EP0151723A1 - Means for introducing metal in a continuous vertical casting plant for casting metal tubes, in particular from cast iron - Google Patents
Means for introducing metal in a continuous vertical casting plant for casting metal tubes, in particular from cast iron Download PDFInfo
- Publication number
- EP0151723A1 EP0151723A1 EP84114695A EP84114695A EP0151723A1 EP 0151723 A1 EP0151723 A1 EP 0151723A1 EP 84114695 A EP84114695 A EP 84114695A EP 84114695 A EP84114695 A EP 84114695A EP 0151723 A1 EP0151723 A1 EP 0151723A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- die
- base
- central relief
- cavity
- relief
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/04—Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/006—Continuous casting of metals, i.e. casting in indefinite lengths of tubes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/14—Plants for continuous casting
- B22D11/145—Plants for continuous casting for upward casting
Definitions
- the present invention relates to the vertical upward continuous casting of a metal tube, in particular of cast iron, without the use of a core for the formation of the cavity of the barrel of the tube.
- the invention relates more precisely to a device for supplying liquid metal to a tubular die giving the external shape of such a tube either from a siphon block (source supply) or from a ladle under gas pressure (low pressure casting, with liquid metal rising in the mold).
- the tubular die of vertical axis forms with a support base which constitutes the bottom a crucible for the metal liquid brought in from below, either by siphon block or by ladle.
- the crucible formed by the tubular die and the support base contains a cylindrical volume of liquid metal, which is all the more important the larger the diameter of the tube to be obtained.
- the Applicant has posed the problem of considerably reducing the volume of metal, in particular liquid cast iron to be brought to the lower end of the die in an installation for continuous upward casting of a tube, despite the absence of a core, therefore to achieve significant savings in liquid metal fusion energy, in particular in liquid iron.
- the subject of the invention is a device for the vertical upward continuous casting of a metal tube, in particular of cast iron, of the type comprising an inlet of liquid metal at the bottom of a cooled die resting on a base, the die forming crucible with the base to contain the liquid metal, characterized in that it has, inside the die and in the vertical axis thereof, a central relief of height corresponding to that of the die to accommodate with it ci an annular volume of liquid metal at the bottom of which is the mouth of at least one liquid metal supply duct.
- the crucible contains only a small annular volume of liquid metal whose annular width is much greater than the thickness of the tube to be obtained but whose total volume is considerably reduced compared to that which a crucible without of central relief.
- the central relief is hollowed out by a cavity which passes right through it, which allows access, by this cavity inside the tube being formed, to above the central relief, that is to say the possibility of introducing through this cavity of the central relief control tools, for example of liquid metal level or thickness of the tube formed.
- the invention is applied to the continuous upward casting of a cast iron tube T.
- a base 1 hollow, made of refractory material, for example of the silico-aluminous type, internally comprises an L-shaped pouring duct with horizontal or slightly oblique leg 2 and with vertical chimney 3 ending at its upper part by a pouring funnel 4 .
- the base 1 of the siphon block forms a support base for a tubular die described below.
- the siphon block carries a central relief 5 of frustoconical external shape with vertical axis XX, of high height above the base 1.
- the base 1 carries a crucible consisting of a tubular die comprising a graphite jacket 6, of axis XX, the inside diameter of which corresponds to the outside diameter of the tube T to be obtained and an envelope 7.
- the jacket 6 is cooled externally by an envelope 7, for example made of copper, with circulation of cooling water which enters through a conduit 8 and exits through a conduit 9.
- the assembly "jacket 6 and envelope 7" is therefore designated below. -after under the term “sector 6-7".
- a refractory annular spacer block can be interposed between the cooling jacket or cooling box 7 and the base 1.
- the central relief 5 of the invention which is an integral part of the siphon block 1, 2, 3, 4 in the present example, is also part of the crucible formed by the combination of the siphon block and the die 6 -7.
- the central relief 5 has a height above the base 1 which is at least equal to and preferably greater than the height of the die 6-7 above said base 1.
- the frustoconical central relief 5 has a large base, below the support constituted by the base 1, of diameter substantially less than the internal diameter that one wants to obtain on the tube T-to be formed.
- the small upper base of the central relief 5 has a diameter substantially smaller than that of the cavity of the tube to be obtained.
- the central relief 5 is hollowed out by a lightening cavity 10, for example of frustoconical shape. But such a recess is not compulsory.
- the horizontal conduit 2 of the siphon block opens below the base 1, on the wall of a crucible bottom formed by the siphon block itself, so as to bring the liquid iron to the lower end of the die 6-7, below the lower end edge of the jacket 6.
- the opening of the horizontal conduit 2 for supplying liquid metal has a diameter less than the width of the annular space between the large lower base of the central relief 5 and the cylindrical cavity of the die 6-7.
- annular thickness of this annular volume of metal or of liquid iron is substantially greater than the thickness e of the tube T to be formed.
- the relief 5 constitute a core for the formation of the tube T.
- a certain annular volume of iron or liquid metal must remain between the periphery being solidified and the outer wall.
- the volume annular metal or liquid iron between the central relief 5 and the die 6-7 has at its lower end a radial thickness which is at least twice the thickness e of the tube T.
- the installation is completed by means of vertical guide of the tube T, partially represented by a pair of rollers or guide rollers E and is completed by an extractor not shown and consisting of a lifting device arranged to grip the upper end of the T tube formed and to gradually raise the T tube, using a stepping drive motor.
- Liquid iron is introduced along arrow f into the pouring funnel 4.
- the filling of the siphon block and the crucible constituted by the die 6-7 with jacket 6 and the central relief 5 of the siphon block is carried out until the level of liquid iron N reaches a height slightly lower than the total height of the sector 6-7 so as not to overflow.
- the level N of the liquid iron F is the same inside the crucible or the die 6-7 and inside the chimney 3.
- the jacket 7 is crossed by a current of Cold water.
- a dummy or false tube M consisting of a tubular steel sleeve having substantially the same internal and external diametrical dimensions, therefore substantially of the same thickness e as the tube T to be obtained, is introduced by the top of the die 6-7 using guide rollers E so as to immerse in the cast iron its lower part scalloped in Ml, for example in dovetail, to allow the attachment of the liquid cast iron F.
- the die 6-7 While the die 6-7 is not cooled at its lower end, it is on the contrary cooled over most of its height, up to its upper end because the jacket 6 is enveloped by the envelope of cooling 7. As a result, the cast iron solidifies on contact with the die 6-7 over the entire height which corresponds to that of the liner 7 up to the mannequin M in contact with which it solidifies.
- the thickness of cast iron solidified along a solidification front S is higher the lower the speed of introduction of liquid iron is lower.
- the liquid iron F fills the notch Ml of the mannequin M, solidifies, and by therefore clings to the dummy M.
- the dummy being pulled up by the extractor, rises in spurts and drives the solidified part of the cast iron up, step by step.
- the plate 11 which supports the jacket 7 is refractory material, for example of the silico-aluminous type. It is intended to prevent cooling of the base 1 by the jacket 7.
- the shell 12 supports, by an enlarged frustoconical surface 13, the flange 14 a of an annular interlocking core 14 made of refractory and air-permeable molding material, for example in a hardened mixture of sand and thermosetting resin.
- the core 14 gives the internal profile of the fitting of the pipe to be obtained. It comprises a tubular skirt 15, the external wall of which corresponds to the internal wall of the pipe which is to be molded.
- the skirt 15 extends downwards beyond the shell 12, over a certain height from the die 6-7 at the upper part thereof.
- the skirt 15 therefore provides, with lachemise 6 of the dies 6-7, an annular space 16 corresponding to the thickness of the pipe to be formed.
- the core 14 necessarily includes an internal coating 17 (tubular steel core) impermeable to air and resistant to the temperature of liquid iron.
- the shell 12-core 14 assembly is completed by suction means.
- the core 14 is applied to its surface 13 in the shell 12 by a metallic annular suction plate 18.
- the plate 18 has an annular suction groove 19 opening towards the flange 14a of the core 14, above the annular space 16. In the groove 19 there opens a conduit 20 connected through a tap 21 to a source d suction not shown.
- the suction plate 18 is fixed to the shell 12, for example by screws.
- the extractor of the cast iron pipe being formed is not shown. It comprises a circular metal plate 22 called a lifting plate, of axis XX, secured to the suction plate 18.
- the plate 22 is fixed to the plate 18 for example by screws and is secured to a lifting rod 23 of axis XX, suspended from a vertically guided lifting device, not shown.
- the central relief 5 of the invention for example frustoconical, has dimensions of large base such that the top of the central relief 5 is located inside the cavity of the skirt 15 of the core 14, au- above the upper end of the die 6-7 or of the jacket 6. It is advantageous that the relief 5 is higher than the die 6-7, in FIG. 1 as in FIG. 3, because this makes it possible to limit the volume of liquid iron to an annular space over the entire height of the jacket 6 of the die 6-7 whereas if the central relief 5 was clearly lower than the jacket 6, there would be liquid iron above the top of the relief 5 and therefore an unnecessary excess of liquid iron.
- Liquid iron rapidly fills the annular space 16 from the socket to the porous flange 14a of the core 14.
- the central relief 5 can be a body attached to said siphon block and sealed thereon.
- the blind recess internal recess of the central relief 5 is replaced by an open cavity 10a passing right through, axially, the relief 5, opening at the top of the central relief 5, and opening towards the outside on the underside from socket 1 of the siphon block 1-2-3-4.
- this cavity 10a opening a passage from the outside to the inside of the tube T in formation, it is possible to introduce a CN tool for controlling the level of liquid metal or else a CE tool for measuring the thickness of the tube formed by measuring its internal diameter since its external diameter is known, or else a CT bath temperature measurement tool.
- CN, CT and! CE symbolically represented by dashed lines, are given as examples to illustrate the possibility of access or visit inside the tube T, thanks to this cavity, passage 10a.
- the measurement or detection of the level N since it is in this example a supply of liquid metal by siphon block with communicating vessels constituted by the crucible 6-7 on the one hand and the vertical chimney 3 on the other hand, it is certain that one can detect or measure the level N from the outside, by the chimney 3, at least outside the periods of reloading in liquid iron according to arrow f. But we will see in other variants where we do not have the system of communicating vessels, that it is useful to be able to access the level of liquid iron from the inside.
- the liquid iron supply system is modified: the siphon block 1-2-3-4 is replaced by a pressure casting ladle 24 of the teapot type with oblique filling chute closed by a cover 25.
- a pouring tube vertical 26 made of refractory material passes through the upper wall of the closed pocket 24. It plunges almost to the bottom of the pocket 24 and protrudes above the upper wall of the pocket 24 for a short length along which it is surrounded and reinforced with a frustoconical nozzle 27 of axis XX of connection with an interlocking additional frustoconical 28 of axis XX to the part! lower of the base la to communicate the pouring tube 26 with the cavity 10b or 10c of the central relief 5.
- the central relief 5 is hollowed right through by a cavity to allow the rising passage of liquid cast iron and its discharge inside the crucible formed by the die 6-7 and the base la over the top of the central relief 5.
- the central relief 5 can be given a hollow frustoconical shape of constant thickness with a recess cavity such as 10b. There is thus an enlarged mass of hot liquid iron at the bottom and axial part of the central relief 5.
- the central passage cavity that is to say through the relief 5 a cylindrical shape of the same diameter as the inside diameter of the ascending pouring tube 26, according to the profile in phantom 10c.
- a conduit 29 in communication with the interior of the pocket 24 at the top of the latter, above the level of the liquid metal F is connected to a source of compressed gas or to a discharge under the control of a tap 30.
- the variant of FIG. 5 has the advantage of allowing better control and even automatic control of the supply of liquid iron under low pressure of a gas which may be air or else an inert gas such as nitrogen or l 'argon.
- This arrangement is particularly advantageous since it allows access to an invisible interior space since, in this example, it is between the central relief 5 and the core 17 of the skirt 15 of the nesting core 14.
Landscapes
- Mechanical Engineering (AREA)
- Engineering & Computer Science (AREA)
- Continuous Casting (AREA)
- Casting Support Devices, Ladles, And Melt Control Thereby (AREA)
- Molds, Cores, And Manufacturing Methods Thereof (AREA)
- Manufacture And Refinement Of Metals (AREA)
- Treatment Of Steel In Its Molten State (AREA)
- Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)
- Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)
- Steering-Linkage Mechanisms And Four-Wheel Steering (AREA)
- Vehicle Body Suspensions (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Furnace Charging Or Discharging (AREA)
- Moulding By Coating Moulds (AREA)
- Casting Or Compression Moulding Of Plastics Or The Like (AREA)
- Physical Vapour Deposition (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Road Signs Or Road Markings (AREA)
Abstract
Description
La présente invention est relative à la coulée continue verticale ascendante d'un tube métallique, notamment en fonte, sans l'utilisation d'un noyau pour la formation de la cavité du fût du tube.The present invention relates to the vertical upward continuous casting of a metal tube, in particular of cast iron, without the use of a core for the formation of the cavity of the barrel of the tube.
L'invention concerne plus précisément un dispositif d'alimentation en métal liquide d'une filière tubulaire donnant la forme extérieure d'un tel tube soit à partir d'un bloc siphon (alimentation en source) soit à partir d'une poche de coulée sous pression d'un gaz (coulée sous basse pression, avec montée du métal liquide dans le moule).The invention relates more precisely to a device for supplying liquid metal to a tubular die giving the external shape of such a tube either from a siphon block (source supply) or from a ladle under gas pressure (low pressure casting, with liquid metal rising in the mold).
Dans une installation connue de ce type, décrite par exemple dans la demande de brevet en FRANCE n° 83 11 788 du 12 juillet 1983 la filière tubulaire d'axe vertical forme avec un socle de support qui en constitue le fond un creuset pour le métal liquide amené par le bas, soit par bloc-siphon soit par poche de coulée.In a known installation of this type, described for example in the patent application in FRANCE No. 83 11 788 of July 12, 1983, the tubular die of vertical axis forms with a support base which constitutes the bottom a crucible for the metal liquid brought in from below, either by siphon block or by ladle.
Ainsi, le creuset formé par la filière tubulaire et le socle de support contient un volume cylindrique de métal liquide, qui est d'autant plus important que le diamètre du tube à obtenir est plus élevé.Thus, the crucible formed by the tubular die and the support base contains a cylindrical volume of liquid metal, which is all the more important the larger the diameter of the tube to be obtained.
La Demanderesse s'est posé le problème de réduire considérablement le volume de métal, notamment de fonte liquide à amener à l'extrémité inférieure de la filière dans une installation de coulée continue ascendante d'un tube, malgré l'absence de noyau, donc de réaliser une économie importante d'énergie de fusion de métal liquide, notamment de fonte liquide.The Applicant has posed the problem of considerably reducing the volume of metal, in particular liquid cast iron to be brought to the lower end of the die in an installation for continuous upward casting of a tube, despite the absence of a core, therefore to achieve significant savings in liquid metal fusion energy, in particular in liquid iron.
Le problème est résolu par le dispositif de l'invention.The problem is solved by the device of the invention.
L'invention a pour objet un dispositif pour la coulée continue verticale ascendante, d'un tube métallique, notamment en fonte, du type comportant une entrée de métal liquide à la partie inférieure d'une filière refroidie reposant sur un socle, la filière formant creuset avec le socle pour contenir le métal liquide, caractérisé en ce qu'il comporte à l'intérieur de la filière et dans l'axe vertical de celle-ci un relief central de hauteur correspondant à celle de la filière pour ménager avec celle-ci un volume annulaire de métal liquide à la partie inférieure duquel se trouve l'embouchure d'au moins un conduit d'alimentation en métal liquide.The subject of the invention is a device for the vertical upward continuous casting of a metal tube, in particular of cast iron, of the type comprising an inlet of liquid metal at the bottom of a cooled die resting on a base, the die forming crucible with the base to contain the liquid metal, characterized in that it has, inside the die and in the vertical axis thereof, a central relief of height corresponding to that of the die to accommodate with it ci an annular volume of liquid metal at the bottom of which is the mouth of at least one liquid metal supply duct.
Grâce à cet agencement, le creuset ne contient qu'un faible volume annulaire de métal liquide dont la largeur annulaire est très supérieure à l'épaisseur du tube à obtenir mais dont le volume total est considérablement réduit par rapport à celui que contiendrait un creuset dépourvu de relief central.Thanks to this arrangement, the crucible contains only a small annular volume of liquid metal whose annular width is much greater than the thickness of the tube to be obtained but whose total volume is considerably reduced compared to that which a crucible without of central relief.
En outre, suivant une autre caractéristique importante de l'invention, le relief central est évidé par une cavité qui le traverse de part en part, ce qui permet l'accès, par cette cavité à l'intérieur du tube en formation, au-dessus du relief central, c'est-à-dire la possibilité d'introduire par cette cavité du relief central des outils de contrôle, par exemple de niveau de métal liquide ou d'épaisseur du tube formé.In addition, according to another important characteristic of the invention, the central relief is hollowed out by a cavity which passes right through it, which allows access, by this cavity inside the tube being formed, to above the central relief, that is to say the possibility of introducing through this cavity of the central relief control tools, for example of liquid metal level or thickness of the tube formed.
D'autres caractéristiques et avantages apparaîtront au cours de la description qui va suivre.Other characteristics and advantages will appear during the description which follows.
Aux dessins annexés donnés uniquement à titre d'exemples,
- - la Fig. 1 est une vue schématique en coupe du dispositif d'alimentation en métal liquide de l'invention, pour une installation de coulée continue d'un tube sans emboîtement,
- - la Fig. 2 est une vue partielle en coupe correspondant à la Fig.l illustrant l'emploi d'un mannequin ou faux tube pour débuter la coulée continue,
- - la Fig. 3 est une vue en coupe analogue à la Fig. l du dispositif de l'invention appliquée à la coulée continue d'un tuyau en fonte à emboîtement,
- - la Fig. 4 est une vue partielle en coupe correspondant à la Fig.l, d'une variante de relief central de l'invention à cavité le traversant de part en part,
- - la Fig. 5 est une vue en coupe analogue à la Fig. 3 illustrant la coulêe continue d'un tuyau à emboîtement avec alimentation ascendante en fonte liquide par une poche de coulée sous pression,
- - la Fig. 6 est une vue partielle analogue à la Fig. 5 montrant une variante d'alimentation en métal liquide à partir d'une poche de coulée sous pression.
- - Fig. 1 is a schematic sectional view of the liquid metal supply device of the invention, for an installation for continuous casting of a tube without interlocking,
- - Fig. 2 is a partial sectional view corresponding to FIG. 1 illustrating the use of a dummy or false tube to start the continuous casting,
- - Fig. 3 is a sectional view similar to FIG. l of the device of the invention applied to the continuous casting of an interlocking cast iron pipe,
- - Fig. 4 is a partial sectional view corresponding to FIG. 1, of a central relief variant of the invention with a cavity passing right through it,
- - Fig. 5 is a sectional view similar to FIG. 3 illustrating the continuous casting of an interlocking pipe with ascending supply of liquid iron by a pressure casting ladle,
- - Fig. 6 is a partial view similar to FIG. 5 showing a variant supply of liquid metal from a pressure casting ladle.
Suivant l'exemple d'exécution illustré aux Fig. 1 et 2, l'invention est appliquée à la coulée continue ascendante d'un tube en fonte T.According to the execution example illustrated in FIGS. 1 and 2, the invention is applied to the continuous upward casting of a cast iron tube T.
Cette installation comporte :
- - Une alimentation en fonte liquide par bloc-siphon
- - Un creuset constitué par une filière tubulaire refroidie,
- - Un extracteur non représenté du tube formé.
- - Liquid iron feed by siphon block
- - A crucible consisting of a cooled tubular die,
- - An extractor not shown from the formed tube.
Un socle 1, creux, en matériau réfractaire par exemple de type silico-alumineux comporte intérieurement un conduit de coulée en forme de L à jambage 2 horizontal ou légèrement oblique et à cheminée verticale 3 se terminant à sa partie supérieure par un entonnoir de coulée 4.A
Le socle 1 du bloc-siphon forme une embase de support d'une filière tubulaire décrite ci-après.The
Conformément à l'invention, le bloc-siphon porte un relief central 5 de forme extérieure tronconique d'axe vertical XX, de forte hauteur au-dessus du socle 1.According to the invention, the siphon block carries a
D'autres détails sur le relief 5 de l'invention sont donnés ci-après.Other details on the
Dans l'axe XX, le socle 1 porte un creuset constitué par une filière tubulaire comportant une chemise 6 en graphite, d'axe XX, dont le diamètre intérieur correspond au diamètre extérieur du tube T à obtenir et une enveloppe 7.In axis XX, the
La chemise 6 est refroidie extérieurement par une enveloppe 7, par exemple en cuivre, à circulation d'eau de refroidissement qui entre par un conduit 8 et sort par un conduit 9. L'ensemble "chemise 6 et enveloppe 7" est donc désigné ci-après sous le terme de "filière 6-7".The jacket 6 is cooled externally by an envelope 7, for example made of copper, with circulation of cooling water which enters through a
Alors que la chemise 6 en graphite repose par sa tranche d'extrémité inférieure sur le socle 1 du bloc-siphon, l'enveloppe de refroidissement 7, en contact avec la chemise 6, l'enveloppe sur presque toute sa hauteur, à l'exception de l'extrémité inférieure de la chemise 6 qui n'est pas refroidie. L'enveloppe d'eau de refroidissement 7 n'est donc pas en contact direct avec le socle 1. Eventuellement, mais non obligatoirement, un bloc annulaire réfractaire d'espacement peut être interposé entre l'enveloppe de refroidissement ou boite de refroidissement 7 et le socle 1.While the graphite jacket 6 rests by its lower end edge on the
Le relief central 5 de l'invention, qui fait partie intégrante du bloc-siphon 1, 2, 3, 4 dans le présent exemple, fait également partie du creuset constitué par la combinaison du bloc-siphon et de la filière 6 -7. Le relief central 5 a une hauteur au-dessus du socle 1 qui est au moins égale et de préférence supérieure à la hauteur de la filière 6-7 au-dessus dudit socle 1.The
Le relief central tronconique 5 a une grande base, au-dessous du support constitué par le socle 1, de diamètre sensiblement inférieur au diamètre intérieur que l'on veut obtenir sur le tube T-à former. A fortiori, la petite base supérieure du relief central 5 a un diamètre sensiblement inférieur à celui de la cavité du tube à obtenir.The frustoconical
Dans le présent exemple, le relief central 5 est évidé par une cavité 10 d'allègement, par exemple de forme tronconique. Mais un tel évidement n'est pas obligatoire.In the present example, the
Le conduit horizontal 2 du bloc-siphon débouche au-dessous du socle 1, sur la paroi d'un fond de creuset constitué par le bloc-siphon lui-même, de manière à amener la fonte liquide à l'extrémité inférieure de la filière 6-7, au-dessous de la tranche d'extrémité inférieure de la chemise 6.The
L'orifice d'embouchure du conduit horizontal 2 d'alimentation en métal liquide a un diamètre inférieur à la largeur de l'espace annulaire entre la grande base inférieure du relief central 5 et la cavité cylindrique de la filière 6-7.The opening of the
Dans le creuset de métal ou de fonte liquide ainsi formé par la filière 6-7 ou la chemise 6 et le bloc-siphon 1, 2, 3, 4, se trouve un faible volume de métal liquide ou de fonte liquide puisqu'il est annulaire, étant compris entre la paroi intérieure de la chemise 6 et la paroi extérieure du relief central 5 du bloc-siphon.In the crucible of metal or liquid iron thus formed by the die 6-7 or the jacket 6 and the
L'épaisseur annulaire de ce volume annulaire de métal ou de fonte liquide est sensiblement supérieure à l'épaisseur e du tube T à former. En effet, en aucun cas le relief 5 ne doit constituer un noyau pour la formation du tube T. Bien au contraire, lors du processus de solidification de la zone périphérique dudit volume annulaire de métal ou de fonte liquide, un certain volume annulaire de fonte ou de métal liquide doit subsister entre la périphérie en cours de solidification et la paroi extérieure. Dans l'exemple d'exécution illustré, le volume annulaire de métal ou fonte liquide compris entre le relief central 5 et la filière 6-7 présente à son extrémité inférieure une épaisseur radiale qui est au moins le double de l'épaisseur e du tube T.The annular thickness of this annular volume of metal or of liquid iron is substantially greater than the thickness e of the tube T to be formed. In fact, in no case should the
L'installation est complétée par des moyens de guidage vertical du tube T, partiellement représentés par une paire de galets ou rouleaux de guidage E et est complétée par un extracteur non représenté et consistant en un appareil de levage agencé pour saisir l'extrémité supérieure du tube T formé et pour faire monter progressivement le tube T, à l'aide d'un moteur d'entraînement pas-à-pas.The installation is completed by means of vertical guide of the tube T, partially represented by a pair of rollers or guide rollers E and is completed by an extractor not shown and consisting of a lifting device arranged to grip the upper end of the T tube formed and to gradually raise the T tube, using a stepping drive motor.
De tels moyens de guidage et d'extraction sont connus en soi. FONCTIONNEMENT - (Fig. 1-2)Such guide and extraction means are known per se. OPERATION - (Fig. 1-2)
De la fonte liquide est introduite suivant la flèche f dans l'entonnoir 4 de coulée. Le remplissage du bloc-siphon et du creuset constitué par la filière 6-7 à chemise 6 et le relief central 5 du bloc-siphon est effectué jusqu'à ce que le niveau de fonte liquide N atteigne une hauteur légèrement inférieure à la hauteur totale de la filière 6-7 de manière à ne pas déborder. Par effet de vases communicants, le niveau N de la fonte liquide F est le même à l'intérieur du creuset ou de la filière 6-7 et à l'intérieur de la cheminée 3. La chemise 7 est traversée par un courant d'eau froide.Liquid iron is introduced along arrow f into the pouring funnel 4. The filling of the siphon block and the crucible constituted by the die 6-7 with jacket 6 and the
Pour amorcer la production du tube T, un mannequin ou faux-tube M, constitué par un manchon tubulaire en acier ayant sensiblement les mêmes dimensions diamètrales interne et externe, donc sensiblement de même épaisseur e que le tube T à obtenir, est introduit par le haut de la filière 6-7 à l'aide des galets de guidage E de manière à immerger dans la fonte sa partie inférieure échancrée en Ml, par exemple en queue d'aronde, pour permettre l'accrochage de la fonte liquide F.To start the production of the tube T, a dummy or false tube M, consisting of a tubular steel sleeve having substantially the same internal and external diametrical dimensions, therefore substantially of the same thickness e as the tube T to be obtained, is introduced by the top of the die 6-7 using guide rollers E so as to immerse in the cast iron its lower part scalloped in Ml, for example in dovetail, to allow the attachment of the liquid cast iron F.
Alors que la filière 6-7 n'est pas refroidie à son extrémité inférieure, elle est au contraire refroidie sur la plus grande partie de sa hauteur, jusqu'à son extrémité supérieure du fait que la chemise 6 est enveloppée par l'enveloppe de refroidissement 7. Il en résulte que la fonte se solidifie au contact de la filière 6-7 sur toute la hauteur qui correspond à celle de la chemise 7 jusqu'au mannequin M au contact duquel elle se solidifie. L'épaisseur de fonte solidifiée suivant un front de solidification S est d'autant plus élevée que la vitesse d'introduction de fonte liquide par le bas est plus faible.La fonte liquide F emplit l'échancrure Ml du mannequin M, se solidifie, et par conséquent s'accroche au mannequin M. Le mannequin étant tiré vers le haut par l'extracteur, monte par à-coups et entraîne la partie de fonte solidifiée vers le haut, pas-à-pas.While the die 6-7 is not cooled at its lower end, it is on the contrary cooled over most of its height, up to its upper end because the jacket 6 is enveloped by the envelope of cooling 7. As a result, the cast iron solidifies on contact with the die 6-7 over the entire height which corresponds to that of the liner 7 up to the mannequin M in contact with which it solidifies. The thickness of cast iron solidified along a solidification front S is higher the lower the speed of introduction of liquid iron is lower. The liquid iron F fills the notch Ml of the mannequin M, solidifies, and by therefore clings to the dummy M. The dummy being pulled up by the extractor, rises in spurts and drives the solidified part of the cast iron up, step by step.
Lorsque le mannequin M a tiré vers le haut une amorce de tube T de hauteur suffisante pour venir en prise entre les galets de guidage ou rouleaux de guidage E (Fig. 1), le front de solidification S qui se forme sur la périphérie du volume annulaire de fonte liquide F prend la forme tronconique et la dimension représentées à la Fig. 1 qui correspond à la hauteur totale de fonte liquide F entourée par la chemise de refroidissement 7. L'épaisseur solidifiée maximale se trouve donc au nivau N de la fonte liquide.When the mannequin M has pulled upwards a primer of tube T of sufficient height to come into engagement between the guide rollers or guide rollers E (Fig. 1), the solidification front S which forms on the periphery of the volume ring shape of liquid iron F takes the frustoconical shape and the size shown in FIG. 1 which corresponds to the total height of liquid iron F surrounded by the cooling jacket 7. The maximum solidified thickness is therefore at level N of the liquid iron.
Alors que dans l'exemple de la Fig. 1, le relief central 5 de l'invention est appliqué à une filière 6 destinée à la formation d'un tube T sans emboitement, la variante de la Fig. 3 est appliquée à la formation d'un tube T1 comportant un emboitement. Cette variante dérive de l'installation décrite dans la demande de brevet en France 83 11 788 du 12 Juillet 1983 :
- Dans cette variante, concernant la fabrication d'un tuyau en fonte à emboitement, l'installation est analogue à celle de la Fig. 1, mais comporte en plus, comme décrit dans la demande de brevet 83 11 788, des moyens pour former l'emboitement.
- In this variant, concerning the manufacture of a cast iron pipe with interlocking, the installation is similar to that of FIG. 1, but also comprises, as described in patent application 83 11 788, means for forming the socket.
Dans la description qui suit, les éléments d'installation identiques ou semblables à ceux de la Fig. 1 et jouant le même rôle portent les mêmes repères numériques. On retrouve donc la même alimentation en fonte liquide par bloc-siphon 1, 2, 3, 4 formant socle ou support pour une filière 6 tubulaire en graphite enveloppée par une chemise de refroidissement 7 à circulation d'eau froide.In the description which follows, the installation elements identical or similar to those of FIG. 1 and playing the same role have the same numerical references. We therefore find the same supply of liquid iron by siphon
On retrouve le même relief central 5 de l'invention à évidement 10. Entre la chemise de refroidissement 7 et le socle 1 constitué par le bloc-siphon est interposée une plaque de support isolante 11. La plaque 11 qui supporte la chemise 7 est en matériau réfractaire par exemple de type silico-alumineux. Elle est destinée à éviter le refroidissement du socle 1 par la chemise 7.We find the same
Les moyens pour former l'emboitement sont les suivants :
- La chemise 6 de la filière 6-7 est surmontée ou prolongée à sa partie supérieure
par une coquille 12 annulaire métallique, par exemple en acier, d'axe XX, évasée vers le haut, donnant la forme extérieure de l'emboitement du tuyau en fonte à obtenir. La coquille 12 se raccorde sans discontinuité tant avec la paroi intérieure qu'avec la paroi extérieure de la chemise 6. La coquille 12 est refroidie soit par l'air ambiant, soit par des jets d'eau non représentés.
- The jacket 6 of the die 6-7 is surmounted or extended at its upper part by a metallic
annular shell 12, for example of steel, of axis XX, flared upwards, giving the external shape of the interlocking of the pipe in cast iron to be obtained. Theshell 12 is connected without discontinuity both with the inner wall and with the outer wall of the jacket 6. Theshell 12 is cooled either by the ambient air, or by jets of water not shown.
Intérieurement, la coquille 12 supporte par une portée tronconique élargie 13 la bride 14 a d'un noyau annulaire d'emboitement 14 en matériau de moulage réfractaire et perméable à l'air, par exemple en mélange durci de sable et de résine thermodurcissable. Le noyau 14 donne le profil intérieur de l'emboitement du tuyau à obtenir. Il comporte une jupe tubulaire 15 dont la paroi externe correspond à la paroi interne du tuyau que l'on veut mouler. La jupe 15 se prolonge vers le bas au-delà de la coquille 12, sur une certaine hauteur de la filière 6-7 à la partie supérieure de celle-ci. La jupe 15 ménage donc avec lachemise 6 de la filières 6-7 un espace annulaire 16 correspondant à l'épaisseur du tuyau à former. Intérieurement, le noyau 14 comporte obligatoirement un revêtement interne 17 (âme tubulaire en acier) imperméable à l'air et résistant à la température de la fonte liquide.Internally, the
Pour faire monter la fonte dans l'espace annulaire 16, en vue de former l'emboitement comme on le verra plus loin, l'ensemble coquille 12-noyau 14 est complété par des moyens d'aspiration.To raise the cast iron in the
Le noyau 14 est appliqué sur sa portée 13 dans la coquille 12 par une plaque annulaire métallique 18 d'aspiration. La plaque 18 comporte une gorge annulaire d'aspiration 19 s'ouvrant vers la bride 14a du noyau 14, au-dessus de l'espace annulaire 16. Dans la gorge 19 débouche un conduit 20 relié à travers un robinet 21 à une source d'aspiration non représentée. La plaque d'aspiration 18 est fixée à la coquille 12, par exemple par des vis.The
Dans cette variante, l'extracteur du tuyau en fonte en cours de formation n'est pas représenté. Il comporte une plaque métallique circulaire 22 dite plaque de levage, d'axe XX, solidaire de la plaque d'aspiration 18. La plaque 22 est fixée à la plaque 18 par exemple par des vis et est solidaire d'une tige 23 de levage d'axe XX, suspendue à un appareil de levage guidé verticalement, non représenté.In this variant, the extractor of the cast iron pipe being formed is not shown. It comprises a
Dans cette variante, le relief central 5 de l'invention, par exemple tronconique, a des dimensions de grande base telles que le sommet du relief central 5 est situé à l'intérieur de la cavité de la jupe 15 du noyau 14, au-dessus de l'extrémité supérieure de la filière 6-7 ou de la chemise 6. Il est avantageux que le relief 5 soit plus haut que la filière 6-7, à la Fig. 1 comme à la Fig. 3, car cela permet de limiter le volume de fonte liquide à un espace annulaire sur toute la hauteur de la chemise 6 de la filière 6-7 alors que si le relief central 5 était nettement plus bas que la chemise 6, on aurait de la fonte liquide au-dessus du sommet du relief 5 et par conséquent un excédent inutile de fonte liquide.In this variant, the
Le fonctionnement est le même que celui décrit dans la demande de brevet 83 11 788 :
- 1°) Alimentation en fonte liquide : le robinet 21 du conduit d'aspiration 20 est fermé. De la fonte liquide est introduite suivant la flèche f dans l'entonnoir 4. La fonte liquide F est amenée jusqu'à un niveau N situé à la partie supérieure de la chemise 6 de la filière 6-7,immergeant la jupe 15 et l'âme tubulaire 17 du
noyau 14 mais restant au-dessous du sommet du relief central 5. - 2°) Moulage de l'emboitement du tuyau en fonte : La coquille 12 étant en contact étanche à l'air avec la tranche supérieure de la chemise 6, on ouvre le robinet d'aspiration 21 et l'on aspire l'air contenu dans l'espace annulaire 16 à l'aide du
conduit 20 d'aspiration de la gorge circulaire 19 à travers la bride poreuse 14a du noyau, mais non à travers l'àme imperméable 17 en acier.
- 1) Liquid iron supply: the
tap 21 of thesuction pipe 20 is closed. Liquid iron is introduced along the arrow f into the funnel 4. The liquid iron F is brought to a level N located at the upper part of the jacket 6 of the die 6-7, immersing theskirt 15 and l thetubular core 17 of the core 14 but remaining below the top of thecentral relief 5. - 2) Molding of the socket of the cast iron pipe: The
shell 12 being in airtight contact with the upper edge of the jacket 6, thesuction valve 21 is opened and the air contained is sucked in. in theannular space 16 by means of theduct 20 for suction of thecircular groove 19 through the porous flange 14a of the core, but not through theimpermeable core 17 of steel.
La fonte liquide emplit rapidement l'espace annulaire 16 de l'emboitement jusqu'à la bride poreuse 14a du noyau 14.Liquid iron rapidly fills the
Mais son niveau baisse dans la cavité de l'âme imperméable 17 et dans la cheminée 3 sans descendre au-dessous de la jupe 15. L'emboitement 16 ainsi moulé se solidifie à partir du haut c'est-à-dire à partir de la bride 14a du noyau 14.But its level drops in the cavity of the
3°) Extraction discontinue d'un tuyau à emboitement : Afin de préparer l'extraction, on complète le niveau de fonte liquide qui vient de baisser, en versant de la fonte dans l'entonnoir 4 suivant la flèche f pendant la solidification de l'emboitement. Lorsque l'emboitement 16 est formé et solidifié on ferme le robinet d'aspiration 21. La fonte liquide comprise dans l'espace annulaire entre la jupe 15 et la chemise 6 de la filière 6-7 ainsi que la coquille 12, se refroidit et se solidifie à la fois sous l'influence de la partie supérieure de l'enveloppe de refroidissement 7 et sous l'influence de la coquille 12. A ce stade de solidification suivant un front S, non représenté mais semblable à celui de la Fig. 1, on actionne l'extracteur, c'est-à-dire l'ensemble de la plaque de levage 22 et de la coquille 12 vers le haut (flèche f de la Fig. 3) tout en versant de la fonte liquide dans l'entonnoir 4 pour remplacer la fonte solidifiée au-dessus de la filière 6-7. On veille ainsi à maintenir constant le niveau N de fonte liquide pendant l'extraction, un peu au-dessous de la partie supérieure de la chemise 6 à une hauteur où la fonte est encore refroidie par l'enveloppe 7.3 °) Discontinuous extraction of an interlocking pipe: In order to prepare the extraction, the level of liquid iron which has just fallen is completed, by pouring iron into the funnel 4 according to the arrow f during the solidification of the 'nesting. When the
L'extraction vers le haut de l'emboitement solidifié, en même temps que la montée de la coquille 12, sont effectuées de manière discontinue pas-à-pas, comme cela est décrit dans la demande de brevet 83 11 788. Au-dessous de l'emboîtement et en continuité avec celui-ci se solidifie une amorce de fût du tube T qui s'allonge à chaque course de montée de l'ensemble de la coquille 12 et du noyau 14, suivant une épaisseur e.The upward extraction of the solidified socket, at the same time as the raising of the
Lorsque l'on a obtenu ainsi une longueur de fût suffisante pour le tuyau T en cours de formation, on cesse de verser de la fonte liquide dans l'entonnoir 4 et l'on procède à la vidange rapide de l'espace annulaire entre la filière 6-7 et le relief central 5, par exemple par un orifice inférieur non représenté, dont on retire l'obturateur. Il suffit ensuite de soulever complètement le tuyau formé au-dessus de la filière 6-7 et de dégager son emboîtement hors de la coquille 12 et du noyau 14 et de la plaque d'aspiration 18.When a sufficient barrel length has thus been obtained for the pipe T being formed, the pouring of liquid iron is stopped in the funnel 4 and the annular space between the die 6-7 and the
Autre variante : Dans les Fig. 1 et 3, au lieu de faire partie intégrante du bloc-siphon 1-2-3-4, le relief central 5 peut être un corps rapporté sur ledit bloc-siphon et scellé sur celui-ci.Another variant: In Figs. 1 and 3, instead of being an integral part of the siphon block 1-2-3-4, the
Dans un exemple d'exécution analogue à celui de la Fig. 1, la cavité borgne d'évidement interne du relief central 5 est remplacée par une cavité 10a ouverte traversant de part en part, axialement, le relief 5, débouchant au sommet du relief central 5, et débouchant vers l'extérieur sur la face inférieure du socle 1 du bloc-siphon 1-2-3-4.In an example of execution similar to that of FIG. 1, the blind recess internal recess of the
Il en résulte avantageusement que, par cette cavité 10a ouvrant un passage de l'extérieur vers l'intérieur du tube T en formation, on peut introduire un outil CN de contrôle du niveau de métal liquide ou encore un outil CE de mesure de l'épaisseur du tube formé en mesurant son diamètre interne puisque l'on connaît son diamètre externe, ou encore un outil CT de mesure de température de bain de fonte. Les outils CN, CT et ! CE représentés symboliquement par des traits mixtes, sont indiqués à titre d'exemples pour illustrer la possibilité d'accès ou de visite à l'intérieur du tube T, grâce à cette cavité de,passage 10a. En ce qui concerne plus particulièrement la mesure ou détection du niveau N, étant donné qu'il s'agit dans cet exemple d'une alimentation en métal liquide par bloc-siphon avec vases communicants constitués par le creuset 6-7 d'une part et la cheminée verticale 3 d'autre part, il est certain que l'on peut détecter ou mesurer le niveau N de l'extérieur, par la cheminée 3, au moins en dehors des périodes de rechargement en fonte liquide suivant la flèche f. Mais on verra dans d'autres variantes où l'on ne dispose pas du système des vases communicants, qu'il est utile de pouvoir accéder au niveau de fonte liquide par l'intérieur.It advantageously follows that, by this
Le système d'alimentation en fonte liquide est modifié : le bloc-siphon 1-2-3-4 est remplacé par une poche de coulée sous pression 24 de type théière à goulotte de remplissage oblique fermée par un couvercle 25. Un tube de coulée vertical 26 en matériau réfractaire traverse la paroi supérieure de la poche 24 fermée. Il plonge presqu'au fond de la poche 24 et fait saillie au-dessus de la paroi supérieure de la poche 24 sur une courte longueur suivant laquelle il est entouré et renforcé d'une buse tronconique 27 d'axe X-X de raccordement avec un emboîtement tronconique complémentaire 28 d'axe X-X à la partie ! inférieure du socle la pour faire communiquer le tube de coulée 26 avec la cavité 10b ou 10c du relief central 5. Dans cet exemple, il est obligatoire que le relief central 5 soit évidé de part en part par une cavité pour permettre la traversée montante de la fonte liquide et son déversement à l'intérieur du creuset formé par la filière 6-7 et le socle la par dessus le sommet du relief central 5.The liquid iron supply system is modified: the siphon block 1-2-3-4 is replaced by a
On peut donner au relief central 5 une forme tronconique creuse d'épaisseur constante avec une cavité d'évidement telle que lOb. On a ainsi une masse élargie de fonte liquide chaude à la partie inférieure et axiale du relief central 5.The
On peut également donner à la cavité centrale de passage, c'est-à-dire de traversée du relief 5 une forme cylindrique de même diamètre que le diamètre intérieur du tube de coulée ascendant 26, suivant le profil en traits mixtes 10c. Un conduit 29 en communication avec l'intérieur de la poche 24 à la partie supérieure de celle-ci, au-dessus du niveau du métal liquide F est relié à une source de gaz comprimé ou à une décharge sous la commande d'un robinet 30. La variante de la Fig. 5 présente l'avantage de permettre un meilleur contrôle et même un automatisme de commande de l'alimentation en fonte liquide sous basse pression d'un gaz qui peut être de l'air ou bien un gaz inerte tel que de l'azote ou l'argon.It is also possible to give the central passage cavity, that is to say through the
VARIANTE de la Fig. 6 : Dans une alimentation en métal liquide par poche de coulée sous basse pression, analogue à celle de la Fig. 5, le tube unique vertical 26 de coulée ascendante est remplacé par une paire de tubes 26a et 26b de coulée verticale ascendante qui traversent le socle lb du creuset formé par la filière 6-7 et le socle lb et qui débouchent à la partie inférieure du creuset, dans l'espace annulaire entre le relief central 5 et la filière 6-7. Dans cet exemple, la buse tronconique de raccordement 27 est remplacée par des cales annulaires de support et d'espacement 31 entourant chaque tube 26a, 26b et interposées entre la poche de coulée 24 et le socle lb. Les cales annulaires 31 de support et d'espacement permettent à la cavité axiale 10c du relief central 5 de déboucher à sa partie inférieure vers l'extérieur et par conséquent d'offrir un passage à un outil pour accéder à l'intérieur du creuset par exemple à l'aide d'un outil de contrôle de niveau CN.ALTERNATIVE from FIG. 6: In a supply of liquid metal by a ladle under low pressure, similar to that of FIG. 5, the single vertical tube 26 of upward casting is replaced by a pair of
Cet agencement est particulièrement avantageux puisqu'il permet d'accéder à un espace intérieur invisible puisque, dans cet exemple, il est compris entre le relief central 5 et l'âme 17 de la jupe 15 du noyau d'emboîtement 14.This arrangement is particularly advantageous since it allows access to an invisible interior space since, in this example, it is between the
Claims (14)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT84114695T ATE32843T1 (en) | 1984-01-10 | 1984-12-03 | METAL FEED IN VERTICAL CONTINUOUS CASTING OF METAL TUBES, MAINLY CAST IRON. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8400382A FR2557820B1 (en) | 1984-01-10 | 1984-01-10 | LIQUID METAL SUPPLY DEVICE FOR VERTICAL CONTINUOUS CASTING INSTALLATION OF A METAL TUBE, PARTICULARLY IN CAST IRON |
FR8400382 | 1984-01-10 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0151723A1 true EP0151723A1 (en) | 1985-08-21 |
EP0151723B1 EP0151723B1 (en) | 1988-03-09 |
Family
ID=9300025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP84114695A Expired EP0151723B1 (en) | 1984-01-10 | 1984-12-03 | Means for introducing metal in a continuous vertical casting plant for casting metal tubes, in particular from cast iron |
Country Status (26)
Country | Link |
---|---|
US (1) | US4628987A (en) |
EP (1) | EP0151723B1 (en) |
JP (2) | JPS60148656A (en) |
KR (1) | KR900000785B1 (en) |
AT (1) | ATE32843T1 (en) |
AU (1) | AU580279B2 (en) |
BR (1) | BR8500089A (en) |
CA (1) | CA1251614A (en) |
CZ (1) | CZ281600B6 (en) |
DD (1) | DD229054A5 (en) |
DE (1) | DE3469687D1 (en) |
EG (1) | EG16950A (en) |
ES (1) | ES8700100A1 (en) |
FI (1) | FI77587C (en) |
FR (1) | FR2557820B1 (en) |
GB (1) | GB2160132B (en) |
IN (1) | IN163782B (en) |
MX (1) | MX162663A (en) |
MY (1) | MY100401A (en) |
PL (1) | PL143057B1 (en) |
RO (1) | RO90980B (en) |
SK (1) | SK278335B6 (en) |
SU (1) | SU1356954A3 (en) |
UA (1) | UA5949A1 (en) |
YU (1) | YU44481B (en) |
ZA (1) | ZA8546B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3736956A1 (en) * | 1986-12-22 | 1988-07-07 | Heide Hein Engineering & Desig | METHOD AND DEVICE FOR CONTINUOUSLY CASTING METAL STRINGS FROM HIGH-MELTING METALS, ESPECIALLY STEEL STRANDS |
CN109513890A (en) * | 2018-10-10 | 2019-03-26 | 西安理工大学 | A kind of preparation method of the hollow cast iron tubing with A type graphite tissue |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2575683B1 (en) * | 1985-01-04 | 1987-01-30 | Pont A Mousson | PROCESS AND PLANT FOR THE CONTINUOUS MANUFACTURE OF CAST IRON PIPES WITH SPHEROIDAL GRAPHITE WITH CONTROLLED STRUCTURE |
CN105347456A (en) * | 2015-09-24 | 2016-02-24 | 中国核电工程有限公司 | Neutralizer |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2077552A1 (en) * | 1969-12-15 | 1971-10-29 | Outokumpu Oy | |
FR2090127A1 (en) * | 1970-05-19 | 1972-01-14 | Outokumpu Oy | |
US4355680A (en) * | 1980-11-03 | 1982-10-26 | Caterpillar Tractor Co. | Method and apparatus for continuous casting of hollow articles |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE702638C (en) * | 1936-08-19 | 1941-08-06 | Wieland Werke Akt Ges | Device for continuous casting of metal pipes |
GB492216A (en) * | 1936-09-08 | 1938-09-16 | Ver Leichtmetallwerke Gmbh | Process of and apparatus for casting metal ingots |
BE487759A (en) * | 1946-07-02 | |||
DE1136797B (en) * | 1960-12-31 | 1962-09-20 | Schloemann Ag | Eccentric rotating mandrel in the mold for the continuous casting of hollow bodies, in particular tubes made of metals, for example steel |
JPS4942212B2 (en) * | 1971-10-28 | 1974-11-13 | ||
US4000773A (en) * | 1976-02-09 | 1977-01-04 | Gus Sevastakis | Die assembly for continuous vertical casting of tubular metallic products |
JPS52138018A (en) * | 1976-05-14 | 1977-11-17 | Hiroshi Hagiwara | Continuous casting method of metal and device |
GB1500327A (en) * | 1976-08-18 | 1978-02-08 | Ass Elect Ind | Production of tubular ingots |
GB1562003A (en) * | 1977-07-05 | 1980-03-05 | Mogilev Fiz Tekhn I Akad Nauk | Continuous casting of hollow strands |
US4278124A (en) * | 1978-04-11 | 1981-07-14 | Kawasaki Steel Corporation | Method of producing hollow steel ingot and apparatus therefor |
SU700277A1 (en) * | 1978-06-19 | 1979-12-03 | Могилевское Отделение Физико-Технического Института Ан Белорусской Сср | Device for feeding metal into open-ended mould |
SU816678A2 (en) * | 1979-04-12 | 1981-03-30 | Могилевское Отделение Физико- Технического Института Ah Бело-Русской Ccp | Apparatus for feeding metal in continuous casting mould |
SU931282A1 (en) * | 1980-01-30 | 1982-05-30 | Научно-Исследовательский Институт Специальных Способов Литья | Unit for continuous casting |
DE3207777C2 (en) * | 1982-03-04 | 1984-09-06 | Deutsche Forschungs- und Versuchsanstalt für Luft- und Raumfahrt e.V., 5000 Köln | Method and device for continuous pipe casting of metals, inbes. Nickel and cobalt alloys |
FR2523006A1 (en) * | 1982-03-12 | 1983-09-16 | Pont A Mousson | TUBULAR DIE FOR THE CONTINUOUS CASTING OF A THIN WALL TUBE, CAST IRON |
ES521441A0 (en) * | 1982-04-15 | 1984-01-16 | Creusot Loire | MANUFACTURE PROCEDURE OF A STEEL HOLLOW LINGOT. |
-
1984
- 1984-01-10 FR FR8400382A patent/FR2557820B1/en not_active Expired
- 1984-12-03 DE DE8484114695T patent/DE3469687D1/en not_active Expired
- 1984-12-03 AT AT84114695T patent/ATE32843T1/en not_active IP Right Cessation
- 1984-12-03 EP EP84114695A patent/EP0151723B1/en not_active Expired
- 1984-12-07 CA CA000469628A patent/CA1251614A/en not_active Expired
- 1984-12-14 JP JP59264331A patent/JPS60148656A/en active Granted
- 1984-12-14 GB GB08431703A patent/GB2160132B/en not_active Expired
- 1984-12-17 YU YU2135/84A patent/YU44481B/en unknown
- 1984-12-19 MX MX203831A patent/MX162663A/en unknown
- 1984-12-21 KR KR1019840008199A patent/KR900000785B1/en not_active IP Right Cessation
- 1984-12-28 US US06/687,233 patent/US4628987A/en not_active Expired - Lifetime
- 1984-12-29 IN IN1055/MAS/84A patent/IN163782B/en unknown
-
1985
- 1985-01-03 ZA ZA8546A patent/ZA8546B/en unknown
- 1985-01-07 FI FI850067A patent/FI77587C/en not_active IP Right Cessation
- 1985-01-08 DD DD85272458A patent/DD229054A5/en not_active IP Right Cessation
- 1985-01-09 ES ES539430A patent/ES8700100A1/en not_active Expired
- 1985-01-09 RO RO117257A patent/RO90980B/en unknown
- 1985-01-09 UA UA3833357A patent/UA5949A1/en unknown
- 1985-01-09 BR BR8500089A patent/BR8500089A/en not_active IP Right Cessation
- 1985-01-09 EG EG12/85A patent/EG16950A/en active
- 1985-01-09 SU SU3833357A patent/SU1356954A3/en active
- 1985-01-09 PL PL1985251490A patent/PL143057B1/en unknown
- 1985-01-09 AU AU37562/85A patent/AU580279B2/en not_active Ceased
- 1985-01-10 SK SK201-85A patent/SK278335B6/en unknown
- 1985-01-10 CZ CS85201A patent/CZ281600B6/en unknown
-
1988
- 1988-01-25 MY MYPI88000059A patent/MY100401A/en unknown
-
1989
- 1989-02-22 JP JP1042909A patent/JPH02169169A/en active Granted
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2077552A1 (en) * | 1969-12-15 | 1971-10-29 | Outokumpu Oy | |
FR2090127A1 (en) * | 1970-05-19 | 1972-01-14 | Outokumpu Oy | |
US4355680A (en) * | 1980-11-03 | 1982-10-26 | Caterpillar Tractor Co. | Method and apparatus for continuous casting of hollow articles |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3736956A1 (en) * | 1986-12-22 | 1988-07-07 | Heide Hein Engineering & Desig | METHOD AND DEVICE FOR CONTINUOUSLY CASTING METAL STRINGS FROM HIGH-MELTING METALS, ESPECIALLY STEEL STRANDS |
CN109513890A (en) * | 2018-10-10 | 2019-03-26 | 西安理工大学 | A kind of preparation method of the hollow cast iron tubing with A type graphite tissue |
CN109513890B (en) * | 2018-10-10 | 2020-06-26 | 西安理工大学 | Preparation method of hollow cast iron pipe with A-type graphite structure |
Also Published As
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0152754B1 (en) | Foundry moulding process and mould for low-pressure precision casting with a gasifiable model and binderless sand mould | |
EP0269180B1 (en) | Device for casting pasty metals | |
FR2537897A1 (en) | CONTINUOUS CASTING OF METAL | |
EP0151723B1 (en) | Means for introducing metal in a continuous vertical casting plant for casting metal tubes, in particular from cast iron | |
EP0131263B1 (en) | Process and installation for the continuous casting of cast iron socket tubes | |
CH628544A5 (en) | PROCESS AND INSTALLATION FOR THE CONTINUOUS CASTING OF TUBULAR PRODUCTS. | |
FR2574328A1 (en) | ROTARY FEEDING DEVICE IN CAST IRON OF A VERTICAL CONTINUOUS CASTING SYSTEM OF A SPEROID GRAPHITE CAST IRON PIPE | |
CH654503A5 (en) | TUBULAR DIE FOR CONTINUOUS CASTING. | |
CH657296A5 (en) | METHOD AND DEVICE FOR TREATING LOW PRESSURE MOLDED LIQUID METAL, PARTICULARLY FOR INOCULATING CAST IRON. | |
FR2464771A1 (en) | METHOD AND APPARATUS FOR CASTING METALS IN A MOLD FIXED ON A TILTING TANK | |
BE1013620A5 (en) | Sampling container for cooling curve of metal melt. | |
EP2490842A1 (en) | Method for manufacturing a metal ingot comprising a bore, and associated ingot and molding device | |
EP0495764B1 (en) | Preheating device for a molten metal casting nozzle | |
EP0242347A2 (en) | Apparatus for metal slurry casting | |
EP0183118B1 (en) | Feeding device for liquid metal with temperature control in the continiuous casting of tubes | |
EP0069867B1 (en) | Means for supporting and centering a core in a mould for continuous-casting tubes | |
CH362493A (en) | Device for horizontal continuous casting of metal | |
BE1000221A6 (en) | Rotary cooler for casting of semi-solidified metals - has water cooled tube to cool part of poured metal to solidification range, improving homogeneity of prod. | |
BE417991A (en) | ||
BE1001405A6 (en) | Continuous casting device for metal | |
FR2789612A1 (en) | Injection molding of a metallic material using hot chamber machine involves back flow of metal melt in conduit towards crucible after onset of cooling | |
FR2607738A3 (en) | Device for supplying continuous-cast ingot moulds with molten metal | |
FR2676670A1 (en) | Method and device for casting a hollow metallic ingot | |
FR2558589A1 (en) | Method and apparatus for measuring the level of a liquid, such as molten steel, covered with a floating layer of slag or the like | |
LU86688A1 (en) | Device for casting metal esp. steel, in a pasty phase - in a continuous casting installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Designated state(s): AT BE CH DE FR GB IT LI LU NL SE |
|
17P | Request for examination filed |
Effective date: 19850927 |
|
17Q | First examination report despatched |
Effective date: 19860915 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AT BE CH DE FR IT LI LU NL SE |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH DE FR IT LI LU NL SE |
|
REF | Corresponds to: |
Ref document number: 32843 Country of ref document: AT Date of ref document: 19880315 Kind code of ref document: T |
|
ITF | It: translation for a ep patent filed |
Owner name: JACOBACCI & PERANI S.P.A. |
|
REF | Corresponds to: |
Ref document number: 3469687 Country of ref document: DE Date of ref document: 19880414 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
ITTA | It: last paid annual fee | ||
EPTA | Lu: last paid annual fee | ||
EAL | Se: european patent in force in sweden |
Ref document number: 84114695.4 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 19961121 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 19961125 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: LU Payment date: 19961201 Year of fee payment: 13 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19961203 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 19961218 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 19961223 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 19970116 Year of fee payment: 13 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19971203 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19971204 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19971231 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19971231 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19971231 |
|
BERE | Be: lapsed |
Owner name: S.A. PONT-A-MOUSSON Effective date: 19971231 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19980701 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee |
Effective date: 19980701 |
|
EUG | Se: european patent has lapsed |
Ref document number: 84114695.4 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20021216 Year of fee payment: 19 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20031205 Year of fee payment: 20 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20040831 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |