EP0772730B1 - Bouclier - Google Patents
Bouclier Download PDFInfo
- Publication number
- EP0772730B1 EP0772730B1 EP95924854A EP95924854A EP0772730B1 EP 0772730 B1 EP0772730 B1 EP 0772730B1 EP 95924854 A EP95924854 A EP 95924854A EP 95924854 A EP95924854 A EP 95924854A EP 0772730 B1 EP0772730 B1 EP 0772730B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- chamber
- working chamber
- shield according
- driving shield
- opening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000012530 fluid Substances 0.000 claims abstract description 22
- 238000005520 cutting process Methods 0.000 claims description 22
- 230000008093 supporting effect Effects 0.000 claims description 12
- 210000000481 breast Anatomy 0.000 claims description 10
- 239000000463 material Substances 0.000 claims description 7
- 238000007789 sealing Methods 0.000 claims description 6
- 238000006073 displacement reaction Methods 0.000 claims description 5
- 238000005065 mining Methods 0.000 abstract description 25
- 238000005553 drilling Methods 0.000 abstract description 3
- 238000000605 extraction Methods 0.000 description 20
- 239000011435 rock Substances 0.000 description 18
- 230000005641 tunneling Effects 0.000 description 18
- 239000007788 liquid Substances 0.000 description 10
- 238000003860 storage Methods 0.000 description 8
- 230000009974 thixotropic effect Effects 0.000 description 6
- 238000012423 maintenance Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000009412 basement excavation Methods 0.000 description 4
- 239000000440 bentonite Substances 0.000 description 4
- 229910000278 bentonite Inorganic materials 0.000 description 4
- SVPXDRXYRYOSEX-UHFFFAOYSA-N bentoquatam Chemical compound O.O=[Si]=O.O=[Al]O[Al]=O SVPXDRXYRYOSEX-UHFFFAOYSA-N 0.000 description 4
- 239000000725 suspension Substances 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 230000001133 acceleration Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 230000006735 deficit Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 239000012065 filter cake Substances 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 230000003137 locomotive effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000004091 panning Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 230000003319 supportive effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/08—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
- E21D9/0875—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a movable support arm carrying cutting tools for attacking the front face, e.g. a bucket
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0642—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end
- E21D9/065—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end with devices for provisionally supporting the front face
Definitions
- the invention relates to a jacking shield the type corresponding to the preamble of claim 1.
- the rock is attached to the face using a mechanical Removal device loosened and via pipes a separation plant located outside the tunnel room pumped. Here are rock and bentonite suspension Cut.
- the support fluid then becomes the Mining chamber supplied after passing through if necessary Add new bentonite suspension to the requirements of the rock standing on the face was adjusted.
- DE-PS 24 31 512 a tunneling shield is known in which the rock punctiform by means of a swiveling on all sides Removal arm of the rotatably mounted cutting head released or dismantled and sucked off directly on the cutting head and by from there to the rear from the excavation space of the tunnel shield is promoted.
- this jacking shield is that that the support fluid only in the immediate cutting area comes into contact with the loosened rock and can only be contaminated in this area. In the remaining liquid remains in all other areas of the extraction chamber unaffected by the loosened rock, so that it is not mixed and burdened with it. Since the Support fluid hereby their support and sealing properties longer than with previously known jacking plates retains and therefore renewed or supplemented less often needs to be distinguished from the DE-PS 24 31 512 known removal sign due to particularly low Operating costs during its deployment.
- Another tunneling shield is from DE 32 21 494 C1 known.
- This tunneling shield includes one with one Extraction head provided extraction arm, which on an orbit the working face is movable. To remove the mining material is the mining head one while moving through falling down through the lower part of the orbit coarse mining material and during moving through through the upper part of the orbit that Dismantling material assigned to the clearing bucket that is emitted to the rear.
- the invention is therefore based on the object to develop such a device so that on the one hand Work to remove bouldering from the quarry of the jacking plate and maintenance work from Operators can be made without it a lowering of the thixotropic liquid is required.
- the tunneling shield according to the invention according to claim 1 is a separate working chamber in the mining chamber provided, which against the rear, pressure-free Area of the tunnel shield over at least one security gate is sealed and which one down has directed opening, through which they with the removal chamber communicates.
- the work chamber is with one for the use of suitable fluid medium by operating personnel - usually compressed air or water - pressurizable. While the jacking plate is being dismantled, the Working chamber also with the fluid support medium filled.
- the supporting medioum is supported by the Filling the working chamber with the for the use of the Operator suitable fluid medium under one Pressure that corresponds to the pressure of the support medium the downward opening of the working chamber this displaces without the supporting effect of the support medium would be restricted to the working face.
- the operating personnel can now go through a security gate from the pressure-free area of the heading shield into the Inside the work chamber and go down through it directed opening of the working chamber the desired activities make.
- Jacking shield is the subject of the claim 3.
- the Chamber of Labor has one of the Removal chamber independent chamber housing, which in one provided in the transverse wall of the tunnel shield Bearing opening is at rest.
- the working chamber housing is optional from the position inside the excavation chamber towards a publisher axis that is roughly in the direction the central axis of the heading shield runs in one essentially outside the mining chamber Position under the seal opposite the bearing opening relocatable. This measure prevents the Working chamber for this during normal mining operations excessively limited space required in the excavation chamber.
- the Driving shield in a particularly advantageous embodiment of the Driving shield according to claim 5 is the opening of the Working chamber facing storage area of the storage opening so dimensioned that this in the essentially outside the Dismantling chamber position of the working chamber The opening is completely covered and the working chamber with it seals against the environment.
- the Chamber of Labor can measure the use of the Fluid medium that allows operating personnel - such as compressed air or water - already filled, and the operating staff can the work chamber through the security gate Already seek this out before taking it into the mining area Opening their opening is introduced.
- the face of the face facing the working face Chamber housing as perpendicular to the central axis of the tunnel shield training extending support wall and to move the working chamber so far into the mining chamber that the outer surface of the end wall against the working face is pressed.
- the displacement axis is preferably used hydraulic device.
- Cut-out obstacles, the so-called boulder, as well complete cutting heads can be opened if necessary easy way to remove from the pit when in the Working chamber a gripping device that can be lowered through its opening is provided.
- the dismantling arm can only be pivoted about a pivot axis because this measure a particularly simple and robust storage of the removal arm on the cross wall allowed.
- the removal arm is pivoted at a preferred embodiment of claim 14 by a hydraulic device.
- a preferred embodiment of the tunneling shield according to claim 15 thereby has an increased drilling capacity on that several, independently of each other on the carrier plate pivotable support arms with attached to them Cutting heads are provided.
- the one designated 100 as a whole in the drawing Driving shield comprises a tubular shield jacket 1, which has a transverse wall 2 in its central region, which a front extraction chamber 3 from the rear Part 4 of the tunneling shield 100 is cut off.
- the front one Mining chamber 3 extends straight up to the face 5 and is in the mining operation with a support medium, for example a thixotropic liquid, filled, for the one in the transverse wall not shown in the drawing Inlet is provided.
- a support medium for example a thixotropic liquid, filled, for the one in the transverse wall not shown in the drawing Inlet is provided.
- a support medium for example a thixotropic liquid
- the compensation chamber 39 communicates with the Mining chamber 3 such that to compensate for changes in volume the extraction chamber 3 support fluid between the Chambers an exchange of support fluid takes place. At major volume changes in the mining chamber or in one considerable loss of support fluid through the face the pressure in the extraction chamber can be reduced by additional Pumping or suctioning of support liquid via the inlet can be set.
- Symmetrical to the central axis M of the tunnel shield 100 is a carrier plate in the transverse wall 2 via ball bearings 7 8 rotatably mounted and via a sealing ring 9 sealed against the transverse wall 2.
- the rotary drive of the A hydraulic motor 6 serves as the support plate 8.
- a excavation arm 10 is arranged on the face of the rock, one rotatable about the longitudinal axis L of the extraction arm Cutting head 11 includes and on the carrier plate by means a hinge assembly 12 parallel to that through the the face of the support plate 8 facing the working face and perpendicular to one radially from the center of rotation of the support plate intersecting the longitudinal axis L of the extraction arm Swivel axis is pivotally mounted.
- the pivoting of the Dismantling arm 10 is done by one at the back of the Carrier plate 8 arranged hydraulic cylinder 13.
- Das rear end 14 of the removal arm 10 is through the support plate 8 in the rear part 4 of the tunneling shield 100 through an opening 15 machined into the carrier plate 8 passed through.
- For sealing it is in the area of Opening part of the extraction arm 10 as a spherical Seat 16 executed and via an annular seal arrangement 17 sealed against the carrier plate 8.
- the extraction arm two telescopically interlocking Arm segments 10 ', 10 ", by means of which the length of the removal arm - As shown by the dashed line in Fig. 1 different positions of the extraction arm 10 and Cutting head 11 can be seen - for example with the help of hydraulic Actuators not shown in the drawing are varied.
- the carrier plate 8 has above the removal arm 10 an area widened in the direction of the bore axis 19 in which a bearing opening 20 is incorporated, which is the storage of one along a displacement axis V in the bearing opening 20 displaceable working chamber 21st serves.
- the displacement axis V above the Center axis M of the tunneling shield and runs - from viewed from front to back - slightly sloping upwards.
- the Working chamber 21 points at that shown in the drawing Embodiment a cylindrical segment Housing 22, whose lower flat 23 in the front Area 24 has a downward opening 25.
- the rear region 26 of the working chamber 21 is a double person lock 27 trained.
- the working chamber 21 is in a manner not shown in the drawing a device for loading, also not shown the working chamber 21 with a fluid medium, which gives people access to the working chamber 21 allows, such as compressed air or water, connected.
- a fluid medium which gives people access to the working chamber 21 allows, such as compressed air or water, connected.
- the position of the working chamber 21 is the lower opening 25 from the lower bearing surface 28 of the bearing opening 20 completely covered and both to the chamber 3 and to the rear part 4 of the jacking shield via sealing rings 29, which extends around the entire circumference of the housing 22 extend the working chamber 21, sealed.
- This Position of the working chamber 21 can be operated by the operating personnel Double lock 27 in the front area 24 of the working chamber and then use a suitable one fluid medium can be filled under a pressure which the pressure of the support liquid located in the extraction chamber 3 corresponds.
- the fluid medium in the working chamber has the same pressure as that in the mining chamber support medium for supporting the working face 5, does not penetrate this or only slightly working chamber 21 opened downward, and the operating personnel can carry out maintenance or repair work make the cutting head 11 without lowering it the support fluid in the extraction chamber 3 is required.
- a gripping device that can be lowered through its opening 31 provided, which for the inclusion of a dismantled Cutting head or not shown in the drawing larger pieces of overburden is provided.
- the housing 22 of the working chamber 21 has a front Front side 32, which over the outer circumference of the protrudes cylindrical segment-shaped housing 22 and thus at the same time the additional support of the face 5 serves when the working chamber 21 so far into the mining chamber 3 is pushed in that the end face 32 on the Face 5 is present.
- a double person lock 35 arranged through which - if necessary - after lowering the support fluid, operating personnel directly can get into the mining chamber 3.
- a stone lock 36 is provided, through which larger Scraps in the rear part 4 of the tunnel shield can be brought.
- the tunneling shield is propelled via on the fixed part 2 of the transverse wall 2 'attacking hydraulic Feed cylinder 37, which is with her other End at the front of the existing tubbing extension 38 support.
- the Driving shield either pushed forward continuously, or Dismantling and feed take place in succession. Then there is one significant acceleration of the propulsion can be achieved that the ground initially only along the shield edge 39 forming front end edge of the shield mantle 1 is milled, for which purpose the cutting head 11 in the Fig. 1 shown in dashed lines, exposed position and then by rotating the carrier plate along the blade edge is moved.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Liquid Crystal (AREA)
- Valve Device For Special Equipments (AREA)
- Reciprocating, Oscillating Or Vibrating Motors (AREA)
Claims (15)
- Bouclier de percement comprenant dans sa partie avant une chambre d'abattage (3) délimitée à l'arrière par une paroi transversale (2) étanche et en avant par le front de taille (5) celle chambre contenant, pour abattre le matériau du sol composant le front de taille (5), un bras d'abattage (10) monté de manière étanche sur la paroi transversale (2) et réglable en longueur, ce bras portant une tête rotative en coupe (11) et pouvant, en service, se déplacer en direction de tout point de front de taille (5) à l'intérieur d'un fluide de soutien contenu sous pression dans la chambre d'abattage (3),
caractérisé en ce qu'
il est prévu dans la chambre d'abattage (3) une chambre de travail (21) qui peut être mise en pression par l'intermédiaire d'un liquide et qui est rendue étanche par rapport à la partie arrière (4) dépourvue de pression, du bouclier, par l'intermédiaire d'un sac à poussière (27) cette chambre de travail présentant une ouverture (25) dirigée vers le bas, par laquelle elle communique avec la chambre d'abattage (3). - Bouclier selon la revendication 1,
caractérisé en ce que
l'ouverture (25) a des dimensions permettant d'introduire la tête de coupe (11). - Bouclier selon la revendication 1 ou 2,
caractérisé en ce que
la chambre de travail (21) comporte un boítier séparé (22) qui est monté dans une ouverture (20) prévue dans la paroi transversale et formant palier et qui peut, en partant d'une position située à l'intérieur de la chambre d'abattage (3) se déplacer selon la direction d'un axe de déplacement (V) orienté sensiblement comme l'axe médian (M) du bouclier (100) pour venir occuper une position située essentiellement à l'extérieur de la chambre d'abattage (3) avec étanchéité le long de l'ouverture (20). - Bouclier selon la revendication 3,
caractérisé en ce que
le centre de l'ouverture (20) est situé au-dessus de l'axe médian (M) du bouclier (100) et l'axe de déplacement (V), vu depuis le front de taille (5), est légèrement en pente vers le haut. - Bouclier selon l'une quelconque des revendications 3 ou 4,
caractérisé en ce que
la portée (28) formant palier de l'ouverture (25) située en face de l'ouverture (25) de la chambre de travail (21) recouvre totalement cette ouverture (25) et obture la chambre de travail (21) de manière étanche par rapport à ce qui l'entoure, quand la chambre de travail (21) est située essentiellement à l'extérieur de la chambre d'abattage. - Bouclier selon l'une des revendication 3 à 5,
caractérisé en ce que
la paroi frontale du boítier de chambre, située en face du front de taille (5) est constituée par une paroi de soutien (32) perpendiculaire à l'axe médian du bouclier, la chambre de travail (21) pouvant se déplacer dans la chambre d'abattage (3) jusqu'à ce que la face externe de la paroi frontale (32) soit appliquée sur le front de taille (5). - Bouclier selon la revendication 6,
caractérisé en ce que
la paroi frontale (32) du boítier (22) située en face du front de taille (5) s'étend au-delà de la périphérie de la chambre de travail (21). - Bouclier selon une des revendications 3 à 7,
caractérisé en ce qu'
un vérin hydraulique (30) assure le déplacement de la chambre de travail. - Bouclier selon une des revendications 1 à 8,
caractérisé en ce qu'
il est prévu dans la chambre de travail (21) un dispositif de prise (31) pouvant descendre à travers l'ouverture (25) de la chambre et saisir une tête de coupe (11) ou d'assez gros morceaux de déblais. - Bouclier selon une des revendications 1 à 9,
caractérisé en ce qu'
au moins un bras d'abattage (10) pouvant basculer au moins autour d'un axe est monté sur une plaque porteuse (8) en dehors du milieu de cette plaque qui elle-même est montée avec étanchéité dans la paroi transversale (2), en pouvant tourner à peu près autour de l'axe médian (M). - Bouclier selon la revendication 10,
caractérisé en ce qu'
au moins un bras d'abattage (10) est pivotable sur un axe de rotation. - Bouclier selon la revendication 11,
caractérisé en ce que
l'axe de basculement est d'une part parallèle à la surface de la plaque porteuse (8) tournée vers le front de taille (5), d'autre part perpendiculaire à une droite partant radialement du centre de rotation de la plaque porteuse et coupant l'axe longitudinal (L) du bras d'abattage (10). - Bouclier selon une des revendications 10 à 12,
caractérisé en ce que
le bras d'abattage (10) est monté sur la plaque porteuse (8) avec décalage vers l'extérieur par rapport à l'axe médian (M) du bouclier (100) d'environ la moitié du rayon du perçage. - Bouclier selon une des revendications 10 à 13,
caractérisé en ce qu'
il est prévu un dispositif hydraulique (13) pour basculer le bras d'abattage (10). - Bouclier selon une des revendications 10 à 14,
caractérisé en ce que
plusieurs bras d'abattage basculant indépendamment les uns des autres sont montés sur la plaque porteuse.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE4426497A DE4426497C2 (de) | 1994-07-27 | 1994-07-27 | Vortriebsschild |
DE4426497 | 1994-07-27 | ||
PCT/DE1995/000909 WO1996003570A1 (fr) | 1994-07-27 | 1995-07-12 | Bouclier |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0772730A1 EP0772730A1 (fr) | 1997-05-14 |
EP0772730B1 true EP0772730B1 (fr) | 1998-12-16 |
Family
ID=6524197
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP95924854A Expired - Lifetime EP0772730B1 (fr) | 1994-07-27 | 1995-07-12 | Bouclier |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP0772730B1 (fr) |
JP (1) | JP2925744B2 (fr) |
AT (1) | ATE174657T1 (fr) |
DE (2) | DE4426497C2 (fr) |
WO (1) | WO1996003570A1 (fr) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2758586B1 (fr) * | 1997-01-23 | 1999-03-26 | Doris Engineering | Sas de communication entre deux espaces a des pressions differentes |
NL2001901C (nl) * | 2008-08-20 | 2010-03-10 | Leonardus Karel Van Tol | Inrichting en werkwijze voor het aanbrengen van een uitgraving. |
CN109882189B (zh) * | 2019-02-27 | 2020-06-12 | 中铁工程装备集团有限公司 | 一种适用于断层破碎带的马蹄形半断面盾构机及施工方法 |
CN109915157B (zh) * | 2019-03-18 | 2023-12-19 | 天津大学 | 一种用于盾构机滚刀的自动换刀装置 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2907768A1 (de) * | 1979-02-28 | 1980-09-04 | Holzmann Philipp Ag | Vortriebsschild |
US4283090A (en) * | 1979-10-01 | 1981-08-11 | The Robbins Company | Conveyor mounted excavator |
DE3221494C1 (de) * | 1982-06-07 | 1983-12-22 | Philipp Holzmann Ag, 6000 Frankfurt | Vortriebsschild |
AT384274B (de) * | 1985-10-14 | 1987-10-27 | Voest Alpine Ag | Schildvortriebsmaschine |
DE3831725A1 (de) * | 1988-09-17 | 1990-03-22 | Holzmann Philipp Ag | Vortriebsschild |
DE4427070C1 (de) * | 1994-08-01 | 1995-06-08 | Wirth Co Kg Masch Bohr | Schildvortriebsmaschine mit einer mechanischen Abstützvorrichtung der Ortsbrust |
-
1994
- 1994-07-27 DE DE4426497A patent/DE4426497C2/de not_active Expired - Fee Related
-
1995
- 1995-07-12 EP EP95924854A patent/EP0772730B1/fr not_active Expired - Lifetime
- 1995-07-12 AT AT95924854T patent/ATE174657T1/de not_active IP Right Cessation
- 1995-07-12 WO PCT/DE1995/000909 patent/WO1996003570A1/fr active IP Right Grant
- 1995-07-12 JP JP8505350A patent/JP2925744B2/ja not_active Expired - Lifetime
- 1995-07-12 DE DE59504576T patent/DE59504576D1/de not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
DE4426497A1 (de) | 1996-02-01 |
DE4426497C2 (de) | 1996-12-12 |
JP2925744B2 (ja) | 1999-07-28 |
JPH09508188A (ja) | 1997-08-19 |
ATE174657T1 (de) | 1999-01-15 |
WO1996003570A1 (fr) | 1996-02-08 |
DE59504576D1 (de) | 1999-01-28 |
EP0772730A1 (fr) | 1997-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2553201B1 (fr) | Procédé de réalisation d'un forage horizontal dans le sol et dispositif de forage horizontal | |
DE2930136A1 (de) | Streckenvortriebsmaschine fuer den untertagebau | |
DE3419517A1 (de) | Verfahren zum unterirdischen einbau von rohrleitungen und vorrichtung zur durchfuehrung des verfahrens | |
EP2553202A2 (fr) | Procédé pour faire fonctionner un dispositif de forage horizontal et dispositif de forage horizontal | |
DE3514563A1 (de) | Tunnelvortriebsmaschine | |
DE1283862B (de) | Vortriebsschild | |
EP0772730B1 (fr) | Bouclier | |
DE69008641T2 (de) | Bodenverfestigungsgerät. | |
DE3920392A1 (de) | Verfahren zum abbau und zur foerderung einer unter wasser lagernden bodenschicht und vorrichtung zur durchfuehrung des verfahrens | |
EP2553203B1 (fr) | Dispositif de forage horizontal | |
EP0564615A1 (fr) | Tunnelier | |
EP0716190B1 (fr) | Fraise par le creusage de tranchées | |
EP0774043B1 (fr) | Bouclier | |
DE4006320C1 (en) | Straight line tunnel borer - has guide tube to which casing is connected with load-out conveyor | |
DE3831725A1 (de) | Vortriebsschild | |
DE3114899C2 (fr) | ||
DE2461241B2 (de) | Vorpressbare zylindrische auskleidung fuer tunnel-, stollen- oder streckenvortriebe u.dgl., insbesondere verbauschild | |
DE3605112C2 (fr) | ||
DE3249087C2 (de) | Vorrichtung zum Auffahren eines Stollens, Tunnels oder dergleichen im Rohrvorpreßbetrieb, insbesondere zur Herstellung einer nicht begehbaren Rohrleitung | |
DE19518820A1 (de) | Verfahren und Vorrichtung zum Herstellen von Großbohrlöchern im Erdreich | |
DE3204564A1 (de) | Vorrichtung zum auffahren eines stollens, tunnels oder dergleichen im rohrvorpressbetrieb, insbesondere zur herstellung einer nicht begehbaren rohrleitung | |
DE3209611C1 (de) | Vollschnitt-Schachtbohrmaschine | |
DE19502324A1 (de) | Schlitzfräse | |
DE1634449A1 (de) | Bohrverfahren mit Bohreinrichtung | |
DE3100204A1 (de) | "vortriebsschild" |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19961203 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH DE FR IT LI NL |
|
17Q | First examination report despatched |
Effective date: 19980108 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE FR IT LI NL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY Effective date: 19981216 |
|
REF | Corresponds to: |
Ref document number: 174657 Country of ref document: AT Date of ref document: 19990115 Kind code of ref document: T |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: R. A. EGLI & CO. PATENTANWAELTE Ref country code: CH Ref legal event code: EP |
|
REF | Corresponds to: |
Ref document number: 59504576 Country of ref document: DE Date of ref document: 19990128 |
|
ET | Fr: translation filed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19990712 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19990731 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19990731 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19990731 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
BERE | Be: lapsed |
Owner name: WIRTH MASCHINEN- UND BOHRGERATE-FABRIK G.M.B.H. Effective date: 19990731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20000201 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee |
Effective date: 20000201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20000503 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20050712 |