EP0077877A1 - Anchorage for step irons in concrete elements or the like - Google Patents
Anchorage for step irons in concrete elements or the like Download PDFInfo
- Publication number
- EP0077877A1 EP0077877A1 EP82104800A EP82104800A EP0077877A1 EP 0077877 A1 EP0077877 A1 EP 0077877A1 EP 82104800 A EP82104800 A EP 82104800A EP 82104800 A EP82104800 A EP 82104800A EP 0077877 A1 EP0077877 A1 EP 0077877A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- built
- crampon
- formwork
- anchoring according
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 22
- 235000000396 iron Nutrition 0.000 title 1
- 241000909536 Gobiesocidae Species 0.000 claims abstract description 45
- 238000004873 anchoring Methods 0.000 claims abstract description 26
- 238000009434 installation Methods 0.000 claims abstract description 25
- 238000009415 formwork Methods 0.000 claims abstract description 24
- 239000000463 material Substances 0.000 claims abstract description 11
- 230000000149 penetrating effect Effects 0.000 claims abstract 2
- 229920001169 thermoplastic Polymers 0.000 claims description 3
- 229920001187 thermosetting polymer Polymers 0.000 claims description 3
- 239000004416 thermosoftening plastic Substances 0.000 claims description 3
- 208000000260 Warts Diseases 0.000 claims description 2
- 201000010153 skin papilloma Diseases 0.000 claims description 2
- 230000002093 peripheral effect Effects 0.000 claims 1
- 239000002585 base Substances 0.000 description 5
- 239000004033 plastic Substances 0.000 description 3
- 229920003023 plastic Polymers 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000002253 acid Substances 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 239000003513 alkali Substances 0.000 description 1
- 239000010425 asbestos Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 229910052895 riebeckite Inorganic materials 0.000 description 1
- 239000013535 sea water Substances 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
- E04B1/4114—Elements with sockets
- E04B1/4121—Elements with sockets with internal threads or non-adjustable captive nuts
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06C—LADDERS
- E06C9/00—Ladders characterised by being permanently attached to fixed structures, e.g. fire escapes
- E06C9/02—Ladders characterised by being permanently attached to fixed structures, e.g. fire escapes rigidly mounted
- E06C9/04—Ladders characterised by being permanently attached to fixed structures, e.g. fire escapes rigidly mounted in the form of climbing irons or the like
Definitions
- the invention relates to anchoring for crampons in parts of concrete or the like. With built-in parts to be fastened to a formwork, the crampons being connected to the built-in parts after the formwork has been removed.
- an installation part made of a material with at least the compressive strength of concrete is arranged for each crampon with a fastening flange and a screw connection, and in that the installation part has a basic body running parallel to the fastening flange, which on its after Formwork visible side has three fastening points for the crampon as well as on its opposite concrete side at least one pullable dowel as the upper fastening point for the bolt-through screw connection and two pressure and thrust abutments as further, lower fastening points.
- the installation part according to the invention can already be attached to a concrete wall with the permissible minimum wall thickness of approximately 80 to 100 mm, which is not possible with the two installation parts of the known anchoring.
- DE-GM 77 12 733 describes anchor anchors which can be flush-mounted in a concrete structure for the subsequent fastening of connecting elements.
- these anchor anchors are exposed to uncontrollable tensile, compressive and shear loads.
- a crampon anchoring based on this principle would also be quite expensive because of the numerous welds on the built-in part and because of the large number of anchor dowels required for a crampon, in contrast to the anchoring for crampons according to the invention, and therefore unprofitable when used in large numbers.
- a crampon can be attached to a concrete wall, as described for example in DE-PS 26 50 180.
- a single screw is sufficient as a screw connection.
- the abutments can be adjusted accordingly.
- the dowel engages in the base body of the built-in part and is held in the bore by friction. This means that the anchorage can be pre-assembled before it is transported to the construction site. In addition, the dowel no longer needs to be specially secured against accidental falling out or sliding after the installation part has been attached to the formwork.
- a wart-like projection forms an abutment on the built-in part behind the depressions on its concrete side.
- the built-in part has on its concrete side wall-projecting strips with preferably dovetail-shaped cross-section as an abutment.
- these strips serve to stiffen the base body of the built-in part against bending and / or twisting thereof.
- the visible side of the built-in part after stripping is designed as a cylindrical surface, and that the surface of the mounting flange of the crampon which is in the position of use is curved accordingly.
- This is a preparatory measure for a possible attachment of a crampon to a domed one, in particular concave wall surface, such as shaft walls or the like.
- the built-in part rests on the formwork with a small area, but with a high surface pressure, when it is attached to it by means of tacking nails or the like, and thus prevents the flow of cement slurry onto the area of the base body framed by the web, where after stripping the surface of the mounting flange of the crampon comes to rest. This area then does not need to be specially cleaned.
- the circumferential web would be an obstacle when the built-in part was shuttered. According to the invention it is therefore provided that a predetermined breaking line is provided between the web and base body of the built-in part, along which the web can be broken off if necessary. Then the surface of the base body lies directly against the formwork when the built-in part is shuttered.
- the entire anchorage can be attached to such formwork by holding it to the formwork with the aid of a screw inserted through a hole in the formwork and screwed into the dowel.
- the built-in part is made from an injection-moldable material, in particular from a thermosetting or thermoplastic.
- a thermosetting or thermoplastic in particular from a thermosetting or thermoplastic.
- FIG. 1 shows a built-in part 3 according to the invention with a dowel 10 passing through it in a bore 16 before being encased in the negative formwork for a wall 2, in particular a concrete wall or the like.
- the commercially available dowel 10 has, at its end concreted in in the use position, a hook-shaped pinch 11 to increase its mounting in the wall 2 and an internal thread 14 formed on the end thereof from the front side thereof for a screw bolt 15 to be screwed into it.
- the bore 16 of the installation part 3 has a shoulder 17 at about half its length, against which a collar 18 formed on the dowel 10 can be supported in the direction R, so that the dowel 10 against further pulling out in the direction R from the opening 16 of the installation part 3 is secured, as shown in Figs. 2, 4 and 13.
- the installation part 3 also has two blind hole-like depressions 5, 6 arranged at a distance A from one another near its ends 19, 20.
- two appropriately designed cams 7, 8, which are also arranged at a distance A from one another, of a crampon 9 to be attached to the mounting part 3 are mounted in such a way that the latter is fixed to the mounting part 3 in a manner that is safe from tipping and tilting, as shown in FIG. 13.
- the installation part 3 has reinforcements 21, 22, 23 and reinforcing ribs 24, 25, 26, each with a dovetail cross-section, on its concrete side 37 in the region of the recesses 5, 6 and the bore 16, as shown in FIGS. 2 to 6.
- the latter increases the dimensional stability of the built-in part 3.
- this increases the adhesive surfaces of the built-in part 3, which are important for an intimate and permanent connection with the material of the wall 2 touching the built-in part 3 in its position of use.
- the reinforcements 21, 22, 23 on the rear of the built-in part 3 ensure that the edges of the recesses 5, 6 provided on its front side do not break out if the cams 7, 8 of the crampon 9 attached to the mounting part 3 should exert particularly high loads on the edges of the recesses 5, 6 due to exceptional load cases.
- the built-in part 3 still has two holes 27, 28 which penetrate it completely for nails or the like (not shown specifically here), by means of which the built-in part 3 on the negative formwork for the Wall 2 is tacked before it is made to fix it where it will be used later.
- a crampon 9 in the Fjg. 7 and 8 are mostly used in manholes that are round in cross-section and have a diameter of, for example, 1000-1200 mm
- the surface of the mounting flange 29 facing the shaft wall 2 is curved with a corresponding radius S.
- the counter surface 30 corresponding to this surface of the fastening flange 29 can also be curved on the mounting part 3 with a corresponding radius S, if one so wishes.
- the like. which are to be attached to a wall 2 by means of the inventive anchor 1, have on their wall facing side is usually an opening 31, preferably circular cross-section , through which the screw 12 can be passed, as shown in FIGS. 9 and 10.
- a slot 32 which is open at the top in the position of use instead of an opening 31, without thereby affecting the safety of the holder and thus even the safety of people who would climb these ladders.
- the embodiment with a slot 32 open at the top has the advantage that the S dough iron 9 can be assembled or removed without the screw connection 12 having to be opened completely, as is the case, for example, with a crampon 9 with a closed opening 31.
- a recess 33 should be formed at the opening 31 or the slot 32 in order to offer the screw head or the nut of a screw connection 12 a smooth bearing surface 34, so that the screw connection 12 really is only subjected to tension and not additionally to bending.
- the latter would be the case if the bearing surface for the screw head or the nut of a screw connection 12 were inclined with respect to the axis of the screw connection and the screw head would therefore only rest on one side.
- the installation part 3 is provided on its side facing the crampon 9 to be fastened with a circumferential web 4, the circumferential edge of which - in contrast to the surface 30 arched with the radius S in the embodiment described above - lies in a flat surface .
- a predetermined breaking line 36 is provided along the seam line between the web 4 and the surface 30, along which the web 4 can be broken off by means of a simple tool. If the installation part 3 were to be let in on a concavely curved wall surface, the web 4 could be a hindrance, at least in the formwork. In this case, the web 4 can be removed by breaking off along the predetermined breaking line 36.
- the built-in part 3 can - in contrast to the embodiment of the subject matter of the invention described above and shown below in the drawing - have any other appropriate and reasonable shape and size, provided the type and size of the object to be fastened to it require this.
- it is preferably made of a temperature, form, acid, alkali sea water and / or UV radiation resistant to hydrocarbons Stable, insensitive to mechanical stress, in particular impact-resistant material, especially made of plastic or metal.
- the installation part 3 of the anchoring 1 according to the invention should preferably be made of a plastic made of a thermoset or thermoplastic.
- other commercially available plastics can also be used here, provided that they only meet the requirements placed on them, as formulated above.
- the anchoring according to the invention can also be applied to curved wall surfaces. It can be used on precast concrete elements, on manhole rings, dam structures, lock walls, on the wall surfaces of sewage treatment plants, supply tunnels, silos, towers and other structures in civil engineering.
Abstract
Verankerung (1) für Steigeisen (9) in Teilen (2) aus Beton od. dgl. mit an einer Schalung zu befestigenden Einbauteilen (3), wobei die Steigeisen (9) nach dem Entfernen der Schalung mit den Einbauteilen (3) zu verbinden sind, und wobei für jedes Steigeisen (9) mit einem Befestigungsflansch (29) und einer Verschraubung (12) ein Einbauteil (3) aus einem Werkstoff mit mindestens der Druckfestigkeit von Beton angeordnet ist, und daß das Einbauteil (3) einen parallel zum Befestigungsflansch (29) verlaufenden Grundkörper (35) hat, der auf seiner nach dem Ausschalen sichtbaren Seite (30) drei Befestigungsstellen (5,6,12) für das Steigeisen (9) sowie auf seiner gegenüberliegenden Betonseite (37) mindestens einen auf Zug beanspruchbaren Dübel (10) als oben liegende Befestigungsstelle für die eine Bohrung (16) durchgreifende Verschraubung (12) und zwei auf Druck und Schub beanspruchbare Widerlager (21, 22) als weitere, unten liegende Befestigungsstellen aufweist.Anchoring (1) for crampons (9) in parts (2) made of concrete or the like with built-in parts (3) to be fastened to a formwork, the crampons (9) being connected to the built-in parts (3) after the formwork has been removed are, and wherein for each crampon (9) with a mounting flange (29) and a screw (12) an installation part (3) made of a material with at least the compressive strength of concrete is arranged, and that the installation part (3) one parallel to the mounting flange (29) extending base body (35), which has three fastening points (5, 6, 12) for the crampon (9) on its side visible after stripping (30) and at least one anchor that can be subjected to tension on its opposite concrete side (37) (10) as an upper fastening point for the screw connection (12) penetrating a bore (16) and two abutments (21, 22) that can be subjected to pressure and thrust as further fastening points located below.
Description
Die Erfindung bezieht sich auf eine Verankerung für Steigeisen in Teilen aus Beton od, dgl. mit an einer Schalung zu befestigenden,Einbauteilen, wobei die Steigeisen nach dem Entfernen der Schalung mit den Einbauteilen zu verbinden sind.The invention relates to anchoring for crampons in parts of concrete or the like. With built-in parts to be fastened to a formwork, the crampons being connected to the built-in parts after the formwork has been removed.
Eine Verankerung dieser Art ist beispielsweise in der US-PS 3,374,859,beschrieben, wobei ein U-förmig gebogener Rundstahlbügel mit seinen beiden Enden in zwei separaten Einbauteilen aus Metall gelagert und mittels einer Federblech-Rasteinrichtung in Gebrauchslage gesichert ist. Abgesehen davon, daß diese Art der Steigeisenverankerung hohe Materialkosten verursacht, technisch recht aufwendig und darüber hinaus relativ unsicher ist, sind ihre beiden separaten Einbauteile bei ihrer Montage an der Schalung schwierig zu justieren.An anchoring of this type is described, for example, in US Pat. No. 3,374,859, a U-shaped round steel bar being supported with its two ends in two separate installation parts made of metal and secured in the position of use by means of a spring plate locking device. In addition to the fact that this type of crampon anchoring causes high material costs, is technically quite complex and, moreover, is relatively unsafe, its two separate installation parts are difficult to adjust when they are mounted on the formwork.
Es ist daher Aufgabe der Erfindung, eine Verankerung der eingangs genannten Art zu schaffen, durch die der Materialaufwand der Einbauteile und die Lohnkosten bei der Einschalung derselben gegenüber der bekannten Verankerung wesentlich verringert sind.It is therefore an object of the invention to provide an anchoring of the type mentioned at the outset, by means of which the material expenditure of the built-in parts and the labor costs when formworking the same are substantially reduced compared to the known anchoring.
Diese Aufgabe wird gemäß der Erfindung dadurch gelöst, daß für jedes Steigeisen mit einem Befestigungsflansch und einer Verschraubung ein Einbauteil aus einem Werkstoff mit mindestens der Druckfestigkeit von Beton angeordnet ist, und daß das Einbauteil einen parallel zum Befestigungsflansch verlaufenden Grundkörper hat, der auf seiner nach dem Ausschalen sichtbaren Seite drei Befestigungsstellen für das Steigeisen sowie auf seiner gegenüberliegenden Betonseite mindestens einen auf Zug beanspruchbaren Dübel als oben liegende Befestigungsstelle für die eine Bohrung durchgreifende Verschraubung und zwei auf Druck und Schub beanspruchbare Widerlager als weitere, unten liegende Befestigungsstellen aufweist. Bei dieser Verankerung wird zur Befestigung eines Steigeisens an einer Betonwand od. dgl. an deren Schalung nur ein verhältnismäßig flaches, in Gebrauchslage nur mit geringer Einbautiefe in die Betonwand eingebettetes Einbauteil angebracht, das im Gegensatz zu den beiden Einbauteilen der bekannten Verankerung nur einen Bruchteil an Material-und-Lohnkosten verursacht. Außerdem kann das erfindungsgemäße Einbauteil schon an einer Betonwand mit der zulässigen Mindestwandstärke von etwa 80 bis 100 mm angebracht werden, was bei den beiden Einbauteilen der bekannten Verankerung nicht möglich ist.This object is achieved according to the invention in that an installation part made of a material with at least the compressive strength of concrete is arranged for each crampon with a fastening flange and a screw connection, and in that the installation part has a basic body running parallel to the fastening flange, which on its after Formwork visible side has three fastening points for the crampon as well as on its opposite concrete side at least one pullable dowel as the upper fastening point for the bolt-through screw connection and two pressure and thrust abutments as further, lower fastening points. With this anchoring, only a relatively flat built-in part, which in the use position is only embedded in the concrete wall with a small installation depth, is attached to the formwork for fastening a crampon or the like, which, in contrast to the two built-in parts of the known anchoring, only a fraction of it Material and labor costs. In addition, the installation part according to the invention can already be attached to a concrete wall with the permissible minimum wall thickness of approximately 80 to 100 mm, which is not possible with the two installation parts of the known anchoring.
In der ` DE-GM 77 12 733 sind in eine Betonkonstruktion bündig einzulassende Ankerdübel zur nachträglichen Befestigung von Verbindungselementen beschrieben. Diese Ankerdübel sind jedoch unkontrollierbaren Zug-, Druck- und Schubbeanspruchungen ausgesetzt. Eine auf diesem Prinzip beruhende Steigeisenverankerung wäre wegen zahlreicher Schweißstellen am Einbauteil und wegen der jeweils großen Anzahl der für ein Steigeisen erforderlichen Ankerdübel, im Gegensatz zur erfindungsgemäßen Verankerung für Steigeisen, außerdem ziemlich kostspielig und daher bei Einsatz in größerer Stückzahl unrentabel.DE-GM 77 12 733 describes anchor anchors which can be flush-mounted in a concrete structure for the subsequent fastening of connecting elements. However, these anchor anchors are exposed to uncontrollable tensile, compressive and shear loads. A crampon anchoring based on this principle would also be quite expensive because of the numerous welds on the built-in part and because of the large number of anchor dowels required for a crampon, in contrast to the anchoring for crampons according to the invention, and therefore unprofitable when used in large numbers.
Mit der erfindungsgemäßen Verankerung kann ein Steigeisen an einer Betonwand befestigt werden, wie es beispielsweise in der DE-PS 26 50 180 beschrieben ist. Insbesondere für dieses Steigeisen reicht als Verschraubung eine einzige Schraube aus. Für Steigeisen, die mit mehreren Schrauben an einer Wand befestigt werden müssen, können die Widerlager entsprechend angepaßt werden.With the anchoring according to the invention, a crampon can be attached to a concrete wall, as described for example in DE-PS 26 50 180. For this crampon in particular, a single screw is sufficient as a screw connection. For crampons that have to be fixed to a wall with several screws, the abutments can be adjusted accordingly.
Gemäß der Erfindung ist vorgesehen, daß der Dübel in den Grundkörper des Einbauteils eingreift und in der Bohrung reibschlüssig gehalten ist. Somit kann die Verankerung schon vor dem Transport zur Baustelle vormontiert werden. Außerdem braucht der Dübel nach Anbringung des Einbauteils an der Schalung gegen zufälliges Herausfallen oder -rutschen nicht mehr besonders gesichert zu werden.According to the invention it is provided that the dowel engages in the base body of the built-in part and is held in the bore by friction. This means that the anchorage can be pre-assembled before it is transported to the construction site. In addition, the dowel no longer needs to be specially secured against accidental falling out or sliding after the installation part has been attached to the formwork.
Eine vorteilhafte Weiterbildung der Erfindung besteht darin, daß die unten liegenden Befestigungsstellen auf der sichtbaren Seite des Einbauteils zwei Vertiefungen als Lagerstellen für am Steigeisen ausgebildete Nocken sind. Dieses Konstruktionsmerkmal erleichtert insbesondere die Montagearbeit der Anbringung des Steigeisens an der fertigen Wand erheblich: Nach Einführung seiner Nocken in die zugehörigen Vertiefungen des Einbauteils braucht das Steigeisen nur noch mittels einer seinen Befestigungsflansch erfassenen Schraube befestigt und in seiner Gebrauchslage gesichert zu werden.An advantageous further development of the invention consists in the fact that the fastening points below are two recesses on the visible side of the built-in part as bearing points for cams formed on the crampon. This design feature, in particular, considerably simplifies the assembly work of attaching the crampon to the finished wall: after inserting its cams into the associated recesses in the installation part, the crampon only needs to be fastened by means of a screw that grips its fastening flange and secured in its position of use.
Mit Vorteil ist ferner vorgesehen, daß am Einbauteil hinter den Vertiefungen auf seiner Betonseite ein warzenförmiger Vorsprung ein Widerlager bildet. Hierdurch werden die vom Steigeisen auf das Einbauteil wirkenden Druck- und Schubkräfte sicher in die Wand eingeleitet.It is also advantageously provided that a wart-like projection forms an abutment on the built-in part behind the depressions on its concrete side. As a result, the pressure and shear forces acting on the mounting part from the crampon are safely introduced into the wall.
Die gleiche Wirkung wird gemäß der Erfindung dadurch erzielt, daß das Einbauteil an seiner Betonseite wandwärts vorspringende Leisten mit vorzugsweise schwalbenschwanzförmigem Querschnitt als Widerlager aufweist. Außerdem dienen diese Leisten zur Aussteifung des Grundkörpers des Einbauteils gegen Verbiegen und/oder Verwinden desselben.The same effect is achieved according to the invention in that the built-in part has on its concrete side wall-projecting strips with preferably dovetail-shaped cross-section as an abutment. In addition, these strips serve to stiffen the base body of the built-in part against bending and / or twisting thereof.
Nach der Erfindung ist ferner vorgesehen, daß die nach dem Ausschalen sichtbare Seite des Einbauteils als Zylinderfläche ausgebildet ist, und daß die in Gebrauchslage anliegende Fläche des Befestigungsflansches des Steigeisens entsprechend gekrümmt ist. Dies ist eine vorbereitende Maßnahme für eine mögliche Anbringung eines Steigeisens an einer gewölbte, insbesondere konkav gewölbte Wandfläche, wie etwa Schachtwände od. dgl.According to the invention it is further provided that the visible side of the built-in part after stripping is designed as a cylindrical surface, and that the surface of the mounting flange of the crampon which is in the position of use is curved accordingly. This is a preparatory measure for a possible attachment of a crampon to a domed one, in particular concave wall surface, such as shaft walls or the like.
Erfindungsgemäß ist ferner beabsichtigt, daß an der nach dem Ausschalen sichtbaren Seite des Einbauteils ein am Rand umlaufender Steg ausgebildet ist, von dem ein schmaler Rand an der Schalung anliegt. Auf diese Weise liegt das Einbauteil mit kleiner Fläche, jedoch mit hoher Flächenpressung an der Schalung an, wenn es mittels Heftnägeln od. dgl. an dieser angebracht wird, und verhindert somit das Zuströmen von Zement-Schlempe an die vom Steg umrahmte Fläche des Grundkörpers, an der nach dem Ausschalen ja die Fläche des Befestigungsflansches des Steigeisens zur Anlage gelangt. Diese Fläche braucht dann nicht eigens gereinigt zu werden.According to the invention, it is also intended that on the side of the built-in part that is visible after the formwork has been removed, a web running around the edge is formed, a narrow edge of which rests against the formwork. In this way, the built-in part rests on the formwork with a small area, but with a high surface pressure, when it is attached to it by means of tacking nails or the like, and thus prevents the flow of cement slurry onto the area of the base body framed by the web, where after stripping the surface of the mounting flange of the crampon comes to rest. This area then does not need to be specially cleaned.
Falls das Steigeisen einmal an einer gewölbten Fläche, wie vorstehend schon einmal erwähnt, angeordnet werden soll, wäre der umlaufende Steg ein Hindernis bei der Einschalung des Einbauteils. Erfindungsgemäß ist daher vorgesehen, daß zwischen dem Steg und Grundkörper des Einbauteils eine Sollbruchlinie vorgesehen ist, längs derer der Steg bei Bedarf abgebrochen werden kann. Dann liegt die Fläche des Grundkörpers bei der Einschalung des Einbauteils direkt an der Schalung an.If the crampon is to be arranged on a curved surface, as already mentioned above, the circumferential web would be an obstacle when the built-in part was shuttered. According to the invention it is therefore provided that a predetermined breaking line is provided between the web and base body of the built-in part, along which the web can be broken off if necessary. Then the surface of the base body lies directly against the formwork when the built-in part is shuttered.
Zur leichteren Anbringung des Einbauteils an seiner Schalung ist dieses erfindungsgemäß mit Löchern für Heftnägeln od. dgl. versehen. Sollte das Einbauteil einmal an einer Stahlschalung angebracht werden müssen, so kann die gesamte Verankerung an einer solchen Schalung dadurch angebracht werden, daß sie mit Hilfe einer durch ein Loch in der Schalung eingeführten und in den Dübel einschraubten Schraube an der Schalung gehalten wird.To make it easier to attach the built-in part to its formwork, it is provided according to the invention with holes for tacking nails or the like. Should the installation part ever have to be attached to a steel formwork, the entire anchorage can be attached to such formwork by holding it to the formwork with the aid of a screw inserted through a hole in the formwork and screwed into the dowel.
Schließlich ist gemäß der Erfindung vorgesehen, daß das Einbauteil aus einem spritzgußfähigen Material, insbesondere aus einem Duro- oder Thermoplasten hergestellt ist. Die einfache Herstellbarkeit und der verhältnismäßig preiswerte Werkstoff machen das erfindungsgemäße Einbauteil zu einem billigen Massenartikel.Finally, it is provided according to the invention that the built-in part is made from an injection-moldable material, in particular from a thermosetting or thermoplastic. The ease of manufacture and the relatively inexpensive material make the installation part according to the invention an inexpensive mass-produced item.
Weitere Merkmale, Einzelheiten und Vorteile ergeben sich aus nachfolgender Beschreibung einer bevorzugten Ausführungsform der Erfindung sowie aus der in der Anlage beigefügten Zeichnung. Hierbei zeigen:
- Fig. 1 eine perspektivische Ansicht der erfindungsgemäßenverankerung mit einem Einbauteil und einem in dieses eingesetzen Dübel;
- Fig. 2 eine Rückansicht des Binoauteils in Pfeilrichtung R gemäß Fig. l;
- Fig. 3 einen Längsschnitt durch das Einbauteil längs der Schnittlinie III- III in Fig. 2;
- Fig. 4 einen Querschnitt durch das Einbaubeil längs der Schnittlinie IV - IV in Fig. 2;
- Fig. 5 einen Querschnitt durch das Einbauteil längs der Schnittlinie V - V in Fig. 2;
- Fig. 6 eine teilweise aufgebrochene Draufsicht auf das Einbauteil;
- Fig. 7 eine Draufsicht auf ein am Einbauteil zu befestigendes Steigeisen;
- Fig. 8 eine Ansicht eines Schraubenbolzens, mit welchem das Steigeisen amEinbauteilangebracht wird;
- Fig. 9 eine Teilansicht des Steigeisens in Richtung M gemäß Fig. 7 mit der Darstellung einer ersten Ausführungsform einer Öffnung für den Schraubbolzen;
- Fig. 10 einen Querschnitt durch das Steigeisen längs der Schnittlinie X - X in Fig. 9;
- Fig. 11 eine Teilansicht des Steigeisens in Richtung M gemäß Fig. 7 mit der Darstellung einer zweiten Ausführungsform einer Öffnung für den Schraubbolzen;
- Fig. 12 einen Querschnitt durch das Steigeisen längs der Schnittlinie XII - XII in Fig. 11 und
- Fig. 13 eine Gesamtansicht der an einer Betonwand eingegossenen erfindungsgemäßen Vorrichtung mit Dübel, Einbauteil und einem daran befestigten Steigeisen.
- F ig. 1 shows a perspective view of the anchoring according to the invention with an installation part and a dowel inserted therein;
- FIG. 2 shows a rear view of the bino component in the direction of arrow R according to FIG. 1;
- 3 shows a longitudinal section through the built-in part along the section line III-III in Fig. 2.
- 4 shows a cross section through the built-in part along the section line IV-IV in FIG. 2;
- 5 shows a cross section through the built-in part along the section line V - V in FIG. 2;
- 6 shows a partially broken top view of the installation part;
- 7 shows a plan view of a crampon to be fastened to the built-in part;
- Figure 8 is a view of a bolt that is used to attach the crampon to the fixture;
- FIG. 9 is a partial view of the crampon in the direction M according to FIG. 7, showing a first embodiment of an opening for the screw bolt;
- 10 shows a cross section through the crampon along the section line X - X in FIG. 9;
- FIG. 11 shows a partial view of the crampon in the direction M according to FIG. 7 with the illustration of a second embodiment of an opening for the screw bolt;
- Fig. 12 shows a cross section through the crampon along the section line XII - XII in Fig. 11 and
- 13 is an overall view of the device according to the invention cast on a concrete wall with dowel, built-in part and a crampon attached to it.
Fig. 1 zeigt ein erfindungsgemäßes Einbauteil 3 mit einem dieses in einer Bohrung 16 durchsetzenden Dübel 10 vor dem Einschalen in die Negativ-Schalung für eine Wand 2, insbesondere eine Betonwand od. dgl.1 shows a built-in
Der handelsübliche Dübel 10 weist an seinem in Gebrauchslage einbetonierten Ende eine hakenförmige Quetschung 11 zur Erhöhung seiner Halterung in der Wand 2 sowie ein am anderen Ende von dessen Stirnseite her an diesem ausgebildetes Innengewinde 14 für einen in dieses einzuschraubenden Schraubenbolzen 15 auf.The commercially
Die Bohrung 16 des Einbauteils 3 weist etwa auf halber Länge einen Absatz 17 auf, an dem sich in Richtung R ein am Dübel 10 ausgebildeter Bund 18 abstützen kann, so daß der Dübel 10 gegen weiteres Herausziehen in Richtung R aus der Öffnung 16 des Einbauteils 3 gesichert ist, wie in den Fig. 2, 4 und 13 gezeigt ist.The
Das Einbauteil 3 weist außerdem nahe seiner Enden 19,20 zwei in Abstand A voneinander angeordnete sacklochartige Vertiefungen 5,6 auf. In diesen sind in Gebrauchslage zwei entsprechend ausgebildete, ebenfalls in Abstand A voneinander angeordnete Nocken 7,8 eines am Einbauteil 3 anzubringenden Steigeisens 9 derart gelagert, daß letzteres tritt- und kippsicher am Einbauteil 3 fixiert ist, wie Fig. 13 zeigt.The
Das Einbauteil 3 weist an seiner Betonseite 37 im Bereich der Vertiefungen 5,6 und der Bohrung 16 Verstärkungen 21,22,23 sowie Versteifungsrippen 24,25,26 mit jeweils schwalbenschwanzförmigem Querschnitt auf, wie die Fig. 2 bis 6 zeigen. Durch letztere wird einmal die Formbeständigkeit des Einbauteils 3 erhöht. Zum anderen vergrößern sich dadurch die für eine innige und dauerhafte Verbindung mit dem das Einbauteil 3 in seiner Gebrauchslage berührenden Material der Wand 2 maßgeblichen Haftflächen des Einbauteils 3. Schließlich sorgen die Verstärkungen 21,22,23 an der Rückseite des Einbauteils 3 dafür, daß die Ränder der an seiner Vorderseite vorgesehenen Vertiefungen 5,6 nicht ausbrechen, wenn die Nocken 7,8 des am Einbauteil 3 angebrachten Steigeisens 9 infolge außergewöhnlicher Lastfälle auf die Ränder der Vertiefungen 5,6 einmal besonders hohe Belastungen ausüben sollten.The
Wie die Fig. 1, 2 und 5 zeigen, weist das Einbauteil 3 noch zwei es gänzlich durchsetzende Löcher 27,28 für (hier nicht eigens dargestellte) Nägel od. dgl. auf, mittels derer das Einbauteil 3 an der Negativ-Schalung für die Wand 2 vor deren Herstellung angeheftet wird, um es an der Stelle zu fixieren, wo es später gebraucht wird.1, 2 and 5 show, the built-in
Da Steigeisen 9 der in den Fjg. 7 und 8 dargestellten Art zumeist in im Querschnitt runden Einstiegschächten mit einem Durchmesser von beispielsweise 1000 - 1200 mm verwendet werden, ist die der Schachtwand 2 zugewandte Fläche des Befestigungsflansches 29 mit entsprechendem Radius S gewölbt ausgebildet. Somit kann auch die dieser Fläche des Befestigungsflansches 29 entsprechende Gegenfläche 30 am Einbauteil 3 mit entsprechendem Radius S gewölbt ausgebildet werden, falls man dies wünscht. D a
Das Steigeisen 9 oder andere Bauteile, Konsolen, Geräte, Steigleitern, Beschilderungen, Fender, Beleuchtungsanlagen od. dgl., die mittels der erfindungsgemäßen Verankerung 1 an einer Wand 2 anzubringen sind, weisen an ihrer wandzugewandten Seite üblicherweise eine öffnung 31, vorzugsweise runden Querschnitts, auf, durch die die Verschraubung 12 hindurchgeführt werden kann, wie in den Fig. 9 und 10 gezeigt ist.The crampon teigleitern 9 or other components, brackets, devices, S, od signage, fender, lighting systems. The like., Which are to be attached to a
Es ist jedoch auch möglich, am Steigeisen 9 oder an jedem anderen an einer Wand 2 zu befestigenden Bauteil einen in Gebrauchslage nach oben hin offenen Schlitz 32 statt einer öffnung 31 vorzusehen, ohne daß hierdurch die Sicherheit der Halterung und damit gar die Sicherheit von Menschen beeinträchtigt würde, die diese Steigleitern begehen. Die Ausführung mit einem nach oben hin offenen Schlitz 32 hat den Vorteil, daß das Steigeisen 9 montiert oder entfernt werden kann, ohne daß die Verschraubung 12 vollkommen geöffnet werden müßte, wie dies etwa bei einem Steigeisen 9 mit einer geschlossenen öffnung 31 der Fall ist.However, it is also possible to provide, on the
In beiden möglichen Fällen der Ausgestaltung eines Steigeisens 9 im Anschlußbereich sollte jedoch eine Aussparung 33 an der öffnung 31 bzw. dem Schlitz 32 ausgebildet sein, um dem Schraubenkopf oder der Mutter einer Verschraubung 12 eine glatte Auflagerfläche 34 zu bieten, so daß die Verschraubung 12 wirklich ausschließlich auf Zug und nicht zusätzlich noch auf Biegung beansprucht wird. Letzteres wäre der Fall, wenn die Auflagerfläche für den Schraubenkopf oder die Mutter einer Verschraubung 12 gegenüber der Achse der Verschraubung geneigt wäre und dadurch der Schraubenkopf nur einseitig aufliegen würde.In both possible cases of the configuration of a
Gemäß der Erfindung ist das Einbauteil 3 an seiner.dem zu befestigenden Steigeisen 9 zugewandten Seite mit einem umlaufenden Steg 4 versehen, dessen umlaufender Rand - im Gegensatz zu der in der vorstehend beschriebenen Ausführungsform mit dem Radius S gewölbten Fläche 30 - in einer ebenen Fläche liegt. Entlang der Nahtlinie zwischen dem Steg 4 und der Fläche 30 ist eine Sollbruchlinie 36 vorgesehen, längs derer der Steg 4 mittels eines einfachen Werkzeuges abbrechbar ist. Falls das Einbauteil 3 an einer konkav gekrümmten Wandfläche einzulassen wäre, könnte der Steg 4, zumindest bei der Einschalung, hinderlich sein. In diesem Falle kann der Steg 4 durch Abbrechen längs der Sollbruchlinie 36 entfernt werden.According to the invention, the
Das Einbauteil 3 kann - abweichend von der vorstehend beschriebenen und der nachfolgend in der Zeichnung dargestellten Ausführungsform des Erfindungsgegenstandes - jede'andere zweckmäßige und vernünftige Form und Größe aufweisen, sofern Art und Größe des an ihm zu befestigenden Gegenstandes dies erfordern. Je nach dem Verwendungszweck ist es vorzugsweise aus einem temperatur-, form-, säure-, laugen- meerwasser- und/oder UV-Strahlen-beständigen, gegenüber Kohlenwasserstoffen widerstandsfähigen, gegenüber mechanischen Beanspruchungen unempfindlichen, insbesondere schlagfesten Material, insbesondere aus Kunststoff oder Metall, hergestellt. Das Einbauteil 3 der erfindungsgemäßen Verankerung 1 soll bei Verwendung in einer Wand aus Beton, Stahlbeton, Asbestzement, Mauerwerk und dergleichen vorzugsweise aus einem Kunststoff aus einem Duroplast oder Thermoplast gefertigt sein. Sebstverständlich können auch andere im Handel erhältliche Kunststoffe hierbei Verwendung finden, sofern diese nur die an sie gestellten Forderungen erfüllen, wie sie vorstehend formuliert sind.The built-in
Abschließend sei noch ausdrücklich darauf hingewiesen, daß die erfindungsgemäße Verankerung auch an gekrümmten Wandflächen angebracht werden kann. Sie kann an Betonfertigteilen, an Schachtringen, Dammbauten, Schleusenwänden, an Wandflächen von Kläranlagen, Versorgungstunneln, Silos, Türmen und anderen Bauten im Hoch- und Tiefbaubereich zur Anwendung gelangen.Finally, it should be expressly pointed out that the anchoring according to the invention can also be applied to curved wall surfaces. It can be used on precast concrete elements, on manhole rings, dam structures, lock walls, on the wall surfaces of sewage treatment plants, supply tunnels, silos, towers and other structures in civil engineering.
Claims (11)
dadurch gekennzeichnet,
daß für jedes Steigeisen (9) mit einem Befestigungsflansch (29) und einer Verschraubung (12) ein Einbauteil (3) aus einem Werkstoff mit mindestens der Druckfestigkeit von Beton angeordnet ist, und daß das Einbauteil (3) einen parallel zum Befestigungsflansch (29) verlaufenden Grundkörper (35) hat, der auf seiner nach dem Ausschalen sichtbaren Seite (30) drei Befestigungsstellen (5,6,12) für das Steigeisen (9) sowie auf seiner gegenüberliegenden Betonseite (37) mindestens einen auf Zug beanspruchbaren Dübel (10) als oben liegende Befestigungsstelle für die eine Bohrung (16) durchgreifende Verschraubung (12) und zwei auf Druck und Schub beanspruchbare Widerlager (21,22) als weitere, unten liegende Befestigungsstellen aufweist.1. Anchoring for crampons in parts made of concrete or the like with built-in parts to be fastened to a formwork, the crampons being connected to the built-in parts after the formwork has been removed,
characterized,
that for each crampon (9) with a mounting flange (29) and a screw connection (12) an installation part (3) made of a material with at least the compressive strength of concrete is arranged, and that the installation part (3) parallel to the mounting flange (29) extending base body (35), which has three fastening points (5, 6, 12) for the crampon (9) on its side (30) visible after stripping and at least one anchor (10) that can be subjected to tension on its opposite concrete side (37) has as an attachment point at the top for the screw connection (12) penetrating a bore (16) and two abutments (21, 22) that can be subjected to pressure and thrust as additional attachment points at the bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT82104800T ATE10530T1 (en) | 1981-05-29 | 1982-06-01 | ANCHORING FOR CRAMPONS IN CONCRETE OR SIMILAR PARTS. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE3121249 | 1981-05-29 | ||
DE3121249A DE3121249C2 (en) | 1981-05-29 | 1981-05-29 | Anchoring for crampons in parts made of concrete or the like. |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0077877A1 true EP0077877A1 (en) | 1983-05-04 |
EP0077877B1 EP0077877B1 (en) | 1984-11-28 |
Family
ID=6133414
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP82104800A Expired EP0077877B1 (en) | 1981-05-29 | 1982-06-01 | Anchorage for step irons in concrete elements or the like |
Country Status (6)
Country | Link |
---|---|
US (1) | US4528791A (en) |
EP (1) | EP0077877B1 (en) |
AT (1) | ATE10530T1 (en) |
BR (1) | BR8207725A (en) |
DE (2) | DE3121249C2 (en) |
WO (1) | WO1982004283A1 (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3312458A1 (en) * | 1983-04-07 | 1984-10-11 | Pfeifer Seil- Und Hebetechnik Gmbh & Co, 8940 Memmingen | TRANSPORT ANCHORS FOR PRECAST CONCRETE PARTS |
DE3428123A1 (en) * | 1984-07-31 | 1986-02-13 | Georg Prinzing GmbH & Co KG Betonformen- und Maschinenfabrik, 7902 Blaubeuren | Moulding device for shaping concrete parts |
DE9004574U1 (en) * | 1990-04-23 | 1990-06-28 | Fischer-Werke Artur Fischer Gmbh & Co Kg, 7244 Waldachtal, De | |
DE4244057A1 (en) * | 1992-12-24 | 1994-06-30 | Norbert Lux | Grapnel or step iron bolted fastener |
US6298630B1 (en) * | 2000-05-18 | 2001-10-09 | Verost Russell L. | Wall plate for attaching beams to masonry walls |
AT6641U1 (en) * | 2002-11-25 | 2004-01-26 | Canins Karl Heinz | COMPONENT FOR HOUSE OR VEHICLE CONSTRUCTION |
DE202005010489U1 (en) * | 2005-06-29 | 2006-08-17 | Rehau Ag + Co. | Schacht shell |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2650180A1 (en) * | 1976-02-12 | 1977-08-18 | Gerhard Enssle | Climbing iron for manhole or chute - has upwards bent fixing flange and horizontally engaging bolts on frame |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2785842A (en) * | 1955-07-29 | 1957-03-19 | Claude A Phelps | Ladders for concrete structures |
US3374859A (en) * | 1967-07-24 | 1968-03-26 | Creative Associates Of Albany | Anchor device with releasable latch means |
DE7712733U1 (en) * | 1977-04-22 | 1978-05-03 | Koerner, Winfried, 7140 Ludwigsburg | FASTENING ANCHORS |
GB2115868B (en) * | 1981-08-19 | 1985-09-04 | Rainer Clover | Expanding-anchor step iron |
-
1981
- 1981-05-29 DE DE3121249A patent/DE3121249C2/en not_active Expired
-
1982
- 1982-06-01 AT AT82104800T patent/ATE10530T1/en not_active IP Right Cessation
- 1982-06-01 DE DE8282104800T patent/DE3261359D1/en not_active Expired
- 1982-06-01 EP EP82104800A patent/EP0077877B1/en not_active Expired
- 1982-06-01 US US06/466,338 patent/US4528791A/en not_active Expired - Fee Related
- 1982-06-01 WO PCT/DE1982/000119 patent/WO1982004283A1/en unknown
- 1982-06-01 BR BR8207725A patent/BR8207725A/en unknown
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2650180A1 (en) * | 1976-02-12 | 1977-08-18 | Gerhard Enssle | Climbing iron for manhole or chute - has upwards bent fixing flange and horizontally engaging bolts on frame |
Also Published As
Publication number | Publication date |
---|---|
EP0077877B1 (en) | 1984-11-28 |
DE3121249C2 (en) | 1983-03-17 |
WO1982004283A1 (en) | 1982-12-09 |
ATE10530T1 (en) | 1984-12-15 |
DE3261359D1 (en) | 1985-01-10 |
BR8207725A (en) | 1983-05-10 |
US4528791A (en) | 1985-07-16 |
DE3121249A1 (en) | 1982-12-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3736553A1 (en) | WALL CONNECTOR | |
DE3629772A1 (en) | MOLDED BODY FOR HOLDING AN ANCHOR WHEN CONCRETING A PRECAST CONCRETE PART | |
CH674864A5 (en) | ||
EP0744508B1 (en) | Device for forming a shear reinforcement for flat slabs | |
CH621593A5 (en) | Drainage channel | |
EP0077877B1 (en) | Anchorage for step irons in concrete elements or the like | |
EP0697047B1 (en) | Device for anchoring safety barrier posts in a foundation | |
EP0939172B1 (en) | Exterior building unit for addition to existing constructions | |
DE4116159C2 (en) | ||
EP0943745B1 (en) | Anchoring device for a tension bar in a reinforced concrete mass | |
DE2911974A1 (en) | Wire or mesh fence post - has holder clamping arms inserted in groove entrance and splayed apart to engage groove walls | |
EP0094404A1 (en) | Anchoring device for works effected on a concrete wall or ceiling | |
DE10258435B4 (en) | anchoring element | |
DE2733448C3 (en) | Suspended ceiling | |
DE6604862U (en) | KEIL FOR CLAMPING DEVICES, IN PARTICULAR FOR FORMWORKING CONCRETE STRUCTURES. | |
DE7419527U (en) | Arrangement for connecting a first rod-shaped element to a second rod-shaped element that passes it in a crossing manner | |
DE3305137A1 (en) | Iron reinforcing rail | |
EP0872604A1 (en) | Anchoring device for embedding in concrete and process for its manufacturing | |
DE3322869A1 (en) | Sleeve anchor | |
DE8121134U1 (en) | DEVICE FOR CONNECTING THE NODES OF WOODEN FRAMEWORK ROD | |
DE7018213U (en) | COMPONENT MADE OF STEEL FOR ANCHORING RAILING TO STAIRS, PLATFORMS OR BALCONIES MADE OF REINFORCED CONCRETE. | |
AT315234B (en) | Railings, especially for bridges | |
DE2909919A1 (en) | ANCHORING DEVICE FOR USE IN LIGHTWEIGHT CONCRETE | |
DE3103846C2 (en) | ||
DE10252296A1 (en) | Shoring panel wedge has side-ring for accurate presentation during installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Designated state(s): AT BE CH DE FR GB IT LI LU NL SE |
|
17P | Request for examination filed |
Effective date: 19830304 |
|
ITF | It: translation for a ep patent filed |
Owner name: STUDIO JAUMANN |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Designated state(s): AT BE CH DE FR GB IT LI LU NL SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Effective date: 19841128 Ref country code: NL Effective date: 19841128 Ref country code: BE Effective date: 19841128 |
|
REF | Corresponds to: |
Ref document number: 10530 Country of ref document: AT Date of ref document: 19841215 Kind code of ref document: T |
|
REF | Corresponds to: |
Ref document number: 3261359 Country of ref document: DE Date of ref document: 19850110 |
|
ET | Fr: translation filed | ||
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19850630 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
GBPC | Gb: european patent ceased through non-payment of renewal fee | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Effective date: 19881121 |
|
ITTA | It: last paid annual fee | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 19930616 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 19930623 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 19930719 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19930730 Year of fee payment: 12 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Effective date: 19940601 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Effective date: 19940630 Ref country code: CH Effective date: 19940630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Effective date: 19950228 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Effective date: 19950301 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |