EP1338700A1 - Auxilliary track - Google Patents

Auxilliary track Download PDF

Info

Publication number
EP1338700A1
EP1338700A1 EP20030009998 EP03009998A EP1338700A1 EP 1338700 A1 EP1338700 A1 EP 1338700A1 EP 20030009998 EP20030009998 EP 20030009998 EP 03009998 A EP03009998 A EP 03009998A EP 1338700 A1 EP1338700 A1 EP 1338700A1
Authority
EP
European Patent Office
Prior art keywords
shaped
rail
track
leg
auxiliary track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP20030009998
Other languages
German (de)
French (fr)
Other versions
EP1338700B1 (en
Inventor
Horst Gebhard
Stefan Schmedders
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Voestalpine Railway Systems GmbH
Butzbacher Weichenbau GmbH
Voestalpine Turnout Technology Germany GmbH
Original Assignee
Voestalpine VAE GmbH
Voestalpine BWG GmbH
Butzbacher Weichenbau GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE1997135200 external-priority patent/DE19735200A1/en
Priority claimed from DE1998100218 external-priority patent/DE19800218A1/en
Application filed by Voestalpine VAE GmbH, Voestalpine BWG GmbH, Butzbacher Weichenbau GmbH filed Critical Voestalpine VAE GmbH
Publication of EP1338700A1 publication Critical patent/EP1338700A1/en
Application granted granted Critical
Publication of EP1338700B1 publication Critical patent/EP1338700B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B23/00Easily dismountable or movable tracks, e.g. temporary railways; Details specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B23/00Easily dismountable or movable tracks, e.g. temporary railways; Details specially adapted therefor
    • E01B23/10Shiftable tracks for heavy loads, e.g. carrying excavators
    • E01B23/14Fastening or joining means
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/02Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings

Definitions

  • the invention relates to an auxiliary track with a desired track accordingly spaced rails, in particular intended for transporting a Track section by means of a crane, wherein sections of the rails connected to each other are.
  • Switches mounted on sleepers are often moved from a manufacturing site to a laying site transported by rail-bound vehicles and then relocated. After this In the prior art, a corresponding track section is supported by a traverse and transported by means of this. At the place of installation, the track section on auxiliary traverses handed over and then discontinued and installed by means of this.
  • the transfer prepares from the transport traverse on the auxiliary traverse significant problems. Therefore, in the EP 0 146 164 B1 provided that held during transport, the traverse of cranes which in turn are mounted on a wheeled chassis to be moved to a standard track. To bring the truss to the installation site, are arranged outside the transport rails extending auxiliary rails on the The chassis are supported by auxiliary chassis, which are extendable via cylinders then to drive the cranes to the installation site. As cranes themselves reach jib cranes for use.
  • a track of a traverse is suspended on a chassis supportable, which is movable on a track.
  • the chassis itself is in turn by means of a caterpillar, which is movable next to the track, can be raised and lowered.
  • DE 29 28 152 relates to a device for receiving or laying of Track switches and crossings. It also a tracked vehicle is used, which in the desired extent to the track longitudinal axis is rotatable.
  • the US 5,127,335 provides for laying intersections and switches tracked vehicles before, which is an integral part of a traverse which carries the track part to be laid.
  • FR 2 561 275 relates to a device for laying a rail part, wherein a wheels supportable vehicle is used, which is on both sides of the Rails of the track supports.
  • the present invention is based on the problem of an auxiliary track of the aforementioned To develop such a way that with structurally simple measures connecting of sections of the respective rails is possible without causing unwanted column or joints develop.
  • the wedge clamping along respective web outer surface the abutting portions has tabs connected to the sections how are screwed, that in the area of the bridge of each section is a slot, the sections with in the along each web outer surface extending tabs existing slots partially overlapped, and that the respective section associated with the rail slots from a wedge element for relative displacement between the tabs and the rail sections can be enforced such that the rail sections are braced to each other on impact.
  • each wedge element preferably via an outside on a tab itself supporting fuse as spring pin be secured.
  • each rail at least in sections fixed in a U-shaped or L-shaped bracket with is attached in each case opposite rail facing leg, that in transversely to Lengthwise of the rails extending planes leash releasably with the Mounts are connected, that each lane keeping device comprises a spacer element, each with an end portion on the outside of one of the legs of the brackets abuts, and that each end portion with a the spacer element on impact on the respective Leg pulling tensioning device is connected, which is releasable both with the Holder is also connected to the spacer.
  • the clamping device comprises a U-shaped or claw-shaped leg of the Holder comprehensive element, which is connected via a wedge element with the spacer element is, wherein at the outside of the leg of the holder abutting the spacer element the U-shaped or claw-shaped element rests on the inside of the leg and on the outside spaced therefrom.
  • the spacer element end each a fork-shaped, two mutually parallel fork legs comprehensive geometry between which a portion of the U- or claw-shaped element runs, wherein in the overlap region of the fork legs and the U-shaped or claw-shaped Element overlapping longitudinal slots extending from the wedge element relative displacement between the fork legs to the claw-shaped element are enforceable.
  • each fork leg may be one along the upper longitudinal edge of the leg extending portion which above the rail foot to secure the Lane keeping device runs.
  • the auxiliary rail according to the invention is particularly intended for a crane such as gantry crane in the area of a track section to be incorporated such as points, where the crane transported by means of a trolley on a standard track to the auxiliary track is going to be implemented there.
  • the auxiliary rail has a larger, especially a significantly larger track than the standard track.
  • Figs. 11 and 12 are features embodying the invention for joining sections to take an auxiliary track.
  • a corresponding auxiliary track to a or a plurality of cranes in particular designed as gantry cranes, can be moved so as to be movable, to transport a track section such as switch to an installation site.
  • the gantry cranes become the auxiliary track on a standard track by means of a trolley transported, wherein the gantry crane is designed such that during the Transport on the standard track, the required clearance is maintained.
  • the sections 36, 38, 40, 42 are hinged outwards.
  • the high frame 26 are raised in a circumference and rotated by preferably 90 °, that which are on a trolley supporting inner portions 38, 42 are free and the outer portions 36, 40 can be pivoted to be described later Art deposed on the auxiliary track or its rails 22, 24 and then again be lifted until the frame legs 26, 28, 30, 32 or their sections 36, 38, 40, 42 are aligned to the extent necessary to each other.
  • the frame 26 can thereby not shown telescopic devices such as stamps of the high frame 26 can go out, or a lifting table (Fig. 5, 6) are raised.
  • two wheels 46, 48 and 50, 52 go from each outer section 36, 40 of the frame legs 28, 30, 32, 34, wherein at least one of the wheels 46, 52 is driven by a motor to move the gantry cranes 18, 20 along the auxiliary track to be able to.
  • auxiliary track level frame legs 30, 32 and 28, 34 connected via longitudinal struts 58, which when folded Frame legs 28, 30, 32, 34 are removed.
  • FIGS. 5 and 6 show further features to be emphasized, wherein for elements, which have been described in connection with Figs. 1 to 3, in principle the same reference numerals are used.
  • a lifting trolley 62 extends from a trolley 60 with scissor arms 64, 66 out to the frame 26 and thus the gantry crane in the required To be able to lift and turn the circumference.
  • the lifting table 62 is on a Slewing ring 68 supported, which via a base plate or a base frame 70 with the Dolly 60 is connected. It goes from the base frame or the base plate 70 bolts that pass through the loading surface 72 of the trolley 60, which the required rotation lock is given.
  • the scissor arms 64, 66 which are interconnected centrally via an axis 67, are on the one hand on a base plate 74 of the lifting table 62 and on the other hand on the high frame 26th hinged. This is indicated by the reference numerals 76 and 78.
  • the scissor arm 64 is displaceable with its free end 80 along a guide rail 82 of the lifting table 62. Accordingly, the scissor arm 66 with its free end 84 along a Guide rail 86 slidably extending from the high frame 26.
  • a spindle drive 88 is attached, the in the exemplary embodiment of the attachment region of the scissor arm 66 starts.
  • a trolley 90 by means of a rack and pinion drive traversable.
  • a rack is arranged on the high frame 26, with a one of the trolley 90 via a motor 92 drivable gear meshes.
  • a cable drum extends in the region of an end face of the high frame 26 101, which in turn is actuated by a motor 102.
  • the high frame 26 is first by means of the lifting table 62 raised by operating the spindle drive 88 in an amount that the Gantry crane to the loading area 72 of the trolley 60 is spaced in a circumference, that the lifting table 62 can be rotated by 90 ° by means of the turntable 68.
  • FIGS. 7 to 12 show an auxiliary track 110, along which a crane can be moved. which may have a construction as described above. With one or several corresponding cranes can then a track section such as section of a Move the switch to a place of installation and install it there.
  • the auxiliary track 110 which includes the rails 22, 24, must respect the track width be extremely accurate. To ensure this with simple measures, At the same time the possibility should be given to quickly build up or dismantle the track 110 or to be relocated, the following measures are envisaged.
  • Each rail 22, 24 is at least partially arranged in brackets 112, 113 stationary.
  • Each holder 112, 113 consists of an L or U-profile, from the bottom 116th Bolts go out 118, via the possibly via an intermediate layer 119 a ribbed plate 120 is fastened, on which the rail 22, 24 by means of clamping clamps 122, 124 fastened is.
  • clamping clamps 122, 124 fastened is fastened, on which the rail 22, 24 by means of clamping clamps 122, 124 fastened is.
  • lane keepers 126, 128, 130 are provided, which in Periodically connect the brackets 112, 113 with each other.
  • each tracking device has a spacer 132, whose respective End has a designed as a step 134, 136 rectangular recess, wherein a in the drawing representation vertically extending legs 138, 140 on the outside along the inner leg 142, 144 of the holder 112, 113 extends. Above the leg 142, 144 extends preferably perpendicular to the leg 138, 140 extending portion 148, 150 of the steps 134, 136, on the longitudinal edge of Leg 142, 144 when the tracking device 126 is properly positioned, 128, 130 is supported.
  • Each spacer element 132 is fork-shaped in its end region 152, 154. Accordingly, two parallel in side view L-shaped legs 156, 158 or 160, 162, wherein the respective horizontal leg of the section 148 or 150th is.
  • the U- or claw-shaped element 164, 166 has a extending along the bottom or transverse leg 116, 117 extending portion 172, 174 on, with a projection 176, 178 when properly positioned below the foot 181 of the rail 22, 24 extends.
  • the clear width of the recess 168, 170 of the element 164, 166 is wider than the thickness of the side leg 142, 144, as can be seen from the drawing.
  • the wedge elements 184, 186 can each be secured by means of spring plugs 188, 187, unless they are self-locking fixed in the slots 180, 182.
  • the horizontal runs between the free ends extending legs 148, 150 of the fork-shaped ends of the spacer element 132 and the nose-shaped projection 176, 178 of the claw-shaped element 164, 166, a free space within which the rail foot 181 extend with its longitudinal edge can. Since the rail 22, 24 is fixedly secured in the holder 112, 113, takes place As a result, a backup of the lane keeping device.
  • the tabs 196, 198 in the region of the respective rail section 188, 190 have elongated holes 210, 212, which corresponding slots in the webs 192, 194 of the rail sections 188, 190 are associated overlapping.
  • the wedge elements 214, 216 may - like the wedge elements 184, 186 for securing the Lane keepers - be secured by spring plugs in the narrow range of Wedge members 214, 216 are supported on the outer surface of the tab 198, provided that Wedge elements 214, 216 are not self-locking positioned.
  • Due to the features of the invention is a simple mounting or dismounting the Rails 22, 24 possible, while ensuring that the required track is complied with.

Abstract

The auxiliary rail track, with the rails spaced apart in the required dimensions, has rail lengths (188,190) locked together at their facing ends by a release wedge clamp (214,216) which presses them together, to form a joint without a gap between them. Each wedge is secured e.g. by an external spring plug at a strap (196,198).

Description

Die Erfindung bezieht sich auf ein Hilfsgleis mit einer gewünschten Spur entsprechend zueinander beabstandeten Schienen, insbesondere bestimmt zum Transportieren eines Gleisabschnitts mittels eines Krans, wobei Abschnitte der Schienen miteinander verbunden sind.The invention relates to an auxiliary track with a desired track accordingly spaced rails, in particular intended for transporting a Track section by means of a crane, wherein sections of the rails connected to each other are.

Auf Schwellen montierte Weichen werden häufig von einer Fabrikationsstätte zum Verlegeort mittels schienengebundener Fahrzeuge transportiert und sodann verlegt. Nach dem Stand der Technik wird ein entsprechender Gleisabschnitt von einer Traverse abgestützt und mittels dieser transportiert. Am Ort des Einbaus kann der Gleisabschnitt auf Hilfstraversen übergeben und sodann mittels dieser abgesetzt und eingebaut werden.Switches mounted on sleepers are often moved from a manufacturing site to a laying site transported by rail-bound vehicles and then relocated. After this In the prior art, a corresponding track section is supported by a traverse and transported by means of this. At the place of installation, the track section on auxiliary traverses handed over and then discontinued and installed by means of this.

Da die Gleisabschnitte Längen von 50 m und mehr aufweisen können, bereitet das Umsetzen von der Transporttraverse auf die Hilfstraversen erhebliche Probleme. Daher ist in der EP 0 146 164 B1 vorgesehen, dass während des Transports die Traverse von Kränen gehalten werden, die ihrerseits auf einem mit Rädern versehenen Chassis montiert sind, um auf ein Standardgleis verfahren zu werden. Um die Traverse an den Verlegeort zu bringen, werden außerhalb der Transportschienen verlaufende Hilfsschienen angeordnet, auf die sich die Chassis über Hilfsfahrgestelle abstützen, die über Zylinder ausfahrbar sind, um sodann die Kräne zu dem Verlegeort zu fahren. Als Kräne selbst gelangen Auslegerkräne zum Einsatz.Since the track sections may have lengths of 50 m and more, the transfer prepares from the transport traverse on the auxiliary traverse significant problems. Therefore, in the EP 0 146 164 B1 provided that held during transport, the traverse of cranes which in turn are mounted on a wheeled chassis to be moved to a standard track. To bring the truss to the installation site, are arranged outside the transport rails extending auxiliary rails on the The chassis are supported by auxiliary chassis, which are extendable via cylinders then to drive the cranes to the installation site. As cranes themselves reach jib cranes for use.

Nach der DE 33 40 739 Al ist ein Gleis von einer Traverse herabhängend auf einem Fahrwerk abstützbar, welches auf einem Gleis verfahrbar ist. Das Fahrwerk selbst wiederum ist mittels einer Raupe, welches neben dem Gleis verfahrbar ist, anheb- und absenkbar.According to DE 33 40 739 A1, a track of a traverse is suspended on a chassis supportable, which is movable on a track. The chassis itself is in turn by means of a caterpillar, which is movable next to the track, can be raised and lowered.

Die DE 29 28 152 bezieht sich auf eine Einrichtung zum Aufnehmen bzw. Verlegen von Gleisweichen und -kreuzungen. Dabei wird ebenfalls ein Raupenfahrzeug benutzt, welches in gewünschtem Umfang zur Gleislängsachse drehbar ist.DE 29 28 152 relates to a device for receiving or laying of Track switches and crossings. It also a tracked vehicle is used, which in the desired extent to the track longitudinal axis is rotatable.

Die US 5,127,335 sieht zum Verlegen von Kreuzungen und Weichen Raupenfahrzeuge vor, die integraler Bestandteil einer das zu verlegende Gleisteil tragenden Traverse ist.The US 5,127,335 provides for laying intersections and switches tracked vehicles before, which is an integral part of a traverse which carries the track part to be laid.

Die FR 2 561 275 bezieht sich auf eine Vorrichtung zum Verlegen eines Gleisteils, wobei ein über Räder abstützbares Fahrzeug verwendet wird, das sich zu beiden Seiten der Schienen des Gleises abstützt.FR 2 561 275 relates to a device for laying a rail part, wherein a wheels supportable vehicle is used, which is on both sides of the Rails of the track supports.

Der vorliegenden Erfindung liegt das Problem zu Grunde, ein Hilfsgleis der eingangs genannten Art derart weiterzubilden, dass mit konstruktiv einfachen Maßnahmen ein Verbinden von Abschnitten der jeweiligen Schienen möglich ist, ohne dass unerwünschte Spalte bzw. Fugen sich ausbilden.The present invention is based on the problem of an auxiliary track of the aforementioned To develop such a way that with structurally simple measures connecting of sections of the respective rails is possible without causing unwanted column or joints develop.

Zur Lösung des Problems wird vorgeschlagen, dass die Abschnitte der Schiene über eine lösbare Keilverspannung verbunden sind.To solve the problem, it is proposed that the sections of the rail over a detachable wedge bracing are connected.

Insbesondere ist vorgesehen, dass die Keilverspannung entlang jeweiliger Stegaußenfläche der aneinanderstoßenden Abschnitte Laschen aufweist, die mit den Abschnitten verbunden wie verschraubt sind, dass im Bereich des Stegs eines jeden Abschnitts ein Langloch verläuft, das abschnittsweise mit in den entlang jeder Stegaußenfläche verlaufenden Laschen vorhandenen Langlöchern bereichsweise überlappt, und dass die dem jeweiligen Abschnitt der Schiene zugeordneten Langlöcher von einem Keilelement zur Relativverschiebung zwischen den Laschen und den Schienenabschnitten derart durchsetzbar ist, dass die Schienenabschnitte auf Stoß zueinander verspannt sind.In particular, it is provided that the wedge clamping along respective web outer surface the abutting portions has tabs connected to the sections how are screwed, that in the area of the bridge of each section is a slot, the sections with in the along each web outer surface extending tabs existing slots partially overlapped, and that the respective section associated with the rail slots from a wedge element for relative displacement between the tabs and the rail sections can be enforced such that the rail sections are braced to each other on impact.

Dabei kann jedes Keilelement über vorzugsweise eine außenseitig an einer Lasche sich abstützende Sicherung wie Federstecker sicherbar sein.In this case, each wedge element preferably via an outside on a tab itself supporting fuse as spring pin be secured.

Um eine hinreichende Spurgenauigkeit zwischen den Schienen sicherzustellen, ohne dass konstruktiv aufwendige Maßnahmen erforderlich sind, ist vorgesehen, dass jede Schiene zumindest abschnittsweise ortsfest in einer im Schnitt U- oder L-förmigen Halterung mit jeweils gegenüberliegender Schiene zugewandtem Schenkel befestigt ist, dass in quer zur Längsrichtung der Schienen verlaufenden Ebenen Spurhalteeinrichtungen lösbar mit den Halterungen verbunden sind, dass jede Spurhalteeinrichtung ein Abstandselement umfasst, das jeweils mit einem Endabschnitt außenseitig an einem der Schenkel der Halterungen anliegt, und dass jeder Endabschnitt mit einer das Abstandselement auf Stoß auf den jeweiligen Schenkel ziehenden Spanneinrichtung verbunden ist, die lösbar sowohl mit der Halterung als auch mit dem Abstandselement verbunden ist.To ensure a sufficient track accuracy between the rails without that structurally complex measures are required, it is provided that each rail at least in sections fixed in a U-shaped or L-shaped bracket with is attached in each case opposite rail facing leg, that in transversely to Lengthwise of the rails extending planes leash releasably with the Mounts are connected, that each lane keeping device comprises a spacer element, each with an end portion on the outside of one of the legs of the brackets abuts, and that each end portion with a the spacer element on impact on the respective Leg pulling tensioning device is connected, which is releasable both with the Holder is also connected to the spacer.

Insbesondere umfasst die Spanneinrichtung ein U- oder klauenförmiges den Schenkel der Halterung umfassendes Element, das über ein Keilelement mit dem Abstandselement verbunden ist, wobei bei außenseitig an dem Schenkel der Halterung anstoßendem Abstandselement das U- oder klauenförmige Element innenseitig an dem Schenkel anliegt und außenseitig zu diesem beabstandet ist. Dabei kann das Abstandselement endseitig jeweils eine gabelförmige, zwei parallel zueinander verlaufende Gabelschenkel umfassende Geometrie aufweisen, zwischen denen ein Abschnitt des U- bzw. klauenförmigen Elementes verläuft, wobei im Überlappungsbereich von den Gabelschenkeln und dem U- oder klauenförmigen Element sich überlappende Längsschlitze verlaufen, die von dem Keilelement zur Relativverschiebung zwischen den Gabelschenkeln zu dem klauenförmigen Element durchsetzbar sind. In particular, the clamping device comprises a U-shaped or claw-shaped leg of the Holder comprehensive element, which is connected via a wedge element with the spacer element is, wherein at the outside of the leg of the holder abutting the spacer element the U-shaped or claw-shaped element rests on the inside of the leg and on the outside spaced therefrom. In this case, the spacer element end each a fork-shaped, two mutually parallel fork legs comprehensive geometry between which a portion of the U- or claw-shaped element runs, wherein in the overlap region of the fork legs and the U-shaped or claw-shaped Element overlapping longitudinal slots extending from the wedge element relative displacement between the fork legs to the claw-shaped element are enforceable.

Bevorzugterweise kann jeder Gabelschenkel einen entlang oberen Längsrandes des Schenkels verlaufenden Abschnitt aufweisen, der oberhalb des Schienenfußes zur Sicherung der Spurhalteeinrichtung verläuft.Preferably, each fork leg may be one along the upper longitudinal edge of the leg extending portion which above the rail foot to secure the Lane keeping device runs.

Die erfindungsgemäße Hilfsschiene ist insbesondere dafür bestimmt, einen Kran wie Portalkran im Bereich eines einzubauenden Gleisabschnitts wie Weiche aufzunehmen, wobei der Kran mittels eines Transportwagens auf einem Standardgleis zu dem Hilfsgleis transportiert wird, um dort umgesetzt zu werden. Dabei weist die Hilfsschiene eine größere, insbesondere eine erheblich größere Spur als das Standardgleis auf.The auxiliary rail according to the invention is particularly intended for a crane such as gantry crane in the area of a track section to be incorporated such as points, where the crane transported by means of a trolley on a standard track to the auxiliary track is going to be implemented there. The auxiliary rail has a larger, especially a significantly larger track than the standard track.

Weitere Einzelheiten, Vorteile und Merkmale der Erfindung ergeben sich nicht nur aus den Ansprüchen, den diesen zu entnehmenden Merkmalen -für sich und/oder in Kombination-, sondern auch aus der nachfolgenden Beschreibung von der Zeichnung zu entnehmenden bevorzugten Ausführungsbeispielen.Further details, advantages and features of the invention will become apparent not only from the Claims, the features to be taken from them-alone and / or in combination- but also from the following description of the drawing to be taken preferred embodiments.

Es zeigen:

Fig.1
eine Vorderansicht einer ersten Ausführungsform eines Portalkrans zum Verlegen eines Gleisabschnitts,
Fig.2
eine Seitenansicht des Portalkrans nach Fig. 1,
Fig. 3
eine Draufsicht des Portalkrans nach Fig. 1 und 2,
Fig. 4
eine Seitenansicht einer von zwei Portalkränen zu einem Verlegeort transportierbaren Traverse mit an dieser befestigtem Gleisabschnitt,
Fig. 5
eine Seitenansicht einer zweiten Ausführungsform eines Portalkrans in auf ein Hilfsgleis ausgerichteter Position,
Fig. 6
der Portalkran nach Fig. 5 in auf dem Hilfsgleis abgestützter Position,
Fig. 7
einen Ausschnitt eines Hilfsgleises,
Fig. 8
einen Schnitt entlang der Linie AA in Fig. 7,
Fig. 9
eine Spurhalteeinrichtung für das Hilfsgleis gemäß Fig. 7 in Seitenansicht,
Fig. 10
die Spurhalteeinrichtung nach Fig. 9 in Draufsicht,
Fig. 11
in Draufsicht auf Stoß miteinander verbundene Schienenabschnitt des Hilfsgleises gemäß Fig. 7 und
Fig. 12
eine Lasche der Verbindung gemäß Fig. 11.
Show it:
Fig.1
a front view of a first embodiment of a gantry crane for laying a track section,
Fig.2
a side view of the gantry crane of FIG. 1,
Fig. 3
a top view of the gantry crane according to FIGS. 1 and 2,
Fig. 4
a side view of one of two gantry cranes transportable to a laying traverse with attached to this track section,
Fig. 5
a side view of a second embodiment of a gantry crane in aligned on an auxiliary track position,
Fig. 6
the gantry crane according to FIG. 5 in the position supported on the auxiliary track,
Fig. 7
a section of an auxiliary track,
Fig. 8
a section along the line AA in Fig. 7,
Fig. 9
a track holding device for the auxiliary track of FIG. 7 in side view,
Fig. 10
the lane keeping device according to Fig. 9 in plan view,
Fig. 11
in a plan view of shock interconnected rail section of the auxiliary track of FIG. 7 and
Fig. 12
a tab of the compound according to FIG. 11.

Den Fig. 11 und 12 sind die Erfindung prägenden Merkmale zum Verbinden von Abschnitten eines Hilfsgleises zu entnehmen. Auf einem entsprechenden Hilfsgleis sollen ein oder mehrere insbesondere als Portalkräne ausgebildete Kräne verfahrbar abgesetzt werden, um einen Gleisabschnitt wie Weiche zu einem Einbauort zu transportieren. Dabei werden die Portalkräne zu dem Hilfsgleis auf einem Standardgleis mittels eines Transportwagens transportiert, wobei der Portalkran derart ausgebildet ist, dass während des Transports auf dem Standardgleis das zu beachtende Lichtraumprofil eingehalten wird.Figs. 11 and 12 are features embodying the invention for joining sections to take an auxiliary track. On a corresponding auxiliary track to a or a plurality of cranes, in particular designed as gantry cranes, can be moved so as to be movable, to transport a track section such as switch to an installation site. there the gantry cranes become the auxiliary track on a standard track by means of a trolley transported, wherein the gantry crane is designed such that during the Transport on the standard track, the required clearance is maintained.

Um einen von einer Traverse 10 ausgehenden Gleisabschnitt 12 wie Weiche von einer Fabrikationsstätte zu einem Verlegeort zu transportieren, wird die Traverse 10 mit dem Gleisabschnitt 12 auf Transportwagen gelagert und in die Nähe des Verlegeortes auf üblichen Gleisen, die als Standardgleise bezeichnet werden, transportiert. Die entsprechenden Schienen sind in Fig. 1 und Fig. 6 mit dem Bezugszeichen 14 und 16 versehen.To a outgoing from a traverse 10 track section 12 as a switch from one Transporting factory to a laying site, the Traverse 10 with the Track section 12 stored on trolleys and in the vicinity of the installation site on usual Railroads, which are referred to as standard tracks transported. The corresponding Rails are provided in FIGS. 1 and 6 with reference numerals 14 and 16.

Um die Traverse 10 mit dem Gleisabschnitt 12 von den Transportwagen aufzunehmen und sodann unmittelbar zu dem Verlegeort zu transportieren und dort einzubauen, werden von weiteren Transportwagen Portalkräne 18, 20 mitgenommen, die das für das Standardgleis zulässige Raumprofil nicht überschreiten, gleichwenn die Portalkräne 18, 20 zum Umsetzen der Traverse 10 von dem Transportwagen und sodann zum Verlegeort über ein Hilfsgleis verfahren werden, dessen Schienen 22, 24 außerhalb der des Standardgleises verlaufen, also eine erheblich breitere Spur aufweisen.To receive the cross member 10 with the track section 12 of the trolley and then transported directly to the installation site and install there, are of another trolley gantry cranes 18, 20 taken, that for the standard track do not exceed permissible room profile, the same as the gantry cranes 18, 20 for converting Traverse 10 from the trolley and then to the installation via an auxiliary track be moved, whose rails 22, 24 run outside of the standard track, So have a much wider track.

Um dies zu bewerkstelligen, weisen die Portalkräne 18, 20 von einem Hochrahmen 26 ausgehende Rahmenbeine 28, 30, 32, 34 auf, die jeweils zumindest aus zwei gegeneinander verschwenkbaren Abschnitten, einem äußeren Abschnitt 36, 40 und einem von dem Hochrahmen 26 ausgehenden inneren Abschnitt 38, 42 zusammengesetzt sind. Selbstverständlich können auch mehr als zwei zueinander verschwenkbare Abschnitte 36, 38 bzw. 40, 42 jeden oder zumindest einige der Rahmenbeine 28, 30, 32, 34 bilden. Dabei sind die Abschnitte 36, 38, 40, 42 über ein Scharnier 44, 45, Gelenk oder ein gleichwirkendes Element verbunden.To accomplish this, have the gantry cranes 18, 20 of a high frame 26th outgoing frame legs 28, 30, 32, 34, each at least two against each other pivotable sections, an outer section 36, 40 and one of the High frame 26 outgoing inner section 38, 42 are composed. Of course can also more than two mutually pivotable sections 36, 38 and 40, 42 form each or at least some of the frame legs 28, 30, 32, 34. Here are the Sections 36, 38, 40, 42 via a hinge 44, 45, hinge or equivalent element connected.

Die Abschnitte 36, 38, 40, 42 sind nach außen klappbar. Hierzu muss zunächst der Hochrahmen 26 in einem Umfang angehoben und um vorzugsweise 90° gedreht werden, dass die sich auf einem Transportwagen abstützenden inneren Abschnitte 38, 42 frei sind und die äußeren Abschnitte 36, 40 verschwenkt werden können, um in nachstehend beschriebener Art auf das Hilfsgleis bzw. dessen Schienen 22, 24 abgesetzt und sodann wieder angehoben zu werden, bis die Rahmenbeine 26, 28, 30, 32 bzw. deren Abschnitten 36, 38, 40, 42 im erforderlichen Umfang zueinander ausgerichtet sind. Der Rahmen 26 kann dabei über nicht dargestellte Teleskopeinrichtungen wie Stempel, die von dem Hochrahmen 26 ausgehen können, oder einen Hubtisch (Fig. 5, 6) angehoben werden.The sections 36, 38, 40, 42 are hinged outwards. For this, first the high frame 26 are raised in a circumference and rotated by preferably 90 °, that which are on a trolley supporting inner portions 38, 42 are free and the outer portions 36, 40 can be pivoted to be described later Art deposed on the auxiliary track or its rails 22, 24 and then again be lifted until the frame legs 26, 28, 30, 32 or their sections 36, 38, 40, 42 are aligned to the extent necessary to each other. The frame 26 can thereby not shown telescopic devices such as stamps of the high frame 26 can go out, or a lifting table (Fig. 5, 6) are raised.

Die in einer Ebene quer zum Hilfsgleis verlaufenden Rahmenbeine, also die Rahmenbeine 28, 30 einerseits und die Rahmenbeine 32, 34 andererseits, können zueinander verschwenkbar und somit abstandsveränderbar ausgebildet sein, um von den äußeren Abschnitten 36, 40 endseitig ausgehende Laufräder 46, 48, 50, 52 auf die Spur des Hilfsgleises, also auf den Abstand der Hilfsschienen 22, 24 ausrichten zu können. Hierzu sind an dem Hochrahmen 26 angelenkte Teleskopstreben 54, 56 vorgesehen, die ihrerseits gelenkig mit den inneren Abschnitten 38, 42 der Rahmenbeine 28, 30, 32, 34 verbunden sind.The running in a plane transverse to the auxiliary track frame legs, so the frame legs 28, 30 on the one hand and the frame legs 32, 34 on the other hand, can be pivoted to each other and thus be formed variable in distance to the outer sections 36, 40 end-outgoing wheels 46, 48, 50, 52 on the track of the auxiliary track, So to be able to align the distance of the auxiliary rails 22, 24. These are on the high frame 26 articulated telescopic struts 54, 56 are provided, which in turn articulated with the inner portions 38, 42 of the frame legs 28, 30, 32, 34 are connected.

Vorzugsweise gehen jeweils zwei Laufräder 46, 48 bzw. 50, 52 von jedem äußeren Abschnitt 36, 40 der Rahmenbeine 28, 30, 32, 34 aus, wobei zumindest eines der Räder 46, 52 mittels eines Motors antreibbar ist, um die Portalkräne 18, 20 entlang des Hilfsgleises verfahren zu können.Preferably, two wheels 46, 48 and 50, 52 go from each outer section 36, 40 of the frame legs 28, 30, 32, 34, wherein at least one of the wheels 46, 52 is driven by a motor to move the gantry cranes 18, 20 along the auxiliary track to be able to.

Vom Hochrahmen 26 gehen übliche Hebemittel, Steuer- und Antriebseinrichtungen aus, um die Traverse 10 mit dem Gleisabschnitt 12 in erforderlichem Umfang anzuheben bzw. absenken zu können.From the high frame 26 go out conventional lifting, control and drive devices, to raise the cross member 10 with the track section 12 to the extent necessary or to be able to lower.

Ferner sind die in einer entlang des Hilfsgleises verlaufenden Ebene angeordneten Rahmenbeine 30, 32 bzw. 28, 34 über Längsstreben 58 verbindbar, die bei zusammengeklappten Rahmenbeinen 28, 30, 32, 34 entfernt sind.Further, the arranged in a running along the auxiliary track level frame legs 30, 32 and 28, 34 connected via longitudinal struts 58, which when folded Frame legs 28, 30, 32, 34 are removed.

Den Fig. 5 und 6 sind weitere hervorzuhebende Merkmale zu entnehmen, wobei für Elemente, die im Zusammenhang mit den Fig. 1 bis 3 beschrieben worden sind, grundsätzlich gleiche Bezugszeichen verwendet werden.FIGS. 5 and 6 show further features to be emphasized, wherein for elements, which have been described in connection with Figs. 1 to 3, in principle the same reference numerals are used.

Wie aus den Fig. 5 und 6 ersichtlich geht von einem Transportwagen 60 ein Hubtisch 62 mit Scherenarmen 64, 66 aus, um den Rahmen 26 und damit den Portalkran im erforderlichen Umfang anzuheben und drehen zu können. Hierzu ist der Hubtisch 62 auf einem Drehkranz 68 abgestützt, der über eine Grundplatte oder einen Grundrahmen 70 mit dem Transportwagen 60 verbunden ist. Dabei gehen von dem Grundrahmen bzw. der Grundplatte 70 Bolzen aus, die die Ladefläche 72 des Transportwagens 60 durchsetzen, wodurch die erforderlichen Drehsicherung gegeben ist.As can be seen from FIGS. 5 and 6, a lifting trolley 62 extends from a trolley 60 with scissor arms 64, 66 out to the frame 26 and thus the gantry crane in the required To be able to lift and turn the circumference. For this purpose, the lifting table 62 is on a Slewing ring 68 supported, which via a base plate or a base frame 70 with the Dolly 60 is connected. It goes from the base frame or the base plate 70 bolts that pass through the loading surface 72 of the trolley 60, which the required rotation lock is given.

Die Scherenarme 64, 66, die mittig über eine Achse 67 miteinander verbunden sind, sind einerseits an einer Basisplatte 74 des Hubtisches 62 und andererseits am Hochrahmen 26 angelenkt. Dies wird durch die Bezugszeichen 76 und 78 angedeutet. Der Scherenarm 64 ist mit seinem freien Ende 80 entlang einer Führungsschiene 82 des Hubtisches 62 verschiebbar. Entsprechend ist der Scherenarm 66 mit seinem freien Ende 84 entlang einer Führungsschiene 86 verschiebbar, die von dem Hochrahmen 26 ausgeht. Im Bereich des freien Endes 80 des Schenkels oder Scherenarms 64 ist ein Spindelantrieb 88 befestigt, der im Ausführungsbeispiel vom Befestigungsbereich des Scherenarms 66 ausgeht. Hierzu ist am Scherenarm 64 eine Kontermutter befestigt, die von der Spindel des Spindelantriebs 88 durchsetzt ist, um gemäß der Drehrichtung der Spindel 88 die Scherenarme 64, 66 entlang der Führungsschienen 82, 86 zu verfahren. Entsprechend wird der Hochrahmen 26 und damit der Portalkran angehoben bzw. abgesenkt.The scissor arms 64, 66, which are interconnected centrally via an axis 67, are on the one hand on a base plate 74 of the lifting table 62 and on the other hand on the high frame 26th hinged. This is indicated by the reference numerals 76 and 78. The scissor arm 64 is displaceable with its free end 80 along a guide rail 82 of the lifting table 62. Accordingly, the scissor arm 66 with its free end 84 along a Guide rail 86 slidably extending from the high frame 26. In the area of free end 80 of the leg or scissor arm 64, a spindle drive 88 is attached, the in the exemplary embodiment of the attachment region of the scissor arm 66 starts. This is attached to the scissor arm 64 has a lock nut, which is of the spindle of the spindle drive 88th is traversed in accordance with the direction of rotation of the spindle 88, the scissor arms 64, 66 along the guide rails 82, 86 to proceed. Accordingly, the high frame 26 and so that the gantry crane raised or lowered.

Entlang der Oberseite des Hochrahmens 26 ist eine Laufkatze 90 mittels eines Zahnstangenantriebs verfahrbar. Hierzu ist an dem Hochrahmen 26 eine Zahnstange angeordnet, mit der ein von der Laufkatze 90 über einen Motor 92 antreibbares Zahnrad kämmt.Along the top of the high frame 26 is a trolley 90 by means of a rack and pinion drive traversable. For this purpose, a rack is arranged on the high frame 26, with a one of the trolley 90 via a motor 92 drivable gear meshes.

Um ein Anheben bzw. Absenken der äußeren verschwenkbaren Abschnitte 36, 40 der Rahmenbeine 28, 30, 32, 34 zu ermöglichen, weist der Hochrahmen 26 im Bereich seiner Stirnseiten galgenförmige Halterungen 94, 96 auf, von denen wiederum Hebezüge 98, 100 ausgehen, die mit den äußeren Abschnitten 36, 40 der Rahmenbeine 28, 30, 32, 34 verbindbar sind.To raise or lower the outer pivotable portions 36, 40 of the To enable frame legs 28, 30, 32, 34, the high frame 26 in the region of its End faces gallows-shaped brackets 94, 96 on, in turn hoists 98, 100 go out with the outer portions 36, 40 of the frame legs 28, 30, 32, 34 connectable are.

Außerdem verläuft im Bereich einer Stirnseite des Hochrahmens 26 eine Kabeltrommel 101, die ihrerseits über einen Motor 102 betätigbar ist.In addition, a cable drum extends in the region of an end face of the high frame 26 101, which in turn is actuated by a motor 102.

Beim Transport des Portalkrans ist dieser mittels des Hubtisches 62 bzw. des Drehkranzes 68 in Richtung des Standardgleises derart ausgerichtet, dass die beim Verfahren des Portalkrans in einer quer zur Längsrichtung des Hilfsgleises verlaufenden Ebene angeordneten Rahmenbeine 28, 30 bzw. 32, 34 in einer in Längsrichtung des Standardgleises verlaufenden Ebene ausgerichtet sind.When transporting the gantry this is by means of the lifting table 62 and der Drehkranzes 68 aligned in the direction of the standard track, that in the process of the gantry crane arranged in a direction transverse to the longitudinal direction of the auxiliary track level Frame legs 28, 30 and 32, 34 extending in a longitudinal direction of the standard track Level are aligned.

Mit anderen Worten verlaufen die Längsseiten des Portalkrans, die in den Fig. 5 und 6 dargestellt sind, in Fahrtrichtung des Standardgleises, sind also zu der den Fig. 5 und 6 zu entnehmenden Position um 90° gedreht. Hierdurch weist der Portalkran mit seinen hochgeklappten Rahmenbeinen 28, 30, 32, 34 ein Raumprofil auf, das für übliche Standardgleise zulässig ist. Soll der Portalkran auf ein Hilfsgleis aufgesetzt werden, um die von der Traverse 10 ausgehende Weiche oder sonstigen Gleisabschnitt 12 aufzunehmen und an einen Verlegeort zu transportieren, wird der Hochrahmen 26 zunächst mittels des Hubtisches 62 durch Betätigen des Spindelantriebs 88 in einem Umfang angehoben, dass der Portalkran zu der Ladefläche 72 des Transportwagens 60 in einem Umfang beabstandet ist, dass der Hubtisch 62 mittels des Drehkranzes 68 um 90° gedreht werden kann.In other words, the longitudinal sides of the gantry crane, which in Figs. 5 and 6 run are shown, in the direction of travel of the standard track, so are to the Figs. 5 and 6 to Removed position rotated by 90 °. As a result, the gantry crane with its folded up Frame legs 28, 30, 32, 34 a room profile, the usual for standard tracks is permissible. If the gantry crane to be placed on an auxiliary track to those of the Traverse 10 outgoing turnout or other track section 12 record and on To transport a laying site, the high frame 26 is first by means of the lifting table 62 raised by operating the spindle drive 88 in an amount that the Gantry crane to the loading area 72 of the trolley 60 is spaced in a circumference, that the lifting table 62 can be rotated by 90 ° by means of the turntable 68.

Sodann werden die äußeren Abschnitte 36, 40 der Rahmenbeine 28, 30, 32, 34 mittels der Hebezüge 98, 100 herabgelassen, bis die Laufräder 46, 48, 50, 52 auf den Schienen 22, 24 des Hilfsgleises positioniert sind. In dieser Stellung sind die äußeren Abschnitte 36, 40 der Rahmenbeine 28, 30, 32, 34 nach außen abgewinkelt, übertragen jedoch bereits Kräfte des Portalkrans auf das Hilfsgleis. Während des weiteren Anhebens des Portalkrans mittels des Spindelantriebs 88 und damit des Hubtischs 62 gleiten die Scherenarme oder Scherenschenkel 64, 66 mit ihren freien Enden 80, 84 entlang der Führungsschienen 82, 86 des Hubtisches 62 bzw. des Hochrahmens 26, wie durch die Fig. 6 angedeutet wird. Sobald die äußeren Abschnitte 36, 40 der Rahmenbeine 28, 30, 32, 34 zu den Innenabschnitten 38, 42 ausgerichtet sind, werden die Abschnitte 36, 38 bzw. 40, 42 über von diesen ausgehende Flansche miteinander verbunden. Sodann wird der Scherenarm oder -schenkel 64 von dem Hochrahmen 26 gelöst, so dass die Schenkel oder Arme 64, 66 in ihre Ausgangspositionen zurückgleiten können.Then, the outer portions 36, 40 of the frame legs 28, 30, 32, 34 by means of Hoists 98, 100 lowered until the wheels 46, 48, 50, 52 on the rails 22, 24th of the auxiliary track are positioned. In this position, the outer portions 36, 40 of the Frame legs 28, 30, 32, 34 angled outwards, but already transmit forces of Portal crane on the auxiliary track. During the further lifting of the gantry crane by means of Spindle drive 88 and thus the lifting table 62 slide the scissor arms or scissor legs 64, 66 with their free ends 80, 84 along the guide rails 82, 86 of the Lifting table 62 and the high frame 26, as indicated by the Fig. 6. As soon as the outer portions 36, 40 of the frame legs 28, 30, 32, 34 to the inner portions 38, 42nd are aligned, the sections 36, 38 and 40, 42 over from this outgoing Flanges interconnected. Then, the scissor arm or leg 64 of the High frame 26 is released, so that the legs or arms 64, 66 in their original positions can slide back.

Die jeweils auf eine der Schienen 22, 24 angeordneten Rahmenbeine 28, 30 bzw. 32, 34 werden über eine Strebe miteinander verbunden, um eine hohe Stabilität sicherzustellen. Sodann kann der Portalkran entlang des Hilfsgleises, also der Hilfsschienen 22, 24 verfahren werden, wobei zumindest jeweils ein Laufrad 46, 48, 50, 52 eines jeden Rahmenbeins 28, 30, 32, 34 motorangetrieben sein sollte.The respectively on one of the rails 22, 24 arranged frame legs 28, 30 and 32, 34th are connected together via a strut to ensure high stability. Then, the gantry crane along the auxiliary track, so the auxiliary rails 22, 24 move are at least one impeller 46, 48, 50, 52 of each frame leg 28, 30, 32, 34 should be motor driven.

Den Fig. 7 bis 12 ist ein Hilfsgleis 110 zu entnehmen, entlang dem ein Kran verfahrbar ist, der eine Konstruktion aufweisen kann, wie diese zuvor beschrieben ist. Mit einem bzw. mehreren entsprechenden Kränen kann sodann ein Gleisabschnitt wie Abschnitt einer Weiche zu einem Verlegeort verfahren und dort eingebaut werden.FIGS. 7 to 12 show an auxiliary track 110, along which a crane can be moved. which may have a construction as described above. With one or several corresponding cranes can then a track section such as section of a Move the switch to a place of installation and install it there.

Das Hilfsgleis 110, das die Schienen 22, 24 umfasst, muss hinsichtlich der Spurbreite überaus genau verlegt sein. Um dies mit einfachen Maßnahmen sicherzustellen, wobei gleichzeitig die Möglichkeit gegeben sein soll, das Gleis 110 schnell auf- bzw. abzubauen bzw. zu verlegen, sind folgende Maßnahmen vorgesehen. The auxiliary track 110, which includes the rails 22, 24, must respect the track width be extremely accurate. To ensure this with simple measures, At the same time the possibility should be given to quickly build up or dismantle the track 110 or to be relocated, the following measures are envisaged.

Jede Schiene 22, 24 ist zumindest abschnittsweise in Halterungen 112, 113 ortsfest angeordnet. Jede Halterung 112, 113 besteht aus einem L- oder U-Profil, von dessen Boden 116 Schrauben 118 ausgehen, über die gegebenenfalls über eine Zwischenlage 119 eine Rippenplatte 120 befestigt ist, auf der die Schiene 22, 24 mittels Spannklemmen 122, 124 befestigbar ist. Insoweit wird jedoch auf hinlänglich bekannte Konstruktionen verwiesen.Each rail 22, 24 is at least partially arranged in brackets 112, 113 stationary. Each holder 112, 113 consists of an L or U-profile, from the bottom 116th Bolts go out 118, via the possibly via an intermediate layer 119 a ribbed plate 120 is fastened, on which the rail 22, 24 by means of clamping clamps 122, 124 fastened is. In that regard, however, reference is made to well-known constructions.

Da die Schienen 22, 24 ortsfest in der Halterung 112, 113 befestigt sind, muss nur noch sichergestellt werden, dass die Halterungen 112, 113 selbst zueinander einen vorgegebenen Abstand einhalten. Hierzu sind Spurhalteeinrichtungen 126, 128, 130 vorgesehen, die in regelmäßigen Abständen die Halterungen 112, 113 untereinander verbinden.Since the rails 22, 24 are fixed in place in the holder 112, 113, only has to ensure that the brackets 112, 113 themselves to each other a predetermined Keep distance. For this purpose, lane keepers 126, 128, 130 are provided, which in Periodically connect the brackets 112, 113 with each other.

Merkmale entsprechender Spurhalterungen 126, 128, 130 sind den Fig. 9 und 10 zu entnehmen. So weist jede Spurhalteeinrichtung ein Abstandselement 132 auf, dessen jeweiliges Ende eine als Stufe 134, 136 ausgebildete rechteckige Ausnehmung aufweist, wobei ein in der zeichnerischen Darstellung vertikal verlaufender Schenkel 138, 140 außenseitig entlang des innenliegenden Schenkels 142, 144 der Halterung 112, 113 verläuft. Oberhalb der Schenkel 142, 144 erstreckt sich ein vorzugsweise senkrecht zu dem Schenkel 138, 140 verlaufender Abschnitt 148, 150 der Stufen 134, 136, der auf dem Längsrand des Schenkels 142, 144 bei ordnungsgemäßer Positionierung der Spurhalteeinrichtung 126, 128, 130 abgestützt ist.Features corresponding track holders 126, 128, 130 are shown in FIGS. 9 and 10. Thus, each tracking device has a spacer 132, whose respective End has a designed as a step 134, 136 rectangular recess, wherein a in the drawing representation vertically extending legs 138, 140 on the outside along the inner leg 142, 144 of the holder 112, 113 extends. Above the leg 142, 144 extends preferably perpendicular to the leg 138, 140 extending portion 148, 150 of the steps 134, 136, on the longitudinal edge of Leg 142, 144 when the tracking device 126 is properly positioned, 128, 130 is supported.

Jedes Abstandselement 132 ist in seinem Endbereich 152, 154 gabelförmig ausgebildet, weist demzufolge zwei parallel zueinander in Seitenansicht L-förmige Schenkel 156, 158 bzw. 160, 162 auf, wobei der jeweilige horizontale Schenkel der Abschnitt 148 bzw. 150 ist.Each spacer element 132 is fork-shaped in its end region 152, 154. Accordingly, two parallel in side view L-shaped legs 156, 158 or 160, 162, wherein the respective horizontal leg of the section 148 or 150th is.

Zwischen den Schenkeln 156, 158 bzw. 160, 162 erstreckt sich ein im Schnitt klauen- oder U-förmiges vorzugsweise aus Flacheisen bestehendes Element 164, 166 mit einer Aussparung 168, 170, innerhalb der der Seitenschenkel 142, 144 der Halterung 112, 113 verläuft. Between the legs 156, 158 and 160, 162, a Klauen- or extends in the section U-shaped preferably made of flat iron element 164, 166 with a recess 168, 170, within which the side legs 142, 144 of the holder 112, 113 extends.

Innerhalb der Halterung 112, 113 weist das U- bzw. klauenförmige Element 164, 166 einen sich entlang des Bodens bzw. Querschenkels 116, 117 verlaufenden Abschnitt 172, 174 auf, der mit einem Vorsprung 176, 178 bei ordnungsgemäßer Positionierung unterhalb des Fußes 181 der Schiene 22, 24 verläuft.Within the holder 112, 113, the U- or claw-shaped element 164, 166 has a extending along the bottom or transverse leg 116, 117 extending portion 172, 174 on, with a projection 176, 178 when properly positioned below the foot 181 of the rail 22, 24 extends.

Die lichte Weite der Aussparung 168, 170 des Elementes 164, 166 ist breiter als die Dicke des Seitenschenkels 142, 144, wie der Zeichnung zu entnehmen ist.The clear width of the recess 168, 170 of the element 164, 166 is wider than the thickness of the side leg 142, 144, as can be seen from the drawing.

Im Überlappungsbereich zwischen den Schenkeln 156, 158 bzw. 160, 162 des gabelförmig ausgebildeten Endbereichs des Abstandselementes 132 und dem Element 164, 166 sind Längsschlitze überlappend vorgesehen, die ganz allgemein mit den Bezugszeichen 180, 182 versehen sind. Diese Längsschlitze 180, 182 sind von jeweils einem Keilelement 184, 186 derart durchsetzbar, dass das Abstandselement 132 verschiebbar ist, um mit seinem vertikal verlaufenden Schenkel 138, 140 an die Außenseite des Querschenkels 142, 144 der Halterung 112, 113 zum Liegen zu kommen. Gleichzeitig liegt das Element 164, 166 innenseitig an dem Schenkel 142, 144 an. Auf diese Weise ist eine eindeutige Positionierung des Abstandselements 132 zu den Außenschenkeln 142, 144 der Halterungen 112, 113 sichergestellt, wodurch wiederum die Spur des Hilfsgleises 110 eindeutig festgelegt ist.In the overlap region between the legs 156, 158 and 160, 162 of the fork-shaped formed end portion of the spacer 132 and the element 164, 166 are Longitudinal slots provided overlapping, generally by the reference numeral 180, 182 are provided. These longitudinal slots 180, 182 are each formed by a wedge element 184, 186 so enforceable that the spacer 132 is slidable to his vertically extending legs 138, 140 to the outside of the transverse leg 142, 144th the holder 112, 113 to come to rest. At the same time the element 164, 166 lies inside on the leg 142, 144 at. This way is a unique positioning the spacer 132 to the outer legs 142, 144 of the brackets 112, 113 ensured, which in turn uniquely determined the track of the auxiliary track 110 is.

Die Keilelemente 184, 186 können jeweils mittels Federsteckern 188, 187 gesichert sein, sofern diese nicht selbstklemmend in den Langlöchern 180, 182 fixiert sind.The wedge elements 184, 186 can each be secured by means of spring plugs 188, 187, unless they are self-locking fixed in the slots 180, 182.

Wie die Fig. 9 des Weiteren verdeutlicht, verläuft zwischen den freien Enden der horizontal verlaufenden Schenkel 148, 150 der gabelförmig ausgebildeten Enden des Abstandselements 132 und dem nasenförmigen Vorsprung 176, 178 des klauenförmigen Elements 164, 166 ein Freiraum, innerhalb der sich der Schienenfuß 181 mit seinem Längsrand erstrecken kann. Da die Schiene 22, 24 in der Halterung 112, 113 ortsfest befestigt ist, erfolgt hierdurch eine Sicherung der Spurhalteeinrichtung.As further illustrated in Fig. 9, the horizontal runs between the free ends extending legs 148, 150 of the fork-shaped ends of the spacer element 132 and the nose-shaped projection 176, 178 of the claw-shaped element 164, 166, a free space within which the rail foot 181 extend with its longitudinal edge can. Since the rail 22, 24 is fixedly secured in the holder 112, 113, takes place As a result, a backup of the lane keeping device.

Um Abschnitte 188, 190 der Schiene 22, 24 untereinander zu verbinden, wird erfindungsgemäß eine Konstruktion entsprechend der Fig. 11 und 12 benutzt, mit der die Abschnitte 188, 190 keilverspannt sind, so dass die Stirnflächen der Abschnitte 188, 190 aufeinander gepresst sind.In order to connect sections 188, 190 of the rail 22, 24 with each other, according to the invention a construction according to the Fig. 11 and 12 used, with the sections 188, 190 are wedge-stressed, so that the end faces of the sections 188, 190 to each other pressed.

Hierzu verlaufen entlang der jeweiligen Stege 192, 194 der Schienenabschnitte 188, 190 Laschen 196, 198, die Bohrungen 200, 202, 204, 206 im Bereich des Abschnitts 188 bzw. des Abschnitts 190 aufweisen. Entsprechend der Position der Bohrung 200, 202 bzw. 204, 206 sind in den Stegen 192 bzw. 194 Bohrungen vorgesehen, um auf diese Weise die Laschen 196, 198 mit dem Abschnitt 188 bzw. 190 zu verbinden. Da zwischen den Schrauben 208 und der jeweiligen Bohrung ein Spiel besteht, muss sichergestellt sein, dass sich zwischen den Schienenabschnitten 188, 190 im Stoßbereich kein Spalt ausbildet. Daher ist erfindungsgemäß vorgesehen, dass die Laschen 196, 198 im Bereich des jeweiligen Schienenabschnitts 188, 190 Langlöcher 210, 212 aufweisen, denen entsprechende Langlöcher in den Stegen 192, 194 der Schienenabschnitte 188, 190 überlappend zugeordnet sind. Durch die zumindest in jedem Schienenabschnitt 188, 190 teilweise überlappenden Langlöchern wird nun jeweils ein Keilelement 214 bzw. 216 geschoben, wodurch eine Relativverschiebung zwischen den Laschen 196 und 198 und den Schienenabschnitten 188, 190 derart erfolgt, dass die Stoßflächen der Abschnitte 188, 190 auf Stoß aufeinanderzuliegen kommen, so dass sich ein Spalt zwischen den Schienenabschnitten 188, 190 nicht ausbildet.For this purpose, run along the respective webs 192, 194 of the rail sections 188, 190th Tabs 196, 198, the holes 200, 202, 204, 206 in the region of section 188 or of section 190. According to the position of the bore 200, 202 or 204, 206 are provided in the webs 192 and 194 holes to in this way the tabs 196, 198 to be connected to the section 188 and 190, respectively. As between the screws 208 and the respective hole is a game, it must be ensured that no gap is formed between the rail sections 188, 190 in the joint area. thats why According to the invention provided that the tabs 196, 198 in the region of the respective rail section 188, 190 have elongated holes 210, 212, which corresponding slots in the webs 192, 194 of the rail sections 188, 190 are associated overlapping. By at least in each rail section 188, 190 partially overlapping slots now each wedge element 214 and 216 is pushed, creating a relative displacement between the tabs 196 and 198 and the rail sections 188, 190 such that the abutment surfaces of the sections 188, 190 abut each other come, so that a gap between the rail sections 188, 190 does not form.

Die Keilelemente 214, 216 können - wie die Keilelemente 184, 186 zur Sicherung der Spurhalteeinrichtungen - mittels Federsteckern gesichert sein, die im schmalen Bereich der Keilelemente 214, 216 an der Außenfläche der Lasche 198 abgestützt sind, sofern die Keilelemente 214, 216 nicht selbstklemmend positioniert sind.The wedge elements 214, 216 may - like the wedge elements 184, 186 for securing the Lane keepers - be secured by spring plugs in the narrow range of Wedge members 214, 216 are supported on the outer surface of the tab 198, provided that Wedge elements 214, 216 are not self-locking positioned.

Durch die erfindungsgemäßen Merkmale ist ein einfaches Montieren bzw. Abbauen der Schienen 22, 24 möglich, wobei gleichzeitig sichergestellt ist, dass die erforderliche Spur eingehalten wird. Due to the features of the invention is a simple mounting or dismounting the Rails 22, 24 possible, while ensuring that the required track is complied with.

BEZUGSZEICHENLISTELIST OF REFERENCE NUMBERS

1010
Traversetraverse
1212
Gleisabschnitttrack section
14, 1614, 16
Schienen (Standardgleis)Rails (standard track)
18, 2018, 20
Portalkränegantry cranes
22, 2422, 24
Schienen (Hilfsgleis)Rails (auxiliary track)
2626
Hochrahmenhigh frame
28, 30, 32, 3428, 30, 32, 34
Rahmenbeineframe legs
36, 4036, 40
äußerer Abschnitt der Rahmenbeineouter section of the frame legs
38, 4238, 42
innerer Abschnitt der Rahmenbeineinner section of the frame legs
44, 4544, 45
Scharnierhinge
46, 48, 50, 5246, 48, 50, 52
Laufräderimpellers
54, 5654, 56
Teleskopstrebentelescopic struts
5858
Längsstrebenlongitudinal struts
6060
TransportwagenDolly
6262
HubtischLift table
64, 6664, 66
Scherenarmescissor arms
6767
Achseaxis
6868
Drehkranzslewing ring
7070
Grundrahmenbase frame
7272
Ladefläche des TransportwagensLoading surface of the trolley
7474
Basisplattebaseplate
76, 7876, 78
Anlenkpunktepivot points
8080
freies Ende des Scherenarms 64free end of the scissors arm 64
8282
Führungsschieneguide rail
8484
freies Ende des Scherenarms 66free end of the scissors arm 66
8686
Führungsschieneguide rail
8888
Spindelantriebspindle drive
9090
Laufkatzetrolley
9292
Motorengine
94, 9694, 96
galgenförmige Halterungengallows-shaped brackets
98, 10098, 100
Hebezügehoists
101101
Kabeltrommelcable drum
102102
Motorengine
110110
Hilfsgleisauxiliary track
112, 113112, 113
Halterungenbrackets
116116
Bodenground
118118
Schraubenscrew
119119
Zwischenlageliner
120120
Rippenplatterib plate
122, 124122, 124
Spannklemmenclamps
126, 128, 130126, 128, 130
SpurhalteeinrichtungenTracking devices
132132
Abstandselementspacer
134, 136134, 136
Stufestep
138, 140138, 140
vertikaler Schenkel vertical thigh
142, 144142, 144
innenliegender Schenkel der Halterung 112, 113inner leg of the bracket 112, 113th
148, 150148, 150
Abschnittsection
152, 154152, 154
Endbereicheend regions
156, 158, 160, 162156, 158, 160, 162
L-förmiger SchenkelL-shaped thigh
164, 166164, 166
klauenförmiges Elementclaw-shaped element
168, 170168, 170
Aussparungrecess
172, 174172, 174
Abschnittsection
176, 178176, 178
Vorsprunghead Start
181181
Fußfoot
180, 182180, 182
Längsschlitzelongitudinal slots
184, 186184, 186
Keilelementekey members
185, 187185, 187
Federsteckercotter pin
188, 190188, 190
Abschnitte der Schienen 22, 24Portions of the rails 22, 24
192, 194192, 194
StegeStege
196, 198196, 198
Laschentabs
200, 202, 204, 206200, 202, 204, 206
Bohrungendrilling
208208
Schraubescrew
210, 212210, 212
Langlöcherslots
214, 216214, 216
Keilelementkey member

Claims (9)

Hilfsgleis (110) mit einer gewünschten Spur entsprechend zueinander beabstandeten Schienen (22, 24), insbesondere bestimmt zum Transportieren eines Gleisabschnitts mittels eines Krans, wobei Abschnitte (188, 190) der Schienen miteinander verbunden sind,
dadurch gekennzeichnet, dass die Abschnitte (188, 190) der Schiene (22, 24) über eine lösbare Keilverspannung verbunden sind.
Auxiliary track (110) having a desired track corresponding to spaced apart rails (22, 24), in particular intended for transporting a track section by means of a crane, wherein sections (188, 190) of the rails are connected to each other,
characterized in that the portions (188, 190) of the rail (22, 24) are connected via a releasable wedge bracing.
Hilfsgleis nach Anspruch 1,
dadurch gekennzeichnet, dass die Keilverspannung entlang jeweiliger Stegaußenfläche der aneinanderstoßenden Abschnitte (188, 190) Laschen (196, 198) aufweist, die mit den Abschnitten verbunden wie verschraubt sind, dass im Bereich des Stegs (192, 194) eines jeden Abschnitts ein Langloch verläuft, das mit in den entlang jeder Stegaußenfläche verlaufenden Laschen vorhandenen Langlöchern (210, 212) zumindest bereichsweise überlappt, und dass die dem jeweiligen Abschnitt der Schiene (22, 24) zugeordneten Langlöcher von einem Keilelement (214, 216) zur Relativverschiebung zwischen den Laschen und den Schienenabschnitten derart durchsetzbar ist, dass die Schienenabschnitte auf Stoß zueinander verspannt sind.
Auxiliary track according to claim 1,
characterized in that the wedge bracing along respective web outer surface of the abutting portions (188, 190) has tabs (196, 198) connected to the sections screwed such that in the region of the web (192, 194) of each section is a slot that at least partially overlaps with the elongated holes (210, 212) extending in each web outer surface, and in that the oblong holes associated with the respective section of the rail (22, 24) are displaced by a wedge element (214, 216) for relative displacement between the flaps and The rail sections can be enforced in such a way that the rail sections are clamped to each other on impact.
Hilfsgleis nach Anspruch 1 oder 2,
dadurch gekennzeichnet, dass jedes Keilelement (214, 216) über vorzugsweise eine außenseitig an einer Lasche (198) sich abstützende Sicherung wie Federstecker sicherbar ist.
Auxiliary track according to claim 1 or 2,
characterized in that each wedge element (214, 216) can be secured via a preferably on the outside of a tab (198) supporting backup as spring pin.
Hilfsgleis nach zumindest Anspruch 1,
dadurch gekennzeichnet, dass jede Schiene (22, 24) zumindest abschnittsweise ortsfest in einer im Schnitt U-oder L-förmigen Halterung (112, 113) mit jeweils gegenüberliegender Schiene zugewandtem Schenkel (142, 144) befestigt ist, dass in quer zur Längsrichtung der Schienen verlaufenden Ebenen Spurhalteeinrichtungen (126, 128, 130) lösbar mit den Halterungen verbunden sind, dass jede Spurhalteeinrichtung ein Abstandselement (132) umfasst, das jeweils mit einem Endabschnitt außenseitig an einem der Schenkel der Halterungen anliegt, und dass jeder Endabschnitt mit einer das Abstandselement auf Stoß auf den jeweiligen Schenkel ziehenden Spanneinrichtung (164, 166, 184, 186) verbunden ist, die lösbar sowohl mit der Halterung als auch mit dem Abstandselement verbunden ist.
Auxiliary track according to at least claim 1,
characterized in that each rail (22, 24) at least partially fixed in a in the U-shaped or L-shaped bracket (112, 113) each with opposing rail facing leg (142, 144) is fixed, that in transverse to the longitudinal direction of Track extending levels track devices (126, 128, 130) are detachably connected to the brackets, that each tracking device comprises a spacer element (132), each with an end portion on the outside of one of the legs of the brackets, and that each end portion with a the spacer element is connected in shock on the respective leg pulling tension device (164, 166, 184, 186) which is releasably connected to both the holder and with the spacer element.
Hilfsgleis nach Anspruch 4,
dadurch gekennzeichnet, dass die Spanneinrichtung ein U- oder klauenförmiges den Schenkel (142, 144) der Halterung (122, 113) umfassendes Element (164, 166) umfasst, das über ein Keilelement (184, 186) mit dem Abstandselement (132) verbunden ist, wobei bei außenseitig an dem Schenkel der Halterung anstoßendem Abstandselement das U- oder klauenförmige Element innenseitig an dem Schenkel anliegt und außenseitig zu diesem beabstandet ist.
Auxiliary track according to claim 4,
characterized in that the tensioning means comprises a U-shaped or claw-shaped member (164, 166) comprising the legs (142, 144) of the support (122, 113) connected to the spacer element (132) via a wedge element (184, 186) is, wherein abuts on the outside of the leg of the holder abutting spacer element, the U-shaped or claw-shaped element on the inside of the leg and is spaced on the outside thereof.
Hilfsgleis nach einem der vorhergehenden Ansprüche,
dadurch gekennzeichnet, dass das U- oder klauenförmige Element (164, 166) einen unterhalb vom Schienenruß (181) anordbaren Vorsprung wie Nase (176, 178) aufweist.
Auxiliary track according to one of the preceding claims,
characterized in that the U-shaped or claw-shaped element (164, 166) has a below the rail soot (181) can be arranged projection such as nose (176, 178).
Hilfsgleis nach einem der vorhergehenden Ansprüche,
dadurch gekennzeichnet, dass das Abstandselement (132) endseitig jeweils eine gabelförmige, zwei parallel zueinander verlaufende Gabelschenkel (156, 158, 160, 162) umfassende Geometrie aufweist, zwischen denen ein Abschnitt des U- bzw. klauenförmigen Elementes (164, 166) verläuft, und dass im Überlappungsbereich von den Gabelschenkeln und dem U- oder klauenförmigen Element sich überlappende Längsschlitze (180, 182) verlaufen, die von dem Keilelement (184, 186) zur Relativverschiebung zwischen den Gabelschenkeln zu dem klauenförmigen Element durchsetzbar sind.
Auxiliary track according to one of the preceding claims,
characterized in that the spacer element (132) each end has a fork-shaped, two mutually parallel fork legs (156, 158, 160, 162) comprehensive geometry, between which a portion of the U- or claw-shaped element (164, 166), and that in the overlapping region of the fork legs and the U-shaped or claw-shaped element overlapping longitudinal slots (180, 182) extend, which are enforceable by the wedge element (184, 186) for relative displacement between the fork legs to the claw-shaped element.
Hilfsgleis nach einem der vorhergehenden Ansprüche,
dadurch gekennzeichnet, dass das Keilelement (184, 186) mittels einer Sicherung wie Federstecker (186) sicherbar ist.
Auxiliary track according to one of the preceding claims,
characterized in that the wedge element (184, 186) by means of a fuse such as spring pin (186) is securable.
Hilfsgleis nach einem der vorhergehenden Ansprüche,
dadurch gekennzeichnet, dass jeder Gabelschenkel einen entlang oberen Längsrandes Schenkels (142, 144) verlaufenden Abschnitt (148, 150) aufweist, der oberhalb des Schienenfußes (181) zur Sicherung der Spurhalteeinrichtung verläuft.
Auxiliary track according to one of the preceding claims,
characterized in that each fork leg has a portion (148, 150) extending along the upper longitudinal edge of the leg (142, 144), which extends above the rail foot (181) to secure the tracking device.
EP03009998A 1997-08-13 1998-08-03 Auxilliary track Expired - Lifetime EP1338700B1 (en)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
DE1997135200 DE19735200A1 (en) 1997-08-13 1997-08-13 Rail track handling system
DE19735200 1997-08-13
DE19800218 1998-01-06
DE1998100218 DE19800218A1 (en) 1998-01-06 1998-01-06 Equipment for transporting rail track section to laying location
EP98114517A EP0898016B1 (en) 1997-08-13 1998-08-03 Method and device for the transport of a section of track

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
EP98114517A Division EP0898016B1 (en) 1997-08-13 1998-08-03 Method and device for the transport of a section of track

Publications (2)

Publication Number Publication Date
EP1338700A1 true EP1338700A1 (en) 2003-08-27
EP1338700B1 EP1338700B1 (en) 2005-04-06

Family

ID=26039126

Family Applications (3)

Application Number Title Priority Date Filing Date
EP98114517A Expired - Lifetime EP0898016B1 (en) 1997-08-13 1998-08-03 Method and device for the transport of a section of track
EP03009998A Expired - Lifetime EP1338700B1 (en) 1997-08-13 1998-08-03 Auxilliary track
EP03009999A Expired - Lifetime EP1338701B1 (en) 1997-08-13 1998-08-03 Auxilliary track

Family Applications Before (1)

Application Number Title Priority Date Filing Date
EP98114517A Expired - Lifetime EP0898016B1 (en) 1997-08-13 1998-08-03 Method and device for the transport of a section of track

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP03009999A Expired - Lifetime EP1338701B1 (en) 1997-08-13 1998-08-03 Auxilliary track

Country Status (6)

Country Link
EP (3) EP0898016B1 (en)
AT (3) ATE278840T1 (en)
DE (3) DE59810440D1 (en)
DK (1) DK0898016T3 (en)
ES (1) ES2213243T3 (en)
PT (1) PT898016E (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106809618A (en) * 2017-03-17 2017-06-09 上海邮政科学研究院 A kind of mitered track for logistics sorting

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20312567U1 (en) * 2003-08-13 2003-11-06 Eichholz Gmbh & Co Kg Device for transporting pre-assembled turnouts intended for a solid carriageway
ES2363849B1 (en) * 2009-06-16 2012-06-19 Fcc Contrucción, S.A. INSTALLATION PROCEDURE FOR PLATE ROAD IN BITUBO TUNNELS.
CN103015276B (en) * 2013-01-06 2015-02-18 中铁上海工程局集团有限公司 Host machine of track-laying machine improved based on replacement structure, and assembly method thereof
CN104326395A (en) * 2014-10-14 2015-02-04 江苏扬子鑫福造船有限公司 Quick movement tooling for gantry crane
CN104499384A (en) * 2015-01-04 2015-04-08 中铁四局集团有限公司 Steel sleeper type temporary transition track structure for inner operating railway of subway tunnel
CN108726395A (en) * 2018-07-13 2018-11-02 中铁工程机械研究设计院有限公司 Rubber-tyred subway tracklaying crane and its construction method
CN114837024A (en) * 2022-05-23 2022-08-02 中国二十二冶集团有限公司 Track transfer auxiliary device and method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2049398A5 (en) * 1969-06-09 1971-03-26 Olivier Raymond
DE2308616A1 (en) * 1973-02-21 1974-09-05 Voggenreiter Franz SLEEPLESS CRANEWAY BODY
DE2928152A1 (en) * 1978-11-16 1980-05-22 Plasser Bahnbaumasch Franz MOBILE DEVICE FOR RECORDING AND OR LAYING TRACKS OR CROSSINGS
DE3340739A1 (en) * 1982-11-25 1984-05-30 SIG Schweizerische Industrie-Gesellschaft, 8212 Neuhausen am Rheinfall Track construction machine for exchanging a mounted track section or a mounted track connection
EP0146164A1 (en) * 1983-12-20 1985-06-26 Les Fils D'auguste Scheuchzer S.A. Method for the renewal of railroad switches, and railroad machine for carrying it out
FR2561275A1 (en) * 1984-03-14 1985-09-20 Bertrand Gilles Method for renewing the railway track gear and device for the implementation thereof.
AT387763B (en) * 1986-02-25 1989-03-10 Mayreder Kraus & Co Ing Crane track
US5127335A (en) * 1990-07-09 1992-07-07 Kershaw Manufacturing Company, Inc. Points and crossing changer

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2619504C3 (en) * 1976-05-03 1978-11-16 Georg Robel Gmbh & Co, 8000 Muenchen Laying system for sleepers, rails and track sections
DE3338687C2 (en) * 1983-10-25 1985-09-05 Deutsche Gesellschaft für Wiederaufarbeitung von Kernbrennstoffen mbH, 3000 Hannover Remotely controllable remote handling device for large cells
DE59500694D1 (en) * 1994-02-14 1997-10-30 Weiss Gmbh & Co Leonhard Loading procedures for rail transport and facilities for carrying out this procedure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2049398A5 (en) * 1969-06-09 1971-03-26 Olivier Raymond
DE2308616A1 (en) * 1973-02-21 1974-09-05 Voggenreiter Franz SLEEPLESS CRANEWAY BODY
DE2928152A1 (en) * 1978-11-16 1980-05-22 Plasser Bahnbaumasch Franz MOBILE DEVICE FOR RECORDING AND OR LAYING TRACKS OR CROSSINGS
DE3340739A1 (en) * 1982-11-25 1984-05-30 SIG Schweizerische Industrie-Gesellschaft, 8212 Neuhausen am Rheinfall Track construction machine for exchanging a mounted track section or a mounted track connection
EP0146164A1 (en) * 1983-12-20 1985-06-26 Les Fils D'auguste Scheuchzer S.A. Method for the renewal of railroad switches, and railroad machine for carrying it out
FR2561275A1 (en) * 1984-03-14 1985-09-20 Bertrand Gilles Method for renewing the railway track gear and device for the implementation thereof.
AT387763B (en) * 1986-02-25 1989-03-10 Mayreder Kraus & Co Ing Crane track
US5127335A (en) * 1990-07-09 1992-07-07 Kershaw Manufacturing Company, Inc. Points and crossing changer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106809618A (en) * 2017-03-17 2017-06-09 上海邮政科学研究院 A kind of mitered track for logistics sorting

Also Published As

Publication number Publication date
DE59812726D1 (en) 2005-05-12
ATE256788T1 (en) 2004-01-15
EP0898016A2 (en) 1999-02-24
EP1338700B1 (en) 2005-04-06
ATE278840T1 (en) 2004-10-15
DK0898016T3 (en) 2004-04-19
EP1338701A1 (en) 2003-08-27
EP1338701B1 (en) 2004-10-06
DE59812099D1 (en) 2004-11-11
EP0898016B1 (en) 2003-12-17
PT898016E (en) 2004-04-30
ES2213243T3 (en) 2004-08-16
EP0898016A3 (en) 2000-05-31
DE59810440D1 (en) 2004-01-29
ATE292711T1 (en) 2005-04-15

Similar Documents

Publication Publication Date Title
EP1738028B1 (en) Machine for transporting points
EP1759063B1 (en) Transport vehicle for transporting and unloading long rails
DE10000227A1 (en) Permanent way production method comprises producing running section consisting of rails and sleepers, inserting rods into concrete bearing layer, adjusting running section, fixing it to rods, pouring upper bearing layer and adding revetment
DD256890A5 (en) APPENDIX FOR RECORDING OR LOCATING, AND TRANSPORTING GLEISJOCHEN
EP1338700B1 (en) Auxilliary track
DE4009354C2 (en) Detachable track carrier bridge with a stem carrier arranged between the track carriers
DE3825508C1 (en) Method for adjusting and fastening functional surfaces of a guideway of an electromagnetic high-speed train and device for carrying out the method
EP0486456B1 (en) Railway switch transport wagon
AT17062U1 (en) Mobile working scaffold
DE102009014858A1 (en) Formwork device for placing concrete in cantilevered parapet at bridge, has intermediate piece hinged above pivot point at end region of arm and detachably fixed at rod of support frame by cantilever arm at pivot point
DE19800218A1 (en) Equipment for transporting rail track section to laying location
AT500982B1 (en) METHOD FOR LAYING A TRACK OF A FIXED RAILWAY
AT390288B (en) DEVICE AND METHOD FOR CORRECTING THE POSITION OF A TRACK STRUCTURE POSSIBLE ON A LENGTH CONCRETE TAPE
EP1740771B1 (en) Device for adjusting a track structure and switches
EP0563872B1 (en) Portable bridge and vehicle for placing the bridge
DE10135748C1 (en) Reinforced concrete tunnel lining formation device has positioning carriage between concrete reinforcement carriage and shuttering carriage
DE2928355A1 (en) RAIL VEHICLE WITH RELEASE DEVICE
DE4333250A1 (en) Apparatus and method for mounting and dismounting bridges, in particular temporary bridges, in existing railway tracks
DE3122892C2 (en)
DE19620511A1 (en) Method and apparatus for laying bridge
DE102007048214A1 (en) Prefabricated supporting concrete slab aligning method for rail track for rail-mounted vehicle, involves adjusting concrete slabs and two beam elements in desired height, side and inclination positions by using lifting leveling elements
EP2278071B1 (en) Modular platform edge with deconstructable platform edge board
DE102022110726A1 (en) Crane jacking system
DD269639A5 (en) METHOD AND APPARATUS FOR EIN- BZW. EXPANSION OF GLEISJOCHEN
DE1759284C (en) Movable device for producing the superstructure of multi-span bridges or similar structures in sections

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AC Divisional application: reference to earlier application

Ref document number: 0898016

Country of ref document: EP

Kind code of ref document: P

AK Designated contracting states

Designated state(s): AT BE CH DE DK ES FI FR GB GR IE IT LI LU NL PT SE

17P Request for examination filed

Effective date: 20030925

RIN1 Information on inventor provided before grant (corrected)

Inventor name: GEBHARD, HORST

Inventor name: SCHMEDDERS, STEFAN

17Q First examination report despatched

Effective date: 20040312

AKX Designation fees paid

Designated state(s): AT BE CH DE DK ES FI FR GB GR IE IT LI LU NL PT SE

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AC Divisional application: reference to earlier application

Ref document number: 0898016

Country of ref document: EP

Kind code of ref document: P

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK ES FI FR GB GR IE IT LI LU NL PT SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20050406

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050406

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050406

Ref country code: GB

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050406

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REF Corresponds to:

Ref document number: 59812726

Country of ref document: DE

Date of ref document: 20050512

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050706

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050706

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050706

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050717

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050803

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050803

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20050812

Year of fee payment: 8

Ref country code: NL

Payment date: 20050812

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050831

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050831

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050908

GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]

Effective date: 20050406

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20060110

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

EN Fr: translation not filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070301

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070301

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20070301

BERE Be: lapsed

Owner name: BWG G.M.B.H. & CO. KG

Effective date: 20050831

Owner name: VAE GMBH

Effective date: 20050831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050406