der Dichtungsbahn (22) die Unterseite der Form kontaktiert, eine Wärmedämmschicht (18) mit Hilfe von Ortschaum auf die Innenseite der in die Form eingelegten Dichtungsbahn (22) aufgetragen wird; und bei dem nach dem zumindest teilweise Erhärten des Ortschaums eine Beton aufweisende Schicht (16) auf den Ortschaum in der Form aufgebracht wird.Method for producing a prefabricated component, in which a geomembrane ( 22 ) into a prefabricated component ( 14 ) limiting upwardly open mold is inserted, wherein the one outer side of the prefabricated component ( 14 ) forming surface of the geomembrane ( 22 ) contacted the bottom of the mold, a thermal barrier coating ( 18 ) with the help of Ortschaum on the inside of the inserted in the form of geomembrane ( 22 ) is applied; and in which after the at least partial hardening of the local foam a layer comprising concrete ( 16 ) is applied to the local foam in the mold. Verfahren zum Herstellen eines vorgefertigten Bauteils, bei dem eine Beton aufweisende Schicht (16) in eine das herzustellende Vorgefertigtes Bauteil (14) begrenzende nach oben offene Form eingebracht wird, eine Wärmedämmschicht (18) mit Hilfe von Ortschaum auf die in der Form befindliche Betonschicht (16) aufgetragen wird; und bei dem eine Dichtungsbahn (22) auf den vorzugsweise noch nicht oder nicht vollständig erhärteten Ortschaum aufgebracht wird.Method for producing a prefabricated component, in which a concrete-comprising layer ( 16 ) into a prefabricated component ( 14 ) is introduced limiting upward open mold, a thermal barrier coating ( 18 ) using local foam on the concrete layer in the mold ( 16 ) is applied; and in which a geomembrane ( 22 ) is applied to the preferably not yet or not completely hardened local foam. Verfahren nach Anspruch 22 oder 23, dadurch gekennzeichnet, dass die Dichtungsbahn (22) eine Kunststoffdichtungsbahn ist.A method according to claim 22 or 23, characterized in that the geomembrane ( 22 ) is a plastic sealing strip. Verfahren nach einem der Ansprüche 22 bis 24, dadurch gekennzeichnet, dass die Wärmedämmschicht (18) mit Hilfe eines Polyurethanschaums hergestellt wird.Method according to one of claims 22 to 24, characterized in that the thermal barrier coating ( 18 ) is produced by means of a polyurethane foam. Verfahren nach Anspruch 25, dadurch gekennzeichnet, dass die Wärmedämmschicht (18) durch eine chemische Reaktion von Polyisocyanaten mit mindestens einer akiden Wasserstoff enthaltenden Verbindung unter Mitwirkung eines Treibmittels hergestellt wird.A method according to claim 25, characterized in that the thermal barrier coating ( 18 ) is prepared by a chemical reaction of polyisocyanates with at least one acide-containing compound with the aid of a propellant. Verfahren nach einem der Ansprüche 22 bis 26, dadurch gekennzeichnet, dass die Wärmedämmschicht (18) auf eine auf der Innenseite der Dichtungsbahn (22) vorhandene Vliesschicht (24) aufgespritzt und/oder gegossen wird.Method according to one of claims 22 to 26, characterized in that the thermal barrier coating ( 18 ) on one on the inside of the geomembrane ( 22 ) existing nonwoven layer ( 24 ) is sprayed and / or poured. Verfahren nach einem der Ansprüche 22 bis 27, dadurch gekennzeichnet, dass mindestens ein Verbindungsmittel (25a, 25b, 20) zum Verbinden der Wärmedämmschicht (18) und der Betonschicht (16) eingebracht wird.Method according to one of claims 22 to 27, characterized in that at least one connecting means ( 25a . 25b . 20 ) for connecting the thermal barrier coating ( 18 ) and the concrete layer ( 16 ) is introduced. Verfahren nach einem der Anspruch 28, dadurch gekennzeichnet, dass das Verbindungsmittel eine Schicht (20) aus Klebstoff aufweist, die zwischen der Wärmedämmschicht (18) und der Betonschicht (16) angeordnet wird.Method according to one of the claim 28, characterized in that the connecting means comprises a layer ( 20 ) made of adhesive between the thermal barrier coating ( 18 ) and the concrete layer ( 16 ) is arranged. Verfahren nach einem der Anspruch 29, dadurch gekennzeichnet, dass das Verbindungsmittel mindestens ein mechanisches Verbindungsmittel (25a, 25b), vorzugsweise einen Kunststoffanker, aufweist, der derart angeordnet wird, dass zumindest eine Verbindung zwischen der Wärmedämmschicht (18) und der Beton aufweisenden Schicht (16) erzeugt wird.Method according to one of claim 29, characterized in that the connecting means at least one mechanical connection means ( 25a . 25b ), preferably a plastic anchor, which is arranged such that at least one connection between the thermal barrier coating ( 18 ) and the concrete layer ( 16 ) is produced. Verfahren nach einem der Ansprüche 22 bis 30, dadurch gekennzeichnet, dass die Beton aufweisende Schicht (16) als eine stahlarmierte Betonschicht oder stahlarmierte Leichtbetonschicht hergestellt wird.Method according to one of claims 22 to 30, characterized in that the layer comprising concrete ( 16 ) is produced as a steel-reinforced concrete layer or steel-reinforced lightweight concrete layer. Verfahren nach einem der Ansprüche 22 bis 31, dadurch gekennzeichnet, dass mit Hilfe des Verfahrens ein. vorgefertigtes Bauteil (14) nach einem der Ansprüche 1 bis 18 hergestellt wird.Method according to one of claims 22 to 31, characterized in that by means of the method a. prefabricated component ( 14 ) is produced according to one of claims 1 to 18. Verwendung des vorgefertigten Bauteils nach einem der Ansprüche 1 bis 21 mit mindestens einem mit dem vorgefertigten Bauteil (14) verbundenen weiteren vorgefertigten Bauteil zum Herstellen eines flüssigkeitsdichten Behälters.Use of the prefabricated component according to one of claims 1 to 21 with at least one with the prefabricated component ( 14 ) connected further prefabricated component for producing a liquid-tight container. Verwendung des vorgefertigten Bauteils nach Anspruch 33, dadurch gekennzeichnet, dass der Behälter ein Keller eines Gebäudes ist, wobei die Dichtungsbahn (22) in eingebautem Zustand an der Außenseite des Kellers angeordnet ist.Use of the prefabricated component according to claim 33, characterized in that the container is a basement of a building, wherein the geomembrane ( 22 ) is arranged in the installed state on the outside of the basement. Verwendung des vorgefertigten Bauteils nach Anspruch 33, dadurch gekennzeichnet, dass der Behälter ein Becken, insbesondere ein Schwimmbecken, ist, wobei die Dichtungsbahn (22) an der Innenseite des Beckens angeordnet ist.Use of the prefabricated component according to claim 33, characterized in that the container is a basin, in particular a swimming pool, wherein the sealing membrane ( 22 ) is arranged on the inside of the basin.
DE200510051316 2005-10-26 2005-10-26 Prefabricated component for producing a building part Ceased DE102005051316A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE200510051316 DE102005051316A1 (en) 2005-10-26 2005-10-26 Prefabricated component for producing a building part
EP06120337A EP1780348A3 (en) 2005-10-26 2006-09-08 Prefabricated element for making a construction element

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200510051316 DE102005051316A1 (en) 2005-10-26 2005-10-26 Prefabricated component for producing a building part

Publications (1)

Publication Number Publication Date
DE102005051316A1 true DE102005051316A1 (en) 2007-05-03

Family

ID=37696085

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200510051316 Ceased DE102005051316A1 (en) 2005-10-26 2005-10-26 Prefabricated component for producing a building part

Country Status (2)

Country Link
EP (1) EP1780348A3 (en)
DE (1) DE102005051316A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017126966A1 (en) * 2017-11-16 2019-05-16 Rainer Knecht Precast concrete and method for producing a precast concrete part

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499095A (en) * 2016-12-23 2017-03-15 万保金 The built-in presstressed reinforcing steel steel reinforced concrete wall of prefabricated formwork
CN106480999A (en) * 2016-12-23 2017-03-08 万保金 The thicker strip composite beam formwork internal partition wall such as prefabricated
CN106522418A (en) * 2016-12-23 2017-03-22 万保金 Prefabricated composite shell mould built-in prestressed steel reinforced concrete wall
CN106522410A (en) * 2016-12-23 2017-03-22 万保金 Prefabricated superposed formwork built-in steel reinforced concrete wall
CN106499096A (en) * 2016-12-23 2017-03-15 万保金 Prefabricated formwork built-in profile steel concrete walls
CN106522411A (en) * 2016-12-23 2017-03-22 万保金 Concrete wall provided with truss bar in prefabricated formwork shell
CN106499090A (en) * 2016-12-23 2017-03-15 万保金 The built-in steel pipe bundle concrete walls of prefabricated formwork
CN106639055A (en) * 2016-12-23 2017-05-10 万保金 Enclosure wall prefabricated with superposed beam form
CN117344916A (en) * 2023-10-31 2024-01-05 深圳市百胜建筑科技有限公司 Spliced prefabricated part and construction method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2355880A1 (en) * 1973-11-08 1975-05-28 Fricke Karl Ludwig Sheet metal profile reinforced concrete slab - has embedded omega profiles with perforated web and tension flange

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT285901B (en) * 1968-10-17 1970-11-25 Semperit Ag Precast element
DE20301570U1 (en) * 2003-01-31 2003-05-08 Foamglas Gmbh Deutsche Thermal and moisture insulation bonded to building sub-surface foundations
DE202004005037U1 (en) * 2004-03-31 2005-05-19 Schwörer Haus GmbH & Co. Prefabricated cellar wall has an inner lining over concrete separated by layer of thermal insulation by layer of bitumen
DE202005005924U1 (en) * 2005-04-12 2005-06-30 Glatthaar-Fertigkeller Gmbh Core insulated prefabricated wall with composite needles

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2355880A1 (en) * 1973-11-08 1975-05-28 Fricke Karl Ludwig Sheet metal profile reinforced concrete slab - has embedded omega profiles with perforated web and tension flange

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017126966A1 (en) * 2017-11-16 2019-05-16 Rainer Knecht Precast concrete and method for producing a precast concrete part

Also Published As

Publication number Publication date
EP1780348A2 (en) 2007-05-02
EP1780348A3 (en) 2008-08-06

Similar Documents

Publication Publication Date Title
DE102005051316A1 (en) Prefabricated component for producing a building part
DE102005026797A1 (en) Insulation-composite wall manufacturing method for e.g. apartment building, involves constructing shear wall by attaching vertical and horizontal shed formwork and by inserting concrete reinforcement for supports and ring bars
EP2169132A2 (en) Slab-shaped construction element
EP2181227A2 (en) Prefabricated transportable composite wall element composed of shuttering blocks
EP1630300A1 (en) Waterprotected basement
EP3498929B1 (en) High-rise building module and building constructed from same
EP2198095B1 (en) Method of producing a part of a building using a formwork element, and part of a building produced thereby
DE19537139A1 (en) Prefabricated solid house in modular construction
EP1482098B1 (en) Water-impermeable cellar and method of its construction
DE102012106778A1 (en) Method for treating of ultra-high-strength concrete of sandwich element, involves installing ultra-high-strength concrete in adjustable roller gap, such that strong bond is produced between reinforcement and ultra high-strength concrete
DE19962088A1 (en) Wall construction, wall component, wall for the construction of structures and methods for the production thereof
DE102019003036B4 (en) Thermal insulation assembly
DE10030729A1 (en) Plate element for construction of walls, ceilings or roofs of buildings comprises a concrete and wooden structure provided with an inner layer which consists of a mechanically stable, self-supporting material
EP1632613B1 (en) Cellar for buildings
CH717632A2 (en) Finished part for sealing walls in contact with the ground.
DE202023101953U1 (en) Sealing foil and structure with sealing foil
EP3176330B1 (en) Cover of a substrate
EP1582634A1 (en) Prefabricated basement wall and method of manufacturing
DE20311076U1 (en) Method for building waterproof cellar using prefabricated double skin floor plate and wall plates with concrete filling for monobloc construction
WO2022258682A1 (en) Base plate for structures, method of making a base plate, use of a base plate
DE2155456A1 (en) KIT OF PRECAST CONCRETE ELEMENTS FOR CONSTRUCTION OF A BASEMENT FOR A BUILDING
DE102010026746A1 (en) Method for constructing basement wall, involves arranging precast concrete component as basement wall on bottom plate that is provided at basement location, where precast concrete component has inner wall panel
EP2011616B1 (en) Insulation body for a thermally insulated concrete wall and thermally insulated concrete wall and method for its manufacture
AT13558U1 (en) Connection structure of a load-bearing straw bale wall to a base plate
DE202014004059U1 (en) finished basement

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8131 Rejection