EP0370396B1 - A reinforced concrete load-bearing pile with multi-branches and enlarged footings and means for forming the pile - Google Patents

A reinforced concrete load-bearing pile with multi-branches and enlarged footings and means for forming the pile Download PDF

Info

Publication number
EP0370396B1
EP0370396B1 EP19890121260 EP89121260A EP0370396B1 EP 0370396 B1 EP0370396 B1 EP 0370396B1 EP 19890121260 EP19890121260 EP 19890121260 EP 89121260 A EP89121260 A EP 89121260A EP 0370396 B1 EP0370396 B1 EP 0370396B1
Authority
EP
European Patent Office
Prior art keywords
pile
cavity
forming
branch
pressing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP19890121260
Other languages
German (de)
French (fr)
Other versions
EP0370396A2 (en
EP0370396A3 (en
Inventor
Zhang Junsheng
Xu Yanqin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Junsheng Zhang
YANQIN, XU
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP0370396A2 publication Critical patent/EP0370396A2/en
Publication of EP0370396A3 publication Critical patent/EP0370396A3/en
Application granted granted Critical
Publication of EP0370396B1 publication Critical patent/EP0370396B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

Definitions

  • This invention relates to a reinforced concrete load-bearing pile, especially used for consolidating foundations of buildings and bridges or other foundations, and to means and a method for forming the pile.
  • a concrete load-bearing foundation pile is known from US-A-1 521 522 having fins projecting radially which are integral with the pile body. These fins are arranged in groups along the axis of the pile body. Furtheron, the pile body has an enlarged footing integrated with the body.
  • a reinforced concrete load-bearing foundation pile which is considered as the nearest prior art is disclosed in FR-A-2 370 170 and comprises a pile-body, having a concrete pipe and a cast-in-place enlarged footing integrated with the body.
  • the object of the invention is to provide a reinforced concrete load-bearing pile for consolidating foundations, means and a method for forming such a pile which allow to save construction material, manpower, energy and investment costs.
  • a reinforced concrete load-bearing pile for consolidating foundations having a pile body, comprising a concrete pipe in a main pile cavity and a cast-in-place enlarged footing integrated with the body wherein the pile body comprises said concrete pipe and a concrete core, said concrete pipe having at least one branch opening thereon, and at least a concrete branch integrated with said pile body.
  • Means for forming this load-bearing pile comprises a concrete pipe (4) having at least one branch opening thereon and forming a pile cavity drilling/pressing device, a branch cavity pressing device and an enlarged footing cavity pressing device.
  • the pile cavity drilling/pressing device is firstly used to form a main pile cavity; then, the branch cavity pressing device and the enlarged footing cavity pressing device are successively used to form at least one branch cavity and enlarged footing cavity; after the whole pile cavity is completed, reinforcing steel bars may be placed into the cavity and casting is carried out.
  • Fig. 1 is a sketch of a load-bearing pile with multi-branches and enlarged footings according to the invention.
  • Fig. 2 is a sketch of a pile cavity drilling/pressing device.
  • Fig. 3. is a sketch of a modified pile cavity drilling/pressing device.
  • Fig. 4 is a sketch of a branch cavity pressing device.
  • Fig. 5 is a sketch of an enlarged footing cavity pressing device.
  • a reinforced concrete load-bearing pile comprises a pile body, at least one branch and enlarged footing which are integrated with the pile body.
  • the branches can be connected to any part of the pile body, preferably arranged in groups along the axis of the pile body.
  • the branches of each group are preferably staggered with those of adjacent groups.
  • the numbers of groups and branches in each group are determined according to the condition of ground, building, etc.
  • the pile body may consist of a concrete pipe with correspondingly arranged openings for forming branches, and a core.
  • the enlarged footings can be connected with the pile body. e.g., at the bottom end of the pile body. The enlarged footing, together with all the branches provides a larger supporting area, thus ensuring higher load-bearing capability of the pile.
  • the load-bearing pile according to the present invention can be wholly or partly casted-in-place after a corresponding cavity is formed.
  • Means for forming the pile comprises a pile cavity drilling/pressing device, a branch cavity pressing device and an enlarged footing cavity pressing device.
  • the pile cavity drilling/pressing device can be used to form a cavity for the pile body. It consists of a pipe body with a blade portion provided at one end and strengthening portion at the end part of the blade portion. There can be at least one opening provided on the pipe body used for forming branch cavities. In order to remove soil inside the pipe body to form the pile cavity, means such as an earth auger with screw blades can be provided. In case of soft ground, a movable conical head is provided at the beginning end of the pipe body forming the pile cavity without removing any soil.
  • a modified structure of the device may have a spiral cutting blade connected to the outside of the pipe body.
  • the branch cavity pressing device can be either single-armed or multi-armed.
  • Each arm has a chisel bearing, a support connected to the bearing bottom and a chisel which is arranged inside the bearing and composed of flexibly connected a chisel end, power transmitting parts and a chisel head.
  • a movable support can be futher provided at the bottoms of the supports for positioning and supporting, and the chisel bearings can be connected or integrated.
  • the said support of the device guides the direction of the chisel head.
  • the transmilting parts can be balls preferably.
  • the enlarged footing cavity pressing device comprises a column with a collar fixed at one end and two collars slidably mounted thereon, pairs of pivoted arms pivots with the collars at the same side of the column, a sleeve is slidably provided on the other end of the column.
  • two pairs of pivoted arms are arranged symmetrically.
  • branches 2 are obliquely integrated with a pile body 1, which comprises a concrete pipe 4 and a core 5.
  • the concrete pipe 4 may be embeded reinforcing steel.
  • the branches 2 are arranged in pairs along the pile body 1.
  • the two branches 2 in each pair are symmetrically arranged and staggered with those in adjacent pairs.
  • An enlarged footing 3 connects to the bottom end of the pile body 1.
  • Fig. 2 shows a pile cavity drilling/pressing device which is in the form of a pipe.
  • a blade portion 11 is provided at one end of the pipe body 14. The thickness of the pipe wall increases from the blade end.
  • a strengthening portion which is in the form of a round collar 12, is provided.
  • At least one opening 13 can be provided on the pipe body 14 for forming branch cavities.
  • the device can be used for either soft ground or stiff ground, preferably for firm ground. It can be driven into ground by pressing.
  • Fig. 3 shows a modified pile cavity drilling/pressing device, which is preferred for soft ground.
  • This device is further provided with a spiral cutting blade 23 connected to the outside of the pipe body.
  • Means for removing soil such as an earth auger or a pump (not shown) is provided; or a movable conical head 25 is provided at the blade end of the pipe body to form a pile cavity without removal of any soil.
  • This device can be driven into ground by rotating.
  • Fig. 4 shows a preferred embodiment of a branch cavity pressing device which is symmetrically twin-armed.
  • Each of the arm has a chisel bearing 30, a support 31 connected to the bearing bottom, and a chisel arranged in the cavity of the chisel bearing 30 and composed by flexibly connecting a chisel end 32, power transmitting balls 33 and a chisel head 34.
  • a movable support 35 is provided at the bottoms of the supports 31.
  • the supports 31 are obliquely arranged and can be used as guides.
  • Fig. 5 shows a preferred enlarged footing cavity pressing device.
  • a fixed collar 42 is provided at one end of a column 37.
  • Two collars 39 slidably mounted on the column 37.
  • a pair of pivoted arms 40 pivot with the movable collars 39 at the same side of the column 37, and another pair of arms 40 at the other side. The said two pairs of arms are symmetricaly arranged.
  • a sleeve 38 is slidably mounted at the other end of the column 37. As the sleeve 38 moves downwardly, the pivoted arms 40 are folded. Thus, the radial dimension of the device is increased.
  • a pile cavity is firstly formed and a concrete pipe is placed into the cavity. Then branch cavities and enlarged footing cavities are to be formed said branch cavities being formed through openings of the concrete pipe. As a cavity of the pile is completed, reinforcing steel can be put in and casting-in-place can be carried out.
  • the pile cavity drilling/pressing device can be used to form the pile cavity.
  • Either a pipe type device or a screw type device can be used according to the degree of compactness of the soil.
  • the device can be driven into the ground either vertically or at an angle of inclination.
  • An earth auger 24 is used to take out the soil (or a mud pump can be used to pump out the mud).
  • a movable conical head 25 is mounted at the beginning part of the device, a pile cavity may be formed without taking out the soil. If the ground is stiff, the pile drilling/pressing device can be taken out when the cavity is made.
  • the branch cavities can be made through the openings on the pipe body, and the enlarged footing cavities can also be made at the end of the pipe body.
  • the pile drilling/pressing device may be withdrawn first, and a precast concrete tube 4 is put in instead. Then the branch cavities and the enlarged footing cavities are made.
  • the chisel head 34 of the branch cavity pressing device is directed to either the openings 13 on the pipe body 14 of the drilling/pressing device (there may be a pair of openings at one level and another pair of openings at different positions of a different level), or to the openings provided on the precast concrete pipe 4. Pressure is applied at the chisel end 32.
  • the chisel head 34 can be taken out at any time for filling consolidating material (soilid waste, backfill, etc), so that the surroundings and base of the branch cavities can be consolidated.
  • consolidating material so that the surroundings and base of the branch cavities can be consolidated.
  • the enlarged footing cavity pressing device is introduced into the pile cavity to a predetermined depth (there can be more than one enlarged footing for one pile), then,the pressing sleeve 38 is pressed continually while the device is rotated.
  • the pivoted arms 40 may form a cavity for the enlarged footing after the device being rotated 180°.
  • Enlarged footing may also be made with the branch cavity pressing device by turning the chisel bearing 30 while pressing the chisel end 32, getting the same effect as using the enlarged footing cavity pressing device.
  • filling materials may be added, and the base may be compacted by means of rammers so as to increase the degree of compactness of the soil layer.
  • the branches and enlarged footing cavities reinforcing steel bars may be placed into the cavity and concrete may be cast.
  • Branches may be precasted. When the branch cavities are made, the precasted branches may be put into place by means of the branch cavity pressing device. The pile can finally be casted.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

  • This invention relates to a reinforced concrete load-bearing pile, especially used for consolidating foundations of buildings and bridges or other foundations, and to means and a method for forming the pile.
  • Present foundations like driving piles, cast-in-place piles, tree root-like piles, explosion piles and caissons, have disadvantages such as weak load-supporting capability, low stability, waste of material, labor, investment and energy, etc. Especially in case of complicated soft ground, the foundation tends to settle wholly or unevenly due to the low load capacity of the piles. That brings technical difficulty to both design and construction.
  • A concrete load-bearing foundation pile is known from US-A-1 521 522 having fins projecting radially which are integral with the pile body. These fins are arranged in groups along the axis of the pile body. Furtheron, the pile body has an enlarged footing integrated with the body.
  • A reinforced concrete load-bearing foundation pile, which is considered as the nearest prior art is disclosed in FR-A-2 370 170 and comprises a pile-body, having a concrete pipe and a cast-in-place enlarged footing integrated with the body.
  • The object of the invention is to provide a reinforced concrete load-bearing pile for consolidating foundations, means and a method for forming such a pile which allow to save construction material, manpower, energy and investment costs.
  • This object is solved according to the present invention by a reinforced concrete load-bearing pile for consolidating foundations having a pile body, comprising a concrete pipe in a main pile cavity and a cast-in-place enlarged footing integrated with the body wherein the pile body comprises said concrete pipe and a concrete core, said concrete pipe having at least one branch opening thereon, and at least a concrete branch integrated with said pile body.
  • Another object of the invention is a method according to claim 8, wherein the preamble is known from above-mentioned document FR-A-2370170. Means for forming this load-bearing pile comprises a concrete pipe (4) having at least one branch opening thereon and forming a pile cavity drilling/pressing device, a branch cavity pressing device and an enlarged footing cavity pressing device.
  • In forming a pile cavity for a load-bearing pile according to the invention, the pile cavity drilling/pressing device is firstly used to form a main pile cavity; then, the branch cavity pressing device and the enlarged footing cavity pressing device are successively used to form at least one branch cavity and enlarged footing cavity; after the whole pile cavity is completed, reinforcing steel bars may be placed into the cavity and casting is carried out.
  • The present invention will be more fully understood from the following detailed description in connection with the illustrated embodiment in the accompanying drawings.
  • Fig. 1 is a sketch of a load-bearing pile with multi-branches and enlarged footings according to the invention.
  • Fig. 2 is a sketch of a pile cavity drilling/pressing device.
  • Fig. 3. is a sketch of a modified pile cavity drilling/pressing device.
  • Fig. 4 is a sketch of a branch cavity pressing device.
  • Fig. 5 is a sketch of an enlarged footing cavity pressing device.
  • A reinforced concrete load-bearing pile according to the present invention comprises a pile body, at least one branch and enlarged footing which are integrated with the pile body. The branches can be connected to any part of the pile body, preferably arranged in groups along the axis of the pile body. The branches of each group are preferably staggered with those of adjacent groups. The numbers of groups and branches in each group are determined according to the condition of ground, building, etc. The pile body may consist of a concrete pipe with correspondingly arranged openings for forming branches, and a core. The enlarged footings can be connected with the pile body. e.g., at the bottom end of the pile body. The enlarged footing, together with all the branches provides a larger supporting area, thus ensuring higher load-bearing capability of the pile.
  • The load-bearing pile according to the present invention can be wholly or partly casted-in-place after a corresponding cavity is formed. Means for forming the pile comprises a pile cavity drilling/pressing device, a branch cavity pressing device and an enlarged footing cavity pressing device.
  • The pile cavity drilling/pressing device can be used to form a cavity for the pile body. It consists of a pipe body with a blade portion provided at one end and strengthening portion at the end part of the blade portion. There can be at least one opening provided on the pipe body used for forming branch cavities. In order to remove soil inside the pipe body to form the pile cavity, means such as an earth auger with screw blades can be provided. In case of soft ground, a movable conical head is provided at the beginning end of the pipe body forming the pile cavity without removing any soil. A modified structure of the device may have a spiral cutting blade connected to the outside of the pipe body.
  • The branch cavity pressing device can be either single-armed or multi-armed. Each arm has a chisel bearing, a support connected to the bearing bottom and a chisel which is arranged inside the bearing and composed of flexibly connected a chisel end, power transmitting parts and a chisel head. As for a multi-armed branch cavity pressing device, a movable support can be futher provided at the bottoms of the supports for positioning and supporting, and the chisel bearings can be connected or integrated. The said support of the device guides the direction of the chisel head. The transmilting parts can be balls preferably.
  • The enlarged footing cavity pressing device comprises a column with a collar fixed at one end and two collars slidably mounted thereon, pairs of pivoted arms pivots with the collars at the same side of the column, a sleeve is slidably provided on the other end of the column. Preferably two pairs of pivoted arms are arranged symmetrically.
  • This invention has the following advantages:
    • 1. A load-bearing pile according to the invention has substantially higher load-carrying capability and foundation stability than those of ordinary load-bearing piles, overcoming at the same time residual settlement problems of foundations and rendering possible realization of a more solid and stable foundation.
    • 2. With this kind of piles, more than 50% of the construction material may be saved compared with those of all other sorts of prevailing foundations. Also there may be economy in manpower, energy and investment, shortening construction period and lowering cost.
    • 3. The formation means of a pile of the invention has the advantages of simple construction and easy maintenance, overcoming the difficulty of making branch cavities in particular, rendering possible embodiment and application of the techniques of a load-bearing pile according to the invention.
  • Referring to Fig. 1, branches 2 are obliquely integrated with a pile body 1, which comprises a concrete pipe 4 and a core 5. The concrete pipe 4 may be embeded reinforcing steel. The branches 2 are arranged in pairs along the pile body 1. The two branches 2 in each pair are symmetrically arranged and staggered with those in adjacent pairs. An enlarged footing 3 connects to the bottom end of the pile body 1.
  • Fig. 2 shows a pile cavity drilling/pressing device which is in the form of a pipe. A blade portion 11 is provided at one end of the pipe body 14. The thickness of the pipe wall increases from the blade end. At the end part of the blade portion 11, a strengthening portion, which is in the form of a round collar 12, is provided. At least one opening 13 can be provided on the pipe body 14 for forming branch cavities. The device can be used for either soft ground or stiff ground, preferably for firm ground. It can be driven into ground by pressing.
  • Fig. 3 shows a modified pile cavity drilling/pressing device, which is preferred for soft ground. This device is further provided with a spiral cutting blade 23 connected to the outside of the pipe body. Means for removing soil such as an earth auger or a pump (not shown) is provided; or a movable conical head 25 is provided at the blade end of the pipe body to form a pile cavity without removal of any soil. This device can be driven into ground by rotating.
  • Fig. 4 shows a preferred embodiment of a branch cavity pressing device which is symmetrically twin-armed. Each of the arm has a chisel bearing 30, a support 31 connected to the bearing bottom, and a chisel arranged in the cavity of the chisel bearing 30 and composed by flexibly connecting a chisel end 32, power transmitting balls 33 and a chisel head 34. A movable support 35 is provided at the bottoms of the supports 31. The supports 31 are obliquely arranged and can be used as guides.
  • Fig. 5 shows a preferred enlarged footing cavity pressing device. A fixed collar 42 is provided at one end of a column 37. Two collars 39 slidably mounted on the column 37. A pair of pivoted arms 40 pivot with the movable collars 39 at the same side of the column 37, and another pair of arms 40 at the other side. The said two pairs of arms are symmetricaly arranged. A sleeve 38 is slidably mounted at the other end of the column 37. As the sleeve 38 moves downwardly, the pivoted arms 40 are folded. Thus, the radial dimension of the device is increased.
  • In forming a reinforced concrete load-bearing pile according to the invention, a pile cavity is firstly formed and a concrete pipe is placed into the cavity. Then branch cavities and enlarged footing cavities are to be formed said branch cavities being formed through openings of the concrete pipe. As a cavity of the pile is completed, reinforcing steel can be put in and casting-in-place can be carried out.
  • The pile cavity drilling/pressing device can be used to form the pile cavity. Either a pipe type device or a screw type device can be used according to the degree of compactness of the soil. The device can be driven into the ground either vertically or at an angle of inclination. An earth auger 24 is used to take out the soil (or a mud pump can be used to pump out the mud). If a movable conical head 25 is mounted at the beginning part of the device, a pile cavity may be formed without taking out the soil. If the ground is stiff, the pile drilling/pressing device can be taken out when the cavity is made. As the device is being withdrawn, the branch cavities can be made through the openings on the pipe body, and the enlarged footing cavities can also be made at the end of the pipe body. In case of the soil layer which is easy to collapse, the pile drilling/pressing device may be withdrawn first, and a precast concrete tube 4 is put in instead. Then the branch cavities and the enlarged footing cavities are made. In forming branch cavities, the chisel head 34 of the branch cavity pressing device is directed to either the openings 13 on the pipe body 14 of the drilling/pressing device (there may be a pair of openings at one level and another pair of openings at different positions of a different level), or to the openings provided on the precast concrete pipe 4. Pressure is applied at the chisel end 32. Since the chisel end 32, the power transmitting balls 33 and the chisel head 34 are connected by a steel cable, the chisel head 34 can be taken out at any time for filling consolidating material (soilid waste, backfill, etc), so that the surroundings and base of the branch cavities can be consolidated. In forming the cavities for enlarged footings,the enlarged footing cavity pressing device is introduced into the pile cavity to a predetermined depth (there can be more than one enlarged footing for one pile), then,the pressing sleeve 38 is pressed continually while the device is rotated. The pivoted arms 40 may form a cavity for the enlarged footing after the device being rotated 180°. Enlarged footing may also be made with the branch cavity pressing device by turning the chisel bearing 30 while pressing the chisel end 32, getting the same effect as using the enlarged footing cavity pressing device. In forming cavities for enlarged footings, while the cavities are being pressed, filling materials may be added, and the base may be compacted by means of rammers so as to increase the degree of compactness of the soil layer. After forming the pile cavity, the branches and enlarged footing cavities, reinforcing steel bars may be placed into the cavity and concrete may be cast. Thus the entire process of making the reinforced concrete load-bearing pile with multi-branches and enlarged footings is completed. Branches may be precasted. When the branch cavities are made, the precasted branches may be put into place by means of the branch cavity pressing device. The pile can finally be casted.
  • Thus, while the invention has been described in relation to a particular embodiment, those having skill in the art will recognize modifications of materials, structure and the like which will still fall within the scope of the present invention as defined by the appended claims.

Claims (23)

  1. A reinforced concrete load-bearing pile for consolidating foundations having a pile body (1), comprising a concrete pipe (4) in a main pile cavity and a cast-in-place enlarged footing (3) integrated with the body (1) characterized in that the pile body (1) comprises said concrete pipe (4) and a concrete core (5), said concrete pipe (4) having at least one branch opening thereon, and at least a concrete branch (2) integrated with said pile body (1).
  2. A pile according to claim 1, wherein branches (2) are arranged in groups along the axis of the pile body (1).
  3. A pile according to claim 2, wherein there are two branches (2) in a group.
  4. A pile according to claim 2, wherein the branches (2) of each group are symmetrically arranged and staggered with those of adjacent groups.
  5. A pile according to claim 2, wherein the branches (2) are precasted.
  6. A pile according to claim 2, characterized in that the branch cavities are formed obliquely relative to the main pile cavity.
  7. Means for forming a pile according to claim 1, comprising a concrete pipe (4) having at least one branch opening (13) thereon and forming a pile cavity drilling/pressing device (11-14), a branch cavity pressing device (30-35) and an enlarged footing cavity pressing device (37-40,42).
  8. Means for forming a pile according to claim 7, wherein said branch cavity pressing device has a chisel bearing (30), a support (31) connected to the bearing bottom and a chisel arranged in the cavity of the chisel bearing (30) and composed of a chisel head (34) and power transmitting parts (33) flexibly connected to a chisel end (32).
  9. Means for forming a pile according to claim 7, wherein said branch cavity pressing device is multi-armed, each arm of the device has a chisel bearing (30), a support (31) connected to the bearing bottom and composed of a chisel head (34) and power transmitting parts (33) flexibly connected to a chisel end (32), a movable support (35) is provided at the bottoms of the supports (31).
  10. Means for forming a pile according to claim 8 or 9, wherein said power transmitting parts (33) are ball shaped.
  11. Means for forming a pile according to claim 9, wherein said branch cavity pressing device is symmetrically twin-armed, the chisel bearings (30) are integrated formed.
  12. Means for forming a pile according to claim 7, wherein said pile cavity drilling/pressing device comprises a pipe body (14), a blade portion (11,21) is provided at the beginning end of the pipe body (14) with a strengthening portion (12,22) at the end part of the blade portion (11).
  13. Means for forming a pile according to claim 12, wherein said pile cavity drilling/pressing device has at least one branch opening (13) provided on the pipe body (14).
  14. Means for forming a pile according to claim 12, wherein means for removing soil, e.g. an earth auger (24) with screw blades, is provided.
  15. Means for forming a pile according to claim 12, wherein a spiral cutting blade (23) is provided outside the pipe body (14).
  16. Means for forming a pile according to claim 12, wherein a movable conical head (25) is provided at the beginning end of the pipe body (14).
  17. Means for forming a pile according to claim 7, wherein said enlarged footing cavity pressing device comprises a column (37) with a collar (42) fixed at one end and two collars (39) slidably mounted thereon, at least one pair of pivoted arms (40) pivots with the collars (39) at the same side of the column (37), a sleeve (38) is slidably provided on the other end of the column (37).
  18. A method for forming a pile according to claim 1, by forming a pile cavity, placing a concrete pipe (4) into the cavity, forming at least one enlarged footing cavity and casting the pile, characterized by forming at least one branch cavity through openings of the concrete pipe (4) and forming the concrete branch integrally with said pile (1).
  19. A method for forming a pile according to claim 18, by consolidating the surrounding and the bases of the branch cavity and the enlarged footing cavity.
  20. A method according to claim 18, further comprising adding filling material into the branch cavity and the enlarged footing cavity while the surroundings and the bases of the cavities are consolidated so that the filling material is combined with the surrounding earth of the cavities and the earth is compacted.
  21. A method according to claim 18, characterized by forming the branch cavities in groups along the pile cavity, the branch cavities in each group beeing staggered with those of adjacent groups.
  22. A method according to claim 18, wherein a branch cavity pressing device (30-35) having a chisel is introduced into the pile cavity to a predetermined position, pressure is applied on the chisel end (32) to drive the chisel head (34) into the earth.
  23. A method according to claim 18, wherein an enlarged footing cavity pressing device having a sleeve (38) is introduced into the pile cavity to a predetermined position, the device is rotated as the sleeve (38) is pressed to enlarge the space for an enlarged footing (3).
EP19890121260 1988-11-22 1989-11-17 A reinforced concrete load-bearing pile with multi-branches and enlarged footings and means for forming the pile Expired - Lifetime EP0370396B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN88220149 1988-11-22
CN88220149U CN2046512U (en) 1988-11-22 1988-11-22 Foundation reinforced concrete bearing pile with multi-branch of bearing dish

Publications (3)

Publication Number Publication Date
EP0370396A2 EP0370396A2 (en) 1990-05-30
EP0370396A3 EP0370396A3 (en) 1991-04-03
EP0370396B1 true EP0370396B1 (en) 1993-06-09

Family

ID=4852424

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19890121260 Expired - Lifetime EP0370396B1 (en) 1988-11-22 1989-11-17 A reinforced concrete load-bearing pile with multi-branches and enlarged footings and means for forming the pile

Country Status (4)

Country Link
EP (1) EP0370396B1 (en)
JP (1) JPH02243820A (en)
CN (1) CN2046512U (en)
CA (1) CA2003376C (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9724024D0 (en) * 1997-11-13 1998-01-14 Kvaerner Cementation Found Ltd Improved piling method
CN1057363C (en) * 1998-07-10 2000-10-11 贺德新 All-intelligent multifunctional hydraulic extruding extender
CN100393947C (en) * 2006-06-05 2008-06-11 马金五 Construction method of tamping expending force bearing disc pile
CN101768962B (en) * 2009-01-05 2013-09-25 吴保全 Precast perforated pipe
JP2019007149A (en) * 2017-06-21 2019-01-17 菱建基礎株式会社 Friction cut casing
CN113818470B (en) * 2021-09-20 2023-05-02 肇庆市建筑工程有限公司 Building construction foundation pile
CN114263169B (en) * 2021-11-12 2023-06-20 中冶建筑研究总院有限公司 Steel pipe pile
CN114277835B (en) * 2022-03-07 2022-06-17 中国海洋大学 Uplift filling pile for reinforcing seabed and construction method thereof

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1443306A (en) * 1919-08-05 1923-01-23 Blumenthal Maurice Means for and method of producing concrete piles
US1521522A (en) * 1923-12-05 1924-12-30 Fowler Charles Evan Caisson and method of making the same
GB331945A (en) * 1929-04-19 1930-07-17 Callenders Cable & Const Co Improvements connected with the production of foundations for poles and the like
FR1427486A (en) * 1965-03-24 1966-02-04 Gnii Keramzitu Device for creating local footings in cast-pile shafts in bonded soils
DE2436093A1 (en) * 1974-07-24 1976-02-12 Mannesmann Roehren Werke Ag BUMP POST WITH ADAPTABLE SPREADERS
JPS5358105A (en) * 1976-11-08 1978-05-25 Nippon Concrete Ind Co Ltd Method of generating supporting force for middle excavation system
JPS5433313A (en) * 1977-08-17 1979-03-12 Marugo Kk Concrete pile
JPS54161715A (en) * 1978-06-12 1979-12-21 Kazuhiro Kawase Foundation pillar and method of executing foundation pillar
JPS55155825A (en) * 1979-05-23 1980-12-04 Marugo Kiso Kogyo Kk Burying method for pile with extension shoe
JPS5634823A (en) * 1979-08-30 1981-04-07 Touparu Gijutsu Kenkyusho:Kk Concrete pile injection constructing method
JPS57193621A (en) * 1981-05-23 1982-11-29 Tadayoshi Fujimatsu In-place reinforced concrete expanded bottom foundation pile and its construction and bit therefore
JPS6059224A (en) * 1983-09-07 1985-04-05 Kazuhiko Kishigami Construction of foundation pile
JPS62160315A (en) * 1985-12-30 1987-07-16 Kajima Corp Burying work of pile
JP3573794B2 (en) * 1994-06-20 2004-10-06 三洋電機株式会社 Hot air heater

Also Published As

Publication number Publication date
CA2003376A1 (en) 1990-05-22
EP0370396A2 (en) 1990-05-30
CA2003376C (en) 1999-07-27
JPH02243820A (en) 1990-09-27
EP0370396A3 (en) 1991-04-03
CN2046512U (en) 1989-10-25

Similar Documents

Publication Publication Date Title
US4405262A (en) Method for erection of a temporary bridge, and a pile means therefor
US4293242A (en) Piles
US3250075A (en) Method of retaining wall construction and anchoring
CN102864781A (en) Foundation pit supporting method utilizing inclined piles
US5870789A (en) Precast bridges
EP0370396B1 (en) A reinforced concrete load-bearing pile with multi-branches and enlarged footings and means for forming the pile
US4834582A (en) Methods for underpinning unstable structures
US5122013A (en) Reinforced concrete load-bearing pile with multi-branches and enlarged footings, and means and method for forming the pile
EP1041240B1 (en) Auger drill
GB2329204A (en) Earth auger
US5219249A (en) Reinforced concrete load-bearing pile forming device
KR101765879B1 (en) Composite block for ground reinforcement and reinforceing method of the foundation bottom using the same
GB2132667A (en) Method of installing precast concrete piles
JP2004316118A (en) Immersion method for caisson
JPH0381422A (en) Caisson method
CN112049104A (en) Extensible soft soil area pile foundation structure and construction method thereof
JPH05306518A (en) Excavator for steel tubular pile and construction of steel tubular pile
CN2199240Y (en) Building basic technique foundation pit inclined guard post
CN2346836Y (en) Steel concrete large section hollow square pile
CN215471979U (en) Tubular pile production unloading auxiliary device
KR900005913B1 (en) Base stake inflated in bump state at lower end there of and its construction
CN211571734U (en) Composite multi-row pile foundation pit supporting structure
JPS63103121A (en) Field piling work
JP2001011874A (en) Construction method for structural stud using precast pile
JP2838019B2 (en) Caisson blade framing method

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): FR GB IT NL

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: JUNSHENG, ZHANG

Owner name: YANQIN, XU

RIN1 Information on inventor provided before grant (corrected)

Inventor name: JUNSHENG, ZHANG

Inventor name: YANQIN, XU

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): FR GB IT NL

17P Request for examination filed

Effective date: 19911001

17Q First examination report despatched

Effective date: 19911111

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): FR GB IT NL

ITF It: translation for a ep patent filed

Owner name: ING. A. GIAMBROCONO & C. S.R.L.

ET Fr: translation filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20041111

Year of fee payment: 16

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20041117

Year of fee payment: 16

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20041118

Year of fee payment: 16

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20051117

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20051117

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060601

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20051117

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060731

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20060601

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20060731