EP1293735A2 - Refrigerant circuit - Google Patents

Refrigerant circuit Download PDF

Info

Publication number
EP1293735A2
EP1293735A2 EP02020405A EP02020405A EP1293735A2 EP 1293735 A2 EP1293735 A2 EP 1293735A2 EP 02020405 A EP02020405 A EP 02020405A EP 02020405 A EP02020405 A EP 02020405A EP 1293735 A2 EP1293735 A2 EP 1293735A2
Authority
EP
European Patent Office
Prior art keywords
refrigerant
bypass pipe
amount control
control tank
heat exchanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP02020405A
Other languages
German (de)
French (fr)
Other versions
EP1293735A3 (en
EP1293735B1 (en
Inventor
Kunio Sugiyama
Yoichi Yamada
Shigeo Zuiki
Yoshiki Nagasaki
Yoshihiro Sumida
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of EP1293735A2 publication Critical patent/EP1293735A2/en
Publication of EP1293735A3 publication Critical patent/EP1293735A3/en
Application granted granted Critical
Publication of EP1293735B1 publication Critical patent/EP1293735B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B9/00Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point
    • F25B9/002Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point characterised by the refrigerant
    • F25B9/006Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point characterised by the refrigerant the refrigerant containing more than one component
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/04Refrigeration circuit bypassing means
    • F25B2400/0415Refrigeration circuit bypassing means for the receiver
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/16Receivers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B45/00Arrangements for charging or discharging refrigerant

Definitions

  • the invention relates to control of the amount of refrigerant flowing in a refrigeration cycle using a mixed refrigerant.
  • Fig. 2 shows a refrigeration cycle as described in Japanese Patent Application Laid-Open No. 120119/1995, which is a conventional refrigeration cycle utilized for a heat pump and consists of a compressor, a four-way valve, a heat exchanger, an expansion valve, and an accumulator.
  • reference numeral 101 designates a compressor
  • 102 designates a four-way valve for changing the flow of a refrigerant between a cooling operation and a heating operation
  • 103 designates an indoor heat exchanger
  • 104 through 107 designate check valves
  • 108 designates a receiver
  • 109 designates an expansion valve
  • 110 designates an outdoor heat exchanger
  • 111 designates an indoor blast fan
  • 112 designates an outdoor blast fan.
  • the refrigerant compressed by the compressor 101 flows into the outdoor heat exchanger 110 by way of the four-way valve 102, sequentially flows through the check valve 104, the receiver 108, the expansion valve 109, the check valve 107, and the indoor heat exchanger 103, and returns to the compressor 101 by way of the four-way valve 102.
  • the compressed refrigerant flows into the indoor heat exchanger 103 from the compressor 101 by way of the four-way valve 102, sequentially flows through the check valve 105, the receiver 108, the expansion valve 109, the check valve 106, and the outdoor heat exchanger 110, and returns to the compressor 101 by way of the four-way valve 102.
  • the amount of refrigerant required by the refrigerant circuit during the cooling operation is compared with that required by the same during the heating operation.
  • the indoor heat exchanger 103 is generally superior to the outdoor heat exchanger 110 in terms of an efficiency for condensing a refrigerant.
  • the content volume of a portion of the heat exchanger through which the refrigerant flows can be reduced.
  • a heating operation requires a smaller amount of refrigerant than does a cooling operation.
  • the receiver 108 provided upstream of the expansion valve 109 in a direction in which the refrigerant flows is for storing a refrigerant liquid, thereby adjusting a difference in the amount of refrigerant required for cooling operation and that required for heating operation.
  • Fig. 3 shows the refrigeration cycle of the refrigerant circuit shown in Fig. 2 in the form of a p-h diagram.
  • an interval between "a" and "b” corresponds to a compression stroke of the compressor 101
  • an interval between "b” and “c” corresponds to a condensation stroke of the heat exchanger 103 or 110
  • an interval between "c” and “d” corresponds to an expansion stroke of the expansion valve 109
  • an interval between "d” and "a” corresponds an evaporation stroke of the heat exchanger 110 or 103.
  • the refrigerant liquid and refrigerant gas are mixedly present in the receiver 108 of the refrigerant circuit.
  • the refrigerant provided in the receiver has become saturated.
  • the saturated liquid refrigerant flows into the evaporator by way of a liquid pipe, a strainer, a liquid line electromagnetic valve, these being not shown, and the expansion valve 109. Since the liquid refrigerant is not excessively cooled, the refrigerant is likely to enter a flash gas state in which a refrigerant liquid and the refrigerant gas are mixedly present if the liquid pipe or the like has resistance.
  • the amount of refrigerant flowing through the expansion valve 109 drops considerably, as a result of which predetermined refrigerating power is not achieved.
  • Fig. 4 shows an example of a basic refrigerant circuit disposed in another conventional air-cooling heat pump chiller.
  • the refrigerant compressed by the compressor 201 flows through the four-way valve 202, the air-side heat exchanger 203, the expansion valve 204, and the water-side heat exchanger 205, and then returns to the compressor 201 while passing through the four-way valve 202 and the accumulator 206.
  • the compressed refrigerant flows through the four-way valve 202, and sequentially flows through the water-side heat exchanger 205, the expansion valve 204, the air-side heat exchanger 203 and returns to the compressor 201 byway of the four-way valve 202 and the accumulator 206.
  • the amount of refrigerant required by the refrigerant circuit during the cooling operation is compared with that required by the same during the heating operation.
  • the water-side heat exchanger 205 is generally superior to the air-side heat exchanger 203 in terms of an efficiency for condensing a refrigerant. Hence, the inner volume of the heat exchanger in the refrigerant side can be reduced.
  • a heating operation requires a smaller amount of refrigerant than does a cooling operation.
  • the excessive refrigerant flows into and is stored in the refrigerant amount control tank 208 by way of the bypass pipe 207. At this time, the refrigerant amount control tank 208 is filled with a refrigerant liquid.
  • the amount of refrigerant required by the refrigerant circuit becomes deficient.
  • the refrigerant stored in the refrigerant amount control tank 208 flows into a refrigerant circuit, thereby compensating for the deficiency.
  • the refrigerant amount control tank 208 is filled with only a refrigerant gas.
  • the amount of refrigerant required during a heating operation becomes smaller than that required during a cooling operation in the coolant circuit. Hence, excessive refrigerant flows into the refrigerant amount control tank 208. Conversely, the amount of refrigerant becomes deficient during the cooling operation, and the refrigerant flowing from the refrigerant amount control tank 208 compensates for the deficiency.
  • the volume of the refrigerant amount control tank 208 is determined by the amount of excessive refrigerant arising during a heating operation.
  • the refrigerant liquid accumulating in the accumulator 206 assumes a composition largely consisting of HFC 134a, which among the components is the most susceptible to condensation.
  • the refrigerant existing in the refrigerant circuit exclusive of the accumulator 206 is largely consisting of HFC 32 and HFC 125, which are remaining components.
  • the excessive refrigerant liquid which flows into the refrigerant amount control tank 208, also assumes a composition largely consisting of HFC 32 and HFC 125.
  • the refrigerant existing in the refrigerant circuit assumes a standard composition.
  • HFC 134a which is susceptible to condensation, becomes liquefied in the water-side heat exchanger 205 prior to the remaining components; that is, HFC 32 and HFC 125, in a transient state arising during startup.
  • the excessive refrigerant liquid flowing into the refrigerant amount control tank 208 tends to contain a large amount of HFC 134a.
  • the refrigerant existing in the refrigerant circuit exclusive of the refrigerant amount control tank 208 assumes a composition largely consisting of the remaining components; that is, HFC 32 and HFC 125. In accordance with characteristics of the refrigerant, the refrigerating power tends to increase.
  • an unillustrated high-pressure switch which is a protective device to be attached to a refrigerant pipe interposed between an outlet port of the compressor 201 and the four-way valve 202 for avoiding occurrence of an increase in high pressure, becomes apt to issue a warning or to halt operation.
  • the refrigerant gas and the refrigerant liquid are simultaneously stored in the refrigerant amount control tank 208.
  • the refrigerant gas stored in the refrigerant amount control tank 208 contains HFC 32 and HFC 125, which are susceptible to evaporation, in larger quantity than does a standard composition.
  • HFC 32 and HFC 125 which are susceptible to evaporation, in larger quantity than does a standard composition.
  • the composition of the refrigerant situated in the refrigerant circuit exclusive of the refrigerant amount control tank 208 changes in accordance with the quantity of refrigerant gas stored in the refrigerant amount control tank 208. In association with a decrease in the quantity of refrigerant gas, the refrigerating power changes.
  • the invention has been conceived to solve the foregoing problem and aims at maintaining the composition of a mixed refrigerant flowing through a refrigerant circuit at a standard composition.
  • the invention provides an improved refrigerant circuit, in which connection is made, by way of a refrigerant pipe, between a compressor, a four-way valve, a first heat exchanger serving as a condenser or an evaporator, an expansion valve, a second heat exchanger serving as an evaporator or a condenser, and an accumulator.
  • the refrigerant circuit comprises a first bypass pipe connected to a refrigerant pipe provided between the expansion valve and the second heat exchanger.
  • a refrigerant amount control tank is connected to the first bypass pipe.
  • a second bypass pipe which is connected to the refrigerant amount control tank at one end, is connected, at another end, to a position on a refrigerant pipe interposed between the expansionvalve and the second heat exchanger, and the position is closer to the expansion valve than to a position where the first bypass pipe is attached.
  • a check valve is interposed into the second bypass pipe.
  • Fig. 1 shows an example of a basic refrigerant circuit employed in an air-cooling heat pump chiller, showing a preferred embodiment of the present invention.
  • reference numeral 1 designates a compressor
  • 2 designates a four-way valve for switching the flow of a refrigerant between a cooling operation and a heating operation
  • 3 designates an air-side heat exchanger
  • 4 designates an expansion valve
  • 5 designates a water-side heat exchanger
  • 6 designates an accumulator
  • 8 designates a refrigerant amount control tank disposed by way of a bypass pipe 7
  • 9 designates a bypass pipe, which has a check valve 10, and which returns the refrigerant accumulating in the refrigerant amount control tank 8 to a refrigerant circuit.
  • a pipe smaller in diameter than the bypass pipe 7 is used for the bypass pipe 9.
  • a pipe having an outside diameter of 9.52 mm is used for the bypass pipe 7
  • a pipe having an outside diameter of 6.4 mm is used for the bypass pipe 9.
  • Non-azeotropic mixed refrigerant HFC 407C is used as refrigerant for the refrigerant circuit.
  • a difference between them lies in that a portion of the refrigerant accumulating in the refrigerant amount control tank 8 is returned to the refrigerant circuit at all times by way of the bypass pipe 9, which is disposed at an upper portion of the refrigerant amount control tank 8 and which has the check valve 10, by virtue of the pressure developing in a position on a main pipe of the refrigerant circuit to which the bypass pipe 9 is attached being lower than the pressure developing in a position on the main pipe to which the bypass pipe 7 is attached.
  • the refrigerant circuit is assumed to operate while a liquid refrigerant accumulates in the accumulator 6.
  • the liquid refrigerant accumulating in the accumulator 6 assumes a composition largely consisting of HFC 134a, which among the components is the most susceptible to condensation.
  • the refrigerant existing in the refrigerant circuit exclusive of the accumulator 6 largely consists of HFC 32 and HFC 125, which are remaining components.
  • the excessive refrigerant liquid which flows into the refrigerant amount control tank 8, also assumes a composition largely consisting of HFC 32 and HFC 125.
  • the liquid refrigerant which largely consists of HFC 134a and is accumulated in the accumulator 206, flows through the refrigerant circuit while being evaporated.
  • the refrigerant existing in the refrigerant circuit exclusive of the refrigerant amount control tank 8 assumes a composition largely consisting of HFC 134a.
  • a portion of the refrigerant which accumulates in the refrigerant amount control tank 8 and assumes a composition largely consisting of HFC 32 and HFC 125, is returned to the refrigerant circuit by way of the bypass pipe 9, which is disposed at an upper portion of the refrigerant amount control tank 8 and which has the check valve 10, by virtue of a difference between the pressure developing in a position on a main pipe of the refrigerant circuit to which the bypass pipe 7 is attached and the pressure developing in a position on the main pipe of the refrigerant circuit to which the bypass pipe 9 is attached.
  • the portion of the refrigerant is mixed with a refrigerant largely consisting of HFC 134a.
  • the refrigerant flowing through the refrigerant circuit returns to a standard composition.
  • the quantity of refrigerant returning to the refrigerant circuit by way of the bypass pipe 9 is regulated by means of rendering the diameter of the bypass pipe 9 smaller than that of the bypass pipe 7, thus effecting a setting such that a constant quantity of excessive refrigerant can be ensured in the refrigerant amount control tank 8 during a stable heating operation.
  • the refrigerant circuit is assumed to halt operations while no liquid refrigerant has accumulated in the accumulator 6. At this time, the refrigerant flowing through the refrigerant circuit assumes a standard composition.
  • HFC 134a which is susceptible to condensation, becomes liquefied in the water-side heat exchanger 5 prior to the remaining components; that is, HFC 32 and HFC 125.
  • the excessive refrigerant liquid flowing into the refrigerant amount control tank 8 tends to contain a large amount of HFC 134a.
  • a portion of the refrigerant, which accumulates in the refrigerant amount control tank 8, is returned to the refrigerant circuit immediately before the expansion valve 4 by way of the bypass pipe 9, which is disposed at an upper portion of the refrigerant amount control tank 8 and which has the check valve 10, by virtue of a difference between the pressure developing in a position on a main pipe of the refrigerant circuit to which the bypass pipe 7 is attached and the pressure developing in a position on the main pipe of the refrigerant circuit to which the bypass pipe 9 is attached.
  • a portion of the refrigerant assuming a composition largely consisting of HFC 134a returns to the refrigerant circuit and is mixed with the refrigerant assuming a composition largely consisting of HFC 32 and HFC 125.
  • the refrigerant flowing through the refrigerant circuit is returned to a standard composition.
  • the bypass pipe 9 plays the role of draining gas from the refrigerant amount control tank 8.
  • the refrigerant can flow smoothly into the tank 8 by way of the bypass pipe 7. This effect is not limited to non-azeotropic mixed refrigerant HFC and is yielded by a single refrigerant or non-azeotropic refrigerant.
  • the embodiment has described a heat pump chiller involving a noticeable difference in the quantity of refrigerant required for heating operation and that required for cooling operation.
  • the invention can also be applied to another air conditioner capable of changing flow of a refrigerant by means of a four-way valve.
  • the invention provides an improved refrigerant circuit, in which connection is made, by way of a refrigerant pipe, between a compressor 1, a four-way valve 2, a first heat exchanger 3 serving as a condenser or an evaporator, an expansion valve 4, a second heat exchanger 5 serving as an evaporator or a condenser, and an accumulator 6.
  • the refrigerant circuit comprises a first bypass pipe 7 connected to a refrigerant pipe provided between the expansion valve 4 and the second heat exchanger 5.
  • a refrigerant amount control tank 8 is connected to the first bypass pipe 7.
  • a check valve 10 is interposed into the second bypass pipe 9.
  • the second bypass pipe 9 plays the role of draining gas from the refrigerant amount control tank 8 and enables smooth flow of refrigerant when excessive refrigerant is stored in the refrigerant amount control tank 8 during a heating operation.
  • the second bypass pipe is smaller in diameter than the first bypass pie.
  • the quantity of refrigerant accumulated in the refrigerant amount control tank is returned to the refrigerant circuit from the refrigerant amount control tank by way of the second bypass pipe.
  • the quantity of refrigerant accumulating in the refrigerant amount control tank can be maintained constant.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Compression-Type Refrigeration Machines With Reversible Cycles (AREA)
  • Transition And Organic Metals Composition Catalysts For Addition Polymerization (AREA)
  • Details Of Measuring And Other Instruments (AREA)

Abstract

In a refrigerant circuit, an expansion valve 4 is connected to a heat exchanger 5 by a refrigerant pipe, and a bypass pipe 7/9 is provided. By way of a bypass pipe 9 having a check valve 10, a refrigerant is returned to a refrigerant circuit from a refrigerant amount control tank 8 that is installed in the bypass pipe 7/9.

Description

    Background of the Invention Field of the Invention
  • The invention relates to control of the amount of refrigerant flowing in a refrigeration cycle using a mixed refrigerant.
  • Background Art
  • Fig. 2 shows a refrigeration cycle as described in Japanese Patent Application Laid-Open No. 120119/1995, which is a conventional refrigeration cycle utilized for a heat pump and consists of a compressor, a four-way valve, a heat exchanger, an expansion valve, and an accumulator. In Fig. 2, reference numeral 101 designates a compressor; 102 designates a four-way valve for changing the flow of a refrigerant between a cooling operation and a heating operation; 103 designates an indoor heat exchanger; 104 through 107 designate check valves; 108 designates a receiver; 109 designates an expansion valve; 110 designates an outdoor heat exchanger; 111 designates an indoor blast fan; and 112 designates an outdoor blast fan.
  • Next, operation of the refrigeration cycle will be described.
  • During a cooling operation, the refrigerant compressed by the compressor 101 flows into the outdoor heat exchanger 110 by way of the four-way valve 102, sequentially flows through the check valve 104, the receiver 108, the expansion valve 109, the check valve 107, and the indoor heat exchanger 103, and returns to the compressor 101 by way of the four-way valve 102.
  • During a heating operation, the compressed refrigerant flows into the indoor heat exchanger 103 from the compressor 101 by way of the four-way valve 102, sequentially flows through the check valve 105, the receiver 108, the expansion valve 109, the check valve 106, and the outdoor heat exchanger 110, and returns to the compressor 101 by way of the four-way valve 102.
  • Here, the amount of refrigerant required by the refrigerant circuit during the cooling operation is compared with that required by the same during the heating operation. The indoor heat exchanger 103 is generally superior to the outdoor heat exchanger 110 in terms of an efficiency for condensing a refrigerant. Hence, the content volume of a portion of the heat exchanger through which the refrigerant flows can be reduced. A heating operation requires a smaller amount of refrigerant than does a cooling operation.
  • The receiver 108 provided upstream of the expansion valve 109 in a direction in which the refrigerant flows is for storing a refrigerant liquid, thereby adjusting a difference in the amount of refrigerant required for cooling operation and that required for heating operation.
  • Fig. 3 shows the refrigeration cycle of the refrigerant circuit shown in Fig. 2 in the form of a p-h diagram. In the diagram, an interval between "a" and "b" corresponds to a compression stroke of the compressor 101; an interval between "b" and "c" corresponds to a condensation stroke of the heat exchanger 103 or 110; an interval between "c" and "d" corresponds to an expansion stroke of the expansion valve 109; and an interval between "d" and "a" corresponds an evaporation stroke of the heat exchanger 110 or 103.
  • At this time, the refrigerant liquid and refrigerant gas are mixedly present in the receiver 108 of the refrigerant circuit. Hence, as indicated by the point "c" shown in Fig. 3, the refrigerant provided in the receiver has become saturated. After having left the receiver 108, the saturated liquid refrigerant flows into the evaporator by way of a liquid pipe, a strainer, a liquid line electromagnetic valve, these being not shown, and the expansion valve 109. Since the liquid refrigerant is not excessively cooled, the refrigerant is likely to enter a flash gas state in which a refrigerant liquid and the refrigerant gas are mixedly present if the liquid pipe or the like has resistance. When the refrigerant has entered a flash gas state, the amount of refrigerant flowing through the expansion valve 109 drops considerably, as a result of which predetermined refrigerating power is not achieved.
  • As a solution, there is a method of providing a refrigerant pipe connected to a liquid outlet port of the heat exchanger with a refrigerant amount control tank by way of a bypass pipe, to thereby temporarily store excessive refrigerant.
  • Fig. 4 shows an example of a basic refrigerant circuit disposed in another conventional air-cooling heat pump chiller.
  • In the drawing, reference numeral 201 designates a compressor; 202 designates a four-way valve for switching the flow of a refrigerant between a cooling operation and a heating operation; 203 designates an air-side heat exchanger; 204 designates an expansion valve; 205 designates a water-side heat exchanger; 206 designates an accumulator; and 208 designates a refrigerant amount control tank disposed at a liquid outlet side of the refrigerant pipe by way of a bypass pipe 207.
  • The operation of the refrigerant circuit will now be described.
  • During a cooling operation, the refrigerant compressed by the compressor 201 flows through the four-way valve 202, the air-side heat exchanger 203, the expansion valve 204, and the water-side heat exchanger 205, and then returns to the compressor 201 while passing through the four-way valve 202 and the accumulator 206.
  • During a heating operation, the compressed refrigerant flows through the four-way valve 202, and sequentially flows through the water-side heat exchanger 205, the expansion valve 204, the air-side heat exchanger 203 and returns to the compressor 201 byway of the four-way valve 202 and the accumulator 206.
  • Here, the amount of refrigerant required by the refrigerant circuit during the cooling operation is compared with that required by the same during the heating operation. The water-side heat exchanger 205 is generally superior to the air-side heat exchanger 203 in terms of an efficiency for condensing a refrigerant. Hence, the inner volume of the heat exchanger in the refrigerant side can be reduced. A heating operation requires a smaller amount of refrigerant than does a cooling operation. The excessive refrigerant flows into and is stored in the refrigerant amount control tank 208 by way of the bypass pipe 207. At this time, the refrigerant amount control tank 208 is filled with a refrigerant liquid.
  • If the operation is switched to a cooling operation after the heating operation, the amount of refrigerant required by the refrigerant circuit becomes deficient. Hence, the refrigerant stored in the refrigerant amount control tank 208 flows into a refrigerant circuit, thereby compensating for the deficiency. At this time, the refrigerant amount control tank 208 is filled with only a refrigerant gas.
  • Specifically, the amount of refrigerant required during a heating operation becomes smaller than that required during a cooling operation in the coolant circuit. Hence, excessive refrigerant flows into the refrigerant amount control tank 208. Conversely, the amount of refrigerant becomes deficient during the cooling operation, and the refrigerant flowing from the refrigerant amount control tank 208 compensates for the deficiency.
  • The volume of the refrigerant amount control tank 208 is determined by the amount of excessive refrigerant arising during a heating operation.
  • Under the foregoing method, when a mixed refrigerant HFC 407C, in which HFC 134a, HFC 32, and HFC 125 are mixed at predetermined proportions, is used as a refrigerant, the following problems will arise.
  • First, there will be described a case where a heating operation is started while a refrigerant remains accumulated in the accumulator 206.
  • During halts, the refrigerant liquid accumulating in the accumulator 206 assumes a composition largely consisting of HFC 134a, which among the components is the most susceptible to condensation. The refrigerant existing in the refrigerant circuit exclusive of the accumulator 206 is largely consisting of HFC 32 and HFC 125, which are remaining components. When a heating operation is started, the excessive refrigerant liquid, which flows into the refrigerant amount control tank 208, also assumes a composition largely consisting of HFC 32 and HFC 125.
  • Consequently, there is a decrease in the quantity of HFC 32 and HFC 125 contained in the refrigerant circuit exclusive of the refrigerant amount control tank 208. In contrast, the liquid refrigerant, which largely contains HFC 134a and is accumulated in the accumulator 206, flows through the refrigerant circuit while being evaporated. Hence, the refrigerant existing in the refrigerant circuit exclusive of the refrigerant amount control tank 208 assumes a composition largely consisting of HFC 134a. In light of characteristics of the refrigerant, the refrigerating power tends to decrease.
  • Next will be described a case where a heating operation is started while no refrigerant is accumulated in the accumulator 206.
  • During halts, the refrigerant existing in the refrigerant circuit assumes a standard composition. However, when a heating operation is started, HFC 134a, which is susceptible to condensation, becomes liquefied in the water-side heat exchanger 205 prior to the remaining components; that is, HFC 32 and HFC 125, in a transient state arising during startup. The excessive refrigerant liquid flowing into the refrigerant amount control tank 208 tends to contain a large amount of HFC 134a.
  • Consequently, the refrigerant existing in the refrigerant circuit exclusive of the refrigerant amount control tank 208 assumes a composition largely consisting of the remaining components; that is, HFC 32 and HFC 125. In accordance with characteristics of the refrigerant, the refrigerating power tends to increase.
  • However, a high pressure also tends to increase, and hence an unillustrated high-pressure switch, which is a protective device to be attached to a refrigerant pipe interposed between an outlet port of the compressor 201 and the four-way valve 202 for avoiding occurrence of an increase in high pressure, becomes apt to issue a warning or to halt operation.
  • Depending on an operating condition, the refrigerant gas and the refrigerant liquid are simultaneously stored in the refrigerant amount control tank 208. At this time, the refrigerant gas stored in the refrigerant amount control tank 208 contains HFC 32 and HFC 125, which are susceptible to evaporation, in larger quantity than does a standard composition. Hence, there arises a decrease in the amount of HFC 32 and HFC 125 contained in the refrigerant situated in the refrigerant circuit exclusive of the refrigerant amount control tank 208. The composition of the refrigerant situated in the refrigerant circuit exclusive of the refrigerant amount control tank 208 changes in accordance with the quantity of refrigerant gas stored in the refrigerant amount control tank 208. In association with a decrease in the quantity of refrigerant gas, the refrigerating power changes.
  • The invention has been conceived to solve the foregoing problem and aims at maintaining the composition of a mixed refrigerant flowing through a refrigerant circuit at a standard composition.
  • Summary of the Invention
  • The invention provides an improved refrigerant circuit, in which connection is made, by way of a refrigerant pipe, between a compressor, a four-way valve, a first heat exchanger serving as a condenser or an evaporator, an expansion valve, a second heat exchanger serving as an evaporator or a condenser, and an accumulator. The refrigerant circuit comprises a first bypass pipe connected to a refrigerant pipe provided between the expansion valve and the second heat exchanger. A refrigerant amount control tank is connected to the first bypass pipe. A second bypass pipe, which is connected to the refrigerant amount control tank at one end, is connected, at another end, to a position on a refrigerant pipe interposed between the expansionvalve and the second heat exchanger, and the position is closer to the expansion valve than to a position where the first bypass pipe is attached. A check valve is interposed into the second bypass pipe. Thus, the second bypass pipe plays the role of draining gas from the refrigerant amount control tank and enables smooth flow of refrigerant when excessive refrigerant is stored in the refrigerant amount control tank during a heating operation.
  • Other and further objects, features and advantages of the invention will appear more fully from the following description.
  • Brief Description of the Drawings
  • Fig. 1 shows an example of a basic refrigerant circuit employed in an air-cooling heat pump chiller, showing a first embodiment of the present invention.
  • Fig. 2 shows an example of a conventional refrigeration cycle.
  • Fig. 3 shows a p-h diagram of the refrigeration cycle of the refrigerant circuit shown in Fig. 2.
  • Fig. 4 shows an example of a basic refrigerant circuit disposed in another conventional air-cooling heat pump chiller.
  • Detailed Description of the Preferred Embodiment
  • Fig. 1 shows an example of a basic refrigerant circuit employed in an air-cooling heat pump chiller, showing a preferred embodiment of the present invention.
  • In the drawing, reference numeral 1 designates a compressor; 2 designates a four-way valve for switching the flow of a refrigerant between a cooling operation and a heating operation; 3 designates an air-side heat exchanger; 4 designates an expansion valve; 5 designates a water-side heat exchanger; 6 designates an accumulator; 8 designates a refrigerant amount control tank disposed by way of a bypass pipe 7; and 9 designates a bypass pipe, which has a check valve 10, and which returns the refrigerant accumulating in the refrigerant amount control tank 8 to a refrigerant circuit. A pipe smaller in diameter than the bypass pipe 7 is used for the bypass pipe 9. For example, when a pipe having an outside diameter of 9.52 mm is used for the bypass pipe 7, a pipe having an outside diameter of 6.4 mm is used for the bypass pipe 9.
  • Non-azeotropic mixed refrigerant HFC 407C is used as refrigerant for the refrigerant circuit.
  • Operation of the refrigerant circuit will now be described.
  • In the refrigerant circuit shown in Fig. 1, during a heating operation excessive refrigerant flows into the refrigerant amount control tank 8 by way of the bypass pipe 7. During a cooling operation, the refrigerant flowing out of the refrigerant amount control tank 8 compensates for the deficiency. In these regards, the refrigerant circuit is identical with that shown in Fig. 4, which shows the related art technique.
  • A difference between them lies in that a portion of the refrigerant accumulating in the refrigerant amount control tank 8 is returned to the refrigerant circuit at all times by way of the bypass pipe 9, which is disposed at an upper portion of the refrigerant amount control tank 8 and which has the check valve 10, by virtue of the pressure developing in a position on a main pipe of the refrigerant circuit to which the bypass pipe 9 is attached being lower than the pressure developing in a position on the main pipe to which the bypass pipe 7 is attached.
  • Here, the refrigerant circuit is assumed to operate while a liquid refrigerant accumulates in the accumulator 6. At this time, the liquid refrigerant accumulating in the accumulator 6 assumes a composition largely consisting of HFC 134a, which among the components is the most susceptible to condensation. The refrigerant existing in the refrigerant circuit exclusive of the accumulator 6 largely consists of HFC 32 and HFC 125, which are remaining components.
  • When a heating operation is started, the excessive refrigerant liquid, which flows into the refrigerant amount control tank 8, also assumes a composition largely consisting of HFC 32 and HFC 125.
  • The liquid refrigerant, which largely consists of HFC 134a and is accumulated in the accumulator 206, flows through the refrigerant circuit while being evaporated. Hence, the refrigerant existing in the refrigerant circuit exclusive of the refrigerant amount control tank 8 assumes a composition largely consisting of HFC 134a.
  • Here, a portion of the refrigerant, which accumulates in the refrigerant amount control tank 8 and assumes a composition largely consisting of HFC 32 and HFC 125, is returned to the refrigerant circuit by way of the bypass pipe 9, which is disposed at an upper portion of the refrigerant amount control tank 8 and which has the check valve 10, by virtue of a difference between the pressure developing in a position on a main pipe of the refrigerant circuit to which the bypass pipe 7 is attached and the pressure developing in a position on the main pipe of the refrigerant circuit to which the bypass pipe 9 is attached. Hence, with lapse of time the portion of the refrigerant is mixed with a refrigerant largely consisting of HFC 134a. When the refrigerant circuit operates stably, the refrigerant flowing through the refrigerant circuit returns to a standard composition.
  • At this time, the quantity of refrigerant returning to the refrigerant circuit by way of the bypass pipe 9 is regulated by means of rendering the diameter of the bypass pipe 9 smaller than that of the bypass pipe 7, thus effecting a setting such that a constant quantity of excessive refrigerant can be ensured in the refrigerant amount control tank 8 during a stable heating operation.
  • Next, the refrigerant circuit is assumed to halt operations while no liquid refrigerant has accumulated in the accumulator 6. At this time, the refrigerant flowing through the refrigerant circuit assumes a standard composition.
  • When a heating operation is started in this state; i.e., when the refrigerant circuit is in a transient state arising during startup, HFC 134a, which is susceptible to condensation, becomes liquefied in the water-side heat exchanger 5 prior to the remaining components; that is, HFC 32 and HFC 125. The excessive refrigerant liquid flowing into the refrigerant amount control tank 8 tends to contain a large amount of HFC 134a.
  • Here, a portion of the refrigerant, which accumulates in the refrigerant amount control tank 8, is returned to the refrigerant circuit immediately before the expansion valve 4 by way of the bypass pipe 9, which is disposed at an upper portion of the refrigerant amount control tank 8 and which has the check valve 10, by virtue of a difference between the pressure developing in a position on a main pipe of the refrigerant circuit to which the bypass pipe 7 is attached and the pressure developing in a position on the main pipe of the refrigerant circuit to which the bypass pipe 9 is attached. Hence, a portion of the refrigerant assuming a composition largely consisting of HFC 134a returns to the refrigerant circuit and is mixed with the refrigerant assuming a composition largely consisting of HFC 32 and HFC 125. During stably-operating state, the refrigerant flowing through the refrigerant circuit is returned to a standard composition.
  • The bypass pipe 9 plays the role of draining gas from the refrigerant amount control tank 8. When excessive refrigerant liquid is accumulated in the refrigerant amount control tank 8 during a heating operation, the refrigerant can flow smoothly into the tank 8 by way of the bypass pipe 7. This effect is not limited to non-azeotropic mixed refrigerant HFC and is yielded by a single refrigerant or non-azeotropic refrigerant.
  • The embodiment has described a heat pump chiller involving a noticeable difference in the quantity of refrigerant required for heating operation and that required for cooling operation. Needless to say, the invention can also be applied to another air conditioner capable of changing flow of a refrigerant by means of a four-way valve.
  • The features and advantages of the present invention may be summarized as follows.
  • The invention provides an improved refrigerant circuit, in which connection is made, by way of a refrigerant pipe, between a compressor 1, a four-way valve 2, a first heat exchanger 3 serving as a condenser or an evaporator, an expansion valve 4, a second heat exchanger 5 serving as an evaporator or a condenser, and an accumulator 6. The refrigerant circuit comprises a first bypass pipe 7 connected to a refrigerant pipe provided between the expansion valve 4 and the second heat exchanger 5. A refrigerant amount control tank 8 is connected to the first bypass pipe 7. A second bypass pipe 9, which is connected to the refrigerant amount control tank 8 at one end, is connected, at another end, to a position on a refrigerant pipe interposed between the expansion valve 4 and the second heat exchanger 5, and the position is closer to the expansion valve 4 than to a position where the first bypass pipe 7 is attached. A check valve 10 is interposed into the second bypass pipe 9. Thus, the second bypass pipe 9 plays the role of draining gas from the refrigerant amount control tank 8 and enables smooth flow of refrigerant when excessive refrigerant is stored in the refrigerant amount control tank 8 during a heating operation.
  • When a mixed refrigerant is used, a portion of the liquid that has flowed into the refrigerant amount control tank by way of the second bypass pipe is circulated at all times, whereby a refrigerant whose composition differs from a standard composition in terms of component proportions is temporarily accumulated in the refrigerant amount control tank. Even when the composition of the refrigerant existing in the refrigerant circuit has changed, the refrigerant can be restored to a standard composition in during a normal operation.
  • In another aspect, the second bypass pipe is smaller in diameter than the first bypass pie. During a heating operation, the quantity of refrigerant accumulated in the refrigerant amount control tank is returned to the refrigerant circuit from the refrigerant amount control tank by way of the second bypass pipe. At the time of normal operation, the quantity of refrigerant accumulating in the refrigerant amount control tank can be maintained constant.
  • It is further understood that the foregoing description is a preferred embodiment of the disclosed device and that various changes and modifications may be made in the invention without departing from the spirit and scope thereof.

Claims (3)

  1. A refrigerant circuit, in which connection is made, by way of a refrigerant pipe, between a compressor (1), a four-way valve (2), a first heat exchanger (3) serving as a condenser or an evaporator, an expansion valve (4), a second heat exchanger (5) serving as an evaporator or a condenser, and an accumulator (6), the refrigerant circuit comprising:
    a first bypass pipe (7) connected to a refrigerant pipe provided between the expansion valve (4) and the second heat exchanger (5);
    a refrigerant amount control tank (8) connected to the first bypass pipe (7);
    a second bypass pipe (9) which is connected to the refrigerant amount control tank (8) at one end and which is connected, at another end, to a position on a refrigerant pipe interposed between the expansion valve (4) and the second heat exchanger (5), the position being closer to the expansion valve (4) than to a position where the first bypass pipe (7) is attached; and
    a check valve (10) which is interposed into the second bypass pipe (9), wherein
    the second bypass pipe (9) plays the role of draining gas from the refrigerant amount control tank (8) and enables smooth flow of refrigerant when excessive refrigerant is stored in the refrigerant amount control tank (8) during a heating operation.
  2. The refrigerant circuit according to claim 1, wherein a mixed refrigerant is used.
  3. The refrigerant circuit according to claim 1 or 2, wherein the second bypass pipe (9) is smaller in diameter than the first bypass pipe (7).
EP02020405A 2001-09-12 2002-09-10 Refrigerant circuit Expired - Lifetime EP1293735B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2001276040A JP4848608B2 (en) 2001-09-12 2001-09-12 Refrigerant circuit
JP2001276040 2001-09-12

Publications (3)

Publication Number Publication Date
EP1293735A2 true EP1293735A2 (en) 2003-03-19
EP1293735A3 EP1293735A3 (en) 2003-05-28
EP1293735B1 EP1293735B1 (en) 2007-03-14

Family

ID=19100808

Family Applications (1)

Application Number Title Priority Date Filing Date
EP02020405A Expired - Lifetime EP1293735B1 (en) 2001-09-12 2002-09-10 Refrigerant circuit

Country Status (7)

Country Link
EP (1) EP1293735B1 (en)
JP (1) JP4848608B2 (en)
CN (1) CN1173139C (en)
AT (1) ATE356962T1 (en)
DE (1) DE60218793T2 (en)
ES (1) ES2284756T3 (en)
PT (1) PT1293735E (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT513637A1 (en) * 2012-12-13 2014-06-15 Herz Energietechnik Gmbh Heat pump method and apparatus for optimizing subcooling during the condensation process in the cold vapor compression process
CN112714849A (en) * 2018-09-28 2021-04-27 三菱电机株式会社 Refrigeration cycle device

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5157580B2 (en) * 2008-03-28 2013-03-06 ダイキン工業株式会社 Refrigeration equipment
CN101949621A (en) * 2010-09-30 2011-01-19 广东志高空调有限公司 Energy-saving air conditioner with refrigerant adjusting function
JP2012077983A (en) * 2010-09-30 2012-04-19 Daikin Industries Ltd Refrigerating circuit
JP5765211B2 (en) * 2011-12-13 2015-08-19 ダイキン工業株式会社 Refrigeration equipment
GB2533230B (en) * 2013-08-09 2020-06-17 Trane Air Conditioning Systems China Co Ltd Transitional refrigerant migration control in refrigeration systems
KR101669971B1 (en) * 2014-11-17 2016-10-27 엘지전자 주식회사 Air conditioner
CN105674640B (en) * 2014-11-18 2018-04-17 上海海立电器有限公司 The flux matched regulating device of air-conditioning system refrigerant charging and method
EP3508802B1 (en) 2015-10-20 2020-04-22 Mitsubishi Electric Corporation Refrigeration cycle apparatus
US11105544B2 (en) * 2016-11-07 2021-08-31 Trane International Inc. Variable orifice for a chiller
CN106482303B (en) * 2016-11-25 2022-05-17 广州华凌制冷设备有限公司 Air conditioner and refrigeration control method thereof
CN109974169B (en) * 2019-02-28 2021-02-19 浙江高翔工贸有限公司 Double-working-medium air conditioner
DE102019002297A1 (en) * 2019-03-31 2020-10-01 Steffen Klein Expansion of the R718 area of application
JP7501257B2 (en) * 2020-09-09 2024-06-18 富士通株式会社 Cooling device, electronic device, and cooling method

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0627589B2 (en) * 1985-11-19 1994-04-13 三洋電機株式会社 Heat pump refrigeration system
KR930000852B1 (en) * 1987-07-31 1993-02-06 마쓰시다덴기산교 가부시기가이샤 Heat pump system
JPH01273959A (en) * 1988-04-25 1989-11-01 Nippon Denso Co Ltd Air conditioner for vehicle
JPH0745982B2 (en) * 1988-08-31 1995-05-17 松下電器産業株式会社 Heat pump device
JPH0414975A (en) * 1990-05-08 1992-01-20 Sharp Corp Picture reproducing device
US5186012A (en) * 1991-09-24 1993-02-16 Institute Of Gas Technology Refrigerant composition control system for use in heat pumps using non-azeotropic refrigerant mixtures
JPH06341741A (en) * 1993-06-01 1994-12-13 Daikin Ind Ltd Defrosting controller for refrigerating device
JPH0712411A (en) * 1993-06-24 1995-01-17 Hitachi Ltd Refrigerating cycle and control method of ratio of composition of refrigerant for same
JP3168496B2 (en) * 1993-10-28 2001-05-21 株式会社日立製作所 Air conditioner
JPH10119561A (en) * 1996-10-14 1998-05-12 Calsonic Corp Air conditioner for automobile
JP2000179957A (en) * 1998-12-17 2000-06-30 Hitachi Ltd Air conditioner

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT513637A1 (en) * 2012-12-13 2014-06-15 Herz Energietechnik Gmbh Heat pump method and apparatus for optimizing subcooling during the condensation process in the cold vapor compression process
AT513637B1 (en) * 2012-12-13 2016-05-15 Herz Energietechnik Gmbh Heat pump method and apparatus for optimizing subcooling during the condensation process in the cold vapor compression process
CN112714849A (en) * 2018-09-28 2021-04-27 三菱电机株式会社 Refrigeration cycle device
CN112714849B (en) * 2018-09-28 2022-07-08 三菱电机株式会社 Refrigeration cycle device

Also Published As

Publication number Publication date
EP1293735A3 (en) 2003-05-28
ATE356962T1 (en) 2007-04-15
CN1173139C (en) 2004-10-27
PT1293735E (en) 2007-05-31
ES2284756T3 (en) 2007-11-16
DE60218793T2 (en) 2007-12-06
JP4848608B2 (en) 2011-12-28
DE60218793D1 (en) 2007-04-26
JP2003083644A (en) 2003-03-19
EP1293735B1 (en) 2007-03-14
CN1405515A (en) 2003-03-26

Similar Documents

Publication Publication Date Title
EP1293735B1 (en) Refrigerant circuit
JP4258553B2 (en) Heat source unit and refrigeration system
US20110094259A1 (en) Multi-stage refrigerant system with different compressor types
JP4767199B2 (en) Air conditioning system operation control method and air conditioning system
US20100192607A1 (en) Air conditioner/heat pump with injection circuit and automatic control thereof
EP1498668A1 (en) Heat source unit of air conditioner and air conditioner
JPH11153369A (en) Refrigerating device and method for filling refrigerant
JP5796619B2 (en) Air conditioner
US12085320B2 (en) Heat source unit and refrigeration apparatus
JP3731174B2 (en) Refrigeration cycle
US6966193B2 (en) Control of multi-circuit economized system
JP6021943B2 (en) Air conditioner
JP2008082674A (en) Supercooling device
WO2022029845A1 (en) Air conditioner
JP2009036508A (en) Supercooling system
JP2008082676A (en) Supercooling device
JP5193450B2 (en) Supercooling device
JP2008082677A (en) Supercooling device
EP1235043A1 (en) Refrigerating device
JP2635453B2 (en) Refrigeration cycle
JP2000320916A (en) Refrigerating cycle
JP3336032B2 (en) Refrigeration circuit with injection circuit
CN118057957A (en) Air conditioner
JP2008082680A (en) Supercooling device
JP2009162407A (en) Refrigerating device

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LI LU MC NL PT SE SK TR

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LI LU MC NL PT SE SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK RO SI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LI LU MC NL PT SE SK TR

AX Request for extension of the european patent

Extension state: AL LT LV MK RO SI

17P Request for examination filed

Effective date: 20030709

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LI LU MC NL PT SE SK TR

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: MITSUBISHI DENKI KABUSHIKI KAISHA

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIN1 Information on inventor provided before grant (corrected)

Inventor name: SUGIYAMA, KUNIO

Inventor name: NAGASAKI, YOSHIKI

Inventor name: SUMIDA, YOSHIHIRO

Inventor name: ZUIKI, SHIGEO

Inventor name: YAMADA, YOICHI

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LI LU MC NL PT SE SK TR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070314

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070314

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070314

Ref country code: CH

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070314

Ref country code: LI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070314

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 60218793

Country of ref document: DE

Date of ref document: 20070426

Kind code of ref document: P

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20070419

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070614

ET Fr: translation filed
NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: GB

Ref legal event code: 727

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2284756

Country of ref document: ES

Kind code of ref document: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070314

REG Reference to a national code

Ref country code: GB

Ref legal event code: 727A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070314

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070314

26N No opposition filed

Effective date: 20071217

REG Reference to a national code

Ref country code: GB

Ref legal event code: 727B

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070930

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070615

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070910

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070314

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070314

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070614

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070910

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070314

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20100903

Year of fee payment: 9

REG Reference to a national code

Ref country code: GB

Ref legal event code: 746

Effective date: 20110513

REG Reference to a national code

Ref country code: DE

Ref legal event code: R084

Ref document number: 60218793

Country of ref document: DE

Effective date: 20110627

Ref country code: DE

Ref legal event code: R084

Ref document number: 60218793

Country of ref document: DE

Effective date: 20110506

REG Reference to a national code

Ref country code: ES

Ref legal event code: GC2A

Effective date: 20111027

REG Reference to a national code

Ref country code: PT

Ref legal event code: MM4A

Free format text: LAPSE DUE TO NON-PAYMENT OF FEES

Effective date: 20120312

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120312

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150910

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 15

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150910

PGRI Patent reinstated in contracting state [announced from national office to epo]

Ref country code: IT

Effective date: 20161122

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 16

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20210812

Year of fee payment: 20

Ref country code: IT

Payment date: 20210811

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20210804

Year of fee payment: 20

Ref country code: BE

Payment date: 20210817

Year of fee payment: 20

Ref country code: DE

Payment date: 20210803

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20211001

Year of fee payment: 20

REG Reference to a national code

Ref country code: DE

Ref legal event code: R071

Ref document number: 60218793

Country of ref document: DE

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20220926

REG Reference to a national code

Ref country code: BE

Ref legal event code: MK

Effective date: 20220910

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

Expiry date: 20220909

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20220909

Ref country code: ES

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20220911