DE8424900U1 - Device for the fully automatic production of masonry from standard bricks and mortar or adhesive using a rotating masonry robot - Google Patents
Device for the fully automatic production of masonry from standard bricks and mortar or adhesive using a rotating masonry robotInfo
- Publication number
- DE8424900U1 DE8424900U1 DE19848424900 DE8424900U DE8424900U1 DE 8424900 U1 DE8424900 U1 DE 8424900U1 DE 19848424900 DE19848424900 DE 19848424900 DE 8424900 U DE8424900 U DE 8424900U DE 8424900 U1 DE8424900 U1 DE 8424900U1
- Authority
- DE
- Germany
- Prior art keywords
- mortar
- masonry
- gripper
- robot
- standard bricks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000004570 mortar (masonry) Substances 0.000 title claims description 33
- 239000011449 brick Substances 0.000 title claims description 17
- 239000000853 adhesive Substances 0.000 title claims description 4
- 230000001070 adhesive effect Effects 0.000 title claims description 4
- 238000004519 manufacturing process Methods 0.000 title claims description 4
- 238000000034 method Methods 0.000 claims description 9
- 210000001503 joint Anatomy 0.000 claims description 7
- 238000003860 storage Methods 0.000 claims description 6
- 230000004888 barrier function Effects 0.000 claims description 3
- 239000004575 stone Substances 0.000 description 13
- 238000010276 construction Methods 0.000 description 6
- 230000008901 benefit Effects 0.000 description 5
- 238000009434 installation Methods 0.000 description 3
- 238000012432 intermediate storage Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 244000309464 bull Species 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 241001527806 Iti Species 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/22—Tools or apparatus for setting building elements with mortar, e.g. bricklaying machines
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
• I · · t ·■ ■ ·· ·• I · · t ·■ ■ ·· ·
\Vorrichtunq zur vollautomatischen Herstellung von Mauerwerk aus Normsteinen und Mör tel oder Kleber mit Hilfe eines drehbaren Mauerroboters y»\ Device for the fully automatic production of masonry from standard bricks and mortar or adhesive using a rotating masonry robot y»
Die Erfindung betrifft eine Vorrichtung zum Herstellen von Mauerwerk aus Normsteinen und Mörtel oder Kleber mit Hilfe eines drehbaren Mauerroboters gemäß dem Oberbegriff des Anspruchs 1.The invention relates to a device for producing masonry from standard bricks and mortar or adhesive with the aid of a rotating masonry robot according to the preamble of claim 1.
Maurerarbeiten für Gebäude werden in einer seit Jahrhunderten üblichen Technik ausgeführt, wofür das Berufsbild des Maurerfacharbeiters entwickelt worden ist. Diese Technik ist jedoch von der Fähigkeit und Zuverlässigkeit der Arbeitskräfte und den Witterungsverhältnissen abhängig.Bricklaying work for buildings is carried out using a technique that has been in use for centuries, for which the profession of bricklayer was developed. However, this technique depends on the skills and reliability of the workers and the weather conditions.
Vorschläge zur Mechanisierung des Mauerns sind bekannt, beispielsweise aus DE-OS 26 08 826. Die Vorteile dieses Vorschlages beruhen in der Erleichterung des Einsatzes körperlicher Kräfte des Bauarbeiters auf der Baustelle. Die Arbeit des Maurers erübrigt sich jedoch hierdurch nicht, denn es ist nicht möglich, die Maurerarbeit selbsttätig, kontinuierlich und absolut zuverlässig auszuführen, und zwar im gezielten Umfang, zu jeder geforderten Zeit und unabhängig vom Wetter.Proposals for the mechanization of bricklaying are known, for example from DE-OS 26 08 826. The advantages of this proposal are based on the fact that it makes it easier for the construction worker to use his physical strength on the construction site. However, this does not make the bricklayer's work redundant, because it is not possible to carry out the bricklaying work independently, continuously and absolutely reliably, to the desired extent, at any time required and regardless of the weather.
Angesichts dieses Standes der Technik liegt der Erfindung die Aufgabe zugrunde, eine Vorrichtung zu schaffen, mit deren Hilfe Mauerwerk im bestimmbaren Umfang, mit der erforderlichen Präzision, automatisch und kontinuierlich hergestellt werden kann. Dabei soll das Mauerwerk nach einem festlegbaren Prograr^mplan in einer vorgegebenen Zeit ausführbar und von der Kunst des Maurers und von der Witterung unabhängig sein. Außerdem soll der Aufwand an Zeit gesenkt werden, ohne die Qualität des Mauerwerks zu mindern,In view of this state of the art, the invention is based on the task of creating a device with the help of which masonry can be produced to a definable extent, with the required precision, automatically and continuously. The masonry should be able to be carried out according to a definable program plan in a given time and should be independent of the skill of the mason and the weather. In addition, the time required should be reduced without reducing the quality of the masonry.
t · · ■■ ·· ■ * t · · ■■ ·· ■ *
I · t · · I » ft I · t · · I » ft
CIt «II · «CIt «II · «
• I Il lit· · ·• I Il lit· · ·
-&agr;&idigr; und es soll das vorgegebene ArbeitsprogFamm für den jeweiligen Anwendungsfall berechenbar und kontrollierbar auszuführen sein.-αδειδα and the specified work program for the respective application should be able to be carried out in a predictable and controllable manner.
Diese Aufgabe wird bei der erfindungsgemäß geschaffenen Vorrichtung durch die Merkmale des Anspruchs 1 gelöst. Vorteilhafte Ausgestaltungen hiervon sind in den weiteren Ansprüchen aufgeführt.This object is achieved in the device created according to the invention by the features of claim 1. Advantageous embodiments thereof are listed in the further claims.
Einer der Vorteile der erfindungsgemäßen Vorrichtung besteht darin, daß auf der Ladefläche eines Lastfahrzeuges mehrere Einheiten von Maurerrobotern aufsetzbar sind. Hierbei besteht jeder Maurerroboter aus einem Sockel und mindestens zwei verfahrbaren Greifereinrichtungen. Die eine Greifereinrichtung greift die Mörtelgefäße aus dem Mörtelvorratsbehälter, während die andere Greifereinrichtung die Normsteine aus einem Zwischenlager greift. Das zur Maueranschlußstelle durch die Greifereinrichtung geförderte Mörtelgefäß trägt dann eine Lagerfuge auf, worauf auf der Lagerfuge die von der anderen Greifereinrichtung gehobenen Normsteine aufgesetzt werden. Die Stoßfuge wird ebenfalls mit Hilfe des Mörtelgefäßes eingebracht.One of the advantages of the device according to the invention is that several units of bricklaying robots can be placed on the loading area of a truck. Each bricklaying robot consists of a base and at least two movable gripping devices. One gripping device grips the mortar containers from the mortar storage container, while the other gripping device grips the standard bricks from an intermediate storage area. The mortar container conveyed to the wall connection point by the gripping device then applies a bed joint, after which the standard bricks lifted by the other gripping device are placed on the bed joint. The butt joint is also introduced using the mortar container.
Die Abfolge aller Teilvorgänge des Mauerns wird mittels einer an dem Maurerroboter angeschlossenen Steuereinrichtung ausgeführt, wobei die Festlegung der Mauerflucht mittels einer Laserschranke der Steuereinrichtung vorgegeben wird.The sequence of all sub-processes of bricklaying is carried out by means of a control device connected to the bricklaying robot, whereby the alignment of the brickwork is determined by means of a laser barrier on the control device.
Einer der wesentlichen Vorteile der Erfindung besteht in der Möglichkeit der fabrikmäßigen Herstellung des Mauerwerks, das nach der für den jeweiligen Verwendungsfall erstellten Berechnung serienweise und mit der erforderlichen Präzision hergestellt werden kann. Hierbei ist auch eine Fertigungs- und Qualitätskontrolle anhand der Aufschreibungen der Steuereinrichtung möglich. Die Handarbeit mehrerer Maurerfacharbeiter wird durch einen einzigen Bedienungsmann der automatischen Maurermaschine ersetzt.One of the main advantages of the invention is the possibility of factory-made masonry, which can be produced in series and with the required precision according to the calculations made for the respective application. Production and quality control is also possible using the records of the control device. The manual work of several skilled masons is replaced by a single operator of the automatic masonry machine.
-5--5-
Ein weiterer Vorteil der Erfindung besteht in der genauen Einhaltung der Mauerflucht mittels einer Laserschranke; die in die Steuereinrichtung einbezogen ist.A further advantage of the invention is the precise maintenance of the wall alignment by means of a laser barrier which is integrated into the control device.
der Arbeitsvorgänge auf der Baustelle, weil das Herstellen des Hauerwerks zügig und nach rationaler Vorplanung aller Teilvorgänge, wie Herstellen der Lagerfuge von der Maueranschlußstelle aus, Aufstellen der Normsteine auf der vom Laser bestimmten Aufsetzstelle und Herstellen der Stoßfuge, erfolgen kann. Der Gesamtvorgang der Herstellung des Mauerwerks kann somit kontinuierlich und mit Einsparung von Zeit und Material erfolgen.of the work processes on the construction site, because the construction of the masonry can be carried out quickly and after rational advance planning of all sub-processes, such as creating the bed joint from the wall connection point, setting up the standard bricks on the placement point determined by the laser and creating the butt joint. The entire process of creating the masonry can therefore be carried out continuously and with savings in time and material.
Einer der wichtigsten Vorteile besteht schließlich in der Wendigkeit des Einsatzes einer mobilen Maurer-Anlage, die zu jeder beliebigen Uhrzeit und unabhängig vom Wetter einsatzbereit ist. Die Herstellung des Mauerwerks kann damit zeitgerecht eingeplant und ausgeführt werden. Die erfindungsgemäße Vorrichtung beseitigt somit jeglichen Risikofaktor für Termine und Lohnkosten.Finally, one of the most important advantages is the maneuverability of using a mobile masonry system that is ready for use at any time and regardless of the weather. The construction of the masonry can therefore be planned and carried out on time. The device according to the invention thus eliminates any risk factor for deadlines and labor costs.
erläutert. Es zeigen:
25explained. They show:
25
Fig. 1 schematisch die mit der Erfindung ausgeführten Teilvorgänge, nämlichFig. 1 schematically shows the sub-processes carried out with the invention, namely
Antransport der Maurerroboter-Einheiten, Entladen der Roboter-Einheit, Fig. Ic Montage des Lasers und eines Gleises an der Maueranschlußstelle,Transport of the bricklaying robot units, unloading of the robot unit, Fig. Ic Installation of the laser and a track at the wall connection point,
Fig. Id Aufbau der Roboter-Einheit auf der Maueranschlußstelle mit Bereitstellen der Wagen für das Normstein-Zwischenlager und die Mörtelvorratsbehälter, Fig. Id Installation of the robot unit on the wall connection point with provision of the trolleys for the standard brick intermediate storage and the mortar storage containers,
Fig. Ie Beschicken des Wagens mit Normsteinen, Fig. If Beschicker des Wagens mit dem Mörtelvorrat, Fig. Ig Aufbringen der Lagerfuge,Fig. Ie Loading the wagon with standard bricks, Fig. If Loading the wagon with the mortar supply, Fig. Ig Applying the bed joint,
J » · · M Ml· ■· t J » · · M Ml· ■· t
Aufsetzen der Normsteine,Setting up the standard stones,
Abbau und Abtransport der Maurerroboter-Ein-Dismantling and removal of the bricklaying robots
heiten,ities,
das Transportfahrzeug für die Roboter-Einheitenthe transport vehicle for the robot units
in Seitenansicht undin side view and
in Rückansicht,in rear view,
den Roboter in Greiferstellung,the robot in gripper position,
Einzelheiten des Roboters,Details of the robot,
den Roboter in Arbeitsstellung,the robot in working position,
Funktionen des Mörtelgefäßgreifers,Functions of the mortar container gripper,
Funktionen des Normsteingreifers undFunctions of the standard stone gripper and
Fig. 9 Aufbringen des MörtelsFig. 9 Applying the mortar
Die in Fig. 1 zusammengefaßten tinzelfiguren la bis Ii zeigen die Teilvorgänge von der Anfahrt eines Lastfahrzeuges 1 bis zu dessen Abfahrt nach Erstellung eines Mauerwerks 13.The individual figures la to Ii summarized in Fig. 1 show the partial processes from the arrival of a truck 1 to its departure after the construction of a masonry structure 13.
Aus Fig. 2 und 3 sind das Lastfahrzeug 1 und die auf dessen Ladefläche 2 aufgesetzten Maurerroboter 3 ersichtlich, wobei Montagezubehör 14, wie Gleise, Materialwagen für Normsteine 5 und Mörtel 7, griffbereit untergebracht ist.Fig. 2 and 3 show the truck 1 and the bricklaying robots 3 mounted on its loading area 2, with assembly accessories 14, such as tracks, material trolleys for standard bricks 5 and mortar 7, stored within easy reach.
mit
7aFig
with
7a
Fig
- 7d. 7
Fig
- 7d
mit
8aFig
with
8a
Fig
- 8d. 8th
Fig
- 8d
Fig. 4 zeigt im einzelnen einen Maurerroboter 3 mit Sockel 3a, Greifereinrichtungen 3b für Mörtelgefäße mit Mörtelgefäßgreifer 16 und Greifereinrichtungen 3c für Normsteine - mit Steingreifer 15 mit einem Mörtelvorratsbehälter 6 sowie flörtelgefäßen 7 und einem Normstein-Zwischenlager 4 auf der Maueranschlußstelle 8 in der Greiferstellung.Fig. 4 shows in detail a bricklaying robot 3 with base 3a, gripper devices 3b for mortar containers with mortar container gripper 16 and gripper devices 3c for standard bricks - with brick gripper 15 with a mortar storage container 6 as well as mortar containers 7 and a standard brick intermediate storage 4 on the wall connection point 8 in the gripper position.
Fig. 5 zeigt Einzelheiten des Maurerroboters 3.Fig. 5 shows details of the bricklaying robot 3.
Zur Werdeutlichung der Arbeitsweise des Maurerroboters 3 ist dieser in Fig. 6 in Arbeitsstellung dargestellt.To clarify the operation of the bricklaying robot 3, it is shown in working position in Fig. 6.
-7--7-
Fig. 7 verdeutlicht die Wirkungsweise der Greifereinrichtung 3b für die Mörtelgefäße 7 mit dem Greiferelement 16.Fig. 7 illustrates the operation of the gripper device 3b for the mortar containers 7 with the gripper element 16.
Fig. 7a zeigt das Anfahren des Mörtelgefäßgreifers 16 am Mörtelvorratslager 6.Fig. 7a shows the approach of the mortar container gripper 16 to the mortar storage facility 6.
Fig. 7b zeigt das Einfahren des Mörtelgefäßgreifers 16 am fiörtelgefäß 7.Fig. 7b shows the insertion of the mortar container gripper 16 into the mortar container 7.
Fig. 7c zeigt den Transport des Mörtelgefäßes 7 zur Einbaustelle. Fig. 7c shows the transport of the mortar container 7 to the installation site.
Fig. 7d zeigt das Aufsetzen des Mörtelgefäßes 7 auf der Lagerfuge 9.Fig. 7d shows the placement of the mortar container 7 on the bed joint 9.
fe
mit Fühlern 15a Iwith sensors 15a I
einer Auslösernut 15b %{ a trigger groove 15b % {
einem Auslöserstempel mit Feder 15c &ggr; a trigger stamp with spring 15c &ggr;
einer Steinanzeige 15da stone display 15d
einer Entspannungsnut 15ea relaxation groove 15e
einer Spannfeder 15fa tension spring 15f
einer Sicherungsnut . 15ga locking groove . 15g
einem Sicherungshebel 15ha safety lever 15h
einem Sicherungshebelgestänge 15ia safety lever rod 15i
einem Andrückstempel 15k unda stamp 15k and
einem Federspanner 151.a spring compressor 151.
Fig. 8c zeigt das Greifen des Normsteines 5 mit dem Steingreifer 15. Der Fühler 15a hat den Normstein 5 ertastet, die Greifereinrichtung 3d drückt nach unten. Wenn die Auslösernut 15b in Höhe des Auslöserstempels 15c steht, wird dieser durch die Feder in die Auslösernut 15b gedrückt undFig. 8c shows the gripping of the standard stone 5 with the stone gripper 15. The sensor 15a has sensed the standard stone 5, the gripper device 3d presses downwards. When the release groove 15b is at the height of the release stamp 15c, the latter is pressed into the release groove 15b by the spring and
-8--8th-
gibt dabei die Entspannungsnut 15e frei. Durch diese Bewegung wird ein elektrischer Kontakt betätigt, der die Abwärtsbewegung der Greifereinrichtung 3c beendet. Bei Freigabe der Entspannungsnut 15e wird die Steinzange 15d durch die Spannfeder 15f am Normstein 5 festgedrückt, worauf der Sicherungshebel 15h in die Sicherungsnut 15g einrastet. Der Normstein 5 ist transportfertig.releases the relaxation groove 15e. This movement activates an electrical contact, which ends the downward movement of the gripper device 3c. When the relaxation groove 15e is released, the stone tongs 15d are pressed firmly onto the standard stone 5 by the tension spring 15f, whereupon the safety lever 15h engages in the safety groove 15g. The standard stone 5 is ready for transport.
Fig. 8d zeigt das Absetzen des Normsteins 5 auf der Lagerfuge 9 und das Lösen der Greifereinrichtung 3c vom Stein. Durch das Andrücken des Normsteins 5 an der Lagerfuge 9 wird der Andrückstempel 15k nach oben gedruckt. Er bewirkt die Auslösung einer Mechanik in der Greifereinrichtung 3c, die das Sinherungshebelgestänge 15i und die Federspanner 15e nach unten drückt. Hierdurch wird der Sicherungshebel 15h aus der Sicherungsnut 15g bewegt, und das System wird in den in Fig. 8a gezeigten Zustand zurückgesetzt .Fig. 8d shows the setting down of the standard stone 5 on the bearing joint 9 and the release of the gripper device 3c from the stone. By pressing the standard stone 5 onto the bearing joint 9, the pressure stamp 15k is pushed upwards. This triggers a mechanism in the gripper device 3c, which presses the locking lever rod 15i and the spring tensioners 15e downwards. This moves the safety lever 15h out of the safety groove 15g and the system is reset to the state shown in Fig. 8a.
In Fig. 9 ist die Funktion des Mörtelgefäßes 7 beim Aufbringen des Mörtels gezeigt.Fig. 9 shows the function of the mortar container 7 when applying the mortar.
Der Mörtel fließt aus dem Mörtelgefäß 7 durch die Austrittsöffnung 7a auf die Lagerfuge 9. Ein Stoßfugenstopfer 17, der am Mörtelgefäßgreifer 16 befestigt ist, wird durch Druckpunktauslösung vertikal bewegt, bis die Stoßfuge 10 gestopft ist. Die Horizontalbewegung des Mörtelgefäßes 7 wird durch die Steuerung der Greifereinrichtung 3b im Abstand der Stoßfugen 10 während des Stoßfugenstopfens unterbrochen.The mortar flows out of the mortar container 7 through the outlet opening 7a onto the bed joint 9. A butt joint tamper 17, which is attached to the mortar container gripper 16, is moved vertically by pressure point release until the butt joint 10 is tamped. The horizontal movement of the mortar container 7 is interrupted by the control of the gripper device 3b at the distance of the butt joints 10 during the butt joint tamping.
Ausdrücklich sei im übrigen vermerkt, daß etwaige weitere Merkmale der Vorrichtung, soweit diese vorstehend nicht beschrieben wurden, sich im einzelnen auch aus der Zeichnung ergeben.It should also be expressly noted that any further features of the device, insofar as they have not been described above, can also be seen in detail from the drawing.
Claims (5)
dadurch gekennzeichnet, daß der drehbare Mauerroboter (3) auf einem Sockel (3a) angeordnet ist und zwei getrennt voneinander wirkende Greifereinrichtung (3b, 3c) aufweist.1. Device for the fully automatic production of masonry from standard bricks and mortar or adhesive using a rotating masonry robot,
characterized in that the rotatable wall robot (3) is arranged on a base (3a) and has two gripper devices (3b, 3c) acting separately from one another.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19848424900 DE8424900U1 (en) | 1984-08-22 | 1984-08-22 | Device for the fully automatic production of masonry from standard bricks and mortar or adhesive using a rotating masonry robot |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19848424900 DE8424900U1 (en) | 1984-08-22 | 1984-08-22 | Device for the fully automatic production of masonry from standard bricks and mortar or adhesive using a rotating masonry robot |
Publications (1)
Publication Number | Publication Date |
---|---|
DE8424900U1 true DE8424900U1 (en) | 1987-03-19 |
Family
ID=6770029
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19848424900 Expired DE8424900U1 (en) | 1984-08-22 | 1984-08-22 | Device for the fully automatic production of masonry from standard bricks and mortar or adhesive using a rotating masonry robot |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE8424900U1 (en) |
-
1984
- 1984-08-22 DE DE19848424900 patent/DE8424900U1/en not_active Expired
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0674069B1 (en) | Arrangement and method for realising building constructions using masonry blocks and/or shutterings | |
DE19603234A1 (en) | Automatic brick wall building machine | |
DE3505841A1 (en) | DEVICE FOR BRACKING LARGE-FORMAT WALL ARTIFICIAL STONES | |
DE3430915A1 (en) | Method and apparatus for producing a masonry structure from standard blocks and mortar or adhesive with the aid of industrial robots | |
DE19743717C2 (en) | Automatic walling device | |
DE3615460C1 (en) | Device for the production of reinforcements of reinforced concrete slabs for prefabricated ceilings | |
AT253200B (en) | Method and device for producing masonry from building blocks | |
DE8424900U1 (en) | Device for the fully automatic production of masonry from standard bricks and mortar or adhesive using a rotating masonry robot | |
DE2215661C3 (en) | Device for the production of preferably story-high brick slabs | |
AT403603B (en) | METHOD AND DEVICE FOR PRODUCING PRE-PREPARED WALL ELEMENTS FROM BRICK | |
DE4216367A1 (en) | Prefab. masonry element of bricks with mortar joints - has building faces of stepped or toothed configuration | |
DE19808812C2 (en) | Process for making a solid carriageway | |
DE2829863C2 (en) | Device for the production of vertical wall panels from masonry stones | |
EP0536600B1 (en) | Device for producing reinforcements | |
DE1584637C3 (en) | Device for producing a large-format building board and use of the device | |
DE4231393C1 (en) | Device for accurate incorporation of supports in bore holes, slot walls or similar - has movable and fixable centering bridge and centering flue entering bore hole or wall slot | |
EP0872609B1 (en) | Method of making a layered wall-slab | |
DE2359428A1 (en) | Continuous, automatic mfr. of prefabricated walls - by assembling and applying mortar to moulded blocks immediately after pressing | |
DE2113644A1 (en) | Fully automatic masonry machine | |
DE2449398A1 (en) | Mechanical artificial stone masonry wall erection - involving transfer to separator plate, group assembly, hoisting, laying and mortaring | |
DE19538891C2 (en) | Method and device for the horizontal laying of slabs | |
EP1111186B1 (en) | Method of reinforcing arches | |
DE19813583A1 (en) | Method and device for producing masonry | |
DE20004153U1 (en) | Platform edge setting device | |
DE2654584B2 (en) | Device for the prefabrication of large brick walls |