EP0354335A2 - Support pour un bouclier de percement - Google Patents
Support pour un bouclier de percement Download PDFInfo
- Publication number
- EP0354335A2 EP0354335A2 EP89111810A EP89111810A EP0354335A2 EP 0354335 A2 EP0354335 A2 EP 0354335A2 EP 89111810 A EP89111810 A EP 89111810A EP 89111810 A EP89111810 A EP 89111810A EP 0354335 A2 EP0354335 A2 EP 0354335A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- formwork
- shield
- support
- ring
- rings
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000009415 formwork Methods 0.000 claims abstract description 69
- 238000006243 chemical reaction Methods 0.000 claims abstract description 11
- 238000011065 in-situ storage Methods 0.000 claims abstract description 7
- 238000009412 basement excavation Methods 0.000 claims description 4
- 238000009434 installation Methods 0.000 claims description 3
- 210000001061 forehead Anatomy 0.000 claims description 2
- 230000000977 initiatory effect Effects 0.000 claims 1
- 230000005641 tunneling Effects 0.000 description 7
- NMFHJNAPXOMSRX-PUPDPRJKSA-N [(1r)-3-(3,4-dimethoxyphenyl)-1-[3-(2-morpholin-4-ylethoxy)phenyl]propyl] (2s)-1-[(2s)-2-(3,4,5-trimethoxyphenyl)butanoyl]piperidine-2-carboxylate Chemical compound C([C@@H](OC(=O)[C@@H]1CCCCN1C(=O)[C@@H](CC)C=1C=C(OC)C(OC)=C(OC)C=1)C=1C=C(OCCN2CCOCC2)C=CC=1)CC1=CC=C(OC)C(OC)=C1 NMFHJNAPXOMSRX-PUPDPRJKSA-N 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 210000003128 head Anatomy 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0607—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
Definitions
- the invention relates to a support for a jacking shield, as described in the preamble of claim 1.
- reaction forces cannot be transferred directly to the lining.
- the pressure of the freshly poured concrete on the forehead formwork in the annular space is generally not sufficient to absorb the reaction forces that arise during driving. They are therefore introduced at the front of the formwork and released from the formwork by skin friction to the already hardened concrete in the rear, switched area.
- the jacking presses supported on the formwork must be moved back at least in the area to be cleared for the installation of the formwork part to be moved.
- the shield is not supported by jacking presses for the period of implementation of this formwork part, at least in sections of the shield circumference.
- a disadvantage of this previously used auxiliary support is that the connections for anchoring the carrier to the formwork have to be loosened each time a formwork ring is moved through the erector with the folded formwork ring. Furthermore, these limited number of unwieldy braces of the auxiliary support connected to the formwork generate forces which are the cause of a very unfavorable load on the formwork, the front formwork section being completely relieved of longitudinal forces during the reinforcement.
- the invention intends to further develop a support for a jacking shield of the generic type such that when a new formwork ring for in-situ concrete expansion is set, the driving shield can be securely supported on the formwork rings, the course of forces in the formwork and in-situ concrete expansion during the auxiliary support is virtually unchanged from the state of the advance remains.
- the auxiliary support of the shield during the relocation of the formwork rings is brought about by length-adjustable support units arranged concentrically on the inside of the jacket.
- these support units are simple elements that are common in tunnel construction and can be actuated fully mechanically.
- the support units on separate lugs on the outer surface of the formwork outside the abutting surfaces of the individual formwork rings do not require any additional handles on the formwork or on the traveling girder if a formwork ring is to be moved.
- the freedom of movement of the erector on the carriage is not restricted by any auxiliary devices for supporting the shield.
- the installation of the support units according to the invention requires a slight extension of the tail part of the shield and a shield tail seal with an enlarged working area, which results from the widening of the annular gap necessary for the sliding over of the lugs.
- a tunnel tube 2 is opened with a shield 1.
- the lining 3 of the tunnel tube 2 consists of in-situ concrete, which is pressed through openings in the front formwork 4 into the annular gap 5, which the breakout profile 6 and the outer surface of the inner formwork 7 form together.
- the inner formwork 7 is built up from formwork rings 8.9.
- the jacking presses 12 are supported at the front against the shield 1 and at the rear via a pressure ring 13 on the end face 11 of the foremost formwork ring 9.
- the jacking presses 12 transmit the reaction forces from the jacking and any excess pressure in the excavation chamber 14 to the inner formwork 7.
- the jacking presses 12 are pulled in with the pressure ring 13 in order to make room for inserting a formwork ring 10 which has been removed from the rear end of the inner formwork 7 in front of the last installed formwork ring 9 of the inner formwork.
- the formwork ring 10 can be dismantled unhindered by the support units 16 from the erector 18 movable on the driving beam 19 at the rear end of the inner formwork 7, transported to the front end of the inner formwork 7 and reinstalled will.
- the jacking presses 12 are pressed with the pressure ring 13 against the end face 11 of the newly installed formwork ring and a new jacking section can begin.
- the supports 16 can be withdrawn. While the supports 16 are in operation, suitable devices - in the example a hydraulic cylinder 21 - press the head 20 of the support 16 against the outer surface of the inner formwork 7.
- the tail 15 with the front formwork 4 and the tail seal 22 must slide over the lugs 17.
- the lugs 17 are therefore expediently tapering backwards against the formwork surface with a slight slope and the annular gap 23 between the end formwork 4 and the outer surface of the inner formwork 7 is correspondingly wider.
- a shield tail seal 22 with a correspondingly enlarged working area must be provided.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19883827098 DE3827098C1 (fr) | 1988-08-10 | 1988-08-10 | |
DE3827098 | 1988-08-10 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0354335A2 true EP0354335A2 (fr) | 1990-02-14 |
EP0354335A3 EP0354335A3 (fr) | 1990-12-19 |
Family
ID=6360569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19890111810 Withdrawn EP0354335A3 (fr) | 1988-08-10 | 1989-06-29 | Support pour un bouclier de percement |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP0354335A3 (fr) |
DE (1) | DE3827098C1 (fr) |
ES (1) | ES2013224A4 (fr) |
GR (1) | GR900300053T1 (fr) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0890708A1 (fr) | 1997-07-11 | 1999-01-13 | Heerema Ondergrondse Infrastructuren B.V. | Procédé, système et dispositif pour la construction de parois dans le sol |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT394032B (de) * | 1990-09-04 | 1992-01-27 | Anton Ruef | Einrichtung zum aufbereiten von oelhaltigen schlaemmen |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3515680A1 (de) * | 1983-09-07 | 1986-11-06 | Dyckerhoff & Widmann AG, 8000 München | Verfahren zum herstellen eines roehrenfoermigen unterirdischen hohlraums, z. b. einer rohrleitung, sowie vorrichtung zum durchfuehren des verfahrens |
DE3628028A1 (de) * | 1986-08-19 | 1988-02-25 | Gewerk Eisenhuette Westfalia | Schildvortriebseinrichtung |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3015210C2 (de) * | 1980-04-19 | 1983-01-13 | Bade & Theelen Gmbh, 3160 Lehrte | Schildvortriebsmaschine für Tunnel und Strecken |
-
1988
- 1988-08-10 DE DE19883827098 patent/DE3827098C1/de not_active Expired
-
1989
- 1989-06-29 EP EP19890111810 patent/EP0354335A3/fr not_active Withdrawn
- 1989-06-29 ES ES89111810T patent/ES2013224A4/es active Pending
-
1991
- 1991-07-31 GR GR90300053T patent/GR900300053T1/el unknown
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3515680A1 (de) * | 1983-09-07 | 1986-11-06 | Dyckerhoff & Widmann AG, 8000 München | Verfahren zum herstellen eines roehrenfoermigen unterirdischen hohlraums, z. b. einer rohrleitung, sowie vorrichtung zum durchfuehren des verfahrens |
DE3628028A1 (de) * | 1986-08-19 | 1988-02-25 | Gewerk Eisenhuette Westfalia | Schildvortriebseinrichtung |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0890708A1 (fr) | 1997-07-11 | 1999-01-13 | Heerema Ondergrondse Infrastructuren B.V. | Procédé, système et dispositif pour la construction de parois dans le sol |
US6357965B2 (en) | 1997-07-11 | 2002-03-19 | Heerema Ondergrondse Infrastructuren B.V. | Method, system and device for building a wall in the ground |
Also Published As
Publication number | Publication date |
---|---|
ES2013224A4 (es) | 1990-05-01 |
DE3827098C1 (fr) | 1989-12-21 |
EP0354335A3 (fr) | 1990-12-19 |
GR900300053T1 (en) | 1991-07-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2550050C2 (de) | Einrichtung zum Auffahren von Tunnels o.dgl. mittels eines Verbauschildes unter Einbringen einer Ortbetonauskleidung | |
DE2852663C2 (de) | Messerschild | |
DE19722000A1 (de) | Tunnelbohrmaschine | |
EP0513083B1 (fr) | Coffrage-support et glissant automoteur pour la mise en oeuvre d'un revetement en beton coule sur place | |
DE2622671C2 (de) | Einrichtungen zum Vortrieb eines Grabens im offenen Verbau für die Rohrverlegung | |
CH646490A5 (de) | Verfahren und vorrichtung zum einbringen einer betonauskleidung beim vortrieb unterirdischer hohlraeume. | |
DE2739079A1 (de) | Verfahren zur herstellung eines tunnels mit unterteiltem querschnitt | |
DE2725827A1 (de) | Messerschild-vortriebseinrichtung | |
DE1206938B (de) | Steuerbarer Vortriebsschild zum Auffahren von Tunneln, Strecken od. dgl., und Verfahren zum Herstellen einer Ortbetonauskleidung mit einem solchen Vortriebsschild | |
EP0354335A2 (fr) | Support pour un bouclier de percement | |
DE2857475C1 (de) | Vorrichtung und Verfahren fuer den Ausbau eines im Schildvortrieb aufgefahrenen Tunnels | |
DE2555524C2 (de) | Vortriebsmesser für einen Verbauschild | |
DE3404839A1 (de) | Schildvortriebsverfahren zur herstellung einer ortbetonroehre und vorrichtung zur durchfuehrung des verfahrens | |
AT399203B (de) | Vorrichtung zum vortreiben von tunnel und stollen | |
DE2605741C2 (de) | Verbauschild und Verfahren zum Auffahren eines Tunnels, Stollens, Grabens o.dgl. unter Verwendung eines Verbauschildes | |
DE3526205C2 (fr) | ||
DE1658770C3 (de) | Verfahren zum Ausbauen eines Tunnels mit Tübbing-Ringen und Vortriebsschild zur Durchführung dieses Verfahrens | |
EP0624693B1 (fr) | Procédé et dispositif de réalisation des ouvrages d'étanchéité en segment, dans la construction civile | |
EP1273727B1 (fr) | Procédé et dispositif de pose de conduits, en particulier de canalisations | |
DE3435724C2 (fr) | ||
DE2605740C2 (de) | Verfahren zum Auffahren von Tunneln u.dgl. mittels eines Verbauschildes und Vortriebsmesser zur Verwendung bei einem Verbauschild | |
DE2553248C3 (de) | Messerschild und Verfahren zum Einbau von Ausbauelementen im Messerschwanzbereich des Schildes | |
DE2429805C3 (de) | Schalungseinrichtung zum Ausbau von Strecken und Stollen | |
DE3520092A1 (de) | Verfahren zum herstellen eines roehrenfoermigen unterirdischen hohlraums, z.b. eines verkehrstunnels sowie vorrichtung zum durchfuehren des verfahrens | |
DE2743225A1 (de) | Schreitender ausbautunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH ES FR GR IT LI NL |
|
TCNL | Nl: translation of patent claims filed | ||
ITCL | It: translation for ep claims filed |
Representative=s name: LENZI & C. |
|
EL | Fr: translation of claims filed | ||
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH ES FR GR IT LI NL |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 19910620 |