DEP0002065DA - Method and device for the production of building panels, in particular plasterboard - Google Patents

Method and device for the production of building panels, in particular plasterboard

Info

Publication number
DEP0002065DA
DEP0002065DA DEP0002065DA DE P0002065D A DEP0002065D A DE P0002065DA DE P0002065D A DEP0002065D A DE P0002065DA
Authority
DE
Germany
Prior art keywords
parts
rotating container
container
molded parts
molds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
Other languages
German (de)
Inventor
Helmut Weyler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Publication date

Links

Description

Abschrift«Copy"

Erfinder una Anmelder Architekt Heimat ffe/ler,Inventor and applicant architect Heimat ffe / ler,

Stuttgart -Xaltental.HixeeuerBtr.Stuttgart -Xaltental.HixeeuerBtr.

Pat entanmeldungPatent registration

Verfahr erKzür Herstellung Ton Bauplatten insbesondereProcess for the production of clay building boards in particular

Gipsplattene Plasterboard e

Die Erfindung bezieht sich auf ein Verfahren zur Herstellung von Bauplatteneinsbesondere Gipsplatt eis und hat den Zwecke solche Platten in einfacher und auch für äen Kleinbetrieb oder den Hand= w,erker lohnender Weise su fertigen.The invention relates to a method for the production of building panels e in particular gypsum plaster and has the purpose of producing such panels in a simple and also for a small business or hand = w, oriel worthwhile manner.

Die Verwendung von Gipsbau^latte» mim Hauöbau wird bei den neueren Bauweisen immer mehr Verbreitung finden »Neben den guten Eigensehaften der Schalldämmung, F euer sicherheit und Wärmeisolierung liegt der Hauptvorteil in der verhältnismäßig kurzen Bauzeiten der Gebäude aus Gipsplattenoder unter weitgehender Verwendung solcher Platten erstellt werden öThe use of gypsum laths in house construction will find more and more widespread use in the newer construction methods. In addition to the good properties of sound insulation, fire safety and heat insulation, the main advantage is the relatively short construction times of the building from gypsum boards or with extensive use of such boards ö

Sofern nicht Gipsdielen oder Gipsbauplatten von der Fabrik bezogen wurdene hat man im Bauhandwerk de# Gipsauffcrmg im Hausinnern an Ort und Stelle vorgenommenes wurde dabei dar Gipsbrei in grossen Wannen von Hand angerührt und die Wände wurden damit beworfen Dieses Verfahren ist sehr zeitraubend und im Grunde genommen ausserordentlieh primitiv« Nur im Ausland,hauptsächlich in den Vereinig= ten Staaten8wurden für das Gießen von Bauplatten aus Gips grosse Maschinen hergestellt und verwendet 9 die aber für die andere ge= lagerten Verhältnisse in Buropa nicht so ohne weiteres geeignet vor allem aber in der Anschaffung so teuer sind^dass solche Ma= schinen nur für Fabriken in Präge kommen^ die sich mit dem Gross*= Serienbau solcher Bauplatten befassen,*Unless gypsum boards or gypsum boards were purchased from the factory s has plaster slurry was method practiced in the building trade de # Gipsauffcrmg inside the house in place thereby represents stirred in large tubs of hand and the walls were so pelted This process is very time consuming and basically ausserordentlieh primitive "Only abroad, mainly in the essen = th States 8 were prepared large machines for the casting of structural panels made of plaster and used 9 but camped for the other ge = conditions in Buropa not readily suitable above all in the Acquisition is so expensive ^ that such machines only come into mint for factories ^ that deal with the large-scale * = series production of such building panels, *

Für den Handwerker hat seither eine kleine 9 billig® Maschine und Anlage für die lohnende Herstellung von Gipsbauplatt en gefehlteFor the craftsman since a small 9 billig® machine and plant has en for rewarding production of Gipsbauplatt gefehlte

Die vorliegende Erfindung schliesst diese Lücke und schafft durch das neue Verfahren zur Herstellung von €±ps®auplatten8 insbesondere Gipsplattenf die Möglichkeit8dass diese Platten überall auch vom Kleinbetrieb und sogar vom Handwerker selbst hergestellt und so in aer Sauwirtschaft auf breitester Grundlage verwendet werden können* Die zur Durchführung des erfindungsgemässen Verfahrens erforderlich© Anlage ist nicht nur verhältnismässig billig in der Anschaffung» sondern diese Anlage erfordert trotz sehr guter Mengenleistung so wenig Eaumgdass sie in federn Schuppen aufgestellt und betrieben werden kann»Die Handhabung ist einfach und alle Teile sind so einfach und betriebssicherjdass Störungen ausgeschlossen sinde Damit ist eine derartige Anlage gerade für den Kleinbetrieb und Handwerkes besonders geeigneteThe present invention closes this gap and creates through the new method for the production of € ± ps®auplatten 8 in particular gypsum boards f the possibility 8 that these boards are made everywhere by small businesses and even by the craftsmen themselves and thus used in a dirty economy on the broadest basis can * the required © for carrying out the inventive process plant is not only relatively cheap to buy "but this system requires despite very good amount power so little Eaum g that it can be set up in feathers shed and operated" the handling is easy and all parts are so simple and reliable that malfunctions are ruled out. This means that such a system is particularly suitable for small businesses and tradespeople

Das erfindungsgemMsse Verfahren besteht darin,dass das Gut in einem rotierenden Behälter giessfertig angemacht und aus diesem Behälter unmittelbar in darunter kontinuierlich vorbeibewegte Formen einge= füllt wirdeWeiter sind die Giessformen für die Bauplatten derart zusammengesetzt8 dass die einzelnen Porsteile nach Herausnahme der fertigen Platte wieder an die neu za füllende Seite des FormverbandesThe erfindungsgemMsse method is that the material in a rotating container dressed giessfertig and is filled from this container directly incorporated in including continuously moved past molding = e Next the molds for the building panels are composed in such a way 8 that the individual Porst parts after removal of the finished board again on the new za filling side of the molding

angelegt werden, sodsss eine stetige Arbeitsweise möglich iat und dasssman mit verhältnismässig wenig Formen bezw* Normteilen auskommen ksnn^ ohne dass damit die Leistungsfähigkeit einer solchen Anlage herabgemindert würde«so that a steady working method is possible and that one can use relatively few forms or standard parts get along ksnn ^ without reducing the performance of such a system «

Die Einrichtung zur !Dorchfßhrung des neuartigen Verfahrens ist derart s dass die Formteile aus einer durchgehenden ®h@nen Platte b©st©henfdie an der Unterkante und an der Seite^ Abstandleist^n trägt9 wobei die seitlichen Abstandsleisten benachbarter Formteile entgegengesetzt zueinander liegen«"" Die zu den G-iessforraen zusammengesetzten Formteile werden gegenseitig durch leicht lösbare Klammern zusammengehalteneThe device for! Dorchfßhrung the novel method is such s that the molded parts to each other from a continuous ®h @ nen plate b © st © hen f the said lateral spacer strips of adjacent mold parts opposite to the lower edge and on the side ^ distance Leist ^ n carries 9 lying «""The molded parts assembled to form the cast forraen are mutually held together by easily detachable clips

Um naeh des Abbinden des Gipsbreis die fertigen Platten leicht aus &@x Torrn zn bringen 8 werden die Formteile am Ende des auf einer Transporteinrichtung zurückgelegten leges duoh eine Kulissen= Steuerung in wagerechter Richtung gegeneinander verschoben^ sodass sich die Oberfläche der Gipsbauplatte allseitig von der Form lösteTo the finished panels easily accommodate from & @ x Torrn zn Naeh of the setting of the gypsum slurry 8, the mold parts at the end of on a transport device covered leges Duoh one sliding = control in dare right direction shifted from each other ^ the surface of the gypsum board itself so that all sides of the form solved

Zum Torwärt©bewegen der zu einem festen Verband zusammengeschlossenen Formteile ist unter dem Behälter zum Aufbereiten des Gipsbreis entweder ein endloses#über Rollen laufendes Förderband oder aber ein Schwingbalken angeordnet $ der über zwei Kurbelwellen und &·Β· eine di® beiden Kurbelwellen untereinander verbindende Kette bewegt wirdβ Jm letzteren Falle geht die Vorwärtsbewegung der Formen schrittweise vor sich und diese werden immer wieder auf den festen Auflagen abgesetzt«For Torwärt © move the merged at a fixed association moldings is below the container for rendering the gypsum slurry either an endless # over rollers moving conveyor belt or a vibrating beams arranged $ of the two crankshafts and & · Β · a DI® two crankshafts with each linking chain is moved? In the latter case the forward movement of the forms goes on step by step and these are repeatedly placed on the fixed supports "

Endlich wird gemäi der Erfindung in den rotierenden Behälter ein im Raum festgehaltener8 in sich beweglicher Teil z«Be eine Kette eingelegt8 damit beim Aufbereiten des Gipsbreis eine innige Mischung von Wasser und Gips entsteht vm.& damit nirgeni&an den Behälter« wandungen die Masse festklebteFinally gemäi of the invention into the rotating container, a pinned in space 8 movable in itself part is z «B e a chain engaged 8 so that when preparing the gypsum slurry, an intimate mixture of water and gypsum is produced vm. & Therefore nirgeni & onto the container" walls of the mass stuck

Jn den Zeichnungen ist eia Ausführungsbeispiel der Erfindung schematiseh dargestellt und zwar zeigtIn the drawings, an exemplary embodiment of the invention is shown schematically and specifically shows

Abbe 1 eine Seitenansicht der Gesamtanlage mit endlosem Förderbandjteilweise im SchnittFig. 1 shows a side view of the entire system with an endless conveyor belt, partially in section

Abbe 2 die Fördereinrichtung mit Kurbelstehwisg©Fig. 2 shows the conveyor device with crank arm ©

Abbe 3 die einzelnen FormteileFig. 3 the individual moldings

Abbe 4 den zusammengesetzten FormenverbandFig. 4 shows the composite mold assembly

und Abb« 5 die Kulissensteuerung für die Formen am Auslaufand Fig. 5 the gate control for the forms at the outlet

der Fördereinrichtungeof the funding institutions

Her rotierende8trichterförmige Behälter a ruht in dem Gestell i und wird zeB* über einen Motor h angetrieben «Am Auslauf des Be* hälters a sitzt das Absperrorgan ke Eine am Gestell i befestigte Kett© ζ ragt in das Jnnere des Behälters a hinein*Her rotierende8trichterförmige container a resting in the frame i and z e B * by a motor h driven "At the outlet of Be * hälters a sitting the obturator k e A on the frame i fortified warp © ζ protrudes in The interior of the container a into *

Zum Bewegen der Formen b während des Füllens bis zum Abbinden des Gipsbreis und bis zur Herausnahme der fertigen Bauplatte!* ist eine Fördereinrichtung unterhalb des Behälters a eingebaut,Gemäß Abb«. I besteht diese Fördereinrichtung aus dem endlosen Band cs das überTo move the molds b during filling until the plaster of paris has set and until the finished building board is removed! I this conveyor consists of the endless belt c s that over

a ie Räder d# e geführt ist vaA s.B. mit Hilf® der Kurbel g bewegt werden kann„Zur Gewicht saufnehme der Formen b sind unter dem oberen Teil des Förderbandes ο Tragrollen f angeordnet*a he wheels d # e is guided vaA sB can be moved with the help of the crank g "To take up the weight of the forms b, there are ο carrying rollers f under the upper part of the conveyor belt *

Abbs Ä zeigt eine etwas anders gestaltete Fördereinrichtung^ die a"ber ebenfalls unter dem Behälter a aag®oxös©t wird* Sie "besteht aus den "beiden festen Tragbalken 1 und dem Schwingbalken Ei8der ZeB1* über die Kurbelwellen η eine hin- und hergehende und eine auf~und abgehend© Bewegung ausführt« Die Kurbelwellen η und damit der Schwingbalken a werden ζβΒβ über die Kurbel 3 und eine zwischen den Kurbel= wellen 1 liegende Kette mit Kettenrädern ο bewegt ,BiLt dieser Fördereinrichtung ist ein Johrittweiser Torlauf der Formen b aöglioh# die auf den festen !Tragbalken immer wieder abgesetzt werden« Die Formen b setzen sich aus den einzelnen Formteilen V und TaH zusammen (ibb*5)*Diese Formteile bestehen aus den durchgehendes ebenen blatten ^j die an der Unterkante und an einer Seite die Abstandsieistem rsu tragen und zwar so# dass die seitliehen Ab= stanisleisten η zweier benachbarten Formteile b und to entgegen= gesetzt zueinander liegen® ps gibt also Reehtsteile bVund liaksteile b^Zum Tragen der Formteile b* und h sind Handgriffe a und Schlitze t angeordneteFig s Ä shows a somewhat differently designed conveyor device ^ which is also a "aag®oxös © t" under the container * It "consists of" the two fixed support beams 1 and the oscillating beam Ei 8 of the ZeB 1 * via the crankshafts η one back and forth and an up and down movement «The crankshafts η and thus the oscillating beam a are moved ζ β Β β via the crank 3 and a chain with sprockets between the crankshafts 1, because this conveyor is a Johrittweiser Torlauf the forms b aöglioh # which are sold over and over again on the solid! stringers "the forms b are composed of the individual molded parts V and Ta H (ibb * 5) * These fittings are made j from the continuous flat blatten ^ the on the lower edge and on one side, the spacer bars r s u wear in such a way # that the side bars η of two adjacent molded parts b and to are opposite to each other parts b ^ To carry the molded parts b * and h , handles a and slots t are arranged

Den Zusammenbau der Formteile bf und h*' zeigt Abb5« *,# Die Recht"* und Linksteile b* und be * werden so aneinandergefügt $ dass durch die Platten y und die Abstandslelsten usv begrenzte Hohlräum© w1 entstehen* in die der Gipsbrei eingefüllt wird und die den fertigen GipSPiatten w die Form gafeen· Die leicht lösbaren Klammern χ halten die Formteile b1 unä toThe assembly of the moldings b f and h * 'is shown in Figure 5, "*, # The right" * and left parts b * and b s * are so bound together $ that y through the plates and the Abstandslelsten u s v limited Hohlräum © w1 arise * in which the gypsum paste is poured and which gafeen the finished gypsum slabs w the shape · The easily detachable clamps χ hold the molded parts b 1 in place

Die Formen b werden am Ende des auf der Transporteinrichtung zurückgelegten Weges an Kulissen rg q vorbeigeführts die eine Vers Schiebung der Formteile b*#bet gegeneinander in wagerechteCRiQh= tung bewirken^ sodass die fertigen Gipsplatten w leicht aus der Form gehen (Abbe 5)The molds b are at the end of the distance on the conveyor path at scenes r g q passed s b is an Ver s shifting of the mold parts * # b et in wagerechteCRiQh = tung cause ^ so that the finished gypsum board w easily from the mold go against each other (Fig e 5)

Die Wirkungsweise des Yerfahrens und der Einrichtung zutf Durch= führung des Verfahrens ist folgerde ι The operation of the device and the Yerfahrens zutf = By carrying out the method is successful earth ι

Jn den trichterförmigen rotierenden Behälter a wird Giptemehl und Wasser eingebracht und gut durcheinander gemischt ,bis ein gleich51 massiger dünner Gipsbrei entstent»Auf die Transporteinrichtung werden die Formteil© b* und bte aufgesetzt und durch Halteklamiaern π zusamraengehängt«Der fertig aufbereitete Gipsbrei läuft nach Öffnen des Absperrorganes k in die Hohlräume w* der Formen b ein und füllt diese Hohlräume voll aus «SP wie die Formen sieh naoh-ein ander fülle^ wird durch Irenen an den Handkurbeln g bezw* der gesamte Formverband unter dem Auslauf des Behälters a vorbelgeführfc. bis am Ende der Fördereinrichtung* naohdem die Gipsplatten in den Formen b vollständig abgebunden haben* der vorderste Formteil bfi oder b* abgenommen und die fertige Gipsplatte w her ausgenommenwerden kanne Zur Erleichterung des Herausnehmens werden die Form= teile b oder b am Ende der Fördereinrichtung durch die Kulissen r* q gegeneinander wagrecht verschobene Der damit freigewordene Fora= teil b oder b wird mit Wasser abgespült und an der Rückseite des Formverbandes b-wieder angesetzt 9 sodass die Arbeitsweise der An= lage kontinuierlich ist«Jn the funnel-shaped rotating container a Giptemehl and water is introduced and thoroughly mixed together until a uniform 51 moderate thin gypsum slurry entstent "on the transport means, the molding © b * and b te π zusamraengehängt placed and Halteklamiaern" The reconstituted gypsum slurry passes by Open the shut-off element k into the cavities w * of the molds b and fill these cavities completely. SP As the molds look like, each other is filled with irons on the hand cranks g and the entire mold assembly under the outlet of the container a . until at the end of the conveyor system * after the plasterboard has completely set in molds b * the foremost molded part b fi or b * removed and the finished plasterboard w her can be removed e To facilitate removal, the molds = parts b or b at the end of the Conveyor device horizontally displaced against each other through the scenes r * q The fora = part b or b thus freed up is rinsed off with water and reattached to the back of the molding compound b- 9 so that the operation of the system is continuous «

V1QJxZ^uUnS ist nicht auf die gezeichneten und beschriebenen Ausfuhrungsbeispiele beschränkt* So kann z*Be die gesamte Anlage V 1 QJxZ ^ uUnS is not limited to the drawn and described exemplary embodiments * Thus, for B * e the entire system

fahrbar stisasmengeisaiit seist lass Sie ®Iso überall an den Bau Steilen eingesetst werden fearnie-Bi© F£brdereiBrloihtimg für die Formen Ii !kann sow®!il ψοη Iteid als enoh durch ©inen Kotör an getriebmi werden^ wofeei die Eraft toe des den Behälter β
&®n Motor efozmieltmm. iste
mobile stisasumeisaiit seis t let you ®Iso be used everywhere on the construction steep fearnie-Bi © F £ brdereiBrloihtimg for the forms Ii! can be sow®! il ψοη Iteid as enoh through © inen Kotör ^ where the power toe of the Container β
& ®n engine efozmieltmm. is e

Install© Ä@r in ö«n BelaSlter a eingelegtem Kette β ken& suoh eis fester oä@r soliwenkiisrer Ära# am Gestell i sagetee©htt in
Behält^r a Mneinraexi
Install © Ä @ r in ö «n BelaSlter a pickled chain β ken & Suoh ice solid oä @ r soliwenkiisrer era on the frame # i sagetee © ht t in
Retains ^ ra Mneinraexi

Claims (1)

Patentansprüche»Patent claims » l) Verfahren zax Herstellung von Bauplatten ι insbesondere &ips= platten8 dadurch gekennzeichnet s dass das Gut in einem rotieren den Behälter J*®f giessfertig angemacht und aus diesem Behält JT) immittelbar in'darunter kontinuierlich vorbeibewegte Formen >OT eingefüllt wird« "**l) The method zax manufacture of building panels ι particular & ips = slabs 8 characterized s that the material in a rotating container J * ®F giessfertig turned on and immittelbar in'darunter continuously moved past from this container JT) forms> OT filled is "" * * 2} Verfahren naeh Anspruch I1 dadurch gekannt zeichnet t dass di© (Jiessformen für die Platten zusammengesetzt sind und dass die einzelnen Formteile ( b% b9*) naqh Herausnahme der fertigen Platte Im) wieder an die neu zu füllende Seite des Forsnrer81 band es £b) angelegt werden^ sodaejs eine stetig© Arbeitsweise möglieh ist©2} method Naeh claim I 1 characterized known by t that di © (Jiessformen are composed of the plates and that the individual molded parts (b% b 9 *) naqh removal of the finished board in) back to the re-filling side of the Forsnrer 81 tied it £ b) be created ^ sodaejs a steady © mode of operation is possible © 3) Torrichtung zur Durchführung des Verfahrens naöi den Ansprüchen 1 und 2 .dadurch gekenntzeichnetf dass die durchgehende ebene Platte (y) der Formteile (b1« b*1 ) an der ünterkante und an einer Seite Abstandeleisten i ufv ) trägt v wobei die seitliches A"btdlit \) bhbt SOtil (b% 8i) 31 3) Door direction for carrying out the method naöi claims 1 and 2. Characterized f that the continuous flat plate (y) of the molded parts (b 1 «b * 1 ) on the lower edge and on one side spacer strips i u f v ) carries v where the side A "btdlit \) bhbt SOtil (b% 8i ) 31 Ab©tandsl@ist@n Vn) benachbarter Forateile (b% b8*) entgegen gesetzt zueinander liegen»From © tandsl @ ist @ n Vn) neighboring format parts (b% b 8 *) are opposite to each other » 4) Vorrichtung nach Ansprüchen S9 dadurch gekennzeichnet* dasssdie zu den Giessformen zusammengesetzten Formteile vbf b ) gegenseitig durch leicht lösbar® Klammern ix) zusamcieagehalten werden»4) Device according to claims S 9, characterized * that the mold parts assembled to form the molds vb f b ) are mutually held together by easily detachable® clips ix) » 5) Vorrichtung nach den Ansprüchen 3 und ^9 dadurch gekennzeichnet» dass die Formteile (bf oder bSi) am Ende des auf einer !Transport* einrichtung (o beswe l«m) zurückgelegten Weges durch eine Zulissensteuerung (r#f3 in wagerechter Richtung gegeneinander verschoben werdenk8 5) Device according to Claims 3 and 9, characterized in that the molded parts (b f or b Si ) at the end of the path covered on a! Transport device (o besw e l «m) are controlled by an admission control (r # f3 in be shifted against each other in the horizontal direction k8 ^) Vorrichtung nach den Ansprüchen 3 bis 5g dadurch gekennzeichnet® dass zum Vorwärtsbewegen der zu einem Verband zusamraengesehlos8= senen Formteil® ( b%bfl) ein endloses Förderband (<sJ mit den Antriebseinriohtungen( ^-9e§f|g ) unter den rotierenden Behäl= ter (a) angeordnet ist β ^) Device according to claims 3 to 5 g gekennzeichnet® in that for advancing the dressing to a zusamraengesehlos 8 = Senen Formteil® (b% fl b) an endless conveyor belt (<sJ with the Antriebseinriohtungen (^ - 9 e§f | g ) arranged under the rotating container (a) is β 7) Vorrichtung nach den Ansprüchen 3 Ms §f dadurch gekennzeichnet $ dass zum Vorwärtsbewegen der zu einem Verband susasraengesehloB* senen Formteile (b\b <?.) unter dem rotierenden Behälter (aU ein Schwisigbalksn (m) angeordnet ist* der über die Kurbelwellen (n) bewegt wird und die Formen (b) auf den festen Auflagen Cl) schrittweise vorwärtsbewegt *7) Device according to claims 3 Ms § f characterized $ in that for advancing the to a bandage susasraengesehloB * Senen mold parts (b \ b <?.) beneath the rotating container (aU a Schwisigbalksn (m) is arranged * of the crankshafts on the (n) is moved and the molds (b) are moved forward step by step on the fixed supports Cl) * 8)Vorrichtung nach den Ansprüchen 3 bis 5g dadurch gekennzeichnet« dass in den rotierenden Behälter (a) ein jm Raum festgehaltener* in sich beweglicher ϊβϋ# s„Be eine Kette is) eingelegt ist«8) Device according to claims 3 to 5 g characterized "in that in the rotating container (a) a space jm * pinned in itself movable ϊβϋ # s" B e is a chain) is inserted " Einripfetimg nasch denEinripfetimg nasch den

Family

ID=

Similar Documents

Publication Publication Date Title
CH418628A (en) Method for applying cover layers to a core plate, device for carrying out the method and building board produced according to the method
DE2538736A1 (en) METHOD AND DEVICE FOR THE PRODUCTION OF PLASTER BUILDING PANELS
DEP0002065DA (en) Method and device for the production of building panels, in particular plasterboard
DE814575C (en) Method and device for the production of building panels, in particular plasterboard
DE2155061B2 (en) METHOD AND DEVICE FOR THE SIMULTANEOUS MANUFACTURING OF SEVERAL REINFORCED, PLATE-SHAPED GAS CONCRETE BUILDINGS
AT242581B (en) Method and device for applying cover layers to insulating panels and multilayer insulating panels
DE1559048A1 (en) Process for mechanical masonry and machine for practicing the process
DE1584837B1 (en) Process and device for the production of reinforced molded parts with longitudinal cavities from light mineral aggregates with binders
AT263597B (en) Method and device for manufacturing large components
DE19813583B4 (en) Apparatus for the production of masonry
DE1081367B (en) Device for the production of single or multi-layer building panels as prefabricated parts for prefabricated houses
DE2043071A1 (en) Process for the production of cast products and apparatus for carrying out the process
AT254013B (en) Machine for the production of roof tiles from concrete or the like.
DE2518790C3 (en) Transport device for workpieces to be immersed in containers or baths
AT240235B (en) Method and device for the production of reinforced brick beams
AT128027B (en) Method and device for the production of panels from a filling material with a cold-setting binder.
DE1584837C (en) Method and device for the manufacture of reinforced molded pieces with longitudinal cavities made of light mineral additives with binders
AT227136B (en) Device for making blocks from lightweight concrete
DE598435C (en) Dismountable form for the production of hollow concrete blocks
DE135517C (en)
DE10234932B4 (en) Method and device for producing a concrete product with an exposed grain surface area
DE555890C (en) Process for the production of ridge tiles
AT252781B (en) Mold and system for pouring and transporting large lightweight concrete bodies
DE2101093C3 (en) Device for the production of reinforced, plate-shaped wall and ceiling elements made of concrete for prefabricated construction
DE4319952A1 (en) Method and device for manufacturing concrete grid panels with reinforcement insert