DE3519623A1 - Process for producing a mangle bowl for bowl mangles - Google Patents

Process for producing a mangle bowl for bowl mangles

Info

Publication number
DE3519623A1
DE3519623A1 DE19853519623 DE3519623A DE3519623A1 DE 3519623 A1 DE3519623 A1 DE 3519623A1 DE 19853519623 DE19853519623 DE 19853519623 DE 3519623 A DE3519623 A DE 3519623A DE 3519623 A1 DE3519623 A1 DE 3519623A1
Authority
DE
Germany
Prior art keywords
trough
bowl
heating
machining
mangle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19853519623
Other languages
German (de)
Other versions
DE3519623C2 (en
Inventor
Waldemar 5900 Siegen Hadem
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HADEM, WALDEMAR, 5900 SIEGEN, DE
Original Assignee
Uebach Apparatebau 5905 Freudenberg GmbH
UEBACH APPARATEBAU GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Uebach Apparatebau 5905 Freudenberg GmbH, UEBACH APPARATEBAU GmbH filed Critical Uebach Apparatebau 5905 Freudenberg GmbH
Priority to DE19853519623 priority Critical patent/DE3519623A1/en
Publication of DE3519623A1 publication Critical patent/DE3519623A1/en
Application granted granted Critical
Publication of DE3519623C2 publication Critical patent/DE3519623C2/de
Granted legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D06TREATMENT OF TEXTILES OR THE LIKE; LAUNDERING; FLEXIBLE MATERIALS NOT OTHERWISE PROVIDED FOR
    • D06FLAUNDERING, DRYING, IRONING, PRESSING OR FOLDING TEXTILE ARTICLES
    • D06F67/00Details of ironing machines provided for in groups D06F61/00, D06F63/00, or D06F65/00
    • D06F67/08Beds; Heating arrangements therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Heat Treatment Of Articles (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Abstract

In the production of mangle bowls 1 for bowl mangles, the bowl sheet 2 is first bent to form a half-shell and then welded on its outside 3 to a plurality of parallel heating shells 4 extending longitudinally. The heating shells 4 are thereafter welded to reinforcing elements 8 and the steam pipelines 6 and 7. The entire mangle bowl 1 is subsequently then annealed with low stress, and finally the bowl inner face is machined in a cutting manner, for example lathe-turned and/or ground. Before this cutting machining commences, the entire mangle bowl is heated at least to its later operating temperature and is also maintained at this temperature during the subsequent machining. <IMAGE>

Description

Verfahren zum Herstellen einer #ngelmulde für MuldenmangelnMethod for producing a #ngelmulde for flatwork ironers

Die Erfindung betrifft ein Verfahren zum Herstellen einer Mangelmulde für Muldenmangeln, insbesondere für Großmuldenmangeln mit einem Mangelwalzendurchmesser von mindestens 400 mm, bei welchem zunächst das Muldenblech zu einer Halbschale gebogen und dann mit einer größeren Anzahl paralleler Heizschalen verschweißt wird, bei welchem daran anschließend die Heizschalen mit Verstärkungselementen und Dampfrohrleitungen verschweißt werden, woraufhin dann die gesamte Mulde spannungsarm geglüht sowie schließlich die Muldeninnenfläche spanabhebend bearbeitet, z.B. ausgedreht und/oder geschliffen, wird.The invention relates to a method for producing a mangle trough for flatwork ironers, especially for large flatwork ironers with an ironer roller diameter of at least 400 mm, in which the trough sheet initially becomes a half-shell bent and then welded to a larger number of parallel heating trays, in which then the heating bowls with reinforcement elements and steam pipes are welded, whereupon the entire trough is annealed as well as stress relieved Finally, the inner surface of the trough is machined, e.g. turned and / or sanded, is.

Bei den bekannten #gelinulden für Muldenmangeln werden auf die Außenseite des als Halbschale geformten Muldenblechs parallel zur Muldenachse verlaufende, Heizkanäle bildende und sich schuppenartig überlappende, gewölbte Blechstreifen als sogenannte Heizschalen aufgeschweißt, die aufgrund ihrer Formgebung und Anordnung zugleich auch zu einer Stabilisierung der Mangelmulde beitragen sollen.The well-known #gelinulden for flatwork ironers are on the outside of the bowl plate shaped as a half-shell running parallel to the bowl axis, Arched sheet metal strips that form heating channels and overlap like scales welded on as so-called heating shells, due to their shape and arrangement at the same time should also contribute to a stabilization of the lack trough.

Zur weiteren Formstabilisierung der i\langelmulden werden darüber hinaus die Heizschalen noch mit einer größeren Anzahl von stegartigen Verstärkungselementen verschweißt, die sich im wesentlichen quer zur Längsachse der lSngelmulde erstrekken und deren Bogenkontur so angepaßt sind, daß sie mit ihrer Bogenkante Anlageflächen für die Außenseiten der Heizschalen bilden und mit jeder derselben fest verschweißt werden können.To further stabilize the shape of the hollow areas, In addition, the heating bowls have a larger number of web-like reinforcing elements welded, which extend essentially transversely to the longitudinal axis of the ironing trough and whose arc contour are adapted so that they contact surfaces with their arc edge for the outside of the heating bowls form and with each of the same can be firmly welded.

Im praktischen Betrieb der Muldenmangeln werden die Mangelmulden regelmäßig auf eine Temperatur aufgeheizt, die im Bereich zwischen 180 und 200°C liegt.In practical operation of the flatwork ironers, the flatwork ironers become regular heated to a temperature in the range between 180 and 200 ° C.

Aufgrund dieser Erhitzung stellt sich naturgemäß eine Materialdehnung ein, die trotz der durch die Heizschalen und die Verstärkungsstege bewirkten Versteifung zu einer Formänderung der Mangelmulden führt. Diese Formänderung der Mangelgelmulden ist dabei solcherart, daß diese sich im Bereich ihrer Muldenöffnung auseinanderspreizen, und zwar, wie die praktische Erfahrung gezeigt hat, um ein Maß, das durchaus im Bereich von 5 mm liegen kann.Due to this heating, there is naturally an expansion of the material one that despite the stiffening caused by the heating shells and the reinforcement webs leads to a change in shape of the ironer troughs. This change in shape of the mangle money troughs is such that these spread apart in the area of their trough opening, and, as practical experience has shown, to a degree that is entirely within the Range of 5 mm.

Abgesehen davon, daß aufgrund dieses Spreizeffektes ein beträchtlicher Anteil von Arbeitsfläche zwischen der Mangelmulde und der Mangelwalze verlorengeht, hat sich auch der nachteil gezeigt, daß die zu mangelnde Wäsche bei durch Wärmedehnung aufgespreizter Mangelmulde nicht dauerhaft einwandfrei zwischen Mangelnulde und Mangelwalze einläuft und dadurch das Arbeitsergebnis nachhaltig beeinträchtigt werden kann.Apart from the fact that due to this spreading effect a considerable Share of working area between the ironer trough and the ironer roller is lost, has also shown the disadvantage that the lack of laundry due to thermal expansion Spread out ironer trough not permanently flawless between ironer trough and The ironer roller runs in and the work result is permanently impaired as a result can.

Durch die DE-AS 1 211 122 ist es zwar bereits bekannt, eine mit Hochdruck-Dampfbeheizung arbeitende Mangelmulde mit kraftangetriebenen Hebelgetrieben auszustatten, um über diese eine an den Umfang der Mangelwalze angepaßte Formhaltung zu bewirken.From DE-AS 1 211 122 it is already known, one with high pressure steam heating to equip working ironer trough with power-driven lever gears to over this to bring about a shape retention adapted to the circumference of the ironer roller.

Abgesehen davon, daß die bekannte Ausgestaltung einen erheblichen und kostenintensiven Zusatzaufwand erforderlich macht, ist die Formhaltung durch die Hebelgetriebe entweder davon abhängig, daß deren Einstellung ständig kontrolliert wird oder aber es sind zusätzliche Funktionselemente notwendig, die eine selbsttätige Anpassung ermöglichen.Apart from the fact that the known configuration is a considerable and makes costly additional effort necessary, the shape retention is through the lever gearbox either depends on their setting is constantly monitored or additional functional elements are necessary, which enable automatic adjustment.

Zweck der Erfindung ist es, mit möglichst geringem Aufwand eine Mangelmulde für Muldenmangeln so auszulegen, daß sie in optimaler Weise und ohne zusätzliche Manipulationen eine möglichst exakte Anpassung an den Umfang der Mangelwalze gewährleistet. Daher liegt der Erfindung die Aufgabe zugrunde, ein Verfahren zum Herstellen einer Mangelmulde für Muldenmangeln der eingangs näher spezifizierten Gattung anzugeben, das im praktischen Gebrauch eine optimale Konturierung der Mangelmulde relativ zur Mangelwalze gewährleistet.The purpose of the invention is to create a mangle trough with as little effort as possible for flatwork ironers to be interpreted in such a way that they can be used in an optimal manner and without additional Manipulation ensures the most exact adaptation possible to the circumference of the ironer roller. Therefore, the invention is based on the object of a method for producing a Indicate lack trough for flat ironers of the type specified in more detail at the beginning, that in practical use an optimal contouring of the ironer trough relative to the Ironer roller guaranteed.

Gelöst wird diese Aufgabe erfindungsgemäß auf überraschend einfache Art und Weise dadurch, daß gemäß dem Kennzeichen des Anspruchs 1 die gesamte Mulde vor Beginn der spanabhebenden Bearbeitung mindestens auf ihre spätere Betriebstemperatur gebracht und während der anschließenden Bearbeitung auf dieser Temperatur gehalten wird.According to the invention, this object is achieved in a surprisingly simple manner Way in that according to the characterizing part of claim 1, the entire trough at least to their later operating temperature before starting the machining brought and kept at this temperature during the subsequent processing will.

Es hat sich gezeigt, daß auf diese Art und WeiseMangelmulden geschaffen werden können, die bei Arbeitstemperatur der Muldenmangeln eine einwandfreie Lagenzuordnung zur Mangelwalze haben und auch beibehalten.It has been shown that deficiency troughs are created in this way that a perfect layer assignment at the working temperature of the flatwork ironers to the ironer roller have and also maintained.

Nach dem Kennzeichen des Anspruchs 2 ist erfindungsgemäß vorgesehen, daß die gesamte Mulde auf 200 0C erwärmt und während ihrer spanabhebenden Bearbeitung auch auf dieser Temperatur gehalten wird.According to the characterizing part of claim 2, the invention provides that the entire trough is heated to 200 0C and during its machining is also kept at this temperature.

Als empfehlenswert hat sich gezeigt, wenn gemäß Anspruch 3 das Heizmedium schon vor Beginn der spanabhebenden Bearbeitung in die Heizschalen und die Dampfrohrleitungen eingefüllt wird.It has been shown to be advisable if, according to claim 3, the heating medium in the heating bowls and the steam pipes even before the machining begins is filled.

Dabei kann entweder nach Anspruch 4 das Heizmedium während der Bearbeitung in den Heizschalen und Dampfrohrleitungen eingeschlossen werden. Es besteht jedoch nach Anspruch 5 auch die Möglichkeit, daß das Heizmedium während der spanabhebenden Bearbeitung deritngelmulde ständig in Durchflußbewegung gehalten wird.In this case, either according to claim 4, the heating medium during processing become trapped in the heating trays and steam pipes. It does exist, however according to claim 5 also the possibility that the heating medium during the machining Processing deritngelmulde is constantly kept in flow movement.

In der einzigen Figur der Zeichnung ist der Aufbau einer Mangelmulde 1 für Muldenmangeln gezeigt. Sie besteht aus einem zu einer Halbschale gebogenen Muldenblech 2 von etwa 15 bis 20 mm Dicke, auf dessen Außenfläche 3 parallel zur Muldenachse verlaufende Heizschalen 4 aufgeschweißt sind. Diese Heizschalen 4 bestehen dabei aus gewölbten Blechstreifen, die sich gegenseitig schuppenartig überlappen, dem Muldenblech 2 eine erhöhte Formstabilität geben und jeweils Durchströmkanäle 5 für das Heizmedium, bspw. Hochdruckdampf, bilden.The only figure in the drawing shows the structure of a mangle trough 1 shown for flatwork ironers. It consists of one bent into a half-shell Trough plate 2 of about 15 to 20 mm thickness, on the outer surface 3 parallel to Trough axis extending heating shells 4 are welded. These heating trays 4 are made made of curved sheet metal strips that overlap each other like scales, give the trough plate 2 increased dimensional stability and each through-flow channels 5 for the heating medium, for example high-pressure steam.

Dieser Dampf kann durch das Zuleitungsrohr 6 mit einer Temperatur von etwa 200°C und einem Betriebsdruck von 16 bar in die Durchströmkanäle 5 der Heizschalen 4 eingeleitet werden, von wo aus er nacheinander sämtliche Durchströmkanäle 5 beaufschlagt, bis er zu dem Durchströmkanal 5 gelangt, welcher mit dem Ableitungsrohr 7 versehen ist.This steam can through the supply pipe 6 with a temperature of about 200 ° C and an operating pressure of 16 bar in the flow channels 5 of the Heating shells 4 are initiated, from where he successively all through-flow channels 5 is applied until it reaches the throughflow channel 5, which with the discharge pipe 7 is provided.

Zur weiteren Versteifung der Mangelmulde 1 dienen noch eine Reihe von stegartigen Verstärkungselementen 8, die sich quer zur Längsachse der Mangelmulde 1 erstrecken und an ihrem einen Rand eine den Heizschalen 4 angepaßte Kontur haben. Diese Verstärkungselemente 8 sind dabei mit den einzelnen Heizschalen 4 mindestens durch Schweißpunkte verbunden und dienen auf diese Art und Weise zur Stabilisierung der Biegeform des Muldenbleches 2.A row is used to further reinforce the ironer trough 1 of web-like reinforcing elements 8, which extend transversely to the longitudinal axis of the ironer trough 1 and have a contour adapted to the heating bowls 4 at one edge. These reinforcing elements 8 are at least with the individual heating shells 4 connected by welding points and serve in this way for stabilization the bending shape of the trough plate 2.

Nachdem zunächst die Heizschalen 4, die Verstärkungselemente 8 und die Damfprohrleitungen 6 und 7 mit dem Muldenblech 2 verschweißtworden##ind, wird die gesamte Mangelmulde 1 spannungsarm geglüht.After first the heating shells 4, the reinforcing elements 8 and the steam pipes 6 and 7 with the trough plate 2 welded ## ind, the entire ironer trough 1 is annealed to relieve stress.

Bevor dann die konkav gewölbte Innenfläche des Muldenbleches 2 durch Ausdrehen und/oder Aus schleifen einer spanabhebenden Endbearbeitung unterzogen wird, wird die gesamte Mangelmulde 1 mindestens auf ihre spätere Betriebstemperatur also auf eine Temperatur von ca. 2000C #rbitzt und anschließend d.h., während der Dauer der spanabhebenden Bearbeitung auf dieser Temperatur gehalten.Before then the concavely curved inner surface of the trough plate 2 through Boring and / or grinding subjected to a final machining process is, the entire ironer trough 1 is at least to its later operating temperature So to a temperature of approx. 2000C #rbitzt and then that is, during the Maintained the duration of the machining at this temperature.

Am zweckmäßigsten ist es, die zu bearbeitende Abngelmulde 1 in die Bearbeitungsmaschine einzuspannen und dann mit genügendem Zeitabstand vor Beginn des Bearbeitungsvorgangs das Heizmedium in die Dampfrohrleitungen 6 und 7 und die Heizschalen 5 einzufüllen. Während des Bearbeitungsvorgangs kann dann das Heizmedium in den Heizschalen 5 sowie den Dampfrohrleitungen 6 und 7 eingeschlossen werden, sich also im Ruhezustand befinden.It is most useful to edit the Abngelmulde 1 in the Clamp the processing machine and then with a sufficient time interval before the start the machining process, the heating medium in the steam pipes 6 and 7 and the Fill heating trays 5. The heating medium can then be used during the machining process are enclosed in the heating trays 5 and the steam pipes 6 and 7, are therefore in the idle state.

Besonders zu empfehlen ist es jedoch, wenn das Heizmedium während der spanabhebenden Bearbeitung ständig in Durchflußbewegung gehalten wird, so daß über die Dauer des Bearbeitungsvorgangs die gleichen Bedingungen vorherrschen, die später im praktischen Gebrauch, also bei in die Muldenmangel eingesetzter Bügelmulde 1 auftreten.It is particularly recommended, however, if the heating medium is used during the machining is constantly kept in flow motion, so that the same conditions prevail over the duration of the processing operation that later in practical use, i.e. when the ironing recess is inserted into the ironer 1 occur.

Es hat sich gezeigt, daß auf die vorstehend erläuterte Art und Weis Mangelmulden geschaffen werden können, die den späteren Arbeitsbedingungen in einer Muldenmangel optimal Rechnung tragen und dadurch einen dauerhaft einwandfreien Betrieb der Muldenmangeln gewährleisten.It has been shown that in the manner explained above Deficiency troughs can be created, which later work in a Optimally take account of the lack of troughs and thereby ensure long-term, flawless operation of the flatwork ironers.

- Leerseite -- blank page -

Claims (5)

Patentansprüche 1. Verfahren zum Herstellen einer M#gelmulde für Muldenmangeln, insbesondere Großmuldenmangeln mit einem Mangelwalzendurchmesser von mindestens 400 mm, bei welchem zunächst das Muldenblech zu einer Halbschale gebogen und dann mit einer großen Anzahl von in Längsrichtung parallel verlaufenden Heizschalen verschweißt wird, bei welchem daran anschließend die Heizschalen mit Verstärkungselementen und Dampfrohrleitungen verschweißt werden, woraufhin danndie gesamte Bügelmulde spannungs arm geglüht sowie schließlich die Muldeninnenflächen spanabhebend bearbeitet, z.B. ausgedreht und/oder ausgeschliffen, wird, dadurch gekennzeichnet, daß die gesamte Mangelmulde (1) vor Beginn der spanabhebenden Bearbeitung mindestens auf ihre spätere Betriebstemperatur erhitzt und während der anschließenden Bearbeitung auf dieser Temperatur gehalten wird.Claims 1. A method for producing a M # gel trough for flat ironers, in particular large bowl ironers with an ironer roller diameter of at least 400 mm, in which the trough sheet is first bent into a half-shell and then welded to a large number of parallel heating shells in the longitudinal direction is, in which then the heating shells with reinforcing elements and Steam pipes are welded, whereupon the entire bracket trough is tensioned poorly annealed and finally machined the inner surface of the trough, e.g. turned and / or ground, is characterized in that the entire Defect trough (1) before the start of machining, at least to its later Operating temperature heated and during the subsequent processing on this Temperature is maintained. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die gesamte Mmngelaulde auf 2000C erwärmt und während der spanabhebenden Bearbeitung ihrer Muldeninnenfläche auf dieser Temperatur gehalten wird.2. The method according to claim 1, characterized in that the entire Mmngelaulde heated to 2000C and during the machining of its inner surface is kept at this temperature. 3. Verfahren nach einem der Ansprüche 1 und 2, dadurch gekennzeichnet, daß das Heizmedium vor Beginn der spanabhebenden Bearbeitung in die Heizschalen (5) und die Dampfrohrleitungen (6, 7) eingefüllt wird.3. The method according to any one of claims 1 and 2, characterized in that that the heating medium in the heating shells before the start of machining (5) and the steam pipes (6, 7) is filled. 4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß das Heizmedium während der spanabhebenden Bearbeitung der Muldeninnenfläche in den Heizschalen (5) und Dampfrohrleitungen (6, 7) eingeschlossen wird.4. The method according to any one of claims 1 to 3, characterized in that that the heating medium during the machining of the inner surface of the trough is enclosed in the heating trays (5) and steam pipes (6, 7). 5. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß das Heizmedium während der spanabhebenden Bearbeitung in den Heizschalen (5) und Dampfrohrleitungen (6, 7) ständig in Durchflußbewegung gehalten wird.5. The method according to any one of claims 1 to 3, characterized in, that the heating medium during the machining process in the heating shells (5) and steam pipes (6, 7) are kept constantly in flow movement.
DE19853519623 1985-05-31 1985-05-31 Process for producing a mangle bowl for bowl mangles Granted DE3519623A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19853519623 DE3519623A1 (en) 1985-05-31 1985-05-31 Process for producing a mangle bowl for bowl mangles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19853519623 DE3519623A1 (en) 1985-05-31 1985-05-31 Process for producing a mangle bowl for bowl mangles

Publications (2)

Publication Number Publication Date
DE3519623A1 true DE3519623A1 (en) 1986-12-04
DE3519623C2 DE3519623C2 (en) 1992-12-17

Family

ID=6272154

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19853519623 Granted DE3519623A1 (en) 1985-05-31 1985-05-31 Process for producing a mangle bowl for bowl mangles

Country Status (1)

Country Link
DE (1) DE3519623A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8905552U1 (en) * 1989-05-03 1989-06-22 Herbert Kannegiesser Gmbh + Co, 4973 Vlotho Ironing trough for trough ironers
EP0384543A1 (en) * 1989-02-23 1990-08-29 Jensen Holding Ag Apparatus for ironing laundry

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1211122B (en) * 1963-10-29 1966-02-24 Waescherei Guenther Flexible ironer tray for a laundry ironer
DE8031711U1 (en) * 1980-11-28 1981-03-26 Übach Apparatebau GmbH, 57258 Freudenberg Ironing trough for flatwork ironers
DE8330073U1 (en) * 1983-10-19 1984-01-26 Übach Apparatebau GmbH, 5905 Freudenberg Ironing trough for flatwork ironers

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1211122B (en) * 1963-10-29 1966-02-24 Waescherei Guenther Flexible ironer tray for a laundry ironer
DE8031711U1 (en) * 1980-11-28 1981-03-26 Übach Apparatebau GmbH, 57258 Freudenberg Ironing trough for flatwork ironers
DE8330073U1 (en) * 1983-10-19 1984-01-26 Übach Apparatebau GmbH, 5905 Freudenberg Ironing trough for flatwork ironers

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0384543A1 (en) * 1989-02-23 1990-08-29 Jensen Holding Ag Apparatus for ironing laundry
US5022169A (en) * 1989-02-23 1991-06-11 Jensen Holding Ag Apparatus for ironing laundry
DE8905552U1 (en) * 1989-05-03 1989-06-22 Herbert Kannegiesser Gmbh + Co, 4973 Vlotho Ironing trough for trough ironers

Also Published As

Publication number Publication date
DE3519623C2 (en) 1992-12-17

Similar Documents

Publication Publication Date Title
DE3850364T2 (en) Heat pipe and manufacturing method.
AT390975B (en) DEVICE WITH A WORKTOP HEATED WITH A HEAT MEDIUM
DE2546444A1 (en) HEAT TRANSITION WALL FOR BOILING LIQUIDS
DE2750456B1 (en) Spinning rotor for OE rotor spinning machine
DE2202424A1 (en) Roller that can be used when working at high temperatures
DE4443598C2 (en) Process for producing a press jacket
DE3519623A1 (en) Process for producing a mangle bowl for bowl mangles
EP0024520B1 (en) Process for producing thermally insulated composite profiles
DE2646450C3 (en) Multi-spot welding machine for the production of gratings
DE2615460C2 (en) Method of joining webs
CH648402A5 (en) HEAT EXCHANGER.
DE2104183C3 (en) Heat transfer device
EP1006236B1 (en) Heated calander roller
DE2757579C3 (en) Drying cylinder of a paper machine
CH650587A5 (en) METHOD AND DEVICE FOR THE DRAINAGE OF A WATER-PERMEABLE CONVEYOR BELT AND A LAYER OF WATER-CONTAINING MATERIAL.
DE2552854A1 (en) METHOD AND DEVICE FOR HOT PRESSING PLATES OF SPAIN OR FIBERS OF WOOD OR OTHER LIGNOCELLULOSE-CONTAINING MATERIAL
EP0715910B1 (en) Connection for sheet-metal edges and apparatus therefore
CH673421A5 (en) Heating radiator production method - presses flat tubes inwards at curved edges for pressure-welding to manifolds
DE2548185A1 (en) PROCESS FOR REMOVING EXCESS LIQUID IMPREEGNANT FROM A RELATIVELY THICK FIBER MAT
CH654864A5 (en) HEAT DISCHARGE.
DE2106568C3 (en) Standing, steam-heated formwork wall for the factory prefabrication of large concrete components
DE2366292C2 (en) Process for the production of a heat pipe with capillary grooves
DE103899C (en)
DE3433271A1 (en) METHOD AND DAMPER FOR TREATING FABRIC RAILS
DE55393C (en) Rolled plate for making the thread of wood screws

Legal Events

Date Code Title Description
8127 New person/name/address of the applicant

Owner name: HADEM, WALDEMAR, 5900 SIEGEN, DE

8110 Request for examination paragraph 44
D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee