DE536879C - Process for the production of concrete bases lying below the earth's surface - Google Patents

Process for the production of concrete bases lying below the earth's surface

Info

Publication number
DE536879C
DE536879C DEST45669D DEST045669D DE536879C DE 536879 C DE536879 C DE 536879C DE ST45669 D DEST45669 D DE ST45669D DE ST045669 D DEST045669 D DE ST045669D DE 536879 C DE536879 C DE 536879C
Authority
DE
Germany
Prior art keywords
production
earth
concrete
box
trench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEST45669D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Publication date
Priority to DEST45669D priority Critical patent/DE536879C/en
Application granted granted Critical
Publication of DE536879C publication Critical patent/DE536879C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)

Description

Verfahren zur Herstellung von unter der Erdoberfläche liegenden Betonsockeln Mauerwerkssockel von Gartenmauern, Gartenhäuschen, Stallungen, einstöckigen Gebäuden, wie überhaupt von Bauwerken, die keinen hohen spezifischen Druck auf ihre Grundmauern ausüben, lassen sich nach dem nachstehend beschriebenen Verfahren für etwa die Hälfte der bisher erforderlichen Herstellungskosten ausführen. Bis jetzt pflegte man den Mauerwerkssockel bei solchen Bauwerken in seiner ,tanzen Tiefe mit Rücksicht auf die Schaufelbreite und den im Graben stehenden Arbeiter etwa 3o cm breit auszuführen. Die Menge des für einen solchen Sockel verwandten Stampfbetons betrug z. B. bei einer Sockellänge von i m und einer Tiefe von o,8 m bei 0,3 m Breite i # 0,8 # 0,3 == 0,24 cbm. Die Herstellung von Mauerwerkssockeln unter Benutzung entfernbarer Verschalungen, wie sie bei der Ausführung größerer Bauwerke allgemein üblich sind, kommt infolge der verhältnismäßig hohen Unkosten, die die Verschalungen :erfordern, meist für Leichtbauten obengenannter Art nicht in Frage.Process for the production of underground concrete bases Masonry bases of garden walls, garden sheds, stables, one-story buildings, as in general for buildings that do not have a high specific pressure on their foundation walls can be exercised for about half by following the procedure described below execute the production costs previously required. Up until now it has been looked after Masonry plinths in such structures in its depth dance with consideration make the shovel width and the worker standing in the trench about 30 cm wide. The amount of stamped concrete used for such a base was z. B. at a base length of 1 m and a depth of 0.8 m with a width of 0.3 m i # 0.8 # 0.3 == 0.24 cbm. The manufacture of masonry plinths using removable ones Cladding, as it is generally used in the execution of larger structures, comes as a result of the relatively high costs that the formworks require: mostly out of the question for lightweight constructions of the type mentioned above.

Das nachstehend beschriebene erfindungsgemäße Verfahren verbilligt die Herstellung wie folgt: Nach erfolgtem Ausheben des Erdreiches, das mit Rücksicht auf die Schaufelbreite wie bisher in einer Breite von etwa 0,3 m geschieht, wird ein besonders für diesen Zweck angefertigter Kasten in die Mitte des, Grabens gestellt. Dieser Kasten kann eine Fußbreite von etwa io cm, eine Kopfbreite in Flurhöhe von etwa 2o cm bei beliebiger Länge besitzen. Er füllt den ausgehobenen Graben nur zum Teil aus. In den Raum zwischen Kasten und Grabenwand wird ein Teil der vorher ausgehobenen Erde geworfen und festgestampft. Sodann wird der Kasten im Graben um seine eigene Länge verschoben und der dadurch frei gewordene Hohlraum mit Beton ausgefüllt, worauf sich der beschriebene Arbeitsvorgang bis zur Fertigstellung des Sockels wiederholt. Verschiebbare bzw. herausziehbare Schalungen sind an sich nicht mehr neu und finden z. B. bei der Herstellung von mehrschichtigen Wänden aus verschiedenen Betonarten Anwendung. Mit verschiebbaren Schalungen werden hier die einzelnen Betonsorten auseinandergehalten und vor dem Vermischen geschützt.The method according to the invention described below makes production cheaper as follows: After the earth has been excavated, which takes place with a width of about 0.3 m as before, taking into account the width of the shovel, a box specially made for this purpose is placed in the middle of the trench posed. This box can have a foot width of about 10 cm, a head width at floor level of about 20 cm with any length. It only partially fills the dug out trench. Part of the previously excavated earth is thrown and pounded into the space between the box and the trench wall. The box is then moved by its own length in the trench and the cavity that has become free is filled with concrete, whereupon the process described is repeated until the base is completed. Slidable or pull-out formwork is no longer new per se and can be found e.g. B. in the production of multi-layer walls from different types of concrete application. With sliding formwork, the individual types of concrete are kept apart and protected from mixing.

Das erfindungsgemäße Verfahren hat sich dagegen zur Aufgabe gestellt, die Betonsockel von Kleinbauten wirtschaftlicher herzustellen als bisher.The method according to the invention, on the other hand, has set itself the task of to produce the concrete base of small buildings more economically than before.

Nach diesem Verfahren wird für einen i,o m langen Sockel von o,8 m Tiefe, o, i in Fuß- und o,2 m Kopfbreite z # o,8 . °'2 -E- o,' 2 - o, 12 cbm Beton benötigt, während der in der bisher gebräuchlichen Art hergestellte Sockel gleicher Länge und Tiefe nach oben angeführtem Beispiel o,24 cbm Beton, inithin die doppelte Menge erforderte.According to this procedure, for an i, om long base of 0.8 m depth, o, i in foot width and 0.2 m head width z # o.8. ° '2 -E- o,' 2 - o, 12 cubic meters of concrete required, while the base of the same length and depth produced in the manner customary up to now, in the above example, 0.24 cubic meters of concrete, required twice the amount.

Bei Holzhäusern, Gartenhäuschen, Stallungen, Scheunen, Gartenmauern, überhaupt Bauwerken, deren aufgehendes Mauerwerk nur etwa einen halben Ziegelstein breit gehalten wird, läßt sich die vorstehend nachgewiesene Ersparnis noch vergrößern, weil dann die Kopfbreite des Sockels nur etwa 15 cm betragen braucht.In the case of wooden houses, garden sheds, stables, barns, garden walls, structures in general, whose rising masonry is only about half a brick wide, the savings shown above can be increased because the head width of the base then only needs to be about 1 5 cm.

Hierzu tritt noch eine weitere Ersparnis, die sich durch die verminderte Beseitigung der beim Grabenbau ausgehobenen Erde ergibt, weil ein Teil der letzteren wieder'in dem Raum zwischen Kasten und Grabenwand verschwindet und daher nicht abgefahren zu werden braucht. Auch hierfür beträgt bei dem neuen Verfahren die Ersparnis an abzufahrender ausgehobener Erde die Häffte.In addition, there is another saving, which is reduced by the Removal of the earth excavated during trenching results because part of the latter again disappears in the space between the box and the ditch wall and therefore does not leave needs to become. Here, too, the savings are made with the new process excavated earth to be driven off the port.

Die Zeichnung stellt in Fig. i einen Sokkelquerschnitt nach dem neuen Verfahren dar, während Fig.2 und 3 den Formkasten veranschaulichen. a ist der in den Graben einzulassende Formkasten, b sind an ihm befestigte Stangen, die zum Anfassen dienen.The drawing shows in Fig. I a base cross-section according to the new Process, while Figures 2 and 3 illustrate the molding box. a is the in the trench to be let in molding box, b are attached to it rods that can be touched to serve.

Claims (1)

PATENTANSPRUCH: Verfahren zur Herstellung von unter der Erdoberfläche liegenden Betonsockeln, dadurch gekennzeichnet, daß in den in bekannter Weise ausgehobenen Graben ein Formkasten (a) eingelassen wird, dessen Ouerschnitt kleiner als der des Grabens ist, worauf der nicht durch den Kasten (a) ausgefüllte Grabenraum (b) mit Erde ausgestampft und schließlich nach Entfernung des Kastens (a) der von ihm vorher eingenommene Raum mit Beton, an dessen Stelle auch Kies, Schotter u. dgl. treten kann, ausgefüllt wird.PATENT CLAIM: Process for the production of underground lying concrete bases, characterized in that in the excavated in a known manner Dig a molding box (a), the cross-section of which is smaller than that of the Trench is whereupon the trench space (b) not filled by box (a) with Stomped out earth and finally after removing the box (a) that of it before occupied space with concrete, in its place also gravel, gravel and the like can be filled out.
DEST45669D Process for the production of concrete bases lying below the earth's surface Expired DE536879C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEST45669D DE536879C (en) Process for the production of concrete bases lying below the earth's surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEST45669D DE536879C (en) Process for the production of concrete bases lying below the earth's surface

Publications (1)

Publication Number Publication Date
DE536879C true DE536879C (en) 1931-10-28

Family

ID=7464949

Family Applications (1)

Application Number Title Priority Date Filing Date
DEST45669D Expired DE536879C (en) Process for the production of concrete bases lying below the earth's surface

Country Status (1)

Country Link
DE (1) DE536879C (en)

Similar Documents

Publication Publication Date Title
DE1947249C3 (en) Method for producing a diaphragm wall in the ground and prefabricated part for carrying out the method
DE536879C (en) Process for the production of concrete bases lying below the earth's surface
DE2204518C3 (en) Method of making a floor-to-ceiling prefabricated sanitary block
DE4119259A1 (en) Method for constructing basements under existing building - uses root piles to underpin existing load-bearing walls for construction of concrete ceiling, foundation blocks, support columns
CH354237A (en) Building block used for the production of formwork-free concrete masonry
CH585823A5 (en) Concrete foundation for waterlogged ground - uses preliminary foundation walls and extending baseplate to form trough
DE882907C (en) Method for building a formwork for the production of reinforced concrete rib ceilings
CH275110A (en) Shaped stone.
DE536160C (en) Process for the production of hollow beams for reinforced concrete rib ceilings
DE593664C (en) Installation on caissons for the foundation of structures
DE805072C (en) Process for the erection of building walls made of concrete
DE4025176A1 (en) Basement construction in water-bearing ground - has frame for walls constructed, lowered and soil is pumped out
AT203705B (en) Process for the production of plastering on walls in cast concrete or brickwork
DE551172C (en) Process for preparing the subsoil of concrete pavements
AT66916B (en) Process for the production of reinforced concrete under water.
DE427777C (en) Method for filling the workspace of sunken structures
DE3210186C2 (en)
DE609976C (en) Process for the production of a watertight construction pit enclosure
CH245930A (en) Pressed concrete construction process for the production of building structures under water.
CH391264A (en) Process for the production of a basement light shaft on a building, as well as a basement light shaft produced according to this process
DE599787C (en) Process for the production of bored piles with a widened pile base
DE710573C (en) Process for the production of shafts, shaft wells, pipe wells or the like.
DE751954C (en) Method of manufacturing hollow concrete masonry
AT337958B (en) CONNECTION FOR BRICKS, IN PARTICULAR HIGH-HOLE BRICKS, ASSEMBLED PRE-FABRICATED PARTS
DE609238C (en) Method for producing a sufficiently watertight construction pit enclosure within the soil surrounding the pit