EP0721026B1 - Machine and installation for performing operations on a railway track - Google Patents

Machine and installation for performing operations on a railway track Download PDF

Info

Publication number
EP0721026B1
EP0721026B1 EP95890212A EP95890212A EP0721026B1 EP 0721026 B1 EP0721026 B1 EP 0721026B1 EP 95890212 A EP95890212 A EP 95890212A EP 95890212 A EP95890212 A EP 95890212A EP 0721026 B1 EP0721026 B1 EP 0721026B1
Authority
EP
European Patent Office
Prior art keywords
machine
track
frame
work section
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP95890212A
Other languages
German (de)
French (fr)
Other versions
EP0721026A1 (en
Inventor
Josef Theurer
Herbert Wörgötter
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Franz Plasser Bahnbaumaschinen Industrie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Franz Plasser Bahnbaumaschinen Industrie GmbH filed Critical Franz Plasser Bahnbaumaschinen Industrie GmbH
Publication of EP0721026A1 publication Critical patent/EP0721026A1/en
Application granted granted Critical
Publication of EP0721026B1 publication Critical patent/EP0721026B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor

Definitions

  • the invention relates to a machine for performing track construction work, with a machine frame supported on rail bogies, the one between two rail bogies first working section and a second immediately following this in the machine longitudinal direction Has working section, and with arranged on the machine frame, in Machine rails running longitudinal direction for moving a through a drive self-propelled, preferably designed as a crane transport device.
  • Such a track construction machine is already known from US Pat. No. 5,193,461. which is used to exchange sleepers of a track and with an over Rail running gear movable machine frame is equipped. This is divided into two successive working sections, one of which is the first is located between the two rail bogies; this section an opening of the machine frame is assigned in its upper area. The second working section immediately following is with running rails provided on which a transport device in the form of a machine in the longitudinal direction self-propelled sleeper crane is stored. The running tracks extend further over sleeper transport wagons coupled to the machine, on which old and new sleepers are stored. Based on the These are now cranes between the wagons and the first stage of work transported back and forth and through the opening in the machine frame passed under which is assigned to the threshold changing device Storage device is located.
  • FR 2 378 898 is a trolley for laying or picking up Gleisjochen known.
  • This car has an end on rail bogies supported machine frame, on which there is a cross section of the car arcuate structure. This protrudes over the respective at both longitudinal ends Rail chassis in front and is in the upper end area with in the longitudinal direction of the car running tracks connected.
  • Sledges are track yokes along the entire length of the structure Longitudinal carriage movable.
  • the object of the present invention is to create a machine of the type mentioned above, which are particularly suitable for use in track construction work suitable in switch and crossing areas.
  • Track elements can by means of the transport device e.g. from a coupled loading wagon brought up and over the running rails to the - below the located in the first working section - to be transported. The then maneuver the track elements into the desired, correct position is particularly shaped by the special design of the machine frame simple, since in the lower area there is no frame side member Have cross-connection and therefore freedom of movement and advantageously also a clear view of the construction site below the running rails nothing is restricted.
  • the training according to claim 3 ensures optimal mobility of the Transport device with the training according to claims 4 and 5 also with an advantageous long range to cope with the different in operational situations that occur in practice.
  • the machine 1 shown in FIGS. 1 and 2 or 3 has one on rail bogies 2 stored machine frame 3 and is for implementation of track construction work on a track 4 movable.
  • One end of the machine frame 3 is coupled to a drive vehicle 5 on which a Central energy source 6 for the energy supply of all drives of the machine 1 is located.
  • the machine frame 3 is in two in the machine longitudinal direction arranged one behind the other and articulated together Frame parts 7.8 divided.
  • the one directly adjacent to the drive vehicle 5 Frame part 7 forms in between two rail bogies 2 located area a first working section 9, while in the machine longitudinal direction immediately adjoining and over the frame part 8 extending area is defined as the second working section 10.
  • the frame part 8 is in the present embodiment as two of its own Rail carriages 2 supported platform car 11 formed, which is releasably connected to the other frame part 7 by a coupling 12 is.
  • the frame part 7 of the machine frame forming the first working section 9 3 essentially consists of two parallel to each other in the machine longitudinal direction extending frame side members 13 which are in the cross machine direction are distant from each other and in the area of the first working section 9 are shaped cranked upwards.
  • the two frame side members 13 in this between the rail bogies 2 area located exclusively by a cross connection 14 connected to each other in the upper end area of the frame side members 13 is provided.
  • a work cabin 26 is arranged with an access positioned between the two frame side members 13 27 to the work area or track 4.
  • the machine frame 3 also has a pair of running rails 15 which in the machine longitudinal direction over the first and second working sections 9.10 and extend in a directly above the rail undercarriage 2 level 16 are arranged, this level with the loading area 17 of the platform carriage 11 coincides and the running rails 15 in the area of the second working section 10 on the loading surface 17 lie on.
  • the rails 15 In the area of the first working section 9 or the cranked one Frame part 7 are the rails 15 over - at regular intervals spaced from each other in the machine longitudinal direction - vertical Supports 29 connected to the frame side members 13.
  • the horizontal distancing the two rails 15 corresponds approximately to the distance of the two frame side members 13 to each other (Fig. 3).
  • a self-propelled transport device 18 is located on the running rails 15 stored, equipped with a drive 51 and based on this below the - provided above the rails 15 - cross connection 14 of Frame side members 13 from the second working section 10 into the first working section 9 is movable.
  • the transport device 18 is a gantry crane 19 formed, the rail bogies 20 and 23 at each longitudinal end has a driving cabin 21, in each of which a central control device 22 is arranged.
  • the transport device 18 is also included two each in the machine longitudinal direction over a longitudinal end 23 of the gantry crane 19 projecting gripping devices 24 provided by drives 25 height and side adjustable and for gripping and transporting of track parts are provided.
  • the rails 15 for example on the underside of the cross connection 14 to fasten and the transport device 18 on the rails 15 hanging process.
  • a rail part 52 to be transported one Switch section between the underside of the cab 21 and the Level of the rails 15 is positionable.
  • the gripping devices 24 carrying the rails 15 are not shown.
  • the machine 1 by means of the drive vehicle 5 Track construction site move and positioned so that the first working section 9 of the machine frame 3 above the point to be machined in Track 4 is located.
  • movable gantry cranes 19 are the to be replaced or Installation in the track required rail parts 52 between the first working section 9 and the - used for material storage - platform car 11 des second working section 10 transported back and forth. Because of the tunnel-like Formation of the frame part forming the first working section 9 7 above the rails 15, the gantry crane 19 is unhindered the entire work area can be moved while the gripping devices 24 both downwards and on the track level to the side without restrictions are pivotable and can be used in a variety of ways.
  • the work staff can also Hand tools etc. are brought to the workplace.
  • a work unit such as for example a rail welding unit (indicated by dash-dotted lines) 28 height and side adjustable to arrange and this in connection with the To bring transport device 18 to use.
  • a rail welding unit indicated by dash-dotted lines
  • side adjustable to arrange and this in connection with the To bring transport device 18 to use.
  • FIGS. 4 to 6 is a system 30 for carrying out various Track construction work shown, which is indicated by an arrow 31 Working direction on the track 4 is movable.
  • the specially for quick Renewal of rail sections trained system 30 exists of several, arranged one behind the other in the longitudinal direction of the track and each 32 self-propelled vehicles using its own travel drive and the machine 1 and drive vehicle already described in FIGS. 1 to 3 5.
  • a loading wagon 33 At the front end of the system 30 in the working direction (FIG. 4) is a loading wagon 33 can be seen, the one at its rear end with a swiveling Loading ramp 34 is equipped. Through this, individual, on the Loading car 33 transported working machines with flanged wheels be placed on track 4, namely a rail nail puller 35, a threshold anchor remover 36, a clip remover 37, a rail cutter 38 and a rail web grinder 39. The loading carriage 33 follows the machine 1 described above with the platform truck 11 and on the running rails 15 mounted transport device 18 (Fig. 5).
  • Machine 1 has an independently movable one in the working direction Welding machine 40 with a height-adjustable welding unit 41 (Fig. 6), which is followed by a vehicle 42 on which there is a rail pulling device 43, a crane boom provided for positioning the same 44 and a rail head grinding unit 45 are located.
  • the end the system 30 forms a further loading carriage 46 with a loading ramp 47 which, in turn, has individual machines equipped with flanged wheels - such as a rail nailing machine 48, sleeper anchor installation machine 49 and Clip installation machine 50 can be transported.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)
  • Catching Or Destruction (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)
  • Body Structure For Vehicles (AREA)

Abstract

The machine chassis (2) is mounted on rail bogies (2), and comprises first and second working areas (9,10) between them and connected directly together. Lengthwise rails (15) on the chassis are provided for a self-propelled transporting unit (18). In the first working area, the chassis comprises two parallel lengthwise girders (13) joined together only by cross-members (14) above the rails. The unit travels from the second working area to the first and under the cross-members. In the first area, the girders can be cranked upwards, the cross-members being situated at the ends of the higher-level portion. In both areas the rails can be in a plane immediately above the bogies.

Description

Die Erfindung betrifft eine Maschine zur Durchführung von Gleisbauarbeiten, mit einem auf Schienenfahrwerken abgestützten Maschinenrahmen, der einen zwischen zwei Schienenfahrwerken gelegenen ersten Arbeitsabschnitt und einen an diesen in Maschinenlängsrichtung unmittelbar anschließenden zweiten Arbeitsabschnitt aufweist, und mit am Maschinenrahmen angeordneten, in Maschinenlängsrichtung verlaufenden Laufschienen zum Verfahren einer durch einen Antrieb selbstverfahrbaren, vorzugsweise als Kran ausgebildeten Transporteinrichtung.The invention relates to a machine for performing track construction work, with a machine frame supported on rail bogies, the one between two rail bogies first working section and a second immediately following this in the machine longitudinal direction Has working section, and with arranged on the machine frame, in Machine rails running longitudinal direction for moving a through a drive self-propelled, preferably designed as a crane transport device.

Durch die US 5,193,461 ist bereits eine derartige Gleisbaumaschine bekannt, die zum Austauschen von Schwellen eines Gleises dient und mit einem über Schienenfahrwerke verfahrbaren Maschinenrahmen ausgestattet ist. Dieser ist in zwei hintereinanderliegende Arbeitsabschnitte gegliedert, von denen sich der erste zwischen den beiden Schienenfahrwerken befindet; diesem Abschnitt ist in seinem oberen Bereich eine Öffnung des Maschinenrahmens zugeordnet. Der unmittelbar daran anschließende zweite Arbeitsabschnitt ist mit Laufschienen versehen, auf denen eine Transporteinrichtung in Form eines in Maschinenlängsrichtung selbstverfahrbaren Schwellenkranes gelagert ist. Die Laufschienen erstrecken sich weiters über an die Maschine gekuppelte Schwellentransportwaggons, auf denen Alt- und Neuschwellen abgelegt sind. Anhand des Kranes werden diese nun zwischen den Waggons und dem ersten Arbeitsabschnitt hin- bzw. hertransportiert und durch die Öffnung im Maschinenrahmen hindurchgeführt, unter der sich eine der Schwellenwechselvorrichtung zugeordnete Ablageeinrichtung befindet.Such a track construction machine is already known from US Pat. No. 5,193,461. which is used to exchange sleepers of a track and with an over Rail running gear movable machine frame is equipped. This is divided into two successive working sections, one of which is the first is located between the two rail bogies; this section an opening of the machine frame is assigned in its upper area. The second working section immediately following is with running rails provided on which a transport device in the form of a machine in the longitudinal direction self-propelled sleeper crane is stored. The running tracks extend further over sleeper transport wagons coupled to the machine, on which old and new sleepers are stored. Based on the These are now cranes between the wagons and the first stage of work transported back and forth and through the opening in the machine frame passed under which is assigned to the threshold changing device Storage device is located.

Durch die FR 2 378 898 ist ein Wagen zum Verlegen bzw. Aufnehmen von Gleisjochen bekannt. Dieser Wagen weist einen endseitig auf Schienenfahrwerken abgestützten Maschinenrahmen auf, auf dem sich ein im Wagenquerschnitt bogenförmiger Aufbau befindet. Dieser ragt an beiden Längsenden über das jeweilige Schienenfahrwerk vor und ist im oberen Endbereich mit in Wagenlängsrichtung verlaufenden Laufschienen verbunden. Mit auf diesen veschiebbar gelagerten Schlitten sind Gleisjoche über die gesamte Länge des Aufbaues in Wagenlängsrichtung verschiebbar. FR 2 378 898 is a trolley for laying or picking up Gleisjochen known. This car has an end on rail bogies supported machine frame, on which there is a cross section of the car arcuate structure. This protrudes over the respective at both longitudinal ends Rail chassis in front and is in the upper end area with in the longitudinal direction of the car running tracks connected. With these slidably mounted Sledges are track yokes along the entire length of the structure Longitudinal carriage movable.

Die Aufgabe der vorliegenden Erfindung besteht nun in der Schaffung einer Maschine der eingangs genannten Art, die sich besonders zum Einsatz bei Gleisbauarbeiten in Weichen- und Kreuzungsbereichen eignet.The object of the present invention is to create a machine of the type mentioned above, which are particularly suitable for use in track construction work suitable in switch and crossing areas.

Diese Aufgabe wird mit einer Maschine der gattungsgemäßen Art dadurch gelöst, daß der Maschinenrahmen im ersten Arbeitsabschnitt im wesentlichen aus zwei parallel zueinander und in Maschinenlängsrichtung verlaufenden, in Maschinenquerrichtung voneinander distanzierten Rahmenlängsträgern besteht, die im Bereich zwischen den Schienenfahrwerken lediglich durch eine oberhalb der Laufschienen vorgesehene Querverbindung miteinander verbunden sind, und daß die Transporteinrichtung vom zweiten Arbeitsabschnitt unterhalb der Querverbindung in den ersten Arbeitsabschnitt verfahrbar ausgebildet ist, wobei sich die Laufschienen durchgehend über beide Arbeitsabschnitte erstrecken.This object is achieved with a machine of the generic type in that that the machine frame in the first working section essentially two parallel to each other and in the machine longitudinal direction, in the machine cross direction there are spaced apart frame side members, those in the area between the rail bogies only by one above the cross rails provided are connected to one another, and that the transport device from the second working section below the Cross connection is designed to be movable in the first working section, whereby the running rails extend continuously over both working sections.

Mit einer derartig ausgebildeten Gleisbaumaschine ist es nun in vorteilhafter Weise möglich, völlig problemlos auch mit sperrigen bzw. überdimensionierten Gleiselementen während des Arbeitseinsatzes zu hantieren, die beim Ein- und Umbau von Weichen und dergleichen benötigt werden. Solche Elemente können mittels der Transporteinrichtung z.B. von einem angekuppelten Verladewagen herangebracht und über die Laufschienen bis direkt an die - unterhalb des ersten Arbeitsabschnittes befindliche - Einbaustelle transportiert werden. Das anschließende Manövrieren der Gleiselemente in die gewünschte, korrekte Position gestaltet sich durch die spezielle Ausbildung des Maschinenrahmens besonders einfach, da in dessen unterem Bereich die Rahmenlängsträger keine Querverbindung aufweisen und daher die Bewegungsfreiheit sowie vorteilhafterweise auch die freie Sicht auf die Baustelle unterhalb der Laufschienen durch nichts eingeschränkt ist. Die oberhalb der Laufschienen angeordnete Querverbindung gewährleistet aber trotz dieses optimalen Freiraumes, daß die nötige Verwindungssteifigkeit des Maschinenrahmens auch dann erhalten bleibt, wenn der erste Arbeitsabschnitt durch weite Distanzierung der Schienenfahrwerke voneinander auf ein Maximum erweitert wird. Dies bietet - speziell im Zusammenhang mit der Weiterbildung gemäß Anspruch 2 - wiederum den Vorteil, Platz für zusätzliche Arbeitsaggregate bzw. mehr Bewegungsfreiheit für das Arbeitspersonal zu schaffen. With such a track construction machine, it is now more advantageous Possible, completely problem-free even with bulky or oversized Track elements to be handled during work, which when moving in and out Conversion of switches and the like are needed. Such elements can by means of the transport device e.g. from a coupled loading wagon brought up and over the running rails to the - below the located in the first working section - to be transported. The then maneuver the track elements into the desired, correct position is particularly shaped by the special design of the machine frame simple, since in the lower area there is no frame side member Have cross-connection and therefore freedom of movement and advantageously also a clear view of the construction site below the running rails nothing is restricted. The cross connection arranged above the running rails guarantees despite this optimal freedom that the necessary The rigidity of the machine frame is maintained even if the first stage of work by far distancing the rail bogies is expanded from one another to a maximum. This offers - especially in context with the training according to claim 2 - again the advantage Space for additional work units or more freedom of movement for the work staff to accomplish.

Die Weiterbildung nach Anspruch 3 sichert eine optimale Verfahrbarkeit der Transporteinrichtung, die mit den Ausbildungen gemäß den Ansprüchen 4 und 5 auch mit vorteilhaft großer Reichweite zur Bewältigung der verschiedenen, in der Praxis vorkommenden Einsatzsituationen ausgestattet ist.The training according to claim 3 ensures optimal mobility of the Transport device with the training according to claims 4 and 5 also with an advantageous long range to cope with the different in operational situations that occur in practice.

Das in Anspruch 6 beschriebene Merkmal erweist sich als nützlich, um dem Arbeitspersonal einen raschen und vor allem geschützten Zugang zur Gleisbaustelle zu ermöglichen, ohne durch eventuell auf einem Nebengleis vorhandenen Zugsverkehr gefährdet werden zu können.The feature described in claim 6 proves useful to the Workers have quick and, above all, protected access to the track construction site to enable, without through possibly existing on a siding Train traffic can be endangered.

Mit der Variante nach Anspruch 7 und 8 ist es möglich, die Gleisbaumaschine bedarfsweise auf verschiedene Einsatzbedingungen bzw. Transporterfordernisse abzustimmen, während die in Anspruch 9 geoffenbarte Ausbildung die vorteilhafte Eingliederung der erfindungsgemäßen Maschine in eine größere Anlage für Gleisbauarbeiten darstellt.With the variant according to claim 7 and 8, it is possible to build the track construction machine if necessary to different operating conditions or transport requirements vote while the training disclosed in claim 9 the advantageous incorporation of the machine according to the invention into a larger one Plant for track construction works.

Nachfolgend wird die Erfindung anhand der Zeichnungen näher beschrieben.The invention is described in more detail below with reference to the drawings.

Es zeigen:

  • Fig. 1 und 2 eine - aus Platzgründen in zwei Teilen dargestellte - Seitenansicht einer Maschine zur Durchführung von Gleisbauarbeiten,
  • Fig. 3 eine vergrößerte Schnittansicht der Maschine gemäß Pfeil III in Fig. 1 und
  • Fig. 4, 5 und 6 eine schematisierte Seitenansicht einer die genannte Maschine beinhaltenden Anlage zur Durchführung von Gleisbauarbeiten.
  • Show it:
  • 1 and 2 a - for space reasons shown in two parts - side view of a machine for performing track construction work,
  • Fig. 3 is an enlarged sectional view of the machine according to arrow III in Fig. 1 and
  • 4, 5 and 6 is a schematic side view of a system containing the machine mentioned for carrying out track construction work.
  • Die in Fig. 1 und 2 bzw. 3 ersichtliche Maschine 1 weist einen auf Schienenfahrwerken 2 gelagerten Maschinenrahmen 3 auf und ist zur Durchführung von Gleisbauarbeiten auf einem Gleis 4 verfahrbar. Ein Ende des Maschinenrahmens 3 ist mit einem Antriebsfahrzeug 5 gekuppelt, auf dem sich eine zentrale Energiequelle 6 zur Energieversorgung sämtlicher Antriebe der Maschine 1 befindet.The machine 1 shown in FIGS. 1 and 2 or 3 has one on rail bogies 2 stored machine frame 3 and is for implementation of track construction work on a track 4 movable. One end of the machine frame 3 is coupled to a drive vehicle 5 on which a Central energy source 6 for the energy supply of all drives of the machine 1 is located.

    Der Maschinenrahmen 3 ist aufgrund seiner großen Länge in zwei in Maschinenlängsrichtung hintereinander angeordnete und gelenkig miteinander verbundene Rahmenteile 7,8 gegliedert. Der dem Antriebsfahrzeug 5 direkt benachbarte Rahmenteil 7 bildet in einem zwischen zwei Schienenfahrwerken 2 gelegenen Bereich einen ersten Arbeitsabschnitt 9, während der in Maschinenlängsrichtung unmittelbar daran anschließende und sich über den Rahmenteil 8 erstreckende Bereich als zweiter Arbeitsabschnitt 10 definiert ist. Der Rahmenteil 8 ist beim vorliegenden Ausführungsbeispiel als auf zwei eigenen Schienenfahrwerken 2 abgestützter Plattformwagen 11 ausgebildet, der durch eine Kupplung 12 lösbar mit dem anderen Rahmenteil 7 verbunden ist.Due to its great length, the machine frame 3 is in two in the machine longitudinal direction arranged one behind the other and articulated together Frame parts 7.8 divided. The one directly adjacent to the drive vehicle 5 Frame part 7 forms in between two rail bogies 2 located area a first working section 9, while in the machine longitudinal direction immediately adjoining and over the frame part 8 extending area is defined as the second working section 10. The frame part 8 is in the present embodiment as two of its own Rail carriages 2 supported platform car 11 formed, which is releasably connected to the other frame part 7 by a coupling 12 is.

    Der den ersten Arbeitsabschnitt 9 bildende Rahmenteil 7 des Maschinenrahmens 3 besteht im wesentlichen aus zwei parallel zueinander in Maschinenlängsrichtung verlaufenden Rahmenlängsträgern 13, die in Maschinenquerrichtung voneinander distanziert sind und die im Bereich des ersten Arbeitsabschnittes 9 nach oben gekröpft geformt sind. Wie aus Fig. 3 deutlich wird, sind die beiden Rahmenlängsträger 13 in diesem zwischen den Schienenfahrwerken 2 befindlichen Bereich ausschließlich durch eine Querverbindung 14 miteinander verbunden, die im oberen Endbereich der Rahmenlängsträger 13 vorgesehen ist. Am vom zweiten Arbeitsabschnitt 10 weiter distanzierten Ende des Maschinenrahmens 3 ist eine Arbeitskabine 26 angeordnet, die mit einem zwischen den beiden Rahmenlängsträgern 13 positionierten Zugang 27 zum Arbeitsbereich bzw. zum Gleis 4 ausgestattet ist.The frame part 7 of the machine frame forming the first working section 9 3 essentially consists of two parallel to each other in the machine longitudinal direction extending frame side members 13 which are in the cross machine direction are distant from each other and in the area of the first working section 9 are shaped cranked upwards. As is clear from Fig. 3, are the two frame side members 13 in this between the rail bogies 2 area located exclusively by a cross connection 14 connected to each other in the upper end area of the frame side members 13 is provided. At a further distance from the second working section 10 At the end of the machine frame 3, a work cabin 26 is arranged with an access positioned between the two frame side members 13 27 to the work area or track 4.

    Der Maschinenrahmen 3 weist weiters ein Paar Laufschienen 15 auf, die sich in Maschinenlängsrichtung über den ersten und zweiten Arbeitsabschnitt 9,10 erstrecken und die in einer unmittelbar oberhalb der Schienenfahrwerke 2 gelegenen Ebene 16 angeordnet sind, wobei diese Ebene mit der Ladefläche 17 des Plattformwagens 11 zusammenfällt und die Laufschienen 15 im Bereich des zweiten Arbeitsabschnittes 10 auf der Ladefläche 17 aufliegen. Im Bereich des ersten Arbeitsabschnittes 9 bzw. des gekröpften Rahmenteiles 7 sind die Laufschienen 15 über - in regelmäßigen Abständen voneinander in Maschinenlängsrichtung distanziert angeordnete - vertikale Stützen 29 mit den Rahmenlängsträgern 13 verbunden. Die horizontale Distanzierung der beiden Laufschienen 15 entspricht in etwa dem Abstand der beiden Rahmenlängsträger 13 zueinander (Fig. 3).The machine frame 3 also has a pair of running rails 15 which in the machine longitudinal direction over the first and second working sections 9.10 and extend in a directly above the rail undercarriage 2 level 16 are arranged, this level with the loading area 17 of the platform carriage 11 coincides and the running rails 15 in the area of the second working section 10 on the loading surface 17 lie on. In the area of the first working section 9 or the cranked one Frame part 7 are the rails 15 over - at regular intervals spaced from each other in the machine longitudinal direction - vertical Supports 29 connected to the frame side members 13. The horizontal distancing the two rails 15 corresponds approximately to the distance of the two frame side members 13 to each other (Fig. 3).

    Auf den Laufschienen 15 ist eine selbstverfahrbare Transporteinrichtung 18 gelagert, die mit einem Antrieb 51 ausgestattet und anhand dieses unterhalb der - oberhalb der Laufschienen 15 vorgesehenen - Querverbindung 14 der Rahmenlängsträger 13 vom zweiten Arbeitsabschnitt 10 in den ersten Arbeitsabschnitt 9 verfahrbar ist. Die Transporteinrichtung 18 ist als Portalkran 19 ausgebildet, der Schienenfahrwerke 20 sowie an jedem Längsende 23 je eine Fahrkabine 21 aufweist, in denen jeweils eine zentrale Steuereinrichtung 22 angeordnet ist. Des weiteren ist die Transporteinrichtung 18 mit zwei jeweils in Maschinenlängsrichtung über ein Längsende 23 des Portalkranes 19 vorkragenden Greifvorrichtungen 24 versehen, die durch Antriebe 25 höhen- und seitenverstellbar ausgebildet und zum Erfassen und Transportieren von Gleisteilen vorgesehen sind. Alternativ wäre es natürlich auch möglich, die Laufschienen 15 beispielsweise an der Unterseite der Querverbindung 14 zu befestigen und die Transporteinrichtung 18 auf den Laufschienen 15 hängend zu verfahren.A self-propelled transport device 18 is located on the running rails 15 stored, equipped with a drive 51 and based on this below the - provided above the rails 15 - cross connection 14 of Frame side members 13 from the second working section 10 into the first working section 9 is movable. The transport device 18 is a gantry crane 19 formed, the rail bogies 20 and 23 at each longitudinal end has a driving cabin 21, in each of which a central control device 22 is arranged. The transport device 18 is also included two each in the machine longitudinal direction over a longitudinal end 23 of the gantry crane 19 projecting gripping devices 24 provided by drives 25 height and side adjustable and for gripping and transporting of track parts are provided. Of course, it would also be an alternative possible, the rails 15 for example on the underside of the cross connection 14 to fasten and the transport device 18 on the rails 15 hanging process.

    In Fig. 3 ist ersichtlich, daß ein zu transportierender Schienenteil 52 eines Weichenabschnittes zwischen der Unterseite der Fahrkabine 21 und der Ebene der Laufschienen 15 positionierbar ist. Der Einfachheit halber sind die die Laufschienen 15 tragenden Greifvorrichtungen 24 nicht dargestellt.In Fig. 3 it can be seen that a rail part 52 to be transported one Switch section between the underside of the cab 21 and the Level of the rails 15 is positionable. Are for the sake of simplicity the gripping devices 24 carrying the rails 15 are not shown.

    Im Arbeitseinsatz wird die Maschine 1 mittels des Antriebsfahrzeuges 5 zur Gleisbaustelle verfahren und so positioniert, daß sich der erste Arbeitsabschnitt 9 des Maschinenrahmens 3 über der zu bearbeitenden Stelle im Gleis 4 befindet. Anhand des praktisch über die gesamte Länge der Maschine 1 verfahrbaren Portalkranes 19 werden die auszutauschenden bzw. zum Einbau ins Gleis benötigten Schienenteile 52 zwischen dem ersten Arbeitsabschnitt 9 und dem - zur Materiallagerung dienenden - Plattformwagen 11 des zweiten Arbeitsabschnittes 10 hin- und hertransportiert. Aufgrund der tunnelartigen Ausbildung des den ersten Arbeitsabschnitt 9 bildenden Rahmenteiles 7 oberhalb der Laufschienen 15 ist der Portalkran 19 ungehindert über den gesamten Arbeitsbereich verfahrbar, während gleichzeitig die Greifvorrichtungen 24 sowohl nach unten als auch auf Gleisniveau zur Seite hin uneingeschränkt verschwenkbar sind und so mannigfaltig einsetzbar sind. Über den Zugang 27 der Arbeitskabine 26 können vom Arbeitspersonal weiters Handwerkzeuge etc. zur Arbeitsstelle gebracht werden. Es wäre aber auch denkbar, in diesem Bereich ein Arbeitsaggregat, wie etwa beispielsweise eine (in strichpunktierten Linien angedeutete) Schienenschweißeinheit 28 höhen- und seitenverstellbar anzuordnen und diese in Verbindung mit der Transporteinrichtung 18 zum Einsatz zu bringen. Von besonderem Vorteil ist, daß bei der gesamten Manipulation der abzutransportierenden bzw. einzubauenden Gleisteile das Lichtraumprofil nicht überschritten werden muß.In work, the machine 1 by means of the drive vehicle 5 Track construction site move and positioned so that the first working section 9 of the machine frame 3 above the point to be machined in Track 4 is located. Based on practically the entire length of the machine 1 movable gantry cranes 19 are the to be replaced or Installation in the track required rail parts 52 between the first working section 9 and the - used for material storage - platform car 11 des second working section 10 transported back and forth. Because of the tunnel-like Formation of the frame part forming the first working section 9 7 above the rails 15, the gantry crane 19 is unhindered the entire work area can be moved while the gripping devices 24 both downwards and on the track level to the side without restrictions are pivotable and can be used in a variety of ways. Via the access 27 of the work cabin 26, the work staff can also Hand tools etc. are brought to the workplace. But it would be also conceivable in this area a work unit, such as for example a rail welding unit (indicated by dash-dotted lines) 28 height and side adjustable to arrange and this in connection with the To bring transport device 18 to use. Of particular advantage is that in the entire manipulation of the transported or installed The track clearance profile must not be exceeded.

    In den Fig. 4 bis 6 ist schematisch eine Anlage 30 zur Durchführung von diversen Gleisbauarbeiten dargestellt, die in einer durch einen Pfeil 31 angedeuteten Arbeitsrichtung auf dem Gleis 4 verfahrbar ist. Die speziell zur raschen Erneuerung von Schienenabschnitten ausgebildete Anlage 30 besteht aus mehreren, in Gleislängsrichtung hintereinander angeordneten und jeweils anhand eines eigenen Fahrantriebes 32 selbstverfahrbaren Fahrzeugen und der in Fig. 1 bis 3 bereits beschriebenen Maschine 1 samt Antriebsfahrzeug 5.4 to 6 is a system 30 for carrying out various Track construction work shown, which is indicated by an arrow 31 Working direction on the track 4 is movable. The specially for quick Renewal of rail sections trained system 30 exists of several, arranged one behind the other in the longitudinal direction of the track and each 32 self-propelled vehicles using its own travel drive and the machine 1 and drive vehicle already described in FIGS. 1 to 3 5.

    Am in Arbeitsrichtung vorderen Ende der Anlage 30 (Fig. 4) ist ein Verladewagen 33 zu sehen, der an seinem hinteren Ende mit einer hochschwenkbaren Laderampe 34 ausgestattet ist. Über diese können einzelne, auf dem Verladewagen 33 transportierte und Spurkranzrollen aufweisende Arbeitsmaschinen ins Gleis 4 gesetzt werden, und zwar ein Schienennagelzieher 35, ein Schwellenankerentferner 36, ein Clipentferner 37, ein Schienentrennschleifer 38 sowie ein Schienenstegschleifer 39. Dem Verladewagen 33 folgt die oben beschriebene Maschine 1 mit dem Plattformwagen 11 und der auf den Laufschienen 15 gelagerten Transporteinrichtung 18 (Fig. 5). At the front end of the system 30 in the working direction (FIG. 4) is a loading wagon 33 can be seen, the one at its rear end with a swiveling Loading ramp 34 is equipped. Through this, individual, on the Loading car 33 transported working machines with flanged wheels be placed on track 4, namely a rail nail puller 35, a threshold anchor remover 36, a clip remover 37, a rail cutter 38 and a rail web grinder 39. The loading carriage 33 follows the machine 1 described above with the platform truck 11 and on the running rails 15 mounted transport device 18 (Fig. 5).

    An die Maschine 1 schließt in Arbeitsrichtung eine unabhängig verfahrbare Schweißmaschine 40 mit einem höhenverstellbaren Schweißaggregat 41 an (Fig. 6), der ein Fahrzeug 42 nachgeordnet ist, auf dem sich eine Schienenziehvorrichtung 43, ein zum Positionieren derselben vorgesehener Kranausleger 44 sowie ein Schienenkopfschleifaggregat 45 befinden. Den Abschluß der Anlage 30 bildet ein weiterer Verladewagen 46 mit Laderampe 47, auf dem wiederum mit Spurkranzrollen ausgestattete Einzelmaschinen - wie eine Schienennagelmaschine 48, Schwellenankereinbaumaschine 49 und Clipeinbaumaschine 50 transportiert werden.Machine 1 has an independently movable one in the working direction Welding machine 40 with a height-adjustable welding unit 41 (Fig. 6), which is followed by a vehicle 42 on which there is a rail pulling device 43, a crane boom provided for positioning the same 44 and a rail head grinding unit 45 are located. The end the system 30 forms a further loading carriage 46 with a loading ramp 47 which, in turn, has individual machines equipped with flanged wheels - such as a rail nailing machine 48, sleeper anchor installation machine 49 and Clip installation machine 50 can be transported.

    Mit dieser Anlage 30 sind im Arbeitseinsatz sämtliche, im Rahmen des Austauschens von Schienenteilen erforderliche Arbeiten durchführbar.With this system 30 are all in use, in the context of the exchange required work can be carried out by rail parts.

    Claims (9)

    1. A machine for implementing track maintenance operations, comprising a machine frame (3), supported on on-track undercarriages (2), which has a first work section (9) located between two on-track undercarriages (2) and a second work section (10) immediately following it in the longitudinal direction of the machine, and guide rails (15) arranged on the machine frame (3) and extending in the longitudinal direction of the machine for the displacement of a transporting device (18) preferably formed as a crane and designed to be self-propelled by means of a drive (51), characterized in that
      a) the machine frame (3) in the first work section (9) is essentially composed of two longitudinal frame beams (13) extending parallel to one another and in the longitudinal direction of the machine and at a distance from one another in the transverse direction of the machine, the said longitudinal frame beams being connected to one another in the region between the on-track undercarriages (2) solely by a transverse connection (14) provided above the guide rails (15), and in that
      b) the transporting device (18) is designed to travel from the second work section (10) underneath the transverse connection (14) into the first work section (9), the guide rails (15) extending continuously over both work sections (9,10).
    2. A machine according to claim 1, characterized in that the two longitudinal frame beams (13) in the first work section (9) are designed so as to be upwardly recessed, and the transverse connection (14) is provided in the upper end region of the longitudinal frame beams (13).
    3. A machine according to one of claims 1 or 2, characterized in that the guide rails (15) are arranged both in the first and in the second work section (9,10) in a plane (16) located immediately above the on-track undercarriages (2).
    4. A machine according to one of claims 1, 2 or 3, characterized in that the transporting device (18) is designed as a gantry crane (19) comprising a driver's cab (21) and having on-track undercarriages (20) and gripping devices (24) for picking up and transporting track parts.
    5. A machine according to claim 4, characterized in that provided at each longitudinal end (23) of the transporting device (18) is a driver's cab (21) with a central control unit (22) and a respective gripping device (24) projecting in the longitudinal direction of the machine over the longitudinal end (23) and vertically and laterally adjustable by means of drives (25).
    6. A machine according to one of claims 1 to 5, characterized in that there is provided at the end of the machine frame (3) more remote from the second work section (10) an operator's cab (26) with an access (27) located between the two longitudinal frame beams (13).
    7. A machine according to one of claims 1 to 6, characterized in that the machine frame (3) is composed of two frame parts (7,8), arranged one following the other in the longitudinal direction of the machine, joined together in an articulated manner, and respectively forming the first or the second work section (9,10).
    8. A machine according to claim 7, characterized in that the frame part (8) forming the second work section (10) is designed as a platform wagon (11) supported on two on-track undercarriages (2) and is releasably connected to the frame part (7) forming the first work section (9) by means of a coupling (12).
    9. An installation for implementing track maintenance operations with a machine according to one of claims 1 to 8, characterized in that track-going units (35,36,37,38) for removing rail fastening means and for cutting through rails of the track (4) are arranged preceding the machine (1) in the working direction, while track-going units (40,45) for rail-welding and for rail-grinding are arranged following the machine (1) in the working direction.
    EP95890212A 1995-01-03 1995-11-30 Machine and installation for performing operations on a railway track Expired - Lifetime EP0721026B1 (en)

    Applications Claiming Priority (3)

    Application Number Priority Date Filing Date Title
    AT895 1995-01-03
    AT8/95 1995-01-03
    AT895 1995-01-03

    Publications (2)

    Publication Number Publication Date
    EP0721026A1 EP0721026A1 (en) 1996-07-10
    EP0721026B1 true EP0721026B1 (en) 2000-10-25

    Family

    ID=3479143

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP95890212A Expired - Lifetime EP0721026B1 (en) 1995-01-03 1995-11-30 Machine and installation for performing operations on a railway track

    Country Status (10)

    Country Link
    US (1) US5590601A (en)
    EP (1) EP0721026B1 (en)
    AT (1) ATE197179T1 (en)
    AU (1) AU706712B2 (en)
    CA (1) CA2166438C (en)
    CZ (1) CZ281767B6 (en)
    DE (1) DE59508811D1 (en)
    DK (1) DK0721026T3 (en)
    FI (1) FI118974B (en)
    RU (1) RU2105835C1 (en)

    Cited By (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE102010022679A1 (en) 2010-06-04 2011-12-08 Robel Bahnbaumaschinen Gmbh Vehicle combination for transporting rails
    CN106192625A (en) * 2016-08-29 2016-12-07 中铁七局集团第工程有限公司 A kind of railway switch lays unit

    Families Citing this family (23)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    EP1799909B1 (en) * 2004-08-20 2016-03-09 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
    CN100591563C (en) * 2006-03-09 2010-02-24 襄樊金鹰轨道车辆有限责任公司 Double-power working vehicle for railway tunnel
    US9121140B2 (en) * 2011-02-09 2015-09-01 Robert B. Conner, Jr. Low profile material handling system
    CN103015277A (en) * 2012-12-21 2013-04-03 中铁科工集团有限公司 Long steel rail laying unit
    MX365543B (en) 2013-02-06 2019-06-06 Herzog Railroad Services Inc Rail loading and unloading machine.
    AT515547B1 (en) * 2014-06-24 2015-10-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Method of renewing a track
    CN104179097B (en) * 2014-09-04 2016-04-06 昆明学院 One carries rail swivel block machine
    CN104164807A (en) * 2014-09-04 2014-11-26 昆明学院 Rail lifting sleeper changing machine
    CN104195904B (en) * 2014-09-04 2016-02-10 昆明学院 Pillow machine is changed in a kind of mechanization
    CN104195894B (en) * 2014-09-04 2016-02-10 昆明学院 Between a kind of sleeper, vibration is revolved and is dug quick lithagoue machine
    CN104195903B (en) * 2014-09-04 2016-09-14 昆明学院 A kind of sleeper handling apparatus
    CN104195896B (en) * 2014-09-04 2016-04-06 昆明学院 Between a kind of sleeper, the row's of digging stone device is revolved in vibration
    CN104164808B (en) * 2014-09-04 2016-05-25 昆明学院 A kind of sleeper device of changing
    CN106351078A (en) * 2016-08-30 2017-01-25 吉林大学 Tie renewal machine with series parallel four-rod mechanism
    CN106223140A (en) * 2016-08-30 2016-12-14 吉林大学 A kind of automation equipment changing sleeper
    CN106283979A (en) * 2016-08-30 2017-01-04 吉林大学 One has the automatization of the flat quarrel function of tamping and changes pillow machinery
    CN106320105A (en) * 2016-08-30 2017-01-11 吉林大学 Sleeper replacing machine with sleeper end stone removing device
    CN106283980A (en) * 2016-08-30 2017-01-04 吉林大学 There are four nuts and synchronize the sleeper replacement device of mounting or dismounting function
    CN106351079A (en) * 2016-08-30 2017-01-25 吉林大学 Sleeper replacement equipment with transition and sleeper push-pull integrated device
    CN106337330A (en) * 2016-08-30 2017-01-18 吉林大学 Automatic and rapid sleeper hoisting device
    CN106351087A (en) * 2016-08-30 2017-01-25 吉林大学 Automatic sleeper replacing mechanism
    CN106400623A (en) * 2016-09-13 2017-02-15 吉林大学 Automatic rail lifting and sleeper replacing device
    RU191642U1 (en) * 2019-05-29 2019-08-14 Открытое Акционерное Общество "Российские Железные Дороги" Attachment for earthmoving equipment designed to bend a rail link when laying a railway track

    Family Cites Families (8)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE416083C (en) * 1923-11-27 1925-07-08 Polensky & Zoellner Device for the installation and removal of railway bridges
    DE444975C (en) * 1923-12-03 1927-06-01 Arthur White Bretland A work train composed of a cantilever car and car with a gate crane running on rails on the outside of the car for laying and changing railway tracks
    FR2378898A1 (en) 1977-01-28 1978-08-25 Secmafer Sa Railway track removal process - by lifting lengths of rail onto the last flat truck of train and transferring them forward by crane
    DE3117898A1 (en) * 1980-07-24 1982-03-04 Franz Plasser Bahnbaumaschinen-Industriegesellschaft mbH, 1010 Wien DRIVABLE PLANT AND METHOD FOR RENOVATING THE SIDELINE
    IT1232099B (en) * 1989-05-23 1992-01-23 Valditerra S P A PROCEDURE FOR THE CONTINUOUS WELDING OF RAIL TRUNKS, ROTABLE AND EQUIPPED FOR ITS IMPLEMENTATION
    AT400729B (en) 1990-08-24 1996-03-25 Plasser Bahnbaumasch Franz MACHINE FOR REPLACING THE SILLS OF A TRACK
    AT400339B (en) * 1991-09-10 1995-12-27 Plasser Bahnbaumasch Franz MACHINE ARRANGEMENT FOR RENEWING A TRACK
    AT406970B (en) * 1993-09-17 2000-11-27 Plasser Bahnbaumasch Franz MACHINE FOR PREPARING WELDING WORK ON A TRACK

    Cited By (4)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE102010022679A1 (en) 2010-06-04 2011-12-08 Robel Bahnbaumaschinen Gmbh Vehicle combination for transporting rails
    WO2011151015A1 (en) 2010-06-04 2011-12-08 Robel Bahnbaumaschinen Gmbh Vehicle train for transporting rails
    CN106192625A (en) * 2016-08-29 2016-12-07 中铁七局集团第工程有限公司 A kind of railway switch lays unit
    CN106192625B (en) * 2016-08-29 2018-04-06 中铁七局集团第一工程有限公司 A kind of railway switch lays unit

    Also Published As

    Publication number Publication date
    FI960009A0 (en) 1996-01-02
    ATE197179T1 (en) 2000-11-15
    CZ281767B6 (en) 1997-01-15
    FI118974B (en) 2008-05-30
    US5590601A (en) 1997-01-07
    EP0721026A1 (en) 1996-07-10
    AU706712B2 (en) 1999-06-24
    RU2105835C1 (en) 1998-02-27
    AU4078696A (en) 1996-07-11
    FI960009A (en) 1996-07-04
    CZ350395A3 (en) 1996-08-14
    DE59508811D1 (en) 2000-11-30
    DK0721026T3 (en) 2000-11-27
    CA2166438C (en) 2005-11-29
    CA2166438A1 (en) 1996-07-04

    Similar Documents

    Publication Publication Date Title
    EP0721026B1 (en) Machine and installation for performing operations on a railway track
    DE2928152C2 (en) Mobile device for picking up and / or laying track switches or crossings
    EP0621371B1 (en) Railway track renewing or laying machine
    DE2550391C2 (en) Method for removing bedding material from ballast bedding
    DE2023931C2 (en) Track renewal train for continuously changing sleepers and / or rails on a track
    EP0682148B1 (en) Installation for transporting lengths of assembled track
    CH639717A5 (en) DEVICE FOR CONTINUOUSLY DISMANTLING OR REPLACING THE RAILS AND SILLS OF A TRACK.
    DE4431503A1 (en) Machine for preparing welding work on a track
    AT402308B (en) STAMPING MACHINE
    EP0276646B1 (en) Installation for taking-up or laying as well as transporting lengths of assembled track
    DE2840917A1 (en) MOBILE RAIL WELDING MACHINE
    AT406493B (en) TRACK CONSTRUCTION MACHINE FOR CARRYING OUT TRACK WORK
    DE2930682A1 (en) EQUIPMENT FOR REPLACEMENT OR RENEWING THE RAILS OF A LAYED TRACK
    CH628380A5 (en) MOBILE DEVICE FOR THE CONTINUOUS REPLACEMENT OF A RAILWAY consisting of RAILS AND SILLS.
    EP1369330B2 (en) Maintenance vehicle
    EP0811721B1 (en) Device for laying railway track
    DE2313055A1 (en) METHOD AND DEVICE FOR REMOVING AND INSTALLING GLEISJOCHEN
    DD256158A5 (en) VEHICLE APPARATUS FOR RECORDING OR LOCATING AND TRANSPORTING GLEISJOCHEN
    EP0486456B1 (en) Railway switch transport wagon
    EP0576891B1 (en) Railgrinding machine
    EP1881110B1 (en) Device and method for extending a track composed of track fields or track sections
    AT504516A4 (en) Crane vehicle for railway construction, includes manipulator with power-driven gripping device for holding rail bridge
    AT404040B (en) MACHINE FOR REPLACING RAILS OF A TRACK
    EP1081293A2 (en) Rail-road excavator
    DE2817635C2 (en)

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    17P Request for examination filed

    Effective date: 19951207

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT CH DE DK FR GB IT LI SE

    17Q First examination report despatched

    Effective date: 19981215

    GRAG Despatch of communication of intention to grant

    Free format text: ORIGINAL CODE: EPIDOS AGRA

    GRAG Despatch of communication of intention to grant

    Free format text: ORIGINAL CODE: EPIDOS AGRA

    GRAH Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOS IGRA

    GRAH Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOS IGRA

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): AT CH DE DK FR GB IT LI SE

    REF Corresponds to:

    Ref document number: 197179

    Country of ref document: AT

    Date of ref document: 20001115

    Kind code of ref document: T

    ITF It: translation for a ep patent filed

    Owner name: JACOBACCI & PERANI S.P.A.

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: NV

    Representative=s name: DIPL.-ING. ETH H. R. WERFFELI PATENTANWALT

    Ref country code: CH

    Ref legal event code: EP

    ET Fr: translation filed
    GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

    Effective date: 20001025

    REG Reference to a national code

    Ref country code: DK

    Ref legal event code: T3

    REF Corresponds to:

    Ref document number: 59508811

    Country of ref document: DE

    Date of ref document: 20001130

    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    26N No opposition filed
    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: IF02

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DK

    Payment date: 20121120

    Year of fee payment: 18

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: CH

    Payment date: 20121121

    Year of fee payment: 18

    Ref country code: FR

    Payment date: 20121206

    Year of fee payment: 18

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: SE

    Payment date: 20121120

    Year of fee payment: 18

    Ref country code: GB

    Payment date: 20121031

    Year of fee payment: 18

    Ref country code: IT

    Payment date: 20121123

    Year of fee payment: 18

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: AT

    Payment date: 20121011

    Year of fee payment: 18

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DE

    Payment date: 20130118

    Year of fee payment: 18

    REG Reference to a national code

    Ref country code: DK

    Ref legal event code: EBP

    Effective date: 20131130

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PL

    REG Reference to a national code

    Ref country code: AT

    Ref legal event code: MM01

    Ref document number: 197179

    Country of ref document: AT

    Kind code of ref document: T

    Effective date: 20131130

    GBPC Gb: european patent ceased through non-payment of renewal fee

    Effective date: 20131130

    REG Reference to a national code

    Ref country code: SE

    Ref legal event code: EUG

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: CH

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20131130

    Ref country code: LI

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20131130

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: ST

    Effective date: 20140731

    REG Reference to a national code

    Ref country code: DE

    Ref legal event code: R119

    Ref document number: 59508811

    Country of ref document: DE

    Effective date: 20140603

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: AT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20131130

    Ref country code: IT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20131130

    Ref country code: SE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20131201

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20140603

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: DK

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20131130

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: FR

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20131202

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20131130