CN2046512U - Foundation reinforced concrete bearing pile with multi-branch of bearing dish - Google Patents

Foundation reinforced concrete bearing pile with multi-branch of bearing dish Download PDF

Info

Publication number
CN2046512U
CN2046512U CN88220149U CN88220149U CN2046512U CN 2046512 U CN2046512 U CN 2046512U CN 88220149 U CN88220149 U CN 88220149U CN 88220149 U CN88220149 U CN 88220149U CN 2046512 U CN2046512 U CN 2046512U
Authority
CN
China
Prior art keywords
pile
bearing
hole
branch
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN88220149U
Other languages
Chinese (zh)
Inventor
张俊生
徐艳琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xu Yanqin
Zhang Junsheng
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN88220149U priority Critical patent/CN2046512U/en
Publication of CN2046512U publication Critical patent/CN2046512U/en
Priority to EP19890121260 priority patent/EP0370396B1/en
Priority to CA 2003376 priority patent/CA2003376C/en
Priority to JP30450889A priority patent/JPH02243820A/en
Priority to US07/743,831 priority patent/US5122013A/en
Priority to US07/844,734 priority patent/US5219249A/en
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a foundation reinforced concrete bearing pile with multi-branch and a bearing dish and a shaping tool of the bearing pile, which are used on various soft and hard foundations in construction engineering. Compared with a common pile, the bearing pile is additionally provided with a plurality of branch piles and one or more bearing dishes. The bearing pile is filled on site. The shaping tool of the utility model comprises a pile hole molding (pressing) device, a branch pile hole bifurcate and pressure increasing device and an arched depressor for bearing dish holes. The bearing pile of the utility model has the advantages that the bearing capacity and the foundation stability are improved obviously; the building material can be saved by more than 50%; the manpower and the energy resource are saved and the construction period is shortened. The shaping tool of the utility model has simple structure and convenient repair and use; the problem of branching off and making holes is solved.

Description

Foundation reinforced concrete bearing pile with multi-branch of bearing dish
The utility model relates to the reinforced concrete pile on a kind of building, bridge or various bases, and the forming tool of stake.
Several basis of the prior art, all exist bearing capacity little as piling, castinplace pile, root pile, explosion stake and laying foundation etc., poor stability, waste constructional materials, manpower, investment and the energy, especially to the soft basic unit of complexity, more can cause base integral to sink or uneven subsidence, bring difficulty for technically design and construction owing to pile quality is poor.
The purpose of this utility model is to propose a kind of steel concrete bearing peg that multiple-limb, multi-loadbearing set are arranged.And the forming tool scheme of this stake, to overcome weak point of the prior art.
The utility model is to realize like this.
Multiple-limb, load dish underpin concrete bearing peg comprise pile 1, have a plurality of on the pile and the angled branch's stake 2 of pile axis, and branch's stake can be per two external surfaces that are symmetricly set on pile.Also have one or more load dishes 3 on the pile.
The forming tool of multiple-limb, load dish underpin concrete bearing peg is beaten (pressure) device, branch's pile hole forming bifurcated pressurizer and force-bearing disc hole shaping arched depressor by the shaping of pile hole and is formed.The bifurcated pressurizer has a cylindrical cutter seat 30, and the seat bottom is connected with cutter holder 31; In the circular hole in the cutter seat, be equipped with flexibly connect together by cutter tail 32, power transmission ball 33, cutter 34 chisel that constitute, cutter holder 31 is led for the cutter head; The cutter holder also has the holder 35 of living, the supporting and the location of playing the cutter holder down.Arched depressor is to connect bow-shaped arm 40 by the clear ring 39 that is connected with pressure cylinder 38 on center pillar 37.
Pile hole in the forming tool of multiple-limb, load dish underpin concrete bearing peg is shaped, and to make (pressure) device be that a front end has cutting edge 11, cutting edge root to have to have the tubular type that can be provided with the plum blossom screw pile that fetches earth (as 24 among Fig. 3) in one or more groups symmetrical branch stake hole 13, the body to make (pressure) device on thickened wall 12, the body.
Pile hole in the forming tool of multiple-limb, load dish underpin concrete bearing peg is shaped, and to make (pressure) device also can be that a front end has cutting edge 21, cutting edge root to have to have on thickened wall 22, the body in one or more groups symmetrical branch stake hole, the body and is provided with the plum blossom screw pile 24 that fetches earth, and be externally connected with spiral beating (pressure) device of spiral leaf 23 at body.
Below in conjunction with embodiment and accompanying drawing, the utility model is described in detail.
Fig. 1 multiple-limb, load dish underpin concrete bearing peg schematic diagram.
Fig. 2 tubular type is played (pressure) device schematic diagram;
Fig. 3 is spiral to play (pressure) device schematic diagram;
Fig. 4 bifurcated pressurizer schematic diagram;
Fig. 5 arched depressor schematic diagram.
The pile 1 of multiple-limb, load dish underpin concrete bearing peg can be made up of the concrete floral tube 4 and the interior pile 5 in band branch stake hole according to the construction needs.In the concrete floral tube reinforcing bar is arranged, at an interior pile concrete placing.
Pile shaping in the forming tool of multiple-limb, load dish underpin concrete bearing peg is made (pressure) device and can be added conehead alive at the body Inner Front End.
Branch's stake bifurcated pressurizer in the forming tool can have only the single armed chisel.The both arms chisel that symmetry also can be arranged.In the single armed pressurizer, live and hold in the palm 35.
In the process of using technology of the present utility model to construct, need select for use tubular type (or spiral) pile hole to be shaped according to soil property and make (pressure) device, vertical or tilt to beat (pressures) device and squeeze into (or screw-in) stratum by designing requirement, and take out earth or extract earth out with slush pump with screw pile 24, if add conehead alive at pressure device body head, then can directly beat (revolving) and go out the pile hole, and need not fetch earth.Can the outside central siphon body in limit if the pile hole soil property of accomplishing fluently is solid, the construction in branch stake hole is carried out by the hole on the body in the limit, and the forming construction that carries out force-bearing disc hole with the position on body base; Easily the landslide soil property then can be extracted body earlier out, puts into the concrete floral tube 4 of the system of giving again, carries out the forming construction of branch stake hole and force-bearing disc hole at last.When doing branch stake hole, the cutter of bifurcated pressurizer 34 lets drive at branch stake hole on the depressor body, and (branch stake hole can be a horizontal plane symmetry two holes to be arranged, and two holes of the different other a pair of symmetry in position are arranged at another horizontal plane.) or aim at branch stake hole on the prefabricated concrete floral tube, on cutter tail 32, carry out punching press then, owing to link with wire rope between cutter tail, power transmission ball and the cutter head, so the cutter head can be raised at any time, and can in the hole of digging out, fill out reinforced material (hard rubbish, backfill etc.), thereby compacting branch stake hole around and the bottom.When doing force-bearing disc hole, arched depressor is put into along the pile hole, constantly push pressure cylinder 38 in the load dish position of design code (can do a plurality of trays on the pile post), and the rotation arched depressor, after turning over 180 °, bow-shaped arm 40 just stamps out force-bearing disc hole.The bow force-bearing disc hole also can use the bifurcated pressurizer, and change on the limit, press on the limit, obtains the effect the same with arched depressor.In the forming process of force-bearing disc hole, also can the limit flanging in the hole, fill out reinforced material, can also be with ramming head compacting bottom, to improve the compactness on stratum.After having finished the shaping of pile hole, branch stake hole and force-bearing disc hole, can in the hole, transfer reinforcing bar, carry out concrete spouting, thereby multiple-limb, load dish underpin concrete bearing peg are manufactured and finished.Also can give system for branch's stake, after branch stake hole is carried out, put into the bifurcated pressurizer and to give system branch stake, carry out the perfusion of pile at last again.
The utility model has the advantages that:
1, the utility model bearing pile is significantly improved than the stability on common carrying bearing capacity of pile, basis, has overcome the surplus heavy amount on basis, makes more more stable and stronger of basis.
2, this used construction material can be saved more than 50% than existing various bases, and saves manpower, the energy and investment, the reduction of erection time, reduces cost.
3, the forming tool of the utility model bearing pile is simple in structure, and use and maintenance is convenient. Particularly solved bifurcated and done the difficult problem in hole, made the technology of multiple-limb, force bearing disk strengthening of foundation concrete bearing pile be achieved and use.

Claims (7)

1, a kind of multiple-limb, load dish underpin concrete bearing peg comprise pile, it is characterized in that having on the pile a plurality of and the angled branch's stake of pile axis; Also have one or more load dishes on the pile.
2,, it is characterized in that pile can be made up of the concrete floral tube and the interior pile in band branch stake hole according to the described bearing peg of claim 1.
3, a kind of multiple-limb, load dish underpin concrete bearing peg forming tool is characterized in that it is shaped by the pile hole to make (pressure) device, branch's pile hole forming bifurcated pressurizer and force-bearing disc hole shaping arched depressor composition; The bifurcated pressurizer has a cylindrical cutter seat, and the seat bottom is connected with the cutter holder, and a chisel that is made of cutter tail, power transmission ball, cutter head that flexibly connects together is housed in the circular hole in the cutter seat, and the cutter holder also has one to live and hold in the palm down; Arched depressor is to connect bow-shaped arm by the clear ring that is connected with pressure cylinder on center pillar.
4, according to the described forming tool of claim 3, it is characterized in that it is that a front end has cutting edge that (pressure) device is made in the shaping of pile hole, the cutting edge root has has the tubular type that can be provided with the plum blossom screw pile that fetches earth in one or more groups symmetrical branch stake hole, the body to make (pressure) device on thickened wall, the body.
5, according to the described forming tool of claim 3, it is characterized in that being shaped the pile hole, to make (pressure) device be that a front end has cutting edge, cutting edge root to have to have on thickened wall, the body in one or more groups symmetrical branch stake hole, the body and is provided with the plum blossom screw pile that fetches earth, and be externally connected with spiral beating (pressure) device of spiral leaf at body.
6,, it is characterized in that the pile body Inner Front End make (pressure) device that is shaped has conehead alive according to claim 4 or 5 described forming tools.
7,, it is characterized in that branch's stake bifurcated pressurizer has a single armed chisel or symmetrical both arms chisel is arranged according to the described forming tool of claim 3.
CN88220149U 1988-11-22 1988-11-22 Foundation reinforced concrete bearing pile with multi-branch of bearing dish Expired - Lifetime CN2046512U (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
CN88220149U CN2046512U (en) 1988-11-22 1988-11-22 Foundation reinforced concrete bearing pile with multi-branch of bearing dish
EP19890121260 EP0370396B1 (en) 1988-11-22 1989-11-17 A reinforced concrete load-bearing pile with multi-branches and enlarged footings and means for forming the pile
CA 2003376 CA2003376C (en) 1988-11-22 1989-11-20 A reinforced concrete load-bearing pile with multi-branches and enlarged footings and means for forming the pile
JP30450889A JPH02243820A (en) 1988-11-22 1989-11-22 Reinforcing concrete load bearing pipe having plurality of branches and spread post root part and means for forming pile
US07/743,831 US5122013A (en) 1988-11-22 1991-08-12 Reinforced concrete load-bearing pile with multi-branches and enlarged footings, and means and method for forming the pile
US07/844,734 US5219249A (en) 1988-11-22 1992-03-02 Reinforced concrete load-bearing pile forming device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN88220149U CN2046512U (en) 1988-11-22 1988-11-22 Foundation reinforced concrete bearing pile with multi-branch of bearing dish

Publications (1)

Publication Number Publication Date
CN2046512U true CN2046512U (en) 1989-10-25

Family

ID=4852424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN88220149U Expired - Lifetime CN2046512U (en) 1988-11-22 1988-11-22 Foundation reinforced concrete bearing pile with multi-branch of bearing dish

Country Status (4)

Country Link
EP (1) EP0370396B1 (en)
JP (1) JPH02243820A (en)
CN (1) CN2046512U (en)
CA (1) CA2003376C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100393947C (en) * 2006-06-05 2008-06-11 马金五 Construction method of tamping expending force bearing disc pile
CN101768962B (en) * 2009-01-05 2013-09-25 吴保全 Precast perforated pipe

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9724024D0 (en) * 1997-11-13 1998-01-14 Kvaerner Cementation Found Ltd Improved piling method
CN1057363C (en) * 1998-07-10 2000-10-11 贺德新 All-intelligent multifunctional hydraulic extruding extender
JP2019007149A (en) * 2017-06-21 2019-01-17 菱建基礎株式会社 Friction cut casing
CN111501740A (en) * 2020-06-04 2020-08-07 刘家赫 Improved cast-in-place CFG pile and composite foundation structure thereof and construction method thereof
CN111927323A (en) * 2020-08-28 2020-11-13 周冲 Rotary excavating bamboo joint pile construction method and device thereof
CN113818470B (en) * 2021-09-20 2023-05-02 肇庆市建筑工程有限公司 Building construction foundation pile
CN113775092B (en) * 2021-11-12 2022-02-08 中冶建筑研究总院有限公司 Assembled composite floor system of steel beam support precast slab in shape of Chinese character 'wang' and building thereof
CN114277835B (en) * 2022-03-07 2022-06-17 中国海洋大学 Uplift filling pile for reinforcing seabed and construction method thereof

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1443306A (en) * 1919-08-05 1923-01-23 Blumenthal Maurice Means for and method of producing concrete piles
US1521522A (en) * 1923-12-05 1924-12-30 Fowler Charles Evan Caisson and method of making the same
GB331945A (en) * 1929-04-19 1930-07-17 Callenders Cable & Const Co Improvements connected with the production of foundations for poles and the like
FR1427486A (en) * 1965-03-24 1966-02-04 Gnii Keramzitu Device for creating local footings in cast-pile shafts in bonded soils
DE2436093A1 (en) * 1974-07-24 1976-02-12 Mannesmann Roehren Werke Ag BUMP POST WITH ADAPTABLE SPREADERS
JPS5358105A (en) * 1976-11-08 1978-05-25 Nippon Concrete Ind Co Ltd Method of generating supporting force for middle excavation system
JPS5433313A (en) * 1977-08-17 1979-03-12 Marugo Kk Concrete pile
JPS54161715A (en) * 1978-06-12 1979-12-21 Kazuhiro Kawase Foundation pillar and method of executing foundation pillar
JPS55155825A (en) * 1979-05-23 1980-12-04 Marugo Kiso Kogyo Kk Burying method for pile with extension shoe
JPS5634823A (en) * 1979-08-30 1981-04-07 Touparu Gijutsu Kenkyusho:Kk Concrete pile injection constructing method
JPS57193621A (en) * 1981-05-23 1982-11-29 Tadayoshi Fujimatsu In-place reinforced concrete expanded bottom foundation pile and its construction and bit therefore
JPS6059224A (en) * 1983-09-07 1985-04-05 Kazuhiko Kishigami Construction of foundation pile
JPS62160315A (en) * 1985-12-30 1987-07-16 Kajima Corp Burying work of pile
JP3573794B2 (en) * 1994-06-20 2004-10-06 三洋電機株式会社 Hot air heater

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100393947C (en) * 2006-06-05 2008-06-11 马金五 Construction method of tamping expending force bearing disc pile
CN101768962B (en) * 2009-01-05 2013-09-25 吴保全 Precast perforated pipe

Also Published As

Publication number Publication date
CA2003376C (en) 1999-07-27
EP0370396A2 (en) 1990-05-30
CA2003376A1 (en) 1990-05-22
EP0370396A3 (en) 1991-04-03
JPH02243820A (en) 1990-09-27
EP0370396B1 (en) 1993-06-09

Similar Documents

Publication Publication Date Title
CN2046512U (en) Foundation reinforced concrete bearing pile with multi-branch of bearing dish
CN111357446A (en) Be used for rape to transplant planting device
CN1051065A (en) Multiple-limb, load dish underpin concrete bearing peg
CN209837088U (en) Ecological L type retaining wall of pin-connected panel
CN109137937B (en) Urban side slope environment-friendly greening and reinforcing engineering structure and construction process thereof
CN215252792U (en) Foundation reinforcing device
CN213773339U (en) Tubular pile with large bearing capacity
CN211621748U (en) Digging device for building infrastructure construction
CN112593480A (en) Plant-growing concrete assembled bridge pier
CN211036988U (en) A instrument that is used for PHC tubular pile stake core to draw soil
CN202881932U (en) Underwater mud pile
CN112443172A (en) Reinforced structure is used in ancient building rammed earth wall construction
CN212052839U (en) Building pile
CN1320215C (en) Method for making foundation piles in high embankment region
CN209162881U (en) A kind of photovoltaic bracket digging foundation of Complex Mountain
CN214832611U (en) Building combined foundation pile
CN212716132U (en) Gardens are with protection fence
CN2131899Y (en) Shaping unit for multi-support multi-loadbearing foundation reinfored stake
CN219908885U (en) Foundation reinforcing structure
CN211898529U (en) Landscape retaining wall capable of being planted
CN213625921U (en) Remote pipeline positioning device
CN221052652U (en) Building reinforcing pile
CN217027151U (en) Concrete highway slope protection structure
CN221133570U (en) Ecological restoration equipment of soil
CN214613560U (en) Plant-growing concrete assembled bridge pier

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
COR Change of bibliographic data

Free format text: CORRECT: PATENTEE ADDRESS; FROM: ROOM 102, HOUSE 27, BAFANGKUAI, HANGU DISTRICT, TIANJIN CITY TO: 100094 NO.301, BUILDING 4, FAMILY COMMITTEE OF WATER CONSERVANCY FOUNDATION GENERAL TEAM, NO.1, YANGCHANG, HEISHANHU, HAIDIAN DISTRICT, BEIJING CITY

CP03 Change of name, title or address

Address after: 100094 Beijing city Haidian District Montenegro Shanghai sheep farm No. 1 water conservancy Corps PTA Building No. 4 301

Patentee after: Zhang Junsheng

Patentee after: Xu Yanqin

Address before: Room 27, Building 102, box eight, Hangu District, Tianjin

Patentee before: Zhang Junsheng

Patentee before: Xu Yanqin

C15 Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993)
RN01 Renewal of patent term
C53 Correction of patent for invention or patent application
COR Change of bibliographic data

Free format text: CORRECT: PATENTEE ADDRESS; FROM: 4, NO. 1, HEISHANHUYANGCHANG, HAIDIAN DISTRICT, BEIJING CITY 1 301 TO: NO. 48, QINGLONGQIAOGONGDESI, HAIDIAN DISTRICT, BEIJING CITY, 100091

CP03 Change of name, title or address

Address after: 100091, 48, merit temple, Qinglong bridge, Beijing, Haidian District

Patentee after: Zhang Junsheng

Patentee after: Xu Yanqin

Address before: Beijing, Haidian District, Montenegro, Shanghai sheep farm No. 4 - 1 - 1 - 301

Patentee before: Zhang Junsheng

Patentee before: Xu Yanqin

C53 Correction of patent for invention or patent application
COR Change of bibliographic data

Free format text: CORRECT: PATENTEE ADDRESS; FROM: NO. 48, HAIDIANQINGLONGQIAOGONGDESI, BEIJING CITY, 100091 TO: 100084 ZIGUANG BUILDING, QINGHUA UNIVERSITYM, HAIDIAN, BEIJING CITY 505

CP03 Change of name, title or address

Address after: 100084 purple building, Tsinghua University, Beijing, Haidian 505

Patentee after: Zhang Junsheng

Patentee after: Xu Yanqin

Address before: 100091, 48, merit temple, Qinglong bridge, Beijing, Haidian

Patentee before: Zhang Junsheng

Patentee before: Xu Yanqin

C17 Cessation of patent right
CX01 Expiry of patent term