EP0259295A1 EP87890174A EP87890174A EP0259295A1 EP 0259295 A1 EP0259295 A1 EP 0259295A1 EP 87890174 A EP87890174 A EP 87890174A EP 87890174 A EP87890174 A EP 87890174A EP 0259295 A1 EP0259295 A1 EP 0259295A1
Authority
EP
European Patent Office
Prior art keywords
anchor bolt
grooves
tie bolt
sickle
connecting head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP87890174A
Other languages
German (de)
English (en)
Other versions
EP0259295B1 (fr
Inventor
Eric Schuh
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Riss GmbH
Original Assignee
Riss GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Riss GmbH filed Critical Riss GmbH
Publication of EP0259295A1 publication Critical patent/EP0259295A1/fr
Application granted granted Critical
Publication of EP0259295B1 publication Critical patent/EP0259295B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/62Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled
    • B66C1/66Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled for engaging holes, recesses, or abutments on articles specially provided for facilitating handling thereof
    • B66C1/666Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled for engaging holes, recesses, or abutments on articles specially provided for facilitating handling thereof for connection to anchor inserts embedded in concrete structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/04Cores for anchor holes or the like around anchors embedded in the concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus

Definitions

  • the invention relates to a device for transporting and manipulating heavy loads, in particular precast concrete parts, by means of a lifting device, consisting of an anchor bolt intended for concreting in heavy loads, which is provided with a temporary component in the precast concrete part, preferably made of elastic material, in particular rubber or elastic Plastic, existing recess body is built into the heavy load, and a connector for connecting the anchor bolt to the lifting gear, which engages behind and integrally forms a connecting head formed on the anchor bolt, consisting of a cylindrical part that tapers in the shape of a truncated cone towards the shaft of the anchor bolt and relates to the anchor bolt is pivotally mounted.
  • a lifting device consisting of an anchor bolt intended for concreting in heavy loads, which is provided with a temporary component in the precast concrete part, preferably made of elastic material, in particular rubber or elastic Plastic, existing recess body is built into the heavy load, and a connector for connecting the anchor bolt to the lifting gear, which engages behind and integrally forms a connecting head formed on the anchor bolt, consist
  • the aim of the invention is to achieve a further improvement of this device, in particular with regard to its load absorption or load transmission properties.
  • This is achieved according to the invention in the device specified at the outset by providing at least two diametrically opposed, approximately perpendicular to the bolt axis and parallel to each other crescent-like crescent-shaped grooves in the connecting head of the anchor bolt, in which the connector with its runners can be hung, the bolt axis Closer walls of the sickle-like grooves (groove base) running parallel to the bolt axis are flat.
  • This configuration in particular in the case of an inclined pulling direction, as can be seen e.g. when setting up the precast concrete results, the force transmission into the precast concrete part is secured and the same is prevented from flaking off at the force application points. This will be explained in more detail later.
  • an expedient embodiment of the invention is characterized in that the shank of the anchor bolt has an elliptical cross-section and optionally has a widening on all sides at its end remote from the connector in a manner known per se.
  • the connecting head of the anchor bolt can be provided on the side of the sickle-like grooves facing away from the connecting piece with a transverse hole which runs preferably perpendicularly to the groove base of the sickle-like grooves and is in a manner known per se approximately perpendicular to the bolt axis.
  • a reinforcement bar can be inserted through this hole to better transfer the loads from the anchor bolt to the precast concrete.
  • the recess body which is split in the middle in a known manner and can be opened, has a cavity in its interior which is designed as a negative form of the connecting head of the anchor bolt and in particular is provided with two sickle-like projections penetrating into the sickle-like grooves of the connecting head .
  • FIG. 1 shows an axial section through a device for transporting and manipulating prefabricated concrete parts known from AT-PS 358 788, the connector of which can also be used, for example, in the device according to the invention
  • FIG. 2 shows a view of the object from FIG. 1 from the direction A with the precast concrete part removed and the adjusting lever arm pivoted up to illustrate the connection piece which can also be used in the device according to the invention
  • FIGS. 3 and 4 are views of the anchor bolt according to the present invention from two directions offset by 90 °
  • FIGS. 5 and 6 are two sectional views along mutually perpendicular planes through a recess body according to the present invention
  • FIGS. 7 and 8 two schematic sectional representations along mutually perpendicular planes in order to explain the application of force in the device according to the invention.
  • the device consists of an anchor bolt 3 with a shank 4 and connecting head 5 set up for concreting into the precast concrete part 1 and a spherical connecting piece 6 which can be connected thereto and from which a manipulating arm 7 projects.
  • the connector 6 has an arcuate slot groove 8, the projecting edges or runners 8a (cf. in particular Fig. 2) engage behind the connecting head 5.
  • the slot groove 8 is adapted in cross section to the shape of the connecting head 5 or the crescent-shaped grooves formed therein (cf. FIGS. 3,4 and 7,8).
  • the slot groove 8 has at its end an insertion recess 9 for the connecting head 5.
  • the shaft 4 of the anchor bolt 3 is guided in the slot 10 of the slot groove 8.
  • the connecting piece 6 has a central articulated bore 11 which runs essentially perpendicular to the plane of the slot groove 8 through the center of curvature 12 thereof.
  • a shackle 13 is used for attaching the hoist. This passes through a part of the articulated bore 11.
  • the manipulator arm 7 has nothing to do with the lifting gear striking, rather it functions as an adjustment arm for the insertion recess 9 of the slot groove 8; it is also oriented accordingly and can be pivoted through the towing shackle 13, as indicated by the bow arrow in FIG. 1.
  • the articulated bore 11 has bevels 14, which allow movement of the trailer shackle 13 in the articulated bore 11 without further ado, etc. in different directions.
  • Fig. 3 shows a view of the anchor bolt 3 according to the invention perpendicular to the course of the crescent-shaped grooves 15 formed in the connecting head 5 and Fig. 4 shows a view from a direction rotated by 90 °, i.e. in the direction of the course of the grooves 15.
  • the connecting head 5 consists of a cylindrical part which tapers towards the shaft 4 in the shape of a truncated cone.
  • two horizontal, sickle-like grooves 15 are provided opposite each other with respect to the pin axis 3a, which run approximately perpendicular to the pin axis 3a.
  • the walls (groove base) 15a of the sickle-like grooves 15 running parallel to the pin axis 3a are flat.
  • the connector 6 is suspended with its runners 8a in the sickle-like grooves 15 of the anchor bolt 3.
  • a plate-like connecting head 5a is thus formed above the grooves 15 for forwarding the load from the anchor bolt 3 to the connector 6 and finally to the lifting device, not shown.
  • the connecting head 5 is provided with a transverse hole 16 lying approximately perpendicular to the pin axis 3a, which advantageously runs perpendicular to the groove base 15a of the crescent-like grooves 15.
  • a reinforcing bar 17 (see FIGS. 7 and 8) can be inserted through this transverse hole 16 in order to be able to better transmit the load from the anchor bolt 3 to the precast concrete part 1.
  • the lower bottom of the transverse hole 16 can, like indicated at 16a, to be sloping outwards in order to better adapt to any curvature of the reinforcing bar 17.
  • the lower third of the connecting head 5 consists of the conical transition to the shaft 4, which can optionally be formed with an elliptical cross section.
  • a conventional truncated cone-shaped widening 18 on all sides is used, which also serves as anchoring means in the concrete.
  • Such recess body 19 are firmly attached to the inside of the formwork for the future precast concrete part 1.
  • the formwork is loosened and the recess body 19 is removed from the finished prefabricated concrete part 1, so that a recess corresponding to the negative shape of the recess body 19 is formed on the concrete surface for the purpose of attacking the connector 6 on the head 5 of the anchor bolt 3 (cf. Figs. 1,7,8).
  • the hemisphere is cut along the middle connecting plane perpendicular to the flats 20 (at 22 in FIG. 5), so that the recess body 19 can be opened in order to be able to accommodate the upper part of the head 5 of the anchor bolt 3 in its interior.
  • a cavity 23 is formed, which is designed as a negative shape of the connecting head 5 of the anchor bolt 3, and which in particular has two sickle-like projections 24 penetrating into the sickle-like grooves 15 of the connecting head 5. At least the upper section of the connection head 5 is thus completely surrounded by the recess body 19 (or fills the cavity 23 of the recess body 19).
  • Holes 26, 27 are provided in the base surface 25 of the recess body 19, which are used to fasten the recess body to the formwork or Remove from the precast 1 serve.
  • the anchor bolt 3 is installed in the precast concrete part 1.
  • the anchor bolt 3 is placed with its connecting head 5 in the hinged recess body 19.
  • a corresponding reinforcing bar 17 is inserted through the transverse hole 16 of the anchor bolt 3 (if necessary).
  • the anchor bolt 3 is held firmly and securely in its position so that it cannot shift or shift when concreted in.
  • the recess body 19 is removed from the prefabricated concrete part 1 (for example, by pulling out or levering out by means of the holes 26), as a result of which a recess in the form of a laterally flattened hemisphere for receiving the connecting piece 6 when coupling the precast concrete part 1 to the hoist.
  • the connector 6 will move in the pulling direction until the runners 8a of the connector 6 lock in the grooves 15 of the anchor bolt 3, ie until on the one hand the runners 8a with their outside below Support on the cylindrical middle part of the connection head 5 - see Circle B in FIG. 7 - and on the other hand the runners 8a rest with their inside on the underside of the plate-like connecting head 5a - see circle C in FIG. 7.
  • the vertical force is also at C, but over a somewhat wider area on the underside of the plate-like connecting head 5a via the remaining web between the grooves 15 or their flat groove base walls 15a via the shaft 4 and the widening 18 initiated in the concrete of the prefabricated part 1.
  • the horizontal force component Y H is broken down into a compressive force between the concrete and the connecting piece 6 at D, into a compressive force on the web remaining between the grooves 15 at F and a tensile force in the mentioned web of the anchor bolt 3 at E.
  • the compressive force on the concrete at D is adequately secured with enough concrete in the Y direction.
  • the vertical force component Y V is introduced into the concrete of the precast element 1.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
EP19870890174 1986-08-21 1987-07-16 Dispositif pour transporter et manipuler des charges lourdes, en particulier des éléments préfabriqués en béton Expired - Lifetime EP0259295B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AT225386A AT385972B (de) 1986-08-21 1986-08-21 Vorrichtung zum transportieren und manipulieren von schwerlasten, insbesondere betonfertigteilen
AT2253/86 1986-08-21

Publications (2)

Publication Number Publication Date
EP0259295A1 true EP0259295A1 (fr) 1988-03-09
EP0259295B1 EP0259295B1 (fr) 1990-01-31

Family

ID=3530889

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19870890174 Expired - Lifetime EP0259295B1 (fr) 1986-08-21 1987-07-16 Dispositif pour transporter et manipuler des charges lourdes, en particulier des éléments préfabriqués en béton

Country Status (3)

Country Link
EP (1) EP0259295B1 (fr)
AT (1) AT385972B (fr)
DE (1) DE3761575D1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2633959A1 (fr) * 1988-07-11 1990-01-12 Arteon Marcel Piece d'ancrage, notamment pour beton
EP0498742A1 (fr) * 1991-02-08 1992-08-12 Etablissements A. Mure Dispositif pour le maintien provisoire d'un organe de levage sur une surface métallique de coffrage pendant les phases de coulée et de prise du béton d'un élément en béton préfabriqué
WO1994008885A1 (fr) * 1992-10-12 1994-04-28 Jessen Laurids A Dispositif venant s'emboiter sur une charge en vue de soulever des elements de construction en beton

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3072992A (en) * 1960-04-11 1963-01-15 Aeroquip Corp Grip fitting
FR2072873A5 (fr) * 1969-12-04 1971-09-24 Waerner Thor
FR2167274A5 (en) * 1972-01-11 1973-08-24 Arteon Marcel Cast panels contg inserts -eg anchorage bolts temporarily - located during casting between split plastic (gps) shells
GB1437010A (en) * 1973-09-26 1976-05-26 Mannesmann Leichtbau Gmbh Structural unit
FR2382398A1 (fr) * 1977-03-01 1978-09-29 Haeussler Ernst Dispositif d'accrochage d'un element prefabrique en beton a un appareil de levage
WO1982001541A1 (fr) * 1980-10-23 1982-05-13 Co Burke Systeme de levage pour parois basculantes
DE3220131A1 (de) * 1982-05-28 1983-12-01 DETEC Fertigung GmbH, 6080 Groß-Gerau Transportanker fuer betonfertigteile

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1684278A1 (de) * 1967-06-13 1970-07-09 Haeussler Ernst Vorrichtung zum Manipulieren von Betonfertigteilen
DE2223519C3 (de) * 1972-05-13 1975-07-03 Haeussler, Ernst, Dr.-Ing., 4300 Essen Vorrichtung zum Anhängen eines Betonfertigteile an ein Hebezeug

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3072992A (en) * 1960-04-11 1963-01-15 Aeroquip Corp Grip fitting
FR2072873A5 (fr) * 1969-12-04 1971-09-24 Waerner Thor
FR2167274A5 (en) * 1972-01-11 1973-08-24 Arteon Marcel Cast panels contg inserts -eg anchorage bolts temporarily - located during casting between split plastic (gps) shells
GB1437010A (en) * 1973-09-26 1976-05-26 Mannesmann Leichtbau Gmbh Structural unit
FR2382398A1 (fr) * 1977-03-01 1978-09-29 Haeussler Ernst Dispositif d'accrochage d'un element prefabrique en beton a un appareil de levage
WO1982001541A1 (fr) * 1980-10-23 1982-05-13 Co Burke Systeme de levage pour parois basculantes
DE3220131A1 (de) * 1982-05-28 1983-12-01 DETEC Fertigung GmbH, 6080 Groß-Gerau Transportanker fuer betonfertigteile

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2633959A1 (fr) * 1988-07-11 1990-01-12 Arteon Marcel Piece d'ancrage, notamment pour beton
WO1990000658A1 (fr) * 1988-07-11 1990-01-25 Marcel Arteon Piece d'ancrage notamment pour beton
AU619874B2 (en) * 1988-07-11 1992-02-06 Itw Australia Pty Ltd Anchorage piece, in particular for concrete
US5469675A (en) * 1988-07-11 1995-11-28 Arteon; Marcel Anchoring piece, in particular for concrete
EP0498742A1 (fr) * 1991-02-08 1992-08-12 Etablissements A. Mure Dispositif pour le maintien provisoire d'un organe de levage sur une surface métallique de coffrage pendant les phases de coulée et de prise du béton d'un élément en béton préfabriqué
FR2672648A1 (fr) * 1991-02-08 1992-08-14 Mure Ets Dispositif pour le maintien, provisoire d'un organe de levage sur une surface metallique de coffrage pendant les phases de coulee et de prise du beton d'un element en beton prefabrique.
WO1994008885A1 (fr) * 1992-10-12 1994-04-28 Jessen Laurids A Dispositif venant s'emboiter sur une charge en vue de soulever des elements de construction en beton
AU666230B2 (en) * 1992-10-12 1996-02-01 Oso Star Aps Load-engaging device for hoisting concrete building elements
US5580115A (en) * 1992-10-12 1996-12-03 Jessen; Laurids A. Load-engaging device for hoisting concrete building elements

Also Published As

Publication number Publication date
AT385972B (de) 1988-06-10
EP0259295B1 (fr) 1990-01-31
DE3761575D1 (de) 1990-03-08
ATA225386A (de) 1987-11-15

Similar Documents

Publication Publication Date Title
DE68909917T2 (de) Ankervorrichtung insbesondere für beton.
EP2875193B1 (fr) Montage d'un coffrage de mur et système d'ancrage à élément de dimension modulaire
CH668250A5 (de) Vorrichtung zum anhaengen eines betonfertigteils an ein hebezeug.
DE69004062T2 (de) Hebe- und aufrichtanker, insbesondere für betonplatten.
CH651278A5 (de) Vorrichtung zum anhaengen eines betonfertigteils an ein hebezeug.
EP3569795B1 (fr) Dispositif de positionnement d'une ancre de transport
CH620261A5 (en) Mounting and transporting anchor for prefabricated concrete units
EP0122521A2 (fr) Ancrage pour le transport d'éléments préfabriqués
EP2975196B1 (fr) Élément de mur et combination d'élément de mur et moyens de levage dudit mur
DE2758992A1 (de) Tragwerk zum heben und transportieren von insbesondere betonplatten durch ein hub- bzw. transportgeraet
EP0259295B1 (fr) Dispositif pour transporter et manipuler des charges lourdes, en particulier des éléments préfabriqués en béton
EP0019922A1 (fr) Dispositif d'ancrage et de manutention à pied élargi et tête de levage
DE3541262C2 (fr)
EP2408706A1 (fr) Élément de butée et combinaison d'un élément de butée et d'un moyen de fixation
DE4344838C2 (de) Kupplungsvorrichtung für einen Transportanker in einem Betonfertigteil
DE19946320B4 (de) Doppelwand
DE2708787A1 (de) Vorrichtung zum anhaengen eines betonfertigteils an ein hebezeug
AT394599B (de) Waermedaemmender bauteil
EP0878596A1 (fr) Ancre de transport à incorporer dans des panneaux en béton poreux
DE2617866A1 (de) Vorrichtung zum anschlagen von betonfertigteilen
DE2518398A1 (de) Einrichtung zum heben und transportieren von betonfertigteilen o.dgl.
DE6908100U (de) Transportanker fuer fertigbauteile
DE3329373C2 (de) Hilfsvorrichtung für die Manipulation eines Stahlbetonfertigteils mit Hilfe eines Hebezeuges sowie Verfahren zum Befestigen der Hilfsvorrichtung an der Stirnseite des Stahlbetonfertigteils
DE2232374A1 (de) Ausbildung und befestigung von traghuelsen fuer schwere betonplatten, insbesondere bruestungen fuer balkone
DE3436460A1 (de) Transportanker fuer betonfertigteile

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): BE CH DE FR GB IT LI LU NL SE

17P Request for examination filed

Effective date: 19880128

17Q First examination report despatched

Effective date: 19890620

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE CH DE FR GB IT LI LU NL SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

Effective date: 19900131

Ref country code: NL

Effective date: 19900131

Ref country code: BE

Effective date: 19900131

Ref country code: SE

Effective date: 19900131

Ref country code: GB

Effective date: 19900131

REF Corresponds to:

Ref document number: 3761575

Country of ref document: DE

Date of ref document: 19900308

ET Fr: translation filed
NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19900731

Ref country code: CH

Effective date: 19900731

Ref country code: LI

Effective date: 19900731

GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19950731

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19970328

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19970811

Year of fee payment: 11

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990501