EP0713956A1 - Procédé et dispositif pour le revêtement d'un tunnel avec béton coulé sur place - Google Patents
Procédé et dispositif pour le revêtement d'un tunnel avec béton coulé sur place Download PDFInfo
- Publication number
- EP0713956A1 EP0713956A1 EP95402627A EP95402627A EP0713956A1 EP 0713956 A1 EP0713956 A1 EP 0713956A1 EP 95402627 A EP95402627 A EP 95402627A EP 95402627 A EP95402627 A EP 95402627A EP 0713956 A1 EP0713956 A1 EP 0713956A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- concrete
- formwork
- wall
- length
- profile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 65
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000011065 in-situ storage Methods 0.000 title 1
- 238000009415 formwork Methods 0.000 claims description 60
- 238000005507 spraying Methods 0.000 claims description 17
- 239000011378 shotcrete Substances 0.000 claims description 15
- 238000000576 coating method Methods 0.000 claims description 11
- 238000006073 displacement reaction Methods 0.000 claims description 10
- 238000004519 manufacturing process Methods 0.000 claims description 10
- 239000011248 coating agent Substances 0.000 claims description 8
- 238000005253 cladding Methods 0.000 claims description 5
- 239000000654 additive Substances 0.000 claims description 2
- 239000000126 substance Substances 0.000 claims description 2
- 238000005086 pumping Methods 0.000 claims 1
- 238000010408 sweeping Methods 0.000 claims 1
- 230000001360 synchronised effect Effects 0.000 claims 1
- 238000009416 shuttering Methods 0.000 abstract 5
- 238000002347 injection Methods 0.000 abstract 1
- 239000007924 injection Substances 0.000 abstract 1
- 238000009412 basement excavation Methods 0.000 description 4
- 239000000428 dust Substances 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 238000009499 grossing Methods 0.000 description 1
- 231100001231 less toxic Toxicity 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000001050 lubricating effect Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 235000019645 odor Nutrition 0.000 description 1
- 230000001739 rebound effect Effects 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 231100000331 toxic Toxicity 0.000 description 1
- 230000002588 toxic effect Effects 0.000 description 1
- 239000003440 toxic substance Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/04—Devices for both conveying and distributing
- E04G21/0418—Devices for both conveying and distributing with distribution hose
- E04G21/0472—Details of connection of the hose to the formwork, e.g. inlets
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
Definitions
- the present invention relates to a method for producing a concrete wall or wall cladding and, more particularly but not exclusively, to a method for producing a concrete cladding in an underground structure, as well as to an apparatus designed for the implementation of this process.
- the concrete coverings of underground structures such as tunnels are generally made of vibrated concrete poured inside wooden or metal formwork.
- Such a coating operation is fairly simple to carry out, but it turns out to be laborious because of the slowness of the stuffing operations of the masks and the time necessary for the hardening of the concrete which, for certain types of concrete, is at least 24 hours. . Because of this drawback, it is common in tunnels of large cross-section to use elaborate formwork of great length. However, such formwork is then expensive without being able to be quickly amortized.
- the object of the present invention is to remedy the above-mentioned drawbacks of known methods, and for this purpose it proposes a method for producing a wall or a wall covering in concrete, and in particular a concrete covering. of an underground structure, as well as an apparatus designed for the implementation of this process, which while being very simple and very effective, turn out to be inexpensive, and harmless for the staff.
- the method for producing a concrete wall or wall covering consists in placing a movable formwork opposite a bearing part for the wall or the wall covering, in introducing concrete inside the space provided between said support part and the formwork, then at move the said formwork in the direction of the length of the said support part by a distance substantially equal to the length of the previously concreted area, to carry out a new introduction of concrete, and to repeat this succession of operations until for producing the complete wall or the complete wall covering, and it is characterized in that, inside the space between the support part and the formwork, a quick setting concrete is sprayed, and in that the said displacement of the formwork takes place as soon as the sprayed concrete sets.
- quick setting concrete concrete with a setting time of a few minutes or fractions of a minute.
- the application of the method according to the invention to the production of a concrete wall or of a concrete wall covering in an underground structure is characterized in that the movable formwork is placed opposite a transverse portion of the length of the wall of the structure to be coated and has a profile corresponding to that of this transverse portion, in that the projection of quick-setting concrete takes place in the annular space formed between the formwork and said transverse portion of the length of the wall or between the formwork and the ground, and in that the displacement of the formwork after setting of the sprayed concrete takes place over a distance equal to the length of said transverse zone.
- the apparatus for implementing the method according to the invention for coating an underground structure comprises a short formwork, mounted on a carriage movable in the direction of the longitudinal axis of the wall, the profile of the said formwork corresponding to the transverse profile of the wall to be coated, means for controlling the movement of the carriage, a rapid-setting robotic concrete spraying means associated with concrete and chemical admixture supply means, and control and guiding members selectively ensuring the movement of said mobile spraying means inside the annular chamber following the profile thereof, and a remote control cabin of the apparatus.
- Said concrete projection means advantageously constituted by a lance, is robotized.
- Appropriate control devices are provided to allow the correct continuity and compactness of filling to be checked.
- a video camera makes it possible to control the good adequacy of the speed of displacement of the lance with the flow of shotcrete, in order to order a possible correction.
- a cockpit can thus be kept at a distance, the occupant of which is protected from dust and toxic odors prevailing in the immediate vicinity of the formwork.
- the structure of the formwork according to the invention is articulated and controlled by screw jacks so as to allow an adjustment of the geometry of its facing so that, by retraction, it can slightly separate it from the fresh concrete before moving the formwork .
- the wall of a tunnel is shown at 1, the interior covering of which is desired, and at 2 the raft which has been made.
- a carriage On rails 3 fixed to the raft 2 and oriented along the longitudinal axis of the tunnel, can move, by means of bogies 4, a carriage generally designated at 5.
- the carriage 5 made up of a reticulated metal structure, has the shape of a gantry and is designed so as to axially provide a passage as large as possible for men and / or equipment.
- This carriage 5 carries a formwork 6 of curved shape with a smooth outer surface, having at least two articulations 7 which allow its shape to be adjusted.
- Hydraulic cylinders 8, 9 acting between the chassis of the carriage 5 and the formwork 6 allow fine adjustment, in lateral direction and in height, of the position of the formwork.
- a concrete spray nozzle 10 with its accessories (not shown in the drawing) for supplying compressed air, concrete and various additives, is integral with an assembly comprising a hydraulic motor II and a toothed wheel 12 rotated by this motor.
- the toothed wheel 12 is subject to a rack 13 fixed to the inner face of the formwork 6 so that, during the operation of the engine 11, the wheel 12 describes the rack 13 by moving the nozzle 10 for spraying concrete following the contour of the annular space 14 formed between the wall 1 and the formwork 6.
- the main direction of filling of the annular space is parallel to the axis of the structure, and the nozzle 10 is introduced more or less deeply into the annular space 14.
- the operation of the motor 11 and the supply of the nozzle 10 are then controlled so that the latter continuously describes the profile of the space 14 by spraying therewith quick setting concrete.
- the operator controls the stopping of the supply and the displacement of the nozzle 10 then as soon as the concrete is set , that is to say after a few minutes, it controls the movement of the carriage 5 along the rails 3 of a length L equal to that of the pass made, then proceeds to a new projection operation of concrete.
- the formwork 6 is slightly retracted by means of the jacks 8, 9 so as to separate it from the fresh concrete, so as not to degrade the smoothing. or the compactness of the coating installed.
- the hydraulic registration of the formwork 6 is carried out automatically.
- Appropriate control devices carried by the device make it possible to check the correct continuity and compactness of the filling.
- a video camera (not shown) makes it possible to remotely control the adequacy between the speed of movement of the nozzle 10 and the flow of shotcrete, with a view to possible correction.
- the cockpit is advantageously kept at a distance and an additional direct control can be carried out by the operator before moving the truck.
- the movement of the carriage 5 is remotely controlled from the cockpit, which is closed, self-propelled and with high visibility.
- the first phase of the above-mentioned process producing a continuous thin hull in coffered sprayed concrete, can also be implemented to obtain, in uncoated tunnels, thin concrete hulls to protect vehicles from falling blocks stone or water inlets.
- a flat formwork 15 is kept vertical, and resting on the edges of the wall to be constructed, by the hydraulic arms 16 of a machine (not shown) such as a hydraulic shovel mounted on tracks.
- the front lateral end of the formwork 15 is equipped with an endless chain 17 on which is fixed the end of a lance 18 for spraying concrete.
- the nozzle 19 fitted to the end of the lance 18 is bent to enter the space 20 formed between the formwork 15 and the excavation wall.
- a slide 21 is fixed to the excavation wall, above the area of realization of the wall, and the formwork 15 is suspended from this slide 21 by an articulated console 22.
- the length of the slide 21 is a few meters and corresponds to the length of travel of the arms 16 for a fixed position of the hydraulic shovel.
- the displacement and guidance system of the projection nozzle has been described as consisting of a toothed wheel meshing with a rack integral with the formwork, but that this displacement and guidance system could have any equivalent structure . It could for example include a carriage carrying the projection nozzle and moving along the profile of the formwork by means of a double cable with end winding winch. It will also be understood that the carriage 5 has been described as moving on rails via bogies, but that any equivalent means could be used. Thus, if the raft has not been previously made, provision can be made to move the carriage 5 from an overhead crane on a cable or a suspended rail.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR9414079A FR2727465A1 (fr) | 1994-11-24 | 1994-11-24 | Procede pour la realisation d'une paroi ou d'un revetement de paroi en beton, et appareillage pour la mise-en-oeuvre de ce procede |
FR9414079 | 1994-11-24 |
Publications (1)
Publication Number | Publication Date |
---|---|
EP0713956A1 true EP0713956A1 (fr) | 1996-05-29 |
Family
ID=9469107
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP95402627A Withdrawn EP0713956A1 (fr) | 1994-11-24 | 1995-11-22 | Procédé et dispositif pour le revêtement d'un tunnel avec béton coulé sur place |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0713956A1 (enrdf_load_stackoverflow) |
FR (1) | FR2727465A1 (enrdf_load_stackoverflow) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002016736A1 (de) * | 2000-08-21 | 2002-02-28 | Tachus Gmbh | Verfahren und maschine für den tunnelbau, schalelement und schalsystem |
CN108202390A (zh) * | 2017-12-07 | 2018-06-26 | 海隆管道工程技术服务有限公司 | 海底用混凝土配重管的加工设备及工艺 |
CN109281320A (zh) * | 2018-11-28 | 2019-01-29 | 中建隧道建设有限公司 | 用于基坑侧墙找平层施工的喷射混凝土滑膜施工装置及方法 |
CN109538250A (zh) * | 2019-01-28 | 2019-03-29 | 中南大学 | 用于隧道初支带模喷射混凝土快速施工的装置及方法 |
CN111173535A (zh) * | 2019-12-10 | 2020-05-19 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种混凝土喷浆机组 |
CN111219197A (zh) * | 2018-11-26 | 2020-06-02 | 蓝传雯 | 一种模喷设备及模喷工艺 |
CN115288743A (zh) * | 2022-08-18 | 2022-11-04 | 中铁一局集团有限公司 | 一种隧道封闭式智能汽养台车 |
GB2617615A (en) * | 2022-04-14 | 2023-10-18 | Colin Eddie Consulting Ltd | Tunnel lining method and apparatus |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3022562A (en) * | 1960-04-07 | 1962-02-27 | C S Card Iron Works Co | Tunnel form |
FR2075730A5 (enrdf_load_stackoverflow) * | 1970-01-19 | 1971-10-08 | G P | |
US3877855A (en) * | 1973-05-04 | 1975-04-15 | Raymond A Hanson | Slipform with longitudinally movable form sections |
FR2391353A1 (fr) * | 1977-05-17 | 1978-12-15 | Magyar Szenbanyaszati Troeszt | Procede et appareil de soutenement d'une consolidation par paroi de revetement de systemes de cavites souterraines |
GB2008656A (en) * | 1977-11-25 | 1979-06-06 | Schwing Gmbh F | Apparatus for distributting concrete especially in the shuttering of gallery linings in mine and tunnel workings |
DE3137170C1 (de) * | 1981-09-18 | 1983-04-07 | Bilfinger + Berger Bauaktiengesellschaft, 6800 Mannheim | Vorrichtung zum Auftragen von Spritzgut zur Sicherung und Auskleidung von Ausbruchsflächen im untertägigen Hohlraumbau |
US4769192A (en) * | 1987-03-27 | 1988-09-06 | Blaw Knox Corporation | Pulsating slip form apparatus and method |
DE3737472A1 (de) * | 1987-11-05 | 1989-05-18 | Kloeckner Becorit Ind | Hinterfuelleinrichtung fuer streckenausbaumaschinen |
US4917538A (en) * | 1988-04-26 | 1990-04-17 | Shigetoshi Koga | Tunnel lining process and apparatus therefor |
FR2691204A1 (fr) * | 1992-05-13 | 1993-11-19 | Al Cant Coffrages | Dispositif de coffrage pour la réalisation d'une paroi en béton notamment d'un tunnel. |
EP0624713A2 (de) * | 1993-05-13 | 1994-11-17 | Philipp Holzmann AG | Rollschalung |
-
1994
- 1994-11-24 FR FR9414079A patent/FR2727465A1/fr active Granted
-
1995
- 1995-11-22 EP EP95402627A patent/EP0713956A1/fr not_active Withdrawn
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3022562A (en) * | 1960-04-07 | 1962-02-27 | C S Card Iron Works Co | Tunnel form |
FR2075730A5 (enrdf_load_stackoverflow) * | 1970-01-19 | 1971-10-08 | G P | |
US3877855A (en) * | 1973-05-04 | 1975-04-15 | Raymond A Hanson | Slipform with longitudinally movable form sections |
FR2391353A1 (fr) * | 1977-05-17 | 1978-12-15 | Magyar Szenbanyaszati Troeszt | Procede et appareil de soutenement d'une consolidation par paroi de revetement de systemes de cavites souterraines |
GB2008656A (en) * | 1977-11-25 | 1979-06-06 | Schwing Gmbh F | Apparatus for distributting concrete especially in the shuttering of gallery linings in mine and tunnel workings |
DE3137170C1 (de) * | 1981-09-18 | 1983-04-07 | Bilfinger + Berger Bauaktiengesellschaft, 6800 Mannheim | Vorrichtung zum Auftragen von Spritzgut zur Sicherung und Auskleidung von Ausbruchsflächen im untertägigen Hohlraumbau |
US4769192A (en) * | 1987-03-27 | 1988-09-06 | Blaw Knox Corporation | Pulsating slip form apparatus and method |
DE3737472A1 (de) * | 1987-11-05 | 1989-05-18 | Kloeckner Becorit Ind | Hinterfuelleinrichtung fuer streckenausbaumaschinen |
US4917538A (en) * | 1988-04-26 | 1990-04-17 | Shigetoshi Koga | Tunnel lining process and apparatus therefor |
FR2691204A1 (fr) * | 1992-05-13 | 1993-11-19 | Al Cant Coffrages | Dispositif de coffrage pour la réalisation d'une paroi en béton notamment d'un tunnel. |
EP0624713A2 (de) * | 1993-05-13 | 1994-11-17 | Philipp Holzmann AG | Rollschalung |
Non-Patent Citations (1)
Title |
---|
RUDOLF RIKER: "Neue Geräte im Tunnel -und Stollenbau", BMT BAUSMASCHINE+BAUTECHNNIK, vol. 34, no. 4, WIESBADEN-GERMANY, XP000561204 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002016736A1 (de) * | 2000-08-21 | 2002-02-28 | Tachus Gmbh | Verfahren und maschine für den tunnelbau, schalelement und schalsystem |
CN108202390A (zh) * | 2017-12-07 | 2018-06-26 | 海隆管道工程技术服务有限公司 | 海底用混凝土配重管的加工设备及工艺 |
CN111219197A (zh) * | 2018-11-26 | 2020-06-02 | 蓝传雯 | 一种模喷设备及模喷工艺 |
CN109281320A (zh) * | 2018-11-28 | 2019-01-29 | 中建隧道建设有限公司 | 用于基坑侧墙找平层施工的喷射混凝土滑膜施工装置及方法 |
CN109281320B (zh) * | 2018-11-28 | 2024-01-30 | 中建隧道建设有限公司 | 用于基坑侧墙找平层施工的喷射混凝土滑膜施工装置及方法 |
CN109538250A (zh) * | 2019-01-28 | 2019-03-29 | 中南大学 | 用于隧道初支带模喷射混凝土快速施工的装置及方法 |
CN109538250B (zh) * | 2019-01-28 | 2023-09-15 | 中南大学 | 用于隧道初支带模喷射混凝土快速施工的装置及方法 |
CN111173535A (zh) * | 2019-12-10 | 2020-05-19 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种混凝土喷浆机组 |
GB2617615A (en) * | 2022-04-14 | 2023-10-18 | Colin Eddie Consulting Ltd | Tunnel lining method and apparatus |
WO2023199056A1 (en) * | 2022-04-14 | 2023-10-19 | Colin Eddie Consulting Limited | Tunnel lining method and apparatus |
GB2617615B (en) * | 2022-04-14 | 2024-04-03 | Colin Eddie Consulting Ltd | Tunnel lining method and apparatus |
CN115288743A (zh) * | 2022-08-18 | 2022-11-04 | 中铁一局集团有限公司 | 一种隧道封闭式智能汽养台车 |
Also Published As
Publication number | Publication date |
---|---|
FR2727465A1 (fr) | 1996-05-31 |
FR2727465B1 (enrdf_load_stackoverflow) | 1997-02-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0006812B1 (fr) | Procédé pour la pose de conduites immergées et dispositif s'y rapportant | |
EP0713956A1 (fr) | Procédé et dispositif pour le revêtement d'un tunnel avec béton coulé sur place | |
JP4386798B2 (ja) | トンネル覆工コンクリートの養生方法および養生装置 | |
JPH0363399A (ja) | トンネル掘削方法および装置 | |
CN108952731B (zh) | 一种隧道的施工方法 | |
JPH0236755B2 (enrdf_load_stackoverflow) | ||
JP3907280B2 (ja) | 地雷処理方法および地雷処理装置 | |
US3691992A (en) | Apparatus for truing mortar coating | |
CN110424990B (zh) | 一种掘进灌注支护施工设备及方法 | |
JPH02204597A (ja) | トンネル掘進方法及びその装置 | |
JP4566890B2 (ja) | トンネル覆工コンクリート打設方法及び妻型枠装置 | |
JP4624243B2 (ja) | トンネル覆工コンクリート打設方法及び妻型枠装置 | |
JP4496473B2 (ja) | コンクリート吹付け装置 | |
JPH08338006A (ja) | トンネル内工事用桟橋 | |
JPH0925724A (ja) | コンクリート打設ホッパー | |
JP2589537B2 (ja) | トンネル覆工工法及びその装置 | |
JP4602597B2 (ja) | トンネル施工機 | |
JPS6245958B2 (enrdf_load_stackoverflow) | ||
SU1789711A1 (en) | Device for performance of concrete spraying | |
JPH07208081A (ja) | ライニング打設機 | |
JP2000303775A (ja) | 斜坑掘削機の発進装置 | |
JP2020122298A (ja) | トンネル覆工用型枠 | |
JPS6147278B2 (enrdf_load_stackoverflow) | ||
JPS6040718Y2 (ja) | トンネル用コンクリ−ト型枠装置におけるコンクリ−ト打設装置 | |
JP2002349197A (ja) | 吹付け方法および吹付け装置並びに吹付け条件の決定方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT CH DE ES GB IT LI |
|
17P | Request for examination filed |
Effective date: 19961126 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 19990601 |