DE4235544C1 - Blockhouse wall - Google Patents
Blockhouse wallInfo
- Publication number
- DE4235544C1 DE4235544C1 DE19924235544 DE4235544A DE4235544C1 DE 4235544 C1 DE4235544 C1 DE 4235544C1 DE 19924235544 DE19924235544 DE 19924235544 DE 4235544 A DE4235544 A DE 4235544A DE 4235544 C1 DE4235544 C1 DE 4235544C1
- Authority
- DE
- Germany
- Prior art keywords
- beams
- fixed
- wall
- support post
- blockhouse
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/70—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of wood
- E04B2/701—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of wood with integrated supporting and obturation function
- E04B2/702—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of wood with integrated supporting and obturation function with longitudinal horizontal elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
- Joining Of Building Structures In Genera (AREA)
Description
Die Erfindung betrifft eine Blockhauswand mit den im Ober begriff des Anspruchs 1 angegebenen Merkmalen.The invention relates to a block house wall with in the upper Concept of claim 1 specified features.
Aus der US 2 387 659 ist es bekannt, Blockhauswände als Fertigteile vorzumontieren, um die Errichtung eines Block hauses zu vereinfachen. Bei diesen vormontierten Wänden sind aus zwei oder drei Balken zusammengenagelte Balkengruppen mit Nut und Feder übereinandergefügt und mit einer von unten bis oben durchgehenden Bohrung versehen, durch welche eine Spann schraube gesteckt wird, mit der die einzelnen Gruppen dann zur gesamten Wand als Fertigteil zusammengeschraubt werden.From US 2,387,659 it is known to use blockhouse walls Pre-assemble prefabricated parts to build a block simplify house. These are pre-assembled walls with two or three beams nailed together Tongue and groove joined together and with one from the bottom up through hole provided through which a clamping screw, with which the individual groups then can be screwed together as a finished part to form the entire wall.
Bei aus Balken zusammengefügten Wänden kommt es beim Altern der Holzbalken häufig zu Schwunderscheinungen mit der Folge, daß die aufeinanderliegenden Balken nach unten durchsacken, das Blockhaus sich also setzt. Wird eine solche Holzkonstruk tion mit Mauerwerk kombiniert, so ergeben sich Verschiebungen einzelner Teile des Bauwerks gegeneinander mit häufig uner wünschten Folgen. Sind z. B. Innenwände gefliest und senkt sich die äußere Holzwand, so lösen sich die Fliesen von der Wand. Ferner ergeben sich Probleme bei Steigleitungen, etwa für Wasser, Gas, oder als Abflußleitungen, die gegenüber der sich senkenden Holzkonstruktion starr sind, so daß sich die Auslässe der Leitungen relativ zu der Holzkonstruktion ver schieben, wenn diese sich setzt. Ähnliches gilt für über das Dach hinausragende Entlüftungsrohre, gemauerte Kamine etc., wo infolge solcher Verschiebungen Undichtigkeiten am Dach entstehen. Setzen sich in Blockbauweise ausgeführte Giebel, so treten Verspannungen der Dachkonstruktion auf, die zu Schäden führen können, wenn man nicht aufwendige Gleitlage rungen zum Ausgleich vorsieht, welche gegenseitige Verschie bungen von Dach und Wandteilen des Blockhauses erlauben. In the case of walls assembled from beams, it occurs with aging the wooden beam often causes fading, that the beams lying on top of each other sag down, the log house is set. Will such a wooden structure tion combined with masonry, there are shifts individual parts of the building against each other with often un wanted consequences. Are z. B. tiled and lowered interior walls the outer wooden wall, the tiles detach from the Wall. There are also problems with risers, for example for water, gas, or as drain lines opposite the lowering wooden structure are rigid, so that the Ver outlets of the lines ver relative to the wooden structure push when it sits. The same applies to about that Ventilation pipes protruding from the roof, brick chimneys etc., where as a result of such shifts leaks on the roof arise. Gables made in block construction, so tensions in the roof structure occur Damage can result if you do not have an elaborate sliding layer provisions to compensate which mutual differences Allow exercises on the roof and wall parts of the log house.
Häufig waren im Rahmen der Herstellergarantie auch jahrelange aufwendige Serviceleistungen erforderlich, um den durch ein Setzen der Blockhauswände aufgetretenen Veränderungen Rech nung zu tragen, etwa Nacharbeiten an Fenster- und Türaus schnitten, Nachstellen von Spannschrauben, Ablassen von Stütz pfeilern usw.Often years were within the scope of the manufacturer's guarantee elaborate services required to ensure the through a Set changes to the log house walls wear, such as reworking window and door openings cut, readjust tensioning bolts, lower support pillars etc.
Der Erfindung liegt die Aufgabe zugrunde, Maßnahmen anzu geben, durch welche sich derartige unerwünschte Auswirkungen von Setzerscheinungen bei Blockhauswänden vermeiden lassen. Diese Aufgabe wird durch die im Kennzeichenteil des An spruchs 1 angegebenen Merkmale gelöst.The invention has for its object to take measures give through which such undesirable effects prevent signs of settlement from appearing on log walls. This task is performed by the in the label part of the To solved 1 specified characteristics.
Weiterbildungen der Erfindung sind in den Unteransprüchen gekennzeichnet.Further developments of the invention are in the subclaims featured.
Durch die Aufhängung einzelner Balken der Blockhauswand an Stützpfosten werden die betreffenden Balken in ihrer Höhen lage fixiert und können sich daher nicht senken. Auf diese Weise wird verhindert, daß sich die Absenkungen der einzel nen Balken von der Fundamentebene an aufwärts bis zum Dach aufsummieren, und zumindest im oberen Teil der Wand große Verschiebungen auftreten. Die Anzahl der Stützpfosten pro Wand richtet sich nach der jeweiligen Länge der Wand, bei nicht zu großen Grundrissen können zwei Stützpfosten pro Wand genügen. Die Anzahl der an den Stützpfosten zu fixierenden Balken richtet sich nach der für zulässig erachteten Toleranz für nurmehr partiell abschnittweise zwischen jeweils zwei fixierten Balken auftretende Senkungen und nach der Höhe der Wand. So können beispielsweise drei oder fünf Balken zu einer in sich verspannten Einheit oder Gruppe zusammengefaßt wer den, von denen ein Balken am Stützpfosten fixiert wird.By hanging individual beams on the blockhouse wall The posts in question will be the height of the beams in question fixed and therefore can not lower. To this This prevents the subsidence of the individual a beam from the foundation level up to the roof add up, and large at least in the upper part of the wall Shifts occur. The number of support posts per Wall depends on the respective length of the wall, at Two support posts per wall can not be too large are enough. The number of to be fixed to the support posts The bar is based on the tolerance that is considered permissible for only partial sections between two each fixed beams occurring subsidence and according to the amount of Wall. For example, three or five bars can be combined into one who are united in a tense unit or group the one of which a beam is fixed to the support post.
Die Verspannung mehrerer Balken zu einer solchen Balkengruppe kann beispielsweise mit Spannstreben in Form von Spannschrau ben erfolgen, welche die betreffenden Balken einer solchen Balkengruppe ebenso wie die Stützpfosten durchsetzen. Die an den Stützpfosten fixierten Balken verändern ihre Lage im Gefüge der Wand nicht, so daß an diesen Stellen keine Wand verschiebungen auftreten. Die Verschiebungen der nicht fixier ten Balken lassen sich auf diese Weise so klein wie gewünscht halten, um die oben genannten Probleme zu vermeiden.The bracing of several beams to form such a beam group can, for example, with tension struts in the form of a tension screw ben done, the relevant bars of such Push through the beam group as well as the support posts. The beams fixed to the support posts change their position in the Do not structure the wall so that there is no wall at these points shifts occur. The shifts of the non-fix The bars can be made as small as desired in this way hold to avoid the above problems.
Um infolge tolerierbarer Verschiebungen noch auftretende Spalte zwischen den Balkengruppen zu vermeiden, läßt sich gemäß einer Weiterbildung der Erfindung zwischen den in sich verspannten Balkengruppen eine Ausgleichsfuge vorsehen, wobei die einander zugewandten Balken benachbarter Balkengruppen mit Nut und Feder ineinandergreifen, so daß hier keine Spalt öffnung entsteht. Zur noch besseren Abdichtung kann zwischen Nutgrund und Feder ein elastischer Dichtstreifen eingefügt sein, der auch bei Spiel zwischen Nut und Feder für die Dicht heit der Wand sorgt und sich Abstandsänderungen zwischen Feder und Nutgrund anpaßt.To still occur due to tolerable shifts You can avoid gaps between the groups of bars according to a development of the invention between themselves tensioned beam groups provide a compensation joint, whereby the facing bars of neighboring bar groups interlock with tongue and groove so that there is no gap here opening arises. For even better sealing, you can choose between An elastic sealing strip is inserted into the groove base and tongue be the seal even when there is play between tongue and groove the wall and changes in distance between Adjust tongue and groove base.
Eine zweckmäßige Ausgestaltung der Erfindung besteht darin, daß die Stützpfosten aus Brettschichtholz in Form sogenannter Leimbinder hergestellt werden, womit sich eine sehr gute Formbeständigkeit in Längsrichtung der Stützpfosten erreichen läßt, so daß diese ihre Stützfunktion auch gut erfüllen, ohne sich selbst zu setzen. Solche Stützpfosten lassen sich problemlos mit rechteckigem Querschnitt herstellen, so daß sie gut durch die rechteckigen Durchbrechungen der Balken hin durchpassen. Die Fixierung der Balken an den Stützpfosten kann zweckmäßigerweise mit Hilfe von Querbolzen erfolgen, die den betreffenden Balken und den Stützpfosten durchsetzen.An expedient embodiment of the invention consists in that the support post made of glulam in the form of so-called Glue binders are made, which is a very good Achieve dimensional stability in the longitudinal direction of the support posts lets so that they also fulfill their support function well without to sit down yourself. Such support posts can be easily produce with a rectangular cross-section, so that through the rectangular openings in the beams fit through. Fixing the beams to the support posts can expediently be carried out with the aid of cross bolts, who push through the relevant beam and the support post.
Die Erfindung sei im folgenden anhand eines in den beiliegen den Figuren dargestellten Ausführungsbeispiels näher erläu tert. Es zeigen:The invention is based on one in the enclosed the figures shown embodiment explained in more detail tert. Show it:
Fig. 1 einen Grundriß eines Blockhauses mit gemäß der Er findung ausgebildeten Wänden; Fig. 1 is a plan view of a block house with walls designed according to the invention;
Fig. 2 einen Aufriß durch einen Teil einer Wand des Block hauses gemäß Fig. 1; und Figure 2 is an elevation through part of a wall of the block house of FIG. 1. and
Fig. 3 einen Querschnitt längs der Schnittlinie III-III aus Fig. 2. Fig. 3 is a cross section along the section line III-III in FIG. 2.
Der in Fig. 1 dargestellte Grundriß läßt vier Wände erken nen, die durch aufeinanderliegende Balken 2a bzw. 2b zusam mengefügt sind, wobei die kürzeren Balken 2a die Schmalseite und die längeren Balken 2b die Längsseite des Blockhauses bilden. An den Ecken des Blockhauses sind die Balken 2a, 2b mit Schwalbenschwanzverbindungen 4 zusammengesetzt. Üblicher weise liegt die unterste Balkenlage auf einem Fundament auf, das in den Zeichnungen jedoch nicht eigens veranschaulicht ist. In jedem Balken 2a, 2b sind beispielsweise zwei Durch brechungen 6 ausgebildet, und die Durchbrechungen sämtlicher übereinanderliegenden Balken bilden jeweils durchgehende senkrechte Kanäle. Diese Kanäle werden von je einem Stütz pfosten 8 durchsetzt, der in jeweils untersten und obersten Balken 2a, 2b mit Hilfe von Querbolzen 10 befestigt ist, wie Fig. 2 erkennen läßt, die ferner eine solche Fixierung auch eines mittleren Balkens 2b am Stützpfosten 8 zeigt.The floor plan shown in Fig. 1 can identify four walls that are joined together by beams 2 a and 2 b, the shorter bars 2 a forming the narrow side and the longer bars 2 b forming the long side of the log house. At the corners of the log house, the beams 2 a, 2 b are assembled with dovetail connections 4 . The lowest beam position is usually on a foundation, but this is not specifically illustrated in the drawings. In each bar 2 a, 2 b, for example, two openings 6 are formed, and the openings of all the bars lying one above the other form continuous vertical channels. These channels are each supported by a support post 8 , which is fastened in the bottom and top beams 2 a, 2 b with the aid of cross bolts 10 , as shown in FIG. 2, which also shows such a fixation also of a middle beam 2 b Support post 8 shows.
Ferner sieht man in Fig. 2 Spannstreben 12 in Form von Spannschrauben, mit denen jeweils mehrere Balken zusammenge spannt sind. So bilden die beiden obersten Balken in Fig. 2 eine Balkengruppe 9, die fünf mittleren Balken eine zweite Balkengruppe 11 und die drei untersten Balken schließlich eine dritte Balkengruppe 13. Da der oberste Balken am Stützpfosten 8 mit Hilfe der erwähnten Querbolzen 10 fixiert ist und der Stützbolzen nicht nachgibt, kann der oberste Balken nicht durchhängen, und über die Spannstrebe 12 ist damit auch die Position des zweitobersten Balkens durch Fixierung am ober sten Balken festgelegt und verändert sich ebenfalls nicht. Ebenso ist die Lage des viertuntersten Balkens durch Fixie rung mit Hilfe der Querbolzen 10 am Stützpfosten 8 fixiert, so daß dieser Balken seine Lage nicht ändern kann, und die vier über ihn befindlichen Balken, die mit der Spannstrebe 12 mit ihm zusammengespannt sind, bilden mit ihm die Balkengrup pe 11, die sich allenfalls etwas in sich setzen kann, wobei die Einzelbeiträge sich zu einem tolerierbaren Gesamtbeitrag summieren, der von einer Ausgleichsfuge 14 aufgenommen wird, die durch eine Nut- und Feder-Verbindung gebildet wird, wie dies Fig. 3 besser erkennen läßt. Die Nut ist dort mit 16 und die Feder mit 18 bezeichnet. In den Boden der Nut 16 ist ein elastischer Dichtstreifen 20 eingelegt, der den freien Raum zwischen Nutgrund und Feder 18 ausfüllt und auch bei Änderungen dieses Abstandes infolge seiner schwammartigen Elastizität für eine sichere Abdichtung sorgt.Furthermore, one can see in FIG. 2 tensioning struts 12 in the form of tensioning screws, with each of which several bars are tensioned together. The two uppermost bars in FIG. 2 form a bar group 9 , the five middle bars form a second bar group 11 and the three bottom bars finally form a third bar group 13 . Since the uppermost beam is fixed to the support post 8 with the aid of the cross bolts 10 mentioned and the support bolt does not yield, the uppermost beam cannot sag, and the tensioning strut 12 also fixes and changes the position of the second uppermost beam by fixing it to the uppermost beam not yourself either. Likewise, the position of the fourth bottom bar is fixed by fixation with the help of the cross bolts 10 on the support post 8 , so that this bar cannot change its position, and the four bars located above it, which are clamped together with the tension strut 12 with it, form with him the Balkengrup pe 11 , which can at best be a bit in itself, the individual contributions add up to a tolerable total contribution, which is taken up by a compensating joint 14 , which is formed by a tongue and groove connection, as shown in FIG. 3 shows better. The groove is designated 16 and the tongue 18 . In the bottom of the groove 16 , an elastic sealing strip 20 is inserted, which fills the free space between the base of the groove and the tongue 18 and ensures a secure seal even when this distance changes due to its spongy elasticity.
Claims (5)
daß die Durchbrechungen (6) der Balken (2a, 2b) langlochartig ausgebildet sind,
daß die Stützpfosten (8) einen zumindest näherungsweise recht eckigen Querschnitt aufweisen und den von den Durchbrechun gen (6) gebildeten Kanal durchsetzen,
und daß auf einen am Stützpfosten (8) fixierten Balken (2a, 2b) folgende, jeweils nicht am Stützpfosten (8) fixierte Balken mittels Spannstreben (12) mit dem fixierten Balken verspannt sind.1. Log house wall, which is assembled from superimposed beams, in which the beams have transverse to their longitudinal direction and in the wall plane extending openings, which in the assembled state form at least one continuous channel, which is set by a component, and in which the beams are clamped to one another, at least some of the beams being fixed to a support post, characterized in that
that the openings ( 6 ) of the beams ( 2 a, 2 b) are elongated,
that the support posts ( 8 ) have an at least approximately rectangular cross-section and penetrate the channel formed by the openings ( 6 ),
and that on a beam ( 2 a, 2 b) fixed to the support post ( 8 ), the following beams, each not fixed to the support post ( 8 ), are clamped to the fixed beam by means of struts ( 12 ).
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19924235544 DE4235544C1 (en) | 1992-10-21 | 1992-10-21 | Blockhouse wall |
EP93116996A EP0594157A1 (en) | 1992-10-21 | 1993-10-20 | Log cabin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19924235544 DE4235544C1 (en) | 1992-10-21 | 1992-10-21 | Blockhouse wall |
Publications (1)
Publication Number | Publication Date |
---|---|
DE4235544C1 true DE4235544C1 (en) | 1994-03-03 |
Family
ID=6471005
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19924235544 Expired - Fee Related DE4235544C1 (en) | 1992-10-21 | 1992-10-21 | Blockhouse wall |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0594157A1 (en) |
DE (1) | DE4235544C1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1043455A1 (en) * | 1999-04-08 | 2000-10-11 | GE & CO. S.A. | Log for chalet-type wooden constructions |
DE19920566C1 (en) * | 1999-05-05 | 2000-10-19 | Rainer Drechsler | Garden house has a locking unit for the upper planks at the corners with a vertical gap between the flat locking section and the upper surface of the upright post and a nut with a spring screwed to a spindle in the post |
DE10061833A1 (en) * | 2000-12-12 | 2002-07-04 | Juergen Lampatzer | Clamping device is for wall component and is composed of at least two individual components held together by guide component, locating points being provided on first and second sides of guide component |
FR2905962A1 (en) * | 2006-09-15 | 2008-03-21 | Chalets Et Maisons Bois Poirot | Wall constructing method for residence i.e. chalet, involves proceeding to modeling of wall during wall`s construction, and performing corrective actions for continuing with construction of wall if resulting deformation is acceptable |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE1015770A5 (en) * | 2003-11-06 | 2005-08-02 | Baekel Johan Van | Building wall construction system, comprises stacked profiled parts containing bores for reinforcing parts with specific length in relation to wall height |
ES2282002B1 (en) * | 2005-03-18 | 2008-08-01 | M. Del Carmen Pedrola Marques | SYSTEM OF EMBOSSING OF BOARDS FOR THE FORMATION OF STRUCTURES. |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2387659A (en) * | 1941-11-19 | 1945-10-23 | Martin O Hafsos | Building unit and construction |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1784746C3 (en) * | 1968-09-13 | 1974-03-14 | Carl Otto 5276 Wiehl Muellenschlaeder | Woodhouse |
US3742665A (en) * | 1971-05-24 | 1973-07-03 | M Larimer | Modular building construction |
DE2706485C3 (en) * | 1977-02-16 | 1981-06-11 | Wagner Handelshaus Gmbh, 5900 Siegen | Component composed of basic components for the creation of parapets, walls, borders, plant boxes and the like. |
FR2426779A2 (en) * | 1978-05-23 | 1979-12-21 | Bekaert Sa Nv | Fence type wall construction system - in which hollow blocks are clamped together using vertical angle iron bars and hooked brackets |
AU578763B2 (en) * | 1984-11-19 | 1988-11-03 | John Tilden | Log cabin |
FI891667A (en) * | 1989-04-07 | 1990-10-08 | Ismo Aatos Aittamaeki | FJAEDRANDE SPAENNBULT. |
-
1992
- 1992-10-21 DE DE19924235544 patent/DE4235544C1/en not_active Expired - Fee Related
-
1993
- 1993-10-20 EP EP93116996A patent/EP0594157A1/en not_active Withdrawn
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2387659A (en) * | 1941-11-19 | 1945-10-23 | Martin O Hafsos | Building unit and construction |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1043455A1 (en) * | 1999-04-08 | 2000-10-11 | GE & CO. S.A. | Log for chalet-type wooden constructions |
DE19920566C1 (en) * | 1999-05-05 | 2000-10-19 | Rainer Drechsler | Garden house has a locking unit for the upper planks at the corners with a vertical gap between the flat locking section and the upper surface of the upright post and a nut with a spring screwed to a spindle in the post |
EP1050635A2 (en) | 1999-05-05 | 2000-11-08 | Rainer Drechsler | Garden shed |
DE10061833A1 (en) * | 2000-12-12 | 2002-07-04 | Juergen Lampatzer | Clamping device is for wall component and is composed of at least two individual components held together by guide component, locating points being provided on first and second sides of guide component |
FR2905962A1 (en) * | 2006-09-15 | 2008-03-21 | Chalets Et Maisons Bois Poirot | Wall constructing method for residence i.e. chalet, involves proceeding to modeling of wall during wall`s construction, and performing corrective actions for continuing with construction of wall if resulting deformation is acceptable |
Also Published As
Publication number | Publication date |
---|---|
EP0594157A1 (en) | 1994-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0030622A1 (en) | Shoring plate for a trenching device | |
DE2338092A1 (en) | PROCEDURE FOR ASSEMBLING A LIGHT HOUSE COVER | |
DE4235544C1 (en) | Blockhouse wall | |
DE2616494C3 (en) | Lintel for bridging openings in cavity walls | |
DE9214307U1 (en) | Wall construction element and wall formed from it | |
DE4104402A1 (en) | Expansion joint construction with two metal bearer profiles - has gap between two frontally opposed bearer profiles filled with embedded rubber sealing strip and adhered in position | |
DE2836701C3 (en) | Prefabricated log house walls | |
DE2517532A1 (en) | BUILDING CONSTRUCTION | |
DE4237635C2 (en) | Kit for creating a floor of an exhibition or festival hall or tent | |
DE19912143B4 (en) | Component set for the construction of a greenhouse | |
EP0115881A1 (en) | Insulating element of synthetic material for the thermal insulation of a floor composed of multiple beams | |
DE60031169T2 (en) | FRAME STRUCTURE | |
DE29612763U1 (en) | Wooden house and blackboard intended for its production | |
AT396709B (en) | WINDOW BENCH AND METHOD FOR THEIR ASSEMBLY | |
DE29503328U1 (en) | platform | |
WO1997018374A1 (en) | Prefabricated window unit | |
DE2342883C3 (en) | External wall construction made of large panel elements | |
DE29616241U1 (en) | Solid wood wall element | |
DE8108110U1 (en) | ELEMENT FOR SUPPORTING FLOOR PANELS OR THE LIKE | |
DE3531254C2 (en) | ||
DE202007000018U1 (en) | Prefabricated framework module for constructing e.g. medium building, has vertical sticks and horizontal bars connected with each other at their ends by using mortise dowel joint, and mechanism receiving threaded bars | |
DE9003873U1 (en) | Wooden house in log cabin style | |
DE202004013200U1 (en) | Building has at least two building components which are detachably interconnected, each having floor frame and ceiling frame interconnected by supports, and with detachable and exchangeable panels in outer wall areas | |
DE10227564A1 (en) | Method for tiling roof using prefabricated large panels has the gaps between the vertical edges of the panels covered by special tiles which overlap the fixed tiles at both edges | |
DE7203095U (en) | Construction element for a building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8100 | Publication of the examined application without publication of unexamined application | ||
D1 | Grant (no unexamined application published) patent law 81 | ||
8364 | No opposition during term of opposition | ||
8339 | Ceased/non-payment of the annual fee |