DE707714C - Formwork scaffolding for reinforced concrete masts to be produced at the installation site - Google Patents

Formwork scaffolding for reinforced concrete masts to be produced at the installation site

Info

Publication number
DE707714C
DE707714C DEG95600D DEG0095600D DE707714C DE 707714 C DE707714 C DE 707714C DE G95600 D DEG95600 D DE G95600D DE G0095600 D DEG0095600 D DE G0095600D DE 707714 C DE707714 C DE 707714C
Authority
DE
Germany
Prior art keywords
reinforced concrete
produced
scaffolding
installation site
masts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEG95600D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ingg A & G Ghira
Original Assignee
Ingg A & G Ghira
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ingg A & G Ghira filed Critical Ingg A & G Ghira
Application granted granted Critical
Publication of DE707714C publication Critical patent/DE707714C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Description

Schalungsgerüst für am Ort der Aufstellung herzustellende Eisenbetonmaste Pfahlartige Eisenbetonmaste werden bisher meist nicht am Ort der Aufstellung hergestellt, sondern als fertige Maste von der Herstellungsstätte zum Verwendungsort gebracht und dort aufgerichtet. Dies ist für große Maste nicht geeignet, da die Schwierigkeiten und Kosten der Heranschaffung und der sicheren Aufstellung zu groß werden.Formwork scaffolding for reinforced concrete masts to be produced on site Pile-like reinforced concrete masts have so far mostly not been produced at the place of installation, but brought as finished masts from the manufacturing site to the place of use and erected there. This is not suitable for large masts because of the difficulties and costs of procurement and safe installation become too great.

Man hat deshalb schon versucht, große Eisenbetonmaste am. Wrwendungsort: herzustellen und da-bei Holzformen verwendet, wobei man entsprechend dem schrittweisen Fortschreiten zu größeren Höhen an die Verschalung schräge Streben anlegte oder Spannseile anbrachte, die im Boden verankert waren. Durch dieses nachträgliche Anbringen von Streben oder Spannseilen -und infolge der auftretenden Windkräfte gelangt man jedoch nicht mit Sicherheit zu einwandfreien geraden Pfahlmasten.Attempts have therefore already been made to erect large reinforced concrete poles at the place of application: to manufacture and use wooden molds, step-by-step Progressing to greater heights applied to the cladding inclined struts or Attached tension ropes that were anchored in the ground. By this subsequent attachment from struts or tension ropes - and as a result of the wind forces that occur one arrives but not with certainty to perfect straight pole masts.

Gemäß der Erfindung wird die Aufgabe der Errichtung großer Eisenbetonmaste dadurch gelöst, daß zuerst aus dem äußeren Teil der eisernen Formkästen für den Eisenbetonmast und aus zwei Hüfsstützen ein dreiseitiges standfestes Baugerüst gebildet wird und daß sodann die inneren Formkastentefle des Mastes von unten beginnend an die äußeren Formkastenteile angeschlossen werden', worauf die sich jeweils bildenden Hohlräume fortschreitend mit Beton gefüllt werden.According to the invention, the task of erecting large reinforced concrete poles is solved in that first from the outer part of the iron molding boxes for the Reinforced concrete mast and a three-sided, stable scaffolding formed from two hip supports and that then the inner molding box part of the mast starting from the bottom the outer molding box parts are connected ', whereupon the respective forming Cavities are progressively filled with concrete.

Da die Formkastenteile selbst eine der Stützen des Baugerüsts bilden, wird wenig Gerüstmaterial gebraucht, und da das Baugdrüst, welches zugleich die Schalung des Mastes umfaßt, durchaus standfest ist, wird ein einwandfrei gerader Mast erstellt.Since the molding box parts themselves form one of the supports of the scaffolding, Little scaffolding material is needed, and since the scaffolding, which is also the Formwork of the mast includes, is quite stable, a perfectly straight one Mast created.

In der Zeichnung ist der Erfindungsgegenstand,dargestellt, und zwar zeigt Abb. i im Aufriß ein Gerüst für i#inen Mast ohne Fundamentblock; Abb. ia zeigt dasselbe Gerüst für einen Mast mit Fundamentblock; Abb. 2 und 2a zeigen dieselben Gerüste im Grundriß; Abb. 3 zeigt einen waagerechten Schnitt durch einen Formkasten; Abb. 4 zeigt eine Einzelheit des untersten Formkastens.In the drawing, the subject of the invention is shown, namely Fig. I shows in elevation a frame for a mast without a foundation block; Fig. Ia shows the same frame for a mast with a foundation block; Fig. 2 and 2a show the same scaffolding in plan; Fig. 3 shows a horizontal section through a molding box; Fig. 4 shows a detail of the bottom molding box.

Bei der Herstellung eines Mastes, z. B. für elektrische Leitungen, wird zunächst eine Grube i ausgehoben, in welcher entweder ein Fundamentblock aus Beton hergestellt .c !er in welcher der Mast ohne Fundament erstellt wird. Die äußeren Teile A der Formkästen, -#on denen einer in Abb. 3 im Schnitt dargestellt ist, bilden die Hauptstütze des Gerüstes. Diese wird mit den beiden Hilfs- stützen 2 durch Streben und Absteifungen, und 4 zu einem standfesten Gerüst verb Falls, wie in Abb. i dargestellt, der Masu- Fundamentblock erstellt wird, füllt in nächst den untersten Formkasten 5 mit Betoh7 aus und entfernt nach dem Abbinden die untersten Formkast#enteile, worauf dann die Grube aufgefüllt wird.When making a mast, e.g. B. for electrical lines, first a pit i is dug, in which either a foundation block made of concrete. C! He in which the mast is created without a foundation. The outer parts A of the molding boxes, one of which is shown in section in Fig. 3 , form the main support of the framework. This is done with the two auxiliary support 2 by struts and braces, and 4 verb to a stable framework If, as shown in Fig. I, the Masu Foundation block is created, fills in Next, remove the lowest molding box 5 with Betoh7 and after it has set, remove the lowest molding box parts, whereupon the pit is filled.

Für die Hilfsstützen bedarf es keiner Baugrube. Sie können, wie in Abb. i gezeigt, mit einem auf den Grund aufgesetzten Block 6 verbunden werden. Die Erstellung des Baugerüstes für den Mast erfolgt nun von Knotenpunkt zu Knotenpunkt durch Verbindung der äußeren TeileA der Forinkästen des Mastes mit den durchgehenden Hilfsstätzen. An den Knotenpunkten selbst sind die Teile A unter sich durch nicht dargestellte Steckverschlüsse verbunden. Nach FertigsteUung des ganzen Gerüstes wird nun das innere Formkastenstück B mit Bindedraht oder sonst auf einfache Weise mit dem Teil A verbunden, worauf mit dem Einbringen der Bewehrungseigen und dem Einfällen des Betons begonnen werden kann. Schrittweise nach oben fortschrei- gf.-nd wird somit der Mast an Ort und Stelle W. - 126-rgestellt, ohne daß er während der Her- We'11ung irgendwelchen Erschütterungen aus- gesetzt wird. Auf die waagerechten Eisen 3 des Gerüstes werden nach Bedarf Bretter als Arbeitsbühne für die Arbeiter aufgelegt. Die Formkästen und Gerüstteile aus Eisen werden immer wieder verwendet.No construction pit is required for the auxiliary supports. As shown in Fig. I, they can be connected to a block 6 placed on the ground. The construction of the scaffolding for the mast is now carried out from node to node by connecting the outer partsA of the forin boxes of the mast with the continuous auxiliary posts. At the nodes themselves, the parts A are connected to one another by snap fasteners (not shown). After the entire framework has been completed, the inner molding box piece B is now connected to part A with binding wire or otherwise in a simple manner, whereupon the introduction of the reinforcement properties and the collapse of the concrete can begin. Progress upwards step by step If necessary, the mast will be in place W. - 126-established without being From any shocks. is set. Boards are placed on the horizontal iron 3 of the scaffolding as a work platform for the workers. The molding boxes and frame parts made of iron are used again and again.

Claims (1)

PATENTANSPRUCH : Schalungsgerüst für am Ort der Aufstellung herzustellende Eisenbetonmaste, dadurch gekennzeichnet, -daß der eine Teil (A) des aus mehreren Schüssen bestehenden zweiteiligen Formkastens mit zwei Stützen durch Streben und Absteifungen (3, 4) zu einem dreiseitigen Gerüst verbunden ist und der zweite Teil (B) des Formkastens am ersten Teil lösbar befestigt ist.PATENT CLAIM : Formwork scaffolding for reinforced concrete masts to be produced at the installation site, characterized in that one part (A) of the two-part molding box consisting of several sections is connected to two supports by struts and stiffeners (3, 4) to form a three-sided structure and the second Part (B) of the molding box is releasably attached to the first part.
DEG95600D 1935-03-23 1936-01-21 Formwork scaffolding for reinforced concrete masts to be produced at the installation site Expired DE707714C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
IT707714X 1935-03-23

Publications (1)

Publication Number Publication Date
DE707714C true DE707714C (en) 1941-07-01

Family

ID=11314330

Family Applications (1)

Application Number Title Priority Date Filing Date
DEG95600D Expired DE707714C (en) 1935-03-23 1936-01-21 Formwork scaffolding for reinforced concrete masts to be produced at the installation site

Country Status (1)

Country Link
DE (1) DE707714C (en)

Similar Documents

Publication Publication Date Title
DE707714C (en) Formwork scaffolding for reinforced concrete masts to be produced at the installation site
DE371180C (en) Process for the manufacture of reinforced concrete structures
DE557473C (en) Method of manufacturing reinforced concrete chimneys with rigid iron inserts
AT150932B (en) Method and device for the production of reinforced concrete masts or reinforced concrete lattice masts.
DE631553C (en) Process for the production of beamless reinforced concrete cups
AT118011B (en) Formwork for ring structures.
DE673652C (en) Process for the production of reinforced concrete lattice masts
CH330032A (en) Shoring for a formwork for the production of building parts, in particular of ceilings in reinforced concrete construction
DE510831C (en) Pull-up formwork
DE481753C (en) Junction connection for wooden trusses
DE872109C (en) Portal mast for electrical high-voltage lines
DE872850C (en) Half-timbered framework for building elevators
DE606876C (en) Process and core formwork for the production of hollow stone ceiling beams
DE817207C (en) Process for the production of reinforced concrete skeleton structures from prefabricated parts
DE502269C (en) Concrete iron framework wall for one or multi-storey buildings
DE454414C (en) Method of manufacturing reinforced concrete rib masts using centrifugal molds
AT165177B (en) Portal mast for electrical high-voltage lines
DE842708C (en) Assembly construction method
AT158553B (en) Process for the production of reinforced concrete hollow poles.
DE966419C (en) Alignment device for large containers filled with liquid, especially for water basin gas containers
AT158233B (en) Process for the production of a supporting frame for formwork walls of reinforced concrete masts, in particular for electrical overhead lines.
DE945117C (en) Precast concrete stairs
DE439169C (en) Shield-like hiking formwork
GB461722A (en) Method for the manufacture of reinforced concrete masts
DE831764C (en) Reinforced concrete I-beam and process for its manufacture