EP1205578B1 - Einrichtung für die chemische Tauchbehandlung von Metallstücken - Google Patents
Einrichtung für die chemische Tauchbehandlung von Metallstücken Download PDFInfo
- Publication number
- EP1205578B1 EP1205578B1 EP01402867A EP01402867A EP1205578B1 EP 1205578 B1 EP1205578 B1 EP 1205578B1 EP 01402867 A EP01402867 A EP 01402867A EP 01402867 A EP01402867 A EP 01402867A EP 1205578 B1 EP1205578 B1 EP 1205578B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- tank
- tanks
- row
- treatment
- disposed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C22/00—Chemical surface treatment of metallic material by reaction of the surface with a reactive liquid, leaving reaction products of surface material in the coating, e.g. conversion coatings, passivation of metals
Definitions
- the present invention relates to the design and manufacture of a chemical treatment plant by dipping parts contained in cages, or other containers, such treatment involving immersion in a tank containing a treatment bath. It applies in particular to installations in which the actual chemical treatment is a manganese phosphating treatment carried out on parts of motor vehicles. It applies equally to any similar installation, knowing that in essence the chemical treatments by dipping use relatively polluting baths.
- the current manganese phosphating plants comprise a series of tanks arranged in line one behind the other in which a preparation treatment is carried out first comprising in particular a degreasing step and alkaline rinsing steps, the chemical treatment proper. comprising a phosphating step, possibly preceded by a refining step, and a finishing treatment including in particular acid rinsing, drying and cooling steps. All the tanks where these different treatments are carried out are arranged along a line at the entrance of which there is a loading device in the installation, an unloading device being provided at its outlet, at the other end. Each cage containing the parts to be treated covers the entire line. It is transferred from one tank to the next in the series by a manipulator which circulates along the line to take each cage in turn in one tank and deposit it in the next.
- the parts to be treated are arranged in containers, or cages, which come from other manufacturing units and which are then returned in the chain.
- containers or cages
- the parts to be treated are arranged in containers, or cages, which come from other manufacturing units and which are then returned in the chain.
- they must be completely immersed in the various tanks, in particular in the phosphatation tank to avoid a phosphatation bath / atmosphere interface and in the degreasing or pickling tanks to thoroughly clean the entire tank. container.
- the containers are placed at the bottom of the tanks. It can not then be avoided that the manipulators used to move the containers from one tank to another are in contact with the various baths and undergo alterations. And, except for the drying steps, it can not be avoided that the manipulator leaving a bath with its charge causes liquid that may drip on nearby equipment, resulting in additional difficulties for maintaining the purity of the various baths and for the safety of the workers.
- the present invention aims at providing a dip-dip chemical treatment installation in a tank containing a chemical treatment bath, for parts constituting charges contained in containers or cages which, in other tanks, are also subjected to a pre-treatment treatment and a subsequent finishing treatment, which is much more compact in terms of its size, which has a flexibility of use to adapt to very different capabilities and easy maintenance. More generally, it aims to solve the various difficulties the industry faces in this area, including those highlighted above.
- the installation according to the invention is particularly remarkable in that the tanks of the different treatment stations are arranged on two parallel lines separated by an aisle allowing access to the tanks, a first line comprising a device for loading and unloading at a specific temperature. ends and preparation tanks, and a second line comprising two chemical treatment tanks which are used alternately and finishing tanks, in that a longitudinal transfer manipulator is provided in each line, to take a turn of role each charge in a tank and deposit in another, and in that it comprises transverse transfer means ensuring the connection between the two lines, in the forward direction and in the return direction.
- the loading and unloading device which is unique because at only one end of the first line, comprises a plurality of load-receiving cells, each receiving a load at the input or at the output of the installation.
- the fact of providing a single station in which the loading and unloading of the parts to be treated makes it possible to further reduce the size of the installation and that the installation can easily be integrated into a production line, since the parts to be treated return to the same place after their treatment.
- the invention is embodied in various embodiments of the installation, which may in particular vary depending on whether the application envisaged leads to privileging or not the possibility of involving workers on a chemical treatment tank at a standstill while the the other is in operation as well as the rest of the different equipment of the installation.
- the circulation of the cages containing the charges to be treated can advantageously be organized so as never to pass a cage out of a polluting bath over a bath to keep clean and to circumscribe around the tanks of chemical treatment areas on which they may drop drops of liquid or other soiling. This avoids having to equip the tanks so-called clean areas of covers and sealing devices to the passage of the cages.
- the two chemical treatment tanks are each arranged at one end of the second line and different finishing tanks are associated with them, respectively between the corresponding tank and a central zone of the installation between the two lines. It is then advantageously in this middle zone that the means for transferring charges from one line to the other are arranged.
- a single manipulator can be used for this purpose, since it comprises the means giving it the degrees of freedom necessary for it to be operative both in direction to go to bring the charges to a chemical treatment tank (phosphating, for example ), in return direction to take them out of the last corresponding tank (finishing tank).
- phosphating for example
- finishing tank the last corresponding tank
- the plant according to the invention comprising three rinsing tanks used in the context of the preparation treatment, one of these tanks is disposed in each line while the third is arranged between the two lines, in the central aisle, the three tanks being aligned in a transverse direction so as to achieve an H arrangement of all the tanks.
- the transverse transfer means comprise two separate manipulators, this solution being particularly preferred when the two chemical treatment tanks used alternately are grouped side by side on the second line.
- Said means then advantageously comprise, in particular in the context of a phosphating plant of metal parts, a first transfer transfer manipulator disposed at a tank of the final station of the preparation treatment and passing a cage of the first line in the second line and a second transfer transfer transfer manipulator disposed at a tank of the final station of the finishing treatment and passing a cage from the second line to the first line.
- the design according to the invention advantageously allows the use of tanks having a symmetry with respect to their axis or their center so that each tank can be placed in one line or the other; you just have to turn it 180 degrees.
- On the side of the tank which is adjacent to the central aisle everything relating to the power circuits, in particular the heating resistors, is arranged so that only one power supply line is used.
- the chemical treatment tanks for example phosphating
- the aisle separating the two lines makes it possible to obtain an intermediate position of the transverse transfer means in which the two longitudinal manipulators can move over all of their respective lines.
- each cell of the loading / unloading device can receive a carriage with its load and this carriage is immobilized in the cell until the return of its load, that is to say all parts contained in the same cage.
- This arrangement ensures that the loads do not remain during processing, since the carriage remains prisoner until the return of its load.
- the work of the operators is minimized since their only actions are to enter or exit the carts in the cells, the loads are then moved by the manipulators. In particular, it is no longer necessary to push or pull piles of baskets, which simplifies the trolleys, which can be constituted by a simple trolley.
- the installation according to the invention is made in the form of pre-assembled modules comprising the loading / unloading device or tanks with their support and their steam extraction device and at least a part of the manipulator support.
- This modular structure which consists of six or seven modules, for example, delivered pre-assembled and assembled at the point of use, minimizes on-site operations.
- the load consists of a U-shaped cage containing the parts to be treated and there is provided in each load / unloading cell, an intermediate support which has a horizontal wall upper cover and on which the cage remains attached during the entire duration of the treatment, the intermediate support being grasped by the manipulators and placed on each in such a way that the cage is suspended in the tank and immersed completely in the treatment bath.
- the intermediate support allows to obtain a total immersion of the cage while protecting, thanks to its lid, the manipulator of any contact with the baths.
- the supports receiving the intermediate support are out of the bath, which makes it easy to perform their initial adjustment for horizontal alignment. Finally, these supports are closer to the manipulator so that there is no problem of centering the latter.
- the cage comprises, at its upper part, horizontal rods which are perpendicular to the direction of translation of the longitudinal manipulators and which cooperate with hooks arranged at the lower part of the intermediate support, the hooking or unhitching of the cage on the intermediate support being obtained, in each cell, by a small horizontal displacement followed by a lifting movement of the longitudinal manipulator of the first line.
- the intermediate support comprises measuring devices and / or a data storage device in which the processing monitoring is recorded.
- the intermediate supports can be equipped with on-board temperature probes and record, for each load, a follow-up of the treatment times and the temperatures. This information will be read in the loading / unloading device and recorded on a support accompanying the processed parts in the rest of the production line.
- the installation comprises cascade rinsing tanks disposed adjacently in a line, on the side of each rinsing tank, there is provided a first siphoid wall parallel to the line, which is connects to a complete partition perpendicular to the line to form, with the side wall and the upstream partition of the tank, a water inlet zone and a second siphoid wall perpendicular to the line which connects to a complete partition parallel to the line for forming with the side wall and the downstream wall of the tank, a water discharge zone, the upstream and downstream walls comprising, in the arrival and discharge water zones, an upper indentation of which the lower part is substantially at the level of the rinsing bath.
- the rinsing water supply is therefore on the side of the tanks and the siphonic partitions allow circulating the rinsing water around the load before it is evacuated.
- the upper part of the siphoid walls is crenellated so that the supernatant elements of the rinsing bath also circulate in the tank passing over the siphoid walls.
- the arrival and discharge water zones are arranged on the outer sides of the line. In this way, these areas are accessible without having to enter the internal aisle separating the two lines, outside the side curtains usually provided protection.
- the zone between the two zones of arrival and discharge of water constitutes a zone of measurement and sampling of the bath. This zone is in direct communication with the bath surrounding the charge, and thus measurements of the charge processing conditions can be made.
- the water discharge zone constitutes a bath level control zone.
- the level measurement in this zone advantageously controls the supply of water to the first tank.
- the lower part of the first siphoid wall is curved in the direction of the downstream wall of the tank.
- the resulting throttling makes it possible to regulate the "flushing" of the rinsing water, that is to say the proportion of rinsing water which passes under the siphoid tank and that which passes over it.
- the figure 1 shows schematically a top view of a first embodiment of an installation according to the present invention which is intended for a manganese phosphating treatment of parts of the automotive industry, for example transmission gears .
- the different treatment tanks are arranged contiguously on two parallel lines 1 and 2 which are separated by a central aisle 3.
- the first line 1 comprises a device 4 for loading and unloading charges which comprises several adjacent cells 20 which can receive a trolley carrying containers containing the workpieces.
- a drying tank 10 Following this loading and unloading device 4 are two cooling tanks 5 and 6, then a drying tank 10, a first alkaline rinsing tank 7 and a degreasing tank 8.
- the second line 2 comprises at each its ends a phosphating tank 9 and 11, and each of the two phosphatation tanks, it is associated with a refining tank 12 and 13 adjacent.
- the displacement of the charges in the first line 1 is achieved by means of a first longitudinal manipulator with two axes capable of translational movements parallel to the first line 1 and movements of descent or lifting of the load.
- a second longitudinal two-axis manipulator is provided for the displacement of the loads in the second line 2.
- the various components of the installation are assembled according to pre-assembled modules, which are mounted at the factory and which are assembled together at the work site.
- Each of these modules comprises one or more tanks, or the loading / unloading device with the tank support device and the vapor extraction device (not shown), as well as a part of the support on which the manipulators circulate.
- a first module comprises the loading / unloading cells 20 with a first part of the support of the longitudinal manipulator of the line 1
- a second module is constituted by the two cooling tanks 5 and 6 with their support and their device for extracting vapors.
- a third module comprises the three alkaline rinsing tanks 7, 18 and 19 with the assembly of the transverse connecting manipulator and a part of the transverse manipulator support of the line 1 and a part of the support of the longitudinal manipulator of the line 2
- a fourth module comprises degreasing tanks 8 and part of the support of the longitudinal manipulator of line 1
- a fifth module comprises phosphating tanks 9 and refining 12
- a sixth module comprises the three acidic rinsing tanks 14 to 16
- the seventh module comprises the phosphating tank 11 with its associated refining tank 13.
- the figure 2 represents a variant of the installation of the figure 1 .
- the two drying tanks 21 and 22 are arranged after the acid rinsing tanks 14 to 16 with which they constitute a module.
- the two cooling tanks 23 and 24 are placed at the location of the drying tanks 10 and 17 of the installation of the figure 1 .
- This embodiment has only six modules instead of seven in the installation of the figure 1 , a new module grouping the three alkaline rinsing tanks and the two cooling vessels 23 and 24 and the two drying vats 21 and 22 are grouped together in the acid rinsing module 14 to 16.
- the figure 3 represents another embodiment of the invention. It includes the loading and unloading device 4 with its cells 20, following which are arranged successively the degreasing tank 8 comprising two cells, the first alkaline rinse tank 7, the second alkaline rinse tank 19, and the tank third alkaline rinse 18, in which is carried out the last stage of the preparation treatment.
- This tank 18, which is therefore the final tank of the preparation treatment, extends over the entire width of the installation, that is to say on the lines 1 and 2 and on the aisle 3.
- a first transfer transfer manipulator which carries out the passage from the first line 1 to the second line 2, is disposed at this final tank 18. It is constituted by a transfer carriage 25 which moves longitudinally in the vessel 18 and which receives charges deposited therein by the longitudinal transfer manipulator of the first line 1 and which are taken up by the longitudinal transfer manipulator of the second line 2. It is therefore a simple manipulator with a single axis of displacement.
- the second line 2 there is, starting from the final preparation tank 18, a refining tank 12, the first phosphatizing tank 9 comprising three cells, the second phosphating tank 11, the first acid rinsing tank 14 the second acid rinse tank 15, the third acid rinse tank 16 and the two drying tanks 17 and 10.
- the cooling tank 5 is arranged in the alley 3, at the end opposite the device of the loading and unloading device 4, just after the final preparation tank 18. On either side of this cooling tank 5 in each of the lines 1 and 2, there is provided a maintenance station 26 and 27 of the longitudinal transfer manipulator of the line.
- a second transfer transfer manipulator 29 which is also constituted by a transfer carriage and which carries out the return of the second line 2 to the first line 1.
- the two connecting manipulators are constituted by a single manipulator with three displacement axes 63 which, as described elsewhere, performs the forward flow from the first line 1 to the second line 2 at the level of the alkaline rinsing tanks 7, 19 and 18 and the return flow from the second line 2 to the first line 1 at the drying tanks 17 and 10 in the case of the figure 1 and at the level of the cooling tanks 23 and 24 in the case of the figure 2 .
- the embodiment of the figure 3 comprises four modules, in addition to the loading and unloading device 4.
- the first module comprises degreasing cells 8, first alkaline rinse 7 and second alkaline rinse 19.
- the second module groups the refining cell 12 and the cells of phosphatation constituting the first phosphatation tank 9.
- the third module comprises the second three-cell phosphating tank 11.
- the fourth module comprises the first, second and third acid rinsing tanks 14 to 16 and the drying station comprising the tanks 17 and 10.
- the fourth module consists of the third alkaline rinse tank 18 and the cooling station 5.
- Each of the cells 20 of the loading and / or unloading device 4 can receive a carriage on which is placed a container constituting a basket in which are placed the metal parts to be treated.
- the receptacles intended to receive the parts to be treated are indeed constituted by a kind of "U" shaped cage having a bottom and two side vertical walls. This basket structure makes it possible to obtain very good circulation of the treatment baths around the parts to be treated.
- Such a cage is represented on the figure 3 . It comprises a bottom 31 and two opposite vertical side walls 32. When a cage is in position in a cell 20, the side walls 32 are parallel to the direction of the line of the tanks. Each upper wall comprises two rods 33 which are perpendicular to the tank line and which cooperate with hooks arranged at the bottom of an intermediate support adapted to be gripped by a transverse manipulator or the connecting manipulator.
- the figure 4 represents in section such a cage 30 above which there is an intermediate support 34, which can be grasped and transported by a manipulator 35.
- the intermediate support 34 which is shown in cross section on the figure 5 , comprises hooks 36 which are arranged in a plane parallel to the tank lines at the bottom of the support 34. These hooks 36 are fixed on transverse horizontal bars 37 disposed at the upper part of the intermediate support 34. Below these bars 37 is a plate 38 forming a lid, which is inclined relative to the horizontal as can be seen on the figure 5 , and which, as we can see on the figure 4 , is folded along a transverse axis, so as to have the shape of a "V" very open upwards.
- the bars 37 can be gripped by the manipulator 35 by means of horizontal displacement grippers.
- the intermediate support 34 is shown in its rest position in a cell 30.
- the ends of the bars 37 rest on supports 39 of the loading and unloading cell.
- the figure 6 represents, in top view, the three acid rinsing tanks 14, 15 and 16, which are arranged one behind the other in the line of the installation.
- suction ducts 41 of the vapors which are arranged above the tanks.
- These three acid rinsing tanks 14 to 16 are arranged and arranged in such a way that the water which arrives upstream via a pipe 28 flows successively into the third rinsing tank 16, the second rinsing tank 15 and the first rinsing tank. 14, to then reach an evacuation zone from which the residual water is recovered, for example by means of a pump, and sent to the phosphatation tanks. This is possible because one is in line 2, in a set of treatment with acid medium.
- the different tanks are separated from each other by total partitions, that is to say partitions that are connected to the bottom of the tank, but these partition walls 44 and 45 have, on the left side, a notch allowing the cascade from one tank to another.
- the cascade circulation of the bath water is carried out by means of siphoid partitions which are arranged in a particular arrangement.
- a first siphoid partition 46 is disposed in the left part of the tank, parallel to the axis 50 of the tank line 2.
- This siphoid partition is connected on the one hand to the upstream partition 47 of all the tanks, and on the other hand, to a total partition 48 which is perpendicular to the axis 50 and is connected to the left side wall 49 of all the tanks.
- a siphoidal partition 51 which is perpendicular to the axis 50 and which is connected to the side wall 49 on the one hand and, on the other hand, to a total wall 52 which is connected to it.
- -at the downstream wall of the tank namely the partition wall 44 or 45 or the wall 53 separating the first rinsing tank from the discharge zone.
- each of the siphoid walls 46 and 51 have at its upper end passages, in the form of crenellations, the bottom is substantially at the bath of the tank.
- the walls 46 and 48 define a water inlet zone and the walls 51 and 52 define a water discharge zone.
- a zone 54 is in direct and complete relationship with the rest of the tank. This zone is used to carry out measurements to determine the operating conditions of each of the rinsing tanks 14 to 16.
- Electrical resistors 55 are still shown in the figure, which are used to heat the water of the third rinsing bath 16, as well as the supports 42 in the form of "V" on which the intermediate support 34 is placed.
- Figures 7 to 9 there is shown in the tank 14 a load consisting of the cage 30 hooked on the intermediate support 34. It can also be seen, in particular on the figure 9 , the apertures 65 in the form of crenellations of the siphoid walls.
- the figure 10 is a partial section showing a siphoid wall 51, parallel to the line of the tanks, and a partition wall, for example, the wall 53. It can be seen on this section, which is a section in a plane parallel to the second line 2 in the left part of the tanks, the opening 56 arranged in the total wall 53 and the slot 65 which is arranged in the upper part of the siphoid partition 51.
- the bottom of the opening 56 corresponds substantially to the level 57 of the bath in the when the latter is empty and the bottom of the crenellations 55 substantially corresponds to the level 58 of the tank when a charge is introduced.
- the siphoid wall 51 is curved in its lower part, in the direction of the wall 53, so as to create a constriction which determines the "flushing" of the evacuation of the water from the tank when one introduces a charge into the latter.
- the depth and shape of this curvature 59 is determined to obtain an evacuation of the bath water at 90% below the siphoid partition 51 and 10% above by the tooth 55.
- a tube 60 disposed at the bottom of each tank transversely and centrally, which serves to perform a stirring of the bath by sending air bubbles. This makes it possible to obtain a good mixing of the bath under the loads and in the zones of arrival and discharge of water, with the exception of the zone 34 in which there are no disturbances and it is possible to carry out measurements as well as bathing samples.
- the figure 11 is a cross-sectional view through the refining and degreasing tanks 8.
- the loads shown in broken lines and resting on the "V" supports 42 and the heating resistors 29 can be seen.
- this figure the manipulator 61 of the line No. 1 and the manipulator 62 of the line No. 2 in the raised position so as to be able to circulate over all the tanks.
- the figure 12 is also a cross section through the alkaline rinsing tanks 7, 18 and 19. It can be seen in particular that the transverse connecting manipulator 63 is also in the up position so as to be able to move transversely across the three rinsing tanks 7, 18 and 19.
- Trolleys constituted by simple wheeled tables, receive loads and are brought into one of the cells 20 of the loading / unloading device 4.
- the feeding can be done manually or by automatic systems, for example those using so-called wire-guided trolleys, which move on a predefined circuit.
- the first operation consists in associating an intermediate support 34 which is assigned to each of the cells 20 to each of the loads constituted by a cage 30.
- the manipulator 61 comes to grip the intermediate piece 34 which rested on the supports 39, then it performs a lifting movement to release the intermediate support 34 of the supports 39.
- the longitudinal manipulator of the line 1 is brought into the cell in a position such that its hooks 36 are slightly offset with respect to the hooking rods 33.
- a downward movement is then made so that the hooks 36 are below the level of the hooking rods 33.
- a slight translational movement is then made in the line of the tank line so that the hooks are just below the hooking rods, and ends with a lifting movement so that the rods 33 are gripped by the hooks 36.
- the manipulator 61 brings the charge successively into the three degreasing tanks 8, then into the first alkaline rinsing tank 7. Each time, the manipulator 61 disengages from the intermediate support 34 and places it on the V-shaped supports 42. During the treatment of a load, the manipulator 61 can manipulate other loads to pass them in different tanks.
- the transverse connecting manipulator 63 then seizes the charge in the tank 7 to pass successively into the second rinsing tank 19 and the third rinsing tank 18.
- This link manipulator 63 when not used, is positioned above the second rinsing tank 19 so as to leave the free passage for the other two transverse manipulators 61 and 62, they can evolve over their entire line.
- the charge is then taken by the longitudinal manipulator 62 of the second line, transported from the rinsing tank 18 to a refining tank, corresponding to the phosphating tank which is in operation, for example the refining tank 12.
- charge is then fed into the phosphating tank 9, then into the three acid rinsing tanks 14, 15 and 16.
- the charge is fed to a drying station 10 or 17 and then to the cooling station 6 or 5.
- the load returns to his cell, where his carrier carriage waits for him who can then bring it back into the production line.
- the installation simultaneously processes several charges, which are handled by one of the three manipulators 61 to 63.
- the manipulator 63 also has an intermediate position, namely above the second alkaline rinsing tank 19, where it allows the free movement of the other two transverse manipulators 61 and 62 along the entire line 1 or 2.
- the plant can operate with an active phosphating tank and a phosphatizing tank being cleaned, which does not interrupt the operation of the plant for tank cleaning operations. This cleaning is further facilitated by the fact that each of the phosphating tanks 9 and 11 is accessible on three of its sides.
- the cleaning operation of a phosphatation tank is carried out safely because a partition is interposed between it and its refining tank so as to prevent access to the phosphating tank during cleaning.
- all preparation treatment stations are arranged in the first line 1 which is therefore a "clean" line, that is to say that the charges circulate in the line without danger of falling droplets comprising a chemical during their passage over other charges arranged in a treatment station.
- the alkaline third rinse tank 18 also extends on the aisle 3 and the second line 2.
- the second line 2 comprises all the finishing treatment stations, with the exception of the cooling station 5 which is located in the aisle 3, and the chemical treatment, refining 12 and phosphating tanks 9 and 11.
- the second line may be considered a "dirty" line because charges with a chemical may flow over other charges being processed.
- the different tanks are arranged in the order of the treatment steps starting from the loading and unloading device 4, in the first line 1, and in the opposite direction, starting from the third alkaline rinsing tank. 18, in the second line 2.
- each load travels all the line 2 by passing through one of the phosphating tanks 9 or 11 and returns to the dry state, so without risk of falling droplets, passing over all the tanks to reach the level of the second link manipulator 29 which passes through the cooling chamber 5, then in the first line 1.
- the load is then taken by the transverse manipulator of the line 1 and transferred into its cell of the loading device and reloading 4.
- the cascade operation of the acidic rinse tanks will be explained with reference to Figures 6 to 9 .
- the level in the various tanks is regulated by means of a level measuring device disposed in the zone 43 which is not turbulent and which acts on the flow rate of the feed device 28.
- the passage of the clear water supply in the third rinse tank 16 is simply performed from below the siphoid partition 46.
- the level goes up as shown on the figure 10 and the passage of the first bath of rinsing in the tank 15 is then 90% below the siphoid wall 46 and 10% above by the crenellations 55; in particular the supernatants are then removed from the water supply zone to the tank 16.
- the water sent into the tank 16 circulates in the latter being brewed by the air bubbles sent by the pipe 60 and the bath spring in the zone 54 to pass, still 90% below the siphoid partition 51, 10 % of bath passing over crenellations with supernatants.
- the same phenomenon occurs for tanks 15 and 14, which ensures complete circulation of the bath, and the dirty water in zone 43 is discharged, for example by a pump, and sent to a phosphatation tank. This makes it possible to limit as much as possible the water consumption of the installation, to arrive at a very low consumption, which is, for example, less than two liters of water per m 2 of treated room surface.
- the cages 30 are, in each case, completely immersed in the baths, which makes it possible to avoid any interface between a bath and the external atmosphere which could create damage to the cage .
- it is completely cleaned in the rinsing and degreasing tanks. It can therefore be reused and returned to the production line.
- the cover 38 provides total protection of the manipulators. In addition, it allows to collect and evacuate outside the tanks condensates that can form above them.
- the intermediate supports 34 are provided with measuring devices, such as temperature sensors, as well as data recording devices which make it possible to record the follow-up of the complete treatment, with particular reference to the temperatures and durations of the data. each treatment.
- the corresponding data can be picked up and sent to an information carrier accompanying the parts in the rest of the manufacturing stations.
- the invention makes it possible to obtain an extremely compact installation compared to current online installations.
- the fact of using two chemical treatment tanks makes it possible to obtain great flexibility in the capacity and the rate of operation of the installation. Indeed, when one of the two phosphating tanks 9 or 11 is considered soiled and requires cleaning, the second tank is used, which allows not to interrupt the operation of the installation which is only stopped when the second The tank is also soiled to clean the two tanks. In the case of the embodiments of Figures 1 and 2 where the two treatment tanks are arranged at one end of the second line and can be isolated, the tanks can be maintained without stopping the operation of the installation.
- the use of the intermediate support makes it possible to have containers that are not damaged during processing and that can therefore be reused. In particular, they can be put back into service in the production line.
- eleven charging cells are provided, the complete cycle of the treatment lasts 42 minutes and charge displacement is carried out every four minutes. We can then treat 4.5 tons per hour of parts to be phosphated.
- the two cooling tanks are arranged in the loading and / or unloading device in a variant according to which two additional loading / unloading cells are provided so as to obtain three cells accessible to the load-bearing carriages.
- the other cells including both having a cooling tank, are closed and have only supports capable of receiving the intermediate supports. The fact of providing three loading / unloading cells makes it possible to group the movements of the manipulator, which leaves more free time for the operator who must store the empty carts corresponding to the closed cells in the vicinity of the installation.
- the hooks of the intermediate support are directed in a plane perpendicular to the axis of the two lines and that the hooks arranged on one side of the support, for example the hooks arranged on the outer side of the line, are offset with respect to the other two hooks, a corresponding offset being provided for the hooking rods of the cage.
- the first hooking rods of the cage which are made in the form of rings, pass next to the outer hooks of the intermediate support and are placed in the other two hooks.
- the rods are in their corresponding hooks a little above the bottom of the hooks, so that the catch of the cage is obtained by a single lifting movement of the manipulator. Because of the axial symmetry of the arrangement of their rods, the cages can be introduced by any side, the rods being always positioned for proper placement in the cell.
Landscapes
- Chemical & Material Sciences (AREA)
- General Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Mechanical Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Cleaning By Liquid Or Steam (AREA)
- Chemical Treatment Of Metals (AREA)
- Catalysts (AREA)
- Filtering Materials (AREA)
Claims (14)
- Einrichtung für die chemische Tauchbehandlung von in Käfigen enthaltenen Werkstücken durch Eintauchen jedes Käfigs in einen Tank (9, 11), der ein chemisches Behandlungsbad enthält, wobei die Werkstücke in anderen Tanks zunächst einer Vorbehandlung und einer späteren Fertigbehandlung unterzogen werden und die Tanks der verschiedenen Behandlungsstationen in zwei parallelen Reihen (1, 2), getrennt durch eine Gasse (3), die den Zugang zu den Tanks ermöglicht, angeordnet sind, dadurch gekennzeichnet, dass eine erste Reihe (1) an einem seiner Enden eine einzelne Be- und Entladevorrichtung sowie Vorbehandlungstanks (7, 8, 18, 19) und eine zweite Reihe (2) zwei abwechselnd genutzte Tanks (9, 11) für die chemische Behandlung sowie Tanks (10, 14-16, 17, 21, 22) für die Fertigbehandlung umfasst, dass in jeder Reihe (1, 2) ein Manipulator zur Längsbeförderung (61, 62) vorgesehen ist, um jeden Käfig einzeln von einem Tank zu einem anderen in der gleichen Reihe zu bewegen, und dadurch dass sie Mittel zur Querbeförderung (25; 63) umfasst, welche die Verbindung zwischen den beiden Reihen sicherstellen, damit die Käfige zwischen den Reihen hin und her befördert werden können.
- Einrichtung gemäß Anspruch 1, dadurch gekennzeichnet, dass die Be- und Entladevorrichtung mehrere Zellen für die Aufnahme der Chargen umfasst, wobei jede Zelle eine festgelegte Charge am Einlass der Einrichtung und die gleiche Charge am Austritt der Einrichtung aufnimmt und jede Zelle (20) der Be- und Entladevorrichtung vorteilhaft geeignet ist, einen Schlitten aufzunehmen, der die Charge trägt und bis zur Rückkehr der Charge unbeweglich in der Zelle gehalten wird.
- Einrichtung gemäß Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Tanks (9, 11) für die chemische Behandlung und die Tanks (14-18) für die Fertigbehandlung jeweils an einem Ende der zweiten Reihe angeordnet sind, dass in jeder Reihe ein Manipulator zur Längsbeförderung (61, 62) vorgesehen ist und dass die Mittel zur Querbeförderung (63) mittig zwischen den beiden Reihen (1, 2) angeordnet sind und vorteilhaft einen einzelnen Manipulator umfassen, der auf Höhe eines Spültanks für die Vorbehandlung angeordnet ist.
- Einrichtung gemäß Anspruch 3, dadurch gekennzeichnet, dass sie drei Spültanks für die Vorbehandlung umfasst, von denen jeweils einen in jeder Reihe (7, 18) und der dritte (19) zwischen den beiden Reihen in der Gasse (3) angeordnet ist, wobei die drei Tanks (7, 18, 19) in Querrichtung so ausgerichtet sind, dass sie in ihrer Gesamtheit eine "H"-förmige Anordnung ergeben.
- Einrichtung gemäß Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Tanks (9, 111) für die chemische Behandlung in der zweiten Reihe nebeneinander angeordnet sind und dass die Beförderungsmittel einen ersten Manipulator umfassen, der auf Höhe eines Tanks (19 ; 18) der letzten Vorbehandlungsstation angeordnet ist und einen Käfig der ersten Reihe (1) zur zweiten Reihe (2) befördert, und einen zweiten verbindenden Manipulator (29 ; 63), der auf Höhe eines Tanks (15 ; 10, 17) der letzten Endbehandlungsstation angeordnet ist und einen Käfig der zweiten Reihe (2) zur ersten Reihe (1) befördert.
- Einrichtung gemäß Anspruch 5, dadurch gekennzeichnet, dass ein Tank (19; 18) der letzten Vorbehandlungsstation so zwischen den beiden Reihen (1, 2) in der Gasse (3) angeordnet ist, dass er sich über die gesamte Breite der Einrichtung erstreckt, und dass der erste verbindende Manipulator (25) aus einem Beförderungsschlitten besteht, der sich in Querrichtung im letzten Vorbehandlungstank (18) bewegt.
- Einrichtung gemäß einem der Ansprüche 5 und 6, dadurch gekennzeichnet, dass die letzte Endbehandlungsstation einen geschlossenen Behälter (5) umfasst, der sich zwischen den beiden Reihen (1,2) in der Gasse (3) an der Seite gegenüber der Be- und Entladevorrichtung (4) befindet, dass der zweite verbindende Manipulator (29) zwischen den beiden Reihen (1,2) auf der Ebene dieses letzten Endbehandlungsbehälters (5) angeordnet ist und dass jede Reihe (1,2) eine Station zur Wartung ihrer jeweiligen Vorrichtung für die Längsbeförderung (61, 62) umfasst, wobei diese beiden Wartungsstationen für die Vorrichtung zur Längsbeförderung (61, 62) beiderseits des letzten Endbehandlungsbehälters (5) angeordnet sind.
- Einrichtung gemäß einem der Ansprüche 5 bis 7, dadurch gekennzeichnet, dass alle Vorbehandlungstanks (8, 7, 19, 18) in der ersten Reihe (1) in der Reihenfolge der Behandlung angeordnet sind, beginnend mit der Be- und Entladevorrichtung (4), und dass alle Fertigbehandlungstanks (14-16, 17, 10) in der zweiten Reihe (2) in der Reihenfolge der Behandlung angeordnet sind, beginnend mit den beiden Tanks für die chemische Behandlung (9, 11) in Richtung auf die Be- und Entladevorrichtung (4).
- Einrichtung gemäß Anspruch 2, eventuell kombiniert mit einem der Ansprüche 3 bis 8, dadurch gekennzeichnet, dass die Charge aus einem "U"-förmigen Käfig (30) besteht, der die zu behandelnden Werkstücke enthält, und dass für jede Zelle der Be- und Entladevorrichtung (4) ein Zwischenträger (34) vorgesehen ist, der mit einer oberen horizontalen Wand (38), die eine Abdeckung bildet, ausgeführt ist und in den der Käfig während der gesamten Behandlung eingehakt bleibt, wobei der Zwischenträger von den Manipulatoren aufgenommen und so auf jeden Tank platziert wird, dass der Käfig im Tank hängt und vollständig in das Behandlungsbad eingetaucht ist.
- Einrichtung gemäß Anspruch 9, dadurch gekennzeichnet, dass der Käfig (30) in seinem oberen Bereich oben mit horizontalen Stangen (33) versehen ist, die senkrecht zur Bewegungsrichtung des Manipulators zur Längsbeförderung ausgeführt sind und mit Haken (36) zusammenwirken, die am unteren Teil des Zwischenträgers angebracht sind, wobei das Einhaken oder Aushaken des Käfigs am bzw. vom Zwischenträger in jeder Zelle durch eine leichte horizontale Verschiebung und das anschließende Anheben des Manipulators zur Längsbeförderung der ersten Reihe erfolgt.
- Einrichtung gemäß Anspruch 9 oder 10, dadurch gekennzeichnet, dass der Zwischenträger Messvorrichtungen und eine Vorrichtung zum Speichern von Daten umfasst, in welcher der Verlauf der Behandlung verzeichnet wird.
- Einrichtung gemäß einem der vorgenannten Ansprüche, dadurch gekennzeichnet, dass in der zweiten Reihe (2) jedem Tank für die chemische Behandlung (9, 11) ein Veredelungstank (12, 13) zugeordnet ist.
- Einrichtung gemäß einem der vorgenannten Ansprüche, dadurch gekennzeichnet, dass sie kaskadenförmig angeordnete Spültanks (14-16) umfasst, die nebeneinander in einer Reihe (2) angeordnet sind, dass auf der Seite jedes Spültanks eine erste Siphon (46) parallel zur Reihe vorgesehen ist, die an eine abschließende Zwischenwand (48) senkrecht zur Reihe anschließt, um mit der Seitenwand (49) und der oberhalb befindlichen Wand (47, 44, 45) des Tanks eine Wasserzulaufzone zu bilden, sowie eine zweite Siphon (51) senkrecht zur Reihe, die an eine abschließende Zwischenwand (52) parallel zur Reihe anschließt, um mit der Seitenwand (49) und der unterhalb befindlichen Wand (44, 45, 53) des Tanks eine Wasserablaufzone zu bilden, wobei die oberhalb und unterhalb ausgeführten Wände (47, 44, 45, 53) in den Wasserzulauf- und - ablaufzonen einen oberen bogenförmigen Ausschnitt (56) umfassen, dessen unterer Teil sich ungefähr auf dem Pegel des Spülbades befindet, und diese Wasserzulauf- und Ablaufzonen vorteilhaft an der Außenseite der Reihe ausgeführt sind, wobei die Siphonwände (46, 51) vorteilhaft an ihrem oberen Teil Einkerbungen (55) aufweisen, während der untere Teil der zweiten Siphonwand (51) vorteilhaft in Richtung der oberhalb befindlichen Wand (53) des Tanks (14, 15,-16) gebogen ist.
- Einrichtung gemäß Anspruch 12 oder 13, dadurch gekennzeichnet, dass der von den beiden Zonen des Wasserzulaufs und -ablaufs eingeschlossene Bereich (54) als Bereich für das Messen und zur Entnahme von Proben aus dem Bad ausgelegt ist und dass die Wasserablaufzone zur Kontrolle des Badpegels dient.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0015038A FR2816326B1 (fr) | 2000-11-08 | 2000-11-08 | Installation de traitement chimique au trempe de pieces metalliques |
FR0015038 | 2000-11-08 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1205578A1 EP1205578A1 (de) | 2002-05-15 |
EP1205578B1 true EP1205578B1 (de) | 2010-08-18 |
Family
ID=8856731
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP01402867A Expired - Lifetime EP1205578B1 (de) | 2000-11-08 | 2001-11-08 | Einrichtung für die chemische Tauchbehandlung von Metallstücken |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP1205578B1 (de) |
AT (1) | ATE478170T1 (de) |
DE (1) | DE60142823D1 (de) |
FR (1) | FR2816326B1 (de) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109898075B (zh) * | 2019-02-20 | 2024-07-19 | 嘉兴市兆丰五金科技股份有限公司 | 一种螺钉加工用磷化池 |
CN115044893B (zh) * | 2022-06-20 | 2023-04-21 | 江西麦得豪新材料有限公司 | 一种铜箔加工用防氧化处理装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS596385A (ja) * | 1982-07-04 | 1984-01-13 | Sankyo Alum Ind Co Ltd | 表面処理用被処理物搬送装置 |
-
2000
- 2000-11-08 FR FR0015038A patent/FR2816326B1/fr not_active Expired - Fee Related
-
2001
- 2001-11-08 EP EP01402867A patent/EP1205578B1/de not_active Expired - Lifetime
- 2001-11-08 AT AT01402867T patent/ATE478170T1/de not_active IP Right Cessation
- 2001-11-08 DE DE60142823T patent/DE60142823D1/de not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
EP1205578A1 (de) | 2002-05-15 |
FR2816326A1 (fr) | 2002-05-10 |
DE60142823D1 (de) | 2010-09-30 |
FR2816326B1 (fr) | 2003-04-18 |
ATE478170T1 (de) | 2010-09-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3328481B2 (ja) | 処理方法および装置 | |
FR2559354A1 (fr) | Appareil de traitement thermique, notamment de sterilisation de produits alimentaires et chariot pour un tel appareil | |
EP1561236A2 (de) | Transport- und lagerungssystem für halbleiterscheibenbehälter, und transfermechanismus | |
EP0236639B1 (de) | Automatische flexible Vorrichtung für die Durchführung schneller thermochemischer Behandlungen | |
WO2010140048A2 (en) | Machine and method for treating containers of liquids, and treatment device | |
EP1205578B1 (de) | Einrichtung für die chemische Tauchbehandlung von Metallstücken | |
EP1062686B1 (de) | Vorrichtung und verfahren zum chemischen behandlen von mikroelektronischen scheiben | |
FR2816327A1 (fr) | Installation de traitement chimique au trempe de pieces metalliques | |
EP1137514B1 (de) | Baukastensystem poliermaschine und substrat planarisierung | |
CN203760439U (zh) | 用于在晶圆的端子面上生产接触金属的设备 | |
WO1986005129A1 (fr) | Ensemble destine a redonner les conditions initiales de proprete dans un tube de quartz utilise comme chambre de reaction pour la fabrication des circuits integres | |
JPH0799177A (ja) | 基板の浸漬処理装置 | |
EP0785402B1 (de) | Wärmebehandlungsanlage für eine Ladung aus metallischen Stücken | |
FR2619126A1 (fr) | Sous-systeme et procede de decapage par injection, rincage, sechage, controle et bouchage de tubes dans un systeme de fabrication de tubes | |
JP3584718B2 (ja) | 多結晶体自動洗浄装置 | |
JP2010075576A (ja) | 洗浄方法 | |
FR3051001A1 (fr) | Procede et installation de decapage de plaques metalliques | |
FR2668401A1 (fr) | Dispositif de traitement de surfaces et procede de mise en óoeuvre de ce dispositif. | |
WO2024150126A1 (fr) | Dispositif modulaire automatisé de transfert de matière pâteuse | |
WO2024150125A1 (fr) | Unité automatisée de production de produits laitiers basée sur des modules mobiles de fonctions différentes individuellement lavables | |
CN116890012A (zh) | 模块化容器清洁机和用于操作模块化容器清洁机的方法 | |
JPH11192459A (ja) | 基板水洗方法および該方法を使用する基板処理装置 | |
CN118891707A (zh) | 用于在清洁线中清洁半导体晶圆的方法 | |
JPH0996634A (ja) | 金属材料マクロ組織試験装置 | |
FR2535985A1 (fr) | Procede et portique de manutention pour traiter des pieces par immersion |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
17P | Request for examination filed |
Effective date: 20020919 |
|
AKX | Designation fees paid |
Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: FRENCH |
|
REF | Corresponds to: |
Ref document number: 60142823 Country of ref document: DE Date of ref document: 20100930 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20100818 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100818 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100818 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101220 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100818 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100818 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101119 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100818 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100818 Ref country code: IE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100818 |
|
BERE | Be: lapsed |
Owner name: HANQUIER, THIERRY Effective date: 20101130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100818 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 60142823 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 60142823 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20101130 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101129 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
26N | No opposition filed |
Effective date: 20110519 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20101118 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20101130 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20101130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20101130 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 60142823 Country of ref document: DE Effective date: 20110519 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20101118 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20101108 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100818 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20121206 Year of fee payment: 12 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110531 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20140731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131202 |