EP0351582A1 - Great length pre-stressing strand for prestressed concrete with grouted anchoring, and method for installing it - Google Patents
Great length pre-stressing strand for prestressed concrete with grouted anchoring, and method for installing it Download PDFInfo
- Publication number
- EP0351582A1 EP0351582A1 EP89111441A EP89111441A EP0351582A1 EP 0351582 A1 EP0351582 A1 EP 0351582A1 EP 89111441 A EP89111441 A EP 89111441A EP 89111441 A EP89111441 A EP 89111441A EP 0351582 A1 EP0351582 A1 EP 0351582A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- anchoring
- tendon
- length
- tensioning
- prestressing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004873 anchoring Methods 0.000 title claims abstract description 50
- 238000000034 method Methods 0.000 title claims description 14
- 239000011513 prestressed concrete Substances 0.000 title claims description 9
- 239000000463 material Substances 0.000 claims abstract description 34
- 238000002347 injection Methods 0.000 claims abstract description 18
- 239000007924 injection Substances 0.000 claims abstract description 18
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 7
- 238000003780 insertion Methods 0.000 claims abstract description 3
- 230000037431 insertion Effects 0.000 claims abstract description 3
- 210000002435 tendon Anatomy 0.000 claims description 46
- 229910000831 Steel Inorganic materials 0.000 claims description 13
- 239000010959 steel Substances 0.000 claims description 13
- 238000004519 manufacturing process Methods 0.000 claims description 8
- 239000013505 freshwater Substances 0.000 claims description 6
- 238000001125 extrusion Methods 0.000 claims description 4
- 239000002131 composite material Substances 0.000 claims description 3
- 230000000149 penetrating effect Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 description 11
- 238000005253 cladding Methods 0.000 description 8
- 230000002787 reinforcement Effects 0.000 description 4
- 239000013535 sea water Substances 0.000 description 3
- 238000007667 floating Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 210000002421 cell wall Anatomy 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000011010 flushing procedure Methods 0.000 description 1
- 238000007665 sagging Methods 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/08—Members specially adapted to be used in prestressed constructions
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/58—Prestressed concrete piles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/12—Mounting of reinforcing inserts; Prestressing
Definitions
- the invention relates to a bundle tendon of large length for prestressed concrete with a subsequent composite of a plurality of individual elements, such as steel bars, wires or wire strands, which in a in a structural part e.g. can be introduced by installing a cladding tube that runs vertically or inclined and can only be accessed at one end and that can be supported at one end by means of an anchor device having an anchor plate relative to the structural part, and a method for its installation.
- tension members made of steel into cavities that are only accessible from one end and their anchoring at the inaccessible end is known in principle in the manufacture of earth and rock anchors.
- An anchoring section is also produced here by injecting hardening material in the depth of the borehole, which serves to firmly anchor the tension member, which is then tensioned from the air end and anchored by means of anchor devices known from prestressed concrete construction.
- the free steel length between the anchoring section and the air-side anchor device basically remains freely stretchable. Similar methods of working are also known for anchoring structures such as retaining walls, dams or the like in the ground.
- tendons also in the form of steel wire strands, have a large, but at least limited length, so that such hairpin-shaped tendons can only achieve component heights that correspond to a maximum of half the tendon length. At larger building heights, intermediate joints with again hairpin-shaped tendons are necessary.
- the invention has for its object to provide a way to design and install a tendon, which is to be installed in a tension channel accessible only at one end, in such a way that it is reliably anchored not only at the inaccessible end, but that the full filling of the tensioning channel for the production of the subsequent bond can also be checked.
- this object is first achieved by a tendon, the individual elements of which are firmly connected to one another at the end of the tendon facing the other end of the tendon, for example welded, and for anchoring over a certain anchoring length in a form-fitting manner with means for additional anchoring in the for producing subsequent composite in the tensioning channel to be injected hardening material are provided.
- the means for additional anchoring to the individual elements are expediently arranged offset from one another.
- the means for additional anchoring expediently consist of the steel wire strands, e.g. metallic sleeves pressed by extrusion.
- the use of means for additional anchoring of the individual elements of a bundle tendon, which are not arranged at the extreme end of the tendon, but offset against one another over the entire anchoring distance, has the advantage that the individual elements can be welded to one another at the extreme end; this is necessary in order to be able to wind the entire, often very long tendon on a reel and lower it reliably into the tendon.
- the means for additional anchoring which regularly increase the diameter of the individual elements, such as pressed-on metallic sleeves, at the same time form spacers which keep the individual elements at a distance from one another in the region of the anchoring length, so that they are full in the injectable hardening material can be embedded; this also makes the The diameter of the entire bundle tendon is minimized in the area of the anchoring length.
- comparatively narrow cladding tubes can be used for the tensioning channel, which in turn leads to small structural dimensions.
- the invention further relates to a method for installing such a bundle tendon in a structural part, in which, after the tendon has been introduced into the tensioning channel, material is first hardened over the area of the anchoring length into the tensioning channel by means of a first injection line provided at the lower end of the anchoring length with an outlet opening is injected, in which after the hardening of this material the tendon is tensioned and anchored by means of the anchor device and then by means of a second injection line provided at the upper end of the anchoring length with an outlet opening, hardening material is injected over the area of the span length into the tensioning channel.
- the first and second injection lines expediently run outside the tensioning channel.
- hardening material which has penetrated into the region of the span length can be removed from the anchor device by rinsing by means of the second injection line. This rinsing process can continue until the material begins to harden or can be repeated periodically.
- the anchoring area on the air side may be over a third injection line, running outside the tensioning channel and flowing into the anchor device below it, is re-injected with hardening material.
- Fig. 1 is a longitudinal section through a wall 1, e.g. a cell wall of a multi-cell structure made of reinforced concrete is shown. It is assumed that the wall at the lower end is based on the sea floor or on a foundation, while the upper end is above the water level; the height of the structure can be 85 m and more.
- a tensioning channel 3 is formed by a cladding tube 2 embedded therein, into which a bundle tendon 4 is inserted.
- the bundle tendon 4 is shown in the illustration of FIG. 1 consisting of only three individual elements 5; it actually consists of a larger, basically any number of individual elements, in the example of FIGS. 2 to 4 of nineteen elements 5, e.g. Steel wire strands.
- the structural part 1 also includes a flaccid reinforcement 6, which is only indicated along the outer wall in FIG. 1.
- the individual elements 5, as shown in FIG. 4, are welded to one another in a tight position at the lower end 7.
- they are provided with means 8 for the locally concentrated application of force.
- These means 8 are expediently pressed onto the individual steel wire strands by means of extrusion; as shown in FIG. 2 in particular, they are grouped together at equal distances l from one another in order to distribute them as evenly as possible over the anchoring length L v .
- the bundle of the individual elements 5 is fixed in this area, for example by a wrapping 9 (FIG. 3).
- hose-like lines are led up parallel to this, namely an injection line A, which opens at 10 at the lower end of the anchoring length L v into the tensioning channel 3, and a flushing and injection line B, which approximately the boundary between the anchoring length L v and the overlying span length L s at 11 opens into the tension channel 3.
- Another line C leads from the air side into the area of the tensioning channel 3 below the anchor device 12;
- a fourth line D is connected to a cover cap 13, with which the tensioning channel 3 in the area of the anchor device 12 can be temporarily closed during the construction stage. If the diameter of the cladding tube 2 can be chosen to be correspondingly large, it is in principle also possible to route the lines A and B within the tensioning channel 3.
- Fig. 5a shows schematically the state of construction after the production of the tension channel 3 with the injection lines A, B and C. It can be seen that the line A at the lower end of the anchoring length L v at 10 opens into the tension channel 3; the line B in the border area between the anchoring length L v and the span length L s at 11 and the line C slightly below the upper end of the tension channel 3.
- Embodiment is the manufacture of a structural part that is kept floating in sea water, precautionary measures must be taken to ensure that the tension channel 3 does not fill with sea water that has aggressive properties and is corrosive both to the cladding tube 2 forming the tension channel 3 and also can act on the tendon 4 to be introduced later.
- the tensioning channel 3 is therefore initially filled with fresh water, which is indicated in FIG. 5b.
- the tensioning member 4 is then lowered into the tensioning channel 3 filled with fresh water, as shown in FIG. 5c; it is provided at its lower end in the manner shown in FIG. 1 with means 8 for additional anchoring and anchored at the upper end in an armature disk 12 in a manner known per se.
- the tensioning channel 3 is closed at its upper end in the area of the anchor device by a cover cap 13 to which a line D is connected.
- hardening material 14 is now injected through the line A into the tensioning channel 3, which fills it up from the bottom.
- Lines C and D are closed, so that the fresh water filling the tensioning channel 3 escapes through line B.
- the tensioning channel 3 is then completely filled over the region of the anchoring length L v when the hardening material 14 emerges at the upper end of the line B.
- the injection is then stopped and line A is closed at the top.
- the tendon 4 can be tensioned (FIG. 5g).
- a hydraulic press 16 is used for this purpose, which is placed on the armature disk 12 in a manner known per se. The individual elements are then anchored in the armature disk 12 in a manner known per se.
- a cover cap 13 ' is placed again and material 14 is now injected through the line B in the opposite direction, hardening material 14 from the base of the span length L s until it emerges in succession from the lines C and D (FIG. 5h).
- hardening material 14 can optionally be re-injected through line C (FIG. 5i).
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Piles And Underground Anchors (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
Description
Die Erfindung betrifft ein Bündelspannglied großer Länge für Spannbeton mit nachträglichem Verbund aus einer Mehrzahl von Einzelelementen, wie Stahlstäben, -drähten oder -drahtlitzen, das in einen in einem Bauwerksteil z.B. durch Einbau eines Hüllrohrs vorbereiteten, vertikal oder geneigt verlaufenden und nur an einem Ende zugänglichen Spannkanal einführbar ist und das an einem Ende mittels einer eine Ankerscheibe aufweisenden Ankervorrichtung gegenüber dem Bauwerksteil abstützbar ist, sowie ein Verfahren zu seinem Einbau.The invention relates to a bundle tendon of large length for prestressed concrete with a subsequent composite of a plurality of individual elements, such as steel bars, wires or wire strands, which in a in a structural part e.g. can be introduced by installing a cladding tube that runs vertically or inclined and can only be accessed at one end and that can be supported at one end by means of an anchor device having an anchor plate relative to the structural part, and a method for its installation.
Insbesondere im Offshore-Bereich besteht oft die Notwendigkeit, vergleichsweise hohe Bauwerksteile, z.B. vom Meeresboden bis über den Wasserspiegel hinausreichende Gründungselemente für Plattformen oder dergleichen in Spannbeton auszuführen. Üblicherweise werden solche Gründungselemente zunächst in einem Dock, dann in entsprechender Wassertiefe schwimmend im Wege der Gleitbauweise hergestellt, wobei das betreffende Bauwerksteil im Maß seines Emporwachsens in die Tiefe sinkt. Im Zuge der Gleitbauweise können zwar schlaffe Bewehrungen und auch Hüllrohre zur Bildung von Spannkanälen eingebaut werden; die Spannglieder selbst können aber grundsätzlich erst nach Fertigstellung der Bauwerksteile selbst auf ganze Länge eingeführt, gespannt und verankert werden.In the offshore sector in particular, there is often a need to build comparatively high structural parts, e.g. Execute foundation elements for platforms or the like in prestressed concrete from the sea floor to above the water level. Typically, such foundation elements are first produced in a dock, then floating in the appropriate water depth using the sliding construction method, the structural part in question sinking in depth as it grows. In the course of the sliding construction, slack reinforcements and cladding tubes can be installed to form tension channels; However, the tendons themselves can generally only be inserted, tensioned and anchored over their entire length after the construction parts have been completed.
Da die Abmessungen solcher Kunstbauten schon aus wirtschaftlichen Gründen optimiert, d.h. möglichst gering gehalten werden, besteht das Problem, Spannglieder, meist Bündelspannglieder, für hohe Belastungen in sehr enge Spannkanäle einzuführen, die nur von einer Seite her zugänglich sind; das andere Ende liegt nicht selten 50 m und mehr unterhalb des Meeresspiegels. Dabei muß in diesem engen Spannkanal zugleich eine zuverlässige Verankerung erreicht werden, da nachträgliche Korrekturen nicht möglich sind. Diese Verankerung darf nicht mehr Platz beanspruchen als das Spannglied selbst, da das Hüllrohr für den Spannkanal, um das Spannglied einführen zu können, grundsätzlich über die gesamte Länge mit gleichem Durchmesser durchgeführt werden muß.Since the dimensions of such structures are already optimized for economic reasons, ie are kept as small as possible, there is the problem of introducing tendons, usually bundle tendons, for high loads into very narrow tension channels that are only accessible from one side; the other end is often 50 m or more below sea level. At the same time, reliable anchoring must be achieved in this narrow clamping channel because subsequent corrections are not possible. This anchoring must not take up more space than the tendon itself, since the cladding tube for the tendon channel in order to be able to insert the tendon generally has to be carried out over the entire length with the same diameter.
Das Einführen von Zuggliedern aus Stahl in nur von einem Ende her zugängliche Hohlräume und deren Verankerung an dem nicht zugänglichen Ende ist zwar bei der Herstellung von Erd- und Felsankern grundsätzlich bekannt. Hier wird auch durch Injizieren von erhärtendem Material in der Tiefe des Bohrloches eine Verankerungsstrecke erzeugt, die der festen Verankerung des Zuggliedes dient, das dann vom luftseitigen Ende her gespannt und mittels aus dem Spannbetonbau bekannter Ankervorrichtungen verankert wird. Die freie Stahllänge zwischen der Verankerungsstrecke und der luftseitigen Ankervorrichtung bleibt grundsätzlich frei dehnbar. Ähnliche Arbeitsweisen sind auch bei der Verankerung von Bauwerken wie Stützmauern, Staumauern oder dergleichen im Boden bekannt.The introduction of tension members made of steel into cavities that are only accessible from one end and their anchoring at the inaccessible end is known in principle in the manufacture of earth and rock anchors. An anchoring section is also produced here by injecting hardening material in the depth of the borehole, which serves to firmly anchor the tension member, which is then tensioned from the air end and anchored by means of anchor devices known from prestressed concrete construction. The free steel length between the anchoring section and the air-side anchor device basically remains freely stretchable. Similar methods of working are also known for anchoring structures such as retaining walls, dams or the like in the ground.
Die bei der Herstellung von Erd- und Felsankern bekannten Maßnahmen lassen sich nicht ohne weiteres auf die Herstellung von Bauwerken aus Spannbeton übertragen. Einerseits steht im Erdboden grundsätzlich genügend Platz zur Verfügung, um ausreichend große Bohrlöcher zu erzeugen, selbst wenn mit deren Durchmesser auch der Aufwand steigt. Außerdem ist es fast immer möglich, dann, wenn sich bei einer späteren Kontrolle ein Anker als nicht ausreichend tragfähig erweist, zusätzlich einen neuen Anker zu setzen. Bei Bauwerken, die den Anforderungen an Bauteile aus Spannbeton genügen müssen, ist dies grundsätzlich nicht möglich.The measures known in the manufacture of earth and rock anchors cannot simply be transferred to the manufacture of prestressed concrete structures. On the one hand, there is basically enough space in the ground to create sufficiently large boreholes, even if the effort increases with their diameter. In addition, it is almost always possible to add a new anchor if an anchor turns out to be insufficiently loadable. In principle, this is not possible for structures that have to meet the requirements for prestressed concrete components.
Aus diesem Grunde hat man sich bei den eingangs geschilderten Bauaufgaben damit beholfen, die bei der Errichtung der Bauwerksteile hergestellten Spannkanäle an ihren unteren Enden mit haarnadelförmigen Umkehrstellen zu versehen, um so ein in einen solchen Spannkanal eingeführtes Spannglied an seinen beiden Enden von der Luftseite her spannen zu können. Um die Spannglieder überhaupt in solche Spannkanäle einführen zu können, sind an den Umkehrstellen große Krümmungsradien vorzusehen. Da die Spannglieder dennoch dicht nebeneinander angeordnet werden müssen, überschneiden sie sich im Bereich der Umkehrstellen; dies bedingt eine entsprechend große Dicke der Bauwerksteile. Außerdem haben Spannglieder, auch in Form von Stahldrahtlitzen, eine zwar große, aber immerhin begrenzte Länge, so daß mit solchen haarnadelförmigen Spanngliedern nur Bauteilhöhen zu erreichen sind, die maximal der halben Spanngliedlänge entsprechen. Bei größeren Bauwerkshöhen sind Zwischenstöße mit wiederum haarnadelförmig ausgebildeten Spanngliedern notwendig.For this reason, you have at the beginning help described construction tasks to provide the tensioning channels produced during the construction of the building parts at their lower ends with hairpin-shaped reversal points, so that a tensioning element inserted into such a tensioning channel can be tensioned at both ends from the air side. In order to be able to insert the tendons into such tendons at all, large radii of curvature must be provided at the reversal points. Since the tendons must nevertheless be arranged close to each other, they overlap in the area of the reversal points; this requires a correspondingly large thickness of the building parts. In addition, tendons, also in the form of steel wire strands, have a large, but at least limited length, so that such hairpin-shaped tendons can only achieve component heights that correspond to a maximum of half the tendon length. At larger building heights, intermediate joints with again hairpin-shaped tendons are necessary.
Der Erfindung liegt die Aufgabe zugrunde, eine Möglichkeit zu schaffen, um ein Spannglied, das in einen nur an einem Ende zugänglichen Spannkanal einzubauen ist, so auszubilden und in einer solchen Weise einzubauen, daß es nicht nur auch an dem nicht zugänglichen Ende zuverlässig verankert, sondern daß die satte Ausfüllung des Spannkanals zur Herstellung des nachträglichen Verbundes auch kontrolliert werden kann.The invention has for its object to provide a way to design and install a tendon, which is to be installed in a tension channel accessible only at one end, in such a way that it is reliably anchored not only at the inaccessible end, but that the full filling of the tensioning channel for the production of the subsequent bond can also be checked.
Nach der Erfindung wird diese Aufgabe zunächst durch ein Spannglied gelöst, dessen Einzelelemente an dem dem anderen Ende des Spannkanals zugekehrten Ende des Spannglieds fest miteinander verbunden, z.B. verschweißt, und zur Verankerung über eine bestimmte Verankerungslänge formschlüssig mit Mitteln zur zusätzlichen Verankerung in dem zur Herstellung des nachträglichen Verbundes in den Spannkanal zu injizierenden erhärtenden Material versehen sind.According to the invention, this object is first achieved by a tendon, the individual elements of which are firmly connected to one another at the end of the tendon facing the other end of the tendon, for example welded, and for anchoring over a certain anchoring length in a form-fitting manner with means for additional anchoring in the for producing subsequent composite in the tensioning channel to be injected hardening material are provided.
Diese Mittel zur zusätzlichen Verankerung an den Einzelelementen sind zweckmäßig jeweils gegeneinander versetzt angeordnet. Bei einem Bündelspannglied, bei dem die Einzelelemente aus Stahldrahtlitzen bestehen, bestehen die Mittel zur zusätzlichen Verankerung zweckmäßig aus auf die Stahldrahtlitzen z.B. durch Fließpressen aufgepreßten metallischen Hülsen.These means for additional anchoring to the individual elements are expediently arranged offset from one another. In the case of a bundle tendon in which the individual elements consist of steel wire strands, the means for additional anchoring expediently consist of the steel wire strands, e.g. metallic sleeves pressed by extrusion.
Grundsätzlich ist es zwar aus dem Stahlbeton- und auch Spannbetonbau bekannt, den Verbund von Bewehrungselementen örtlich durch zusätzliche Maßnahmen zu verbessern, beispielsweise durch Anbringen von Rippen, Verankerungskörpern oder dergleichen bis hin zur Anbringung von durch Stauchen erzielten Ausbauchungen bei Stahldrahtlitzen (DE 25 57 072B2). Es ist auch bekannt, auf ein Drahtseil, einen Stahlstab oder dergleichen eine metallische Hülse unter Verformung im Wege des Fließpressens aufzupressen (DE 12 71 961B2).Basically, it is known from reinforced concrete and prestressed concrete construction to locally improve the connection of reinforcement elements by additional measures, for example by attaching ribs, anchoring bodies or the like up to attaching bulges on steel wire strands (DE 25 57 072B2) . It is also known to press a metallic sleeve onto a wire rope, a steel rod or the like while deforming it by means of extrusion (
Im Rahmen der Erfindung hat die Anwendung von Mitteln zur zusätzlichen Verankerung der Einzelelemente eines Bündelspannglieds, die nicht am äußersten Ende des Spannglieds, sondern über die gesamte Verankerungsstrecke gegeneinander versetzt angeordnet werden, den Vorteil, daß die Einzelelemente am äußersten Ende miteinander verschweißt werden können; dies ist notwendig, um das gesamte, oft sehr lange Spannglied auf eine Haspel aufwickeln und zuverlässig in den Spannkanal absenken zu können. Ein weiterer Vorteil besteht darin, daß die Mittel zur zusätzlichen Verankerung, die regelmäßig den Durchmesser der Einzelelemente vergrößern, wie z.B. aufgepreßte metallische Hülsen, zugleich Abstandhalter bilden, welche die Einzelelemente im Bereich der Verankerungslänge im Abstand voneinander halten, so daß sie satt in das zu injizierende erhärtende Material eingebettet werden können; hierdurch wird zugleich der Durchmesser des gesamten Bündelspannglieds im Bereich der Verankerungslänge minimiert. Dadurch können vergleichsweise enge Hüllrohre für den Spannkanal verwendet werden, was wiederum zu geringen Bauwerksabmessungen führt.In the context of the invention, the use of means for additional anchoring of the individual elements of a bundle tendon, which are not arranged at the extreme end of the tendon, but offset against one another over the entire anchoring distance, has the advantage that the individual elements can be welded to one another at the extreme end; this is necessary in order to be able to wind the entire, often very long tendon on a reel and lower it reliably into the tendon. Another advantage is that the means for additional anchoring, which regularly increase the diameter of the individual elements, such as pressed-on metallic sleeves, at the same time form spacers which keep the individual elements at a distance from one another in the region of the anchoring length, so that they are full in the injectable hardening material can be embedded; this also makes the The diameter of the entire bundle tendon is minimized in the area of the anchoring length. As a result, comparatively narrow cladding tubes can be used for the tensioning channel, which in turn leads to small structural dimensions.
Die Erfindung betrifft weiterhin ein Verfahren zum Einbau eines solchen Bündelspannglieds in ein Bauwerksteil, bei dem nach dem Einführen des Spannglieds in den Spannkanal zunächst mittels einer ersten, am unteren Ende der Verankerungslänge mit einer Austrittsöffnung versehenen Injizierleitung erhärtendes Material über den Bereich der Verankerungslänge in den Spannkanal injiziert wird, bei dem nach dem Erhärten dieses Materials das Spannglied gespannt und mittels der Ankervorrichtung verankert und sodann mittels einer zweiten, am oberen Ende der Verankerungslänge mit einer Austrittsöffnung versehenen Injizierleitung erhärtendes Material über den Bereich der Spannlänge in den Spannkanal injiziert wird. Dabei verlaufen die erste und zweite Injizierleitung zweckmäßig außerhalb des Spannkanals.The invention further relates to a method for installing such a bundle tendon in a structural part, in which, after the tendon has been introduced into the tensioning channel, material is first hardened over the area of the anchoring length into the tensioning channel by means of a first injection line provided at the lower end of the anchoring length with an outlet opening is injected, in which after the hardening of this material the tendon is tensioned and anchored by means of the anchor device and then by means of a second injection line provided at the upper end of the anchoring length with an outlet opening, hardening material is injected over the area of the span length into the tensioning channel. The first and second injection lines expediently run outside the tensioning channel.
Nach dem Injizieren der Verankerungslänge kann durch Spülen mittels der zweiten Injizierleitung von der Ankervorrichtung her etwa in den Bereich der Spannlänge eingedrungenes erhärtendes Material entfernt werden. Dieser Spülvorgang kann bis zum Beginn des Erhärtens des Materials fortgesetzt bzw. periodisch wiederholt werden.After the anchoring length has been injected, hardening material which has penetrated into the region of the span length can be removed from the anchor device by rinsing by means of the second injection line. This rinsing process can continue until the material begins to harden or can be repeated periodically.
Um zu verhindern, daß bei Arbeiten im Offshore-Bereich etwa korrodierendes Meerwasser in die Spannkanäle gelangt, ist es zweckmäßig, diese mit Süßwasser zu füllen und sie nach dem Einführen des Spannglieds am luftseitigen Ende durch eine Kappe abzuschließen, so daß das Wasser beim Injizieren des erhärtenden Materials durch dieses verdrängt wird.In order to prevent any corrosive sea water from entering the tensioning channels when working in the offshore area, it is advisable to fill them with fresh water and to seal them after the insertion of the tendon at the air end by a cap, so that the water when the hardening material is displaced by this.
Der luftseitige Verankerungsbereich kann gegebenenfalls über eine dritte, außerhalb des Spannkanals verlaufende und unterhalb der Ankervorrichtung in diesen mündende Injizierleitung mit erhärtendem Material nachinjiziert werden.The anchoring area on the air side may be over a third injection line, running outside the tensioning channel and flowing into the anchor device below it, is re-injected with hardening material.
Wesentlich für die Erfindung, wenn auch nicht Bedingung, ist in diesem Zusammenhang, daß bei der Errichtung des Bauwerksteils mit den Hüllrohren zur Bildung der Spannkanäle zugleich, aber außerhalb derselben jeweils zwei Leitungen hochgeführt werden, nämlich eine vom unteren Ende und eine vom oberen Ende der Verankerungslänge aus. Durch die Verlegung dieser Leitungen außerhalb der Spannkanäle kann deren Durchmesser gering gehalten werden. Durch diese Leitungen selbst gelingen sowohl ein zuverlässiges Injizieren der Verankerungslänge und der Spannlänge mit erhärtendem Material, als auch die Kontrolle darüber, daß der Spannkanal sowohl im Bereich der Verankerungslänge, wie auch im Bereich der Spannlänge tatsächlich vollständig mit erhärtendem Material gefüllt ist. Dies sicherzustellen ist für die Herstellung von Spannbeton mit nachträglichem Verbund von ausschlaggebender Bedeutung.It is essential for the invention, if not a condition, in this context that when building the building part with the cladding tubes to form the tensioning channels at the same time, but outside the same, two lines are led up, namely one from the lower end and one from the upper end of the Anchorage length. By laying these lines outside the tensioning channels, their diameter can be kept small. These lines themselves ensure that the anchoring length and the span length are reliably injected with hardening material, as well as checking that the tensioning channel is actually completely filled with hardening material both in the area of the anchoring length and in the area of the span length. Ensuring this is of crucial importance for the production of prestressed concrete with a subsequent bond.
Die Erfindung wird nachstehend anhand der Zeichnung näher erläutert. Es zeigt
- Fig. 1 einen zweifach unterbrochenen Längsschnitt durch ein Bauwerksteil, z.B. eine Wand, mit in einen Spannkanal eingeführtem Spannglied,
- Fig. 2 eine schematische Abwicklung der Einzelelemente des Spannglieds im Bereich der Verankerungslänge,
- Fig. 3 einen Querschnitt entlang der Linie III-III in Fig. 1 und
- Fig. 4 einen Querschnitt entlang der Linie IV-IV in Fig. 1 sowie die
- Fig. 5a bis i in jeweils schematischer Darstellung aufeinanderfolgende Arbeitszustände bei der Durchführung des erfindungsgemäßen Verfahrens.
- 1 shows a double interrupted longitudinal section through a structural part, for example a wall, with a tendon inserted into a tensioning channel,
- 2 shows a schematic development of the individual elements of the tendon in the region of the anchoring length,
- Fig. 3 shows a cross section along the line III-III in Fig. 1 and
- FIG. 4 shows a cross section along the line IV-IV in FIG. 1 as well as the
- 5a to i each show a schematic representation of successive working states when carrying out the method according to the invention.
In Fig. 1 ist ein Längsschnitt durch eine Wand 1, z.B. eine Zellenwand eines aus mehreren Zellen bestehenden Bauwerks aus Stahlbeton dargestellt. Dabei ist angenommen, daß sich die Wand am unteren Ende auf den Meeresboden oder auf ein Fundament gründet, während das obere Ende sich oberhalb des Wasserspiegels befindet; die Höhe des Bauwerks kann 85 m und mehr betragen.In Fig. 1 is a longitudinal section through a wall 1, e.g. a cell wall of a multi-cell structure made of reinforced concrete is shown. It is assumed that the wall at the lower end is based on the sea floor or on a foundation, while the upper end is above the water level; the height of the structure can be 85 m and more.
Im Inneren des Bauwerksteils 1 ist durch ein in dieses eingebettetes Hüllrohr 2 ein Spannkanal 3 gebildet, in den ein Bündelspannglied 4 eingesetzt ist. Das Bündelspannglied 4 ist in der Darstellung der Fig. 1 nur aus drei Einzelelementen 5 bestehend dargestellt; es besteht tasächlich aus einer größeren, grundsätzlich beliebigen Anzahl von Einzelelementen, im Beispiel der Fig. 2 bis 4 aus neunzehn Elementen 5, z.B. Stahldrahtlitzen. Neben der Spannbewehrung in Form solcher Spannglieder 4 umfaßt das Bauwerksteil 1 noch eine schlaffe Bewehrung 6, die in Fig. 1 lediglich entlang der Außenwand angedeutet ist.In the interior of the building part 1, a
Die Einzelelemente 5 sind, wie Fig. 4 zeigt, am unteren Ende 7 in dichter Lage zueinander miteinander verschweißt. In dem darüberliegenden, die Verankerungslänge Lv bildenden Bereich sind sie mit Mitteln 8 zur örtlich konzentrierten Krafteinleitung versehen. Diese Mittel 8 sind zweckmäßigerweise auf die einzelnen Stahldrahtlitzen im Wege des Fließpressens aufgepreßte metallische Hülsen; sie sind, wie insbesondere Fig. 2 zeigt, in gleichen Abständen l voneinander gruppenweise zusammengefaßt, um sie über die Verankerungslänge Lv möglichst gleichmäßig zu verteilen. In diesem Bereich ist das Bündel aus den Einzelelementen 5 z.B. durch eine Umwicklung 9 (Fig. 3) fixiert.The
Innerhalb des Bauwerksteils 1, aber außerhalb des Spannkanals 3 sind parallel zu diesem schlauchartige Leitungen hochgeführt, und zwar eine Injizierleitung A, die am unteren Ende der Verankerungslänge Lv bei 10 in den Spannkanal 3 mündet und eine Spül- und Injizierleitung B, die etwa an der Grenze zwischen der Verankerungslänge Lv und der darüberliegenden Spannlänge Ls bei 11 in den Spannkanal 3 mündet. Eine weitere Leitung C führt von der Luftseite her in den Bereich des Spannkanals 3 unterhalb der Ankervorrichtung 12; eine vierte Leitung D ist an eine Abdeckkappe 13 angeschlossen, mit der der Spannkanal 3 im Bereich der Ankervorrichtung 12 während des Bauzustandes zeitweise verschlossen werden kann. Wenn der Durchmesser des Hüllrohres 2 entsprechend groß gewählt werden kann, ist es grundsätzlich auch möglich, die Leitungen A und B innerhalb des Spannkanals 3 zu führen.Inside the building part 1, but outside the
Wie im einzelnen beim Einbau des Spanngliedes verfahren wird, wie dieses gespannt und in Verbund mit dem Bauwerksteil gebracht wird, wird nachstehend anhand der schematisch einige Arbeitsphasen symbolisierenden Darstellungen der Fig. 5a bis i erläutert.How to proceed in detail during the installation of the tendon, how this is tensioned and brought into connection with the structural part, is explained below with the aid of the schematically symbolizing some working phases of the representations of FIGS. 5a to i.
Fig. 5a zeigt schematisch den Bauzustand nach der Herstellung des Spannkanals 3 mit den Injektionsleitungen A, B und C. Es ist erkennbar, daß die Leitung A am unteren Ende der Verankerungslänge Lv bei 10 in den Spannkanal 3 mündet; die Leitung B im Grenzbereich zwischen der Verankerungslänge Lv und der Spannlänge Ls bei 11 und die Leitung C etwas unterhalb des oberen Endes des Spannkanals 3.Fig. 5a shows schematically the state of construction after the production of the
Wenn es sich wie bei dem hier beschriebenen Ausführungsbeispiel um die Herstellung eines Bauwerksteils handelt, das schwimmend im Meerwasser gehalten ist, muß Vorsorge dagegen getroffen werden, daß der Spannkanal 3 sich nicht etwa mit Meerwasser füllt, das aggressive Eigenschaften hat und korrodierend sowohl auf das den Spannkanal 3 bildende Hüllrohr 2, wie auch auf das später einzuführende Spannglied 4 wirken kann. Der Spannkanal 3 wird deshalb zunächst mit Süßwasser gefüllt, was in Fig. 5b angedeutet ist. In den mit Süßwasser gefüllten Spannkanal 3 wird dann gemäß Fig. 5c das Spannglied 4 abgesenkt; es ist an seinem unteren Ende in der aus Fig. 1 ersichtlichen Weise mit Mitteln 8 zur zusätzlichen Verankerung versehen und am oberen Ende in einer Ankerscheibe 12 in an sich bekannter Weise verankert. In diesem Bauzustand wird der Spannkanal 3 an seinem oberen Ende im Bereich der Ankervorrichtung durch eine Abdeckkappe 13 verschlossen, an die eine Leitung D angeschlossen ist.If it is like the one described here Embodiment is the manufacture of a structural part that is kept floating in sea water, precautionary measures must be taken to ensure that the
In dem in Fig. 5d dargestellten Bauzustand wird nun durch die Leitung A erhärtendes Material 14 in den Spannkanal 3 injiziert, das diesen vom Grunde her aufsteigend ausfüllt. Die Leitungen C und D sind geschlossen, so daß das den Spannkanal 3 ausfüllende Süßwasser durch die Leitung B entweicht. Der Spannkanal 3 ist dann über den Bereich der Verankerungslänge Lv vollständig gefüllt, wenn das erhärtende Material 14 am oberen Ende der Leitung B austritt. Die Injektion wird dann beendet und die Leitung A am oberen Ende geschlossen.In the construction state shown in FIG. 5d, hardening
Im nächsten Arbeitsgang (Fig. 5e) wird über die Leitung D Süßwasser eingepreßt (Pfeil 15), durch das zunächst das noch in der Leitung B verbliebene erhärtende Material 14 ausgespült und der Spannkanal 3 bis unter die Ebene der Mündung 11 der Leitung B freigespült wird. Damit ist sichergestellt, daß einerseits die erforderliche Verankerungslänge Lv erreicht wird, daß andererseits aber auch die Leitung B für die später erfolgende Injektion der Spannlänge Ls wieder zur Verfügung steht. Dieser Spülvorgang wird fortgesetzt, bis das Material 14 erhärtet ist, um sicherzustellen, daß nicht durch Nachsacken von Resten die Mündung 11 der Leitung B in den Spannkanal 3 etwa wieder zugesetzt wird. Dabei kann es zweckmäßig sein, mehrere nebeneinander gelegene Spannkanäle 3 in der aus Fig. 5f angedeuteten Weise miteinander zu verbinden. Durch eine ovale Form der Austrittsöffnungen der Leitungen A und B in den Spannkanal, etwa in Gestalt eines Langloches, kann gewährleistet werden, daß selbst bei Absetzen des erhärtenden Materials der Durchgang offen bleibt.In the next step (FIG. 5e), fresh water is injected via line D (arrow 15), through which the hardening
Nach dem Erhärten des Injektionsmaterials 14 kann das Spannglied 4 gespannt werden (Fig. 5g). Hierzu dient eine hydraulische Presse 16, die in an sich bekannter Weise auf die Ankerscheibe 12 aufgesetzt wird. Die Einzelelemente werden dann in ebenfalls an sich bekannter Weise in der Ankerscheibe 12 verankert.After the
Nach Abschluß der Spannarbeiten wird wieder eine Abdeckkappe 13′ aufgesetzt und durch die Leitung B nunmehr in umgekehrter Richtung erhärtendes Material 14 vom Grunde der Spannlänge Ls an aufsteigend injiziert, bis es nacheinander aus den Leitungen C und D austritt (Fig. 5h). Zur Vermeidung des Absetzens von Wasser aus dem Injektionsmaterial kann nach Schließen der Leitung B am oberen Ende gegebenenfalls durch die Leitung C erhärtendes Material 14 nachinjiziert werden (Fig. 5i). Durch die am höchsten Punkt der Abdeckkappe 13′ austretende Leitung D kann sichergestellt werden, daß der gesamte Spannkanal 3 bis einschließlich des Bereiches der Ankervorrichtung 12 satt mit erhärtendem Material 14 gefüllt ist.After completion of the tensioning work, a cover cap 13 'is placed again and
Claims (9)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE3824394A DE3824394C2 (en) | 1988-07-19 | 1988-07-19 | Method of installing a bundle tendon of great length for prestressed concrete with subsequent bonding |
DE3824394 | 1988-07-19 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0351582A1 true EP0351582A1 (en) | 1990-01-24 |
EP0351582B1 EP0351582B1 (en) | 1992-06-17 |
Family
ID=6358978
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP89111441A Expired - Lifetime EP0351582B1 (en) | 1988-07-19 | 1989-06-23 | Great length pre-stressing strand for prestressed concrete with grouted anchoring, and method for installing it |
Country Status (5)
Country | Link |
---|---|
US (1) | US5056284A (en) |
EP (1) | EP0351582B1 (en) |
CA (1) | CA1312738C (en) |
DE (2) | DE3824394C2 (en) |
NO (1) | NO892746L (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0935034A1 (en) * | 1998-02-09 | 1999-08-11 | VSL International AG | Method of manufacturing of an anchoring, anchoring piece and tensioning element for this purpose |
CN102220761A (en) * | 2011-04-12 | 2011-10-19 | 泰州润伟机械有限公司 | Prestressed concrete tubular pile end plate |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5939003A (en) * | 1997-01-31 | 1999-08-17 | Vsl International | Post-tensioning apparatus and method |
US6409433B1 (en) * | 2000-01-27 | 2002-06-25 | David A. Hubbell | Foundation piles or similar load carrying elements |
WO2004001139A1 (en) * | 2002-05-10 | 2003-12-31 | David Allen Hubbell | Foundation piles or similar load carrying elements |
CA2517897A1 (en) * | 2003-03-01 | 2004-09-16 | Charles T. Brackett | Wire bolt |
US20050193681A1 (en) * | 2004-02-21 | 2005-09-08 | Brackett Charles T. | Threaded rod wind and seismic resistance system |
FR2882421A1 (en) * | 2005-02-22 | 2006-08-25 | Freyssinet Internat Stup Soc P | Lattice type metallic tubular structure reinforcing method, involves introducing linear carbon rods inside structure, and injecting cement grout inside structure so that grout makes contact with inner surface of structure and covers rods |
US8322093B2 (en) * | 2008-06-13 | 2012-12-04 | Tindall Corporation | Base support for wind-driven power generators |
US8096195B2 (en) * | 2009-08-17 | 2012-01-17 | Fdh Engineering, Inc. | Method of determining tension in a rod |
US8474219B2 (en) | 2011-07-13 | 2013-07-02 | Ultimate Strength Cable, LLC | Stay cable for structures |
US20120260590A1 (en) | 2011-04-12 | 2012-10-18 | Lambert Walter L | Parallel Wire Cable |
CN104976424B (en) * | 2015-05-15 | 2017-04-12 | 中铁二局工程有限公司 | Anchor cable construction method for rectangular top pipe joint connecting and strengthening |
CN112832537B (en) * | 2021-01-11 | 2022-05-13 | 中国十七冶集团有限公司 | Construction method for preventing blockage and pipe blockage caused by slurry leakage of prestressed pre-buried pipeline |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB712674A (en) * | 1952-09-25 | 1954-07-28 | Stent Precast Concrete Ltd | Improvements in prestressed concrete piles |
FR1435191A (en) * | 1965-03-05 | 1966-04-15 | Ofee Omnium Francais D Etudes | Method and devices for prestressing, and prestressing systems including their implementation |
DE1559568A1 (en) * | 1965-02-11 | 1970-02-12 | Intercontinentale Technik Ges | Tendons made of single fibers |
FR2276438A1 (en) * | 1974-06-24 | 1976-01-23 | Holzmann Philipp Ag | PRE-STRESSED REINFORCEMENT FOR CONSTRUCTION ELEMENTS OR PRE-STRESSED CONCRETE CONSTRUCTIONS |
US4043133A (en) * | 1976-07-21 | 1977-08-23 | Yegge Lawrence R | Structure and method of constructing and test-loading pile anchored foundations |
FR2475605A1 (en) * | 1980-02-11 | 1981-08-14 | Dyckerhoff & Widmann Ag | Non adhering concrete prestressing wire member - has additional anchorage along length, pref. near end wedge anchor |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE618328C (en) * | 1929-04-24 | 1935-09-11 | Andre Coyne | Support walls, dam walls, weir systems or similar structures |
BE794024A (en) * | 1972-01-21 | 1973-05-02 | Brandestini Antonio | ANCHORING DEVICE FOR CABLES COMPOSED OF STRANDS |
DE2753112C3 (en) * | 1977-11-29 | 1981-01-22 | Dyckerhoff & Widmann Ag, 8000 Muenchen | Anchoring of a tensioned tension member for high loads in a concrete component, e.g. a stay cable of a cable-stayed bridge |
US4223497A (en) * | 1978-06-26 | 1980-09-23 | Ccl Systems Limited | Coupling assembly |
DE3138807C2 (en) * | 1981-09-30 | 1986-10-30 | Dyckerhoff & Widmann AG, 8000 München | Free tensioned tension member, especially stay cable for a stay cable bridge |
DE3437350A1 (en) * | 1984-08-30 | 1986-03-13 | Ulrich Dr.Ing. e.h. Dr.Ing. 8000 München Finsterwalder | CABLES FOR CONSTRUCTIONS, ESPECIALLY INCLINED CABLE BRIDGES AND METHOD FOR THE PRODUCTION THEREOF |
FR2588596B1 (en) * | 1985-10-10 | 1987-12-24 | Freyssinet Int Stup | IMPROVEMENTS IN CONCRETE PRE-STRESSING DEVICES COMPRISING SINUOUS TENTED CABLES AND THEIR IMPLEMENTATION METHODS |
-
1988
- 1988-07-19 DE DE3824394A patent/DE3824394C2/en not_active Expired - Fee Related
-
1989
- 1989-06-23 EP EP89111441A patent/EP0351582B1/en not_active Expired - Lifetime
- 1989-06-23 DE DE8989111441T patent/DE58901676D1/en not_active Revoked
- 1989-07-03 NO NO89892746A patent/NO892746L/en unknown
- 1989-07-11 US US07/378,136 patent/US5056284A/en not_active Expired - Fee Related
- 1989-07-18 CA CA000605933A patent/CA1312738C/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB712674A (en) * | 1952-09-25 | 1954-07-28 | Stent Precast Concrete Ltd | Improvements in prestressed concrete piles |
DE1559568A1 (en) * | 1965-02-11 | 1970-02-12 | Intercontinentale Technik Ges | Tendons made of single fibers |
FR1435191A (en) * | 1965-03-05 | 1966-04-15 | Ofee Omnium Francais D Etudes | Method and devices for prestressing, and prestressing systems including their implementation |
FR2276438A1 (en) * | 1974-06-24 | 1976-01-23 | Holzmann Philipp Ag | PRE-STRESSED REINFORCEMENT FOR CONSTRUCTION ELEMENTS OR PRE-STRESSED CONCRETE CONSTRUCTIONS |
US4043133A (en) * | 1976-07-21 | 1977-08-23 | Yegge Lawrence R | Structure and method of constructing and test-loading pile anchored foundations |
FR2475605A1 (en) * | 1980-02-11 | 1981-08-14 | Dyckerhoff & Widmann Ag | Non adhering concrete prestressing wire member - has additional anchorage along length, pref. near end wedge anchor |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0935034A1 (en) * | 1998-02-09 | 1999-08-11 | VSL International AG | Method of manufacturing of an anchoring, anchoring piece and tensioning element for this purpose |
CN102220761A (en) * | 2011-04-12 | 2011-10-19 | 泰州润伟机械有限公司 | Prestressed concrete tubular pile end plate |
Also Published As
Publication number | Publication date |
---|---|
DE58901676D1 (en) | 1992-07-23 |
EP0351582B1 (en) | 1992-06-17 |
DE3824394C2 (en) | 1995-05-04 |
DE3824394A1 (en) | 1990-01-25 |
NO892746D0 (en) | 1989-07-03 |
CA1312738C (en) | 1993-01-19 |
US5056284A (en) | 1991-10-15 |
NO892746L (en) | 1990-01-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0351582B1 (en) | Great length pre-stressing strand for prestressed concrete with grouted anchoring, and method for installing it | |
DE3507732A1 (en) | TIE LINK FOR A ROCK BOLT OR THE LIKE | |
DE2914597A1 (en) | IMPROVEMENTS IN THE MANUFACTURING OF TIE ANCHORS | |
DE102008014700A1 (en) | Corrosion-protected self-drilling anchor and method for its production | |
DE10158524A1 (en) | Pile device and method for the construction of concrete piles in soft ground | |
EP3607147B1 (en) | Offshore foundation | |
DE2434200A1 (en) | METHOD OF EXTRUSION AND REINFORCEMENT OF ROCK CAVITIES | |
DE69001068T2 (en) | METHOD FOR PRODUCING CONCRETE FOUNDATIONS. | |
CH671057A5 (en) | ||
DE4433847C2 (en) | Method for introducing a potting compound into a cavity | |
EP3670775B1 (en) | Method for producing a wall of a structure made of concrete and a wall of a concrete structure | |
DE3806759C2 (en) | Method for renovating a hollow cylindrical building body and kit system therefor | |
DE3335141C2 (en) | ||
DE102007003085B4 (en) | Process for producing a sealing wall with optimized precast concrete elements | |
DE69938438T2 (en) | A CONCRETE ELEMENTS AND PILLAR METHOD EMBEDDED IN CONCRETE | |
DE69007934T2 (en) | Anchoring for tendon and method for its manufacture. | |
DE683407C (en) | Procedure for the foundation of concrete piles | |
DE19634682C2 (en) | Seal for delimiting areas to be filled with a sealing compound on a bundle tension member for prestressed concrete | |
EP0350454A2 (en) | Process for making a tension member adapted to be anchored in the ground | |
DE19604523A1 (en) | Elevated sealing bed manufactured by high pressure injection or submerged concrete | |
DE2240935A1 (en) | METHOD FOR SECURING UNDERWATER CONCRETE SOLES AGAINST FLOATING AND DEVICE FOR CARRYING OUT THE PROCEDURE | |
DE1634273A1 (en) | Ground anchor and process for its manufacture | |
DE3115062C2 (en) | Permanent anchor | |
DE3335072C2 (en) | Embankment wall | |
DE2758489B2 (en) | Process for the production of a pre-stressed ground pile as well as a ground pile manufactured according to the process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE FR GB NL SE |
|
17P | Request for examination filed |
Effective date: 19900201 |
|
17Q | First examination report despatched |
Effective date: 19910429 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE FR GB NL SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Effective date: 19920617 Ref country code: NL Effective date: 19920617 Ref country code: GB Effective date: 19920617 |
|
REF | Corresponds to: |
Ref document number: 58901676 Country of ref document: DE Date of ref document: 19920723 |
|
EN | Fr: translation not filed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Effective date: 19921106 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
GBV | Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed] | ||
26 | Opposition filed |
Opponent name: VSL INTERNATIONAL AG Effective date: 19921212 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19930617 Year of fee payment: 5 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
RDAC | Information related to revocation of patent modified |
Free format text: ORIGINAL CODE: 0009299REVO |
|
RDAG | Patent revoked |
Free format text: ORIGINAL CODE: 0009271 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: PATENT REVOKED |
|
27W | Patent revoked |
Effective date: 19940418 |
|
R27W | Patent revoked (corrected) |
Effective date: 19940418 |