DE7315040U - Assembly aid for NH fuse strips - Google Patents

Assembly aid for NH fuse strips

Info

Publication number
DE7315040U
DE7315040U DE19737315040 DE7315040U DE7315040U DE 7315040 U DE7315040 U DE 7315040U DE 19737315040 DE19737315040 DE 19737315040 DE 7315040 U DE7315040 U DE 7315040U DE 7315040 U DE7315040 U DE 7315040U
Authority
DE
Germany
Prior art keywords
fuse
hood
assembly aid
strips
strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19737315040
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SIEPER F
Original Assignee
SIEPER F
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SIEPER F filed Critical SIEPER F
Priority to DE19737315040 priority Critical patent/DE7315040U/en
Publication of DE7315040U publication Critical patent/DE7315040U/en
Expired legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements

Description

Anmelder:Applicant:

Heinz LenssenHeinz Lenssen

5802 Wetter, Steinstraße 35802 Wetter, Steinstrasse 3

Friedel SieperFriedel Sieper

583 Schwelm, Martinstraße 21583 Schwelm, Martinstrasse 21

L 193L 193

Montagehilfe für NH-SicherungsleistenAssembly aid for NH fuse strips

Bei der Neuerung handelt es sich um eine Montagehilfe für NH-Sicherungsleisten.The innovation is an assembly aid for NH fuse strips.

Mit NH-Sicherungsleisten bestückte Verteilungssysteme, wie Verteilerschränke, Verteilertafeln und dergleichen, sind im allgemeinen so ausgelegt, daß bei Bedarf weitere Sicherungsleisten montiert werden können. Sollen einem solchen Verteilungssystem zusätzliche Sicherungsleisten hinzugefügt werden, kommt man bislang nichb umhin, das System abzuschalten, um den Monteur nicht zu gefährden.Distribution systems equipped with NH fuse strips, such as distribution cabinets, distribution boards and the like, are generally designed in such a way that further fuse strips can be fitted if necessary. Should one If additional fuse strips are added to such a distribution system, it has so far not been possible to avoid the Switch off the system in order not to endanger the fitter.

731504IT-Te.T3~731504IT-Te.T3 ~

Abgesehen davon, daß Ab- und Zuschaltungen zeitraubend sind und zusätzliche Kosten verursachen, ist die Unterbrechung der Stromversorgung für bereits angeschlossene Stromverbraucher unerwünscht, wenn nicht gar unzumutbar.Apart from the fact that disconnections and connections are time consuming and cause additional costs, the interruption is The power supply for electricity consumers already connected is undesirable, if not unreasonable.

Der Neuerung liegt die Aufgabe zugrunde, eine gefahrlose Montage von NH-Sicherungsleisten an unter Spannung stehenden Verteilungssystemen zu ermöglichen.The innovation is based on the task of safely installing NH fuse strips on live ones To enable distribution systems.

Die Aufgabe wird neuerungsgemäß mit einer Montagehilfe für NH-Sicherungsleisten, bestehend aus einer über die Sicherungsleiste stülpbaren Haube aus nicht leitendem Material mit mindestens zwei sich in Klemmen der Sicherungsleiste einfügenden KlemmstUcken in der Deckplatte und von der Deckplatte ausgehenden, von außen zugänglichen PUhrungs· hülsen für einen isolierten Schraubenschlüssel zum Herstellen bzw. Lösen der Schraubverbindungen zwischen Sicherungsleiste und Bestandteil des Verteilungssystems bildenden, unter Spannung stehenden Sammelschienen sowie mindestens einem von außen auf die Deckplatte aufgesetzten Griffstück, gelöst.The task is renewed according to an assembly aid for NH fuse strips, consisting of one over the Fuse strip pull-back hood made of non-conductive material with at least two in the terminals of the fuse strip inserting clamping pieces in the cover plate and from the cover plate, externally accessible holes Sleeves for an insulated wrench for making or loosening the screw connections between the fuse strip and energized busbars forming part of the distribution system, and at least one grip piece placed on the cover plate from the outside, solved.

Die zu montierende Sicherungsleiste wird in die neuerungsgemäße Haube eingefügt, wobei mindestens zwei Sicherungsklemmen an der Deckplatte der Haube angeordnete Klemmstücke übergreifen. Sodann wird die Haube mit der darin befindlichen Sicherungsleiste mit Hilfe der an der Haube vorgesehenen Griffstücke aufgenommen und vor das Traggerüst des Verteilungssystems in der von der Sicherungsleiste einzunehmenden Position plaziert. Danach werden die Schraubverbindungen zwischen der Sicherungsleiste und den Sammelschienen mit Hilfe eines in die Bestandteil der Haube bildenden Führungshülsen eingeführten Schraubenbolzens nebst isoliertem Schraubenschlüssel hergestellt. Schließlich wird die Haube von der montierten Sicherungsleiste wieder abgezogen. Bei der Montage derSicherungsleiste mit Hilfe der neuerungsgemäßen Haube erübrigt sich das aufwendige und unerwünschte Abschalten der Verteilerotation, an der die Sicherungsleiste montiert werden soll, da die Haube die Montage der Sicherungsleiste risikolos unter Spannung zuläßt. Der Vorteil kommt gleichermaßen zum Tragen bei der Demontage von Sicherungsleisten.The fuse strip to be assembled is inserted into the hood according to the innovation, with at least two fuse clips arranged on the cover plate of the hood overlap. Then the hood with the fuse strip located in it is secured with the help of the on the hood provided handles and added in front of the supporting structure of the distribution system in the position to be assumed by the fuse strip. After that will be the screw connections between the fuse strip and the busbars with the help of a part of the Made hood-forming guide sleeves inserted screw bolts together with an insulated wrench. In the end the hood is removed from the mounted fuse strip. When assembling the safety bar with the help of the hood according to the innovation eliminates the need for the complex and undesired shutdown of the distributor rotation on which the fuse strip is to be mounted, since the hood allows the assembly of the fuse strip under tension without risk allows. The advantage also comes into play when dismantling fuse strips.

In weiterer Ausgestaltung der Neuerung weist die Haube zusätzlich Schlüsselführungshülsen für VerbindungenIn a further embodiment of the innovation, the hood also has key guide sleeves for connections

zwischen der Sicherungsleiste und den Bestandteil des tragenden Gerüstes des Verteilungssystems bildenden Tragleisten auf.between the fuse strip and the support strips forming part of the supporting structure of the distribution system on.

Zweckmäßigerweise sind in der Haube Klemmstücke für die außen liegenden Sicherungsklemmen der Sicherungsleiste angeordnet. Bei sich im wesentlichen über die Tiefe der Haube erstreckenden FUhrungshülsen nebst für die Herstellung der Schraubverbindung zwischen Sicherungsleiste und Stromschienen muß die Mantelfläche dieser Führungshülsen am freien Ende zwecks Reduzierung des Platzbedarfs in der Regel an den mit den Wandungen des Trägers für die Sicherungsklemmen korrespondierenden Seiten ausgeklinkt sein. Die verbleibenden Wandteile der sich in die Sicherungsleiste hinein erstreckenden PUhrungshülse stellen in Verbindung mit den Wandungen des Trägers für die Sicherungsklemmen die gezielte Zuführung des Schraubenbolzens zum für ihn vorgesehenen Muttergewinde sicher und schließen ein unkontrolliertes Abgleiten des Schraubenbolzens aus.Clamping pieces for the external fuse terminals of the fuse strip are expediently arranged in the hood. In the case of guide sleeves extending essentially over the depth of the hood, together with for the manufacture the screw connection between the fuse strip and busbars must be the outer surface of these guide sleeves on free end in order to reduce the space requirement usually on the with the walls of the carrier for the fuse clips corresponding pages must be disengaged. The remaining parts of the wall are in the fuse strip Phreading sleeve extending into it are in connection with the walls of the carrier for the securing clips the targeted feeding of the screw bolt to the nut thread intended for it safe and close an uncontrolled The screw bolt slides off.

Eine Haube aus durchsichtigem Material erleichtert die Handhabung. Zweckmäßigerweise bestehen auch die Führungshülsen aus durchsichtigem Material.A hood made of transparent material makes handling easier. The guide sleeves also expediently exist made of transparent material.

In der Zeichnung ist die Neuerung weitergehend erläutert. Es zeigen:The innovation is further explained in the drawing. Show it:

Figur 1 eine Draufsicht auf die Haube,Figure 1 is a plan view of the hood,

Figur 2 einen Schnitt durch die Montagehilfe nach Linie H-II in Figur 1,Figure 2 shows a section through the assembly aid along line H-II in Figure 1,

Figur 3 die Montagehilfe im Einsatz.Figure 3 the assembly aid in use.

Verteilerstationen bestehen im Prinzip aus Ständern 11, 12, 12'. An den im Abstand voneinander verlaufenden Tragleisten 12, 121 sind nebeneinander Sicherungsleisten 13 angeordnet. An eine der Sicherungsleisten ist das Hauptversorgungskabel angeschlossen. An den anderen mit der ersten durch Sammelschienen 14, l4T, 14" verbundenen Sicherungsleisten 13 liegen Verbraucheranschlüsse.Distribution stations basically consist of stands 11, 12, 12 '. Fuse strips 13 are arranged next to one another on the support strips 12, 12 1 which run at a distance from one another. The main supply cable is connected to one of the fuse strips. At the other fuse strips 13 connected to the first by busbars 14, 14 T , 14 ″, there are consumer connections.

Für die Montage einer zusätzlichen Sicherungsleiste 13 unter Spannung ist die neuerungsgemäße Haube 16 vorgesehen. Die Haube l6 weist über Kopf (l6l) Klemmstücke 162, l63f auf, auf die die Sicherungsklemmen 131 derSicherungsleiste 13 aufschiebbar sind. Außerdem sind an derDeckplatte l6l der Haube l6 eine Mehrzahl sich über die Tiefe der Haube l6 erstreckenden, von außen zugänglichen Führungshülsen l63, 164 vorgesehen, von denen drei (163) mit den SammelschienenThe hood 16 according to the innovation is provided for the installation of an additional fuse strip 13 under tension. The hood l6 has overhead (l6l) clamping pieces 162, l63 f , onto which the securing clamps 131 of the securing strip 13 can be pushed. In addition, a plurality of externally accessible guide sleeves 163, 164 extending over the depth of the hood 16 are provided on the cover plate 16l of the hood 16, three of which (163) with the busbars

I I I I I 4I I I I I. 4th

I < II <I

l4, l4*, 14" fluchtende Hülsen sind und zwei (l64) mit den Tragleisten 12, 12' des Ständers 11, 12, 121 fluchtende Hülsen. Griffstücke 166 ermöglichen die Handhabung der Haube 16.14, 14 *, 14 "are aligned sleeves and two (l64) with the support strips 12, 12 'of the stand 11, 12, 12 1 aligned sleeves. Grips 166 enable the handling of the hood 16.

Zur Montage wird die zu montierende Sicherungsleiste 15 in die Haube 16 eingefügt, wobei die mit den Klemmstücken l62 der Haube 16 korrespondierenden Sicherungsklemmen 132 der Sicherungsleiste 13 eine Klemmverbindung zwischen Haube l6 und Sicherungsleiste 1? herstellen. Sodann wird die die Sicherungsleiste IJ enthaltende Haube 16 mit Hilfe der Griffstücke 166 aufgenommen und gegen das Traggertist 11, 12, 12* zur Anlage gebracht, wobei sich die FUhrungshülsen l63 mit ihrem freien Ende, dessen Mantelfläche teilweise ausgeklinkt ist (1631), zwischen die Wandungen IJl des Trägers für die Sicherungsklemmen 132 erstrecken. Danach werden mit Hilfe eines isolierten, in die PUhrungshülsen 163, 164 einzuführenden Schraubenschlüssels 17 zunächst die Schraubverbindungen zwischen der Sicherungsleiste 13 und den Tragleisten 12, 121 hergestellt und sodann die Schraubverbindungen zwischen der Sicherungsleiste 13 und den Sammelschienen 14, l4f, l4". Nach der Montage der Sicherungsleiste 13 wird die Haube l6 im Sinne des Pfeiles A in Figur 3 abgezogen.For assembly, the fuse strip 15 to be assembled is inserted into the hood 16, the fuse clamps 132 of the fuse strip 13 corresponding to the clamping pieces l62 of the hood 16 forming a clamping connection between the hood l6 and the fuse strip 1? produce. Then the hood 16 containing the fuse strip IJ is picked up with the help of the grips 166 and brought to bear against the support device 11, 12, 12 *, the guide sleeves 163 with their free end, the outer surface of which is partially notched (1631), between the Walls IJl of the carrier for the fuse clips 132 extend. Then with the help of an insulated wrench 17 to be inserted into the PUhrungshülsen 163, 164 first the screw connections between the fuse strip 13 and the support strips 12, 12 1 and then the screw connections between the fuse strip 13 and the busbars 14, 14 f , 14 ". After the assembly of the fuse strip 13, the hood 16 is pulled off in the direction of arrow A in FIG.

Claims (6)

1. Montagehilfe für NH-Sicherungsleisten, gekennzeichnet" -· durch eine über die Sicherungsleiste (13) stülpbare Haube (l6) aus nicht leitendem Material mit mindestens zwei sich in Klemmen (132) der Sicherungsleiste (13) einfügenden Klemmstücken (l62) an der Deckplatte (I61) und von der Deckplatte (I61) ausgehenden, von außen zugänglichen PUhrungshülsein (I63) für einen isolierten Schraubenschlüssel zum Herstellen bzw. Lösen der Schraubverbindungen zwischen Sicherungsleiste (13) und Bestandteil eines Verteilungssystems bildenden, unter Spannung stehenden Sammelschienen (14, 14·', 14") sowie mindestens einem von außen auf die Deckplatte (161) aufgesetzten Griffstück (I66).1. Assembly aid for NH fuse strips, marked "- · by a hood (l6) made of non-conductive material that can be slipped over the fuse strip (13) with at least two clamping pieces (l62) inserted into the terminals (132) of the fuse strip (13) on the Cover plate (I61) and from the cover plate (I61), externally accessible Phrungshülsein (I63) for an insulated wrench for making or loosening the screw connections between the fuse strip (13) and part of a distribution system, energized busbars (14, 14 · ', 14 ") and at least one handle (I66) placed on the cover plate (161) from the outside. 2. Montagehilfe nach Anspruch l, dadurch gekennzeichnet, daß zusätzlich SchlüsselfUhrungshülsen (l64) für die Verbindungen zwischen Sicherungsleisten (13) und Bestandteil des tragenden Gerüstes des Verteilungssystems bildenden Tragleisten (12, 12*) vorgesehen sind.2. Assembly aid according to claim l, characterized in that additional key guide sleeves (l64) for the connections between fuse strips (13) and component of the supporting structure of the distribution system forming support strips (12, 12 *) are provided. 3. Montagehilfe nach den Ansprüchen 1 und 2, dadurch gekennzeichnet, daß in der Haube (16) Klemmstücke (lo2) für die außen liegenden Sicherungsklemmen (132) der Sicherungsleiste (15) angeordnet sind.3. Assembly aid according to claims 1 and 2, characterized in that that in the hood (16) clamping pieces (lo2) for the external fuse clips (132) of the fuse strip (15) are arranged. 4. Montagehilfe nach den Ansprüchen 1 bis 3, dadurch gekennzeichnet, daß die Stoßkanten der Haube (16) mit der Stoßfläche der in sie eingefügten Sicherungsleiste (13) fluchtet. 4. Assembly aid according to claims 1 to 3, characterized in that that the abutting edges of the hood (16) is aligned with the abutment surface of the fuse strip (13) inserted into it. 5. Montagehilfe nach den Ansprüchen 1 bis 4, dadurch gekennzeichnet, daß die Mantelfläche der sich im wesentlichen über die Tiefe der Haube (16) erstreckenden Führungshülsen (162) am freien Ende zwecks Reduzierung des Platzbedarfs ausgeklinkt ist (1631).5. Assembly aid according to claims 1 to 4, characterized in that that the outer surface of the guide sleeves extending essentially over the depth of the hood (16) (162) is notched at the free end in order to reduce the space requirement (1631). 6. Montagehilfe nach den Ansprüchen 1 bis 5, dadurch gekennzeichnet, daß insbesondere die Haube (16) aus durchsichtigem Material besteht.6. Assembly aid according to claims 1 to 5, characterized in that that in particular the hood (16) consists of transparent material.
DE19737315040 1973-04-19 1973-04-19 Assembly aid for NH fuse strips Expired DE7315040U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19737315040 DE7315040U (en) 1973-04-19 1973-04-19 Assembly aid for NH fuse strips

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19737315040 DE7315040U (en) 1973-04-19 1973-04-19 Assembly aid for NH fuse strips

Publications (1)

Publication Number Publication Date
DE7315040U true DE7315040U (en) 1973-08-09

Family

ID=6638192

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19737315040 Expired DE7315040U (en) 1973-04-19 1973-04-19 Assembly aid for NH fuse strips

Country Status (1)

Country Link
DE (1) DE7315040U (en)

Similar Documents

Publication Publication Date Title
DE7315040U (en) Assembly aid for NH fuse strips
DE733462C (en) Multiple clamps for fastening parallel running electrical cables to a wall at a distance from this and from each other by means of conductor carriers made of insulating material lined up next to one another on a retaining rail of C-shaped cross-section, which are secured by fastening means, e.g. be held in their clamping position by sliding fastening pieces at each end of the support rail
DE2838371C2 (en) Multiple earthing contact busbar
DE8235062U1 (en) Control cabinet with a base divided into at least two sub-panels
DE102013201603C5 (en) Apparatus and method for feeding small parts at installation locations
DE834260C (en) Housings, especially for electrical devices
DE3206417C2 (en) Busbar holders made of insulating material that can be lined up next to one another
DE3008197A1 (en) Wall fitting for socket with cable entries diagonally opposite - consists of hollow truncated cone with projecting prongs and spring-loaded blades
DE1575295A1 (en) Device for fixing devices on a plate according to variable combinations
DE2946621C2 (en) Work table with a channel containing at least one electrical connection device
DE2238126B2 (en) Cable entry with strain relief
DE838150C (en) Terminal for electric batteries and accumulators
CH344463A (en) Junction box for electrical installations
CH503395A (en) Distribution box for electrical installations
DE752837C (en) Counter or distribution board made of molded insulating material for electrical house electricity networks. like
DE1789641U (en) DEVICE FOR ADJUSTING FASTENING BRACKETS IN ELECTRIC COUNTER CABINETS, DISTRIBUTION PANELS OD. DGL.
DE7911315U1 (en) Device for the temporary secure connection of consumer cables in cable distribution facilities
DE7601370U1 (en) Snap fastening device for electrical equipment
DE2201805C3 (en) Mast boom
DE2418028A1 (en) CONNECTING DEVICE FOR ELECTRIC DISTRIBUTION BOXES
DE1515539A1 (en) Fixing device for electrical connections
DE7237332U (en) Contact clamp
DE1278585B (en) Device to ensure the correct mutual position of flush-mounted installation devices
DE6942373U (en) STRAIN RELIEF DEVICE FOR CONNECTING CABLE
DE1690482U (en) LABORATORY TABLE.