DE3943367C1 DE19893943367 DE3943367A DE3943367C1 DE 3943367 C1 DE3943367 C1 DE 3943367C1 DE 19893943367 DE19893943367 DE 19893943367 DE 3943367 A DE3943367 A DE 3943367A DE 3943367 C1 DE3943367 C1 DE 3943367C1
Authority
DE
Germany
Prior art keywords
mounting device
guide rod
pocket
holder
receiving pocket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE19893943367
Other languages
German (de)
Inventor
Werner Meier
Hermann 4370 Marl De Buehne
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RAG AG
Original Assignee
GEWERKSCHAFT AUGUSTE VICTORIA 4370 MARL DE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEWERKSCHAFT AUGUSTE VICTORIA 4370 MARL DE filed Critical GEWERKSCHAFT AUGUSTE VICTORIA 4370 MARL DE
Priority to DE19893943367 priority Critical patent/DE3943367C1/en
Application granted granted Critical
Publication of DE3943367C1 publication Critical patent/DE3943367C1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The assembly rig for road arch support underpin props has a vertically guided pocket for the prop channel section and similarly guided holder for the outer prop channel section. The pocket (22) forms part of a sled (21) which is winched by hand (30) along a guide bar (9). The bar is lined up vertically on an installed prop at two-arch spacing. The holder (23) forms a sliding holder also on the sled (21) but spaced above the pocket (22). Pocket and holders (22,23) and top holder are L-shaped in horizontal section and the intervals between pocket leg ends and the holders are bridged by roundlink chains. USE/ADVANTAGE - Underground mining, roadway arch supports. Hand winched sled with pocket and holder can be run in by two men without special training and provides overall view of working parts.

Description

Die Erfindung richtet sich auf eine Montagevorrichtung zum Errichten von Zusatzstützen unter Streckenausbaubögen gemäß den Merkmalen im Oberbegriff des Anspruchs 1.The invention is directed to a mounting device for Erection of additional supports under track expansion arches in accordance with the features in the preamble of claim 1.

Eine derartige Montagevorrichtung zählt sowohl durch die Zeitschrift "Glückauf" 125 (1989) Nr. 7/8, Seiten 369 bis 372 als auch durch die DE-OS 36 17 437 zum Stand der Tech­ nik. Sie umfaßt ein Raupenfahrwerk mit einem elektrohydrau­ lischen Antriebsaggregat einschließlich Steuerstand. Stirn­ seitig des Raupenfahrwerks ist eine sowohl in Fahrtrichtung als auch quer zur Fahrtrichtung schwenkbare Teleskoplafette angelenkt. Das Gehäuse der Teleskoplafette ist mit einer Klemmvorrichtung zur Festlegung des umgreifenden Rinnenpro­ filabschnitts versehen, während der aus dem Gehäuse aus­ schiebbare Teil der Teleskoplafette eine Klemmvorrichtung zur Festlegung des einliegenden Rinnenprofilabschnitts auf­ weist. Die zueinander relativbeweglichen Teile der Teleskop­ lafette sind durch Hydraulikzylinder verlagerbar.Such a mounting device counts both by the Magazine "Glückauf" 125 (1989) No. 7/8, pages 369 to 372 and DE-OS 36 17 437 to the state of the art nik. It includes a crawler track with an electrohydrau drive unit including steering position. Forehead on the side of the crawler track is both in the direction of travel as well as telescopic carriage that can be swiveled transversely to the direction of travel articulated. The housing of the telescopic mount is with a Clamping device for determining the encompassing gutter profile section provided while out of the housing sliding part of the telescopic carriage a clamping device to determine the inserted channel profile section points. The relatively movable parts of the telescope The carriages can be moved using hydraulic cylinders.

Eine Eigenart dieser Montagevorrichtung besteht darin, daß sie aufgrund des relativ langen Raupenfahrwerks einschl. Antriebsaggregat untertägig nur in einem beschränkten Umfang einsetzbar ist bzw. nur dort eingesetzt werden kann, wo die mit Zusatzstützen auszurüstenden Streckenabschnitte gezielt so vorbereitet sind, daß die Montagevorrichtung hier verwendet werden kann. Dies ist mit einem zusätzlichen Auf­ wand verbunden. Eine weitere Eigenschaft besteht darin, daß die Montagevorrichtung Antriebsenergie benötigt, was insbesondere unter Beachtung der auch im untertägigen Gruben­ betrieb strengeren Anforderungen des Umweltschutzes nicht unproblematisch ist. In diesem Zusammenhang ist auch zu beachten, daß die Montagevorrichtung ein vergleichsweise kompliziertes Gerät darstellt, das kostenaufwendig ist und entsprechende Investitionsüberlegungen erfordert. Desweite­ ren ist es unumgänglich, die Montagevorrichtung intensiv zu warten. Ganz besonders ist aber hervorzuheben, daß die Handhabung der Montagevorrichtung einer intensiven Einwei­ sung der Bergleute bedarf, um Bedienungsfehler und dadurch hervorgerufene Schäden zu vermeiden.A peculiarity of this mounting device is that due to the relatively long crawler chassis incl. Drive unit during the day only to a limited extent can be used or can only be used where  the route sections to be equipped with additional supports are specifically prepared so that the mounting device here can be used. This is with an additional on wall connected. Another property is that the mounting device requires drive energy, what especially taking into account the underground pits did not operate more stringent environmental protection requirements is unproblematic. In this context, too note that the mounting device is a comparatively represents complicated device that is expensive and appropriate investment considerations required. Furthermore Ren it is inevitable, the assembly device intensive waiting. It is particularly important to emphasize that the Handling the assembly device of an intensive briefing solution of the miners to avoid operating errors and thereby to avoid damage caused.

Der Erfindung liegt die Aufgabe zugrunde, die im Oberbegriff des Anspruchs 1 beschriebene Montagevorrichtung dahingehend zu verbessern, daß sie unter Verzicht auf jegliche fremde Antriebsenergie den jeweiligen örtlichen untertägigen Bedin­ gungen bei kostengünstiger Herstellung variabler angepaßt werden kann.The invention is based on the object in the preamble of the mounting device described in this regard to improve that they waive any strangers Drive energy to the respective local underground conditions conditions in the case of cost-effective production more flexibly adapted can be.

Die Lösung dieses Problems besteht nach der Erfindung in den im kennzeichnenden Teil des Anspruchs 1 aufgeführten Merk­ malen.According to the invention, this problem is solved in the in the characterizing part of claim 1 listed to paint.

Kernpunkt der Erfindung bildet der Sachverhalt, daß eine derartige Montagevorrichtung sehr einfach aufgebaut ist, keine Antriebsenergie benötigt und ohne weiteres von nur zwei Bergleuten gehandhabt werden kann. Ein weiterer Vorteil wird darin gesehen, daß es für den funktionsgerechten Ge­ brauch der Montagevorrichtung keiner besonderen Einweisung der Bergleute bedarf. Sämtliche Einzelteile sind überschau­ bar angeordnet und erlauben eine sichere Handhabung. Beson­ dere Qualitätsanforderungen an die einzelnen Bauteile - auch im Hinblick auf die stets problematische Wartung im unter­ tägigen Grubenbetrieb - werden nicht gestellt. Die Montage­ vorrichtung kann darüberhinaus in kurzer Zeit auf- und abge­ rüstet sowie transportiert werden. Ihr kompakter Gesamtauf­ bau erlaubt einen Einsatz auch in sehr engen Streckenquer­ schnitten. Dabei werden in den jeweiligen Streckenbereichen die dortigen Funktionen, wie z. B. Förderung, Transport, Wetterführung oder Fahrung nicht behindert.The essence of the invention is the fact that a such assembly device is very simple, no drive energy needed and easily by just two miners can be handled. Another advantage is seen in the fact that for the functional Ge need no special instruction of the assembly device the miners need. All individual parts are clear arranged bar and allow safe handling. Especially  quality requirements for the individual components - also with regard to the always problematic maintenance in the below daily mine operation - are not provided. The assembly device can also move up and down in a short time be prepared and transported. Your compact overall construction permits use even in very narrow cross-sections cut. Thereby in the respective route areas the functions there, such as B. Promotion, transportation, Weather guidance or driving not impeded.

Die Montagevorrichtung umfaßt eine stabile zentrale Führungs­ stange, die etwa im Bauabstand zweier Streckenausbaubögen an einer bereits gesetzten Zusatzstütze vertikal ausgerichtet wird. An der einen vorzugsweise mehrkantigen, insbesondere prismatischen, Querschnitt aufweisenden Führungsstange ist ein Schlitten vertikal beweglich. Die Vertikalverlagerung erfolgt mit Hilfe einer Handseilwinde.The mounting device includes a stable central guide rod, which is approximately in the distance between two track expansion arches an additional support that has already been placed is aligned vertically becomes. On one, preferably polygonal, in particular prismatic, cross-section guide rod a sled is vertically movable. The vertical shift takes place with the help of a hand winch.

Bei der Errichtung einer Zusatzstütze wird zunächst der einliegende Rinnenprofilabschnitt in die Aufnahmetasche des Schlittens eingesetzt. Anschließend wird der umgreifende Rinnenprofilabschnitt mittelbar oder unmittelbar auf die Streckensohle gestellt und über den einliegenden Rinnenpro­ filabschnitt geschoben. Danach werden beide Rinnenprofilab­ schnitte mindestens im Bereich der Gleithalterung sowie der Aufnahmetasche gleitschlüssig aneinandergedrückt. Mit Hilfe der Handseilwinde wird dann der Schlitten nach oben gefahren, wobei der einliegende Rinnenprofilabschnitt im umgreifenden Rinnenprofilabschnitt geführt letztlich gegen den entsprechenden Streckenausbaubogen gedrückt wird. Nun­ mehr werden die beiden Rinnenprofilabschnitte mit Hilfe der bekannten Klemmvorrichtungen (Klemmlaschen, Klemmschel­ len) positioniert und anschließend durch ein geeignetes Setzgerät ordnungsgemäß miteinander verspannt. Die Montage­ vorrichtung kann vor oder nach dem Setzen von der Zusatz­ stütze entfernt und für ein neues Arbeitsspiel vorbereitet werden. When installing an additional prop, the inserted channel profile section in the receiving pocket of the slide used. Then the comprehensive Channel profile section indirectly or directly on the Track sole placed and over the inserted channel pro section pushed. Then both channel profiles are removed cuts at least in the area of the slide bracket as well the receptacle pocket is slidably pressed together. With With the help of the hand winch, the sled is then lifted up driven, the inserted channel profile section in encompassing channel profile section ultimately led against the corresponding route extension sheet is pressed. Well the two channel profile sections become more with the help the known clamping devices (clamping tabs, clamping bracket len) positioned and then by a suitable one Setting tool properly clamped together. The assembly Device can be placed before or after the addition support removed and prepared for a new work cycle will.  

Je nach Höhe der Strecke ist es entsprechend den Merkmalen des Anspruchs 2 zweckmäßig, auch am oberen Ende der Führungs­ stange eine weitere Gleithalterung für den einliegenden Rinnenprofilabschnitt vorzusehen. Auf diese Weise gleiten die beiden Rinnenprofilabschnitte beim Errichten der Zusatz­ stütze einwandfrei ineinander, ohne daß Verkantungen mit evtl. Unfallfolge befürchtet werden müssen.Depending on the height of the route, it is according to the characteristics of claim 2 useful, even at the top of the guide rod another slide holder for the inset Channel section to be provided. Glide this way the two gutter profile sections when erecting the addition support each other perfectly without jamming with possible consequences of the accident must be feared.

Das Einsetzen eines Rinnenprofilabschnitts in die Aufnahme­ tasche und in die Gleithalterungen einerseits bzw. das Ent­ fernen der Montagevorrichtung nach dem Errichten der Zusatz­ stütze andererseits wird mit Hilfe der Merkmale des An­ spruchs 3 wesentlich erleichtert. Die Aufnahmetasche ist so ausgebildet, daß die untere Stirnseite des einliegenden Rinnenprofilabschnitts sich hierin abstützen kann, ohne bei der Aufwärtsbewegung die Relativführung durch den um­ greifenden Rinnenprofilabschnitt zu behindern. Sind die Rinnenprofilabschnitte in die Aufnahmetasche und die Gleit­ halterungen eingelegt, genügen die Rundgliederkettenstränge, um die vertikale Ausrichtung der Rinnenprofilabschnitte zu sichern und dennoch die einwandfreie gleitende Relativbewe­ gung des einliegenden Rinnenprofilabschnitts zum umgreifen­ den Rinnenprofilabschnitt zu gewährleisten.The insertion of a channel profile section into the receptacle pocket and in the slide holders on the one hand or the Ent remove the mounting device after installing the add-on Support, on the other hand, is based on the characteristics of the An Proof 3 much easier. The recording bag is designed so that the lower end of the inset Gutter profile section can be supported here without with the upward movement the relative guidance through the hinder gripping profile section. Are the Gutter profile sections in the receiving pocket and the slide brackets inserted, the round link chain strands are sufficient, to the vertical alignment of the channel profile sections secure and yet the flawless sliding relative movement around the inserted channel profile section to ensure the channel profile section.

Die korrekte vertikale Ausrichtung der Führungsstange neben einer bereits gesetzten Zusatzstütze wird durch Ab­ standshalter entsprechend den Merkmalen des Anspruchs 4 gesichert. Bei diesen Abstandshaltern kann es sich um Tele­ skopstangen handeln, die auf eine vorbestimmte Länge ge­ bracht und durch geeignete Klemmelemente in der jeweils ausgezogenen Position arretiert werden können. Die Abstands­ halter sind vorteilhaft so ausgebildet, daß sie mit Schnell­ verschlußelementen an einer bereits gesetzten Zusatzstütze festgelegt, im Zuge des Umrüstens jedoch an die Führungs­ stange herangeklappt werden können. Auf diese Weise werden Losteile verhindert, die Untertage stets leicht verloren­ gehen können.The correct vertical alignment of the guide rod in addition to an additional support that has already been placed, Ab stand holder according to the features of claim 4 secured. These spacers can be tele act scop poles that ge to a predetermined length brings and by suitable clamping elements in each extended position can be locked. The distance Holders are advantageously designed to be quick locking elements on an additional support that has already been placed fixed, but in the course of the conversion to the management  bar can be folded up. That way Loose parts prevented, the underground always slightly lost can go.

Nach Anspruch 5 ist auch die Handseilwinde unmittelbar an der Führungsstange befestigt. Zwischen der Handseilwinde und dem Schlitten erstreckt sich ein Stahlseil, das vorteilhaft am oberen Ende der Führungsstange über eine dort vorgesehene Rolle geführt ist. Durch eine geeignete Übersetzung in der Handseilwinde kann die zum Anheben des einliegenden Rinnen­ profilabschnitts notwendige Kraft problemlos von einem Berg­ mann aufgebracht werden.According to claim 5, the hand winch is immediately on attached to the guide rod. Between the hand winch and A steel cable extends the slide, which is advantageous at the upper end of the guide rod via a provided there Role is performed. By a suitable translation in the Manual cable winch can be used to lift the gutters required section section effortlessly from a mountain man be upset.

Das prismatische Gleitstück gemäß Anspruch 6 hat den Vorteil, daß der Schlitten verkantungsfrei an der Führungsstange entlang bewegt werden kann.The prismatic slider according to claim 6 has the advantage that the carriage does not tilt on the guide rod can be moved along.

Damit ein Bergmann die Gleithalterung am oberen Ende der Führungsstange problemlos erreichen und handhaben kann, ist entsprechend den Merkmalen des Anspruchs 7 am oberen Ende des Schlittens eine horizontale Konsole befestigt. Diese Konsole kann beispielsweise aus einem einfachen Rohr bestehen, das quer an den Schlitten geschweißt ist. Die Konsole dient mithin als Trittstufe. Sie kann aber auch als Handgriff zur Verlagerung des Schlittens verwendet werden.So that a miner can hold the slide at the top of the Can easily reach and handle the guide rod, is according to the features of claim 7 at the top A horizontal bracket is attached to the end of the sled. This console can, for example, from a simple tube exist, which is welded transversely to the slide. The Console therefore serves as a step. But it can also used as a handle for moving the carriage will.

Die Erfindung ist nachfolgend anhand eines in den Zeichnun­ gen veranschaulichten Ausführungsbeispiels näher erläutert. Es zeigen:The invention is based on one in the drawings gene illustrated embodiment explained in more detail. Show it:

Fig. 1 einen vertikalen Längsschnitt durch eine unter­ tägige Strecke mit unter Streckenausbaubögen gesetzten Zusatzstützen einschl. einer Montage­ vorrichtung für Zusatzstützen; Figure 1 is a vertical longitudinal section through an underground route with additional supports set under route extension arches including an assembly device for additional supports.

Fig. 2 die Montagevorrichtung gemäß dem Pfeil II der Fig. 1 in der Ausgangsposition und Fig. 2 shows the mounting device according to the arrow II of FIG. 1 in the starting position and

Fig. 3 einen horizontalen Querschnitt durch die Mon­ tagevorrichtung gemäß der Linie III-III der Fig. 1 ohne Rinnenprofilabschnitte. Fig. 3 shows a horizontal cross section through the Mon day device according to the line III-III of FIG. 1 without channel profile sections.

Mit 1 ist in den Fig. 1 und 2 eine Strecke des untertä­ gigen Grubenbetriebs bezeichnet, die mit Streckenausbaubögen 2 ausgebaut ist. Wie hierbei die Fig. 2 andeutungsweise zeigt, bestehen die Streckenausbaubögen 2 jeweils aus mehre­ ren ineinandergelegten bogenförmigen Rinnenprofilsegmenten 3, die durch Klemmlaschen 4 miteinander verbunden sind und sich unter Gebirgsdruck zueinander verschieben können. Zwei in Streckenlängsrichtung benachbarte Streckenausbaubögen 2 sind miteinander verlascht. 1 with a range of untertä Gigen mining operations is shown in Figs. 1 and 2 denotes that is equipped with track support arches 2. As shown in FIG. 2, the route expansion arches 2 each consist of several nested arc-shaped channel profile segments 3 , which are connected to one another by clamping tabs 4 and can move towards one another under rock pressure. Two route extension arches 2 adjacent in the longitudinal direction of the route are joined together.

Um in gebirgsmechanisch besonders beanspruchten Streckenab­ schnitten die Streckenausbaubögen 2 zu stabilisieren, werden diese in der etwa mittleren vertikalen Längsebene der Strecke 1 durch Zusatzstützen 5 unterfangen, die aus zwei ineinander­ gelegten und miteinander durch Klemmlaschen 18 verspannten geraden Rinnenprofilabschnitten 6 bestehen. Jeweils zwei nebeneinander angeordnete Zusatzstützen 5 werden durch Ab­ standshalter 7 lösbar miteinander verbunden.In order to stabilize sections of the route expansion arches 2 that are particularly stressed in rock mechanics, these are underpinned in the approximately central vertical longitudinal plane of the section 1 by additional supports 5 , which consist of two straight channel section sections 6 which are placed one inside the other and clamped together by clamping tabs 18 . Each two additional supports 5 arranged side by side are releasably connected to each other by spacers 7 .

Zum Errichten dieser Zusatzstützen 5 gelangt eine Montage­ vorrichtung 8 zur Anwendung, die ausschließlich von Hand bedienbar ist.To erect these additional supports 5 , a mounting device 8 is used, which can only be operated by hand.

Bei gemeinsamer Betrachtung der Fig. 1 und 2 ist erkenn­ bar, daß zunächst eine im Querschnitt prismatische Führungs­ stange 9 annähernd im Bauabstand zweier Streckenausbaubögen 2 vertikal parallel zu einer bereits errichteten und gesetz­ ten Zusatzstütze 5 aufgestellt wird.Detection is bar when taken together in FIG. 1 and 2 in that first a prismatic cross-section guide rod 9 in approximately two Bauabstand roadway support sheets 2 already erected vertically and parallel to a law th auxiliary support 5 is positioned.

Hierzu besitzt die Führungsstange 9 am unteren Ende einen Schuh 10, der sich beispielsweise auf einem Holzstück 11 abstützt, welches in einem auf der Streckensohle 12 liegen­ den U-Profil 13 eingebettet ist. For this purpose, the guide rod 9 has a shoe 10 at the lower end, which is supported, for example, on a piece of wood 11 which is embedded in a U-profile 13 lying on the track sole 12 .

Im Abstand oberhalb des Schuhs 10 sind wiederum im vertika­ len Abstand zueinander zwei Gabellaschen 14 an die Führungs­ stange 9 geschweißt (Fig. 1). In die Gabellaschen 14 grei­ fen im Querschnitt viereckig profilierte Stangen 15 von zwei Abstandshaltern 16 ein. Die Stangen 15 sind mit den Gabel­ laschen 14 lösbar und verschwenkbar gekuppelt. Die Stangen 15 fassen in Hohlprofile 17 der Abstandshalter 16 ein, die ihrerseits mit Hilfe von U-förmigen Schellen 19 und Klemm­ keilen 20 an der bereits gesetzten benachbarten Zusatzstütze 5 im geeigneten Höhenbereich festgelegt werden. Die Relativ­ lage der Stangen 15 und der Hohlprofile 17 wird durch Arre­ tierungen 38 gesichert.At a distance above the shoe 10 , two fork brackets 14 are in turn welded to the guide rod 9 at a vertical distance from one another ( FIG. 1). In the fork tabs 14 a cross-sectionally profiled rods 15 of two spacers 16 . The rods 15 are releasably and pivotally coupled to the fork plates 14 . The rods 15 engage in hollow profiles 17 of the spacers 16 , which in turn wedges 20 with the help of U-shaped clamps 19 and clamps 20 are fixed to the adjacent additional support 5 already set in the appropriate height range. The relative location of the rods 15 and the hollow profiles 17 is secured by arrays 38 .

An der Führungsstange 9 ist ein Schlitten 21 vertikalbeweg­ lich verlagerbar. Der Schlitten 21 umfaßt, wie auch die Fig. 3 erkennen läßt, eine untere Aufnahmetasche 22 sowie eine mit Abstand oberhalb der Aufnahmetasche 22 angeordnete Gleithalterung 23. Sowohl Aufnahmetasche 22 als auch Gleit­ halterung 23 sind im horizontalen Querschnitt L-förmig ge­ staltet. Während die Innenseiten beider Schenkel 24 der Gleithalterung 23 vorsprungslos gestaltet sind, weist die Innenseite des in Längsrichtung der Strecke 1 gerichteten Schenkels 25 der Aufnahmetasche 23 im unteren Höhenbereich eine Rippe 26 auf, welche als Auflage für den einliegenden Rinnenprofilabschnitt 6a beim Errichten der Zusatzstütze 5a dient. Außerdem besitzt die Aufnahmetasche 22 am freien Ende des in Streckenlängsrichtung weisenden Schenkels 25 eine vertikale Rippe 27 als ergänzendes Führungselement für den einliegenden Rinnenprofilabschnitt 6a.On the guide rod 9 , a carriage 21 is vertically movable Lich displaceable. As can also be seen in FIG. 3, the slide 21 comprises a lower receiving pocket 22 and a slide holder 23 arranged at a distance above the receiving pocket 22 . Both the receiving pocket 22 and the slide holder 23 are L-shaped in horizontal cross section. While the inner surfaces of both legs 24 of the slide mount are designed vorsprungslos 23, the inner side of the longitudinally directed track 1 leg 25 of the receiving pocket 23 in the lower height range of a rib 26 which as a support for the inset channel profile portion 6a when erecting the auxiliary support 5 a serves. In addition, the receiving pocket 22 at the free end of the leg 25 pointing in the longitudinal direction has a vertical rib 27 as a supplementary guide element for the inserted channel profile section 6 a.

Gleithalterung 23 und Aufnahmetasche 22 sind durch ein pris­ matisches Gleitstück 28 miteinander starr verbunden, welches die Führungsstange 9 nicht völlig umschließt, sondern die in Richtung zur bereits gesetzten Zusatzstütze 5 weisende Längs­ kante 29 freiläßt (Fig. 1 und 3). Slide bracket 23 and receiving pocket 22 are rigidly connected to one another by a prismatic slide 28 which does not completely enclose the guide rod 9 , but rather leaves the longitudinal edge 29 pointing in the direction of the additional support 5 already set (FIGS . 1 and 3).

Diese Längskante 29 der Führungsstange 9 dient auch zur Befestigung der Gabellaschen 14 für die Abstandshalter 16 sowie für eine Handseilwinde 30. Die Handseilwinde 30 wird etwa in Hüfthöhe an der Führungsstange 9 festgeschweißt.This longitudinal edge 29 of the guide rod 9 also serves for fastening the fork straps 14 for the spacers 16 and for a hand cable winch 30 . The hand cable winch 30 is welded to the guide rod 9 at about waist height.

Am oberen Ende der Führungsstange 9 ist eine weitere L-för­ mige Gleithalterung 31 befestigt, die der oberen Gleithal­ terung 23 des Schlittens 21 entspricht.At the upper end of the guide rod 9 , a further L-shaped slide holder 31 is fastened, which corresponds to the upper slide holder 23 of the slide 21 .

An den in Streckenlängsrichtung weisenden Schenkeln 25 und 24 der Aufnahmetasche 22 sowie der Gleithalterungen 23, 31 sind Rundgliederkettenstränge 32 befestigt, welche in C-förmige Haken 33 an den quer zur Streckenlängsrichtung weisenden Schenkeln 25, 24 der Aufnahmetasche 22 und der Gleithalterungen 23, 31 einhängbar sind.On the legs 25 and 24 of the receiving pocket 22 and the slide brackets 23 , 31 pointing in the longitudinal direction of the track, round link chain strands 32 are fastened, which can be suspended in C-shaped hooks 33 on the legs 25 , 24 of the receiving bag 22 and the slide brackets 23 , 31 pointing transversely to the longitudinal direction of the track are.

Von der Handseilwinde 30 aus erstreckt sich ein Stahlseil 34 bis zu einer Umlenkrolle 35 am oberen Ende der Führungsstan­ ge 9 und von dort wieder bis zur oberen Stirnseite des Schlittens 21, wo das Stahlseil 34 bei 36 befestigt ist.From the hand cable winch 30 , a steel cable 34 extends to a deflection roller 35 at the upper end of the guide rod 9 and from there again to the upper end face of the carriage 21 , where the steel cable 34 is fastened at 36 .

Zum Errichten der Zusatzstütze 5a wird zunächst der einlie­ gende Rinnenprofilabschnitt 6a in die Aufnahmetasche 22 in vertikaler Ausrichtung eingesetzt. Dies kann problemlos von Hand durch zwei Bergleute erfolgen. Während der eine Bergmann den Rinnenprofilabschnitt 6a in der vertikalen Position hält, steigt der andere Bergmann auf eine am oberen Ende des Schlittens 21 angeordnete, beispielsweise aus einem Rohr bestehende quer abstehende horizontale Konsole 37 und legt das obere Ende des Rinnenprofilabschnitts 6a mit Hilfe des dortigen Rundgliederkettenstrangs 32 gleitschlüssig an der oberen Gleithalterung 31 fest. Die Konsole 37 kann aber auch als Handgriff zur Verlagerung des Schlittens 21 verwendet werden. To set up the additional support 5 a, the channel profile section 6 a is first inserted into the receiving pocket 22 in a vertical orientation. This can easily be done by hand by two miners. While one miner holds the channel profile section 6 a in the vertical position, the other miner climbs onto a horizontal bracket 37 arranged at the upper end of the slide 21 , for example consisting of a tube, and places the upper end of the channel profile section 6 a with the aid of the there round link chain strand 32 slidably on the upper slide bracket 31 . The console 37 can also be used as a handle for moving the carriage 21 .

Anschließend wird der umgreifende Rinnenprofilabschnitt 6b auf den Boden des U-Profils 13 gesetzt und formschlüssig an den einliegenden Rinnenprofilabschnitt 6a herangeschoben. Danach werden auch die Rundgliederkettenstränge 32 der Auf­ nahmetasche 22 und der Gleithalterung 23 um beide Rinnenpro­ filabschnitte 6a, 6b gleitschlüssig gelegt.Subsequently, the encircling channel profile section 6 b is placed on the bottom of the U-profile 13 and pushed positively onto the channel channel section 6 a lying therein. Thereafter, the round link chain strands 32 on the receiving pocket 22 and the slide bracket 23 around both Rinnenpro filabschnitte 6 a, 6 b placed sliding.

Nunmehr kann durch Betätigung der Handseilwinde 30 der ein­ liegende Rinnenprofilabschnitt 6a unter Zwangsführung am umgreifenden Rinnenprofilabschnitt 6b nach oben gegen den zugeordneten Streckenausbaubogen 2 gedrückt werden.Now, by operating the manual cable winch 30, a lying channel profile section 6 a can be pressed upward against the assigned track extension arch 2 under positive guidance on the encompassing channel profile section 6 b.

Hat der einliegende Rinnenprofilabschnitt 6a den Strecken­ ausbaubogen 2 erreicht, werden Klemmlaschen 18 an die Zusatz­ stütze 5a gelegt und der einliegende Rinnenprofilabschnitt 6a mit dem umgreifenden Rinnenprofilabschnitt 6b verspannt.Has the inserted channel profile section 6 a reached the sections 2 , clamping tabs 18 are placed on the additional support 5 a and the inserted channel profile section 6 a braced with the encompassing channel profile section 6 b.

Im Anschluß daran kann bei noch zugeordneter Montagevorrich­ tung 8 oder bei entfernter Montagevorrichtung 8 die Zusatz­ stütze 5a ordnungsgemäß mit Hilfe eines nicht näher veran­ schaulichten Setzgeräts zwischen der Streckensohle 12 und dem Streckenausbaubogen 2 gesetzt werden.Subsequently may in yet assigned Montagevorrich tung 8 or remote mounting device 8, the auxiliary support 5 a properly by means of a not further illustrated veran setting device between the roadway floor 12 and the roadway support sheet 2 to be set.

Claims (7)

1. Montagevorrichtung zum Errichten von Zusatzstützen (5a) aus zwei miteinander verspannbaren Rinnenprofilabschnitten (6a, 6b) unter Streckenausbaubögen (2), welche eine an einer Führung (9) vertikal zwangsgeführte Aufnahmetasche (22) für den einliegenden Rinnenprofilabschnitt (6a) und eine an der Führung (9) ebenfalls vertikal bewegliche Halterung (23) für den umgreifenden Rinnenprofilabschnitt (6b) auf­ weist, dadurch gekennzeichnet, daß die Aufnahmetasche (22) Bestandteil eines an einer Führungs­ stange (9) durch eine Handseilwinde (30) entlang bewegbaren Schlittens (21) bildet, wobei die Führungsstange (9) etwa im Abstand zweier Streckenausbaubögen (2) an einer bereits gesetzten Zusatzstütze (5) vertikal ausgerichtet ist, und daß die Halterung (23) als Gleithalterung ebenfalls dem Schlitten (21) im Abstand oberhalb der Aufnahmetasche (22) zugeordnet ist. 1. Mounting device for erecting additional pillars (5a) consists of two braced together gutter profile sections (6 a, 6 b) by roadway support sheets (2) having a vertical force guided on a guide (9) receiving pocket (22) for the inset channel profile section (6 a ) and on the guide ( 9 ) also vertically movable holder ( 23 ) for the encircling channel profile section ( 6 b), characterized in that the receiving pocket ( 22 ) is part of a on a guide rod ( 9 ) by a manual cable winch ( 30 ) forms along movable carriage ( 21 ), the guide rod ( 9 ) being vertically aligned approximately at a distance from two track extension arches ( 2 ) on an additional support ( 5 ) that has already been placed, and that the holder ( 23 ) also slides the carriage ( 21 ) is assigned at a distance above the receiving pocket ( 22 ). 2. Montagevorrichtung nach Anspruch 1, dadurch ge­ kennzeichnet, daß am oberen Ende der Führungs­ stange (9) eine weitere Gleithalterung (31) für den einlie­ genden Rinnenprofilabschnitt (6a) vorgesehen ist. 2. Mounting device according to claim 1, characterized in that at the upper end of the guide rod ( 9 ) a further slide bracket ( 31 ) for the in-lying channel profile section ( 6 a) is provided. 3. Montagevorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Aufnahmetasche (22) und die Gleithalterungen (23, 31) im horizontalen Quer­ schnitt L-förmig ausgebildet sind und der Abstand zwischen den Schenkelenden der Aufnahmetasche (22) sowie der Gleit­ halterungen (23, 31) durch Rundgliederkettenstränge (32) überbrückbar ist.3. Mounting device according to claim 1 or 2, characterized in that the receiving pocket ( 22 ) and the sliding brackets ( 23 , 31 ) are L-shaped in horizontal cross section and the distance between the leg ends of the receiving pocket ( 22 ) and the sliding mounts ( 23 , 31 ) can be bridged by round link chain strands ( 32 ). 4. Montagevorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Führungsstange (9) durch längenveränderbare Abstandshalter (16) mit der benach­ barten Zusatzstütze (5) kuppelbar ist.4. Mounting device according to claim 1 or 2, characterized in that the guide rod ( 9 ) by length-adjustable spacers ( 16 ) with the neigh disclosed additional support ( 5 ) can be coupled. 5. Montagevorrichtung nach Anspruch 1, dadurch ge­ kennzeichnet, daß die Handseilwinde (30) etwa in Hüfthöhe an der Führungsstange (9) befestigt und das Winden­ seil (34) von der Handseilwinde (30) aus über das obere Ende der Führungsstange (9) zum Schlitten (21) geführt ist.5. Mounting device according to claim 1, characterized in that the manual cable winch ( 30 ) is attached approximately at waist height to the guide rod ( 9 ) and the winch rope ( 34 ) from the manual cable winch ( 30 ) over the upper end of the guide rod ( 9 ) is guided to the slide ( 21 ). 6. Montagevorrichtung nach Anspruch 1 oder 5, dadurch gekennzeichnet, daß der Schlitten (21) zwi­ schen der Aufnahmetasche (22) und der Gleithalterung (23) mit einem im Querschnitt prismatischen Gleitstück (28) aus­ gerüstet ist.6. Mounting device according to claim 1 or 5, characterized in that the carriage ( 21 ) between the receiving pocket's ( 22 ) and the slide holder ( 23 ) with a cross-section prismatic slide ( 28 ) is equipped. 7. Montagevorrichtung nach einem der Ansprüche 1, 5 oder 6, dadurch gekennzeichnet, daß am oberen Ende des Schlittens (21) eine horizontale Konsole (37) be­ festigt ist.7. Mounting device according to one of claims 1, 5 or 6, characterized in that at the upper end of the carriage ( 21 ) a horizontal bracket ( 37 ) is fastened.
DE19893943367 1989-12-30 1989-12-30 Assembly rig for road arch pin props - has vertical pocket, for prop channel section, forming part of movable side Expired - Lifetime DE3943367C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19893943367 DE3943367C1 (en) 1989-12-30 1989-12-30 Assembly rig for road arch pin props - has vertical pocket, for prop channel section, forming part of movable side

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19893943367 DE3943367C1 (en) 1989-12-30 1989-12-30 Assembly rig for road arch pin props - has vertical pocket, for prop channel section, forming part of movable side

Publications (1)

Publication Number Publication Date
DE3943367C1 true DE3943367C1 (en) 1991-07-25

Family

ID=6396632

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19893943367 Expired - Lifetime DE3943367C1 (en) 1989-12-30 1989-12-30 Assembly rig for road arch pin props - has vertical pocket, for prop channel section, forming part of movable side

Country Status (1)

Country Link
DE (1) DE3943367C1 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3617437A1 (en) * 1986-05-23 1987-11-26 Saarbergwerke Ag Device for installing arch stilts

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3617437A1 (en) * 1986-05-23 1987-11-26 Saarbergwerke Ag Device for installing arch stilts

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
CLARNER, Dipl.-Ing. - BIEHL, Ing.: Entwicklung eines Senkstützengestellgerätes auf dem Bergwerk Ensdorf, Glückauf, 125, 1989, Nr. 7/8, S. 369-372 *

Similar Documents

Publication Publication Date Title
AT512457B1 (en) POWER OR MACHINE
DE1933573B2 (en) Device for straightening vehicle bodies or frames
DE3608511A1 (en) Wagon drill with magazine-mounting device
DE3943367C1 (en) Assembly rig for road arch pin props - has vertical pocket, for prop channel section, forming part of movable side
DE202015008972U1 (en) Drilling rig with a pivotable between a transport position and a working position drilling mast
DE2909918C3 (en) Device for driving and expanding an underground route
DE2754874A1 (en) Multiple purpose mine gallery working platform - has telescopic column on front half, with tilting cross member carrying holders
DE102005014230B4 (en) Device for introducing holes in a slope
DE2535823A1 (en) AUXILIARY DEVICE FOR USE IN UNDERGROUND ROADS, CITIES, TUNNELS ETC.
DE2346853C3 (en) Machine for bringing in a track extension consisting of door frames
DE202015008973U1 (en) Drilling rig with a pivotable between a transport position and a working position mast
DE2704222C3 (en) Procedure and multi-purpose platform for the expansion of sections of mining and tunneling that were excavated by blasting
DE3511275C1 (en) Hydraulic self-advancing support assembly
DE3213601C2 (en) Self-advancing route extension team to expand the longwall / route transition
DE2364502C3 (en) Device for laying pipeline pipes in trenches
DE3626948C2 (en)
DE2811580C3 (en)
DE1817054A1 (en) Face device for struts in underground mining
CH377300A (en) Auxiliary support for drifting, especially in underground mining
DE1583151C3 (en) Anchoring device for face conveyors arranged in the track
DE2801365C3 (en) Equipment for the transport and installation of a provisional route expansion and expansion frame for the provisional route expansion
DE2432256A1 (en) PROCEDURE AND DEVICE FOR SETTING ROAD EXPANSION Bends
CH377758A (en) Auxiliary support for drifting, especially in underground mining
DE2453328A1 (en) Mine roadway conveyor advancer - with tiltable chock on portal frame round pans and roof plate and pin
DE1266260B (en) Support device for the drive station of a face conveyor

Legal Events

Date Code Title Description
8100 Publication of the examined application without publication of unexamined application
D1 Grant (no unexamined application published) patent law 81
8364 No opposition during term of opposition
8327 Change in the person/name/address of the patent owner

Owner name: RUHRKOHLE AG, 45128 ESSEN, DE

8327 Change in the person/name/address of the patent owner

Owner name: RAG AG, 45128 ESSEN, DE

8339 Ceased/non-payment of the annual fee