EP0995523A1 - Installation de coulée continue verticale avec mesure optimisée du niveau de métal liquide - Google Patents

Installation de coulée continue verticale avec mesure optimisée du niveau de métal liquide Download PDF

Info

Publication number
EP0995523A1
EP0995523A1 EP98811066A EP98811066A EP0995523A1 EP 0995523 A1 EP0995523 A1 EP 0995523A1 EP 98811066 A EP98811066 A EP 98811066A EP 98811066 A EP98811066 A EP 98811066A EP 0995523 A1 EP0995523 A1 EP 0995523A1
Authority
EP
European Patent Office
Prior art keywords
measuring
measuring system
mold
level
metal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP98811066A
Other languages
German (de)
English (en)
Inventor
Etienne Caloz
Jean-Pierre Seppey
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
3A Composites International AG
Original Assignee
Alusuisse Lonza Services Ltd
Alusuisse Technology and Management Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alusuisse Lonza Services Ltd, Alusuisse Technology and Management Ltd filed Critical Alusuisse Lonza Services Ltd
Priority to EP98811066A priority Critical patent/EP0995523A1/fr
Priority to EP99950752A priority patent/EP1133371A1/fr
Priority to CA002348613A priority patent/CA2348613A1/fr
Priority to AU63407/99A priority patent/AU749027B2/en
Priority to PCT/EP1999/007868 priority patent/WO2000024535A1/fr
Publication of EP0995523A1 publication Critical patent/EP0995523A1/fr
Priority to ZA200102812A priority patent/ZA200102812B/xx
Priority to IS5920A priority patent/IS5920A/is
Priority to NO20011978A priority patent/NO20011978L/no
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/18Controlling or regulating processes or operations for pouring
    • B22D11/181Controlling or regulating processes or operations for pouring responsive to molten metal level or slag level
    • B22D11/185Controlling or regulating processes or operations for pouring responsive to molten metal level or slag level by using optical means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/18Controlling or regulating processes or operations for pouring
    • B22D11/181Controlling or regulating processes or operations for pouring responsive to molten metal level or slag level
    • B22D11/186Controlling or regulating processes or operations for pouring responsive to molten metal level or slag level by using electric, magnetic, sonic or ultrasonic means

Definitions

  • the invention relates to a vertical continuous casting system, in particular a vertical continuous casting system for the automatic continuous casting of aluminum alloys, comprising at least one mold with a start-up base arranged on a lowerable casting table, a pouring channel system for transporting a molten metal from an oven into the individual molds, and a measuring device for each mold for determining the time-dependent molten metal level N (t) and a flow control device for controlling the supply of metal in the individual molds depending upon the difference between a predetermined desired value curve to N (t) and the measured time-dependent molten metal level N (t).
  • the invention further relates to a method for the vertical continuous casting of metals, in particular aluminum alloys, in a casting plant comprising at least one mold, in which method the liquid metal is fed from an oven via a trough system to the individual molds and via a flow control device into which one can be lowered
  • Approach trays arranged at the casting table are first passed closed molds during a filling phase, starting from an initial level of the metal melt, at which metal melt level control begins, up to a predetermined level, at which the lowering of the casting table for producing the metal strands begins, and throughout lowering phase, the time-dependent metal level N (t) in each mold with a measuring apparatus and measured with a time-dependent setpoint to N (t) is compared, and the metal supply in the individual ingot molds by means of a flow-through
  • the control device is controlled according to the time-dependent difference between the actual and setpoint value of the metal level.
  • Such a method, as well as such a vertical continuous casting installation containing several molds are known for example from DE-OS 32 05 480 A1.
  • the detection of the metal level is done by means of a float as a sensor that rests on the surface of the metal column and consists of a heat-resistant material, which must be selected so that a Absorption of molten metal or contaminants is avoided.
  • Patent EP-B 0 517 629 also describes a device described at the outset and describe a corresponding process for vertical continuous casting of metals, whereby to record the time-dependent molten metal level in the individual molds a capacitive sensor is used.
  • the capacitive level measurement takes place between the surface of the molten metal and one to it at a certain distance located plate, which is at a distance from the metal surface by means of a servo motor is adjusted in such a way that the capacity is constant and equal to a reference capacity is.
  • WO 98/32559 describes a method according to which the metal level in all molds simultaneously according to a setpoint curve identical for all molds is regulated, its slope at the beginning of the regulation in comparison to the mean slope is greater and at the end of the start-up phase is smaller than the average gradient.
  • the filling level of the molds is typically at the beginning of the lowering process between 120 and 200 mm.
  • the precise control of the metal level is particularly in the Lowering phase of crucial importance for a trouble-free operation of a Casting machine.
  • the precise control of the metal level in the individual molds requires one correspondingly accurate measurement of the fill level.
  • precise metal level control requires an accurate and reproducible level measurement over a large measuring range of typically 200 mm.
  • the importance of a precise metal level determination is used in particular in the further developed controls of multi-mold continuous casting plants, such as in the case of controls according to WO 98/32559, where the level control is done with non-linear setpoint curves, greatly increased.
  • Inductive or capacitive sensors are suitable for the exact level determination.
  • the required accuracy can only be achieved in one with inductive sensors Reach measuring range of approx. 30-50 mm.
  • the known from the prior art Vertical continuous casting plants therefore use most facilities where such Sensors using a precision mechanism in cooperation with a servo or Stepper motor are tracked in such a way that the required measurement accuracy allowed measuring range is not exceeded.
  • Capacitive sensors can be used for gutters Measuring ranges of, for example, up to 300 mm can be used; however, they show one great dependence on the external measurement conditions, so that a frequent Recalibration is required.
  • Laser-optical methods can be used for level measurement of highly reflective measuring goods can only be used to a limited extent. Such methods are suitable in principle for level measurement of metal alloys, for example aluminum alloys, during the mold filling phase and at the beginning of the lowering phase. During the lowering phase forms after a few minutes - at least with aluminum alloys Beginning of the lowering phase a highly reflective oxide layer, which the use of laser optics Level measurement procedure severely impaired or even impossible.
  • metal alloys for example aluminum alloys
  • Ultrasound and microwave methods based on the radar principle have a large one Measuring range and allow contactless level measurement, but do not show that required measurement accuracy, at least not for the lowering phase of the continuous casting process.
  • the ultrasonic level measurement methods are strongly temperature-dependent, and that Microwave level measurement methods are sensitive to the measurement environment.
  • the invention is therefore based on the object of a vertical continuous casting plant at the beginning mentioned type with a precise, reliable and inexpensive level measurement to make available and to specify a method of the type mentioned at the outset, in which the metal level measurement is carried out in a simple manner with high precision can be.
  • the object on which the vertical continuous casting installation is based solved in that the measuring device from two physically different working Measuring systems with one sensor each, the sensors with respect to each measuring device the mold is fixed at a predetermined and fixed distance, and the first Measuring system with a measuring accuracy of at least 200 mm has at least ⁇ 2 mm, and the second measuring system in a measuring range of at least 20 mm has a measurement accuracy of at least ⁇ 0.1 mm.
  • the invention advantageously relates to vertical continuous casting plants with several molds.
  • the device according to the invention also comprises vertical continuous casting plants with only a single mold.
  • the solution according to the invention is based on the idea that at the start of the continuous casting process, i.e. during the first filling phase of those initially closed by the approach floor Chill mold, and during the remaining filling phase, as well as during the lowering process of the casting table different level measuring devices can be used, which the specific requirements during the different phases Take into account.
  • the invention is further based on the knowledge that a large measuring range of approximately 200 min only during the first filling phase of those initially closed by the start-up floor Chill mold is required, and in the subsequent filling and lowering phase of the casting table a smaller measuring range of, for example, 15-20 mm is sufficient.
  • a less high measurement accuracy is required during the start phase than in the subsequent filling and lowering phase, since the filling level in the first filling phase is very different changed quickly.
  • the subsequent filling and lowering phase is a very high measurement accuracy required.
  • measuring range means a measuring range in which the values as a whole Range between a maximum and a minimum measured value, where the difference between the maximum and the minimum value Measuring range corresponds.
  • the measured values are in a measuring range of 200 min in a value range between 0 and 200 mm.
  • a measuring device is preferred in which the first measuring system is based on an optical, capacitive, ultrasonic or microwave method, and the second measuring system based on an inductive, capacitive or optical method.
  • a measuring device in which the first measuring system is located on a optical or an ultrasonic or microwave method, and the second measuring system based on an inductive or capacitive process.
  • the first filling phase of the mold closed with the start-up floor usually takes place at the highest possible speed so that the metal level at the beginning of the Mold filling rises very quickly. This will cause the mold to start filling a turbulent flow is formed so that no flat at the beginning of the filling process Melt surface is present, which causes the reflective properties of the melt surface compared to a flat surface of the same metal turn out much smaller. For this reason, as well as those not yet formed in this phase of the process Oxide skin allows the first filling phase to be measured using a laser-optical level Method. For the subsequent casting process, i.e. during the rest of the filling phase and during the lowering process of the casting table, the use of a laser-optical is suitable Level measurement method due to the high reflection of the essentially flat Molten metal surface not for all alloys.
  • a level measurement with ultrasound is based either on the measurement of the runtime of a Sound pulse or on the measurement of sound absorption.
  • the measurement of the Transit time of an ultrasonic pulse i.e. the removal of the melt surface is from the transit time between the transmitted and received signal. That works Runtime procedure usually based on the principle of the echo sounder, i.e. an electrical impulse is, for example, by one on the start-up floor or on a lower area of the mold attached piezoelectric transducer converted into an ultrasonic pulse, which is emitted into the melt and from the melt-air boundary layer partially is reflected, the reflected ultrasound pulse (echo) to a similar piezoelectric transducer hits in which the echo turns into an electrical pulse is converted back.
  • the fill level results from the transit time of the sound pulse and the speed of sound.
  • the fill level can also be based on the same sonar principle measure when the ultrasonic transmitter and receiver are in the air space above the Melt surface is arranged. With ultrasonic level measurement has to Temperature of the media to be taken into account, since the speed of sound is temperature dependent.
  • Microwave transmitter and receiver When measuring the level with microwaves according to the radar principle Microwave transmitter and receiver as well as an antenna attached above the mold.
  • the surface of the molten metal partially reflects that from the microwave transmitter emerging, usually frequency-modulated, electromagnetic waves or Impulses.
  • the distance between the antenna and the melt surface is determined according to the Radar principle measured.
  • a Microwave signal emitted of constant amplitude and again after reflection received and mixed with part of the transmission signal; the frequency of the mixer output signal is proportional to the runtime and therefore a measure of the distance between the transmitter and the melt surface.
  • An optical level measurement can be an interferometric distance measurement, a laser runtime method or a triangulation procedure.
  • the distance of the reflecting Melt surface measured by a sensor. Either the Phase angle difference between reflected and unreflected, modulated laser beam evaluated, or the displacement of the reflector surface is measured (Melt surface) with a counting laser interferometer.
  • interferometric Distance measurement is expediently a monochromatic laser beam split a semitransparent mirror into a measuring and a reference beam. Both beams are emitted by one reflector, one fixed and one movable, reflected. The reflected rays are superimposed on the semi-transparent mirror, creating interference fringes that are transverse to and from the receiver to be analyzed.
  • the level measurement can be carried out by a direct transit time measurement a light pulse or a phase measurement.
  • phase measurement the transmission signal is expediently converted to a carrier signal, for example in the MHz range, modulated, the measurement of the phase shift after demodulation in the receiver.
  • the direct transit time measurement is based on the radar principle, in which smallest time differences in the nano to picosecond range can be measured.
  • the level measurement is traced back to an angle measurement.
  • a highly focused beam of light from a laser hits under a pointed one Angle on the surface of the melt and is reflected on it.
  • the reflected light beam strikes a certain point on the receiver, i.e. for example of a location detector.
  • the position detector can be a CCD line, for example (Batch Coupled Device), which consist of a large number of light-sensitive components (pixels). With a CCD line this position can recorded and converted into the level using the angle or path difference.
  • the Imaging location of the reflected laser beam on the position detector shifts into Dependence on the distance of the melt surface from the sensor.
  • the capacity is dependent on the melt height measured.
  • the capacity changes, for example, through the degree of coverage or the distance between two given surfaces.
  • the capacity changes also by changing the dielectric constant (e.g. the air) Introduction of the molten metal.
  • a change in capacity is, for example, about demonstrated the change in capacitive resistance.
  • the sensors are predetermined and in relation to the mold fixed distance, i.e. the two measuring systems have no device to adjust the height of the sensors.
  • measuring systems that have no mechanically moving parts, and in particular no mechanical precision parts. Measuring systems are further preferred, that work contactlessly in relation to the molten metal.
  • a measuring device for each casting unit (mold) is particularly preferred, in which the first measuring system on an optical method, in particular on a triangulation method, and the second measuring system is based on an inductive method.
  • a first measuring system with a measuring range of up to is very particularly preferred 200 mm, whereby a measuring accuracy of ⁇ 1 mm is achieved in the whole measuring range.
  • the measuring accuracy of the first measuring system is typically between ⁇ 0.1 mm and ⁇ 2 mm, preferably between ⁇ 0.1 mm and ⁇ 1 mm.
  • the measuring range of the second measuring system is typically 20 to 50 mm, the Measuring accuracy typically between ⁇ 0.01 mm and ⁇ 0.1 mm, preferably between ⁇ Is 0.01 mm and ⁇ 0.08 mm.
  • the combination of an optical sensor with an inductive sensor allows provision a compact and powerful measuring device, which on the one hand does not expensive, sensitive and elaborately designed, mechanical sensor tracking devices required and on the other hand due to the measuring range and measuring accuracy an efficient level measurement for the individual casting phases the metal melt allows with sufficiently high accuracy.
  • the inventive Continuous caster is particularly suitable for a control algorithm for Introducing metal into the individual molds, in which non-linear Setpoint curves can be used to control the level of molten metal.
  • the Measurement of the time-dependent metal level N (t) with a measuring device consisting of two physically different working measuring systems is carried out, whereby starting from the initial level until reaching a predetermined melt level done by a first measuring system with a first sensor, and for the further Measurement of the time-dependent metal level curve N (t) during the subsequent one Filling and lowering phases a second measuring system with a second sensor is used, and the sensors of the two measuring systems with respect to the mold are fixed and take a constant position throughout the continuous casting process.
  • the filling phase begins with the introduction of liquid metal onto the start-up floor and ends with the start of lowering the start-up floor, ie when the start level N s is reached at time t s .
  • the metal level control usually only begins when a certain metal level N a is reached at time t a in the mold, which is initially closed by the start-up floor.
  • the first filling phase denotes the period from the start of the introduction of liquid metal into the mold until the time t w , at which the change from the first to the second measuring system for the metal level determination takes place, where t w denotes the time at which the metal level in the first a mold closed by the start-up floor reaches a predetermined height N w .
  • the period between t w and t s describes the second or the further filling phase, or that of the first filling phase that follows.
  • the lowering phase begins when the start level N s is reached at time t s and lasts until the end or the termination of the continuous casting process.
  • the flow control device is a function of the difference of the measured metal level path N (t) of the setpoint curve N soll (t) controlled by a control unit, said flow control device determines the current flowing into the mold molten metal amount.
  • the control unit determines, for example, the start time t a of the mold filling, the time t w for changing the measuring system, the standard time t s of the lowering process, the filling of the mold or the amount of metal to be introduced into the mold per unit of time during the filling phase and during the Lowering process, the lowering speed of the casting table and the control of the measuring system responsible for level measurement N (t).
  • the control unit may also serve to monitor and control further process parameters, such as cooling water supply, CO 2 supply, supply of refining agent, EMC power supply, and automatically initiate the lowering process of the casting table, for example.
  • the metal supply into the individual molds is only regulated directly up to the starting time t s by the time-dependent difference between the actual and the setpoint value of the metal level.
  • the direct control of the metal supply takes place after the start of the lowering process as a function of the bar length, ie as a function of the vertical casting table position, and on the basis of the difference between the actual and target value of the metal level. Accordingly, the control of the metal supply takes place after the start time t s by the bar length-dependent difference between the actual and target value of the metal level. Since the lowering process usually takes place at a constant speed, the bar length increases linearly with time, so that the regulation of the metal supply is also regulated during the lowering process in accordance with the time-dependent difference between the actual and target value of the metal level.
  • the time t a of the start of the level control is preferably determined by measuring the metal level, in particular by level measurement using a laser-optical method.
  • the level measurement by means of the second measuring system i.e. the time of the change of the measuring systems, can either be triggered by a control unit based on the measured metal level, or according to a preferred embodiment, in particular when using a second measuring system with an inductive measuring method, directly by the Melt levels are triggered by changing the measuring system at a time at which the melt enters, for example, the cavity formed by an inductively operating measuring coil.
  • the method according to the invention is suitable for casting plants with only one mold; in particular However, it is suitable for vertical continuous casting plants with several molds.
  • the sensors of the two measuring systems take one casting unit with regard to the mold, a fixed and constant one during the entire continuous casting process Position on, i.e. the measurement takes place without any mechanical tracking device in Form, for example, a height adjustment of the sensors. This is preferably done Level measurement during the first filling phase with regard to the metal melt without contact.
  • the measuring systems include continuously and discontinuously working Level detection systems. Accordingly, the inventive method can by a continuous and / or discontinuous level measurement can be carried out.
  • the Level measurement with the second measuring system is a continuous metal level measurement prefers.
  • the measurement is preferably carried out with the first Measuring system at discrete points in time, in particular with 3 to 10 measured values, the Level measurement with the second measuring system is carried out continuously.
  • the lowering of the casting table begins with the Appropriately soils as soon as the start level is reached in a mold.
  • the metal level in the launder from the start of the filling phase is also preferred Approach floors and the molds on up to and with the stationary pouring phase (lowering phase) kept at a constant level.
  • the continuous casting installation according to the invention and the method according to the invention are suitable for the casting of all continuously castable metals, but preferably for the continuous casting of Aluminum, magnesium and copper alloys.
  • Those according to the invention are particularly suitable Continuous casting plant and the method according to the invention, however, for continuous casting of aluminum alloys.
  • the vertical continuous casting installation shown in FIG. 1 contains a mold 10 with a start-up floor 14 arranged on a lowerable casting table 16, a lifting / lowering device 11 for the casting table, which is driven by a motor 12, the motor being controlled by a control unit 34, a metal level measuring device consisting of two measuring systems 22, 26, a pouring channel system 20 for transporting a molten metal 18 from a furnace (not shown) into the mold 10, a flow control device 30 controlled by the control unit 34 determining the amount of molten metal to be introduced into the mold.
  • the control unit 34 determines, inter alia, the starting time t a of the mold filling, the starting time t s of the lowering process, the filling of the mold or the amount of metal 18 to be introduced into the mold 10 per unit of time during the filling phase and during the lowering process and the lowering speed of the casting table 16 , wherein the control unit 34 operates as a function of the metal level measurement N (t) and a predetermined setpoint curve N Soll (t).
  • the flow control device 30 shown by way of example in FIG. 1 essentially exists from an inlet opening 33 located in the trough 20, which is from a vertically movable plug 32 is closable.
  • the plug 32 can be passed through on the one hand Lower it into the inlet opening 33 into the closed position, or by lifting it Opening cross section and thus the supply of molten metal 18 in the mold 10 accordingly be enlarged.
  • the plug 32 has a stuffing rod, which by a Holding device guided and driven by a motor 31, the motor over the control unit 34 is controlled.
  • the casting trough 20 Before a casting begins, all settings on the Casting plant checked. When all starting conditions are met, tilting of the furnace containing the liquid metal, the casting trough 20 to a predetermined Metal level filled. As soon as a sensor - for example an inductive sensor - a Indicates predetermined fill level in the trough 20, the inlet opening 33 of the Watering trough 20 by lifting the plug 32 of the flow control device 30 released and the filling of the approach floors 14 and 10 molds with the liquid Metal 18 starts.
  • the metal level N (t) takes place in the start-up base 14 or in the mold 10, for example PID-controlled, via a measuring device containing two measuring systems 22, 26.
  • the mold 10 shown in Figure 1 is shown in the closed state, i.e. the The mold 10 rests on the approach floor, the lowering process not yet having started. However, the filling phase is almost complete because the mold 10 is already close to second sensor 28 is filled with liquid metal 18.
  • the first sensor 24 is at a greater distance from the approach floor 14 than the second Sensor 28. This ensures that the on a laser optical Process based, first sensor 24 does not come into contact with the melt 18.
  • the sensors 24 and 28 are at a fixed distance from the respective other measuring system 22 or 26 connected.
  • the two measuring systems 22 and 26 are mechanical to one another firmly connected, i.e.
  • the two measuring systems usually form one with the other mechanical unit.
  • the distance of the sensors 24, 28 from the mold is constant during the entire continuous casting process, ie the distance of the sensors 24, 28 from the metal surface changes constantly, in particular during the filling phase of the mold. Accordingly, at the beginning of the filling phase, the distance of the sensors 24, 28 from the molten metal surface, respectively. to the approach floor 14 is greatest, while this distance decreases continuously or discontinuously during the filling phase and remains essentially constant after reaching the start level N s , ie at the beginning and during the lowering process.
  • the embodiment shown in the drawing relates to continuous casting with a conventional mold.
  • the vertical continuous caster according to the invention also includes other casting methods, such as casting in an electromagnetic Alternating field (EMC), i.e. using an electromagnetic Mold.
  • EMC electromagnetic Alternating field
  • FIG. 2 shows an example of a setpoint curve N to (t) for the inventive method.
  • the setpoint curve N soll (t) shown in FIG. 2 is polygonal and is suitable, for example, for discontinuous control of the metal level. In a range close to the initial level N a , the setpoint curve N set (t) has a value that is relative to the mean slope greater incline. On the other hand, the setpoint curve N to (t) in an up to the starting level N s nearby area a with respect to the central pitch smaller pitch.
  • the value N SOLL (t w) the amount N w at the time t w is the change from the first measurement system 22 to the second measuring system 26 instead.
  • the point in time t w is determined by the entry of the melt into the cavity formed by an inductively working measuring coil. Accordingly, the metal height N (t) above the approach floor 14 during the first filling phase, ie until the filling height has reached the value N w , is determined with the first measuring system 22, which has a large measuring range.
  • the metal height is determined with the second measuring system 26, the measuring range of which is smaller than the first measuring system 22, but has a high measuring accuracy.
  • the high measurement accuracy is particularly important from time t w , since thereafter the setpoint curve N soll (t) is preferably flatter than the mean slope, and thus the metal supply to the individual casting units in a continuous casting installation having several molds 10 until the actual casting start t s , which is initiated by lowering the casting table 16, can be optimally controlled.
  • the starting level N s ie the height of the surface of the liquid metal 18 above the approach floor 14 at the starting time t s , is typically between 100 and 200 mm and in particular between 120 and 190 mm.
  • Starting level t a - the starting level N s is typically reached within a time of 20 to 90 s or preferably within 25 to 45 s.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Measurement Of Levels Of Liquids Or Fluent Solid Materials (AREA)
  • Continuous Casting (AREA)
EP98811066A 1998-10-23 1998-10-23 Installation de coulée continue verticale avec mesure optimisée du niveau de métal liquide Withdrawn EP0995523A1 (fr)

Priority Applications (8)

Application Number Priority Date Filing Date Title
EP98811066A EP0995523A1 (fr) 1998-10-23 1998-10-23 Installation de coulée continue verticale avec mesure optimisée du niveau de métal liquide
EP99950752A EP1133371A1 (fr) 1998-10-23 1999-10-16 Installation de coulee continue verticale avec mesure optimisee du niveau de metal
CA002348613A CA2348613A1 (fr) 1998-10-23 1999-10-16 Installation de coulee continue verticale avec mesure optimisee du niveau de metal
AU63407/99A AU749027B2 (en) 1998-10-23 1999-10-16 Vertical continuous casting installation with optimized measurement of the metal level
PCT/EP1999/007868 WO2000024535A1 (fr) 1998-10-23 1999-10-16 Installation de coulee continue verticale avec mesure optimisee du niveau de metal
ZA200102812A ZA200102812B (en) 1998-10-23 2001-04-05 Verticle continuous casting installation with optimized measurement of the metal level.
IS5920A IS5920A (is) 1998-10-23 2001-04-18 Búnaður fyrir lóðrétta, samfellda steypuvinnslu með kjörmælingu á málmhæðinni
NO20011978A NO20011978L (no) 1998-10-23 2001-04-20 Vertikalstrengstöpeanlegg med optimalisert metallnivåmåling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP98811066A EP0995523A1 (fr) 1998-10-23 1998-10-23 Installation de coulée continue verticale avec mesure optimisée du niveau de métal liquide

Publications (1)

Publication Number Publication Date
EP0995523A1 true EP0995523A1 (fr) 2000-04-26

Family

ID=8236404

Family Applications (2)

Application Number Title Priority Date Filing Date
EP98811066A Withdrawn EP0995523A1 (fr) 1998-10-23 1998-10-23 Installation de coulée continue verticale avec mesure optimisée du niveau de métal liquide
EP99950752A Withdrawn EP1133371A1 (fr) 1998-10-23 1999-10-16 Installation de coulee continue verticale avec mesure optimisee du niveau de metal

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP99950752A Withdrawn EP1133371A1 (fr) 1998-10-23 1999-10-16 Installation de coulee continue verticale avec mesure optimisee du niveau de metal

Country Status (7)

Country Link
EP (2) EP0995523A1 (fr)
AU (1) AU749027B2 (fr)
CA (1) CA2348613A1 (fr)
IS (1) IS5920A (fr)
NO (1) NO20011978L (fr)
WO (1) WO2000024535A1 (fr)
ZA (1) ZA200102812B (fr)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100364696C (zh) * 2003-06-13 2008-01-30 瓦格斯塔夫公司 阻止熔融金属流经模腔的系统、方法和熔融金属铸造系统
WO2010078201A1 (fr) * 2008-12-31 2010-07-08 Tenedora Nemak, S.A. De C.V. Moulage en sable basse pression d'éléments de moteur à cylindres en alliage d'aluminium
EP2386366A3 (fr) * 2010-05-14 2012-10-10 Inteco special melting technologies GmbH Procédé et dispositif d'établissement continu du niveau de scories dans des installations de refusion par laitier électrique à l'aide de lingotières courtes
CN110508764A (zh) * 2019-09-20 2019-11-29 哈尔滨工业大学 一种等外径薄壁合金铸件行波磁场/超声波协同优化的半连铸设备及其半连铸方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017111722A1 (de) * 2017-05-30 2018-12-06 Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung e.V. Verfahren und vorrichtung zum charakterisieren eines objekts, verfahren und vorrichtung zum bestimmen einer zusammensetzung eines objekts sowie verfahren und vorrichtung zum erkennen eines elektrisch leitfähigen und/oder magnetisch permeablen objekts

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3205480A1 (de) * 1981-05-26 1982-12-16 Kaiser Aluminum & Chemical Corp., 94643 Oakland, Calif. Verfahren und einrichtung zum regeln des metallbadpegels in einer mehrzahl von vertikalen kontinuierlichen oder halbkontinuierlichen giesseinheiten
JPH0819844A (ja) * 1994-07-05 1996-01-23 Sumitomo Metal Ind Ltd 連続鋳造機における鋳造制御方法
EP0776715A1 (fr) * 1995-02-28 1997-06-04 Nkk Corporation Procede et appareil de regulation de la coulee continue
WO1998032559A1 (fr) * 1997-01-24 1998-07-30 Alusuisse Technology & Management Ag Procede pour la coulee continue verticale de metaux

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3205480A1 (de) * 1981-05-26 1982-12-16 Kaiser Aluminum & Chemical Corp., 94643 Oakland, Calif. Verfahren und einrichtung zum regeln des metallbadpegels in einer mehrzahl von vertikalen kontinuierlichen oder halbkontinuierlichen giesseinheiten
JPH0819844A (ja) * 1994-07-05 1996-01-23 Sumitomo Metal Ind Ltd 連続鋳造機における鋳造制御方法
EP0776715A1 (fr) * 1995-02-28 1997-06-04 Nkk Corporation Procede et appareil de regulation de la coulee continue
WO1998032559A1 (fr) * 1997-01-24 1998-07-30 Alusuisse Technology & Management Ag Procede pour la coulee continue verticale de metaux

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 096, no. 005 31 May 1996 (1996-05-31) *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100364696C (zh) * 2003-06-13 2008-01-30 瓦格斯塔夫公司 阻止熔融金属流经模腔的系统、方法和熔融金属铸造系统
WO2010078201A1 (fr) * 2008-12-31 2010-07-08 Tenedora Nemak, S.A. De C.V. Moulage en sable basse pression d'éléments de moteur à cylindres en alliage d'aluminium
EP2386366A3 (fr) * 2010-05-14 2012-10-10 Inteco special melting technologies GmbH Procédé et dispositif d'établissement continu du niveau de scories dans des installations de refusion par laitier électrique à l'aide de lingotières courtes
CN110508764A (zh) * 2019-09-20 2019-11-29 哈尔滨工业大学 一种等外径薄壁合金铸件行波磁场/超声波协同优化的半连铸设备及其半连铸方法

Also Published As

Publication number Publication date
WO2000024535A1 (fr) 2000-05-04
CA2348613A1 (fr) 2000-05-04
NO20011978D0 (no) 2001-04-20
NO20011978L (no) 2001-06-08
EP1133371A1 (fr) 2001-09-19
IS5920A (is) 2001-04-18
AU749027B2 (en) 2002-06-13
AU6340799A (en) 2000-05-15
ZA200102812B (en) 2001-11-15

Similar Documents

Publication Publication Date Title
DE2839953C3 (de) Vorrichtung und Verfahren zum Messen der Badspiegelhöhe in einer Stranggießkokille
DE102013015656A1 (de) Verfahren zum Messen der Eindringtiefe eines Laserstrahls in ein Werkstück, Verfahren zum Bearbeiten eines Werkstücks sowie Laserbearbeitungsvorrichtung
EP0581786B1 (fr) Procede pour le reglage des parametres de coulee dans une machine a couler sous pression
AT504145B1 (de) Messvorrichtung und messkopf zum berührungslosen abtasten eines objekts in drei dimensionen
WO1999011844A1 (fr) Procede et dispositif pour controler une matiere fondue servant a la production de cristaux
DD297703A5 (de) Verfahren zur kontinuierlichen bestimmung der dicke einer fluessigen schlackenschicht auf der oberflaeche einer metallscmelze
EP0995523A1 (fr) Installation de coulée continue verticale avec mesure optimisée du niveau de métal liquide
DE3916115C2 (fr)
EP0131979B1 (fr) Procédé de réglage du niveau d'un bain de métal fondu
DE2851256A1 (de) Automatisches metallschmelzenoberflaechen-fuellstands-regelungssystem fuer stranggiessmaschinen
DE3346650A1 (de) Verfahren und vorrichtung zum bestimmen und regeln eines niveaus einer metallschmelze
WO2000038858A1 (fr) Procede permettant de detecter et de reguler le niveau d'un metal fluide dans une lingotiere
WO2017202639A1 (fr) Dispositif et procédé pour déterminer la vitesse d'écoulement d'une matière liquide
EP0451929B1 (fr) Procédé pour la détermination et le réglage d'un niveau du bain de métal liquide
DE2529329C3 (de) Verfahren zum tiegellosen Zonenschmelzen
DE2428364A1 (de) Pegelbestimmungsvorrichtung
EP0331612A2 (fr) Procédé dans une installation de coulée pour la fabrication de billettes
DE3934975A1 (de) Verfahren zur regelung der lage des giessspiegels in einer bandstranggiessanlage und einrichtung hierzu
EP2649407B1 (fr) Procédé pour déterminer le profil de hauteur d'une matière fondue
CH681291A5 (en) Fluid container filling device - has filling valve below fluid surface in container to prevent foaming
DE19604983C2 (de) Vorrichtung zur stereolithografischen schichtweisen Herstellung eines Objektes und Verwendung eines kapazitiven Abstandssensors zur Überwachung des Abstandes zu einer Oberfläche eines dielektrischen Gegenstandes
EP1210635A2 (fr) Procede et dispositif de realisation d'images de hauteur de surfaces techniques avec resolution microscopique
EP0249573A2 (fr) Procédé et dispositif pour laisser couler d'une poche de coulée un métal liquide exempt de scories
DD273459A1 (de) Verfahren und anordnung zur bestimmung von kristallradius, -querschnittsform und vertikaler kristallkeimposition beim kristallzuechtungsverfahren nach czochralski
AT394150B (de) Verfahren und vorrichtung zum angiessen beim stranggiessen von metallen

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): DE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 20001026

AKX Designation fees paid

Free format text: DE

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: ALCAN TECHNOLOGY & MANAGEMENT AG

17Q First examination report despatched

Effective date: 20020618

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20030925