EP1129263B1 - Tension force adjustable prestressed girder - Google Patents

Tension force adjustable prestressed girder Download PDF

Info

Publication number
EP1129263B1
EP1129263B1 EP99944909A EP99944909A EP1129263B1 EP 1129263 B1 EP1129263 B1 EP 1129263B1 EP 99944909 A EP99944909 A EP 99944909A EP 99944909 A EP99944909 A EP 99944909A EP 1129263 B1 EP1129263 B1 EP 1129263B1
Authority
EP
European Patent Office
Prior art keywords
girder
tension
bridge
steel wires
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP99944909A
Other languages
German (de)
French (fr)
Other versions
EP1129263A1 (en
Inventor
Man Yop Han
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Interconstec Co Ltd
Original Assignee
Interconstec Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Interconstec Co Ltd filed Critical Interconstec Co Ltd
Publication of EP1129263A1 publication Critical patent/EP1129263A1/en
Application granted granted Critical
Publication of EP1129263B1 publication Critical patent/EP1129263B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • E04C3/26Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members prestressed
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Definitions

  • This invention relates to prestressed girders.
  • the height of a girder which is long in span is relatively high such that the girder itself is 2.00 m - 3.00 m high.
  • Such a fact entails an increase in the height of an upper deck of an overpass so that, to secure a longitudinal alignment of the overpass matching the designed vehicle speed, the length of the overpass becomes longer, thus raising the construction costs.
  • to lower the height of the girder as low as possible is inevitably needed for improving the usability and the economic value of the girder.
  • Figure 1 of the accompanying diagrammatic drawings is a perspective view to show the general structure of a bridge. As shown in the drawing, a plurality of I-type girders 12 are installed on a column 10. An upper deck slab (not shown) is installed on the girders 12 of the bridge.
  • FIG. 2 of the accompanying diagrammatic drawings is a sectional view showing a girder in which steel wires are arranged according to conventional technology.
  • a girder 20 consists of a body portion 22, an upper flange 28, and a lower flange 24.
  • a plurality of steel wires 26 are built in the body portion 22 in the lengthwise direction.
  • An upper deck of a bridge is installed on the upper flange 28 and the bottom surface of the lower flange 24 is supported by a column 10 (as in Figure 1).
  • Preferred embodiments of the present invention aim to provide prestressed girders in which a tension force can be adjusted to easily increase a load-resisting force of a bridge or building, when excessive sagging or cracks are generated in a girder due to long-term use or when there is a need to increase the load-resisting force of the bridge or building without damaging the bridge or building.
  • a girder comprising an upper flange for supporting an upper deck of a bridge or building, a body portion and a lower flange, said girder being prestressed by tension steel wires provided in a lengthwise direction of said girder and tensioned to compensate for a load-resisting force:
  • non-tension wire means a wire that is installed initially with zero or small tension, for tensioning at a later time in order to augment the tension of wires that were installed initially under significant tension.
  • the girder further comprises a cut-open portion at a predetermined portion in the lengthwise direction of said girder and a coupling member installed at said cut-open portion for coupling ends of said steel wires of which opposite ends are fixed at end portions of said girder.
  • said coupling member comprises a support member having holes formed therein through which respective ends of said steel wires penetrate, and wedges inserted between said steel wires and said support member.
  • one end of the or each said non-tension steel wire is exposed at a respective end portion of said girder to apply a tension force.
  • the arrangement is such that the load-resisting force of said bridge or building can be increased by tensioning the or each said non-tension steel wire during construction of said girder and/or after the construction thereof.
  • the tension force of the or each said non-tension steel wire may be adjusted during or after slab casting and, after construction, the tension force of the or each said non-tension steel wire may be adjusted while said bridge or building is being used.
  • the present invention can be applied to any type of girder regardless of the shape of the section of the girder such as an I-type girder or a bulb T-type girder, the I-type girder is described in the below preferred embodiment.
  • a girder 40 includes an upper flange 28, a lower flange 24, and a body portion 22.
  • One or more tension steel wires 26 and non-tension steel wires 27 are built in and across the lower portion of the body portion 22 and the lower flange 24 of the girder 40 in the lengthwise direction of the girder 40.
  • the non-tension steel wires 27 are built in the lower flange 28 horizontally parallel to each other, as shown in Figure 3A.
  • the upper flange 28 is provided above the body portion 22 in the lateral direction in the section of the girder 40 and an upper deck (not shown) of a bridge is installed on the upper flange 28.
  • the lower flange 24 is provided below the body portion 22 in the lateral direction in the section of the girder 40 and the bottom surface thereof is supported by a column (not shown).
  • Figure 3B shows the arrangement of steel wires according to another preferred embodiment of the present invention.
  • a plurality of non-tension steel wires 27a are provided in the lengthwise direction of the girder 40 outside the lower portion of the body portion 22.
  • the non-tension steel wires 27a have the same function as that of an additional non-tension steel wire 27 provided in the lower flange 24. That is, after a bridge is constructed, sagging of the girder 40 is compensated for by tensioning the non-tension steel wires 27a. Also, the non-tension steel wires 27a can be more easily installed compared to a case of being installed inside the lower flange 24.
  • Figure 4A shows the arrangement of the steel wires at the end portion of the girder of Figure 3A.
  • the tension steel wires 26 and the non-tension steel wires 27 concentrated at the lower portion of the girder 40 are distributed throughout the entire sectional portion of the girder 40. That is, the steel wires are evenly distributed symmetrically in the girder 40 in the vertical and horizontal directions (as seen) so that the tension forces in the tension steel wires 26 and the non-tension steel wires 27 can be evenly distributed throughout the entire portion of the girder 40.
  • Figure 4B shows the arrangement of the steel wires at the end portion of the girder shown in Figure 3B.
  • the tension steel wires 26 and the non-tension steel wires 27 and 27a concentrated at the lower portion of the girder as shown in Figure 3B are evenly distributed symmetrically with respect to the girder 40 in the vertical and horizontal directions (as seen) so that the tension forces in the tension or non-tension steel wires 26, 27 or 27a are evenly distributed throughout the entire portion of the girder 40.
  • FIG 5 shows the arrangement of the steel wires in the lengthwise direction in the girder of Figure 3A and a cut-open portion 36 located in the middle of the girder.
  • the tension steel wires 26 and the non-tension steel wires 27 provided inside the girder 40 are concentrated in the lower portion at the middle portion of the girder 40 and evenly distributed throughout the entire sectional portion of the girder 40 at both end portions of the girder 40.
  • the tension and non-tension steel wires 26 and 27 are fixed at both ends of the girder 40 by a fixing means 32 which is an anchoring device.
  • the fixing means 32 is covered with concrete (not shown) after the girder 40 is constructed.
  • the girder is provided with a cut-open portion 36 for adjusting the tension force of the non-tension steel wires 27 at the middle portion of the girder or at another appropriate position.
  • the cut-open portion 36 is used as a space for accommodating a coupling member of the non-tension steel wires 27. That is, the cut-open portion 36 is used as a working space for adjusting the tension force of the non-tension steel wires 27 later.
  • one or more non-tension steel wire 27 and 27a installed inside or outside the girder 40 is additionally tensioned for reinforcement.
  • the additional tensioning work for the non-tension steel wires 27 and 27a is performed using a hydraulic jack.
  • the tension forces of the non-tension steel wires 27 and 27a are adjusted during or after slab casting and after construction, the tension force is adjusted while the bridge is in use. That is, in the case of a continuous bridge, re-tensioning can be performed before slab casting. However, in this example, the re-tensioning is performed shortly after the slab casting before slab concrete is hardened to prevent application of a tension force on the slab.
  • Figure 6 shows a preferred embodiment of fixing a steel wire at the end portion of a girder.
  • the steel wire 26 is anchored using a support member 50 as an anchoring device.
  • the steel wire 26 is inserted into a hole formed at the centre of the support member 50 at one end of the girder 40.
  • a plurality of wedges 52 are inserted between the steel wire 26 and the support member 50.
  • the steel wire 26 is tensioned by a hydraulic jack and the tensioned steel wire 26 is fixed by the wedges 52.
  • Figure 7 shows steel wires 26 coupled by a coupling member 62 as a preferred embodiment of a steel wire connection in cut-open portion 36.
  • the cut-open portion 36 is formed in the middle of the bottom surface of the girder 40 in the lengthwise direction.
  • the steel wires 26 fixed at both ends of the girder 40 are connected to the coupling member 62 such that forces in different directions are applied.
  • the tension steel wires 26 connected at the coupling member 62 are connected using the support members 50 and the wedges 52 as shown in Figure 6.
  • a coupling member such as 62 is provided at cut-open portion 36 for connecting together and adjusting the tension force of the non-tension steel wires 27.
  • the non-tension steel wires 27 connected to each other by the coupling member 62 are tensioned and fixed by using the wedges 52 so that the tension forces of the tension steel wires 26 can be maintained.
  • a tension force to the non-tension steel wires 27 and 27a provided at left and right sides of the girder 40, bending of the girder 40 to the left or right can be compensated for.
  • steel wires 26 and 27 are connected by the coupling member 62 to be capable of moving to a degree, while steel wires installed outside the girder 40 are not tensioned at all or tensioned by a small tension force so as to increase the tension forces of the steel wires later.
  • adjustable tension forces adjustable can be applied to other prestressed concrete structures such as buildings.
  • I-type girders have been described above with respect to preferred embodiments, other embodiments of the present invention can be applied to any type of girder regardless of the shape of the section of the girder - such as a bulb T-type girder, for example.
  • cracks and sagging of a bridge generated due to long-term deterioration, creep or overload can be corrected by additionally tensioning steel wires installed internally or externally at a girder of the bridge.
  • tensioning steel wires installed internally or externally at a girder of the bridge.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Adhesives Or Adhesive Processes (AREA)
  • Polyurethanes Or Polyureas (AREA)

Abstract

A tension force adjustable prestressed girder is disclosed which can compensate for sagging or cracks of a girder generated due to overload or long-term creep or increase a load-resisting force of a bridge or a building. The tension force adjustable prestressed girder for adjusting a load-resisting force which consists of an upper flange (28) supporting an upper deck of a bridge installed thereon, a body portion (22), and a lower flange (24) which includes tension steel wires (27) provided in a lengthwise direction of the girder (40) and tensioned to compensate for the load-resisting force, and at least one or more non-tension steel wires (27a) provided in the lengthwise direction of the girder, so that the load-resisting force of the bridge or building can be increased by tensioning the non-tension steel wires. Thus, cracks and sagging of a girder generated due to long-term deterioration, creep or overload can be corrected by additionally tensioning steel wires installed internally or externally at a girder of the bridge or building. Thus, repair and reinforcement of the bridge or building is easy so that the load-resisting force of the bridge or building can be easily increased. Also, by adjusting the tension force step by step, the girder can be economically manufactured or the height of the girder can be decreased.

Description

This invention relates to prestressed girders.
In general, when girders installed on a column of a concrete bridge become obsolete as time passes or heavy vehicles exceeding the originally designed weight allowance of a bridge pass over the bridge for a prolonged period, the beam of the bridge may become damaged and excessive sagging may occur at the girders. Concurrently, bending/tensile cracks are generated and, when such damage continues, the bridge may ultimately collapse. Thus, appropriate repair and reinforcement of the bridge is required.
It is known to repair and reinforce a prestressed concrete (PSC) bridge by means of an external steel wire reinforcement construction method (cf. US 5 671 572 A). In such a method, an externally installed steel wire is fixed appropriately at an end portion of a girder. However, it is difficult to install a wire fixing apparatus at the end portion of a girder and reliability of the wire fixing apparatus in respect of the load-resisting force is not assured. Thus, although other methods have been suggested and applied, no effective apparatus has yet been developed. That is, when cracks and sagging occur in a PCS bridge, it is very difficult to repair and reinforce the bridge.
Also, as traffic volume continuously increases and automobile manufacturing technologies develop, the weights of vehicles increase. With an increase in the weights of vehicles, the standard specifications for designing a bridge must be modified. Such modification may result in unbalanced load-resisting states, i.e. the load-resisting forces of existing bridges are not matched. In other words, in a state in which there are roads that allow the passage of heavy trucks, existing together with roads that do not allow the passage of heavy trucks, the efficiency of the transportation network system as a whole is severely lowered. Thus, to make the unbalanced load-resisting forces of these bridges consistent, an economical reinforcement method for upgrading the levels of bridges from 2 to 1 must be urgently found.
As the width of roads increases due to an increase in the number of lanes, the development of a wide span girder for constructing an elevated road or an overpass crossing a wide road has proceeded. Although a preflex beam has been developed and used for the above purposes, conveying the girder is inconvenient due to the length thereof and because the costs are high.
Currently, high strength concrete is used for a girder less than 30 m long that is not a wide span girder. However, as a high tension force is applied to the girder, the amount of creep generated becomes great. As the creep increases, the girder sags further, which directly affects the longitudinal alignment of the road. When the longitudinal alignment deteriorates, a coefficient of impact by passing vehicles increases. Thus, in the case of a high strength girder or a wide span girder, when the girder is used for a long time, an appropriate construction method for compensating for sagging of the girder is required.
Also, the height of a girder which is long in span is relatively high such that the girder itself is 2.00 m - 3.00 m high. Such a fact entails an increase in the height of an upper deck of an overpass so that, to secure a longitudinal alignment of the overpass matching the designed vehicle speed, the length of the overpass becomes longer, thus raising the construction costs. In the case of a bridge crossing a river, to lower the height of the girder as low as possible is inevitably needed for improving the usability and the economic value of the girder.
Figure 1 of the accompanying diagrammatic drawings is a perspective view to show the general structure of a bridge. As shown in the drawing, a plurality of I-type girders 12 are installed on a column 10. An upper deck slab (not shown) is installed on the girders 12 of the bridge.
Figure 2 of the accompanying diagrammatic drawings is a sectional view showing a girder in which steel wires are arranged according to conventional technology. As shown in the drawing, a girder 20 consists of a body portion 22, an upper flange 28, and a lower flange 24. A plurality of steel wires 26 are built in the body portion 22 in the lengthwise direction. An upper deck of a bridge is installed on the upper flange 28 and the bottom surface of the lower flange 24 is supported by a column 10 (as in Figure 1).
After the I-type girder 20 according to the conventional technology is constructed, when the bridge is damaged, that is, sagging or cracks are generated due to increased traffic volume passing over the bridge, or when the designed passage load must be increased according to a revised specification, reinforcement of the bridge is required. However, there are no known economical and reliable reinforcement methods applicable therefor.
Preferred embodiments of the present invention aim to provide prestressed girders in which a tension force can be adjusted to easily increase a load-resisting force of a bridge or building, when excessive sagging or cracks are generated in a girder due to long-term use or when there is a need to increase the load-resisting force of the bridge or building without damaging the bridge or building.
According to one aspect of the present invention, there is provided a girder comprising an upper flange for supporting an upper deck of a bridge or building, a body portion and a lower flange, said girder being prestressed by tension steel wires provided in a lengthwise direction of said girder and tensioned to compensate for a load-resisting force:
  • wherein at least one non-tension steel wire is provided in the lengthwise direction of said girder, so that the load-resisting force of said bridge or building can be increased by tensioning said non-tension steel wire.
  • In the context of this specification, and as will be understood from the description given below with reference to the accompanying drawings, the term "non-tension" wire means a wire that is installed initially with zero or small tension, for tensioning at a later time in order to augment the tension of wires that were installed initially under significant tension.
    Preferably, the girder further comprises a cut-open portion at a predetermined portion in the lengthwise direction of said girder and a coupling member installed at said cut-open portion for coupling ends of said steel wires of which opposite ends are fixed at end portions of said girder.
    Preferably, wherein said coupling member comprises a support member having holes formed therein through which respective ends of said steel wires penetrate, and wedges inserted between said steel wires and said support member.
    Preferably, wherein one end of the or each said non-tension steel wire is exposed at a respective end portion of said girder to apply a tension force.
    Preferably, the arrangement is such that the load-resisting force of said bridge or building can be increased by tensioning the or each said non-tension steel wire during construction of said girder and/or after the construction thereof.
    In such a girder, during construction, the tension force of the or each said non-tension steel wire may be adjusted during or after slab casting and, after construction, the tension force of the or each said non-tension steel wire may be adjusted while said bridge or building is being used.
    Although the present invention can be applied to any type of girder regardless of the shape of the section of the girder such as an I-type girder or a bulb T-type girder, the I-type girder is described in the below preferred embodiment.
    For a better understanding of the invention, and to show how embodiments of the same may be carried into effect, reference will now be made, by way of example, to Figures 3 to 7 of the accompanying diagrammatic drawings, in which:
  • Figure 3A is a sectional view showing the arrangement of steel wires in the middle portion of a girder according to one example of the present invention;
  • Figure 3B is a view similar to Figure 3A, but showing the arrangement of steel wires according to another example of the present invention;
  • Figure 4A is a sectional view showing the arrangement of steel wires at an end portion of the girder of Figure 3A;
  • Figure 4B is a sectional view showing the arrangement of steel wires at an end portion of the girder of Figure 3B;
  • Figure 5 is a view showing a cut-open portion located at the middle portion of a girder and the arrangement of steel wires in the girder;
  • Figure 6 is a side view showing an example of a steel wire fixed at an end portion of a girder; and
  • Figure 7 is a perspective view showing an example of steel wires in a cut-open portion.
  • In the figures, like references denote like or corresponding parts.
    In Figure 3A, a girder 40 includes an upper flange 28, a lower flange 24, and a body portion 22. One or more tension steel wires 26 and non-tension steel wires 27 are built in and across the lower portion of the body portion 22 and the lower flange 24 of the girder 40 in the lengthwise direction of the girder 40.
    Preferably, the non-tension steel wires 27 are built in the lower flange 28 horizontally parallel to each other, as shown in Figure 3A. The upper flange 28 is provided above the body portion 22 in the lateral direction in the section of the girder 40 and an upper deck (not shown) of a bridge is installed on the upper flange 28. The lower flange 24 is provided below the body portion 22 in the lateral direction in the section of the girder 40 and the bottom surface thereof is supported by a column (not shown).
    Figure 3B shows the arrangement of steel wires according to another preferred embodiment of the present invention. As shown in the drawing, a plurality of non-tension steel wires 27a are provided in the lengthwise direction of the girder 40 outside the lower portion of the body portion 22. The non-tension steel wires 27a have the same function as that of an additional non-tension steel wire 27 provided in the lower flange 24. That is, after a bridge is constructed, sagging of the girder 40 is compensated for by tensioning the non-tension steel wires 27a. Also, the non-tension steel wires 27a can be more easily installed compared to a case of being installed inside the lower flange 24.
    Figure 4A shows the arrangement of the steel wires at the end portion of the girder of Figure 3A. As shown in the drawing, the tension steel wires 26 and the non-tension steel wires 27 concentrated at the lower portion of the girder 40 are distributed throughout the entire sectional portion of the girder 40. That is, the steel wires are evenly distributed symmetrically in the girder 40 in the vertical and horizontal directions (as seen) so that the tension forces in the tension steel wires 26 and the non-tension steel wires 27 can be evenly distributed throughout the entire portion of the girder 40.
    Figure 4B shows the arrangement of the steel wires at the end portion of the girder shown in Figure 3B. As shown in the drawing, the tension steel wires 26 and the non-tension steel wires 27 and 27a concentrated at the lower portion of the girder as shown in Figure 3B are evenly distributed symmetrically with respect to the girder 40 in the vertical and horizontal directions (as seen) so that the tension forces in the tension or non-tension steel wires 26, 27 or 27a are evenly distributed throughout the entire portion of the girder 40.
    Figure 5 shows the arrangement of the steel wires in the lengthwise direction in the girder of Figure 3A and a cut-open portion 36 located in the middle of the girder. The tension steel wires 26 and the non-tension steel wires 27 provided inside the girder 40 are concentrated in the lower portion at the middle portion of the girder 40 and evenly distributed throughout the entire sectional portion of the girder 40 at both end portions of the girder 40. The tension and non-tension steel wires 26 and 27 are fixed at both ends of the girder 40 by a fixing means 32 which is an anchoring device. The fixing means 32 is covered with concrete (not shown) after the girder 40 is constructed.
    Here, when the girders are installed having intervals therebetween, or when a portion of the end of the girder is cut away, as shown in the drawing, a space is formed between adjacent girders. Thus, tensioning can be performed in that space when the tension and non-tension steel wires 26 and 27 are to be re-tensioned later. However, in this case, the end portion of the girder 40 must not be covered with concrete. Here, one end of the tension and non-tension steel wires 26 and 27 is exposed at either end portion of the girder 40 to apply a tension force.
    Also, in a preferred embodiment, the girder is provided with a cut-open portion 36 for adjusting the tension force of the non-tension steel wires 27 at the middle portion of the girder or at another appropriate position. The cut-open portion 36 is used as a space for accommodating a coupling member of the non-tension steel wires 27. That is, the cut-open portion 36 is used as a working space for adjusting the tension force of the non-tension steel wires 27 later.
    When cracks 34 or excessive sagging 35 indicated by a dotted line is generated in the girder 40, as shown in Figure 5, one or more non-tension steel wire 27 and 27a installed inside or outside the girder 40 is additionally tensioned for reinforcement. Here, the additional tensioning work for the non-tension steel wires 27 and 27a is performed using a hydraulic jack. Also, the tension forces of the non-tension steel wires 27 and 27a are adjusted during or after slab casting and after construction, the tension force is adjusted while the bridge is in use. That is, in the case of a continuous bridge, re-tensioning can be performed before slab casting. However, in this example, the re-tensioning is performed shortly after the slab casting before slab concrete is hardened to prevent application of a tension force on the slab.
    Figure 6 shows a preferred embodiment of fixing a steel wire at the end portion of a girder. The steel wire 26 is anchored using a support member 50 as an anchoring device. For example, the steel wire 26 is inserted into a hole formed at the centre of the support member 50 at one end of the girder 40. A plurality of wedges 52 are inserted between the steel wire 26 and the support member 50. Here, the steel wire 26 is tensioned by a hydraulic jack and the tensioned steel wire 26 is fixed by the wedges 52.
    Figure 7 shows steel wires 26 coupled by a coupling member 62 as a preferred embodiment of a steel wire connection in cut-open portion 36. As shown in the drawing, the cut-open portion 36 is formed in the middle of the bottom surface of the girder 40 in the lengthwise direction. The steel wires 26 fixed at both ends of the girder 40 are connected to the coupling member 62 such that forces in different directions are applied. Here, the tension steel wires 26 connected at the coupling member 62 are connected using the support members 50 and the wedges 52 as shown in Figure 6.
    As indicated previously, a coupling member such as 62 is provided at cut-open portion 36 for connecting together and adjusting the tension force of the non-tension steel wires 27. Thus, the non-tension steel wires 27 connected to each other by the coupling member 62 are tensioned and fixed by using the wedges 52 so that the tension forces of the tension steel wires 26 can be maintained. Also, by applying a tension force to the non-tension steel wires 27 and 27a provided at left and right sides of the girder 40, bending of the girder 40 to the left or right can be compensated for.
    According to the above-described and illustrated arrangement of steel wires and coupling apparatus, when a bridge is constructed or at an initial stage of construction, steel wires 26 and 27 are connected by the coupling member 62 to be capable of moving to a degree, while steel wires installed outside the girder 40 are not tensioned at all or tensioned by a small tension force so as to increase the tension forces of the steel wires later.
    Although a bridge is described as an example in the above preferred embodiments, adjustable tension forces adjustable according to other embodiments of the present invention can be applied to other prestressed concrete structures such as buildings.
    It is noted that the present invention is not limited to the preferred embodiments described above, and it is apparent that variations and modifications by those skilled in the art can be effected within the spirit and scope of the present invention as defined in the appended claims.
    For example, although I-type girders have been described above with respect to preferred embodiments, other embodiments of the present invention can be applied to any type of girder regardless of the shape of the section of the girder - such as a bulb T-type girder, for example.
    As described above, according to preferred embodiments of the present invention, cracks and sagging of a bridge generated due to long-term deterioration, creep or overload can be corrected by additionally tensioning steel wires installed internally or externally at a girder of the bridge. Thus, repair and reinforcement of the bridge is easy so that the load-resisting force of the bridge can be easily increased. Also, by adjusting the tension force step by step, the girder can be economically manufactured or the height of the girder can be decreased.
    In this specification, the verb "comprise" has its normal dictionary meaning, to denote non-exclusive inclusion. That is, use of the word "comprise" (or any of its derivatives) to include one feature or more, does not exclude the possibility of also including further features.

    Claims (7)

    1. A girder comprising an upper flange (28) for supporting an upper deck of a bridge or a building, a body portion (22) and a lower flange (24), said girder (40) being prestressed by tension steel wires (26) provided in a lengthwise direction of said girder (40) and tensioned to compensate for a load-resisting force:
         characterised in that at least one non-tension steel wire (27) is provided in the lengthwise direction of said girder (40), so that the load-resisting force of said bridge or building can be increased by tensioning said non-tension steel wire (27).
    2. A girder as claimed in claim 1, further comprising a cut-open portion (36) at a predetermined portion in the lengthwise direction of said girder (40) and a coupling member (62) installed at said cut-open portion (36) for coupling ends of said steel wires (26, 27) of which opposite ends are fixed at end portions of said girder (40).
    3. A girder as claimed in claim 2, wherein said coupling member (62) comprises a support member (50) having holes formed therein through which respective ends of said steel wires (26, 27) penetrate, and wedges (52) inserted between said steel wires (26, 27) and said support member (50).
    4. A girder as claimed in claim 1, 2 or 3, wherein one end of the or each said non-tension steel wire (27) is exposed at a respective end portion of said girder (40) to apply a tension force.
    5. A girder according to any of claims 1 to 4, wherein the arrangement is such that the load-resisting force of said bridge or building can be increased by tensioning the or each said non-tension steel wire (27) during construction of said girder (40) and/or after the construction thereof.
    6. A girder as claimed in claim 5 wherein, during construction, the tension force of the or each said non-tension steel wire (27) is adjusted during or after slab casting, and, after construction, the tension force of the or each said non-tension steel wire (27) is adjusted while said bridge or building is being used.
    7. A bridge or building supported by one or more girder (40) according to any of the preceding claims.
    EP99944909A 1998-11-07 1999-09-20 Tension force adjustable prestressed girder Expired - Lifetime EP1129263B1 (en)

    Applications Claiming Priority (3)

    Application Number Priority Date Filing Date Title
    KR9847661 1998-11-07
    KR1019980047661A KR100301431B1 (en) 1998-11-07 1998-11-07 Prestressed concrete girder with regulable tensile force
    PCT/KR1999/000567 WO2000028168A1 (en) 1998-11-07 1999-09-20 Tension force adjustable prestressed girder

    Publications (2)

    Publication Number Publication Date
    EP1129263A1 EP1129263A1 (en) 2001-09-05
    EP1129263B1 true EP1129263B1 (en) 2004-02-04

    Family

    ID=19557479

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP99944909A Expired - Lifetime EP1129263B1 (en) 1998-11-07 1999-09-20 Tension force adjustable prestressed girder

    Country Status (15)

    Country Link
    EP (1) EP1129263B1 (en)
    JP (1) JP2003501568A (en)
    KR (1) KR100301431B1 (en)
    CN (1) CN1115451C (en)
    AT (1) ATE259020T1 (en)
    AU (1) AU750126B2 (en)
    BR (1) BR9915041A (en)
    CA (1) CA2349855C (en)
    DE (1) DE69914621T2 (en)
    ES (1) ES2217805T3 (en)
    RU (1) RU2213187C2 (en)
    TR (1) TR200101267T2 (en)
    UA (1) UA70968C2 (en)
    WO (1) WO2000028168A1 (en)
    ZA (1) ZA200103608B (en)

    Families Citing this family (17)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    KR20010036486A (en) * 1999-10-08 2001-05-07 박상일 Method for designing and fabricating multi-step tension prestressed girder
    KR100427405B1 (en) * 2001-03-07 2004-04-17 박재만 Pssc complex girder
    KR20020071611A (en) * 2001-03-07 2002-09-13 박재만 Pss beam
    KR100466429B1 (en) * 2001-09-28 2005-01-13 허진구 PSC girder that possible an external tension
    KR20040049590A (en) * 2002-12-06 2004-06-12 한국과학기술원 Multiple Stage prestressed Girder
    WO2006007659A1 (en) * 2004-07-21 2006-01-26 S2 Holdings Pty Limited Building methods
    US20080092481A1 (en) 2004-07-21 2008-04-24 Murray Ellen Building Methods
    KR100950027B1 (en) 2009-12-04 2010-03-29 영창중공업 주식회사 Composite girder for bridge
    KR101263305B1 (en) 2011-10-25 2013-05-10 김상운 Correction structuer of bridge deck
    KR101265544B1 (en) 2012-05-15 2013-05-20 주식회사 장헌산업 Pretensioned psc girder of i-type using debonding method
    CN103147537B (en) * 2013-03-05 2016-08-03 哈尔滨工程大学 A kind of bending carrying girder steel
    CH706630B1 (en) * 2013-05-14 2013-12-31 S & P Clever Reinforcement Company Ag Method for pretensioning steel structure e.g. iron bridge, involves vertically driving lifting element to polymer tapes in region between end anchorages for causing traction force tensioning between end regions of polymer tapes
    KR101682923B1 (en) 2016-06-15 2016-12-06 주식회사 노빌테크 Manufacturing method of channel type prestressed girder and the construction method using the girder manufactured thereby
    CN106758873A (en) * 2016-11-11 2017-05-31 太原理工大学 A kind of punching prestressing force strengthens the method that diaphragm plate is connected with girder
    RU2669595C1 (en) * 2017-11-27 2018-10-12 Общество с ограниченной ответственностью "НПП СК МОСТ" Method of strengthening the flight structure of bridge structure with change of the cross section
    RU2677188C1 (en) * 2018-02-26 2019-01-15 Федеральное государственное бюджетное образовательное учреждение высшего образования "Петербургский государственный университет путей сообщения Императора Александра I" Preliminary stress-bearing reinforced beam
    CN113324848B (en) * 2021-05-20 2022-07-15 山东大学 Low-temperature bending strain test method for asphalt mixture trabecula test piece

    Family Cites Families (5)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    US4604003A (en) * 1983-02-22 1986-08-05 Francoeur Ronald A Method and apparatus for retensioning prestressed concrete members
    US4831800A (en) * 1987-06-24 1989-05-23 Nedelcu Lucian I Beam with an external reinforcement system
    US5313749A (en) * 1992-04-28 1994-05-24 Conner Mitchel A Reinforced steel beam and girder
    US5671572A (en) * 1994-02-11 1997-09-30 Siller-Franco; Jose Luis Method for externally reinforcing girders
    KR100261556B1 (en) * 1997-12-31 2000-07-15 박재만 Restrain apparatus for prestress structure

    Also Published As

    Publication number Publication date
    KR19990078494A (en) 1999-11-05
    CN1115451C (en) 2003-07-23
    CA2349855A1 (en) 2000-05-18
    AU5763399A (en) 2000-05-29
    DE69914621D1 (en) 2004-03-11
    ATE259020T1 (en) 2004-02-15
    CA2349855C (en) 2004-12-14
    RU2213187C2 (en) 2003-09-27
    EP1129263A1 (en) 2001-09-05
    CN1331773A (en) 2002-01-16
    DE69914621T2 (en) 2004-09-23
    ES2217805T3 (en) 2004-11-01
    KR100301431B1 (en) 2001-10-29
    JP2003501568A (en) 2003-01-14
    UA70968C2 (en) 2004-11-15
    BR9915041A (en) 2002-06-04
    AU750126B2 (en) 2002-07-11
    ZA200103608B (en) 2002-08-15
    WO2000028168A1 (en) 2000-05-18
    TR200101267T2 (en) 2002-03-21

    Similar Documents

    Publication Publication Date Title
    EP1129263B1 (en) Tension force adjustable prestressed girder
    US6751821B1 (en) Prestressed concrete girder of adjustable load bearing capacity for bridge and adjustment method for load bearing capacity of bridge
    KR100699413B1 (en) Channel bridge construction method available to control channel bridge segment sag
    EP0861354B1 (en) Method for building a bridge and bridge built according to said method
    KR100456471B1 (en) Open-type steel wire holding device and Metod for construction of continuous bridge using of prestressed concret beam having it
    US5727272A (en) Composite structure, especially bridge
    KR20040091350A (en) Prestressed steel girder
    KR100554026B1 (en) Open-type steel wire holding device of bridge
    KR200184684Y1 (en) Apparatus to prevent the negative moment of a bridge
    JPH09235705A (en) Reinforcing structure of gerber bridge hinge and reinforcing method thereof
    JP2979297B2 (en) Suspended slab bridge using external cable and its construction method
    KR20070002361A (en) Bridge construction method optimized precast concrete deck slab for channel bridge
    KR100442969B1 (en) Method and its devices to strengthen a bridge by external prestressing cable
    JP3146172B2 (en) Construction method of bridge using extension cable
    KR100493447B1 (en) Expansion joint for a bridge
    KR19990032977A (en) Repair reinforcement method and apparatus of bridge mold
    KR100349880B1 (en) Adjusting apparatus for prestressing force of girder
    JP2003064621A (en) Hanging floor slab bridge and reinforcing method of hanging floor slab
    KR100475585B1 (en) Method and apparatus for reinforcing P.S.C. beams for bridges
    RU2681048C1 (en) Reinforced beam of reinforced concrete span of the bridge
    KR200310500Y1 (en) Expansion joint for a bridge
    KR200291579Y1 (en) Apparatus for reinforcing P.S.C. beams for bridges
    Mochizuki et al. Design and construction of a cable-trussed girder bridge
    WO1993011314A1 (en) Method of increasing towards an upper limit the carrying ability in constructions by optimization of the degree of utilization of reinforcement and similar strengthening elements
    KR20030000946A (en) The reinforcement method of slab bridge

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    17P Request for examination filed

    Effective date: 20010607

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

    AX Request for extension of the european patent

    Free format text: AL;LT;LV;MK;RO;SI

    GRAH Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOS IGRA

    GRAS Grant fee paid

    Free format text: ORIGINAL CODE: EPIDOSNIGR3

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: NL

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040204

    Ref country code: LI

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040204

    Ref country code: FI

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040204

    Ref country code: CY

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040204

    Ref country code: CH

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040204

    Ref country code: BE

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040204

    Ref country code: AT

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040204

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: FG4D

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: EP

    REG Reference to a national code

    Ref country code: IE

    Ref legal event code: FG4D

    REF Corresponds to:

    Ref document number: 69914621

    Country of ref document: DE

    Date of ref document: 20040311

    Kind code of ref document: P

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: SE

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040504

    Ref country code: GR

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040504

    Ref country code: DK

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20040504

    LTIE Lt: invalidation of european patent or patent extension

    Effective date: 20040204

    NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PL

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: LU

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20040920

    Ref country code: IE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20040920

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DE

    Payment date: 20040922

    Year of fee payment: 6

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: ES

    Payment date: 20040923

    Year of fee payment: 6

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: FR

    Payment date: 20040924

    Year of fee payment: 6

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: MC

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20040930

    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FG2A

    Ref document number: 2217805

    Country of ref document: ES

    Kind code of ref document: T3

    ET Fr: translation filed
    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    26N No opposition filed

    Effective date: 20041105

    REG Reference to a national code

    Ref country code: IE

    Ref legal event code: MM4A

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: IT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

    Effective date: 20050920

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: ES

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20050921

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20060401

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: FR

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20060531

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: ST

    Effective date: 20060531

    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FD2A

    Effective date: 20050921

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: PT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20040704

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: GB

    Payment date: 20090930

    Year of fee payment: 11

    GBPC Gb: european patent ceased through non-payment of renewal fee

    Effective date: 20100920

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100920