EP1881110B1 - Device and method for extending a track composed of track fields or track sections - Google Patents

Device and method for extending a track composed of track fields or track sections Download PDF

Info

Publication number
EP1881110B1
EP1881110B1 EP07007758A EP07007758A EP1881110B1 EP 1881110 B1 EP1881110 B1 EP 1881110B1 EP 07007758 A EP07007758 A EP 07007758A EP 07007758 A EP07007758 A EP 07007758A EP 1881110 B1 EP1881110 B1 EP 1881110B1
Authority
EP
European Patent Office
Prior art keywords
track
section
transport
ballast
carrying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP07007758A
Other languages
German (de)
French (fr)
Other versions
EP1881110A3 (en
EP1881110A2 (en
Inventor
Christian Schreiber
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RTE Technologie GmbH
Original Assignee
RTE Technologie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RTE Technologie GmbH filed Critical RTE Technologie GmbH
Publication of EP1881110A2 publication Critical patent/EP1881110A2/en
Publication of EP1881110A3 publication Critical patent/EP1881110A3/en
Application granted granted Critical
Publication of EP1881110B1 publication Critical patent/EP1881110B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/02Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings

Definitions

  • the invention relates to a device for the expansion of a rail track tracks or track rails formed for rail vehicles and is also directed to a method for removing a track formed of track fields or track yokes track, especially a track laid in a ballast track.
  • the object of the invention is to provide an apparatus and a method for the development of a track formed from track sills for rail vehicles, which also single-track tracks can be developed in one operation in an advantageous manner and thus the removal of the developed track fields without complicated maneuvering is possible ,
  • the device according to the invention consists essentially of a subdivided into at least two sections, can be arranged on the track to be constructed support structure which is supported by support posts on the track bed, with one of the first, rear section associated lifting device for a track field, one between the two Sections movable transport device and arranged at the second section loading station, wherein the support structure, at least in the region of the second section of a trackable on the track rail vehicle, in particular a transport car, is traversable,
  • the inventive method can be carried out in an advantageous manner be characterized in that a consisting of at least two sections support structure is arranged above the track to be removed and supported by support posts that they from at least a rail vehicle on the track, in particular a transport wagon, in the front section is traversed, with a located in the rear section track dug by means of a support structure arranged lifting device excavated from the track bed and by means of a transportable along the support structure transport to one of the second, front
  • the old track to be excavated is used even for the removal of the track fields or rail sections and rail sleepers and transports the track field located at the end of the old track to be removed after it has been lifted out of the ballast bed by means of the lifting device from the rear track Section of the support structure in the front, second section, in which the old track is at least in tact so far in tact that it is a transport carriage for the developed track field or its components can be moved.
  • This rail car can be arranged under the support structure in the region of the second, front section and the transport device with the hanging, straight track surface can be moved along the support structure from the first, rear section in the second, front section on the transport carriage under it where the track field is then deposited at the loading station on the transport wagon.
  • the arrangement can be made so that the support structure in the region of its second, front section has a length corresponding to the length of at least two transport cars, in which case advantageously according to the method can be worked so that the stored on a transport wagon track tore in his individual components (sleepers and rails) is disassembled and the dissolved rails are then stored by means of the lifting and transporting device on the second, arranged in the front section of the transport wagon, while the rail sleepers remain on the first transport wagon.
  • the support structure has a third, to the second section before this subsequent section with a ballast loading station and subsequent to the first section a ballast removal device is provided, the above a conveyor for the track fields extending conveyor with the ballast loading station is connected.
  • This advantageous structural design makes it possible to expand not only the individual track lengths of an old track from the ballast bed and arrange for removal on transport cars, but immediately following the expansion of the track lengths and the track ballast of the ballast bed and expand if necessary, further material from the footwall and to be transported away. According to the method, this is the like from gravel, solidified track substructure or the like.
  • the invention it is possible to adapt and use the device described also for the removal of slab tracks. Due to the arrangement of the conveyor above the transport device, the space requirement of the entire system is very low, in particular in a direction transverse to the track longitudinal direction, which makes it possible in an advantageous manner to use the system and the method for removing a laid in a tunnel track. Moreover, the invention can also be used when, in addition to the track to be removed, a neighboring track runs on which the driving operation must be maintained during the dismantling work.
  • the support posts of the support structure are height adjustable, which unevenness in the areas of the track bed, in which support the support posts can be easily compensated.
  • the support posts are expediently arranged in pairs and are based on the right and left side of the track.
  • the arrangement is preferably made so that at least part of the support posts is provided with a Schlittenfuß, over which they are supported on the footwall, especially on the ballast.
  • the device is movable along the track to be removed, so that the support structure according to the method can proceed along the track to be removed after the removal of one or more track fields and can be supported again.
  • a track field located at the end of the old track to be removed can be successively excavated after the other and stored for transport on the transport carriage arranged in the second section for loading.
  • the support posts is preferably provided with hydraulic traction drives, whereby the inventive device by its own power, namely by means of the traction drives can proceed if there is no track under the supporting structure in the rear, first section, which must be removed.
  • the support posts arranged in the second and / or third section can be supported on the rails of the track and are articulated to the support structure by means of a pivoting device with which they move laterally out of their supporting position on the rails in addition to a support structure undermined rail vehicle lying open position can be brought.
  • the support of any case some support posts directly on the rails ensures a very high support stability even without under the support columns arranged floor plates or the like ..
  • the transport device in the first section and the conveyor appropriately shut down, so that an overload of the construction is not to be provided because of insufficient support.
  • the sections of the support structures are preferably hinged together and thus allow to be easily adapted to the track layout.
  • the transport device is preferably provided with a plurality of, in particular four hoists, in particular chain hoists forming the hoisting device, which are connected at the track area to be excavated at a plurality of points in order to reliably hold them.
  • the hoists can be operated individually or in groups in order to carry out the excavation process optimally.
  • the transport device is expedient along at least one arranged on the support structure, the first and second section bridging track rail movable and can thus together with a raised track field in the manner of a trolley from the first to the second section back and after transfer of the track field on the transport car again return.
  • the conveyor is an endless conveyor, such as a chain scraper conveyor, a belt conveyor or the like., Which of the Gravel removal device excavated excavated, so in particular handed over the old track ballast and with which he is transported to the ballast loading station in the third section.
  • a particularly advantageous embodiment is obtained if at least one transport wagon with the device can be coupled and moved together with this, wherein in particular the one or more arranged in the second section transport wagons can be coupled and moved with the device. It is then unnecessary to move the wagons separately with a locomotive on the track when the device is displaced in the track longitudinal direction, after in the first section no track tracks to be removed are present. Rather, the device takes in this return operation, the wagons, which it engages portal-like, even with, with the relative position between the device and the wagons does not change and the wagons must therefore not be relocated after the walking process to their correct position for storing to get more track fields.
  • At least one transport car is movable relative to the device along the track, so that it can be moved slowly, for example by means of a shunting locomotive under the ballast, so that the material transported by the conveyor evenly distributed in the transport car.
  • a lateral panel provided on the device, which prevents degraded gravel or the like. fall laterally next to the work area of the device on the siding and there may possibly lead to damage of a passing train.
  • a cladding may for example be a continuous sheet metal cladding or from a stable wire mesh, which is close enough to the passage of larger bulkhead parts or the like. to prevent.
  • the entire device is preferably remotely controllable, for example by means of a radio remote control.
  • device 10 in the Fig. 1 in its entirety shown device 10 consists essentially of a three sections 11, 12, 13 extending support structure 14 of steel profiles, which is supported by means of paired support posts 15, 16, 17 on the track bed 18. The entire device is located above a to be built old track 19, which towers over them like a portal. The first, positioned at the track end and thus rear section 11 (left in Fig. 1 ) defines a track removal field from which the track end 20 defining the track end is dug out of the track bed 18, as shown in FIG Fig. 1 at 21 is recognizable.
  • a lifting device 22 in the form of four connectable to the track panel 20 chain hoists is provided on the support structure, which by means of a transport device 23 along the positioned above the old track support structure 14 on rails 24 is movable.
  • the arrangement is such that the rails 24 extend over the first section 11 and the second section 12 up to the front, defined by the support post pair 17 end.
  • the second section 12 of the device 10 forms a loading station for the excavated in the first section track fields 20. For this purpose it is traversable by movable on the old track 19 transport wagons 25, wherein the length of the second section 12 is dimensioned so that two wagons completely space Find.
  • An excavated by means of the lifting device 22 from the track bed 18 track area is raised so far that its underside above the frontal walls 26 of the transport cars 25 and transported along the rails from the first section 11 in the second section 12 and there above the first transport wagon a positioned, whereupon the lifting device 22 lowers the track field and thereby deposits on the first transport carriage 25a.
  • an endless conveyor 27 is arranged with circulating conveyor belt between the rails, which is essentially from one at the rear (in Fig. 1 left) end 28 of the first section 11 arranged feed chute 29 extends to a arranged in the third section 13 ballast loading station 30.
  • the feed chute 29 is associated with a ballast excavating device in the form of a Schrämbaggers 31, with the aid of which immediately following a track field and the track ballast and / or the track substructure becamekoffert and handed over the noted concisee the conveyor 27.
  • the thus-constructed material is transmitted from the conveyor 27 through the first section 11 and the second section 12 transported to the ballast loading station 30 in the third section 13, where it falls into below, by means of a shunting locomotive (not shown) movable transport cars 32 falls.
  • a shunting locomotive not shown
  • movable transport cars 32 falls.
  • the entire device 10 by the length of one of the first section defined track deduction field in the direction of the existing old track, in Fig. 1 So move to the right, and then expand the next or end, end track fields in a similar manner.
  • the support pillar pairs 16 are provided with their own (not shown) hydraulic drive, which consists essentially of extendable hydraulic cylinders, which are articulated on the one hand to the support posts 16 and on the other hand can be supported against the thresholds of the still laid old track.
  • the supporting columns are supported on the rails 34 of the old track by a chassis 33, the front pair of support posts 16a delimiting the second section 12 being provided with a transverse bar 35 arranged at the level of the buffers 34 of the transport cars 25, which is applied in the movement or return operation of the device against the rear buffer of the first transport car 25 and thus entrains both located in the second section 12 transport cars 25, so these are moved to the same extent as the device.
  • the front support posts 17 are provided with trolleys 36, with which they can be supported on the rails of the old track.
  • the front, arranged between the second section 12 and the third section 13 support posts 17 are designed without driving catch for the other two transport cars 32 in the region of the third section; it is preferred here, the transport cars for the removal of the ballast or the like. reposition using the shunting jack, not shown, when the device is moved.
  • the avoidance of a transport stop for the two transport wagons 32 is not least due to the fact that the front support posts 17 are articulated by means of a pivoting device 37 to the support structure 14, with which they from their support on the rails support position ( Fig.
  • a passage position ( Fig. 4 ) in a passage position ( Fig. 4 ), which allows to load the loaded transport cars 25a, b, for example, after coupling them to the front transport wagons 32 together with this under the supporting structure and to reposition unloaded transport wagons in the second section to receive the next track fields.
  • the support posts 17 are therefore not temporarily based on the rails, but with laterally projecting support shoes 39 on the tops of track sleepers, whereby the total weight of the support structure including about still on the conveyor 27 located waste material is safely removed.
  • the rear support posts on the end section 28 of the first section can not be supported on the rails of the old track that has already been removed there.
  • These support posts 15 are therefore provided with carriage feet 38 or, for example, a crawler track, with which they can be supported directly on the track ballast.
  • the carriage feet or the crawler undercarriage are hingedly connected at the bottom to the support posts 15 and can thus adapt to unevenness in the track ballast.
  • all support posts are designed to be height adjustable and this provided with hydraulic cylinders, with which they can be extended and retracted.
  • the invention is not limited to the illustrated and described embodiment, but there are various changes and additions to the device and in the process flow possible without departing from the scope of the invention defined by the claims.
  • the inventive Device can be used in particular not only for the expansion of a track, but also for laying a new track, wherein the described procedures are then performed in substantially the reverse order.
  • With the invention is achieved in a particularly advantageous manner that both consisting of rails and sleepers track superstructure in the form of track fields or track lengths as well as substantially simultaneously track ballast and substructure can be removed and the removed substances can be loaded separately on transport wagons (regular freight cars), without the use of a neighboring track alone using the old track to be removed.

Abstract

The device (10) has a carrying structure (14), divided in two sections (11,12) and arranged over a track (19) which is to be removed. The carrying structure is supported at a track bed (18) by using carrying supports (15,16a,16b,17), with a lifting device (22), assigned to the former section (11), for a track field (20). A transport device (23) is displaceable between the two sections and a loading station is arranged at later section (12). The carrying structure is under-bridged in the area of the later section from a rail-bound vehicle (25a,25b) movable on the track. An independent claim is also included for a method for the disassembling of a rail track formed from track joints, displaced in the road bed.

Description

Die Erfindung betrifft eine Vorrichtung für den Ausbau eines aus Gleisfeldern bzw. Gleisjochen gebildeten Gleises für Schienenfahrzeuge und ist darüber hinaus auf ein Verfahren zum Ausbau eines aus Gleisfeldern bzw. Gleisjochen gebildeten Gleises gerichtet, insbesondere eines im Schotterbett verlegten Gleises.The invention relates to a device for the expansion of a rail track tracks or track rails formed for rail vehicles and is also directed to a method for removing a track formed of track fields or track yokes track, especially a track laid in a ballast track.

Bei der Sanierung oder dem Rückbau alter Gleiskörper, wobei nicht nur die Schienen, sondern auch die meist im Schotterbett verlegten Schwellen ausgebaut werden sollen, wie aus EP 0 768 426 A1 bekannt, erfolgt der Ausbau häufig in ganzen Gleisfeldern, also von sich über eine vergleichsweise große Länge erstreckenden Gleisabschnitten, die vom Altgleis zuvor getrennt wurden, so daß der derart aus dem Gleisverbund gelöste Gleisfeld mit seinen beiden Fahrschienen und den daran noch fest montierten Gleisschwellen aus dem Schotterbett ausgehoben und abtransportiert werden kann.When renovating or dismantling old track bodies, not only the rails but also the sleepers usually laid in the ballast bed should be removed, as if from EP 0 768 426 A1 known, the expansion often takes place in whole track fields, so by itself over a comparatively long length extending track sections that were previously separated from the old track, so that the track thus dissolved from the track track with its two rails and the still firmly mounted track sleepers from the Dredged bed can be dug and removed.

Bei den bekannten Vorrichtungen und Verfahren zum Ausbau eines Altgleises erfolgt das Ausheben der Gleisfelder meist mittels Hebekränen, die auf einem Nachbargleis zu dem auszubauenden Gleis fahren und den ausgehobenen Gleisstoß auf einem meist zwischen zwei Kränen angeordneten Transportwaggon ablegen. Dies hat aber den Nachteil, daß hiermit ein Altgleis nur dann ausgebaut und die ausgebauten Gleisstöße abtransportiert werden können, wenn neben dem rückzubauenden oder zu sanierenden Altgleis ein zweites Gleis vorhanden ist, auf dem die Baufahrzeuge rollen können. Darüber hinaus birgt die bekannte Technik den Nachteil, daß vergleichsweise aufwendige Rangiervorgänge erforderlich sind, sobald der zwischen zwei Kränen laufende Transportwaggon bis zu seiner Kapazitätsgrenze beladen ist und gegen einen anderen Waggon ausgetauscht werden muß.In the known devices and methods for removing an old track lifting the track fields is usually done by lifting cranes that drive on a neighboring track to the track to be removed and store the excavated track gap on a usually arranged between two cranes transport car. However, this has the disadvantage that hereby an old track can only be removed and removed track lengths can be removed if, in addition to the old track to be rebuilt or rehabilitated, a second track is available on which the construction vehicles can roll. In addition, the known technique has the disadvantage that comparatively complicated maneuvering operations are required as soon as the transport wagon running between two cranes is loaded to its capacity limit and must be exchanged for another wagon.

Aufgabe der Erfindung ist es, eine Vorrichtung und ein Verfahren für den Ausbau eines aus Gleisstößen gebildeten Gleises für Schienenfahrzeuge zu schaffen, womit auch einspurig verlegte Gleise in vorteilhafter Weise in einem Arbeitsgang ausgebaut werden können und womit der Abtransport der ausgebauten Gleisfelder ohne aufwendige Rangierarbeiten möglich wird.The object of the invention is to provide an apparatus and a method for the development of a track formed from track sills for rail vehicles, which also single-track tracks can be developed in one operation in an advantageous manner and thus the removal of the developed track fields without complicated maneuvering is possible ,

Zur Lösung dieser Aufgabe besteht die erfindungsgemäße Vorrichtung im wesentlichen aus einer in mindestens zwei Sektionen unterteilten, über dem auszubauenden Gleis anordbaren Trägerkonstruktion, die mittels Tragstützen am Gleisbett abstützbar ist, mit einer der ersten, hinteren Sektion zugeordneten Hebeeinrichtung für ein Gleisfeld, einer zwischen den beiden Sektionen verfahrbaren Transporteinrichtung und einer an der zweiten Sektion angeordneten Verladestation, wobei die Trägerkonstruktion zumindest im Bereich der zweiten Sektion von einem auf dem Gleis fahrbaren Schienenfahrzeug, insbesondere einem Transportwaggon, unterfahrbar ist, Mit einer derartigen, erfindungsgemäßen Vorrichtung kann in vorteilhafter weise das erfindungsgemäße Verfahren ausgeführt werden, das sich dadurch auszeichnet, daß eine aus mindestens zwei Sektionen bestehende Trägerkonstruktion über dem auszubauenden Gleis so angeordnet und mittels Tragstützen abgestützt wird, daß sie von mindestens einem auf dem Gleis fahrbaren Schienenfahrzeug, insbesondere einem Transportwaggon, im Bereich der vorderen Sektion unterfahrbar ist, wobei ein in der hinteren Sektion befindlicher Gleisstoß mittels einer an der Trägerkonstruktion angeordneten Hebeeinrichtung aus dem Gleisbett ausgehoben und mittels einer längs der Trägerkonstruktion verfahrbaren Transporteinrichtung zu einer an der zweiten, vorderen Sektion angeordneten Verladestation verbracht und auf ein dort angeordnetes Schienenfahrzeug verladen wird.To achieve this object, the device according to the invention consists essentially of a subdivided into at least two sections, can be arranged on the track to be constructed support structure which is supported by support posts on the track bed, with one of the first, rear section associated lifting device for a track field, one between the two Sections movable transport device and arranged at the second section loading station, wherein the support structure, at least in the region of the second section of a trackable on the track rail vehicle, in particular a transport car, is traversable, With such a device according to the invention, the inventive method can be carried out in an advantageous manner be characterized in that a consisting of at least two sections support structure is arranged above the track to be removed and supported by support posts that they from at least a rail vehicle on the track, in particular a transport wagon, in the front section is traversed, with a located in the rear section track dug by means of a support structure arranged lifting device excavated from the track bed and by means of a transportable along the support structure transport to one of the second, front section arranged loading station and loaded onto a rail vehicle arranged there.

Erfindungsgemäß nutzt man also das auszubauende Altgleis selbst für den Abtransport der Gleisfelder bzw. der diese bildenden Schienenabschnitte und Schienenschwellen und transportiert hierzu das am Ende des auszubauenden Altgleises befindliche Gleisfeld nach seinem Ausheben aus dem Schotterbett mittels der Hebeeinrichtung aus der hinteren Sektion der Trägerkonstruktion in die vordere, zweite Sektion, in der das Altgleis noch jedenfalls soweit in Takt ist, daß darauf ein Transportwaggon für das ausgebaute Gleisfeld bzw. deren Bestandteile verfahrbar ist. Dieser Gleiswaggon kann unter der Trägerkonstruktion im Bereich von deren zweiter, vorderen Sektion angeordnet werden und die Transporteinrichtung mit dem daran hängenden, gerade ausgebauten Gleisfeld kann entlang der Trägerkonstruktion aus der ersten, hinteren Sektion in die zweite, vordere Sektion über den darunter rangierten Transportwaggon verfahren werden, wo das Gleisfeld dann an der erreichten Verladestation auf dem Transportwaggon abgelegt wird. Die Anordnung kann so getroffen sein, daß die Trägerkonstruktion im Bereich ihrer zweiten, vorderen Sektion eine Länge aufweist, die der Länge von mindestens zwei Transportwaggons entspricht, wobei dann in vorteilhafter Weise verfahrensgemäß so gearbeitet werden kann, daß der auf einem Transportwaggon abgelegte Gleisstoß in seine einzelnen Bestandteile (Schwellen und Schienen) zerlegt wird und die gelösten Schienen dann mittels der Hebe- und Transporteinrichtung auf dem zweiten, in der vorderen Sektion angeordneten Transportwaggon abgelegt werden, während die Schienenschwellen auf dem ersten Transportwaggon verbleiben.According to the invention, therefore, the old track to be excavated is used even for the removal of the track fields or rail sections and rail sleepers and transports the track field located at the end of the old track to be removed after it has been lifted out of the ballast bed by means of the lifting device from the rear track Section of the support structure in the front, second section, in which the old track is at least in tact so far in tact that it is a transport carriage for the developed track field or its components can be moved. This rail car can be arranged under the support structure in the region of the second, front section and the transport device with the hanging, straight track surface can be moved along the support structure from the first, rear section in the second, front section on the transport carriage under it where the track field is then deposited at the loading station on the transport wagon. The arrangement can be made so that the support structure in the region of its second, front section has a length corresponding to the length of at least two transport cars, in which case advantageously according to the method can be worked so that the stored on a transport wagon track tore in his individual components (sleepers and rails) is disassembled and the dissolved rails are then stored by means of the lifting and transporting device on the second, arranged in the front section of the transport wagon, while the rail sleepers remain on the first transport wagon.

In besonders vorteilhafter Weiterbildung der erfindungsgemäßen Vorrichtung weist die Trägerkonstruktion eine dritte, sich an die zweite Sektion noch vor dieser anschließende Sektion mit einer Schotteraufgabestation auf und nachfolgend zur ersten Sektion ist eine Schotterausbauvorrichtung vorgesehen, die über einen oberhalb der Transporteinrichtung für die Gleisfelder verlaufenden Förderer mit der schotteraufgabestation verbunden ist. Diese vorteilhafte konstruktive Ausgestaltung ermöglicht es, nicht nur die einzelnen Gleisstöße eines Altgleises aus dem Schotterbett auszubauen und für den Abtransport auf Transportwaggons anzuordnen, sondern unmittelbar im Anschluß an den Ausbau der Gleisstöße auch den Gleisschotter des Schotterbetts und bei Bedarf auch weiteres Material aus dem Liegenden auszubauen und abzutransportieren. Verfahrensgemäß wird hierzu das aus Schotter, verfestigtem Gleisunterbau od.dgl. bestehende Gleisbett dem Ausbau eines Gleisfeldes nachfolgend mittels der Schotterausbauvorrichtung ausgebaut und das ausgebaute Material wird mittels des an der Trägerkonstruktion angeordneten Förderers zu der vor der zweiten Sektion angeordneten Schotteraufgabestation in der dritten Sektion transportiert und dort einem auf dem Gleis verfahrbaren Transportwaggon übergeben. Erfindungsgemäß ist es möglich, die beschriebene Vorrichtung auch für den Abtrag von Festen Fahrbahnen anzupassen und zu verwenden. Durch die Anordnung des Förderers oberhalb der Transporteinrichtung ist der Platzbedarf der Gesamtanlage insbesondere in einer Richtung quer zur Gleislängsrichtung sehr gering, was es in vorteilhafter Weise möglich macht, die Anlage und das Verfahren auch zum Ausbau eines in einem Tunnel verlegten Gleises einzusetzen. Die Erfindung kann darüber hinaus auch dann verwendet werden, wenn neben dem auszubauenden Gleis ein Nachbargleis verläuft, auf dem der Fahrbetrieb während der Ausbauarbeiten aufrechterhalten bleiben muß.In a particularly advantageous embodiment of the device according to the invention, the support structure has a third, to the second section before this subsequent section with a ballast loading station and subsequent to the first section a ballast removal device is provided, the above a conveyor for the track fields extending conveyor with the ballast loading station is connected. This advantageous structural design makes it possible to expand not only the individual track lengths of an old track from the ballast bed and arrange for removal on transport cars, but immediately following the expansion of the track lengths and the track ballast of the ballast bed and expand if necessary, further material from the footwall and to be transported away. According to the method, this is the like from gravel, solidified track substructure or the like. existing track bed expanded the expansion of a track field below using the ballast removal device and the removed material is transported by means arranged on the support structure conveyor to the disposed before the second section ballast loading station in the third section and there passed a transportable on the track transport car. According to the invention, it is possible to adapt and use the device described also for the removal of slab tracks. Due to the arrangement of the conveyor above the transport device, the space requirement of the entire system is very low, in particular in a direction transverse to the track longitudinal direction, which makes it possible in an advantageous manner to use the system and the method for removing a laid in a tunnel track. Moreover, the invention can also be used when, in addition to the track to be removed, a neighboring track runs on which the driving operation must be maintained during the dismantling work.

In vorteilhafter Weiterbildung der Erfindung sind die Tragstützen der Trägerkonstruktion höhenverstellbar, womit Unebenheiten in den Bereichen des Gleisbettes, in denen sich die Tragstützen abstützen, problemlos ausgeglichen werden können. Die Tragstützen sind zweckmäßig jeweils paarweise angeordnet und stützen sich zur rechten und linken Seite des Gleises ab. Dabei ist die Anordnung vorzugsweise so getroffen, daß wenigstens ein Teil der Tragstützen mit einem Schlittenfuß versehen ist, über den sie sich am Liegenden, insbesondere auf dem Gleisschotter abstützen.In an advantageous embodiment of the invention, the support posts of the support structure are height adjustable, which unevenness in the areas of the track bed, in which support the support posts can be easily compensated. The support posts are expediently arranged in pairs and are based on the right and left side of the track. In this case, the arrangement is preferably made so that at least part of the support posts is provided with a Schlittenfuß, over which they are supported on the footwall, especially on the ballast.

Es ist ersichtlich vorteilhaft, daß die Vorrichtung entlang des auszubauenden Gleises verfahrbar ist, so daß die Trägerkonstruktion verfahrensgemäß nach dem Ausbau eines oder mehrerer Gleisfelder entlang des auszubauenden Gleises verfahren und neu abgestützt werden kann. Sukzessive kann hierdurch ein endseitig des auszubauenden Altgleises befindliches Gleisfeld nach dem anderen ausgehoben und zum Abtransport auf dem in der zweiten Sektion zur Beladung angeordneten Transportwaggon abgelegt werden.It is clearly advantageous that the device is movable along the track to be removed, so that the support structure according to the method can proceed along the track to be removed after the removal of one or more track fields and can be supported again. As a result, a track field located at the end of the old track to be removed can be successively excavated after the other and stored for transport on the transport carriage arranged in the second section for loading.

Besonders vorteilhaft ist es, wenn mindestens ein Teil der Tragstützen mit vorzugsweise hydraulischen Fahrantrieben versehen ist, womit die erfindungsgemäße Vorrichtung aus eigener Kraft, nämlich mittels der Fahrantriebe weiter verfahren kann, wenn sich unter der Tragkonstruktion in der hinteren, ersten Sektion kein Gleisfeld mehr befindet, das ausgebaut werden muß.It when at least a portion of the support posts is preferably provided with hydraulic traction drives, whereby the inventive device by its own power, namely by means of the traction drives can proceed if there is no track under the supporting structure in the rear, first section, which must be removed.

Es ist vorteilhaft, wenn zumindest ein Teil der in der zweiten und/oder dritten Sektion angeordneten Tragstützen auf den Schienen des Gleises abstützbar sind und mittels einer Schwenkeinrichtung an der Trägerkonstruktion angelenkt sind, mit der sie aus ihrer sich an den Schienen abstützenden Stützstellung in eine seitlich neben ein die Trägerkonstruktion unterfahrenes Schienenfahrzeug liegende Durchlaßstellung bringbar sind. Die Abstützung von jedenfalls einigen Tragstützen unmittelbar auf den Schienen gewährleistet eine sehr hohe Stützstabilität auch ohne unter den Tragstützen angeordnete Bodenplatten od.dgl.. Solange die Tragstützen nach außen in die Durchlaßstellung verschwenkt sind, um die Durchfahrt eines Transportwaggons zu gestatten, werden die Transporteinrichtung in der ersten Sektion und der Förderer zweckmäßig stillgesetzt, so daß eine Überlastung der Konstruktion wegen ungenügender Abstützung nicht zu besorgen ist.It is advantageous if at least part of the support posts arranged in the second and / or third section can be supported on the rails of the track and are articulated to the support structure by means of a pivoting device with which they move laterally out of their supporting position on the rails in addition to a support structure undermined rail vehicle lying open position can be brought. The support of any case some support posts directly on the rails ensures a very high support stability even without under the support columns arranged floor plates or the like .. As long as the support posts are pivoted outwardly into the open position to allow the passage of a transport car, the transport device in the first section and the conveyor appropriately shut down, so that an overload of the construction is not to be provided because of insufficient support.

Die Sektionen der Trägerkonstruktionen sind vorzugsweise gelenkig untereinander verbunden und erlauben es somit, an den Gleisverlauf problemlos angepaßt zu werden. Die Transporteinrichtung ist vorzugsweise mit mehreren, insbesondere vier die Hebeeinrichtung bildenden Hebezügen, insbesondere Kettenzügen versehen, die am auszuhebenden Gleisfeld an mehreren Punkten angeschlossen werden, um diesen zuverlässig zu halten. Die Hebezüge können einzeln oder gruppenweise betätigbar sein, um den Aushebevorgang optimal durchführen zu können. Die Transporteinrichtung ist zweckmäßig entlang mindestens einer an der Trägerkonstruktion angeordneten, die erste und zweite Sektion überbrückenden Laufschiene verfahrbar und kann somit gemeinsam mit einem ausgehobenen Gleisfeld nach Art einer Laufkatze aus der ersten in die zweite Sektion hin- und nach Übergabe des Gleisfeldes auf den Transportwaggon wieder zurückfahren.The sections of the support structures are preferably hinged together and thus allow to be easily adapted to the track layout. The transport device is preferably provided with a plurality of, in particular four hoists, in particular chain hoists forming the hoisting device, which are connected at the track area to be excavated at a plurality of points in order to reliably hold them. The hoists can be operated individually or in groups in order to carry out the excavation process optimally. The transport device is expedient along at least one arranged on the support structure, the first and second section bridging track rail movable and can thus together with a raised track field in the manner of a trolley from the first to the second section back and after transfer of the track field on the transport car again return.

Vorzugsweise ist der Förderer ein Endlosförderer, beispielsweise ein Kettenkratzerförderer, ein Bandförderer od.dgl., dem der von der Schotterausbauvorrichtung ausgebaute Aushub, also insbesondere der alte Gleisschotter übergeben und mit dem er zur Schotteraufgabestation in der dritten Sektion transportiert wird.Preferably, the conveyor is an endless conveyor, such as a chain scraper conveyor, a belt conveyor or the like., Which of the Gravel removal device excavated excavated, so in particular handed over the old track ballast and with which he is transported to the ballast loading station in the third section.

Eine ganz besonders vorteilhafte Ausgestaltung ergibt sich, wenn wenigstens ein Transportwaggon mit der Vorrichtung koppelbar und gemeinsam mit dieser verfahrbar ist, wobei insbesondere der oder die in der zweiten Sektion angeordneten Transportwaggons mit der Vorrichtung koppelbar und verfahrbar sein können. Es erübrigt sich dann, die Waggons separat mit einer Lok auf dem Gleis zu verschieben, wenn die Vorrichtung in Gleislängsrichtung versetzt wird, nachdem in der ersten Sektion keine auszubauenden Gleisfelder mehr vorhanden sind. Vielmehr nimmt die Vorrichtung bei diesem Rückvorgang die Waggons, die sie portalartig übergreift, selbst mit, wobei sich die relative Lage zwischen der Vorrichtung und den Waggons nicht ändert und die Waggons somit nach dem Schreitvorgang nicht neu plaziert werden müssen, um ihre korrekte Position zum Ablegen weiterer Gleisfelder zu erhalten.A particularly advantageous embodiment is obtained if at least one transport wagon with the device can be coupled and moved together with this, wherein in particular the one or more arranged in the second section transport wagons can be coupled and moved with the device. It is then unnecessary to move the wagons separately with a locomotive on the track when the device is displaced in the track longitudinal direction, after in the first section no track tracks to be removed are present. Rather, the device takes in this return operation, the wagons, which it engages portal-like, even with, with the relative position between the device and the wagons does not change and the wagons must therefore not be relocated after the walking process to their correct position for storing to get more track fields.

Für eine gleichmäßige Beladung eines Transportwaggons mit dem ausgebauten Schottermaterial od.dgl. hat es sich als zweckmäßig erwiesen, wenn wenigstens ein Transportwaggon relativ zur Vorrichtung entlang des Gleises beweglich ist, so daß dieser beispielsweise mittels einer Rangierlok langsam unter der Schotteraufgabestation verfahren werden kann, so daß sich das von dem Förderer herantransportierte Material gleichmäßig im Transportwaggon verteilt.For a uniform loading of a transport wagon or the like with the excavated gravel material. it has proved to be useful if at least one transport car is movable relative to the device along the track, so that it can be moved slowly, for example by means of a shunting locomotive under the ballast, so that the material transported by the conveyor evenly distributed in the transport car.

Um die erfindungsgemäße Vorrichtung zum Ausbau eines Altgleises einsetzen zu können, das sich in räumlicher Nähe neben einem während der Ausbauarbeiten weiterhin befahrenen Nebengleises befindet, wird vorzugsweise zumindest einseitig eine seitliche Verkleidung an der Vorrichtung vorgesehen, die verhindert, daß ausgebauter Schotter od.dgl. seitlich neben dem Arbeitsbereich der Vorrichtung auf das Nebengleis fallen und dort ggf. zu einer Beschädigung eines vorbeifahrenden Zuges führen kann. Eine solche Verkleidung kann beispielsweise eine durchgehende Blechverkleidung sein oder auch aus einem stabilen Drahtgitter bestehen, das engmaschig genug ist, um den Durchgang von größeren Schotterteilen od.dgl. zu unterbinden. Die gesamte Vorrichtung ist vorzugsweise fernsteuerbar, beispielsweise mittels einer Funkfernsteuerung.In order to use the device according to the invention for the development of an old track, which is located in close proximity to a siding continued during finishing work siding is preferably at least on one side a lateral panel provided on the device, which prevents degraded gravel or the like. fall laterally next to the work area of the device on the siding and there may possibly lead to damage of a passing train. Such a cladding may for example be a continuous sheet metal cladding or from a stable wire mesh, which is close enough to the passage of larger bulkhead parts or the like. to prevent. The entire device is preferably remotely controllable, for example by means of a radio remote control.

Weitere Merkmale und Vorteile der Erfindung ergeben sich aus der nachfolgenden Beschreibung und der Zeichnung, worin eine bevorzugte Ausführungsform der Erfindung anhand eines Beispiels näher erläutert wird. Es zeigt:

Fig. 1
eine erfindungsgemäße Vorrichtung in einer vereinfachten Seitenansicht;
Fig. 2
eine schematisierte Querschnittsdarstellung längs der Linie II-II in Fig. 1;
Fig. 3
eine schematisierte Querschnittsdarstellung der vorrichtung nach Fig. 1 im Schnitt längs der Linie III-III in einer ersten Position von dort angeordneten Tragstützen;
Fig. 4
den Gegenstand der Fig. 3 in einer zweiten Stellung der Tragstütze, ebenfalls im Querschnitt.
Further features and advantages of the invention will become apparent from the following description and the drawing, wherein a preferred embodiment of the invention is explained in more detail by way of example. It shows:
Fig. 1
a device according to the invention in a simplified side view;
Fig. 2
a schematic cross-sectional view along the line II-II in Fig. 1 ;
Fig. 3
a schematic cross-sectional view of the device according to Fig. 1 in section along the line III-III in a first position of there arranged support posts;
Fig. 4
the object of Fig. 3 in a second position of the support bracket, also in cross section.

Die in Fig. 1 in ihrer Gesamtheit dargestellte Vorrichtung 10 besteht im wesentlichen aus einer sich über drei Sektionen 11, 12, 13 erstreckenden Trägerkonstruktion 14 aus Stahlprofilen, die sich mittels paarweise angeordneter Tragstützen 15, 16, 17 am Gleisbett 18 abstützt. Die gesamte Vorrichtung befindet sich oberhalb eines auszubauenden Altgleises 19, das sie portalartig überragt. Die erste, am Gleisende positionierte und somit hintere Sektion 11 (links in Fig. 1) definiert ein Gleisabtragungsfeld, aus dem das Gleisende definierende Gleisfeld 20 aus dem Gleisbett 18 ausgehoben werden, wie dies in Fig. 1 bei 21 erkennbar ist. Hierzu ist an der Trägerkonstruktion eine Hebeeinrichtung 22 in Form von vier am Gleisfeld 20 anschließbaren Kettenzügen vorgesehen, die mittels einer Transporteinrichtung 23 entlang der über dem Altgleis positionierten Trägerkonstruktion 14 an Laufschienen 24 verfahrbar ist. Dabei ist die Anordnung so getroffen, daß die Laufschienen 24 sich über die erste Sektion 11 und die zweite Sektion 12 bis hin zu deren vorderen, durch das Tragstützenpaar 17 definierten Ende erstrecken.In the Fig. 1 in its entirety shown device 10 consists essentially of a three sections 11, 12, 13 extending support structure 14 of steel profiles, which is supported by means of paired support posts 15, 16, 17 on the track bed 18. The entire device is located above a to be built old track 19, which towers over them like a portal. The first, positioned at the track end and thus rear section 11 (left in Fig. 1 ) defines a track removal field from which the track end 20 defining the track end is dug out of the track bed 18, as shown in FIG Fig. 1 at 21 is recognizable. For this purpose, a lifting device 22 in the form of four connectable to the track panel 20 chain hoists is provided on the support structure, which by means of a transport device 23 along the positioned above the old track support structure 14 on rails 24 is movable. In this case, the arrangement is such that the rails 24 extend over the first section 11 and the second section 12 up to the front, defined by the support post pair 17 end.

Die zweite Sektion 12 der Vorrichtung 10 bildet eine Verladestation für die in der ersten Sektion ausgehobenen Gleisfelder 20. Hierzu ist sie von auf dem Altgleis 19 verfahrbaren Transportwaggons 25 unterfahrbar, wobei die Länge der zweiten Sektion 12 so bemessen ist, daß darin zwei Waggons vollständig Platz finden. Ein mittels der Hebeeinrichtung 22 aus dem Gleisbett 18 ausgehobenes Gleisfeld wird soweit angehoben, daß sich seine Unterseite oberhalb der stirnseitigen Wände 26 der Transportwaggons 25 befindet und entlang der Laufschienen aus der ersten Sektion 11 in die zweite Sektion 12 transportiert und dort oberhalb des ersten Transportwaggons a positioniert, woraufhin die Hebeeinrichtung 22 das Gleisfeld absenkt und hierdurch auf dem ersten Transportwaggon 25a ablegt. Es ist möglich, auf diese Weise beide in der zweiten Sektion positionierte Transportwaggons mit kompletten Gleisfeldern bis zur maximalen Beladehöhe bzw. Transportkapazität zu beladen; vorzugsweise jedoch werden die zunächst komplett auf dem ersten Transportwaggon 25 abgelegten Gleisfelder in ihre Einzelteile (Schienen und Schwellen) zerlegt und die Schienen dann mittels der Hebe- und Transporteinrichtung 22, 23 dem zweiten Transportwaggon übergeben, während die Schwellen auf dem ersten Transportwaggon verbleiben.The second section 12 of the device 10 forms a loading station for the excavated in the first section track fields 20. For this purpose it is traversable by movable on the old track 19 transport wagons 25, wherein the length of the second section 12 is dimensioned so that two wagons completely space Find. An excavated by means of the lifting device 22 from the track bed 18 track area is raised so far that its underside above the frontal walls 26 of the transport cars 25 and transported along the rails from the first section 11 in the second section 12 and there above the first transport wagon a positioned, whereupon the lifting device 22 lowers the track field and thereby deposits on the first transport carriage 25a. It is possible in this way to load both transport wagons positioned in the second section with complete track fields up to the maximum loading height or transport capacity; Preferably, however, the first laid completely on the first transport car 25 track fields are broken down into their individual parts (rails and sleepers) and then passed the rails by means of the lifting and transporting device 22, 23 the second transport wagon, while the sleepers remain on the first transport wagon.

Oberhalb der Transporteinrichtung ist zwischen den Laufschienen ein Endlosförderer 27 mit umlaufendem Transportband angeordnet, der sich im wesentlichen von einer am hinteren (in Fig. 1 linken) Ende 28 der ersten Sektion 11 angeordneten Aufgabeschütte 29 bis zu einer in der dritten Sektion 13 angeordneten Schotteraufgabestation 30 erstreckt. Der Aufgabeschütte 29 ist eine Schotterausbauvorrichtung in Form eines Schrämbaggers 31 zugeordnet, mit dessen Hilfe unmittelbar nachfolgend zu einem Gleisfeld auch der Gleisschotter und/oder der Gleisunterbau ausgekoffert und über die Aufgabeschütte dem Förderer 27 übergeben wird. Das derart ausgebaute Material wird von dem Förderer 27 über die erste Sektion 11 und die zweite Sektion 12 hinweg bis zur Schotteraufgabestation 30 in der dritten Sektion 13 transportiert, wo es in darunter angeordnete, mittels einer Rangierlok (nicht dargestellt) verfahrbare Transportwaggons 32 fällt. Durch vor- und Zurückrangieren der Transportwaggons 32 wird dabei deren gleichmäßige Befüllung gewährleistet.Above the transport device, an endless conveyor 27 is arranged with circulating conveyor belt between the rails, which is essentially from one at the rear (in Fig. 1 left) end 28 of the first section 11 arranged feed chute 29 extends to a arranged in the third section 13 ballast loading station 30. The feed chute 29 is associated with a ballast excavating device in the form of a Schrämbaggers 31, with the aid of which immediately following a track field and the track ballast and / or the track substructure ausgekoffert and handed over the Aufgabeschütte the conveyor 27. The thus-constructed material is transmitted from the conveyor 27 through the first section 11 and the second section 12 transported to the ballast loading station 30 in the third section 13, where it falls into below, by means of a shunting locomotive (not shown) movable transport cars 32 falls. By advancing and zurückrangieren the transport cars 32 while their uniform filling is guaranteed.

Sobald alle in der ersten Sektion 11 befindlichen Gleisfelder aus ihrem Gleisbett 18 ausgebaut und mittels der Hebe- und Transporteinrichtung 22, 23 in die zweite Sektion überführt und dort auf den Transportwaggons 25a, b abgelegt wurden, wird die gesamte Vorrichtung 10 um die Länge eines von der ersten Sektion definierten Gleisabtragungsfelds in Richtung des noch bestehenden Altgleises, in Fig. 1 also nach rechts verfahren, um dann den oder die nächsten, endseitigen Gleisfelder in entsprechender Weise auszubauen. Zum Verfahren der Vorrichtung sind die Tragstützenpaare 16 mit einem eigenen (nicht dargestellten) hydraulischen Fahrantrieb versehen, der im wesentlichen aus ausfahrbaren Hydraulikzylindern besteht, die einerseits an den Tragstützen 16 angelenkt sind und sich andererseits gegen die Schwellen des noch verlegten Altgleises abstützen können. Man erkennt insbesondere aus Fig. 2, daß die Tragstützen zum Zwecke der leichteren Verfahrbarkeit sich mit einem Fahrwerk 33 auf den Schienen 34 des Altgleises abstützen, wobei das vordere, also die zweite Sektion 12 begrenzende Tragstützenpaar 16a mit einem in Höhe der Puffer 34 der Transportwaggons 25 angeordneten Querriegel 35 versehen ist, der sich bei dem Verfahr- oder Rückvorgang der Vorrichtung gegen die rückwärtigen Puffer des ersten Transportwaggons 25 anlegt und somit beide in der zweiten Sektion 12 befindliche Transportwaggons 25 mitnimmt, diese also im selben Maß wie die Vorrichtung verschoben werden.Once all located in the first section 11 track fields are removed from their track bed 18 and transferred by means of the lifting and transporting device 22, 23 in the second section and stored there on the transport cars 25 a, b, the entire device 10 by the length of one of the first section defined track deduction field in the direction of the existing old track, in Fig. 1 So move to the right, and then expand the next or end, end track fields in a similar manner. To move the device, the support pillar pairs 16 are provided with their own (not shown) hydraulic drive, which consists essentially of extendable hydraulic cylinders, which are articulated on the one hand to the support posts 16 and on the other hand can be supported against the thresholds of the still laid old track. One recognizes in particular Fig. 2 in that, for the purpose of easier movement, the supporting columns are supported on the rails 34 of the old track by a chassis 33, the front pair of support posts 16a delimiting the second section 12 being provided with a transverse bar 35 arranged at the level of the buffers 34 of the transport cars 25, which is applied in the movement or return operation of the device against the rear buffer of the first transport car 25 and thus entrains both located in the second section 12 transport cars 25, so these are moved to the same extent as the device.

Wendet man sich nunmehr den Fig. 3 und 4 zu, erkennt man, daß auch die vorderen Tragstützen 17 mit Fahrwerken 36 versehen sind, mit denen sie sich auf den Schienen des Altgleises abstützen können. Allerdings sind die vorderen, zwischen der zweiten Sektion 12 und der dritten Sektion 13 angeordneten Tragstützen 17 ohne Mitnehmerriegel für die beiden anderen Transportwaggons 32 im Bereich der dritten Sektion ausgestaltet; es wird hier bevorzugt, die Transportwaggons für den Abtransport des Schotters od.dgl. mit Hilfe der nicht dargestellten Rangierlok neu zu positionieren, wenn die Vorrichtung gerückt wird. Die Vermeidung eines Transportanschlags für die beiden Transportwaggons 32 ist nicht zuletzt dadurch begründet, daß die vorderen Tragstützen 17 mittels einer Schwenkeinrichtung 37 an der Trägerkonstruktion 14 angelenkt sind, mit der sie aus ihrer sich an den Schienen abstützenden Stützstellung (Fig. 3) in eine Durchlaßstellung (Fig. 4) bringen lassen, die es erlaubt, die beladenen Transportwaggons 25a, b beispielsweise nach deren Ankoppeln an die vorderen Transportwaggons 32 gemeinsam mit diesem unter der Tragkonstruktion herauszuziehen und unbeladene Transportwaggons in der zweiten Sektion neu zu positionieren, um die nächsten Gleisfelder aufzunehmen. In der in Fig. 4 dargestellten Durchlaßstellung stützen sich die Tragstützen 17 also vorübergehend nicht auf den Schienen ab, sondern mit seitlich auskragend angeordneten Stützschuhen 39 auf den Oberseiten von Gleisschwellen, womit das Gesamtgewicht der Trägerkonstruktion einschließlich etwa noch auf dem Förderer 27 befindlichen Abraummaterials sicher abgetragen wird.Turning now to the Fig. 3 and 4 To, it can be seen that the front support posts 17 are provided with trolleys 36, with which they can be supported on the rails of the old track. However, the front, arranged between the second section 12 and the third section 13 support posts 17 are designed without driving catch for the other two transport cars 32 in the region of the third section; it is preferred here, the transport cars for the removal of the ballast or the like. reposition using the shunting jack, not shown, when the device is moved. The avoidance of a transport stop for the two transport wagons 32 is not least due to the fact that the front support posts 17 are articulated by means of a pivoting device 37 to the support structure 14, with which they from their support on the rails support position ( Fig. 3 ) in a passage position ( Fig. 4 ), which allows to load the loaded transport cars 25a, b, for example, after coupling them to the front transport wagons 32 together with this under the supporting structure and to reposition unloaded transport wagons in the second section to receive the next track fields. In the in Fig. 4 illustrated transmission position, the support posts 17 are therefore not temporarily based on the rails, but with laterally projecting support shoes 39 on the tops of track sleepers, whereby the total weight of the support structure including about still on the conveyor 27 located waste material is safely removed.

Anders als die im Bereich der zweiten und dritten Sektion angeordneten Tragstützen 16, 17 können sich die hinteren Tragstützen am Endbereich 28 der ersten Sektion nicht auf den Schienen des dort schon ausbauten Altgleises abstützen. Diese Tragstützen 15 sind daher mit Schlittenfüßen 38 oder beispielsweise einem Raupenfahrwerk versehen, mit denen sie sich unmittelbar auf dem Gleisschotter abstützen können. Die Schlittenfüße bzw. das Raupenfahrwerk sind unten an den Tragstützen 15 gelenkig angeschlossen und können sich somit an Unebenheiten im Gleisschotter anpassen. Zur Höheneinstellung der Trägerkonstruktion bzw. um deren möglichst gleichmäßige Höhe über die gesamte Länge zu erhalten, sind alle Tragstützen höhenverstellbar ausgebildet und hierzu mit Hydraulikzylindern versehen, mit denen sie ein- und ausgefahren werden können.Unlike the support posts 16, 17 arranged in the area of the second and third sections, the rear support posts on the end section 28 of the first section can not be supported on the rails of the old track that has already been removed there. These support posts 15 are therefore provided with carriage feet 38 or, for example, a crawler track, with which they can be supported directly on the track ballast. The carriage feet or the crawler undercarriage are hingedly connected at the bottom to the support posts 15 and can thus adapt to unevenness in the track ballast. To adjust the height of the support structure or to obtain their uniform height as possible over the entire length, all support posts are designed to be height adjustable and this provided with hydraulic cylinders, with which they can be extended and retracted.

Die Erfindung ist nicht auf das dargestellte und beschriebene Ausführungsbeispiel beschränkt, sondern es sind verschiedene Änderungen und Ergänzungen bei der Vorrichtung und auch im Verfahrensablauf möglich, ohne den durch die Ansprüche definierten Rahmen der Erfindung zu verlassen. Die erfindungsgemäße Vorrichtung kann insbesondere nicht nur für den Ausbau eines Gleises, sondern auch zum Verlegen eines Neugleises eingesetzt werden, wobei die beschriebenen Verfahrensabläufe dann im Wesentlichen in umgekehrter Reihenfolge durchgeführt werden. Mit der Erfindung wird in besonders vorteilhafter Weise erreicht, daß sowohl der aus Schienen und Schwellen bestehende Gleisoberbau in Form von Gleisfeldern oder Gleisstößen als auch im wesentlichen gleichzeitig Gleisschotter und Unterbau ausgebaut werden können und die ausgebauten Stoffe getrennt auf Transportwaggons (Regelgüterwagen) verladen werden können, und zwar ohne Nutzung eines Nachbargleises allein unter Verwendung des auszubauenden Altgleises.The invention is not limited to the illustrated and described embodiment, but there are various changes and additions to the device and in the process flow possible without departing from the scope of the invention defined by the claims. The inventive Device can be used in particular not only for the expansion of a track, but also for laying a new track, wherein the described procedures are then performed in substantially the reverse order. With the invention is achieved in a particularly advantageous manner that both consisting of rails and sleepers track superstructure in the form of track fields or track lengths as well as substantially simultaneously track ballast and substructure can be removed and the removed substances can be loaded separately on transport wagons (regular freight cars), without the use of a neighboring track alone using the old track to be removed.

Claims (24)

  1. Device for excavating a track composed of track fields or track sections for rail vehicles, essentially consisting of a carrying structure (14) divided into at least two sections (11, 12) that can be arranged above the track to be excavated, which structure can be supported at the track bed (18) by means of carrying supports (15, 16, 17), with a first lifting device (22) for a track field (20) assigned to the first rear section (11) that can be positioned at the track end, a transport device (23) displaceable between the two sections (11, 12) and a loading station arranged at the front second section (12), wherein the carrying structure (14) can be under-bridged by a rail vehicle (25) that can be displaced on the track (19) at least in the region of the second section (12).
  2. Device according to claim 1, characterised in that the carrying structure (14) has a third section (13) connected to the second section, with a ballast infeed station (30) and that a ballast excavation device (29, 31) is provided subsequently to the first section (11), which device is connected to the ballast infeed station (30) via a conveyor (27) proceeding above the transport device (23) for the track fields (20).
  3. Device according to claim 1 or 2, characterised in that the carrying supports (15, 16, 17) are height adjustable.
  4. Device according to one of claims 1 to 3, characterised in that the carrying supports (15, 16, 17) are respectively arranged in pairs and are supported at the right and left side of the track (19).
  5. Device according to one of claims 1 to 4, characterised in that at least part of the carrying supports (15) is provided with a slide base (38) or a crawler chassis, above which they are supported at the underlying bed, particularly at track ballast.
  6. Device according to one of claims 1 to 5, characterised in that is can be displaced along the track (19) to be excavated.
  7. Device according to claim 6, characterised in that at least a part of the carrying supports (16) is provided with preferably hydraulic traction drives.
  8. Device according to one of claims 1 to 7, characterised in that at least part of the carrying supports (17) arranged in the second and/or third section (12, 13) can be supported on the rails of the track (19) and arearticulated at the carrying structure (14) by means of a pivot device (37), with which they can be brought from their support position supported at the rails into a passage position lying laterally next to a rail vehicle (25) crossing below the carrying structure (14).
  9. Device according to one of claims 1 to 8, characterised in that the sections (11, 12, 13) of the of the carrying structure (14) are connected amongst each other in an articulated manner.
  10. Device according to one of claims 1 to 9, characterised in that the transport device (23) is provided with several, preferably four hoists forming the lifting device (22), particularly chain hoists.
  11. Device according to claim 10, characterised in that the hoists can be actuated individually or in groups.
  12. Device according to one of claims 1 to 11, characterised in that the transport device (23) can be displaced along at least one guide rail (24) arranged at the carrying structure (14), bridging the first and second section (11, 12).
  13. Device according to one of claims 2 to 12, characterised in that the conveyor (27) is an endless conveyor, for example a chain scraper conveyor, a belt conveyor or the like.
  14. Device according to one of claims 1 to 12, characterised in that the second section (12) is dimensioned for receiving at least one transport wagon (25) for track fields (20) or the individual parts forming these between their front and rear end respectively defined by carrying supports (16, 17).
  15. Device according to one of claims 2 to 14, characterised in that the third section (13) is defined for receiving at least one transport wagon (32) for ballast excavation or the like between its rear and front end respectively defined by carrying supports (17).
  16. Device according to claim 14 or 15, characterised in that at least one transport wagon (25) can be coupled to the device and can be displaced together therewith.
  17. Device according to claim 16, characterised in that the transport wagon(s) (25) arranged in the second section (12) can be coupled to the device and displaced therewith.
  18. Device according to one of claims 1 to 16, characterised in that at least one transport wagon (32) can be moved relative to the device (10) along the track.
  19. Device according to one of claims 1 to 18, characterised by a lateral cladding provided at least on one side.
  20. Device according to one of claims 1 to 19, characterised in that it can be controlled remotely.
  21. Method for excavating a track formed of track joints, particularly laid in the ballast substructure, wherein a carrying structure (14) consisting of at least two sections (11, 12) is arranged and supported by means of carrying supports (15, 16, 17) above the track (19) to be excavated (19) in such a manner that it can be under-bridged by at least one rail vehicle that can be displaced on the track (19), particularly a transport wagon (25) in the region of the second section (12), wherein a track field (20) in the rear section (11) is lifted from the track bed (18) by means of a lifting device (22) arranged at the carrying structure (14) and is brought to a loading station arranged at the second front section (12) by means of a transport device (23) displaeable along the carrying structure (14) and is loaded onto a rail vehicle arranged there.
  22. Method according to claim 21, characterised in that the track bed (18) consisting of ballast, solidified track foundation or the like is excavated by means of a ballast excavation device (31) subsequent to the excavation of a track field (20) and that the excavated material is transported to a ballast infeed station (30) arranged in front of the second front section (12) by means of a conveyor (27) arranged at the carrying structure (14) and is transferred there to a transport wagon (32) displaceable on the on the track (19).
  23. Method according to claim 21 or 22, characterised in that the carrying structure (14) is displaced along the track (19) to be excavated and supported again after the excavation of one or several track joints (20).
  24. Method according to one of claims 21 to 23, characterised in that the carrying structure (14) is displaced along the track (19) by means of an inherent displacement drive and that a rail vehicle (25) arranged in the front section (12) is coupled to the acrrying structure (14) and is displaced together therewith along the track by means of the displacement drive.
EP07007758A 2006-07-20 2007-04-17 Device and method for extending a track composed of track fields or track sections Not-in-force EP1881110B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102006034072A DE102006034072A1 (en) 2006-07-20 2006-07-20 Device and method for the development of a track formed from track fields or track yokes

Publications (3)

Publication Number Publication Date
EP1881110A2 EP1881110A2 (en) 2008-01-23
EP1881110A3 EP1881110A3 (en) 2008-10-15
EP1881110B1 true EP1881110B1 (en) 2012-03-21

Family

ID=38654747

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07007758A Not-in-force EP1881110B1 (en) 2006-07-20 2007-04-17 Device and method for extending a track composed of track fields or track sections

Country Status (3)

Country Link
EP (1) EP1881110B1 (en)
AT (1) ATE550493T1 (en)
DE (1) DE102006034072A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH708506B1 (en) * 2013-09-05 2017-11-30 Matisa Matériel Ind Sa Vehicle association and method of renewing a track.
CN117144734B (en) * 2023-08-25 2024-03-19 成都工投装备有限公司 Semi-automatic track assembly device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ATE51912T1 (en) * 1987-01-29 1990-04-15 Plasser Bahnbaumasch Franz SYSTEM FOR RECEIVING OR LAYING AND TRANSPORTING TRACK PANELS.
US5778795A (en) * 1995-07-31 1998-07-14 Gobarail (Pty) Limited Railway truck assembly for truck maintainence

Also Published As

Publication number Publication date
ATE550493T1 (en) 2012-04-15
EP1881110A3 (en) 2008-10-15
EP1881110A2 (en) 2008-01-23
DE102006034072A1 (en) 2008-01-24

Similar Documents

Publication Publication Date Title
DE2928152C2 (en) Mobile device for picking up and / or laying track switches or crossings
DE2550391C2 (en) Method for removing bedding material from ballast bedding
DE2023931C2 (en) Track renewal train for continuously changing sleepers and / or rails on a track
DE2720064C2 (en) Mobile device for continuously changing the sleepers of a track
EP0621371B1 (en) Railway track renewing or laying machine
DE2754811C2 (en) Mobile device for laying sleepers
CH639717A5 (en) DEVICE FOR CONTINUOUSLY DISMANTLING OR REPLACING THE RAILS AND SILLS OF A TRACK.
AT400341B (en) THRESHOLDING MACHINE
DE2818514C2 (en)
DD284068A5 (en) UM
DE3430002C2 (en)
DD256890A5 (en) APPENDIX FOR RECORDING OR LOCATING, AND TRANSPORTING GLEISJOCHEN
DE3706563C2 (en) Mobile system for picking up or laying and transporting track yokes
EP0348585B1 (en) Arrangement of machines moving along a track for laying or removing sleepers
DE2313055A1 (en) METHOD AND DEVICE FOR REMOVING AND INSTALLING GLEISJOCHEN
AT403708B (en) TRACK CONSTRUCTION MACHINE
EP1881110B1 (en) Device and method for extending a track composed of track fields or track sections
DD148360A5 (en) SELF-DRIVEN BEDDING CLEANING MACHINE WITH LIFTING DEVICE
DE3511520A1 (en) RAIL CARRIAGE FOR REPLACEMENT OR LAYING OR DISMANTLING AND TRANSPORTING TRACK YOCKS
DE4339833C2 (en) Construction machine for the new construction, expansion or dismantling of paved traffic routes
EP1081293A2 (en) Rail-road excavator
DE3419240A1 (en) Track-construction machine for laying and dismantling mounted track sections or track connections
DE2714050A1 (en) Railway track ballast cleaning machine - incorporates conveyor belt on pivot axle, discharge chute with sieve and front carriage
DE2817635C2 (en)
DE3122892C2 (en)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

17P Request for examination filed

Effective date: 20081112

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 550493

Country of ref document: AT

Kind code of ref document: T

Effective date: 20120415

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502007009503

Country of ref document: DE

Effective date: 20120516

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: ZIMMERLI, WAGNER & PARTNER AG

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20120321

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20120423

Year of fee payment: 6

Ref country code: DE

Payment date: 20120423

Year of fee payment: 6

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20120321

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

BERE Be: lapsed

Owner name: RTE TECHNOLOGIE GMBH

Effective date: 20120430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120721

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120723

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120430

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120417

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120430

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20130104

26N No opposition filed

Effective date: 20130102

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20120621

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120521

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20120426

Year of fee payment: 6

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502007009503

Country of ref document: DE

Effective date: 20130102

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120702

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120621

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120621

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 550493

Country of ref document: AT

Kind code of ref document: T

Effective date: 20130430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130430

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130430

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130430

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20131101

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 502007009503

Country of ref document: DE

Effective date: 20131101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120321

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070417