EP0825326A2 - Method and apparatus for horizontal drilling and for handling drill rods - Google Patents
Method and apparatus for horizontal drilling and for handling drill rods Download PDFInfo
- Publication number
- EP0825326A2 EP0825326A2 EP97111051A EP97111051A EP0825326A2 EP 0825326 A2 EP0825326 A2 EP 0825326A2 EP 97111051 A EP97111051 A EP 97111051A EP 97111051 A EP97111051 A EP 97111051A EP 0825326 A2 EP0825326 A2 EP 0825326A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- drill
- changer
- drilling
- boring bar
- drill pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 79
- 238000000034 method Methods 0.000 title claims description 16
- 239000002689 soil Substances 0.000 description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 230000006378 damage Effects 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000003825 pressing Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 230000005484 gravity Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 238000005253 cladding Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000001939 inductive effect Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000007790 scraping Methods 0.000 description 1
- 239000011343 solid material Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
- E21B19/15—Racking of rods in horizontal position; Handling between horizontal and vertical position
- E21B19/155—Handling between horizontal and vertical position
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/20—Combined feeding from rack and connecting, e.g. automatically
Definitions
- the invention relates to a method for producing boreholes and especially for laying cables in these boreholes in the ground without having to dig up the ground.
- Each residential and commercial building has a variety of underground cables laid and disposed of, be it with water, gas, electrical Electricity etc.
- a drill pipe is made up of a large number one after the other, usually screwed together, several each Meters long, composed of boring bars, flat from the ground surface drilled diagonally into the ground.
- the direction of the drilling progress i.e. the am front end of the drill pipe existing drill head, can be relative well controlled so that the bore is initially flat obliquely downwards is performed until the required target depth is reached, and then essentially is drilled horizontally, again under the control of the In the desired direction.
- the pipeline to be installed is brought into the borehole in that after completing the bore and before pulling back the drill pipe pipe to be pulled in, usually a somewhat flexible steel or plastic pipe, using a special device at the front end of the drill pipe attached and thus the gradual retraction of the drill pipe laying pipe is drawn into the existing borehole.
- the drill pipe is on the front at the rear end Drilled drill pipe pushed forward and additionally in the Usually the drill pipe is driven in rotation and / or by the exit of Water under high pressure from the drill head that in front of the drill head Material washed out, mostly through a hollow through hole in the Drill pipe.
- This method is mainly used for laying cables over larger ones Distances, for example 100 m or several hundred meters, are used so that the one that cannot be used for a line that must be routed in depth Initial distance on which the hole only reaches its target depth, one represents reasonable effort.
- the drilling rig used for this which, among other things, has a slant pointing downwards to guide the Must have drill pipe, large and at least two tons heavy, because the weight of the drill partly as a bearing for the force Presses the drill pipe forward.
- the main line of a supply line which mostly runs under the street, for example a gas, water or power line, is intended to cross one of them branching house connection line of one of the buildings standing on the street open up.
- the bore can be controlled relatively precisely be, but it is not possible, on the one hand, with the hole to be drilled drill as close as possible to the main line to be connected, without not at the same time take the risk of damaging this line when drilling.
- the starting shaft is either conventional excavated by an excavator, or using a special method Rinsing driven vertically into the depth, which makes sense because of the Starting shaft to a little below the main line to be connected must extend.
- Excavator shovel etc. When mechanically lifting the starting shaft with Excavator shovel etc. can easily damage this main strand, or it has to be laborious and slow by hand from a certain depth be excavated.
- the second problem to be solved is the immediately adjacent course of the main line to be connected and the main connecting line to be inserted transversely to each other, that is, an attachment of the main connection line directly above or below the main line to connect the two lines Using a suitable T-piece or other adapter in a simple way and To be able to connect with each other without bridging the length.
- the borehole can immediately only a few millimeters, striving transversely above or below the main line be started, preferably from the main strand opposite side of the starting shaft.
- a single boring bar is only in its central area, i.e. not in the area their front screw connections with the two neighboring boring bars, flexible.
- the screw connection itself must under no circumstances be subject to play, as this will result the directional controllability of the entire drill pipe would be destroyed. Because in the area of the backlash-free screw connection, there is even a pipe Drill pipe is much stiffer than in the middle area of the individual Boring bars, the drill pipe is in the area of its screw connections as hardly to look sideways.
- drill pipe which consists of drill rods is composed of those that exist at the beginning and end Make up approx. 20-25% of the total length of each boring bar, to be considered as overall little elastic in the transverse direction.
- the drill pipe can therefore consist of very many individual, very short Boring bars are assembled.
- This enables one Starting shaft, the cross section of which is no greater than that in depth given small cross section in the floor surface, a horizontal Achieve drilling progress with a drill string, the individual Boring bars in the direction of the drilling axis to the rear end of the existing drill pipe can be applied.
- the individual Boring bars should be significantly shorter than the length measured in the horizontal the cross section of the starting shaft.
- Rotating the drill string around the soil material in front of the drill head scraping or loosening up makes sense only in exceptional cases.
- turning the drill pipe by less than 360 ° must be possible because via an asymmetrical bevel at the top of the drill pipe and their angular position with respect to the drilling axis, the direction of the drilling feed is controlled.
- the boring bars to be added are each on the rear end of the drill pipe screwed on. It is preferably done beforehand with the help the changer motor and the threaded connector attached to it Shot from the higher boring bar magazine.
- the drill drive itself which - as previously described - is primary or exclusive pressing forward in the direction of the drilling axis is in the starting shaft Can be pushed back and forth parallel to the drilling axis, at least around the length of a single boring bar.
- the drill drive preferably moves between an advanced position immediately at the beginning of the Drill hole in the starting shaft, and a retracted position in the Close to those arranged on the opposite wall Boring bar changing device is arranged back and forth.
- Both the boring bar changer and the boring drive are preferred arranged within a derrick, which consists of a latticework There is metal pipes and preferably on its peripheral walls with plates is clad to prevent soil from falling into the starting shaft.
- the derrick is whole, for example using a hand winch, from above lowered into the starting shaft. Since the starting shaft and also the derrick while drilling the hole to below that through the start shaft extending main strand are in the derrick and its walls on the side of the main line corresponding, from below in the derrick open, recesses.
- the starting shaft is preferably introduced so that the locking main strand is located under the boring bar changer while the much more space-consuming drill drive between the Main line and the opposite wall of the starting shaft, in which is to be drilled.
- the boring bar magazine consists of a vertical or inclined slide, in which the boring bars are on top of each other. In the lowest position is the Slide open at the front to remove the bottom boring bar from the Magazine. The boring bar is in this removal position substantially vertically above the drilling axis, and can therefore be vertical from that Removable boring bar changer opposite the derrick will:
- the interchangeable slide, on which the changer motor is also located raised to the level of the removal position on the motor axis of the Changer motor located threaded connector for a predetermined period of time in the boring bar located at the removal position of the boring bar magazine screwed in (with the boring bar passing through the others Boring bars or an additional weight is prevented from turning) and by moving the changer motor with threaded connector along the Changer carriage removed from the magazine in the horizontal direction.
- After lowering down to the drilling axis is done by turning in the opposite direction and Push the changer motor forward with the boring bar on this boring bar screwed the rear end of the drill pipe in the hole.
- the boring bar magazine preferably ends in the drilling rig below Soil surface, but starts above the soil surface and can also protrude diagonally from the rig of the derrick for one easier loading by hand with additional boring bars.
- the drilling rig itself is operated horizontally within the launch shaft hydraulic clamping cylinders clamped to not only hortizontally, but also vertically the position defined once for the introduction of the Keep hole too.
- Figures 1 and 2a each show the lower, in Starting shaft 2, part of the device located, while Figures 1b and 2b show the upper part which partially protrudes above the floor surface 5.
- the elements of the drill are within one made of metal profiles manufactured derrick 11, the outer surfaces preferably - in the drawings are not shown - are covered with metal plates, according to Lowering the derrick 11 into the starting shaft 2 from falling in To prevent soil material in the derrick 11.
- the drilling rig 11 is, for example, not - in the drawings shown - hand winch lowered into the starting shaft 2, and can to this Purpose, for example, in a subframe parked above the starting shaft are guided vertically by guide rollers, slideways etc.
- Fig. 1a In the lower part of Fig. 1a is the drilling axis 3 and the in the borehole 1 introduced into the left side wall.
- a branch line In this borehole 1 a branch line is later to be pulled in, which crosses with this through the lower part of the starting shaft 2 main strand 8 one Supply line can be connected using a sleeve, etc.
- the borehole 3 and thus the subsequent connecting line runs just above the main line 8 of which two possible different ones Sizes are shown in Fig. 1a.
- the derrick 11 has in the area of Main strand 8 open recesses in its side walls from below, to be lowered with its lower edge to below the main strand 8 can.
- the essential elements of the device according to the invention are all on or housed within derrick 11:
- the drill drive 9 which moves the drill pipe to the left in the direction the drilling axis 3 presses forward or when removing the drill pipe the borehole 3 pulls the drill string 6 back, which continues vertically extending drill rod changer 12, which is located in the borehole 3 Drill pipe 6 by attaching additional drill rods 7 to the latter gradually extending the rear end or when pulling back the drill pipe 6 gradually shortened and the boring bar magazine 19, in which the am Drill rods 6 to be attached boring bars 7 or the Inclined slide 24 into which those removed from the drill pipe 6 Drill rods fall in and laterally out of derrick 7 above the Slip out floor surface 5 to be cleaned there by the operating personnel Damage checked and greased for reuse.
- Each threaded rod 7 has an annular groove 18 on its outer circumference.
- the boring bar changer 12 moves in essentially vertically above the main strand 8.
- the means of Boring bar changer 12 transported boring bar 7d moves within a substantially vertical transport lane 10.
- the drill drive 9 is on the drilling axis 3 along guides 29 by means of hydraulic pistons 30 slidable.
- the drill drive 9 takes hold of the rearmost one Area of the drilling rig 11 positioned drill rod 7 of the drill string 6, and the entire drill drive 9 is beyond the position shown in Fig. 1a shifted to the left.
- the drill drive 9 thus moves between the in Fig. 1a left wall of the starting shaft 2 and the main line 8, which near the opposite shaft wall is arranged, back and forth.
- the drilling drive 9 can additionally rotate the drill pipe, both during the Linear movement or separately.
- the drilling drive has one arranged in front of the rotary jaw 33 Breakaway jaw 32, which rotates the drill string relative to the Housing 35 of the drill drive can hold.
- Another jaw 21 is in the immediate vicinity of borehole 3 with respect to the drill pipe 6 fixedly arranged on the derrick 11.
- This too Clamping jaw 21 consists - as can be seen better from FIG. 2a - of two across individual jaws directed against the drill pipe, each, or together by means of a hydraulic cylinder 21 ', which has one end is firmly stored relative to the derrick 11, operated.
- the Boring bar changer 12 On the opposite side of the drill drive 9 in the starting shaft 2 is the Boring bar changer 12 arranged above the main strand 8.
- the Boring bar changer 12 consists essentially of one Changer motor 13 with a threaded connector 34, which is preferably directly on the Output shaft of the changer motor 13 is arranged.
- This threaded connector 13 is equipped with a suitable thread to attach to the rear End face of the boring bars 7 arranged threads for connecting the individual To be able to screw boring bars together. As in Fig. 1a can be seen, it is preferably a along a conical surface applied external thread on the boring bar 7, preferably a Round thread shape is used to prevent damage as much as possible avoid.
- the threaded connector 34 has a contrary to this Internal thread
- the changer motor 13 is with its axis of rotation oriented parallel to the drilling axis 3 of the drilling drive 9.
- the changer motor 3 can be both vertically in the direction of the drilling axis 3 and transversely thereto along the derrick 11:
- the changer motor 13 is attached to a motor frame 16.
- the motor frame 16 is by means of rollers 36, the one on its outer circumference Have an annular groove, along two preferably vertically spaced preferably round rods as motor frame guides 17 along the drilling axis 3 movable.
- the motor frame guides 17 are in turn on one Changer 14 attached, which is preferably formed by analog Rollers 39 in the vertical direction along rod-shaped slide guides 15 is movable, which is spaced in the direction of the drilling axis 3 in the drilling rig 11, in the vicinity of the end face opposite the drill drive 9, are arranged.
- the changer motor 13 can be moved vertically with the help of the changer carriage 14 Direction so that it is with its axis of rotation in the lowest Position aligned with the drilling axis 3, and in its uppermost position - as on best seen in Fig. 2b - with one in the upper area of the derrick 11th arranged gripper 23, which in turn by means of - preferably twice acting - hydraulic cylinder 23 'is actuated. Between these two End positions, preferably still below the level of the floor surface 5, in any case above the drilling axis 3, is located on the path of movement of the Changer motor 13 the removal position of a magazine 19 for new, on Drill rods 6 bores 7a, 7b, 7c to be attached.
- This magazine 19 consists essentially of a hollow profile-like enclosure 20, which is oblique is arranged rising up to a maximum vertical, and into which the boring bars 7 be filled in from above.
- the enclosure 20 has a stop for the bottom Boring bar 7a and the enclosure 20 is on the changer motor 13th facing end face of the bottom boring bar 7a open.
- the magazine 19 preferably projects above the level of Soil surface 5 and extends or laterally from the derrick 11 out to be filled more easily with boring bars 7 by the operating personnel can.
- the changer motor 13 If the changer motor 13 is aligned with the in the removal position in Magazine 19 recorded boring bar 7a, the changer motor 13 by longitudinal movement along its axis of rotation and simultaneous Rotation of the threaded connector 34 are screwed onto the boring bar 7a. This is prevented from rotating with the weight of the boring bars lying above it and, if necessary, an additional one in the magazine 19 stored weight 42. By reversing the changer motor 13 together with the boring bar 7a along the axis of rotation of the Changer motor 13, the boring bar 7a is removed from the magazine 19 and can be added to the drill pipe 6.
- the changer slide 14 of the boring bar changer 12 follows above for removing a new boring bar 7a from the magazine 19 is the motor frame 16 with the changer motor 13 in the horizontal on furthest away from the borehole, i.e. on the right edge of the Starting shaft 2 in Fig. 1a.
- the changer slide 14 is along the guides 15 as far up driven until the threaded connector 34, which with the changer motor 13th is rotatably coupled, with the thread of the lowest, in the removal position of the Magazine 19 located, boring bar 7a is aligned. Then the threaded connector 34 on its axis of rotation to the left, i.e. forward, against it Boring bar 7a driven and driven by the changer motor 13 so that the threaded connector 34 is screwed to the boring bar 7a. This It is screwed on by a timer which is connected to the changer motor 13 is limited to a certain period of a few seconds.
- this hydraulic piston 37 Since the extension and retraction of this hydraulic piston 37 is not so precisely controllable is how it defines the axial progress when screwing in a thread Speed corresponds, is between the hydraulic piston 37 and thereby moved motor frame 16 at least one spring 38, preferably for both Movement directions each have a spring 38a, 38b interposed to here to ensure the necessary length compensation in the direction of the drilling axis 3.
- the threaded connector 34 is preferably fixed on the output shaft the - hydraulic or electric - changer motor 13 arranged, this Changer motor 13, however, not arranged fixedly with respect to the motor frame 16, but movable with the help of rubber bearings, whereby the axis of rotation of the Changer motor 13 compared to the motor frame 16 both a light Cross offset as well as an angle change can take place.
- the compensation functions described are not only for removing one Boring bar from magazine 19, but above all for attaching or Removing a boring bar on the drilling axis on or from the drill pipe 6 necessary.
- the screwing is carried out until one with the changer motor 13th coupled torque sensor a sufficiently strong torque when Screwing reports.
- the previous one is during screwing Boring bar of the drill pipe 6 by means of the rotary jaw 33 of the drilling drive 9, which is in a relatively advanced position to the left located, non-rotatably clamped.
- this rotary jaw 33 solved and the drill drive 9 - see Fig. 1a and Fig. 3 - along to the right retract its two guides 29 so far that the rotary jaw 33 in Area of the last newly attached boring bar 7 is, and from the rotary jaw 33 can be clamped to the threaded connector 34 of the Boring bar changer 12 by rotating the changer motor 13 backwards to release the newly attached boring bar 7.
- the drill string 6 by the length of the new one Boring bar 7 are pressed forward by using the entire drill drive 9 its hydraulic pistons 30, preferably arranged on both sides, opposite the Drilling rig 11 is pushed forward along its guides 29, which with a Force of about 2 t happens.
- the drill pipe is used for directional control before pressing forward or at the same time under certain circumstances using the
- the rotary jaw 33 of the drill drive 9 is rotated somewhat about the drill axis 3.
- the entire Turn boring bar changer 12 up again to the next one Get boring bar 7 from the magazine 19.
- the drill pipe 6 is expanded to the desired length and thus the borehole 1 driven forward to the target point.
- At least one sensor 28, however, preferably three sensors 28a, 28b, 28c are arranged.
- This Sensors 28, preferably designed as inductive sensors, provide the axial Relative position to the boring bar 7 located in the area of the drill drive 9, in that one sensor 28a reacts when the annular groove 18 of this drill rod 7 is exactly opposite. If the drill pipe 6 in the direction of the drill axis 3 slips relative to the drill drive 9, the annular groove 18 leaves the area of this sensor 28a, and this emits an error signal.
- the annular groove 18 must be one of the two Sensors 28b, 28c have overflowed, which is a corresponding signal has produced.
- the direction of displacement of the drill string 6 known to the drill drive 9 and - preferably after fixing the Drill pipe 6 in the borehole 1 by means of the fixed arranged on the derrick Clamping jaw 21 - the drilling drive 9 is again in the direction of the drilling axis 3 move that the sensor 28a is opposite the annular groove 18, that is, the target position is taken again.
- a wiper (not shown) is usually present on the drill drive 9 from one or more rubber lips or a rubber grommet, provided to roughly clean the drill pipe 6 withdrawn from the borehole 1.
- the jaw 33 of the drill drive 9 holds the rearmost drill rod of the drill string 6, the drill drive 9 in the position advanced against borehole 1 on the left edge of the Starting shaft 1 in Fig. 1a, is located.
- the drill drive 9 is moved to the right by the length of one
- the boring bar 7 is withdrawn, then the drill pipe 6 is fixed in the borehole 1. by the clamping jaw 21 arranged on the drilling rig 11 which is now penultimate or a boring bar of the drill pipe 6 lying further forward is fixed.
- the rotary jaw 33 of the drill drive 9 releases this last drill rod 7 and drives forward against borehole 1 to the now last boring bar of the To seize drill pipe 6 and again as far out of the borehole withdraw that they are removed from the drill string 6 as previously described can.
- the broken screw connection through the threaded connector 34 and changer motor 13 together with that on it originally located last threaded rod by turning the thread in Reverse direction (turning to the left) and at the same time in the process of Boring bar changer to the rear, away from the drill pipe, completely loosened.
- the one located on the threaded connector 34 Boring bar by raising the changer slide 14 and possibly simultaneous left-hand movement of the motor frame 16 compared to the Changer carriage 14 - in the gripping area of the gripper 23 in the upper area of the Drilling rig 11 brought.
- the magazine 19 from the vertical movement path of the boring bar can be taken out by Pull up or fold away the magazine 19 relative to the derrick 11.
- the boring bar transported in this way presses before reaching the gripper 23 the swivel-mounted inclined slide 24 to the side from its path of movement.
- the boring bar changer 12 moves downwards Procedure for removing the next boring bar from the drill pipe 6.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Drilling And Boring (AREA)
Abstract
Description
Die Erfindung betrifft ein Verfahren zum Erstellen von Bohrlöchern und insbesondere zum Verlegen von Leitungen in diesen Bohrlöchern im Boden, ohne den Boden aufgraben zu müssen.The invention relates to a method for producing boreholes and especially for laying cables in these boreholes in the ground without having to dig up the ground.
Jedes Wohn- und Geschäftsgebäude wird über eine Vielzahl von unterirdisch verlegten Leitungen ver- und entsorgt, sei es mit Wasser, Gas, elektrischem Strom etc.Each residential and commercial building has a variety of underground cables laid and disposed of, be it with water, gas, electrical Electricity etc.
Früher wurden zum Verlegen derartiger Leitungen im Boden Gräben ausgeschachtet, die Leitungen darin verlegt und die Gräben anschließend wieder verfüllt. Im freien Gelände sind die Folgekosten für die Wiederherstellung der Bodenoberfläche hierfür relativ gering. Wenn sich dieser Vorgang dagegen in einer Ortschaft mit geteerten Straßen, gepflasterten Gehwegen und ähnlichem vollziehen soll, steigen die durch die Wiederherstellung der Bodenoberfläche bedingten Kosten drastisch an, und verteuern damit diese konventionelle Methode der Leitungsverlegung ganz besonders.In the past, trenches were used to lay such cables in the ground excavated, the lines laid in it and the trenches again backfilled. In the open area are the follow-up costs for the restoration of the Soil surface relatively low. If this process is against it a village with paved streets, paved sidewalks and the like is to be carried out, they will increase by restoring the surface of the soil associated costs drastically, making this conventional method more expensive especially the line laying.
Deshalb ist es bereits bekannt, Leitungen zu verlegen, ohne einen Graben entlang der gesamten Leitungslänge aufgraben zu müssen. For this reason, it is already known to lay lines without a trench to dig up the entire length of the line.
Dabei wird mit einem Bohrgerät ein Bohrgestänge, welches sich aus einer Vielzahl hintereinander gesetzter, in der Regel miteinander verschraubter, jeweils mehrerer Meter langer, Bohrstangen zusammensetzt, von der Bodenoberfläche aus flach schräg in den Untergrund gebohrt. Die Richtung des Bohrfortschritts, also des am vorderen Ende des Bohrgestänges vorhandenen Bohrkopfes, kann dabei relativ gut gesteuert werden, so daß die Bohrung zunächst flach schräg nach unten geführt wird, bis die geforderte Soll-Tiefe erreicht ist, und dann im wesentlichen horizontal weitergebohrt wird, und zwar wiederum unter Steuerung des Bohrkopfes in die gewünschte Richtung.With a drill, a drill pipe is made up of a large number one after the other, usually screwed together, several each Meters long, composed of boring bars, flat from the ground surface drilled diagonally into the ground. The direction of the drilling progress, i.e. the am front end of the drill pipe existing drill head, can be relative well controlled so that the bore is initially flat obliquely downwards is performed until the required target depth is reached, and then essentially is drilled horizontally, again under the control of the In the desired direction.
Die zu verlegende Rohrleitung wird dadurch in das Bohrloch eingebracht, daß nach Fertigstellen der Bohrung und vor dem Zurückziehen des Bohrgestänges die einzuziehende Rohrleitung, meist eine etwas flexible Stahl- oder Kunststoffleitung, mittels einer speziellen Vorrichtung am vorderen Ende des Bohrgestänges befestigt und damit beim schrittweisen Zurückziehen des Bohrgestänges die zu verlegende Leitung in das vorhandene Bohrloch eingezogen wird.The pipeline to be installed is brought into the borehole in that after completing the bore and before pulling back the drill pipe pipe to be pulled in, usually a somewhat flexible steel or plastic pipe, using a special device at the front end of the drill pipe attached and thus the gradual retraction of the drill pipe laying pipe is drawn into the existing borehole.
Dabei wird das Bohrgestänge von einem am hinteren Ende stirnseitig am Bohrgestänge befestigten Bohrantrieb vorwärtsgeschoben und zusätzlich in der Regel das Bohrgestänge rotierend angetrieben und/oder durch Austritt von Wasser unter hohem Druck aus dem Bohrkopf das vor dem Bohrkopf befindliche Material herausgespült, meist durch eine hohle Durchgangsöffnung im Bohrgestänge.Here, the drill pipe is on the front at the rear end Drilled drill pipe pushed forward and additionally in the Usually the drill pipe is driven in rotation and / or by the exit of Water under high pressure from the drill head that in front of the drill head Material washed out, mostly through a hollow through hole in the Drill pipe.
Dieses Verfahren wird vor allem zum Verlegen von Leitungen über größere Strecken, beispielsweise 100 m oder mehrere Hundert Meter, verwendet, so daß die für eine durchgängig in der Tiefe zu verlegende Leitung nicht nutzbare Anfangsstrecke, auf welcher die Bohrung erst ihre Soll-Tiefe erreicht, einen vertretbaren Aufwand darstellt. Zusätzlich ist das hierfür verwendete Bohrgerät, welches unter anderem eine schräg nach unten weisende Lafette zum Führen des Bohrgestänges aufweisen muß, groß und mindestens zwei Tonnen schwer, da das Gewicht des Bohrgerätes teilweise als Wiederlager für die Kraft zum Vorwärtspressen des Bohrgestänges dient. This method is mainly used for laying cables over larger ones Distances, for example 100 m or several hundred meters, are used so that the one that cannot be used for a line that must be routed in depth Initial distance on which the hole only reaches its target depth, one represents reasonable effort. In addition, the drilling rig used for this which, among other things, has a slant pointing downwards to guide the Must have drill pipe, large and at least two tons heavy, because the weight of the drill partly as a bearing for the force Presses the drill pipe forward.
Gerade beim Anschluß von Gebäuden besteht jedoch ein spezielles Problem:However, there is a special problem when connecting buildings:
Der meist unter der Straße verlaufende Hauptstrang einer Versorgungsleitung, beispielsweise einer Gas-, Wasser- oder Stromleitung, soll über eine hiervon quer abzweigende Hausanschlußleitung eines der an der Straße stehenden Gebäude erschließen.The main line of a supply line, which mostly runs under the street, for example a gas, water or power line, is intended to cross one of them branching house connection line of one of the buildings standing on the street open up.
Dabei ist es auch heute noch üblich, diese Hausanschlußleitungen durch Ausschachten eines Grabens konventionell zu verlegen, da an den Enden dieser Hausanschlußleitung, nämlich am Verbindungspunkt mit dem Hauptstrang der Versorgungsleitung einerseits und am Durchbruch durch die Kellerwand des Hauses andererseits, ohnehin Platz und Zugänglichkeit für manuelle Arbeiten vorhanden sein muß, und der größte Teil des auszuhebenden Grabens ohnehin nur über das Grundstück des in der Regel noch in der Bauphase befindlichen Gebäudes verläuft, so daß keine großen Oberflächenarbeiten anfallen. Allerdings wird über einen Teil des Grabens die fertig erstellte Straßenoberfläche zerstört und muß anschließend wieder sorgfältig instandgesetzt werden, wobei insbesondere bei Teerungsarbeiten dies nie mehr wieder den Originalzustand wie bei einer durchgängig geteerten Straße ergibt.It is still common today to pass these house connection lines through Excavation of a trench to be laid conventionally, since at the ends of this House connection line, namely at the connection point with the main line of the Supply line on the one hand and at the breakthrough through the basement wall of the House, on the other hand, space and accessibility for manual work anyway must be present, and most of the trench to be excavated anyway only over the plot of land that is usually still under construction Building runs so that no large surface work is required. Indeed the finished road surface is destroyed over part of the trench and must then be carefully repaired again, whereby especially when tarring this will never be the same as the original condition on a paved road.
Es wäre daher wünschenswert, auch für diesen und ähnliche Anwendungsfälle ein Verfahren bzw. eine Vorrichtung zur Verfügung zu haben, welche in der Bodenoberfläche z. B. im Bereich der geteerten oder gepflasterten Straße nur ein minimal kleines Loch erfordert, und nicht einen Graben über die gesamte Länge der zu verlegenden Leitung, z. B. der Hausanschlußleitung.It would therefore be desirable to also use this and similar applications To have a method or a device available, which in the Soil surface z. B. in the area of paved or paved road only one minimally small hole required, and not a trench along its entire length the line to be laid, e.g. B. the house connection line.
Das bisher bekannte Bohrverfahren mit dem Eindringen der Bohrung flach schräg in den Untergrund ist gerade für das vorbeschriebene Erstellen von Hausanschlußleitungen aus verschiedenen Gründen nicht geeignet:The previously known drilling method with the penetration of the hole flat obliquely in the underground is just for the creation of House connection lines are not suitable for various reasons:
Mit dem bekannten Verfahren kann zwar die Bohrung relativ genau gesteuert werden, aber es ist nicht möglich, einerseits mit der einzubringenden Bohrung möglichst nah an der anzuschließenden Hauptleitung vorbeizubohren, ohne nicht gleichzeitig das Risiko einzugehen, diese Leitung beim Bohren zu beschädigen.With the known method, the bore can be controlled relatively precisely be, but it is not possible, on the one hand, with the hole to be drilled drill as close as possible to the main line to be connected, without not at the same time take the risk of damaging this line when drilling.
Darüber hinaus müßte das Einbringen der Bohrung in den Untergrund an einer von dem Hauptstrang relativ weit seitlich versetzten Position aus erfolgen. Das Aufstellen des Bohrgerätes würde damit entweder auf der gegenüberliegenden Straßenseite erfolgen und damit eine komplette Straßenseite sperren, oder - da die dadurch entstehende Querenffernung in der Regel nicht ausreichend sein dürfte - in dem im anzuschließenden Haus gegenüberliegenden Grundstück. Dies würde bedeuten, daß man mit einem z. B. 2 t schweren Bohrgerät in ein angelegtes Gartengrundstück einfahren müßte. Die dabei entstehenden Zerstörungen und Wiedererstellungsarbeiten lassen bereits aus Kostengründen diese Methode ausscheiden, wobei in der Praxis hierzu auch nicht noch die notwendige Zustimmung des Grundstückseigentümers zu erhalten wäre.In addition, the drilling of the hole in the underground would have to be done on one from the main line relatively far laterally offset position. The Setting up the drill would either be on the opposite Street side and thus block a complete street side, or - there the resulting cross hit is usually not sufficient is likely - in the property opposite in the house to be connected. This would mean that with a z. B. 2 t heavy drill in a Garden plot would have to drive in. The resulting Destruction and restoration work already leave for cost reasons discard this method, although in practice it does not include the necessary approval from the property owner would be obtained.
Es ist daher die Aufgabe gemäß der Erfindung, ein Verfahren sowie eine Vorrichtung zu schaffen, um derartige im wesentlichen horizontale Bohrlöcher und darin zu verlegende Leitungen mit geringstmöglicher Beschädigung der Oberfläche, insbesondere nur einer relativ kleinen Öffnung in der Bodenoberfläche, vorzugsweise im Bereich des Anschlusses zwischen Hauptstrang und abzweigender Leitung, herstellen zu können.It is therefore the object according to the invention, a method and a To provide apparatus for such substantially horizontal wells and cables to be laid therein with the least possible damage to the Surface, especially only a relatively small opening in the Floor surface, preferably in the area of the connection between Main line and branching line to be able to manufacture.
Diese Aufgabe wird durch die kennzeichnenden Merkmale der Ansprüche 1 und 9
gelöst. Vorteilhafte Ausführungsformen ergeben sich aus den Unteransprüchen. This object is achieved by the characterizing features of
Durch das Einbringen eines vertikalen Startschachtes im Bereich des anzuschließenden Hauptstranges werden zwei Probleme gleichzeitig gelöst:By inserting a vertical starting shaft in the area of the main line to be connected, two problems are solved simultaneously:
Einerseits wird hier Freiraum geschaffen für die nach Verlegen der Hausanschlußleitung manuell durchzuführende Verbindung von Hauptstrang und Hausanschlußleitung. Der Startschacht wird dabei entweder konventionell mittels eines Baggers ausgehoben, oder mit einem speziellen Verfahren mittels Ausspülen senkrecht in die Tiefe getrieben, was deshalb sinnvoll ist, weil der Startschacht sich bis etwas unterhalb der anzuschließenden Hauptstranges erstrecken muß. Bei mechanischem Ausheben des Startschachtes mit Baggerschaufel etc. kann dabei dieser Hauptstrang leicht beschädigt werden, oder es muß umständlich und langsam ab einer gewissen Tiefe von Hand ausgeschachtet werden.On the one hand, space is created here for those who have relocated House connection line manual connection of main line and House connection line. The starting shaft is either conventional excavated by an excavator, or using a special method Rinsing driven vertically into the depth, which makes sense because of the Starting shaft to a little below the main line to be connected must extend. When mechanically lifting the starting shaft with Excavator shovel etc. can easily damage this main strand, or it has to be laborious and slow by hand from a certain depth be excavated.
Dies ist angesichts eines Querschnittes des Startschachtes an der Oberfläche und auch im Erdboden von ca. 70 x 40 cm in der Horizontalen, einer Tiefe von jedoch 1 m bis 1,50 m nur schwierig zu realisieren.This is in view of a cross section of the starting shaft on the surface and also in the ground of approx. 70 x 40 cm in the horizontal, but a depth of 1 m to 1.50 m difficult to achieve.
Das zweite zu lösende Problem besteht im unmittelbar benachbarten Verlauf des anzuschließenden Hauptstranges und der einzubringenden Hauptanschlußleitung quer zueinander, also ein Anbringen der Hauptanschlußleitung unmittelbar über oder unterhalb des Hauptstranges, um die beiden Leitungen anschließend mit Hilfe eines passenden T-Stückes oder anderen Adapters auf einfache Art und Weise und ohne Längenüberbrückung miteinander verbinden zu können.The second problem to be solved is the immediately adjacent course of the main line to be connected and the main connecting line to be inserted transversely to each other, that is, an attachment of the main connection line directly above or below the main line to connect the two lines Using a suitable T-piece or other adapter in a simple way and To be able to connect with each other without bridging the length.
Wenn von einem offenen Startschacht aus, durch welchen der Hauptstrang hindurchverläuft, die Bohrung begonnen wird, kann das Bohrloch unmittelbar, also nur Millimeter, oberhalb oder unterhalb des Hauptstranges quer abstrebend begonnen werden, und zwar vorzugsweise von der dem Hauptstrang gegenüberliegenden Seite des Startschachtes aus.If from an open starting shaft, through which the main line runs through, the drilling is started, the borehole can immediately only a few millimeters, striving transversely above or below the main line be started, preferably from the main strand opposite side of the starting shaft.
Das Arbeiten von einem Startschacht aus ermöglicht es weiterhin, die Leitung in einer im wesentlichen geraden Verbindungslinie zwischen dem Abzweigungspunkt vom Hauptstrang und dem Endpunkt der Hausanschlußleitung im Gebäude herzustellen. Vom Startschacht aus kann also bereits in dieser Richtung, in der Regel einer horizontalen Richtung, der Vortrieb begonnen werden, so daß während der Bohrung nur sehr geringe Richtungsbeeinflussungen notwendig sind. Dies ermöglicht es, ein Bohrgestänge zu verwenden, welches relativ starr ist.Working from a starting shaft still allows the line in a substantially straight line connecting the branch point from the main line and the end point of the house connection line in the building to manufacture. From the starting shaft you can already move in this direction Usually a horizontal direction, the propulsion should be started so that very little directional interference is required during drilling. This makes it possible to use a drill pipe that is relatively rigid.
Dies wiederum gibt die Möglichkeit, das Bohrgestänge auch aus sehr kurzen, miteinander zu verschraubenden Bohrstangen herzustellen:This in turn enables the drill pipe to be made from very short, To manufacture boring bars to be screwed together:
Eine einzelne Bohrstange ist nur in ihrem mittleren Bereich, also nicht im Bereich ihrer stirnseitigen Verschraubungen mit den beiden benachbarten Bohrstangen, flexibel. Die Verschraubung selbst darf keinesfalls spielbehaftet sein, da hierdurch die Richtungssteuerbarkeit des gesamten Bohrgestänges zunichtegemacht würde. Da im Bereich der spielfreien Verschraubung selbst ein aus Rohren bestehendes Bohrgestänge sehr viel steifer ist als in dem mittleren Bereich der einzelnen Bohrstangen, ist das Bohrgestänge im Bereich seiner Verschraubungen als kaum seitenbeweglich zu betrachten.A single boring bar is only in its central area, i.e. not in the area their front screw connections with the two neighboring boring bars, flexible. The screw connection itself must under no circumstances be subject to play, as this will result the directional controllability of the entire drill pipe would be destroyed. Because in the area of the backlash-free screw connection, there is even a pipe Drill pipe is much stiffer than in the middle area of the individual Boring bars, the drill pipe is in the area of its screw connections as hardly to look sideways.
Entsprechend ist ein Bohrgestänge, welches sich aus Bohrstangen zusammensetzt, deren am Anfangs- und Endbereich vorhandene Verschraubungen ca. 20-25 % der Gesamtlänge jeder Bohrstange ausmachen, als insgesamt wenig elastisch in Querrichtung anzusehen.Corresponding is a drill pipe, which consists of drill rods is composed of those that exist at the beginning and end Make up approx. 20-25% of the total length of each boring bar, to be considered as overall little elastic in the transverse direction.
Da im vorgenannten Fall nur eine sehr geringe Seitenauslenkung der Bohrung notwendig ist, kann das Bohrgestänge also aus sehr vielen einzelnen, sehr kurzen Bohrstangen zusammengesetzt werden. Dies ermöglicht es, von einem Startschacht aus, dessen Querschnitt in der Tiefe nicht größer ist als der vorgegebene kleine Querschnitt in der Bodenoberfläche, einen horizontalen Bohrungsfortschritt mit einem Bohrgestänge zu erzielen, dessen einzelne Bohrstangen in der Richtung der Bohrachse an das hintere Ende des vorhandenen Bohrgestänges angesetzt werden. Dadurch müssen die einzelnen Bohrstangen deutlich kürzer sein als die in der Horizontalen gemessene Länge des Querschnittes des Startschachtes. Since in the aforementioned case only a very small lateral deflection of the bore is necessary, the drill pipe can therefore consist of very many individual, very short Boring bars are assembled. This enables one Starting shaft, the cross section of which is no greater than that in depth given small cross section in the floor surface, a horizontal Achieve drilling progress with a drill string, the individual Boring bars in the direction of the drilling axis to the rear end of the existing drill pipe can be applied. As a result, the individual Boring bars should be significantly shorter than the length measured in the horizontal the cross section of the starting shaft.
Weiterhin ist es nicht sinnvoll, bei Arbeiten von einem derartigen Startschacht aus die Bohrung voranzutreiben durch Ausspülen mittels unter Hochdruck vom Bohrkopf aus in den Boden eingebrachten Wassers. Dieses Wasser würde sich an der Rückseite des Bohrgestänges, also im Startschacht, sammeln, und die anschließenden Arbeiten zur Verbindung von Hauptstrang und Hausanschlußleitung unmöglich machen, ohne vorher das gesamte Wasser abzupumpen etc.Furthermore, it does not make sense to work from such a starting shaft to advance the borehole by rinsing with high pressure from Drill head made of water brought into the ground. This water would collect at the back of the drill pipe, i.e. in the starting shaft, and the subsequent work on the connection of the main line and Make house connection line impossible without first having all the water pump down etc.
Durch die Verwendung eines sehr stabilen Bohrgestänges, insbesondere durch Bohrstangen aus Vollmaterial oder zumindest aus Rohren mit sehr großer Wanddicke, ist es möglich, die Bohrung primär, insbesondere ausschließlich, durch Vorwärtspressen des Bohrgestänges zu erstellen. Dies ist besonders für Arbeiten von einem Startschacht aus geeignet, da sich der Bohrantrieb, welcher das Bohrgestänge vorwärtspressen muß, gut an der gegenüberliegenden Wand des Startschachtes abstützen kann.By using a very stable drill pipe, especially by Boring bars made of solid material or at least of very large tubes Wall thickness, it is possible to drill the hole primarily, especially exclusively, by pressing the drill pipe forward. This is especially for Work from a starting shaft, as the drill drive, which the drill pipe must press forward, well on the opposite wall can support the starting shaft.
Ein Rotieren des Bohrgestänges, um das Bodenmaterial vor dem Bohrkopf abzuschaben bzw. aufzulockern, ist dabei nur in Ausnahmefällen sinnvoll. Ein Drehen des Bohrgestänges um weniger als 360° muß jedoch möglich sein, da über eine an der Spitze des Bohrgestänges vorhandene, asymmetrische Schräge und deren Winkellage bezüglich der Bohrachse die Richtung der Bohrvorschubes gesteuert wird.Rotating the drill string around the soil material in front of the drill head scraping or loosening up makes sense only in exceptional cases. A However, turning the drill pipe by less than 360 ° must be possible because via an asymmetrical bevel at the top of the drill pipe and their angular position with respect to the drilling axis, the direction of the drilling feed is controlled.
Durch das Ansetzen der Bohrstange in Richtung der Bohrachse, welche im wesentlichen horizontal verläuft, ist es weiterhin möglich, die neu hinzuzufügenden bzw. zu entnehmenden Bohrstangen bereits in dieser horizontalen Lage von einem Vorratsmagazin aus in den Startschacht einzubringen bzw. zu entfernen. Dadurch werden Schwierigkeiten aufgrund Richtungsänderung der Bohrstangen bei der Zuführung wie Verklemmen etc. weitestgehend vermieden.By placing the boring bar in the direction of the drilling axis, which in runs essentially horizontally, it is still possible to make the new Boring bars to be added or removed already in this horizontal position from a storage magazine into the starting shaft bring in or remove. This creates difficulties due to Change of direction of the boring bars during feeding such as jamming etc. largely avoided.
Mittels eines Bohrstangenwechslers, der über einen eigenen Wechslermotor verfügt, werden die hinzuzufügenden Bohrstangen jeweils auf das hintere Ende des Bohrgestänges aufgeschraubt. Vorzugsweise erfolgt vorher bereits mit Hilfe des Wechslermotors und des daran befestigten Gewindestutzens auch die Aufnahme aus dem höherliegenden Bohrstangenmagazin.Using a boring bar changer that has its own changer motor , the boring bars to be added are each on the rear end of the drill pipe screwed on. It is preferably done beforehand with the help the changer motor and the threaded connector attached to it Shot from the higher boring bar magazine.
Der Bohrantrieb selbst, der - wie vorher beschrieben - primär oder ausschließlich ein Vorwärtspressen in Richtung der Bohrachse vornimmt, ist im Startschacht parallel zur Bohrachse längs hin- und herverschiebbar, und zwar wenigstens um die Länge einer einzelnen Bohrstange. Vorzugsweise verfährt der Bohrantrieb zwischen einer vorgeschobenen Position, die unmittelbar am Beginn des Bohrloches im Startschacht liegt, und einer zurückgezogenen Position, die in der Nähe der an der gegenüberliegenden Wandung angeordneten Bohrstangenwechseleinrichtung angeordnet ist, hin und her.The drill drive itself, which - as previously described - is primary or exclusive pressing forward in the direction of the drilling axis is in the starting shaft Can be pushed back and forth parallel to the drilling axis, at least around the length of a single boring bar. The drill drive preferably moves between an advanced position immediately at the beginning of the Drill hole in the starting shaft, and a retracted position in the Close to those arranged on the opposite wall Boring bar changing device is arranged back and forth.
Sowohl der Bohrstangenwechsler als auch der Bohrantrieb sind vorzugsweise innerhalb eines Bohrturmes angeordnet, welcher aus einem Gitterwerk aus Metallrohren besteht und vorzugsweise an seinen Umfangswänden mit Platten gegen ein Hereinfallen von Erdreich in den Startschacht verkleidet ist. Dieser Bohrturm wird im Ganzen, beispielsweise mittels einer Handwinde, von oben her in den Startschacht abgesenkt. Da sich der Startschacht und auch der Bohrturm während des Einbringens der Bohrung bis unterhalb des durch den Startschacht verlaufenden Hauptstranges erstreckt, sind im Bohrturm und dessen Wandungen auf der Seite des Hauptstranges entsprechende, von unten im Bohrturm her offene, Aussparungen vorzusehen.Both the boring bar changer and the boring drive are preferred arranged within a derrick, which consists of a latticework There is metal pipes and preferably on its peripheral walls with plates is clad to prevent soil from falling into the starting shaft. This The derrick is whole, for example using a hand winch, from above lowered into the starting shaft. Since the starting shaft and also the derrick while drilling the hole to below that through the start shaft extending main strand are in the derrick and its walls on the side of the main line corresponding, from below in the derrick open, recesses.
Vorzugsweise wird dabei der Startschacht so eingebracht, daß sich der an zuschließende Hauptstrang unter dem Bohrstangenwechsler befindet, während sich der wesentlich mehr Raum beanspruchende Bohrantrieb zwischen dem Hauptstrang und der gegenüberliegenden Wandung des Startschachtes, in welche die Bohrung einzubringen ist, befindet. Dabei kann sich das Gehäuse des Bohrantriebes bis unterhalb der Unterkante des Hauptstranges erstrecken.The starting shaft is preferably introduced so that the locking main strand is located under the boring bar changer while the much more space-consuming drill drive between the Main line and the opposite wall of the starting shaft, in which is to be drilled. The housing of the Extend the drill drive to below the lower edge of the main strand.
Das Bohrstangenmagazin besteht in einer vertikalen oder schrägen Rutsche, in welcher die Bohrstangen übereinander liegen. In der untersten Position ist die Rutsche stirnseitig offen zur Entnahme der untersten Bohrstange aus dem Magazin. In dieser Entnahmeposition befindet sich die Bohrstange im wesentlichen vertikal über der Bohrachse, und kann daher von dem vertikal gegenüber dem Bohrturm verfahrbaren Bohrstangenwechsler entnommen werden:The boring bar magazine consists of a vertical or inclined slide, in which the boring bars are on top of each other. In the lowest position is the Slide open at the front to remove the bottom boring bar from the Magazine. The boring bar is in this removal position substantially vertically above the drilling axis, and can therefore be vertical from that Removable boring bar changer opposite the derrick will:
Hierzu wird der Wechselschlitten, auf dem sich auch der Wechslermotor befindet, bis auf die Höhe der Entnahmeposition angehoben, der auf der Motorachse des Wechslermotors befindliche Gewindestutzen eine vorbestimmte Zeitdauer lang in die der Entnahmeposition des Bohrstangenmagazins befindliche Bohrstange eingeschraubt (wobei die Bohrstange durch die darauflastenden anderen Bohrstangen oder ein zusätzliches Gewicht am Mitdrehen gehindert wird) und durch Verfahren des Wechslermotors mit Gewindestutzen entlang dem Wechslerschlitten in horizontaler Richtung aus dem Magazin entnommen. Nach dem Absenken bis auf die Bohrachse wird durch Drehung in Gegenrichtung und Vorwärtsschieben des Wechslermotors mit der Bohrstange diese Bohrstange auf das hintere Ende des in der Bohrung befindlichen Bohrgestänges aufgeschraubt. Das Bohrstangenmagazin endet vorzugsweise im Bohrturm unterhalb der Bodenoberfläche, beginnt aber oberhalb der Bodenoberfläche und kann dabei zusätzlich schräg aus dem Gestänge des Bohrturmes herausragen, für eine leichtere Beschickung von Hand mit zusätzlichen Bohrstangen.For this purpose, the interchangeable slide, on which the changer motor is also located, raised to the level of the removal position on the motor axis of the Changer motor located threaded connector for a predetermined period of time in the boring bar located at the removal position of the boring bar magazine screwed in (with the boring bar passing through the others Boring bars or an additional weight is prevented from turning) and by moving the changer motor with threaded connector along the Changer carriage removed from the magazine in the horizontal direction. After lowering down to the drilling axis is done by turning in the opposite direction and Push the changer motor forward with the boring bar on this boring bar screwed the rear end of the drill pipe in the hole. The boring bar magazine preferably ends in the drilling rig below Soil surface, but starts above the soil surface and can also protrude diagonally from the rig of the derrick for one easier loading by hand with additional boring bars.
Der Bohrturm selbst wird innerhalb des Startschachtes durch horizontal wirkende hydraulische Klemmzylinder verklemmt, um nicht nur hortizontal, sondern auch vertikal die einmal definiert eingenommene Position für das Einbringen der Bohrung auch zu halten.The drilling rig itself is operated horizontally within the launch shaft hydraulic clamping cylinders clamped to not only hortizontally, but also vertically the position defined once for the introduction of the Keep hole too.
Eine Ausführungsform gemäß der Erfindung ist im folgenden anhand der Figuren beispielhaft näher beschrieben. Es zeigen:
- Fig. 1:
- das erfindungsgemäße Bohrgerät in der Seitenansicht,
- Fig. 2:
- das Gerät gemäß Fig. 1 von vorne in Blickrichtung der Bohrachse, und
- Fig. 3:
- das Gerät in der Aufsicht von oben.
- Fig. 1:
- the drill according to the invention in side view,
- Fig. 2:
- 1 from the front in the direction of view of the drilling axis, and
- Fig. 3:
- the device viewed from above.
Bei den Figuren 1 und 2 zeigen die Figuren 1a bzw. 2a jeweils den unteren, im
Startschacht 2, befindlichen Teil der Vorrichtung, während die Figuren 1b bzw. 2b
den oberen, teilweise über die Bodenoberfläche 5 hinausragenden Teil zeigen.In Figures 1 and 2, Figures 1a and 2a each show the lower, in
Starting
Die Elemente des Bohrgerätes sind dabei innerhalb eines aus Metallprofilen
gefertigten Bohrturmes 11 untergebracht, dessen Außenflächen vorzugsweise - in
den Zeichnungen nicht dargestellt - mit Metallplatten beplankt sind, um nach dem
Absenken des Bohrturmes 11 in den Startschacht 2 ein Hereinfallen von
Bodenmaterial in den Bohrturm 11 zu verhindern.The elements of the drill are within one made of metal profiles
manufactured
Der Bohrturm 11 wird beispielsweise mittels einer - in den Zeichnungen nicht
dargestellten - Handwinde in den Startschacht 2 abgesenkt, und kann zu diesem
Zweck etwa in einem über dem Startschacht abgestellten Hilfsrahmen mit Hilfe
von Führungsrollen, Gleitbahnen etc. vertikal geführt werden.The
Im unteren Teil der Fig. 1a ist horizontal verlaufend die Bohrachse 3 und das in
der linken Seitenwand eingebrachte Bohrloch 1 zu erkennen. In dieses Bohrloch 1
soll später eine Stichleitung eingezogen werden, welche mit dem hierzu quer
durch den unteren Teil des Startschachtes 2 verlaufenden Hauptstrang 8 einer
Versorgungsleitung mit Hilfe einer Muffe etc. verbunden werden kann.In the lower part of Fig. 1a is the
Zu diesem Zweck verläuft das Bohrloch 3 und damit die spätere Anschlußleitung
knapp oberhalb des Hauptstranges 8 von dem zwei mögliche unterschiedliche
Größen in Fig. 1a dargestellt sind. Der Bohrturm 11 weist im Bereich des
Hauptstranges 8 von unten her offene Aussparungen in seinen Seitenwänden auf,
um mit seiner Unterkante bis unterhalb des Hauptstranges 8 abgesenkt werden zu
können.For this purpose, the
Die wesentlichen Elemente der erfindungsgemäßen Vorrichtung sind alle am bzw. innerhalb des Bohrturmes 11 untergebracht:The essential elements of the device according to the invention are all on or housed within derrick 11:
Zum einen der Bohrantrieb 9, welcher das Bohrgestänge nach links in Richtung
der Bohrachse 3 vorwärtspreßt bzw. beim Herausnehmen des Bohrgestänges aus
dem Bohrloch 3 das Bohrgestänge 6 wieder zurückzieht, weiter der sich vertikal
erstreckende Bohrstangenwechsler 12, welcher das im Bohrloch 3 befindliche
Bohrgestänge 6 durch Ansetzen von zusätzlichen Bohrstangen 7 an dessen
hinteren Ende schrittweise verlängert bzw. beim Zurückziehen des Bohrgestänges
6 schrittweise verkürzt sowie das Bohrstangenmagazin 19, in welchem die am
Bohrgestänge 6 anzusetzenden Bohrstangen 7 bevorratet werden bzw. die
Schrägrutsche 24, in welche die vom Bohrgestänge 6 abgenommenen
Bohrstangen hineinfallen und seitlich aus dem Bohrturm 7 oberhalb der
Bodenoberfläche 5 herausrutschen, um dort vom Bedienpersonal gereinigt, auf
Beschädigungen überprüft und für erneute Verwendung eingefettet zu werden.On the one hand, the
Auf der Bohrachse 3 ist aus Übersichtlichkeitsgründen in den Figuren 1 und 2 kein
Bohrgestänge eingezeichnet, jedoch in Fig. 3. Dabei ist zu erkennen, daß sich das
Bohrgestänge 6 aus hintereinander gesetzten, stirnseitig miteinander
verschraubten Bohrstangen 7 zusammensetzt, wie eine davon auch in Fig. 1a,
aufgeschraubt auf den Gewindestutzen 34 des Wechslermotors 13, dargestellt ist.For reasons of clarity, there is no one on the
Jede Gewindestange 7 weist dabei an ihrem Außenumfang eine Ringnut 18 auf.Each threaded rod 7 has an
Wie in Fig. 1a zu erkennen, bewegt sich der Bohrstangenwechsler 12 im
wesentlichen vertikal oberhalb des Hauptstranges 8. Die mittels des
Bohrstangenwechslers 12 transportierte Bohrstange 7d bewegt sich dabei
innerhalb einer im wesentlichen vertikalen Transportschneise 10. Der Bohrantrieb
9 ist auf der Bohrachse 3 entlang von Führungen 29 mit Hilfe von Hydraulikkolben
30 verschiebbar. Zum Vorwärtspressen des Bohrgestänges 6 und damit zum
Vorwärtstreiben der Bohrung ergreift der Bohrantrieb 9 die hinterste, noch im
Bereich des Bohrturmes 11 positionierte Bohrstange 7 des Bohrgestänges 6, und
der gesamte Bohrantrieb 9 wird über die in Fig. 1a dargestellte Position hinaus
nach links verschoben. Der Bohrantrieb 9 bewegt sich damit zwischen der in Fig.
1a linken Wand des Startschachtes 2 und dem Hauptstrang 8, welche nahe der
gegenüberliegenden Schachtwand angeordnet ist, hin und her.As can be seen in Fig. 1a, the
Der Bohrantrieb 9 kann neben einer Axialbewegung in Richtung der Bohrachse 3
das Bohrgestänge auch zusätzlich drehen, und zwar sowohl während der
Linearbewegung oder auch separat. Zu diesem Zweck ist die das Bohrgestänge
haltende Drehbacke 33 des Bohrantriebes 9 gegenüber dessen Gehäuse 35
koaxial zur Bohrachse 3 drehbar bzw. schwenkbar. Dies dient der
Richtungssteuerung im Zusammenwirken mit einer an der Spitze des
Bohrgestänges asymmetrisch angeordneten Schräge.In addition to an axial movement in the direction of the
Weiterhin weist der Bohrantrieb einen vor der Drehbacke 33 angeordnete
Losbrechbacke 32 auf, welche das Bohrgestänge drehfest gegenüber dem
Gehäuse 35 des Bohrantriebes halten kann.Furthermore, the drilling drive has one arranged in front of the
Eine weitere Klemmbacke 21 ist in unmittelbarer Nähe des Bohrloches 3
bezüglich des Bohrgestänges 6 fest am Bohrturm 11 angeordnet. Auch diese
Klemmbacke 21 besteht - wie besser anhand Fig. 2a zu erkennen, aus zwei quer
gegen das Bohrgestänge gerichteten einzelnen Backen, die jeweils, oder
gemeinsam mittels eines Hydraulikzylinders 21', welcher mit seinem einen Ende
fest gegenüber dem Bohrturm 11 gelagert ist, betrieben werden.Another
Am unteren Ende des Bohrturmes 11, noch unterhalb des Bohrantriebes 9 und
des Hauptstranges 8, sind in Richtung der Bohrachse 3 verlaufende
Klemmzylinder 22a, 22b am Bohrturm 11 fest angeordnet, welche am freien Ende
ihrer Kolbenstange eine Preßplatte 25 aufweisen. Da in diesem Bereich der
Bohrturm 11 keine Außenbeplankung aufweist, wird durch Ausfahren der notfalls
in der Regel hydraulisch betriebenen Kolbenstangen dieser Klemmzylinder 22
deren Preßplatten 25 gegen die Wand des Startschachtes 2 gepreßt und damit
der Bohrturm 11 gegen die gegenüberliegende Wandung des Startschachtes 2.
Damit wird der gesamte Bohrturm 11 im Startschacht 2 fixiert, was für die
Fluchtung der durch den Bohrantrieb 9 bezüglich des Bohrturmes 11 definierten
Bohrachse 3 gegenüber dem begonnenen Bohrloch 1 wichtig ist.At the lower end of the
Auf der vom Bohrantrieb 9 gegenüberliegenden Seite im Startschacht 2 ist der
Bohrstangenwechsler 12 oberhalb des Hauptstranges 8 angeordnet. Der
Bohrstangenwechsler 12 besteht dabei im wesentlichen aus einem
Wechslermotor 13 mit einem Gewindestutzen 34, der vorzugsweise direkt auf der
Abtriebswelle des Wechslermotors 13 angeordnet ist. Dieser Gewindestutzen 13
ist mit einem passenden Gewinde ausgestattet, um auf das auf die hintere
Stirnseite der Bohrstangen 7 angeordnete Gewinde zum Verbinden der einzelnen
Bohrstangen miteinander aufgeschraubt werden zu können. Wie in Fig. 1a
ersichtlich, handelt es sich dabei vorzugsweise um ein entlang einer Kegelfläche
aufgebrachtes Außengewinde an der Bohrstange 7, wobei vorzugsweise eine
runde Gewindeform verwendet wird, um Beschädigungen weitestgehend zu
vermeiden. Entsprechend weist der Gewindestutzen 34 ein hierzu konträres
Innengewinde auf, und der Wechslermotor 13 ist mit seiner Rotationsachse
parallel zur Bohrachse 3 des Bohrantriebes 9 orientiert. Der Wechslermotor 3
kann dabei sowohl in Richtung der Bohrachse 3 als auch quer hierzu, vertikal
entlang des Bohrturmes 11, bewegt werden:On the opposite side of the
Zu diesem Zweck ist der Wechslermotor 13 auf einem Motorrahmen 16 befestigt.
Der Motorrahmen 16 ist mittels Rollen 36, die an ihrem Außenumfang eine
Ringnut aufweisen, entlang von zwei vorzugsweise vertikal beabstandeten,
vorzugsweise Rundstangen als Motorrahmenführungen 17 entlang der Bohrachse
3 verfahrbar. Die Motorrahmenführungen 17 sind dabei wiederum auf einem
Wechslerschlitten 14 befestigt, welcher mittels vorzugsweise analog ausgebildeter
Rollen 39 in vertikaler Richtung entlang von stangenförmigen Schlittenführungen
15 verfahrbar ist, welche in Richtung der Bohrachse 3 beabstandet im Bohrturm
11, in der Nähe der von dem Bohrantrieb 9 gegenüberliegenden Stirnseite,
angeordnet sind. For this purpose, the
Der Wechslermotor 13 kann mit Hilfe des Wechslerschlittens 14 in vertikaler
Richtung so verfahren werden, daß er mit seiner Rotationsachse in der untersten
Position mit der Bohrachse 3 fluchtet, und in seiner obersten Position - wie am
besten in Fig. 2b zu erkennen - mit einem im oberen Bereich des Bohrturmes 11
angeordneten Greifer 23, der wiederum mittels eines - vorzugsweise doppelt
wirkenden - Hydraulikzylinders 23' betätigt wird. Zwischen diesen beiden
Endpositionen, vorzugsweise noch unterhalb des Niveaus der Bodenoberfläche 5,
jedenfalls oberhalb der Bohrachse 3, befindet sich auf dem Bewegungsweg des
Wechslermotors 13 die Entnahmeposition eines Magazins 19 für neue, am
Bohrgestänge 6 anzusetzende Bohrstangen 7a, 7b, 7c. Dieses Magazin 19
besteht im wesentlichen aus einer hohlprofilartigen Umfassung 20, welche schräg
ansteigend bis maximal vertikal angeordnet ist, und in welche die Bohrstangen 7
von oben her eingefüllt werden.The
An ihrem unteren Ende weist die Umfassung 20 einen Anschlag für die unterste
Bohrstange 7a auf und die Umfassung 20 ist auf der dem Wechslermotor 13
zugewandten Stirnseite der untersten Bohrstange 7a offen.At its lower end, the
Das Magazin 19 ragt dabei vorzugsweise bis über das Niveau der
Bodenoberfläche 5 auf und erstreckt sich dabei bzw. seitlich aus dem Bohrturm
11 heraus, um vom Bedienpersonal leichter mit Bohrstangen 7 gefüllt werden zu
können.The
Wenn sich der Wechslermotor 13 fluchtend zu der in der Entnahmeposition im
Magazin 19 aufgenommenen Bohrstange 7a befindet, kann der Wechslermotor
13 durch Längsbewegung entlang seiner Rotationsachse und gleichzeitige
Drehung des Gewindestutzens 34 auf die Bohrstange 7a geschraubt werden.
Diese wird dabei am Mitdrehen gehindert durch das Gewicht der auf ihr lastenden,
darüber liegenden Bohrstangen sowie ggf. eines zusätzlich in dem Magazin 19
abgelegten Gewichtes 42. Durch Zurückfahren des Wechslermotors 13
zusammen mit der Bohrstange 7a entlang der Rotationsachse des
Wechslermotors 13 wird die Bohrstange 7a aus dem Magazin 19 entnommen und
kann an das Bohrgestänge 6 angefügt werden. If the
Oberhalb des unteren Endes des Magazins 19 ist im vertikalen Bewegungsweg
der mittels des Bohrstangenwechslers 12 transportierten Bohrstangen unterhalb
des Greifers 23 eine Schrägrutsche 24 so angeordnet, daß deren hochliegendes
Ende noch unterhalb des Greifers 23 liegt. Ein mittels des Bohrstangenwechslers
12 nach oben in den Greifer 23 hinein beförderte Bohrstange 7 drückt dabei die
Schrägrutsche 24, welche um eine Schwenkachse aus diesem Bewegungsweg
herausgeklappt werden kann, zur Seite. Anschließend kippt die Schrägrutsche 24
aufgrund der Schwerkraft in die in Fig. 2b dargestellte Funktionslage zurück. In
dieser Funktionslage fallen zunächst vom Greifer 23 gehaltene Bohrstangen 7k
nach dem Loslassen in die Schrägrutsche 24 hinein und rollen entlang dieser
Schrägrutsche seitlich aus dem Bohrturm 11 heraus, wo sie vom
Bedienungspersonal für die Reinigung und Weiterbearbeitung
entgegengenommen werden.Above the lower end of the
Die Funktion der erfindungsgemäßen Vorrichtung wird im folgenden anhand der Figuren beschrieben.The function of the device according to the invention is described below with reference to the Figures described.
Es wird von einer bereits begonnenen Bohrung ausgegangen, die weiter vorangetrieben werden soll.It is assumed that the drilling has already started, and that continues to be advanced.
In diesem Fall fährt der Wechslerschlitten 14 des Bohrstangenwechslers 12 nach
oben zur Entnahme einer neuen Bohrstange 7a aus dem Magazin 19. Dabei
befindet sich der Motorrahmen 16 mit dem Wechslermotor 13 in der horizontal am
weitesten vom Bohrloch zurückgezogenen Position, also am rechten Rand des
Startschachtes 2 in Fig. 1a.In this case, the changer slide 14 of the
Der Wechslerschlitten 14 wird dabei entlang der Führungen 15 soweit nach oben
gefahren, bis der Gewindestutzen 34, welcher mit dem Wechslermotor 13
drehgekoppelt ist, mit dem Gewinde der untersten, in der Entnahmeposition des
Magazins 19 befindlichen, Bohrstange 7a fluchtet. Dann wird der Gewindestutzen
34 auf seiner Rotationsachse nach links, also nach vorne, gegen diese
Bohrstange 7a gefahren und vom Wechslermotor 13 drehend angetrieben, so daß
der Gewindestutzen 34 mit der Bohrstange 7a verschraubt wird. Dieses
Aufschrauben wird durch einen Zeitschalter, welcher mit dem Wechslermotor 13
gekoppelt ist, auf eine bestimmte Zeitdauer von einigen Sekunden begrenzt.The changer slide 14 is along the
Um ein Greifen der Gewinde des Gewindestutzens 34 und der Bohrstange 7a zu
ermöglichen, muß ein Druck in axialer Richtung vorhanden sein. Zu diesem Zweck
wird der Gewindestutzen 34 mit dem Wechslermotor 13 horizontal axial verfahren,
indem der Motorrahmen 16 gegenüber dem Wechslerschlitten 14 in Richtung der
Bohrachse 3 entlang der Motorrahmenführungen 17a, 17b verfahren wird. Dies
geschieht mit Hilfe eines am Wechslerschlitten 14 befestigten Hydraulikkolbens
37, welcher den Motorrahmen 16 horizontal verschiebt.To grip the threads of the threaded
Da das Aus- und Einfahren dieses Hydraulikkolbens 37 nicht so genau steuerbar
ist, wie es dem Axialfortschritt beim Einschrauben eines Gewindes mit definierter
Drehzahl entspricht, ist zwischen dem Hydraulikkolben 37 und dem dadurch
bewegten Motorrahmen 16 wenigstens eine Feder 38, vorzugsweise für beide
Bewegungsrichtungen jeweils eine Feder 38a, 38b zwischengeschaltet, um hier
den notwendigen Längenausgleich in Richtung der Bohrachse 3 zu gewährleisten.Since the extension and retraction of this
Um weiterhin Fluchtungsfehler zwischen der Rotationsachse des
Gewindestutzens 34 und der im Magazin befindlichen Bohrstange 7a
auszugleichen, ist der Gewindestutzen 34 vorzugsweise fest auf der Abtriebswelle
des - hydraulischen oder elektrischen - Wechslermotors 13 angeordnet, dieser
Wechslermotor 13 jedoch nicht fest gegenüber dem Motorrahmen 16 angeordnet,
sondern mit Hilfe von Gummilagern beweglich, wodurch die Rotationsachse des
Wechslermotors 13 gegenüber dem Motorrahmen 16 sowohl einen leichten
Querversatz als auch eine Winkeländerung vollziehen kann.To continue misalignment between the axis of rotation of the
Threaded
Die beschriebenen Ausgleichsfunktionen sind nicht nur für das Entnehmen einer
Bohrstange aus dem Magazin 19, sondern vor allem auch für das Ansetzen bzw.
Entnehmen einer Bohrstange auf der Bohrachse an bzw. vom Bohrgestänge 6
notwendig. The compensation functions described are not only for removing one
Boring bar from
Anschließend wird der Motorrahmen 16 gegenüber dem Wechslerschlitten 14
wiederum in Richtung der Bohrachse 3 zurückverfahren, wodurch die Bohrstange
7a, die nun auf dem Gewindestutzen 34 sitzt, aus dem Magazin 19 entnommen
wird. Durch vertikales Herabfahren des Wechslerschlittens 14 entlang der
Führungen 15 wird diese Bohrstange 7a - die in Fig. 1a in dieser Transportstellung
als Bohrstange 7d eingezeichnet ist - nach unten verfahren bis auf die Bohrachse
3.The
Durch Vorwärtsfahren des Motorrahmens 16 gegenüber dem Wechslerschlitten
14 in Fig. 1a nach links wird das vordere stirnseitige Ende 27 dieser Bohrstange
mit dem hinteren Ende der letzten Bohrstange eines bereits im Bohrloch
befindlichen Bohrgestänges 6 - wie in Fig. 3 eingezeichnet - in Kontakt gebracht.
Durch die gleichzeitige Drehung des Wechslermotors 13 wird diese neue
Bohrstange auf das Bohrgestänge hinten aufgeschraubt und das Bohrgestänge 6
dadurch verlängert.By moving the
Das Aufschrauben wird solange vollzogen, bis ein mit dem Wechslermotor 13
gekoppelter Drehmomentsensor ein ausreichend starkes Drehmoment beim
Verschrauben meldet. Während des Verschraubens ist die bisherige letzte
Bohrstange des Bohrgestänges 6 mittels der Drehbacke 33 des Bohrantriebes 9,
welcher sich dabei in einer relativ weit nach links vorgeschobenen Position
befindet, drehfest geklemmt.The screwing is carried out until one with the changer motor 13th
coupled torque sensor a sufficiently strong torque when
Screwing reports. The previous one is during screwing
Boring bar of the drill pipe 6 by means of the
Nach dem Ende der Drehung des Wechslermotors 13 wird diese Drehbacke 33
gelöst und der Bohrantrieb 9 - siehe Fig. 1a und Fig. 3 - nach rechts entlang
seiner zwei Führungen 29 soweit zurückverfahren, daß die Drehbacke 33 im
Bereich der letzten neu angesetzten Bohrstange 7 liegt, und von der Drehbacke
33 geklemmt werden kann, um den Gewindestutzen 34 des
Bohrstangenwechslers 12 durch Rückwärtsdrehung des Wechslermotors 13 von
der neu angesetzten Bohrstange 7 zu lösen.After the end of the rotation of the
Während dieses Lösens der Klemmbacke 33 und Zurückverfahrens des
Bohrantriebes 9 wird das Bohrgestänge 6 in der bisherigen Lage, sowohl axial als
auch hinsichtlich der Drehlage - bezüglich des Bohrloches 1 gehalten, indem die
nahe am Bohrloch am Bohrturm 11 befestigte Klemmbacke 21 das Bohrgestänge
6 klemmt. Beim Abschrauben des Gewindestutzens 34 wird der Motorrahmen 16
gegenüber dem Wechslerschlitten 14 wiederum horizontal mittels des
Hydraulikkolbens 37 nach hinten verfahren.During this loosening of the
Nun kann - nach Lösen der Klemmbacke 21 - durch Vorwärtsfahren des
gesamten Bohrantriebes 9 das Bohrgestänge 6 um die Länge der neuen
Bohrstange 7 vorwärtsgepreßt werden, indem der gesamte Bohrantrieb 9 mit Hilfe
seiner vorzugsweise beidseits angeordneten Hydraulikkolben 30 gegenüber dem
Bohrturm 11 entlang seiner Führungen 29 vorwärtsgeschoben wird, was mit einer
Kraft von etwa 2 t geschieht. Für die Richtungssteuerung wird das Bohrgestänge
vor dem Vorwärtspressen oder gleichzeitig unter Umständen mittels der
Drehbacke 33 des Bohrantriebes 9 etwas um die Bohrachse 3 gedreht. Vor,
während oder nach dem Vorwärtsschieben des Bohrantriebes 9 wird der gesamte
Bohrstangenwechsler 12 wiederum nach oben verfahren, um die nächste
Bohrstange 7 aus dem Magazin 19 zu holen. Durch die vielfache Wiederholung
dieses Vorganges wird das Bohrgestänge 6 auf die gewünschte Länge ausgebaut
und damit das Bohrloch 1 bis zum Zielpunkt gesteuert vorwärtsgetrieben.Now - after loosening the jaw 21 - by moving the
Insbesondere wenn das Bohrgestänge 6 vom Bohrantrieb 9 lediglich mittels
Kraftschluß sowohl für die Axialbewegung, als auch für die Drehbewegung
gehalten wird, kann es vorkommen, daß unerwünschterweise das Bohrgestänge 6
gegenüber der Klemmbacke 33 des Bohrantriebes 9, oder auch gegenüber dem
am Bohrturm 11 befestigten Klemmbacke 21 durchrutscht.In particular if the drill string 6 from the
Um dies zu bemerken, und anschließend auch die Soll-Lage zwischen
Bohrantrieb 9 und dem Bohrgestänge 6 wieder einnehmen zu können, sind am
Bohrantrieb 9, vorzugsweise an dessen Gehäuse 35, wenigstens ein Sensor 28,
vorzugsweise jedoch drei Sensoren 28a, 28b, 28c angeordnet. Diese
vorzugsweise als Indukivsensoren ausgebildete Sensoren 28 stellen die axiale
Relativlage zu der im Bereich des Bohrantriebes 9 befindlichen Bohrstange 7 fest,
indem der eine Sensor 28a reagiert, wenn ihm die Ringnut 18 dieser Bohrstange 7
genau gegenüber liegt. Falls das Bohrgestänge 6 in Richtung der Bohrachse 3
gegenüber dem Bohrantrieb 9 durchrutscht, verläßt die Ringnut 18 den Bereich
dieses Sensors 28a, und dieser gibt ein Fehlersignal ab.To notice this, and then the target position between
Da auf beiden Seiten in Richtung der Bohrachse 3 benachbart die beiden anderen
Sensoren 28b, 28c angeordnet sind, muß die Ringnut 18 einen der beiden
Sensoren 28b, 28c überlaufen haben, welcher ein entsprechendes Signal
produziert hat. Dadurch ist die Verschieberichtung des Bohrgestänges 6
gegenüber dem Bohrantrieb 9 bekannt und - vorzugsweise nach Fixierung des
Bohrgestänges 6 im Bohrloch 1 mittels der fest am Bohrturm angeordneten
Klemmbacke 21 - wird der Bohrantrieb 9 wieder so in Richtung der Bohrachse 3
verfahren, daß der Sensor 28a der Ringnut 18 gegenüberliegt, also die Soll-Lage
wieder eingenommen wird.Since the other two are adjacent on both sides in the direction of the
Das Entnehmen des Bohrgestänges 6 aus dem Bohrloch 1 durch Zurückziehen - wobei in der Regel gleichzeitig die gewünschte Leitung durch Befestigung am vorderen Ende des Bohrgestänges 6 in das Bohrloch 1 eingezogen wird - geht wie folgt vor sich:Removing the drill pipe 6 from the borehole 1 by pulling it back - usually at the same time the desired line by attaching to front end of the drill string 6 is drawn into the borehole 1 - how follows in front of it:
Zunächst ist am Bohrantrieb 9 ein nicht dargestellter Abstreifer, meist bestehend
aus einer oder mehreren Gummilippen oder einer Gummitülle, vorgesehen, um
das aus dem Bohrloch 1 zurückgezogene Bohrgestänge 6 grob zu reinigen.First of all, a wiper (not shown) is usually present on the
Bei Beginn des Rückzugsvorganges hält die Klemmbacke 33 des Bohrantriebes 9
die hinterste Bohrstange des Bohrgestänges 6, wobei sich der Bohrantrieb 9 in
der gegen das Bohrloch 1 vorgeschobenen Position am linken Rand des
Startschachtes 1 in Fig. 1a, befindet.When the retraction process begins, the
Von dieser Position aus wird der Bohrantrieb 9 nach rechts um die Länge einer
Bohrstange 7 zurückgezogen, dann das Bohrgestänge 6 im Bohrloch 1 fixiert,
indem die am Bohrturm 11 angeordnete Klemmbacke 21 die nun vorletzte oder
eine weiter vorne liegende Bohrstange des Bohrgestänges 6 fixiert. From this position, the
Dann wird die vorletzte Bohrstange des Bohrgestänges 6 von der Losbrechbacke
32 geklemmt. Anschließend wird der Gewindestutzen 34 - bei dieser Bauweise
zusammen mit dem Wechslermotor 13 - in fluchtende Lage mit der Bohrachse 3
gebracht und dann mittels der vorbeschriebenen Mittel auf das hintere Ende des
Bohrgestänges 6 aufgeschraubt, indem der Gewindestutzen 34 vorwärts, also in
der Regel im Uhrzeigersinn, gedreht und gleichzeitig durch die vorbeschriebenen
Mittel nach vorne gegen das hintere Ende verfahren wird, bis eine ausreichend
feste Verschraubung zwischen dem Gewindestutzen 34 des
Bohrstangenwechslers 12 und der letzten Bohrstange 6 gegeben ist, was
insbesondere durch Drehmomentüberwachung bei diesem Aufschrauben
kontrolliert wird. Nun wird die Drehbacke 33 um die Bohrachse 3 um etwa ½
Umdrehung nach links, also in Öffnungsrichtung des Gewindes, gedreht, wodurch
die Gewindeverschraubung zwischen der letzten und der vorletzten Bohrstange
des Bohrgestänges 6 aufgebrochen wird.Then the penultimate boring bar of the drill pipe 6 from the
Nun entläßt die Drehbacke 33 des Bohrantriebes 9 diese letzte Bohrstange 7 und
fährt gegen das Bohrloch 1 nach vorne, um die nunmehr letzte Bohrstange des
Bohrgestänges 6 zu ergreifen und wiederum soweit aus dem Bohrloch heraus
zurückzuziehen, daß sie wie vorbeschrieben vom Bohrgestänge 6 entfernt werden
kann. Gleichzeitig oder anschließend wird die aufgebrochene Verschraubung
durch den Gewindestutzen 34 und Wechslermotor 13 zusammen mit der darauf
befindlichen ursprünglich letzten Gewindestange durch Drehen des Gewindes in
Rückwärtsrichtung (Linksdrehen) und gleichzeitig im Verfahren des
Bohrstangenwechslers nach hinten, vom Bohrgestänge weg, vollständig gelöst.
Vorher oder gleichzeitig wird die auf dem Gewindestutzen 34 befindliche
Bohrstange durch Hochfahren des Wechslerschlittens 14 und eventuell
gleichzeitiges Nachlinksverfahren des Motorrahmens 16 gegenüber dem
Wechslerschlitten 14 - in den Greifbereich des Greifers 23 im oberen Bereich des
Bohrturmes 11 gebracht. Zu diesem Zweck muß das Magazin 19 aus dem
vertikalen Bewegungsweg der Bohrstange herausgenommen werden durch
Hochziehen oder Wegklappen des Magazins 19 gegenüber dem Bohrturm 11.
Weiterhin drückt die so transportierte Bohrstange vor Erreichen des Greifers 23
die schwenkbar gelagerte Schrägrutsche 24 aus ihrem Bewegungsweg zur Seite. Now the
Nach dem Schließen des Greifers 23 mit Hilfe dessen Kolben 23' wird die
Bohrstange 7k wie in Fig. 2b ersichtlich vom Greifer 23 gehalten, und der
Gewindestutzen 34 kann durch Rückwärtsdrehen des Wechslermotors 13 und
gleichzeitige Rückwärtsverfahrung des Motorrahmens 16 gegenüber dem
Schlitten 14 gelöst werden.After closing the
Durch Öffnen des Greifers 23 fällt diese Bohrstange 7k in die inzwischen aufgrund
der Schwerkraft in die in Fig. 2b zurückgefallene Schrägrutsche 24 und rollt
entlang dieser Schrägrutsche seitlich aus dem Bohrturm 11 heraus für die weitere
Behandlung durch das Bedienungspersonal.By opening the
Gleichzeitig oder anschließend wird der Bohrstangenwechsler 12 nach unten
verfahren zum Entnehmen der nächsten Bohrstange vom Bohrgestänge 6.Simultaneously or subsequently, the
Claims (14)
dadurch gekennzeichnet, daß
characterized in that
dadurch gekennzeichnet, daß
das Bohrgestänge (8) mit dem Bohrantrieb (9) lediglich mittels Kraftschluß verbunden wird.Method according to claim 1,
characterized in that
the drill pipe (8) is connected to the drill drive (9) only by means of a frictional connection.
dadurch gekennzeichnet, daß
das Bohrgestänge (6) mit dem Bohrantrieb (9) wenigstens in Längsrichtung des Bohrloches (1) formschlüssig am Außenumfang des Bohrgestänges (6) gehalten wird. Method according to claim 1,
characterized in that
the drill pipe (6) with the drill drive (9) is positively held on the outer circumference of the drill pipe (6) at least in the longitudinal direction of the borehole (1).
dadurch gekennzeichnet, daß
characterized in that
dadurch gekennzeichnet, daß
die Bohrstangen (7a, 7b, 7c) in jeweils gleicher axialer Position vom Außenumfang her radial nach innen ragende Vertiefungen, insbesondere eine umlaufende Ringnut (18), aufweisen.Device according to claim 4,
characterized in that
the boring bars (7a, 7b, 7c) each have radially inwardly projecting depressions in the same axial position from the outer circumference, in particular a circumferential annular groove (18).
dadurch gekennzeichnet, daß
characterized in that
dadurch gekennzeichnet, daß
characterized in that
dadurch gekennzeichnet, daß
der Motorrahmen (16) zusammen mit dem Wechslermotor (13) gegenüber dem Wechslerschlitten (14) mit Hilfe wenigstens eines Hydraulikkolbens (37) verfahrbar ist, wobei der Hydraulikkolben (37) an dem Motorrahmen (16) mittels wenigstens einer dazwischen angeordneten Feder (38) als Längenausgleich angreift.Device according to one of the preceding device claims,
characterized in that
the motor frame (16) can be moved together with the changer motor (13) relative to the changer slide (14) by means of at least one hydraulic piston (37), the hydraulic piston (37) on the motor frame (16) by means of at least one spring (38) arranged in between attacks as length compensation.
dadurch gekennzeichnet, daß
die Motorrahmenführungen (17) zum Verfahren des Motorrahmens (16) gegenüber dem Wechslerschlitten (14) in Querrichtung einseitig gegenüber der Bohrachse (3) stark beabstandet angeordnet ist.Device according to claim 8,
characterized in that
the motor frame guides (17) for moving the motor frame (16) with respect to the changer slide (14) in the transverse direction are arranged on one side at a great distance from the drilling axis (3).
dadurch gekennzeichnet, daß
der Wechslermotor (13) für das Ansetzen bzw. Lösen einer zusätzlichen Bohrstange (7) am bzw. vom Bohrgestänge (6) über ein Zeitschaltglied verfügt.Device according to one of the preceding device claims,
characterized in that
the changer motor (13) has a timer for attaching or detaching an additional drill rod (7) to or from the drill rod (6).
dadurch gekennzeichnet, daß
am Bohrturm (11) unmittelbar am Bohrloch (1) ein fest angeordneter Klemmbacken (21) zur Fixierung des Bohrgestänges (6) in axialer Richtung angeordnet ist.Device according to one of the preceding device claims,
characterized in that
a fixed jaw (21) for fixing the drill pipe (6) in the axial direction is arranged on the drilling rig (11) directly at the borehole (1).
dadurch gekennzeichnet, daß
der Bohrturm (11), vorzugsweise unterhalb der Bohrachse (3), wenigstens einen in Richtung der Bohrachse (3) verlaufenden Klemmzylinder (22) aufweist, mit welchen der Bohrturm (11) im Startschacht (2) verklemmt werden kann.Device according to one of the preceding device claims,
characterized in that
the drilling rig (11), preferably below the drilling axis (3), has at least one clamping cylinder (22) running in the direction of the drilling axis (3), with which the drilling rig (11) can be clamped in the starting shaft (2).
dadurch gekennzeichnet, daß
im Bereich des Bohrstangenwechslers am oberen Ende des Verfahrweges dessen Wechslerschlitten (14) eine Halteeinheit, insbesondere in Form eines nach unten offenen Greifers (23), angeordnet ist zum Halten der Bohrstange (7) während des Herausdrehens des Gewindestutzens (34) des Wechslermotors (13) zum Ablegen der Bohrstange (7) nach deren Entfernung.Device according to one of the preceding device claims,
characterized in that
In the area of the boring bar changer at the upper end of the travel path, the changer slide (14) of which a holding unit, in particular in the form of a gripper (23) open at the bottom, is arranged for holding the boring bar (7) while unscrewing the threaded connector (34) of the changer motor (13 ) to put down the boring bar (7) after its removal.
dadurch gekennzeichnet, daß
der Greifer (23) oberhalb einer klappbaren Schrägrutsche (24) angeordnet ist, welche um eine Achse so klappbar ist, daß sie durch eine von unterhalb mittels des Bohrstangenwechslers (12) herantransportierte Bohrstange (7) aus dem Bewegungsweg dieser Bohrstange (7) zwischen der Bohrachse (3) und dem darüber angeordneten Greifer (23) herausklappbar ist.Device according to claim 13,
characterized in that
the gripper (23) is arranged above a foldable inclined slide (24) which can be folded about an axis in such a way that it is moved from below the movement path of this drill rod (7) by a drill rod (7) brought in from below by means of the drill rod changer (12) Drilling axis (3) and the gripper (23) arranged above it can be folded out.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19633934A DE19633934C2 (en) | 1996-08-22 | 1996-08-22 | horizontal drilling machine |
DE19633934 | 1996-08-22 |
Publications (3)
Publication Number | Publication Date |
---|---|
EP0825326A2 true EP0825326A2 (en) | 1998-02-25 |
EP0825326A3 EP0825326A3 (en) | 2001-01-24 |
EP0825326B1 EP0825326B1 (en) | 2004-09-22 |
Family
ID=7803392
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP97111051A Expired - Lifetime EP0825326B1 (en) | 1996-08-22 | 1997-07-02 | Method and apparatus for horizontal drilling and for handling drill rods |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0825326B1 (en) |
AT (1) | ATE277270T1 (en) |
DE (2) | DE19633934C2 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003012248A3 (en) * | 2001-07-28 | 2003-09-18 | Tracto Technik | Pipe feed |
CN103154417A (en) * | 2010-03-31 | 2013-06-12 | Tracto技术有限责任两合公司 | Horizontal drilling device |
EP2728104A1 (en) * | 2010-03-31 | 2014-05-07 | Tracto-Technik GmbH & Co.KG | Method for producing a horizontally drilled bore hole in the ground and horizontal drilling device |
CN110230469A (en) * | 2019-07-04 | 2019-09-13 | 西安石油大学 | A kind of horizontal well drilling bit pressure compensation device |
CN118257492A (en) * | 2024-05-29 | 2024-06-28 | 河南省豫西煤田地质勘察有限公司 | Drilling equipment capable of being used for large-size well bore and application method thereof |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10159712B4 (en) * | 2001-07-12 | 2004-12-02 | Tracto-Technik Gmbh | Drilling rig and method for making earth bores |
US7316280B2 (en) | 2001-07-12 | 2008-01-08 | Tracto-Technik Gmbh | Method for producing earth boreholes |
DE10143909A1 (en) * | 2001-09-07 | 2003-04-10 | Tracto Technik | Alignment device for earth boring device has operating devices manipulated from ground level for safety of operating personnel |
DE102008006392A1 (en) * | 2008-01-28 | 2009-07-30 | Herrenknecht Vertical Gmbh | Method and device for creating a deep hole |
DE102010004287A1 (en) * | 2010-01-11 | 2011-07-14 | TERRA AG für Tiefbautechnik | Method and arrangement for producing and / or expanding a bore hole |
DE102010013723A1 (en) | 2010-03-31 | 2011-10-06 | Gdf Suez | Method for operating a horizontal drilling device and horizontal drilling device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4630967A (en) * | 1984-10-27 | 1986-12-23 | Gerd Soltau | Arrangement for underground advance driving of pipe trains composed of individual pipe lengths |
GB2276895A (en) * | 1993-03-13 | 1994-10-12 | Nodig Pipelines Ltd | Horizontal boring |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2527679B1 (en) * | 1982-05-27 | 1987-04-24 | Delbarre Jean | METHOD AND DEVICE FOR DRILLING THE SOIL |
DE3803070C1 (en) * | 1988-02-03 | 1989-06-15 | Meyer & John Gmbh & Co Tief- Und Rohrleitungsbau, 2000 Hamburg, De | Arrangement for advancing an advancement pipe |
DE4241856C1 (en) * | 1992-12-11 | 1994-04-07 | Christian Kost Bauunternehmung | Pipe laying with moving jacking press |
-
1996
- 1996-08-22 DE DE19633934A patent/DE19633934C2/en not_active Expired - Fee Related
-
1997
- 1997-07-02 EP EP97111051A patent/EP0825326B1/en not_active Expired - Lifetime
- 1997-07-02 DE DE59711937T patent/DE59711937D1/en not_active Expired - Lifetime
- 1997-07-02 AT AT97111051T patent/ATE277270T1/en not_active IP Right Cessation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4630967A (en) * | 1984-10-27 | 1986-12-23 | Gerd Soltau | Arrangement for underground advance driving of pipe trains composed of individual pipe lengths |
GB2276895A (en) * | 1993-03-13 | 1994-10-12 | Nodig Pipelines Ltd | Horizontal boring |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003012248A3 (en) * | 2001-07-28 | 2003-09-18 | Tracto Technik | Pipe feed |
CN103154417A (en) * | 2010-03-31 | 2013-06-12 | Tracto技术有限责任两合公司 | Horizontal drilling device |
JP2013527343A (en) * | 2010-03-31 | 2013-06-27 | トラクト−テヒニーク ゲゼルシャフト ミット ベシュレンクテル ハフツング ウント コンパニー コマンディートゲゼルシャフト | Horizontal drilling device |
EP2728104A1 (en) * | 2010-03-31 | 2014-05-07 | Tracto-Technik GmbH & Co.KG | Method for producing a horizontally drilled bore hole in the ground and horizontal drilling device |
CN103154417B (en) * | 2010-03-31 | 2015-08-19 | Tracto技术有限责任两合公司 | Horizontal drilling equipment |
US9523240B2 (en) | 2010-03-31 | 2016-12-20 | Tracto-Technik Gmbh & Co. Kg | Method for producing a horizontal bore in the ground and horizontal drilling device |
CN110230469A (en) * | 2019-07-04 | 2019-09-13 | 西安石油大学 | A kind of horizontal well drilling bit pressure compensation device |
CN110230469B (en) * | 2019-07-04 | 2024-05-28 | 西安石油大学 | Drilling pressure compensation device for horizontal well drilling |
CN118257492A (en) * | 2024-05-29 | 2024-06-28 | 河南省豫西煤田地质勘察有限公司 | Drilling equipment capable of being used for large-size well bore and application method thereof |
Also Published As
Publication number | Publication date |
---|---|
ATE277270T1 (en) | 2004-10-15 |
DE59711937D1 (en) | 2004-10-28 |
DE19633934C2 (en) | 2002-09-26 |
EP0825326A3 (en) | 2001-01-24 |
EP0825326B1 (en) | 2004-09-22 |
DE19633934A1 (en) | 1998-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2728104B1 (en) | Method for producing a horizontally drilled bore hole in the ground and horizontal drilling device | |
EP0527460A2 (en) | Method and device for drilling holes in soil or rock, particularly for the insertion of injection anchors | |
EP2553202B1 (en) | Method for operating a horizontal drilling device and horizontal drilling device | |
EP0825326B1 (en) | Method and apparatus for horizontal drilling and for handling drill rods | |
EP1580398B1 (en) | Apparatus and method for subsoil construction | |
EP0860581A1 (en) | Drilling machine | |
EP0958446B1 (en) | Method and device for driving bore-holes, specially for prospection and extraction drillings | |
DE19512070C2 (en) | Drill | |
EP2553203B1 (en) | Horizontal drilling device | |
EP0860580B1 (en) | Apparatus for handling drill rods | |
DE102006062322B3 (en) | Horizontal thrust boring machine for use in dam, has locally position-fixable frame, and injecting ring and feed motor that are engaged with toothed rack by gear wheel arranged at output shaft of feed motor | |
EP0819819B1 (en) | Milling head,drilling device and method for underwater drilling | |
DE3423842C2 (en) | Device for producing underground cavities with inaccessible cross-sections | |
DE19512109C2 (en) | Drill | |
DE3612762A1 (en) | Telescopic drilling implement | |
EP1407112B1 (en) | Method for producing earth boreholes | |
DE3324757C2 (en) | Device for drilling and casing a vertical borehole | |
DE3729561C2 (en) | ||
DE3605961A1 (en) | PRESS TUBE FOR THE PIPE PRESSING OPERATION AND PIPE PRESSING DEVICE | |
EP0305834A2 (en) | Process and apparatus for making a duct in an underground borehole | |
DE3513194C1 (en) | Apparatus for penetrating soil strata near the surface | |
DE19922813C2 (en) | Automatic boom | |
DE19619532C2 (en) | Method for producing a walkable tunnel connection between two adjacent, drilled shaft bores and device for carrying out the method | |
DE3911379C2 (en) | Pipe pre-pressing station for pipe pre-pressing companies | |
DE29610316U1 (en) | Device for the production of earth bores |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH DE DK ES FR GB IT LI LU MC NL PT |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;RO;SI |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: FLOWTEX FRANCE Owner name: GAZ DE FRANCE Owner name: DOLL FAHRZEUGBAU GMBH |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;RO;SI |
|
17P | Request for examination filed |
Effective date: 20010619 |
|
AKX | Designation fees paid |
Free format text: AT BE CH DE DK ES FR GB IT LI LU MC NL PT |
|
AXX | Extension fees paid |
Free format text: SI PAYMENT 20010619 |
|
17Q | First examination report despatched |
Effective date: 20020809 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: FLOWTEX FRANCE Owner name: TRACTO TECHNIK GMBH Owner name: DOLL FAHRZEUGBAU GMBH |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE DK ES FR GB IT LI LU MC NL PT |
|
AX | Request for extension of the european patent |
Extension state: SI |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20040922 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20040922 Ref country code: GB Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20040922 Ref country code: FR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20040922 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REF | Corresponds to: |
Ref document number: 59711937 Country of ref document: DE Date of ref document: 20041028 Kind code of ref document: P |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20041222 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050102 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
GBV | Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed] |
Effective date: 20040922 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050702 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050702 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050731 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050731 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050731 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050731 |
|
26N | No opposition filed |
Effective date: 20050623 |
|
EN | Fr: translation not filed | ||
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
BERE | Be: lapsed |
Owner name: *FLOWTEC FRANCE Effective date: 20050731 Owner name: *TRACTO TECHNIK G.M.B.H. Effective date: 20050731 Owner name: *DOLL FAHRZEUGBAU G.M.B.H. Effective date: 20050731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050222 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20100922 Year of fee payment: 14 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120201 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 59711937 Country of ref document: DE Effective date: 20120201 |