EP0257382A2 - Méthode pour stabiliser des matériaux de sol - Google Patents
Méthode pour stabiliser des matériaux de sol Download PDFInfo
- Publication number
- EP0257382A2 EP0257382A2 EP87111297A EP87111297A EP0257382A2 EP 0257382 A2 EP0257382 A2 EP 0257382A2 EP 87111297 A EP87111297 A EP 87111297A EP 87111297 A EP87111297 A EP 87111297A EP 0257382 A2 EP0257382 A2 EP 0257382A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- soil
- reinforcement
- suspension
- binder
- geotextile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0266—Retaining or protecting walls characterised by constructional features made up of preformed elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
Definitions
- the present invention relates to a method for stabilizing soil material with the addition of an aqueous suspension of a binder.
- DE PS 3 127 350 describes a method for ground stabilization, according to which the soil to be stabilized is first excavated, then sprayed with a stabilizing agent, then mixed and finally poured back into the trench.
- this method can be used for soil stabilization in flat terrain, it was not able to assert itself due to the disadvantages inherent in it.
- the entire process is quite expensive, since an addition of 100 to 130 kg of cement must be expected per cubic meter of soil and, furthermore, the material treated in the manner described has a very low tensile strength, which is particularly important on slopes.
- a geotextile which has proven itself very well as a reinforcing material for soil stabilization, is preferably used for the production of the reinforcing elements. Descriptions of geotextiles can be found in the SN standard 640 550 "Geotextiles, terms and product descriptions" as well as in “Geotextile manual of the Swiss Association of Geotextile Experts", publisher Vogt and Schild, Solothurn.
- Fig. 1 shows a simplified section of a reinforcement element 1 laid in the ground E.
- the latter has a flexible reinforcement hose 2 made of an unsustainable, alkali-resistant and tear-resistant material, preferably of a geotextile, the mesh size of which is selected so that it is the largest grain of water Binder suspension contained still lets through.
- the supply hose 3 provided with outlet openings 3a serves to supply the aqueous binder suspension and can at its free end, which preferably protrudes from the reinforcement hose 2, with the aqueous binder suspension can be loaded.
- the end section of the feed hose opposite this free end is generally tightly closed, so that the aqueous binder suspension can only exit through the outlet openings 3 a, that is to say inside the reinforcement hose 2.
- a number of reinforcement elements 1 are first laid at mutual intervals on the soil remaining after the slide or excavation (FIG. 2) and then covered with the existing soil Ea, so that the reinforcement elements 1 are surrounded on all sides by the soil are.
- the reinforcement hoses 2 are fed via the feed hoses 3 with the aqueous binder suspension, which e.g. Lime, cement, silicate, mortar, concrete, synthetic resins, etc. may be present and, depending on the prevailing conditions (inclination of the ground, strength of the soil, etc.), is supplied without pressure or under low pressure.
- the suspension flows from the supply hose 3 on both sides into the reinforcement hose 2 and through it into the surrounding soil E.
- the binder has solidified or set or hardened, the entire environment of the reinforcement hose 2 is solidified, since the suspension fills up all gaps in the soil, with the reinforcement hose 2 naturally also being firmly embedded in the stabilized soil.
- the reinforcement hose 2 fulfills a double function: on the one hand, it serves as an infiltration element which ensures the all-round distribution of the binder suspension; on the other hand, it gives the ground an increased resistance to tensile stress, which is particularly important when it comes to slope stabilization, wall anchoring, etc.
- the floor material is glued by the described binder injection and thus solidified or stabilized so that it can also absorb larger pressure loads.
- FIG. 2 shows the reinforcement elements 1 after they have been laid and before filling up the slipped or removed soil Ea. Since the existing soil Ea is reused, it is no longer necessary to remove it and, on the other hand, there is no need to purchase the material previously required (sand, gravel, etc.). After the reinforcement elements are covered by the soil Ea, the binder suspension is introduced from a cistern wagon L via a hose S into the free openings 3B of the supply hoses 3 until the latter has sufficiently penetrated the soil.
- the method described also offers the possibility of solidifying only certain zones of a slope by providing the supply hose with outlet openings only over the partial lengths corresponding to these zones.
- a reinforcing element is thus used for the first time in soil stabilization not only to improve tensile stress, but also to transport and infiltrate the binder suspension.
- These two functions can also be taken over by the variant according to FIG. 3, in which only one reinforcement hose 3 is provided, in the central region of which a spacer 4 is arranged.
- This spacer 4 can be, for example, a rigid plastic profile, that is to say that it cannot be compressed by earth pressure, the lateral openings for passage has the binder suspension.
- the central region 2a of the reinforcing hose 2 is reinforced and rigid, while smaller spacers 5 are formed on the inner wall of the hose, which in turn have openings for the binder suspension.
- the infiltration reinforcement need not necessarily be in the form of a hose. 5, two webs 6, 7 of a relatively thick (for example 5 to 15 mm) geotextile are placed on top of one another, between which in turn there is a supply hose 3 provided with lateral outlet openings.
- This sandwich form also fulfills the intended purpose: the binder suspension flowing into the supply hose 3 is distributed in the direction of the arrow and, taking into account the surrounding soil material, forms a stabilized soil zone that can absorb compressive and tensile forces.
- a plurality of reinforcement elements 1 are preferably arranged offset in different planes.
- Fig. 7 illustrates the rehabilitation of the washed and extended ruts of forest and field because of.
- the ruts F1 and F2 are first milled out to depth T, whereupon the reinforcement elements 1 are inserted and covered with the milled bottom material. Now the binder suspension is injected, which spreads in the direction of the arrow and forms the stabilized ruts, while the vegetation remains undisturbed on the other parts of the path.
- the reinforcing elements 1 are rolled out at different levels when the soil is poured out and, after the dam has been completed, are filled with the binder suspension, which is supplied via a line S (see FIG. 2). It goes without saying that the reinforcing elements in all the described embodiments can also be laid, for example, in a U-shape, in a spiral shape or in any other shape.
- reinforcement elements according to FIG. 1 can be used, the feed hoses 3 of which can be passed through the wall M so that they can be loaded from outside the wall.
- a further floor layer is poured on after the reinforcement elements have been rolled out and anchored to the wall M.
- steel reinforcements such as steel cables or tapes can also be laid with the reinforcement elements.
- a wall M was securely anchored in that first several trenches opening against the wall were milled out to depth T, in which the reinforcement elements 1 were then rolled out, covered with soil and then as in the variant Fig. 10 from outside the wall or from the other end of the feed hoses 3 were loaded with the binder suspension. In comparison to the usual anchoring methods, there is also no need to drill and create the ground anchors.
- the infiltration reinforcements could also be designed in the form of cushions 9 (FIG. 13), which can consist, for example, of two geotextile mats lying one above the other and attached to one another.
- the end of the supply hoses 9 lie between the two geotextile mats and are preferably provided with outlet openings only in the area of the geotextile cushions 8.
- the shape of the supply hoses 9 can be adapted to the requirements in the pillow area, for example as shown at point 9a, so that there is more or less strong infiltration.
- FIGS. 14 to 16 A further embodiment of the method according to the invention is shown in FIGS. 14 to 16.
- the slope area H 1 that remains after a landslide is processed by means of an excavator in such a way that a wave-like or step-shaped surface H2 arises. Should the slope H 1 be wave-shaped from the beginning or have a large number of depressions, this first machining step according to FIG. 14 can be omitted.
- a first geotextile web G1 is now placed with a mesh size of, for example, 0.5 to 2.0 mm, which can have, for example, a width of 2 m and a mesh size of 1.5 mm. For reasons to be explained below, this laying takes place at an angle ⁇ to the fall line FL.
- a first provided with outlet openings hose 10 is meandered on the first geotextile web G 1, fixed by means of steel nails 11 and covered with a second geotextile web G 2, whereupon the whole is covered with the existing, slipped soil E.
- the aqueous suspension is introduced from above and penetrates through the openings of the hose 10 and the meshes of the geotextile tracks G 1 and G 2 into the surrounding earth.
- the desired effect is achieved that the aqueous suspension, as soon as there is no replenishment from above, remains in the sections a (Fig. 15) that extend downwards and thus has time to gradually emerge laterally and infiltrate the surrounding soil. This effect is reinforced by the step-like preprocessing of the slope area according to FIG. 14.
- FIG. 15 there is an untreated strip of earth E u between two rehabilitation lanes, which must be left free in order not to disturb the natural water balance. Thanks to the sloping, these untreated earth stiffeners E u can be kept wide without a risk of slipping to the fall line FL at an angle ⁇ running the rehabilitation tracks or reinforcement hoses 10. Arrows in Fig. 15 indicate how the untreated soil is supported on the rehabilitated sections and is held by them.
- the mesh size of the geotextile webs G 1 and G 2, the outlet openings 3a (FIG. 5) of the hose and the delivery capacity of the pump can be coordinated with one another in such a way that the desired dynamic pressure results.
- the existing, inferior soil can be reinforced on site at the same time with little effort in terms of working time and material in order to absorb the tensile forces and solidify with a view to absorbing compressive forces by means of binder infiltration. Because the reinforcement elements the binder supply and take over its distribution, there is no need for the usual mixing and compacting of the material, which is otherwise only possible with a special soil composition and could only be carried out under certain moisture conditions.
- the geotextiles have proven to be particularly useful for use as reinforcing elements, but could also be replaced by other alkali-resistant and tear-resistant materials.
- the aqueous suspension can e.g. also in several successive phases, if necessary with the inclusion of waiting times. For example, it would also be possible to first add silicate gel pH 12 to 13 and then infiltrate the soil with cement milk W / Z 0.8 to 1.0.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Agronomy & Crop Science (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Soil Working Implements (AREA)
- Floor Finish (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT87111297T ATE63770T1 (de) | 1986-08-20 | 1987-08-05 | Verfahren zur stabilisierung von bodenmaterial. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CH334186 | 1986-08-20 | ||
CH3341/86 | 1986-08-20 |
Publications (3)
Publication Number | Publication Date |
---|---|
EP0257382A2 true EP0257382A2 (fr) | 1988-03-02 |
EP0257382A3 EP0257382A3 (en) | 1988-10-12 |
EP0257382B1 EP0257382B1 (fr) | 1991-05-22 |
Family
ID=4253874
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP87111297A Expired - Lifetime EP0257382B1 (fr) | 1986-08-20 | 1987-08-05 | Méthode pour stabiliser des matériaux de sol |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0257382B1 (fr) |
AT (1) | ATE63770T1 (fr) |
DE (1) | DE3770215D1 (fr) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL1038670C2 (nl) * | 2011-03-14 | 2012-09-17 | Waterslag B V | Inrichting voor in-situ bodemsanering, werkwijze voor het vervaardigen daarvan en werkwijze voor in-situ bodemsanering. |
CN114277811A (zh) * | 2021-12-17 | 2022-04-05 | 青岛地质工程勘察院(青岛地质勘查开发局) | 一种岩土工程治理用防滑坡的边坡加固装置 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102635090A (zh) * | 2012-04-28 | 2012-08-15 | 上海市水利工程设计研究院 | 一种适用于超高流速土基潜水基床的护面结构 |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR470528A (fr) * | 1914-03-20 | 1914-09-15 | Albert Francois | Procédé d'imperméabilisation par cimentation des terrains aquifères fissurés |
US3099911A (en) * | 1958-10-08 | 1963-08-06 | Lee A Turzillo | Means of grouting or concreting |
US3518834A (en) * | 1968-05-09 | 1970-07-07 | Soil Testing Services Inc | Grouting system |
US3524320A (en) * | 1967-01-23 | 1970-08-18 | Lee A Turzillo | Method of protecting areas of an earth situs against scour |
FR2170382A5 (fr) * | 1971-11-08 | 1973-09-14 | Chitis Wolf | |
FR2182251A1 (fr) * | 1972-11-17 | 1973-12-07 | Naue Kg E A H | |
FR2195237A5 (fr) * | 1972-08-01 | 1974-03-01 | Bayer Ag | |
FR2263338A1 (en) * | 1974-03-04 | 1975-10-03 | Ohbayashi Corp | Plate material for drainage purposes - has flexible section imbedded in fibre layer with part forming continuous drainage channel |
GB1417479A (en) * | 1973-09-25 | 1975-12-10 | Turzillo L A | Means and method for producing cementitious mat-like slope covers |
GB1603510A (en) * | 1978-05-31 | 1981-11-25 | Intrusion Prepakt Uk Ltd | Casing for a matress for lining or facing a land surface |
EP0138259A2 (fr) * | 1983-09-29 | 1985-04-24 | Fluvio Labor, Personenvennootschap met beperkte aansprakelijkheid | Massif filtrant et procédé de réalisation d'un talus de digue renforcé |
-
1987
- 1987-08-05 EP EP87111297A patent/EP0257382B1/fr not_active Expired - Lifetime
- 1987-08-05 DE DE8787111297T patent/DE3770215D1/de not_active Expired - Lifetime
- 1987-08-05 AT AT87111297T patent/ATE63770T1/de not_active IP Right Cessation
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR470528A (fr) * | 1914-03-20 | 1914-09-15 | Albert Francois | Procédé d'imperméabilisation par cimentation des terrains aquifères fissurés |
US3099911A (en) * | 1958-10-08 | 1963-08-06 | Lee A Turzillo | Means of grouting or concreting |
US3524320A (en) * | 1967-01-23 | 1970-08-18 | Lee A Turzillo | Method of protecting areas of an earth situs against scour |
US3518834A (en) * | 1968-05-09 | 1970-07-07 | Soil Testing Services Inc | Grouting system |
FR2170382A5 (fr) * | 1971-11-08 | 1973-09-14 | Chitis Wolf | |
FR2195237A5 (fr) * | 1972-08-01 | 1974-03-01 | Bayer Ag | |
FR2182251A1 (fr) * | 1972-11-17 | 1973-12-07 | Naue Kg E A H | |
GB1417479A (en) * | 1973-09-25 | 1975-12-10 | Turzillo L A | Means and method for producing cementitious mat-like slope covers |
FR2263338A1 (en) * | 1974-03-04 | 1975-10-03 | Ohbayashi Corp | Plate material for drainage purposes - has flexible section imbedded in fibre layer with part forming continuous drainage channel |
GB1603510A (en) * | 1978-05-31 | 1981-11-25 | Intrusion Prepakt Uk Ltd | Casing for a matress for lining or facing a land surface |
EP0138259A2 (fr) * | 1983-09-29 | 1985-04-24 | Fluvio Labor, Personenvennootschap met beperkte aansprakelijkheid | Massif filtrant et procédé de réalisation d'un talus de digue renforcé |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL1038670C2 (nl) * | 2011-03-14 | 2012-09-17 | Waterslag B V | Inrichting voor in-situ bodemsanering, werkwijze voor het vervaardigen daarvan en werkwijze voor in-situ bodemsanering. |
CN114277811A (zh) * | 2021-12-17 | 2022-04-05 | 青岛地质工程勘察院(青岛地质勘查开发局) | 一种岩土工程治理用防滑坡的边坡加固装置 |
CN114277811B (zh) * | 2021-12-17 | 2023-11-14 | 青岛地质工程勘察院(青岛地质勘查开发局) | 一种岩土工程治理用防滑坡的边坡加固装置 |
Also Published As
Publication number | Publication date |
---|---|
ATE63770T1 (de) | 1991-06-15 |
EP0257382A3 (en) | 1988-10-12 |
EP0257382B1 (fr) | 1991-05-22 |
DE3770215D1 (de) | 1991-06-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3708081C2 (fr) | ||
CH635885A5 (en) | Anchorage for structural members in soil or in rock and method of producing this anchorage | |
DE2603790A1 (de) | Strassengruendung, sowie verfahren zu ihrer herstellung | |
EP0379466A1 (fr) | Elément de construction pour recouvrir la surface de talus par un revêtement végétal et revêtement comportant de tels éléments | |
DE20000015U1 (de) | Wasserleitung | |
EP0788572B1 (fr) | Procede de reprise en sous-oeuvre de batiments | |
DE4239269A1 (de) | Verfahren und Schirm zum Fixieren großflächiger Schlammablagerungen | |
EP0257382B1 (fr) | Méthode pour stabiliser des matériaux de sol | |
DE20002066U1 (de) | Versickerungssystem | |
DE68912648T2 (de) | Bauverfahren. | |
DE2756047B1 (de) | Anordnung zum Verhindern des seitlichen Abrutschens von Dammgut der Boeschung eines von Fahrzeugen befahrenen Dammes | |
DE102014101334B4 (de) | Böschungssicherungseinrichtung, damit hergestelltes Böschungsbauwerk, sowie Verfahren zur Herstellung eines solchen Böschungsbauwerks | |
DE3127350A1 (de) | Verfahren zur befestigung und/oder stabilisierung von boeden | |
DE102007056408B4 (de) | System und Verfahren zum Aufbau einer Fahrbahn | |
DE1962850C3 (de) | Wasserdurchlässige bituminöse Gemische auf der Grundlage eines Bitumenmörtels und ihre Verwendung in der Wasserbautechnik | |
DE3727752C2 (fr) | ||
AT398994B (de) | Bepflanzbares stützbauwerk und verfahren zu dessen herstellung | |
AT397523B (de) | Verfahren zur stabilisierung von erdbauten und/oder natürlichen hügelhängen | |
EP1125029B1 (fr) | Garniture de drainage par infiltration ou conduite de drainage par infiltration | |
AT357477B (de) | Verfahren zur herstellung eines weges an der schraegen boeschung eines dammes | |
DE2658890C2 (de) | Becken zum Absetzen von in Wasser befindlichen Schwebstoffen, als Filterbecken, Schlammbecken, Klärbecken o.dgl | |
DE10323141B4 (de) | Verfahren zur statischen Sicherung von Stützmauern und Füllpackung hierfür | |
EP4095318A1 (fr) | Procédé de fabrication d'une structure porteuse | |
AT6873U1 (de) | Bewehrungskonstruktion | |
DE10039769C2 (de) | Verfahren zur Stabilisierung von Böschungen |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL SE |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL SE |
|
17P | Request for examination filed |
Effective date: 19890202 |
|
17Q | First examination report despatched |
Effective date: 19900115 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 19910522 Ref country code: SE Effective date: 19910522 Ref country code: NL Effective date: 19910522 Ref country code: BE Effective date: 19910522 Ref country code: FR Effective date: 19910522 Ref country code: GB Effective date: 19910522 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 19910522 |
|
REF | Corresponds to: |
Ref document number: 63770 Country of ref document: AT Date of ref document: 19910615 Kind code of ref document: T |
|
REF | Corresponds to: |
Ref document number: 3770215 Country of ref document: DE Date of ref document: 19910627 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19910831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 19910902 |
|
EN | Fr: translation not filed | ||
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
GBV | Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed] | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 19930729 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Effective date: 19940805 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 19950811 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19951030 Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Effective date: 19960831 Ref country code: LI Effective date: 19960831 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Effective date: 19970501 |