EP0598457A1 - Method for providing a foundation pile in the ground without vibration, and apparatus for applying such method - Google Patents
Method for providing a foundation pile in the ground without vibration, and apparatus for applying such method Download PDFInfo
- Publication number
- EP0598457A1 EP0598457A1 EP93203222A EP93203222A EP0598457A1 EP 0598457 A1 EP0598457 A1 EP 0598457A1 EP 93203222 A EP93203222 A EP 93203222A EP 93203222 A EP93203222 A EP 93203222A EP 0598457 A1 EP0598457 A1 EP 0598457A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- drill tube
- pile base
- tube
- pile
- distance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/44—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/56—Screw piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/22—Placing by screwing down
Definitions
- the invention relates to a method for providing a foundation pile having a slender section and an enlarged pile base in the ground without vibration, which method comprises the steps of
- the bearing capacity of the foundation pile is determined to a significant extent by the ability of the enlarged pile base to transmit forces to the surrounding ground layer, which, however, has been disturbed by the drill tube and has consequently obtained a slight coherence. This slight coherence is insufficiently compensated by the pile base of swelling concrete. Consequently, a reduction factor must be applied to the theoretical bearing capacity of the enlarged pile base, which may for instance be approximately 0.7.
- the length of the pile base poured must be chosen to be greater than would be required for transmitting bearing capacity to the surrounding ground layer.
- a slender foundation pile must produce sufficient bearing capacity for the load to be applied to it. Typically, the transportation of such a slender foundation pile requires a separate transport reinforcement. Slender foundation piles further have the advantage that they can be used successfully in ground layers having negative adhesion.
- the object of the invention is to provide a method in which the bearing capacity of the enlarged pile base per unit of area is greater than the bearing capacity according to the method described hereinabove, so that the reduction factor need not be applied.
- the method according to the invention is characterized in that
- the closing element consists of a preformed, cylindrical displacement tip, forced further into the ground for a particular distance after reaching a bearing ground layer, the preformed displacement tip is surrounded by a ground layer that is not disturbed by the end of the drill tube, enabling transmission of a greater bearing capacity to the surrounding ground by the thus formed closing element.
- Dutch patent application 78.15059 describes a method in which the foundation pile, after having penetrated into a bearing ground layer for some distance, is forced further into the ground for a short distance by means of a hydraulic system acting on the top of the foundation pile.
- a force should be exerted on the foundation pile which is approximately three times the intended bearing capacity of the foundation pile, so that in particular the crushing strength of the foundation pile should be considerably greater than a foundation pile can provide.
- forcing the foundation pile into the ground for a short distance is intended to compact the ground surrounding the pile tip and hence to obtain a certain setting.
- the drill tube is unscrewed, the ground surrounding the pile tip is released again, so that a reduction factor should as yet be applied to the bearing capacity.
- only the closing element is driven further into the bearing ground layer with rotation, with the forces being exerted on the closing element rather than the end of the foundation pile.
- the axial force exerted is considerably less than the intended bearing capacity.
- the invention further relates to an apparatus for applying the method described hereinabove, which comprises a drill tube provided with helical windings on the outer surface thereof.
- this known apparatus is suitable for applying the method in that within the drill tube an inner tube is provided which is movable in axial direction for a limited distance and can be coupled to the drill tube in two pressure-transmitting positions.
- Fig. 1 shows the end of a drill tube 1, known per se, which drill tube 1 is provided with helical coils 13 on the outer surface thereof.
- the drill tube 1 is closed at the lower end by a prefabricated displacement tip or pile base 2 of concrete or steel, precisely projecting from the end of the drill tube 1 by the tip 3 thereof.
- the tip 3 is provided with displacement faces 14.
- Within the pile base 2, a cylindrical recess 4 is present, partially filled with grout 12.
- the axial length of the pile base 2 is at least twice the outside diameter thereof.
- the inner tube 5 is provided, on the outer surface thereof, with a pressure ring 18 bearing on the upper edge of the pile base 2.
- a stop ring 17 is provided on the inner tube 5 above the pressure ring 18 .
- Located between the staggered ring portion 7 and the rib 6 is a circumferential ring portion 9. Two adjacent ribs 6 bound an axial slot.
- the pressure ring 18 can be formed by two separate rings 18, enclosing a guiding and sealing ring 19.
- This guide-sealing ring 19 abuts against the inner surface of the drill tube 1 and also prevents underground water from finding its way into the recess 4 of the pile base 2.
- the drill tube 1 is provided, on the inner surface thereof, with fixed keys 8 slidably accommodated in these axial slots and capable of exerting pressure on the pressure ring 18 so as to be able to force the pile base 2 into the ground in this manner, with drill tube 1 rotating.
- the keys 8 can take up the position shown in Fig. 2, with the lower edge of the keys 8 bearing on the ring portion 9, in which position the keys 8 can also exert a vertical pressure on the pile base 2.
- a unidirectional coupling 10 capable of transmitting a rotary motion to the pile base 2 via the inner tube 5 during rotation of the drill tube 1 in one direction, while during rotation of the drill tube 1 in the opposite direction, the lower edge 16 of the tube 5 can rotate relative to the bottom 15 of the recess 4.
- the first method step consists in forcing the drill tube 1 and the pile base 2 accommodated therein into the ground, for instance during clockwise rotation of the drill tube 1, until the tip 3 of the pile base 2 has reached the level of a bearing ground layer P. Subsequently, the drill tube 1 is rotated in opposite direction, i.e. anti-clockwise, until the lower edge of the drill tube 1 has been displaced in upward direction for a distance X (see Fig. 2) and has reached the level of the upper edge of the pile base 2. During this anti-clockwise rotary movement of the drill tube 1, the weight of the inner tube 5 rests on the pile base 2, so that it remains in position in vertical direction.
- the pile base 2 is entrained in upward direction by the drill tube 1
- a force may be exerted on the inner tube 5, for instance hydraulically, to hold the pile base in position.
- the keys 8 are displaced in upward direction in the axial slots between the ribs 6, until the keys 8 strike the stop ring 17.
- the drill tube 1 is again driven in the original direction of rotation, i.e. clockwise.
- the keys 8 are displaced in circumferential direction, while the lower edge of the keys 8 comes to bear on the ring portion 9, in which position the keys 8 can exert a downward pressure on the tube 5 and hence on the pile base 2.
- the pile base 2 is forced into the bearing ground layer with rotation until the level P minus X metres has been reached.
- the force exerted on the pile base 2 is taken from the weight of the tubes 1, 5 and parts of the drilling installation coupled therewith, and from the vertical component of the drive couple provided by the screw windings 13 of the drill tube 1.
- a vertical load is applied to the upper end of the inner tube 5 by means of hydraulic jacks (not shown), such that the tip 3 of the pile base 2 is forced further into the ground for a short distance Y (Fig. 3).
- the hydraulic jacks for applying a vertical load to the inner tube 5 are mounted on the one hand on the drill tube 1 and on the other hand on a yoke coupled to the inner tube 5.
- the reaction forces for the vertical load are provided by the weight of the drill tube 1 with the parts of the drilling installation coupled thereto and the resistance of the helical windings, located in the ground, on the outer surface of this drill tube 1.
- the pile base 2 forced into the ground in the manner described hereinabove, is surrounded by a bearing ground layer, the cohesion of which has not been disturbed by the end of the drill tube 1, so that the bearing capacity of the pile base has been increased considerably.
- a slender foundation pile 11 is provided in the cylindrical recess 4 of the pile base 2, the annular interspace between the outer surface of the foundation pile 11 and the wall of the cylindrical recess 4 being filled with the grout 12 provided in the cylindrical recess 4 of the pile base 2 (see Fig. 2).
- Figs 4-5 show a variant of the apparatus according to Figs 1-3.
- the coupling between the drill tube 1 and the inner tube 5, provided directly above the pile base 2, is missing.
- This coupling has been replaced by a coupling provided on the ends of the drill tube 1 and the inner tube 5 that project from the ground.
- the coupling is connected and the inner tube 5 is driven in the direction of rotation, the drill tube 1 is driven along with it.
- the coupling is disconnected, a turning moment can be exerted on the inner tube 5 alone, with the inner tube 5 being forced into the ground while the drill tube 1 is stationary.
- the parts of the apparatus according to Figs 4-5 which correspond to parts of the apparatus according to Figs 1-3 have been provided with identical reference numerals.
- the apparatus according to Figs 4-5 is preferably used when foundation piles are to be provided in a soil structure in which very slack ground layers are present above the bearing layer. If, in such a soil structure, the pile base is driven into the ground for such a length that a bearing ground layer P is reached, it is undesired to subsequently move the drill tube 1 upwards in axial direction for a distance X and subsequently drive it in the direction of rotation in order to force the pile base 2 further into the ground, as shown in Figs 2 and 3. The slack ground layer above the bearing ground layer P will then provide too little grip for the helical coils 13 of the drill tube 1.
- Fig. 6 shows the pile base 2 with the pile shaft 11 provided therein, after the tube assembly 1, 5 has been withdrawn from the ground with rotation. Because the drill tube 1 is retained, i.e., subjected per revolution to an axial displacement smaller than the pitch of the helical coils 13, these coils 13 function as a screw conveyor, so that the space between the pile shaft 11 and the wall of the borehole is filled.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
- driving a drill tube (17) into the ground with rotation under axial pressure, which is closed at the lower end by means of a preformed hollow displacement tip (3) and is provided on the outer surface thereof with helical coils (13), until the displacement element has penetrated into a bearing ground layer (P) for a certain distance;
- subsequently increasing the distance between the lower edge of the drill tube (1) and the displacement tip (3) forming an enlarged pile base (2) after penetration into a bearing ground layer (P) due to the pile base (2) being forced with rotation into the bearing ground layer (P) for a distance of at least twice the outer diameter of the pile base (2); and
- providing in the thus formed borehole a prefabricated slender foundation pile (11) whose section is considerably smaller than that of the drill tube (11), while the lower end of the foundation pile (11) comes to rest on the pile base (2).
Description
- The invention relates to a method for providing a foundation pile having a slender section and an enlarged pile base in the ground without vibration, which method comprises the steps of
- driving a drill tube which is closed at the lower end by means of a closing element and provided, on the outer surface thereof, with helical coils, into the ground with rotation under axial pressure until the closing element has penetrated into a bearing ground layer for a certain distance;
- subsequently increasing the distance between the lower edge of the drill tube and the tip of the closing element mounted therein; and
- providing in the thus formed borehole a prefabricated slender foundation pile whose section is considerably smaller than that of the drill tube, while the lower end of the foundation pile comes to rest on the closing element.
- Such a method is disclosed in Dutch patent application 88.02318. In this known method, after the drill tube has penetrated into a bearing ground layer for a certain distance and the borehole formed has been partially filled with swelling concrete, the drill tube is unscrewed in upward direction, so that a prefabricated, slender foundation pile, provided in the borehole formed, is surrounded by a borehole into which swelling concrete is poured. This swelling concrete forms the enlarged pile base, which on the one hand is to adhere to the foundation pile and on the other comes to abut, by the outer surface thereof, against the wall of the borehole made by the drill tube.
- The bearing capacity of the foundation pile is determined to a significant extent by the ability of the enlarged pile base to transmit forces to the surrounding ground layer, which, however, has been disturbed by the drill tube and has consequently obtained a slight coherence. This slight coherence is insufficiently compensated by the pile base of swelling concrete. Consequently, a reduction factor must be applied to the theoretical bearing capacity of the enlarged pile base, which may for instance be approximately 0.7. To ensure an adequate connection between the slender foundation pile and the pile base poured, the length of the pile base poured must be chosen to be greater than would be required for transmitting bearing capacity to the surrounding ground layer. Also in the absence of specific pile-driving reinforcement, a slender foundation pile must produce sufficient bearing capacity for the load to be applied to it. Typically, the transportation of such a slender foundation pile requires a separate transport reinforcement. Slender foundation piles further have the advantage that they can be used successfully in ground layers having negative adhesion.
- The object of the invention is to provide a method in which the bearing capacity of the enlarged pile base per unit of area is greater than the bearing capacity according to the method described hereinabove, so that the reduction factor need not be applied. To this end, the method according to the invention is characterized in that
- the closing element is a preformed hollow-cylindrical displacement tip having a length at least twice the outside diameter, accommodated in the end of the drill tube and forming the enlarged pile base,
- the distance between the lower edge of the drill tube and the tip of the pile base being increased after penetration into a bearing ground layer due to the pile base being forced into the bearing ground layer with rotation for a distance of at least twice the outside diameter of the pile base.
- As the closing element consists of a preformed, cylindrical displacement tip, forced further into the ground for a particular distance after reaching a bearing ground layer, the preformed displacement tip is surrounded by a ground layer that is not disturbed by the end of the drill tube, enabling transmission of a greater bearing capacity to the surrounding ground by the thus formed closing element.
- Dutch patent application 78.15059 describes a method in which the foundation pile, after having penetrated into a bearing ground layer for some distance, is forced further into the ground for a short distance by means of a hydraulic system acting on the top of the foundation pile. In this known method, a force should be exerted on the foundation pile which is approximately three times the intended bearing capacity of the foundation pile, so that in particular the crushing strength of the foundation pile should be considerably greater than a foundation pile can provide. In this known method, forcing the foundation pile into the ground for a short distance is intended to compact the ground surrounding the pile tip and hence to obtain a certain setting. When the drill tube is unscrewed, the ground surrounding the pile tip is released again, so that a reduction factor should as yet be applied to the bearing capacity. In the method according to the invention, only the closing element is driven further into the bearing ground layer with rotation, with the forces being exerted on the closing element rather than the end of the foundation pile. The axial force exerted is considerably less than the intended bearing capacity.
- The invention further relates to an apparatus for applying the method described hereinabove, which comprises a drill tube provided with helical windings on the outer surface thereof. According to the invention, this known apparatus is suitable for applying the method in that within the drill tube an inner tube is provided which is movable in axial direction for a limited distance and can be coupled to the drill tube in two pressure-transmitting positions.
- The method according to the invention and embodiments of the apparatus suitable for the application thereof are explained in more detail with reference to the accompanying drawings. In these drawings:
- Fig. 1 shows the end of the drill tube at the moment when it has reached a bearing ground layer;
- Fig. 2 shows the apparatus according to Fig. 1 with the drill tube unscrewed;
- Fig. 3 shows the closing element of the drill tube in the position where it has been forced into the bearing ground layer; and
- Figs 4-6 show a variant of the apparatus according to Figs 1-3.
- Fig. 1 shows the end of a
drill tube 1, known per se, whichdrill tube 1 is provided withhelical coils 13 on the outer surface thereof. Thedrill tube 1 is closed at the lower end by a prefabricated displacement tip orpile base 2 of concrete or steel, precisely projecting from the end of thedrill tube 1 by thetip 3 thereof. Thetip 3 is provided withdisplacement faces 14. Within thepile base 2, acylindrical recess 4 is present, partially filled withgrout 12. The axial length of thepile base 2 is at least twice the outside diameter thereof. - Accommodated in the
drill tube 1 is an axially movableinner tube 5, whoselower edge 16 practically bears on thebottom 15 of therecess 4 in thepile base 2. Theinner tube 5 is provided, on the outer surface thereof, with apressure ring 18 bearing on the upper edge of thepile base 2. Provided on theinner tube 5 above thepressure ring 18 is astop ring 17, with the axial distance between therings pile base 2. Provided between therings axial ribs 6, evenly distributed along the circumference, staggered circumferentially over some distance in the vicinity of thering 17 to form alocking recess 7. Located between the staggeredring portion 7 and therib 6 is acircumferential ring portion 9. Twoadjacent ribs 6 bound an axial slot. - The
pressure ring 18 can be formed by twoseparate rings 18, enclosing a guiding and sealingring 19. This guide-sealing ring 19 abuts against the inner surface of thedrill tube 1 and also prevents underground water from finding its way into therecess 4 of thepile base 2. Thedrill tube 1 is provided, on the inner surface thereof, withfixed keys 8 slidably accommodated in these axial slots and capable of exerting pressure on thepressure ring 18 so as to be able to force thepile base 2 into the ground in this manner, withdrill tube 1 rotating. In a position where thedrill tube 1 is staggered relative to theinner tube 5, thekeys 8 can take up the position shown in Fig. 2, with the lower edge of thekeys 8 bearing on thering portion 9, in which position thekeys 8 can also exert a vertical pressure on thepile base 2. - Located between the
lower edge 16 of theinner tube 5 and thebottom 15 of therecess 4 is a unidirectional coupling 10, capable of transmitting a rotary motion to thepile base 2 via theinner tube 5 during rotation of thedrill tube 1 in one direction, while during rotation of thedrill tube 1 in the opposite direction, thelower edge 16 of thetube 5 can rotate relative to thebottom 15 of therecess 4. - The first method step consists in forcing the
drill tube 1 and thepile base 2 accommodated therein into the ground, for instance during clockwise rotation of thedrill tube 1, until thetip 3 of thepile base 2 has reached the level of a bearing ground layer P. Subsequently, thedrill tube 1 is rotated in opposite direction, i.e. anti-clockwise, until the lower edge of thedrill tube 1 has been displaced in upward direction for a distance X (see Fig. 2) and has reached the level of the upper edge of thepile base 2. During this anti-clockwise rotary movement of thedrill tube 1, the weight of theinner tube 5 rests on thepile base 2, so that it remains in position in vertical direction. If, due to clamping, thepile base 2 is entrained in upward direction by thedrill tube 1, a force may be exerted on theinner tube 5, for instance hydraulically, to hold the pile base in position. When thedrill tube 1 is displaced, thekeys 8 are displaced in upward direction in the axial slots between theribs 6, until thekeys 8 strike thestop ring 17. - Subsequently, the
drill tube 1 is again driven in the original direction of rotation, i.e. clockwise. Thekeys 8 are displaced in circumferential direction, while the lower edge of thekeys 8 comes to bear on thering portion 9, in which position thekeys 8 can exert a downward pressure on thetube 5 and hence on thepile base 2. During further rotation of the drill tube 1 (see Fig. 3), thepile base 2 is forced into the bearing ground layer with rotation until the level P minus X metres has been reached. The force exerted on thepile base 2 is taken from the weight of thetubes screw windings 13 of thedrill tube 1. - After the
tip 3 of thepile base 2 has reached the level P-X (see Fig. 3), a vertical load is applied to the upper end of theinner tube 5 by means of hydraulic jacks (not shown), such that thetip 3 of thepile base 2 is forced further into the ground for a short distance Y (Fig. 3). By measuring the force exerted on thetube 5 and the resultant lowering Y, data with regard to the magnitude and the quality of the bearing capacity of the foundation pile are obtained. - The hydraulic jacks for applying a vertical load to the
inner tube 5 are mounted on the one hand on thedrill tube 1 and on the other hand on a yoke coupled to theinner tube 5. The reaction forces for the vertical load are provided by the weight of thedrill tube 1 with the parts of the drilling installation coupled thereto and the resistance of the helical windings, located in the ground, on the outer surface of thisdrill tube 1. - The
pile base 2, forced into the ground in the manner described hereinabove, is surrounded by a bearing ground layer, the cohesion of which has not been disturbed by the end of thedrill tube 1, so that the bearing capacity of the pile base has been increased considerably. - Subsequently, a
slender foundation pile 11 is provided in thecylindrical recess 4 of thepile base 2, the annular interspace between the outer surface of thefoundation pile 11 and the wall of thecylindrical recess 4 being filled with thegrout 12 provided in thecylindrical recess 4 of the pile base 2 (see Fig. 2). - Figs 4-5 show a variant of the apparatus according to Figs 1-3. In this variant the coupling between the
drill tube 1 and theinner tube 5, provided directly above thepile base 2, is missing. This coupling has been replaced by a coupling provided on the ends of thedrill tube 1 and theinner tube 5 that project from the ground. When the coupling is connected and theinner tube 5 is driven in the direction of rotation, thedrill tube 1 is driven along with it. When the coupling is disconnected, a turning moment can be exerted on theinner tube 5 alone, with theinner tube 5 being forced into the ground while thedrill tube 1 is stationary. The parts of the apparatus according to Figs 4-5 which correspond to parts of the apparatus according to Figs 1-3 have been provided with identical reference numerals. - The apparatus according to Figs 4-5 is preferably used when foundation piles are to be provided in a soil structure in which very slack ground layers are present above the bearing layer. If, in such a soil structure, the pile base is driven into the ground for such a length that a bearing ground layer P is reached, it is undesired to subsequently move the
drill tube 1 upwards in axial direction for a distance X and subsequently drive it in the direction of rotation in order to force thepile base 2 further into the ground, as shown in Figs 2 and 3. The slack ground layer above the bearing ground layer P will then provide too little grip for thehelical coils 13 of thedrill tube 1. Therefore, in ground layers of the above-described type, it is desired first to force thedrill tube 1 and theinner tube 5 coupled thereto into the ground until a bearing ground layer P has been reached and subsequently to disconnect the coupling of thedrill tube 1 and theinner tube 5, whereupon a turning moment is applied to theinner tube 5, and to force thepile base 2 further into the ground with rotation, by means of theinner tube 5, until the level P-X has been reached. Thedrill tube 1 remains in the position shown in Fig. 4, so that thehelical coils 13 hold more grip on the slack layers above the level P. - After the
pile base 2 has been brought to the desired depth in this manner, in this case, too, a vertical load is applied to theinner tube 5 in order to force thetip 3 of the pile base further into the ground for a short distance Y, while the force exerted and the resultant lowering Y are measured, as described hereinabove with reference to Fig. 3. - Fig. 6 shows the
pile base 2 with thepile shaft 11 provided therein, after thetube assembly drill tube 1 is retained, i.e., subjected per revolution to an axial displacement smaller than the pitch of thehelical coils 13, thesecoils 13 function as a screw conveyor, so that the space between thepile shaft 11 and the wall of the borehole is filled.
Claims (8)
- A method for providing a foundation pile having a slender section and an enlarged pile base in the ground without vibration, said method comprising the steps of- driving a drill tube into the ground with rotation under axial pressure, which is closed at the lower end by means of a closing element and is provided on the outer surface thereof with helical coils, until the closing element has penetrated into a bearing ground layer for a certain distance;- subsequently increasing the distance between the lower edge of the drill tube and the tip of the closing element mounted therein; and- providing in the thus formed borehole a prefabricated slender foundation pile whose section is considerably smaller than that of the drill tube, while the lower end of the foundation pile comes to rest on the closing element,characterized in that- the closing element is a preformed cylindrical hollow displacement tip having a length of at least twice the outside diameter, accommodated in the end of the drill tube and forming the enlarged pile base,- the distance between the lower edge of the drill tube and the closing element being increased after penetration into a bearing ground layer due to the pile base being forced into the bearing ground layer with rotation for a distance of at least twice the outside diameter of the pile base.
- A method according to claim 1, characterized in that- the distance between the lower edge of the drill tube and the tip of the pile base is increased by driving the drill tube in opposite direction of rotation, the pile base remaining in position, and- the drill tube is subsequently driven in the direction of rotation again, while the pile base, projecting freely from the drill tube, is forced into the bearing ground layer with rotation for the same distance as the distance for which the drill tube was previously displaced in upward direction.
- A method according to claim 1 or 2, characterized in that the pile base, after being rotatingly forced into the ground, is loaded by an axial force such that the pile base is forced further into the ground for a short distance (Y), while both the force exerted and the resultant lowering (Y) are measured.
- An apparatus for applying the method according to any one of claims 1-3, substantially consisting of a drill tube provided with helical windings on the outer surface thereof, characterized in that within the drill tube (1), an inner tube (5) is provided which is movable in axial direction for a limited distance (X) and can be coupled to the drill tube (1) in two pressure-transmitting positions.
- An apparatus according to claim 4, characterized in that two axially spaced rings (17, 18) are mounted on the outer surface of the inner tube (5), in the vicinity of the lower end thereof, while provided between said rings (17, 18) are axial ribs (6, 7), evenly distributed over the circumference, with the drill tube (1) comprising inwardly projecting keys (8) extending into axial slots, each slot being bounded by two adjacent ribs (6, 7).
- An apparatus according to claims 4-5, characterized in that the axial slots of the inner tube (5), at the upper end thereof, are provided with a circumferentially enlarged locking recess (7), wherein the keys (8) of the drill tube (1) are receivable for exerting pressure on the bottom (9) of the locking recess (7).
- An apparatus according to claims 4-6, characterized in that the inner tube (5) has a free end projecting beyond the pressure ring (18), receivable in a hollow recess (4) of the pile base (2), the lower edge (16) of said end and the bottom (15) of the recess (4) together forming a coupling acting in one direction of rotation.
- An apparatus for applying the method according to claims 1 and 3, substantially consisting of a drill tube provided with helical windings on the outer surface thereof, characterized in that an inner tube (5) is provided within the drill tube (1), the two tubes (1, 5) being interconnected in the vicinity of the upper end by means of a disconnectable coupling and the inner tube (5), when the coupling is disconnected, being drivable in the direction of rotation and axially movable relative to the drill tube (1), while the inner tube (5) bears on the upper end of a pile base (2) via a pressure ring (18).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL9202008A NL9202008A (en) | 1992-11-18 | 1992-11-18 | Method for applying a foundation pile to the ground in a vibration-free manner, as well as a device for applying the method. |
NL9202008 | 1992-11-18 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0598457A1 true EP0598457A1 (en) | 1994-05-25 |
EP0598457B1 EP0598457B1 (en) | 1996-06-12 |
Family
ID=19861533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19930203222 Expired - Lifetime EP0598457B1 (en) | 1992-11-18 | 1993-11-17 | Method for providing a foundation pile in the ground without vibration, and apparatus for applying such method |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0598457B1 (en) |
DE (1) | DE69303144T2 (en) |
NL (1) | NL9202008A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0687777A1 (en) * | 1994-06-16 | 1995-12-20 | Heiwerken P. van 't Wout Waddinxveen B.V. | Method for arranging concrete piles in the ground |
AU723991B2 (en) * | 1997-06-19 | 2000-09-07 | Peters, Patricia Evelyn | Methods of and apparatus for forming in-ground columns |
WO2014082741A1 (en) * | 2012-11-28 | 2014-06-05 | Franki Grundbau Gmbh & Co. Kg | Method for manufacturing a pile |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL1008750C2 (en) * | 1998-03-30 | 1999-10-01 | Hollandsche Betongroep Nv | Method for manufacturing a foundation pile in the ground. |
CN101793027B (en) * | 2010-04-02 | 2015-02-25 | 孔超 | Core-grouted static pressure anchor rod pile |
DE102013104184A1 (en) | 2013-04-25 | 2014-10-30 | GEPRO Ingenieurgesellschaft für Geotechnik, Verkehrs- und Tiefbau und Umweltschutz mbH | Support support for receiving a support means for a noise barrier |
DE102013104179A1 (en) | 2013-04-25 | 2014-10-30 | GEPRO Ingenieurgesellschaft für Geotechnik, Verkehrs- und Tiefbau und Umweltschutz mbH | Device for absorbing horizontal forces on a pole support and the use of the device when mounting a pole support |
CN108797625A (en) * | 2018-07-03 | 2018-11-13 | 上海勘察设计研究院(集团)有限公司 | A kind of domatic cutter device and its working method for cutting pile |
AT523605A1 (en) * | 2020-03-05 | 2021-09-15 | Porr Bau Gmbh | Thermally insulating civil engineering structure and process for its manufacture |
CN111395321A (en) * | 2020-03-23 | 2020-07-10 | 江西基业科技有限公司 | Construction method of full-ramming type secondary soil-squeezing multi-head club-footed pile |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB552928A (en) * | 1941-10-28 | 1943-04-30 | Braithwaite And Company Engine | Improvements in and relating to screw piles and cylinders |
EP0185402A1 (en) * | 1984-10-31 | 1986-06-25 | Albert Rombaldi | Method for constructing a concrete pile and device for the application of the method |
NL8802318A (en) * | 1988-09-19 | 1990-04-17 | Ballast Nedam Groep Nv | Pile foundation-forming method - delivers material through tubular drill bit core |
-
1992
- 1992-11-18 NL NL9202008A patent/NL9202008A/en not_active Application Discontinuation
-
1993
- 1993-11-17 EP EP19930203222 patent/EP0598457B1/en not_active Expired - Lifetime
- 1993-11-17 DE DE1993603144 patent/DE69303144T2/en not_active Expired - Lifetime
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB552928A (en) * | 1941-10-28 | 1943-04-30 | Braithwaite And Company Engine | Improvements in and relating to screw piles and cylinders |
EP0185402A1 (en) * | 1984-10-31 | 1986-06-25 | Albert Rombaldi | Method for constructing a concrete pile and device for the application of the method |
NL8802318A (en) * | 1988-09-19 | 1990-04-17 | Ballast Nedam Groep Nv | Pile foundation-forming method - delivers material through tubular drill bit core |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0687777A1 (en) * | 1994-06-16 | 1995-12-20 | Heiwerken P. van 't Wout Waddinxveen B.V. | Method for arranging concrete piles in the ground |
NL9400987A (en) * | 1994-06-16 | 1996-02-01 | Heiwerken P Van T Wout Waddinx | Method for installing concrete piles in the ground. |
AU723991B2 (en) * | 1997-06-19 | 2000-09-07 | Peters, Patricia Evelyn | Methods of and apparatus for forming in-ground columns |
WO2014082741A1 (en) * | 2012-11-28 | 2014-06-05 | Franki Grundbau Gmbh & Co. Kg | Method for manufacturing a pile |
AU2013351554B2 (en) * | 2012-11-28 | 2018-02-08 | Franki Grundbau Gmbh & Co. Kg | Method for manufacturing a pile |
Also Published As
Publication number | Publication date |
---|---|
NL9202008A (en) | 1994-06-16 |
DE69303144T2 (en) | 1996-11-21 |
EP0598457B1 (en) | 1996-06-12 |
DE69303144D1 (en) | 1996-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5934836A (en) | Ground anchor device | |
US5919005A (en) | Ground anchor device for penetrating an underground rock formation | |
US4708530A (en) | Concrete foundation pile and device for driving the same into the ground | |
US5904447A (en) | Drive device used for soil stabilization | |
US5833399A (en) | Apparatus for use in forming piles | |
EP0598457B1 (en) | Method for providing a foundation pile in the ground without vibration, and apparatus for applying such method | |
US7748932B2 (en) | Soil stabilization and anchorage system | |
US4832535A (en) | Process for compaction-reinforcement-grouting or for decompaction-drainage and for construction of linear works and plane works in the soils | |
US20090116910A1 (en) | Piling apparatus and method of installation | |
US12091830B2 (en) | Construction method and device for execution of a cast in-situ pile with multiple diameters decreasing with depth | |
US6283231B1 (en) | Soil displacing screw auger and method for making a concrete pile with this auger | |
US3568452A (en) | Method and apparatus for forming bulbular base piles | |
GB2160566A (en) | A device for transmitting rotation to a pile | |
GB1595432A (en) | Precast concrete piling | |
US4040260A (en) | Pile with downwardly extending elongated elements | |
JP3917728B2 (en) | Steel pipe pile and foundation method using the same steel pipe pile | |
EP0707677B1 (en) | Method for forming a foundation pile in the ground utilizing a prefabricated pile shaft | |
US4027491A (en) | Composite earth drilling auger and method of installing same in situ | |
EP0370396B1 (en) | A reinforced concrete load-bearing pile with multi-branches and enlarged footings and means for forming the pile | |
US3881320A (en) | Pile installation in submerged bearing strata | |
IE46432B1 (en) | Precast concrete piling | |
GB2218722A (en) | Pile pressing | |
US4462716A (en) | Pile driving | |
US5122013A (en) | Reinforced concrete load-bearing pile with multi-branches and enlarged footings, and means and method for forming the pile | |
EP0084921B1 (en) | Piles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): BE DE FR GB NL |
|
17P | Request for examination filed |
Effective date: 19940705 |
|
17Q | First examination report despatched |
Effective date: 19950721 |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): BE DE FR GB NL |
|
ET | Fr: translation filed | ||
REF | Corresponds to: |
Ref document number: 69303144 Country of ref document: DE Date of ref document: 19960718 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20000914 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20001129 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20011117 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20011117 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020730 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20121128 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20121128 Year of fee payment: 20 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20121130 Year of fee payment: 20 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R071 Ref document number: 69303144 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R071 Ref document number: 69303144 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: V4 Effective date: 20131117 |
|
BE20 | Be: patent expired |
Owner name: *BETON SON B.V. Effective date: 20131117 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION Effective date: 20131119 |