EP0587993B1 - Réservoir de métal liquide ultra-pur, son procédé de fabrication ainsi que l'installation de production de poudre métallique très pure - Google Patents

Réservoir de métal liquide ultra-pur, son procédé de fabrication ainsi que l'installation de production de poudre métallique très pure Download PDF

Info

Publication number
EP0587993B1
EP0587993B1 EP93108457A EP93108457A EP0587993B1 EP 0587993 B1 EP0587993 B1 EP 0587993B1 EP 93108457 A EP93108457 A EP 93108457A EP 93108457 A EP93108457 A EP 93108457A EP 0587993 B1 EP0587993 B1 EP 0587993B1
Authority
EP
European Patent Office
Prior art keywords
purity metal
vessel
lid
vessel body
molten
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP93108457A
Other languages
German (de)
English (en)
Other versions
EP0587993A1 (fr
Inventor
Hiroaki C/O Chuo-Kenkyusho Kohmoto
Noriaki C/O Chuo-Kenkyusho Murahashi
Rokuro C/O Chuo-Kenkyusho Sato
Tohru C/O Chuo-Kenkyusho Kohno
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Materials Corp
Original Assignee
Mitsubishi Materials Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP13285692A external-priority patent/JPH0730366B2/ja
Priority claimed from JP4132857A external-priority patent/JPH0791572B2/ja
Application filed by Mitsubishi Materials Corp filed Critical Mitsubishi Materials Corp
Publication of EP0587993A1 publication Critical patent/EP0587993A1/fr
Application granted granted Critical
Publication of EP0587993B1 publication Critical patent/EP0587993B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F9/00Making metallic powder or suspensions thereof
    • B22F9/02Making metallic powder or suspensions thereof using physical processes
    • B22F9/06Making metallic powder or suspensions thereof using physical processes starting from liquid material
    • B22F9/08Making metallic powder or suspensions thereof using physical processes starting from liquid material by casting, e.g. through sieves or in water, by atomising or spraying
    • B22F9/082Making metallic powder or suspensions thereof using physical processes starting from liquid material by casting, e.g. through sieves or in water, by atomising or spraying atomising using a fluid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/14Closures
    • B22D41/44Consumable closure means, i.e. closure means being used only once
    • B22D41/48Meltable closures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F9/00Making metallic powder or suspensions thereof
    • B22F9/02Making metallic powder or suspensions thereof using physical processes
    • B22F9/06Making metallic powder or suspensions thereof using physical processes starting from liquid material
    • B22F9/08Making metallic powder or suspensions thereof using physical processes starting from liquid material by casting, e.g. through sieves or in water, by atomising or spraying
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F9/00Making metallic powder or suspensions thereof
    • B22F9/02Making metallic powder or suspensions thereof using physical processes
    • B22F9/06Making metallic powder or suspensions thereof using physical processes starting from liquid material
    • B22F9/08Making metallic powder or suspensions thereof using physical processes starting from liquid material by casting, e.g. through sieves or in water, by atomising or spraying
    • B22F9/082Making metallic powder or suspensions thereof using physical processes starting from liquid material by casting, e.g. through sieves or in water, by atomising or spraying atomising using a fluid
    • B22F2009/0892Making metallic powder or suspensions thereof using physical processes starting from liquid material by casting, e.g. through sieves or in water, by atomising or spraying atomising using a fluid casting nozzle; controlling metal stream in or after the casting nozzle
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22FWORKING METALLIC POWDER; MANUFACTURE OF ARTICLES FROM METALLIC POWDER; MAKING METALLIC POWDER; APPARATUS OR DEVICES SPECIALLY ADAPTED FOR METALLIC POWDER
    • B22F2999/00Aspects linked to processes or compositions used in powder metallurgy

Definitions

  • the present invention relates to a method of producing a vessel for melting a high-purity metal (referred to simply as "melting vessel") without causing contamination of the metal.
  • the invention also is concerned with an apparatus for melting high-purity metal employing a vessel and with an apparatus for producing powder of high-purity metal with a high degree of uniformity of particle size.
  • powdered high-purity metal referred to simply as "powder producing apparatus”, hereafter
  • a melting vessel for melting a high-purity metal therein
  • a gas jetting means which directs a gas to the molten high-purity metal falling from the vessel.
  • Improvements also have been achieved in this field of technique, such as the use of a refractory metal, e.g., tantalum, molybdenum or rhenium, as the vessel material. Such improvements, however, are still unsatisfactory for the reason stated above.
  • the US-A-3665083 discloses an apparatus according to the preamble of claim 1.
  • an apparatus for melting and recasting a titanium alloy using a refractory crucible A titanium alloy disc is positioned in the crucible at the discharge outlet, which can be molten in order to discharge the molten metal through the disc to a mold.
  • the EP-A-199199 discloses a further apparatus for melting a high-purity metal using a melting vessel, in which the lid closing the opening and the bottom of the vessel is made from titanium.
  • the described apparatus uses an arc-generating electrode for melting the metal and the lid.
  • a problem of the known art is that the known melting vessels do not have any means for adjusting the size of the molten metal outlet port formed in the vessel bottom. Thus, the vessels could not be stably used in the gas atomizing method.
  • a vessel for melting a high-purity metal comprises a vessel body provided with a cooling jacket and with an opening of a predetermined size formed in the bottom thereof, and a lid made of the same material as the high-purity metal to be molten and closing the bottom opening of the vessel body.
  • an apparatus for melting a high-purity metal including: a melting vessel having a vessel body provided with an opening of a predetermined size formed in the bottom thereof, and a lid made of the same material as the high-purity metal to be molten and closing the bottom opening of the vessel body; a cooling system for cooling the inner surface region of the vessel body; a beam generating device; a measuring device for measuring the size of an output port formed in the lid and an analyzer; and a control device which controls one or both of the beam output power of the beam generating device and the rate of cooling effected by the cooling system in accordance with the output from the measuring device.
  • the melting vessel of the present invention has a vessel body having an opening of a predetermined size formed in the bottom thereof, means for cooling the inner surface region of the vessel wall and a lid made of the same material as the metal to be molten in the vessel and closing the bottom opening of the vessel.
  • the lid may be attached to the vessel body by, for example, preparing the lid of the same metal as the metal to be molten and fitting the lid into the opening.
  • the lid may be formed by a process including the steps of preparing a closure member having a substantially flattened upper surface, closing the bottom opening by the closure member by bringing the latter into abutment with the lower bottom surface of the vessel body, melting a small amount of the metal to be molten in the vessel so as to allow the molten metal to fill the concavity defined by the closure member and the vessel bottom wall surrounding the opening, and allowing the metal to solidify so as to fill the opening.
  • the melting vessel has a vessel body denoted by 2 which is a substantially cylindrical cup-like bottom-equipped structure having an internal cavity or recess 8.
  • the vessel body 2 is made of copper.
  • a tapered opening 10 converging downward is formed in the center of the bottom of the vessel body 2.
  • the vessel body 2 is double-walled to provide a jacket space 12 which communicates with the interior of the pipes 14 and 16 connected to the side wall of the vessel body 2. The arrangement is such that cooling water is supplied into the jacket space 12 through the pipe 14 so as to cool the inner surface region of the vessel body 2 and is then discharged through the pipe 16.
  • a lid 6 having a tapered outer peripheral surface 6a fits in the opening 10 of the vessel body 2, so as to close the opening 10.
  • This lid 6 is made of the same metal material as the melting object, i.e., the high-purity metal to be molten in the vessel.
  • the melting vessel of this embodiment includes the vessel body 2 and the lid 6.
  • the lid 6 may be separately formed in another vessel and then fitted in the opening 10 to close the latter.
  • the lid 6 may be formed by a method which will be described hereinunder with reference to Fig. 2.
  • a closure member 50 having a flattened upper surface.
  • the closure member 50 is brought into abutment with the lower bottom surface of the vessel body 2 to cover the opening 10.
  • a small amount of the metal M which is the same metal as the high-purity metal to be industrially molten in the vessel 2 is placed in the vessel.
  • This small amount of metal M is then molten by, for example, application of a voltage between the vessel body 2 and the metal M, while the vessel body 2 and the closure member 50 are being cooled. Consequently, the molten metal M flows into the recess 60 defined by the closure member 50 and the bottom wall of the vessel body 2 around the opening 10.
  • the molten metal M is then allowed to solidify within the recess 60.
  • the closure member 50 is removed from the vessel body 2, whereby the lid 6 "fitting" in the opening 10 is obtained in the same form as that shown in Fig. 1.
  • the-melting vessel In operation of the melting vessel of this embodiment, the-melting vessel is charged with an appropriate amount of high-purity metal and is molten by, for example, application of a voltage between the vessel body 2 and the high-purity metal to be molten, while the vessel body is cooled by a cooling medium such as water circulated through the jacket space 12.
  • a cooling medium such as water circulated through the jacket space 12.
  • the portion of the molten high-purity metal contacting the cooled inner wall surface of the vessel body 2 is cooled to solidify so as to form a thin solidified layer or shell covering the entire area of the inner wall surface of the vessel body 2.
  • This solidified metal layer is stably held as long as the cooling of the vessel body 2 is continued. Since the thin solidified metal layer is of the same metal as the high-purity metal molten in the vessel body 2, there is no risk that the metal, i.e., copper constituting the vessel body 2 is molten to contaminate the molten high-purity metal in the vessel body 2.
  • the lid 6 is not substantially molten because it is cooled as the vessel body 2 is cooled. That is to say, the cooling of the vessel body 2 is so controlled as to satisfy also the demand to maintain the lid 6 in solid state. Upper part of the lid 6 contacting the molten high-purity metal may be molten but this does not cause any contamination of the molten high-purity metal because the lid 6 is of the same high-purity metal as that molten in the vessel body 2.
  • the high-purity metal molten in the vessel body 2 is then made to fall downward from the vessel body 2 for the purpose of, for example, production of the metal powder.
  • a beam such as a laser beam, electron beam or a plasma beam is applied to the center of the lid 6 by a beam generator 32 which is disposed right above the lid 6, so that the central portion of the lid 6 is molten by the beam energy so as to form an outlet 6b.
  • the molten high-purity metal is discharged through this outlet 6b.
  • the size of the outlet is easily adjustable by controlling the rate of cooling of the vessel body 2 and the beam power.
  • the described embodiment of the melting vessel and vessel forming method of the present invention contamination of the molten high-purity metal, which inevitably occurred in the known art, is avoided whole through the period of operation including the melting period and discharging period in which the molten high-purity metal is discharged downward.
  • the size of the outlet port for discharging the molten high-purity metal downward can easily be adjusted.
  • the described embodiments enables steady supply of a molten high-purity metal to a process such as a gas-atomizing powder production process, without any risk of contamination of the molten high-purity metal.
  • the present invention also provides an apparatus for producing powder of a high-purity metal by using the above-described melting vessel for high-purity metal.
  • the powder producing apparatus in order to attain uniform particle size of the powder, is embodied in various forms as stated below, with specific consideration of the size of the bottom outlet port formed in the lid, as well as the particle size distribution of the powder which is formed by gas-atomization effected on the molten high-purity metal discharged through the bottom outlet port.
  • Fig. 4 shows an embodiment of the powder production apparatus of the present invention, in which a control is done by adjusting the size or diameter of the outlet port formed in the bottom of the melting vessel.
  • a melting vessel is composed of a vessel body 2 and a lid 6.
  • the vessel body 2 is a substantially cylindrical cup-shaped bottom equipped vessel having an internal recess 8.
  • a tapered opening 10 is formed in the center of the bottom of the vessel body 2 so as to converge downward.
  • the vessel body 2 is double-walled so that an internal jacket space 12 is formed in communication with pipes 14 and 16 connected to the side wall of the vessel body 2.
  • the pipe 14 and the pipe 16 are respectively connected to a water supply pipe 22 and a water return pipe 24 of a cooling system 20 which constitutes cooling means.
  • the arrangement is such that cooling water is supplied through the pipe 14 into the jacket space 12 so as to cool the inner surface region of the vessel body 2 and then discharged and collected through the pipe 16.
  • the cooling system 20 supplies cooling water of a constant temperature and has a function to measure the calorific value removed by cooling per unit time (cooling rate) on the basis of the difference between the constant temperature of water supplied into the melting vessel and the temperature of the water collected therefrom, as well as functions to control the initial temperature of the cooling water to be supplied and the volume of the cooling water delivered per unit time.
  • the lid 6 is made of the same high-purity metal as the high-purity metal which is to be industrially molten in the melting vessel body 2.
  • the lid 6 has a tapered outer peripheral surface 6a which closely fits the tapered wall defining the opening 10 in the vessel body 2 thereby closing the opening 10.
  • Gas jetting devices 18, 18 disposed under the melting vessel body 2 have nozzles 18a, 18a which jet an inert gas such as Ar gas of a constant pressure to the stream of the molten high-purity metal discharged from the melting vessel body 2, thereby atomizing the molten metal to form particles of the high-purity metal.
  • an inert gas such as Ar gas of a constant pressure
  • a size measurement device 26 such as a camera, disposed near the bottom side of the melting vessel body 2, measures the size, e.g., diameter, of the outlet port formed in the center of the lid 6.
  • the size measuring device 26 is connected to a control device 30 serving as control means, through an analyzer 28 which performs image processing and other operations.
  • the measuring device 26 and the analyzer 28 in cooperation form a port diameter detecting means.
  • the control device 30 includes a central processing unit (CPU), a program ROM and various I/O interfaces.
  • a beam generating device 32 which is disposed right above the lid 6 emits and directs a beam towards the central portion of the lid 6.
  • the beam generating device 32 is connected to the control device 30 mentioned before.
  • the beam generating device 32 may be of the type which generates a laser beam, an electron beam, a plasma beam or an arc beam.
  • the control device 30 also is connected to the cooling system 20 to control the cooling rate.
  • the melting vessel body 2 is charged with an appropriate amount of high-purity metal and is molten by, for example, application of a voltage between the vessel body 2 and the high-purity metal to be molten, while the inner surface region of the vessel body 2 is cooled by a cooling medium such as water circulated through the jacket space 12.
  • a cooling medium such as water circulated through the jacket space 12.
  • the portion of the molten high-purity metal contacting the cooled inner wall surface 2a of the vessel body 2 is cooled to solidify so as to form a thin solidified layer or shell covering the entire area of the inner wall surface 2a of the vessel body 2.
  • This solidified metal layer is stably held as long as the cooling of the vessel body 2 is continued. Since the thin solidified metal layer is of the same metal as the high-purity metal molten in the vessel body 2, there is no risk that the metal, i.e., copper constituting the vessel body 2 is molten to contaminate the molten high-purity metal in the vessel body 2.
  • the lid 6 is not substantially molten because it is cooled as the vessel body 2 is cooled. That is to say, the cooling of the vessel body 2 is so controlled as to satisfy also the demand to maintain the lid 6 in solid state. Upper part of the lid 6 contacting the molten high-purity metal may be molten but this does not cause any contamination of the molten high-purity metal because the lid 6 is of the same high-purity metal as that molten in the vessel body 2.
  • a beam is applied by the beam generating device 32 to the central portion of the lid 6 so as to perforate the central region 6b of the lid 6 thereby forming an outlet port. Consequently, the molten high-purity metal inside the vessel body 2 progressively flows out downward through the outlet port, and the downward fall of the molten high-purity metal is cooled and solidified and, in addition, micronized upon collision with the inert gas jetted from the gas jetting devices 18, whereby a powder of the high-purity metal is produced continuously.
  • control device 30 operates to control either one or both of the beam power of the beam generating device 32 and the cooling device 20, based on information concerning the size of the outlet port derived from the measuring device 26 and the analyzer 28, so as to maintain the size of the outlet port constant.
  • control device 30 operates such that, for example, when the size of the outlet port is greater than an appropriate size, the cooling rate is increased to enhance the effect of cooling of the lid 6 thereby reducing the size of the outlet port, whereas, when the size of the outlet port is smaller than the appropriate value, the beam power is increased relative to the cooling rate so as to apply greater heat to the central region 6b of the lid 6 to enlarge the outlet port.
  • the size of the outlet port formed in the lid 6 is maintained constant, so that the molten high-purity metal is discharged steadily at a constant rate, thereby ensuring that the produced metal powder has high degree of uniformity of particle size.
  • the powder production apparatus shown in Fig. 5 lacks the size measuring device 26 and the analyzer 28 employed in the embodiment shown in Fig. 4 but, instead, incorporates a particle size measuring device 40 which constitutes particle size detecting means.
  • This particle size measuring device 40 measures particle size of the product powder by making use of laser diffraction. Part of the high-purity metal powder produced through the gas jetting devices 18, 18 is made to pass through the particle size measuring device 40 for measurement of the powder particle size.
  • the output data from the particle size measuring device 40 is delivered to the control device 30.
  • the process for producing high-purity metal powder in this embodiment is substantially the same as that in the embodiment shown in Fig. 4.
  • the control of the beam output and/or the cooling rate is conducted based upon the powder particle size obtained from the particle size measuring device 40, in contrast to the preceding embodiment of Fig. 4 in which the control is performed in accordance with the data concerning the size of the outlet port derived from the measuring device 26.
  • the embodiment shown in Fig. 5 ensures that the product powder has a high degree of uniformity of the particle size.
  • control device 30 operates such that, for example, when the measured powder particle size is greater than an appropriate size, the cooling rate is increased to enhance the effect of cooling of the lid 6 thereby reducing the size of the outlet port, whereas, when the size of the outlet port is smaller than the appropriate value, the beam power is increased relative to the cooling rate so as to apply greater heat to the central region 6b of the lid 6 to enlarge the outlet port.
  • high-purity metal used in this specification should be understood to cover not only pure metals but also alloys and intermetallic compounds.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Manufacture Of Metal Powder And Suspensions Thereof (AREA)

Claims (8)

  1. Appareil de fusion d'un métal de grande pureté utilisant un récipient de fusion comprenant un corps formant récipient (2) comportant une ouverture (10) d'une taille prédéterminée formée dans le fond ; et un couvercle (6) fermant ladite ouverture (10) et fait de la même matière que le métal de grande pureté à fondre dans ledit corps formant récipient (2), caractérisé en ce que ledit corps formant récipient (2) possède des moyens (12, 20) pour refroidir la zone de surface intérieure (8) de ce dernier, et en ce que l'appareil comprend un dispositif de production de faisceau (32) disposé juste au-dessus dudit couvercle (6), pour appliquer un faisceau à la partie centrale dudit couvercle ; des moyens de détermination de taille d'orifice (26 ; 40) pour déterminer la taille d'un orifice de sortie (6b) formé dans ledit couvercle (6) par ledit faisceau ; des moyens de commande (28, 30) pour commander la puissance de sortie du faisceau desdits moyens de production de faisceau (32) et/ou la vitesse de refroidissement réalisé par lesdits moyens de refroidissement (12, 20) selon la sortie en provenance desdits moyens de détermination de taille d'orifice (26 ; 40) .
  2. Appareil selon la revendication 1, caractérisé en ce que lesdits moyens de détermination d'orifice (26 ; 40) comprennent des moyens de détection de taille d'orifice (26) disposés sous ledit couvercle (6), pour détecter la taille d'un orifice de sortie (6b) formé dans ledit couvercle (6) par ledit faisceau.
  3. Appareil selon la revendication 1 ou 2, pour produire une poudre d'un métal de grande pureté, comprenant : un dispositif d'émission de jet de gaz (18, 18a) qui oriente un jet de gaz vers le flot allant vers le bas (34) du métal fondu de grande pureté déchargé dudit récipient.
  4. Appareil selon l'une quelconque des revendications 1 à 3, pour produire une poudre d'un métal de grande pureté, caractérisé en ce que lesdits moyens de détermination d'orifice (26 ; 40) comprennent des moyens de détection de taille de particule (40) disposés sous ledit couvercle (6), pour détecter la taille de particule d'une poudre de métal de grande pureté produite par ledit jet de gaz agissant sur ledit flot allant vers le bas du métal fondu de grande pureté.
  5. Appareil selon l'une des revendications 2 à 4, caractérisé en ce que lesdits moyens de commande (28, 30) commandent la puissance de sortie du faisceau desdits moyens de production de faisceau (32) et/ou la vitesse de refroidissement réalisé par lesdits moyens de refroidissement (12, 20) selon la sortie en provenance desdits moyens de détection de taille d'orifice (26) et/ou en provenance desdits moyens de détection de taille de particule (40).
  6. Appareil selon l'une des revendications 1 à 5, dans lequel ledit dispositif de production de faisceau produit soit un faisceau laser, soit un faisceau d'électrons, soit un faisceau de plasma, et soit un faisceau d'arc.
  7. Procédé de production d'un récipient de fusion, comprenant la préparation d'un corps formant récipient (2) comportant une ouverture (10) d'une taille prédéterminée formée dans le fond et des moyens (12, 20) pour refroidir la zone de surface intérieure (8) de ce dernier ; la préparation d'un couvercle (6) pour fermer ladite ouverture (10) à partir de la même matière que le métal de grande pureté à fondre dans ledit corps formant récipient ; et l'utilisation des étapes de fermeture de ladite ouverture (10) en amenant un élément de fermeture (50), ayant une surface supérieure sensiblement aplatie, en butée contre la surface de fond inférieure dudit corps formant récipient (2) ; la fusion d'une petite quantité dudit métal de grande pureté (11) dans ledit corps formant récipient (2) de façon à remplir l'évidement (60) formé par ledit élément de fermeture (50) et la paroi de fond dudit corps formant récipient (2) définissant ladite ouverture (10) avec le métal fondu de grande pureté ; l'autorisation de solidification du métal fondu de grande pureté dans ledit évidement ; et de retrait dudit élément de fermeture dudit corps formant récipient.
  8. Procédé de production d'un récipient de fusion selon la revendication 7, dans lequel les étapes de préparation d'un corps formant récipient (2) comprennent : le refroidissement de la zone de surface intérieure (8) de ce dernier.
EP93108457A 1992-05-25 1993-05-25 Réservoir de métal liquide ultra-pur, son procédé de fabrication ainsi que l'installation de production de poudre métallique très pure Expired - Lifetime EP0587993B1 (fr)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP132856/92 1992-05-25
JP13285692A JPH0730366B2 (ja) 1992-05-25 1992-05-25 高純度金属粉末の製造装置
JP4132857A JPH0791572B2 (ja) 1992-05-25 1992-05-25 高純度金属溶解用容器及びその製造方法
JP132857/92 1992-05-25

Publications (2)

Publication Number Publication Date
EP0587993A1 EP0587993A1 (fr) 1994-03-23
EP0587993B1 true EP0587993B1 (fr) 1998-08-12

Family

ID=26467320

Family Applications (1)

Application Number Title Priority Date Filing Date
EP93108457A Expired - Lifetime EP0587993B1 (fr) 1992-05-25 1993-05-25 Réservoir de métal liquide ultra-pur, son procédé de fabrication ainsi que l'installation de production de poudre métallique très pure

Country Status (2)

Country Link
EP (1) EP0587993B1 (fr)
DE (1) DE69320278T2 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104254416A (zh) * 2012-02-29 2014-12-31 伊拉斯蒂尔·克罗斯特公司 用于金属雾化的系统和用于雾化金属粉末的方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT407846B (de) * 1998-11-18 2001-06-25 Boehler Edelstahl Metallurgisches gefäss

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3665083A (en) * 1968-10-14 1972-05-23 Trw Inc Apparatus for melting titanium
US4654858A (en) * 1985-04-19 1987-03-31 General Electric Company Cold hearth melting configuration and method
US4999051A (en) * 1989-09-27 1991-03-12 Crucible Materials Corporation System and method for atomizing a titanium-based material
US5084091A (en) * 1989-11-09 1992-01-28 Crucible Materials Corporation Method for producing titanium particles

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104254416A (zh) * 2012-02-29 2014-12-31 伊拉斯蒂尔·克罗斯特公司 用于金属雾化的系统和用于雾化金属粉末的方法

Also Published As

Publication number Publication date
DE69320278D1 (de) 1998-09-17
DE69320278T2 (de) 1999-03-25
EP0587993A1 (fr) 1994-03-23

Similar Documents

Publication Publication Date Title
EP0541327B1 (fr) Procédé contrÔlé pour produire un courant de poudre métallique atomisée
EP0194847B1 (fr) Méthode de production de poudre de titane
US5310165A (en) Atomization of electroslag refined metal
US5084091A (en) Method for producing titanium particles
US5649992A (en) Methods for flow control in electroslag refining process
US5769151A (en) Methods for controlling the superheat of the metal exiting the CIG apparatus in an electroslag refining process
US5268018A (en) Controlled process for the production of a spray of atomized metal droplets
EP0471798B1 (fr) Filature en fusion a fond de moule refroidi par induction d'alliages metalliques reactifs
US4897111A (en) Method for the manufacture of powders from molten materials
US5427173A (en) Induction skull melt spinning of reactive metal alloys
EP0587993B1 (fr) Réservoir de métal liquide ultra-pur, son procédé de fabrication ainsi que l'installation de production de poudre métallique très pure
US4408971A (en) Granulation apparatus
Passow A study of spray forming using uniform droplet sprays
US5992503A (en) Systems and methods for maintaining effective insulation between copper segments during electroslag refining process
JPS60255906A (ja) 活性金属粉末の製造方法及び設備
JPS58177403A (ja) セラミツクを含まない高純度金属粉末を製造する方法および装置
JPH0730366B2 (ja) 高純度金属粉末の製造装置
US4014964A (en) Process for making metal powder using a laser
US4009233A (en) Method for producing alloy particles
JPS63210206A (ja) 金属粉末製造装置
JP2577173B2 (ja) 金属微粉末の製造方法及び装置
US6250522B1 (en) Systems for flow control in electroslag refining process
JPS63145703A (ja) 粉末製造装置
JPH0724290A (ja) セラミックス材料粉末の製造装置
JPS61295306A (ja) 金属微粉末の製造方法およびその装置

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): DE GB

17P Request for examination filed

Effective date: 19940420

17Q First examination report despatched

Effective date: 19970129

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE GB

REF Corresponds to:

Ref document number: 69320278

Country of ref document: DE

Date of ref document: 19980917

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20120530

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20120518

Year of fee payment: 20

REG Reference to a national code

Ref country code: DE

Ref legal event code: R071

Ref document number: 69320278

Country of ref document: DE

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

Expiry date: 20130524

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20130524

Ref country code: DE

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20130528